zE l>hQ =@@C:~+m~|1!*c@@:&@%| @@<QZ|7@@_<^_~|@@[<搾'|7@@_<.b|7@@_<.b|7@@_<.b@@@@A7 dFTTN@@@@@}92Wc.+RwKWm z@Q8X@ zffff`` L @@@pbHPT_DD_IGDS:FONTLIB. ~B,="V>#W BVHC M@R- M@R- M@R- M@R- M@R- M@R- M@R- M@R- @@ @@!'8 f BVH@@@@`AHCHHHHHHHH HHHHH@@@@@@@K JBCC' BB{ Cable / Tele }BcToT???? @ @@@@@@@@IA@@@V@$@CBF8cTsLBxjcTeR????{Gz???333333?'8  f?B8*cTD3Y@??$@f@???V@  @@@@A????@???@@@@@@@BcTxTB3TnDj@j@j@j@($@j@$@$@$@$@??@?? ??B. cTpM ? d?@`@?j@@L@ Ԃ?0@-C6*?@|a6@  ???333333?333333?333333???<Y pb p wZ"(h(h7"a3' be initiated as soon as practicable. 7"7WL((h(h7" Q7":CPC(h(h7"bj10.The following records should be maintained and made available to the TCEQ upon request: the dates whenT7"R!AXF(h(h7"#p major grading activities occur; the dates when construction activities temporarily or permanently cease on a D7"frJk6(h(h7"P portion of the site; and the dates when stabilization measures are initiated.7" 7WLH(h(h7"O) T7"R?F(h(h7"p11.The holder of any approved Contributing Zone plan must notify the appropriate regional office in writing and H7"(9L]t:(h(h7"{XX obtain approval from the executive director prior to initiating any of the following:7"7WL N(h(h7" U7"ThRG(h(h7"r A. any physical or operational modification of any best management practices or structure(s), including but notO7"O6}A(h(h7"=e limited to temporary or permanent ponds, dams, berms, silt fences, and diversionary structures;u7"7WL(h(h7"Ӷ S7"/QbE(h(h7"iNn B. any change in the nature or character of the regulated activity from that which was originally approved;7"7WLC(h(h7" R7"B^QSD(h(h7"}l C. any change that would significantly impact the ability to prevent pollution of the Edwards Aquifer and47"B$s&(h(h7"+0 hydrologically connected surface water; or7"n7WL (h(h7" L7"%N&P>(h(h7"WD_ D. any development of land previously identified in a contributing zone plan as undeveloped.s7"79(h(h7" !6'S[<Jv)(h(h6'駁V6'IR<H(h(h6'CisThe following TCEQ requirements (Form TNRCC-0592, Rev. 5/01/02) are applicable to all work in recharge zones of theR6'P^D(h(h6'lEdwards Aquifer in Hays, Travis and/or Williamson Counties and must be adhered to by the Contractor and all $6'y:<=h(h(h6'osubcontractors: 6'6(h(h6'0 U6'HR"%G(h(h6'q1. Written construction notification must be given to the appropriate TCEQ regional office no later than 48 hourshS6'?Qe_*E(h(h6'1_n prior to commencement of the regulated activity. Information must include the date on which the regulated T6'tQTF(h(h6'o activity will commence, the name of the approved plan for the regulated activity, and the name of the prime r@6' oG0V2(h(h6']G contractor and the name and telephone number of the contact person. t6'6(h(h6'% W6'6SdI(h(h6'u2. All contractors conducting regulated activities associated with this project must be provided with complete copiesT6'5QF(h(h6'Uo of the approved Water Pollution Abatement Plan and the TCEQ letter indicating the specific conditions of itscW6'bSJI(h(h6'u approval. During the course of these regulated activities, the contractors are required to keep on-site copies of16'd@$D#(h(h6'K) the approved plan and approval letter.r6'6y(h(h6' U6'$ReapG(h(h6'wr3. If any sensitive feature is discovered during construction, all regulated activities near the sensitive featureV6'+R0H(h(h6' Kt must be suspended immediately. The appropriate TCEQ regional office must be immediately notified of any sensitiveU6'PR5%@G(h(h6'q features encountered during construction. The regulated activities near the sensitive feature may not proceediQ6'ZPq32C(h(h6'9zi until the TCEQ has reviewed and approved the methods proposed to protect the sensitive feature and the A6'|H:So3(h(h6'I Edwards Aquifer from any potentially adverse impacts to water quality.c6'6^(h(h6'e R6'!PD(h(h6'@k4. No temporary aboveground hydrocarbon and hazardous substance storage tank system is installed within 150rP6'>O6B(h(h6'g feet of a domestic, industrial, irrigation, or public water supply well, or other sensitive feature. 6'P6 (h(h6''p T6'jQeF(h(h6'p5. Prior to commencement of construction, all temporary erosion and sedimentation (E&S) control measures must beR6'PbLD(h(h6'Sl properly selected, installed, and maintained in accordance with the manufacturers specifications and goodU6'R^cG(h(h6'6r engineering practices. Controls specified in the temporary storm water section of the approved Edwards AquiferW6',SAx,I(h(h6'v Protection Plan are required during construction. If inspections indicate a control has been used inappropriately,V6'FRH(h(h6'fs or incorrectly, the applicant must ensure that the contractor replace or modify the control for site situations.lT6'XQ [F(h(h6'p The controls must remain in place until disturbed areas are revegetated and the areas have become permanently$6'u:HN:(h(h6'A stabilized. 6' 6Њ(h(h6', T6'Qjf"F(h(h6'mo6. If sediment escapes the construction site, off-site accumulations of sediment must be removed at a frequencyyT6'<QF(h(h6'\p sufficient to minimize offsite impacts to water quality (e.g., fugitive sediment in street being washed into :6'FDQ,(h(h6'; surface streams or sensitive features by the next rain).(6'k6((h(h6'/ V6'rRH(h(h6'"t7. Sediment must be removed from sediment traps or sedimentation ponds not later than when design capacity has been P6'OTB(h(h6'[g reduced by 50%. A permanent stake must be provided that can indicate when the sediment occupies 50%i(6'2(h(h6'D_ significantly impact the ability of the plan to prevent pollution of the Edwards Aquifer;n6'6@:(h(h6'G U6'TRGG(h(h6'sr C. any development of land previously identified as undeveloped in the original water pollution abatement plan.6' 7%li(h(h6's  6'6(h(h6'  #Zzȗ\aZzҫ TCEQ-03.dgn #Z D\VE5aZX TCEQ-03.dgn