﻿<?xml version="1.0" encoding="utf-8"?><Report xsi:schemaLocation="ProjectTracker_XLS http://txdot4avdbstd01/ReportServer?%2FProject%20Tracker%20Reports%2FProjectTracker_XLS&amp;rs%3ACommand=Render&amp;rs%3AFormat=XML&amp;rc%3ASchema=True" Name="ProjectTracker_XLS" Textbox154="Report Date 6/12/2025 12:32:30 AM" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="ProjectTracker_XLS"><table1><Detail_Collection><Detail CSJ_NBR="000101062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT PA 2401/DONIPHAN DR/N MESA ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="536118" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/25/2019" PSE_30_ACTL_DT="8/28/2019" PSE_60_TRGT_DT="12/3/2019" PSE_60_ACTL_DT="11/26/2019" PSE_100_TRGT_DT="6/23/2020" PSE_100_ACTL_DT="1/29/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="10/23/2023" CNSTR_PCT_TIME_USED="105.88" CNSTR_PCT_COMPLETE="87.35" DSGN_START_TRGT_DT="4/11/2019" DSGN_START_ACTL_DT="4/11/2019" ENVCLR_TRGT_DT="6/24/2020" ENVCLR_ACTL_DT="7/16/2020" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="4/2/2021" ROW_TRGT_DT="6/4/2020" ROW_ACTL_DT="4/2/2020" RTL_TRGT_DT="7/13/2020" RTL_ACTL_DT="4/5/2021" PE_SPENT_AMT="757091.44" CNSTR_SPENT_AMT="295703.78" CE_SPENT_AMT="59705.15" TOT_SPENT_AMT="1112500.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="353273.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101063" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.598 MI N OF SH 178" LIMITS_TO_DSCR="0.553 MI N OF PA 2401" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="221390" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="8/3/2020" PSE_60_ACTL_DT="7/30/2020" PSE_100_TRGT_DT="2/24/2021" PSE_100_ACTL_DT="4/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="HAWK CONSTRUCTION" CNSTR_NTPD_DT="3/11/2022" CNSTR_WKBG_DT="4/25/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.22" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="4/29/2021" UTIL_TRGT_DT="6/5/2020" UTIL_ACTL_DT="7/30/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="1/25/2021" RTL_TRGT_DT="3/15/2021" RTL_ACTL_DT="5/5/2021" PE_SPENT_AMT="77549.32" CNSTR_SPENT_AMT="211467.89" CE_SPENT_AMT="15890.45" TOT_SPENT_AMT="304907.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="880769.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101066" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.598 MI N OF SH 178" LIMITS_TO_DSCR="0.753 MI N OF PA 2401" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2212271" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="8/3/2020" PSE_60_ACTL_DT="7/30/2020" PSE_100_TRGT_DT="2/24/2021" PSE_100_ACTL_DT="4/12/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.584 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="HAWK CONSTRUCTION" CNSTR_NTPD_DT="3/11/2022" CNSTR_WKBG_DT="4/25/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.22" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="4/29/2021" UTIL_TRGT_DT="6/5/2020" UTIL_ACTL_DT="7/30/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="1/25/2021" RTL_TRGT_DT="3/15/2021" RTL_ACTL_DT="5/5/2021" PE_SPENT_AMT="613418.78" CNSTR_SPENT_AMT="2288258.09" CE_SPENT_AMT="176155.06" TOT_SPENT_AMT="3077831.93" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="3175000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101067" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101069" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="NM/TX STATELINE" LIMITS_TO_DSCR="SH 178" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3437500" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/3/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/3/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/4/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/10/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/18/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/10/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="238889.78" TOT_SPENT_AMT="238889.78" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="3437500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101071" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="LINDBERGH AVE" LIMITS_TO_DSCR="MESA ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19295" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/3/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/11/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="CENTERLINE TECHNOLOGIES, LLC" CNSTR_NTPD_DT="3/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="2/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/24/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/9/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101072" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT MONTOYA RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="39190" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/6/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/31/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/26/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/21/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="62.81" TOT_SPENT_AMT="62.81" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="39190.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/2/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101074" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="NEW MEXICO STATE LINE" LIMITS_TO_DSCR="COUNTRY CLUB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18449869" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="400333.61" TOT_SPENT_AMT="400333.61" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101075" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="TEXAS/NEW MEXICO STATE LINE" LIMITS_TO_DSCR="MESA ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="385859" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="416728.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000101076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SUNLAND PARK DRIVE" LIMITS_TO_DSCR="BALTIMORE DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11138603" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="4/11/2018" PSE_30_ACTL_DT="3/27/2018" PSE_60_TRGT_DT="6/7/2018" PSE_60_ACTL_DT="6/5/2018" PSE_100_TRGT_DT="8/31/2018" PSE_100_ACTL_DT="9/10/2019" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.029 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="J. A. R. CONCRETE, INC." CNSTR_NTPD_DT="12/30/2019" CNSTR_WKBG_DT="4/13/2020" CNSTR_PCT_TIME_USED="108.29" CNSTR_PCT_COMPLETE="89.07" DSGN_START_TRGT_DT="11/1/2017" DSGN_START_ACTL_DT="11/1/2017" ENVCLR_TRGT_DT="7/16/2018" ENVCLR_ACTL_DT="8/14/2019" UTIL_TRGT_DT="7/9/2018" UTIL_ACTL_DT="3/15/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/25/2018" RTL_ACTL_DT="9/26/2019" PE_SPENT_AMT="554557.84" CNSTR_SPENT_AMT="9779368.13" CE_SPENT_AMT="726497.59" TOT_SPENT_AMT="11060423.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="12500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102063" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT RESLER DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="420004" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/25/2019" PSE_30_ACTL_DT="8/28/2019" PSE_60_TRGT_DT="12/3/2019" PSE_60_ACTL_DT="11/26/2019" PSE_100_TRGT_DT="6/23/2020" PSE_100_ACTL_DT="1/29/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="10/23/2023" CNSTR_PCT_TIME_USED="105.88" CNSTR_PCT_COMPLETE="87.35" DSGN_START_TRGT_DT="4/11/2019" DSGN_START_ACTL_DT="4/11/2019" ENVCLR_TRGT_DT="6/24/2020" ENVCLR_ACTL_DT="7/16/2020" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="4/2/2021" ROW_TRGT_DT="6/4/2020" ROW_ACTL_DT="4/2/2020" RTL_TRGT_DT="7/13/2020" RTL_ACTL_DT="4/5/2021" PE_SPENT_AMT="4012.97" CNSTR_SPENT_AMT="437987.84" CE_SPENT_AMT="48112.45" TOT_SPENT_AMT="490113.26" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="376889.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102064" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT CAMILLE DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="335177" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/25/2019" PSE_30_ACTL_DT="8/28/2019" PSE_60_TRGT_DT="12/3/2019" PSE_60_ACTL_DT="11/26/2019" PSE_100_TRGT_DT="6/23/2020" PSE_100_ACTL_DT="1/29/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="10/23/2023" CNSTR_PCT_TIME_USED="105.88" CNSTR_PCT_COMPLETE="87.35" DSGN_START_TRGT_DT="4/11/2019" DSGN_START_ACTL_DT="4/11/2019" ENVCLR_TRGT_DT="6/24/2020" ENVCLR_ACTL_DT="7/16/2020" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="4/2/2021" ROW_TRGT_DT="6/4/2020" ROW_ACTL_DT="4/2/2020" RTL_TRGT_DT="7/13/2020" RTL_ACTL_DT="4/5/2021" PE_SPENT_AMT="111.48" CNSTR_SPENT_AMT="328916.43" CE_SPENT_AMT="38809.03" TOT_SPENT_AMT="367836.94" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="206903.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="DONIPHAN DRIVE" LIMITS_TO_DSCR="SUNLAND PARK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11093875" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="9/22/2021" PSE_30_ACTL_DT="11/21/2022" PSE_60_TRGT_DT="1/12/2022" PSE_60_ACTL_DT="11/29/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="3/27/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="INTERNATIONAL EAGLE ENTERPRISES, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="9/11/2023" CNSTR_PCT_TIME_USED="66.39" CNSTR_PCT_COMPLETE="95.15" DSGN_START_TRGT_DT="3/2/2021" DSGN_START_ACTL_DT="7/19/2022" ENVCLR_TRGT_DT="7/27/2022" ENVCLR_ACTL_DT="4/7/2023" UTIL_TRGT_DT="11/17/2021" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="6/10/2022" ROW_ACTL_DT="4/4/2023" RTL_TRGT_DT="7/27/2022" RTL_ACTL_DT="4/6/2023" PE_SPENT_AMT="739494.11" CNSTR_SPENT_AMT="11454548.90" CE_SPENT_AMT="896418.63" TOT_SPENT_AMT="13090461.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="10972500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102068" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="BALTIMORE ST" LIMITS_TO_DSCR="CINCINNATI AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79853" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="9/22/2021" PSE_30_ACTL_DT="11/21/2022" PSE_60_TRGT_DT="1/12/2022" PSE_60_ACTL_DT="11/29/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="3/27/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="INTERNATIONAL EAGLE ENTERPRISES, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="9/11/2023" CNSTR_PCT_TIME_USED="66.39" CNSTR_PCT_COMPLETE="95.15" DSGN_START_TRGT_DT="3/2/2021" DSGN_START_ACTL_DT="7/19/2022" ENVCLR_TRGT_DT="7/27/2022" ENVCLR_ACTL_DT="4/7/2023" UTIL_TRGT_DT="11/17/2021" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="6/10/2022" ROW_ACTL_DT="4/4/2023" RTL_TRGT_DT="7/27/2022" RTL_ACTL_DT="4/6/2023" PE_SPENT_AMT="16.70" CNSTR_SPENT_AMT="92092.98" CE_SPENT_AMT="7207.32" TOT_SPENT_AMT="99317.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="142511.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102073" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102076" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="DONIPHAN" LIMITS_TO_DSCR="IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="576149" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/4/2022" PSE_30_ACTL_DT="5/25/2022" PSE_60_TRGT_DT="2/7/2023" PSE_60_ACTL_DT="9/1/2022" PSE_100_TRGT_DT="8/29/2023" PSE_100_ACTL_DT="3/23/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="MARTINEZ BROS. CONTRACTORS, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="9/25/2023" CNSTR_PCT_TIME_USED="95.67" CNSTR_PCT_COMPLETE="99.76" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="10/17/2023" ENVCLR_ACTL_DT="10/7/2022" UTIL_TRGT_DT="3/20/2023" UTIL_ACTL_DT="4/27/2023" ROW_TRGT_DT="8/11/2023" ROW_ACTL_DT="4/27/2023" RTL_TRGT_DT="10/17/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="261616.88" CNSTR_SPENT_AMT="499205.58" CE_SPENT_AMT="97751.10" TOT_SPENT_AMT="858573.56" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102077" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SUNLAND PARK DR" LIMITS_TO_DSCR="CASTELLANO DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1244414" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/4/2022" PSE_30_ACTL_DT="5/25/2022" PSE_60_TRGT_DT="2/7/2023" PSE_60_ACTL_DT="9/1/2022" PSE_100_TRGT_DT="8/29/2023" PSE_100_ACTL_DT="3/23/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="MARTINEZ BROS. CONTRACTORS, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="9/25/2023" CNSTR_PCT_TIME_USED="95.67" CNSTR_PCT_COMPLETE="99.76" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="10/17/2023" ENVCLR_ACTL_DT="10/7/2022" UTIL_TRGT_DT="3/20/2023" UTIL_ACTL_DT="4/27/2023" ROW_TRGT_DT="8/11/2023" ROW_ACTL_DT="4/27/2023" RTL_TRGT_DT="10/17/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="73.59" CNSTR_SPENT_AMT="1513514.97" CE_SPENT_AMT="296366.23" TOT_SPENT_AMT="1809954.79" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102078" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="CASTELLANO DR" LIMITS_TO_DSCR="BALTIMORE DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1249532" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/4/2022" PSE_30_ACTL_DT="5/25/2022" PSE_60_TRGT_DT="2/7/2023" PSE_60_ACTL_DT="9/1/2022" PSE_100_TRGT_DT="8/29/2023" PSE_100_ACTL_DT="3/23/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="MARTINEZ BROS. CONTRACTORS, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="9/25/2023" CNSTR_PCT_TIME_USED="95.67" CNSTR_PCT_COMPLETE="99.76" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="10/17/2023" ENVCLR_ACTL_DT="10/7/2022" UTIL_TRGT_DT="3/20/2023" UTIL_ACTL_DT="4/27/2023" ROW_TRGT_DT="8/11/2023" ROW_ACTL_DT="4/27/2023" RTL_TRGT_DT="10/17/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="36.79" CNSTR_SPENT_AMT="1520227.58" CE_SPENT_AMT="297745.05" TOT_SPENT_AMT="1818009.42" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102079" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="SUNLAND PARK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1587999" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4923.86" CE_SPENT_AMT="1852.92" TOT_SPENT_AMT="6776.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000102080" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="BRENTWOOD AVE" LIMITS_TO_DSCR="GLORY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="326240" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000103057" PT_PHASE="Feasibility Studies" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SH 20 (MESA ST)" LIMITS_TO_DSCR="SHAFFER RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="9/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Corridor Planning Management" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="34.900 (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7454480.73" CE_SPENT_AMT="2027.72" TOT_SPENT_AMT="7456508.45" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000103060" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="CINCINNATI AVE" LIMITS_TO_DSCR="E YANCELL DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1227957" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="9/22/2021" PSE_30_ACTL_DT="11/21/2022" PSE_60_TRGT_DT="1/12/2022" PSE_60_ACTL_DT="11/29/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="3/27/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="INTERNATIONAL EAGLE ENTERPRISES, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="9/11/2023" CNSTR_PCT_TIME_USED="66.39" CNSTR_PCT_COMPLETE="95.15" DSGN_START_TRGT_DT="3/2/2021" DSGN_START_ACTL_DT="7/19/2022" ENVCLR_TRGT_DT="7/27/2022" ENVCLR_ACTL_DT="4/7/2023" UTIL_TRGT_DT="11/17/2021" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="6/10/2022" ROW_ACTL_DT="4/4/2023" RTL_TRGT_DT="7/27/2022" RTL_ACTL_DT="4/6/2023" PE_SPENT_AMT="4431.63" CNSTR_SPENT_AMT="1424198.27" CE_SPENT_AMT="111456.19" TOT_SPENT_AMT="1540086.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2840250.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000103063" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT GATEWAY N" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27794" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="3/4/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/4/2025" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/3/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/19/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/7/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20001.22" TOT_SPENT_AMT="20001.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="28906.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104100" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 85" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.2 MI W OF COLDWELL ST" LIMITS_TO_DSCR="SANTA FE ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/3/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/3/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/4/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/10/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/18/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/10/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16.70" TOT_SPENT_AMT="16.70" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="2500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104102" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="TOBIN PL" LIMITS_TO_DSCR="VAL VERDE ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="969589" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="MARTINEZ BROS. CONTRACTORS, LLC" CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="111.76" CNSTR_PCT_COMPLETE="111.73" DSGN_START_TRGT_DT="5/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/2/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/21/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/9/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/2/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="259214.85" CNSTR_SPENT_AMT="1110110.01" CE_SPENT_AMT="95862.83" TOT_SPENT_AMT="1465187.69" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104104" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="US 54 NB FRONTANCE ROAD" LIMITS_TO_DSCR="BARCELONA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2345039" DIST_LET_DATE="3/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/3/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/7/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/7/2027" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/25/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/21/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/11/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/25/2027" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="CAMPBELL" LIMITS_TO_DSCR="0.26 MI W OF COPIA ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4281696" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/6/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/5/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/5/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/21/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/12/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/5/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="46508.66" TOT_SPENT_AMT="46508.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="4624232.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104106" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="STANTON ST" LIMITS_TO_DSCR="CONCEPCION ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="323097" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="348945.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104107" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 85" CNTY_NM="El Paso" LIMITS_FROM_DSCR="S SANTA FE ST" LIMITS_TO_DSCR="STANTON ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="107699" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="116315.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104109" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="S COLDWELL ST" LIMITS_TO_DSCR="S SANTA FE ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1629007" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1759328.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104110" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 85" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT EXECUTIVE BLVD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="646110" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="697799.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104111" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 85" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.1 MI S OF EXECUTIVE" LIMITS_TO_DSCR="CHIHUAHUA ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6880146" DIST_LET_DATE="2/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104112" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 85" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.246 MI E OF SPUR 1966" LIMITS_TO_DSCR="COLDWELL STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="961538" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28369.22" TOT_SPENT_AMT="28369.22" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104114" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104115" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000104116" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000105018" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 259" CNTY_NM="El Paso" LIMITS_FROM_DSCR="GILLETT RD" LIMITS_TO_DSCR="JCT SH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1111111" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="2/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/22/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.758 (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/4/2017" DSGN_START_ACTL_DT="12/4/2017" ENVCLR_TRGT_DT="8/14/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/8/2018" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/29/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/26/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="480941.03" CE_SPENT_AMT="4321.19" TOT_SPENT_AMT="485262.22" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000105020" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 259" CNTY_NM="El Paso" LIMITS_FROM_DSCR="GILLETT RD" LIMITS_TO_DSCR="JCT SH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3625722" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="2/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/22/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.758 (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/4/2017" DSGN_START_ACTL_DT="12/4/2017" ENVCLR_TRGT_DT="8/14/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/8/2018" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/29/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/26/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="143163.15" TOT_SPENT_AMT="143163.15" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3915780.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000201099" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.085 MI S OF FM 76" LIMITS_TO_DSCR="0.17 MI W OF COLINA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="767350" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/13/2020" PSE_30_ACTL_DT="10/29/2020" PSE_60_TRGT_DT="10/13/2020" PSE_60_ACTL_DT="10/29/2020" PSE_100_TRGT_DT="2/15/2021" PSE_100_ACTL_DT="3/12/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.612 (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="INTERNATIONAL EAGLE ENTERPRISES, INC." CNSTR_NTPD_DT="7/22/2021" CNSTR_WKBG_DT="1/28/2022" CNSTR_PCT_TIME_USED="98.62" CNSTR_PCT_COMPLETE="100.65" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="3/16/2021" ENVCLR_ACTL_DT="3/30/2021" UTIL_TRGT_DT="12/31/2020" UTIL_ACTL_DT="3/11/2021" ROW_TRGT_DT="1/28/2021" ROW_ACTL_DT="3/11/2021" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="4/2/2021" PE_SPENT_AMT="588236.12" CNSTR_SPENT_AMT="711966.08" CE_SPENT_AMT="98236.85" TOT_SPENT_AMT="1398439.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1804304.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000201104" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000201105" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000201108" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="GLENWOOD" LIMITS_TO_DSCR="PRESA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8421430" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="9/12/2024" CNSTR_PCT_TIME_USED="76.39" CNSTR_PCT_COMPLETE="92.85" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/17/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/10/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="683719.51" CNSTR_SPENT_AMT="8296060.72" CE_SPENT_AMT="168066.20" TOT_SPENT_AMT="9147846.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="11439066.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.25 MI S OF SL 375" LIMITS_TO_DSCR="2.256 MI S OF SL 375" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1795081" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="5/5/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="7/8/2020" PSE_60_ACTL_DT="7/2/2020" PSE_100_TRGT_DT="11/17/2020" PSE_100_ACTL_DT="1/28/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.013 (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="125.00" CNSTR_PCT_COMPLETE="99.36" DSGN_START_TRGT_DT="2/3/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="12/7/2020" ENVCLR_ACTL_DT="9/29/2020" UTIL_TRGT_DT="10/29/2020" UTIL_ACTL_DT="3/5/2021" ROW_TRGT_DT="10/15/2020" ROW_ACTL_DT="3/5/2021" RTL_TRGT_DT="1/18/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="747146.08" CNSTR_SPENT_AMT="2699851.70" CE_SPENT_AMT="167717.23" TOT_SPENT_AMT="3614715.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202056" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.15 MI E OF SL 375" LIMITS_TO_DSCR="1.27 MI E OF SL 375" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="420180" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/5/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="7/8/2020" PSE_60_ACTL_DT="7/2/2020" PSE_100_TRGT_DT="11/17/2020" PSE_100_ACTL_DT="1/28/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.120 (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="125.00" CNSTR_PCT_COMPLETE="99.36" DSGN_START_TRGT_DT="2/3/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="12/7/2020" ENVCLR_ACTL_DT="9/29/2020" UTIL_TRGT_DT="10/29/2020" UTIL_ACTL_DT="3/5/2021" ROW_TRGT_DT="10/15/2020" ROW_ACTL_DT="3/5/2021" RTL_TRGT_DT="1/18/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="13235.50" CNSTR_SPENT_AMT="502661.26" CE_SPENT_AMT="2179.11" TOT_SPENT_AMT="518075.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="369397.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="0.331 MI S OF SL 375" LIMITS_TO_DSCR="2.256 MI S OF SL 375" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="391337" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/5/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="7/8/2020" PSE_60_ACTL_DT="7/2/2020" PSE_100_TRGT_DT="11/17/2020" PSE_100_ACTL_DT="1/28/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.925 (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="125.00" CNSTR_PCT_COMPLETE="99.36" DSGN_START_TRGT_DT="2/3/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="12/7/2020" ENVCLR_ACTL_DT="9/29/2020" UTIL_TRGT_DT="10/29/2020" UTIL_ACTL_DT="3/5/2021" ROW_TRGT_DT="10/15/2020" ROW_ACTL_DT="3/5/2021" RTL_TRGT_DT="1/18/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="19526.72" CNSTR_SPENT_AMT="549249.12" CE_SPENT_AMT="2331.12" TOT_SPENT_AMT="571106.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1014995.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="RIO VISTA RD" LIMITS_TO_DSCR="PASSMORE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1361380" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/2/2022" PSE_30_ACTL_DT="10/27/2022" PSE_60_TRGT_DT="2/1/2023" PSE_60_ACTL_DT="4/28/2023" PSE_100_TRGT_DT="9/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/10/2024" CNSTR_PCT_TIME_USED="99.24" CNSTR_PCT_COMPLETE="93.70" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="11/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/12/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/8/2023" ROW_ACTL_DT="4/27/2023" RTL_TRGT_DT="11/2/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="116796.59" CNSTR_SPENT_AMT="1345677.37" CE_SPENT_AMT="57031.08" TOT_SPENT_AMT="1519505.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="687622.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202061" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="LP 375" LIMITS_TO_DSCR="0.05 MI S OF HORIZON BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/13/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1502237" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="10/3/2022" PSE_30_ACTL_DT="8/3/2022" PSE_60_TRGT_DT="10/5/2022" PSE_60_ACTL_DT="9/30/2022" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/24/2023" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="INTERNATIONAL EAGLE ENTERPRISES, INC." CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="8/28/2023" CNSTR_PCT_TIME_USED="94.48" CNSTR_PCT_COMPLETE="105.59" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="4/1/2022" ENVCLR_TRGT_DT="4/14/2023" ENVCLR_ACTL_DT="4/27/2023" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="3/24/2023" ROW_TRGT_DT="3/3/2023" ROW_ACTL_DT="3/21/2023" RTL_TRGT_DT="5/4/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="549052.84" CNSTR_SPENT_AMT="1682340.84" CE_SPENT_AMT="145760.66" TOT_SPENT_AMT="2377154.34" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2310CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="2500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="RIO VISTA RD" LIMITS_TO_DSCR="PASSMORE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="928870" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/2/2022" PSE_30_ACTL_DT="10/27/2022" PSE_60_TRGT_DT="2/1/2023" PSE_60_ACTL_DT="4/28/2023" PSE_100_TRGT_DT="9/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/10/2024" CNSTR_PCT_TIME_USED="99.24" CNSTR_PCT_COMPLETE="93.70" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="11/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/12/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/8/2023" ROW_ACTL_DT="4/27/2023" RTL_TRGT_DT="11/2/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20.22" CNSTR_SPENT_AMT="843178.50" CE_SPENT_AMT="49501.32" TOT_SPENT_AMT="892700.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1351393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202063" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="PASSMORE RD" LIMITS_TO_DSCR="MORNING GLORY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="563612" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="3/4/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/4/2025" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/3/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/19/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/7/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="68349.03" TOT_SPENT_AMT="68349.03" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="586156.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202064" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="285 FT E OF RIO VISTA RD" LIMITS_TO_DSCR="FM 76" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19632294" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="270526.35" TOT_SPENT_AMT="270526.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="21988169.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202065" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="ROBERT VARELA" LIMITS_TO_DSCR="MORNING GLORY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="168227" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="181686.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202066" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 20" CNTY_NM="El Paso" LIMITS_FROM_DSCR="LEISURE LN" LIMITS_TO_DSCR="LAZY KNEE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="214960" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="232157.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202067" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202068" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202069" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202070" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202071" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202072" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000202073" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000203024" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000203025" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000204034" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="1 MI W OF ACALA RD" LIMITS_TO_DSCR="SH 148" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3137955" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/6/2021" PSE_30_ACTL_DT="11/22/2021" PSE_60_TRGT_DT="4/7/2022" PSE_60_ACTL_DT="7/5/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="10/26/2022" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="4/12/2023" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="84.50" CNSTR_PCT_COMPLETE="89.32" DSGN_START_TRGT_DT="5/7/2021" DSGN_START_ACTL_DT="6/15/2021" ENVCLR_TRGT_DT="9/29/2022" ENVCLR_ACTL_DT="11/8/2022" UTIL_TRGT_DT="1/24/2022" UTIL_ACTL_DT="10/14/2022" ROW_TRGT_DT="8/12/2022" ROW_ACTL_DT="12/1/2022" RTL_TRGT_DT="11/14/2022" RTL_ACTL_DT="12/1/2022" PE_SPENT_AMT="447867.19" CNSTR_SPENT_AMT="3151576.48" CE_SPENT_AMT="216806.43" TOT_SPENT_AMT="3816250.10" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3772783.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000204035" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="SH 148" LIMITS_TO_DSCR="0.35 MI E OF FM 192" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3695998" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/5/2022" PSE_30_ACTL_DT="1/25/2023" PSE_60_TRGT_DT="4/6/2023" PSE_60_ACTL_DT="4/25/2023" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="70.75" CNSTR_PCT_COMPLETE="98.47" DSGN_START_TRGT_DT="5/7/2021" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="9/28/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/24/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/11/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/14/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="538994.29" CNSTR_SPENT_AMT="4360402.12" CE_SPENT_AMT="147944.89" TOT_SPENT_AMT="5047341.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2364006.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000204037" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="1 MI W OF ACALA RD" LIMITS_TO_DSCR="SH 148" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45500" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="12/6/2021" PSE_30_ACTL_DT="11/22/2021" PSE_60_TRGT_DT="4/7/2022" PSE_60_ACTL_DT="7/5/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="10/26/2022" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="4/12/2023" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="84.50" CNSTR_PCT_COMPLETE="89.32" DSGN_START_TRGT_DT="5/7/2021" DSGN_START_ACTL_DT="6/15/2021" ENVCLR_TRGT_DT="9/29/2022" ENVCLR_ACTL_DT="11/8/2022" UTIL_TRGT_DT="1/24/2022" UTIL_ACTL_DT="10/14/2022" ROW_TRGT_DT="8/12/2022" ROW_ACTL_DT="12/1/2022" RTL_TRGT_DT="11/14/2022" RTL_ACTL_DT="12/1/2022" PE_SPENT_AMT="423.23" CNSTR_SPENT_AMT="49664.00" CE_SPENT_AMT="3615.11" TOT_SPENT_AMT="53702.34" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="RRP" FUND_CAT1_AMT="157945.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000204038" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 20" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="SH 148" LIMITS_TO_DSCR="FM 192" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="118950" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="12/5/2022" PSE_30_ACTL_DT="1/25/2023" PSE_60_TRGT_DT="4/6/2023" PSE_60_ACTL_DT="4/25/2023" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="70.75" CNSTR_PCT_COMPLETE="98.47" DSGN_START_TRGT_DT="5/7/2021" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="9/28/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/24/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/11/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/14/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13481.21" CNSTR_SPENT_AMT="115850.00" CE_SPENT_AMT="5738.70" TOT_SPENT_AMT="135069.91" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="RRP" FUND_CAT1_AMT="165000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000205048" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="3.109 MI E OF SH 20" LIMITS_TO_DSCR="0.12 MI E OF FM 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1031650" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="8/4/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.935 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="143.80" CNSTR_PCT_COMPLETE="92.36" DSGN_START_TRGT_DT="3/4/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="7/16/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="1410896.17" CNSTR_SPENT_AMT="1352175.24" CE_SPENT_AMT="338193.04" TOT_SPENT_AMT="3101264.45" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="702133.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000205049" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.3 MI W OF FM 34" LIMITS_TO_DSCR="0.12 MI E OF FM 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44610" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="7/30/2020" PSE_60_TRGT_DT="8/3/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="1/5/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.378 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="7/25/2022" CNSTR_PCT_TIME_USED="81.25" CNSTR_PCT_COMPLETE="93.69" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="4/27/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="9/28/2020" UTIL_TRGT_DT="6/5/2020" UTIL_ACTL_DT="11/30/2020" ROW_TRGT_DT="2/16/2021" ROW_ACTL_DT="11/30/2020" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="864.41" CNSTR_SPENT_AMT="47438.50" CE_SPENT_AMT="9104.51" TOT_SPENT_AMT="57407.42" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="58745.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000205051" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.1 MI E OF SH 20" LIMITS_TO_DSCR="4.1 MI E OF SH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="361137" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19.46" TOT_SPENT_AMT="19.46" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000205052" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.5 MI W OF FM 2217" LIMITS_TO_DSCR="0.5 MI E OF FM 2217" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="564618" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="609788.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000205053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206057" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.12 MI E OF FM 34" LIMITS_TO_DSCR="11.172 MI E OF FM 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="936725" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="8/4/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.256 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="143.80" CNSTR_PCT_COMPLETE="92.36" DSGN_START_TRGT_DT="3/4/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="7/16/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="89.90" CNSTR_SPENT_AMT="726393.00" CE_SPENT_AMT="306795.19" TOT_SPENT_AMT="1033278.09" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1331623.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206059" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="7.51 MI E OF FM 34" LIMITS_TO_DSCR="8.505 MI E OF FM 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="249935" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/4/2019" PSE_30_ACTL_DT="8/29/2019" PSE_60_TRGT_DT="12/2/2019" PSE_60_ACTL_DT="1/6/2020" PSE_100_TRGT_DT="6/2/2020" PSE_100_ACTL_DT="10/30/2020" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.995 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="3/12/2021" CNSTR_WKBG_DT="7/12/2021" CNSTR_PCT_TIME_USED="92.73" CNSTR_PCT_COMPLETE="97.36" DSGN_START_TRGT_DT="5/1/2019" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="12/2/2019" ENVCLR_ACTL_DT="11/3/2020" UTIL_TRGT_DT="1/16/2020" UTIL_ACTL_DT="9/22/2020" ROW_TRGT_DT="3/4/2020" ROW_ACTL_DT="4/30/2020" RTL_TRGT_DT="7/1/2020" RTL_ACTL_DT="12/4/2020" PE_SPENT_AMT="338021.01" CNSTR_SPENT_AMT="486923.91" CE_SPENT_AMT="107050.49" TOT_SPENT_AMT="931995.41" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="266433.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206060" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.12 MI E OF FM 34" LIMITS_TO_DSCR="11.172 MI E OF FM 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73678" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="7/30/2020" PSE_60_TRGT_DT="8/3/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="1/5/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.256 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="7/25/2022" CNSTR_PCT_TIME_USED="81.25" CNSTR_PCT_COMPLETE="93.69" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="4/27/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="9/28/2020" UTIL_TRGT_DT="6/5/2020" UTIL_ACTL_DT="11/30/2020" ROW_TRGT_DT="2/16/2021" ROW_ACTL_DT="11/30/2020" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="663.37" CNSTR_SPENT_AMT="70876.00" CE_SPENT_AMT="15686.24" TOT_SPENT_AMT="87225.61" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="117490.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="FM 34" LIMITS_TO_DSCR="2.56 MI E. OF FM 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4777419" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/2/2021" PSE_30_ACTL_DT="10/4/2021" PSE_60_TRGT_DT="12/3/2021" PSE_60_ACTL_DT="11/23/2021" PSE_100_TRGT_DT="4/6/2022" PSE_100_ACTL_DT="4/15/2022" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="81.97" CNSTR_PCT_COMPLETE="93.45" DSGN_START_TRGT_DT="10/18/2021" DSGN_START_ACTL_DT="9/13/2021" ENVCLR_TRGT_DT="5/5/2022" ENVCLR_ACTL_DT="1/25/2022" UTIL_TRGT_DT="11/12/2021" UTIL_ACTL_DT="12/2/2021" ROW_TRGT_DT="3/18/2022" ROW_ACTL_DT="2/7/2022" RTL_TRGT_DT="5/5/2022" RTL_ACTL_DT="7/11/2022" PE_SPENT_AMT="23637.07" CNSTR_SPENT_AMT="5249206.72" CE_SPENT_AMT="279725.32" TOT_SPENT_AMT="5552569.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="5732332.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206063" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="12.233 MI E OF FM 34" LIMITS_TO_DSCR="8.173 MI W OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="780419" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="842852.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206064" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000206065" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207051" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="11.172 MI E OF FM 34" LIMITS_TO_DSCR="0.05 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="308892" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="8/4/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.062 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="143.80" CNSTR_PCT_COMPLETE="92.36" DSGN_START_TRGT_DT="3/4/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="7/16/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="89.90" CNSTR_SPENT_AMT="237404.00" CE_SPENT_AMT="80475.90" TOT_SPENT_AMT="317969.80" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="953762.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207053" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="11.172 MI E OF FM 34" LIMITS_TO_DSCR="0.69 MI W OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43172" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="7/30/2020" PSE_60_TRGT_DT="8/3/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="1/5/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.265 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="7/25/2022" CNSTR_PCT_TIME_USED="81.25" CNSTR_PCT_COMPLETE="93.69" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="4/27/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="9/28/2020" UTIL_TRGT_DT="6/5/2020" UTIL_ACTL_DT="11/30/2020" ROW_TRGT_DT="2/16/2021" ROW_ACTL_DT="11/30/2020" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="397.47" CNSTR_SPENT_AMT="42303.00" CE_SPENT_AMT="8681.86" TOT_SPENT_AMT="51382.33" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="58745.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207054" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="LASCA RD" LIMITS_TO_DSCR="3 MI W OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/17/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2326433" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.026 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="10/30/2020" CNSTR_PCT_TIME_USED="63.33" CNSTR_PCT_COMPLETE="102.53" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="387913.26" CNSTR_SPENT_AMT="2674022.75" CE_SPENT_AMT="163334.49" TOT_SPENT_AMT="3225270.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="2700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207055" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="LASCA RD" LIMITS_TO_DSCR="0.95 MI W OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="618284" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="692478.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207057" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="2.2 MI W OF RM 1111" LIMITS_TO_DSCR="0.1 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="633102" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="32.50" CNSTR_PCT_COMPLETE="66.73" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15628.60" CNSTR_SPENT_AMT="360835.08" CE_SPENT_AMT="2505.26" TOT_SPENT_AMT="378968.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000207059" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000208055" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.05 MI E OF RM 1111" LIMITS_TO_DSCR="9.9 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1177874" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="8/4/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.902 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="143.80" CNSTR_PCT_COMPLETE="92.36" DSGN_START_TRGT_DT="3/4/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="7/16/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="90.02" CNSTR_SPENT_AMT="1272708.00" CE_SPENT_AMT="389021.69" TOT_SPENT_AMT="1661819.71" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1171440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000208056" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="RM 1111" LIMITS_TO_DSCR="9.925 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="734700" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="822864.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000208057" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="0.1 MI E OF RM 1111" LIMITS_TO_DSCR="6 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="289050" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="TRI STATE ELECTRIC, LTD." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="32.50" CNSTR_PCT_COMPLETE="66.73" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19.46" CNSTR_SPENT_AMT="272208.92" CE_SPENT_AMT="1889.96" TOT_SPENT_AMT="274118.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000208058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000209040" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="9.9 MI E OF RM 1111" LIMITS_TO_DSCR="19.02 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="642736" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="8/4/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.121 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="143.80" CNSTR_PCT_COMPLETE="92.36" DSGN_START_TRGT_DT="3/4/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="2/8/2021" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="7/16/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="2/8/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/16/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="90.03" CNSTR_SPENT_AMT="585296.00" CE_SPENT_AMT="199549.27" TOT_SPENT_AMT="784935.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1079045.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000209041" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="9.925 MI E OF RM 1111" LIMITS_TO_DSCR="9.399 MI W OF HUDSPETH/CULBERSON CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="756954" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="847788.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000209042" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000210038" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="19.02 MI E OF RM 1111" LIMITS_TO_DSCR="4.73 MI W OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="538565" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.128 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/2/2021" CNSTR_PCT_TIME_USED="154.29" CNSTR_PCT_COMPLETE="85.55" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="27313.05" CNSTR_SPENT_AMT="670001.00" CE_SPENT_AMT="153750.95" TOT_SPENT_AMT="851065.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1079873.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000210039" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="5.355 MI W OF CULBERSON CL" LIMITS_TO_DSCR="HUDSPETH/CULBERSON CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9475089" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="6/20/2024" PSE_30_ACTL_DT="9/16/2021" PSE_60_TRGT_DT="8/15/2024" PSE_60_ACTL_DT="11/23/2021" PSE_100_TRGT_DT="12/19/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="11/14/2023" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="101.40" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="9/13/2021" ENVCLR_TRGT_DT="1/9/2025" ENVCLR_ACTL_DT="1/25/2022" UTIL_TRGT_DT="11/21/2024" UTIL_ACTL_DT="4/15/2022" ROW_TRGT_DT="11/22/2024" ROW_ACTL_DT="4/15/2022" RTL_TRGT_DT="1/9/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="58391.87" CNSTR_SPENT_AMT="10158195.97" CE_SPENT_AMT="314726.60" TOT_SPENT_AMT="10531314.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="9464826.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000210040" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="9.399 MI W OF HUDSPETH/CULBERSON CL" LIMITS_TO_DSCR="3.773 MI W OF HUDSPETH/CULBERSON CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="484762" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="542934.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000210041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000211059" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="4.73 MI W OF US 90" LIMITS_TO_DSCR="US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="865528" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.705 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/2/2021" CNSTR_PCT_TIME_USED="154.29" CNSTR_PCT_COMPLETE="85.55" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="128.83" CNSTR_SPENT_AMT="228540.00" CE_SPENT_AMT="259772.82" TOT_SPENT_AMT="488441.65" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="556618.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000211060" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.5 MI W OF GOLF COURSE DR" LIMITS_TO_DSCR="US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/19/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="228209" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/21/2020" CNSTR_PCT_TIME_USED="137.50" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="136.05" CNSTR_SPENT_AMT="227473.88" CE_SPENT_AMT="5909.44" TOT_SPENT_AMT="233519.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="427000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000211061" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="HUDSPETH/CULBERSON CL" LIMITS_TO_DSCR="0.014 MI EAST OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8882120" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="6/20/2024" PSE_30_ACTL_DT="9/16/2021" PSE_60_TRGT_DT="8/15/2024" PSE_60_ACTL_DT="11/23/2021" PSE_100_TRGT_DT="12/19/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="11/14/2023" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="101.40" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="9/13/2021" ENVCLR_TRGT_DT="1/9/2025" ENVCLR_ACTL_DT="1/25/2022" UTIL_TRGT_DT="11/21/2024" UTIL_ACTL_DT="4/15/2022" ROW_TRGT_DT="11/22/2024" ROW_ACTL_DT="4/15/2022" RTL_TRGT_DT="1/9/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="923.23" CNSTR_SPENT_AMT="9798383.00" CE_SPENT_AMT="307878.13" TOT_SPENT_AMT="10107184.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="7600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000211062" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="2.30 MI E OF HUDSPETH/CULBERSON CL" LIMITS_TO_DSCR="0.01 MI E OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="166487" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="186465.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000211063" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000212026" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="AT MONTANA AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="495015" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="7/5/2017" PSE_30_ACTL_DT="7/21/2017" PSE_60_TRGT_DT="9/6/2017" PSE_60_ACTL_DT="9/21/2017" PSE_100_TRGT_DT="4/10/2020" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.145 (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/7/2016" DSGN_START_ACTL_DT="11/7/2016" ENVCLR_TRGT_DT="1/23/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/8/2018" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/17/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="137484.83" CE_SPENT_AMT="31.11" TOT_SPENT_AMT="137515.94" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000212027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 62" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SH 20 (ALAMEDA AVE)" LIMITS_TO_DSCR="MAGRUDER ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2328423" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/1/2023" PSE_30_ACTL_DT="1/26/2023" PSE_60_TRGT_DT="6/30/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="INTERNATIONAL EAGLE ENTERPRISES, INC." CNSTR_NTPD_DT="5/3/2024" CNSTR_WKBG_DT="6/17/2024" CNSTR_PCT_TIME_USED="60.74" CNSTR_PCT_COMPLETE="98.99" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="11/22/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/5/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="283155.51" CNSTR_SPENT_AMT="2693387.79" CE_SPENT_AMT="44341.88" TOT_SPENT_AMT="3020885.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1808666.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214045" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 258" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SH 20" LIMITS_TO_DSCR="SAN ELIZARIO EAST CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12182031" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="8/1/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/2/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/4/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/23/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/18/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/16/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77780.28" TOT_SPENT_AMT="77780.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="13643875.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214046" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 258" CNTY_NM="El Paso" LIMITS_FROM_DSCR="WINN RD" LIMITS_TO_DSCR="BELEN RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1058464" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="370087.17" TOT_SPENT_AMT="370087.17" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214047" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 258" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SANTIAGO BUSTAMANTE" LIMITS_TO_DSCR="GLORIETTA RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="381947" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="412503.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214048" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 258" CNTY_NM="El Paso" LIMITS_FROM_DSCR="WINN ROAD" LIMITS_TO_DSCR="GLORIETTA ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10945578" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="813.53" TOT_SPENT_AMT="813.53" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214049" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 258" CNTY_NM="El Paso" LIMITS_FROM_DSCR="SAN ELIZARIO EAST CITY LIMITS" LIMITS_TO_DSCR="SH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="453062" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50369.91" TOT_SPENT_AMT="50369.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="489307.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214050" PT_PHASE="Feasibility Studies" CNTY_NM="El Paso" LIMITS_FROM_DSCR="CITY LIMITS OF SAN ELIZARIO" LIMITS_TO_DSCR="CITY LIMITS OF SAN ELIZARIO" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="400000" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Corridor Planning Management" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="160594.59" TOT_SPENT_AMT="160594.59" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214051" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000214052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000219010" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 10-C" CNTY_NM="Hudspeth" LIMITS_FROM_DSCR="1.64 MI W OF RM 1111" LIMITS_TO_DSCR="1.32 MI E OF RM 1111" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2213052" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="11/22/2022" PSE_60_TRGT_DT="3/3/2023" PSE_60_ACTL_DT="3/23/2023" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.747 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2024" CNSTR_WKBG_DT="7/8/2024" CNSTR_PCT_TIME_USED="34.62" CNSTR_PCT_COMPLETE="92.88" DSGN_START_TRGT_DT="8/30/2022" DSGN_START_ACTL_DT="8/30/2022" ENVCLR_TRGT_DT="12/16/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/9/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="72515.55" CNSTR_SPENT_AMT="197327.98" CE_SPENT_AMT="1350.29" TOT_SPENT_AMT="271193.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1399030.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000220009" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 10-D" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.19 MI N OF IH 10" LIMITS_TO_DSCR="0.05 MI S OF IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2978186" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="10/27/2022" PSE_60_TRGT_DT="11/2/2022" PSE_60_ACTL_DT="1/3/2023" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="4/3/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="97.78" CNSTR_PCT_COMPLETE="102.11" DSGN_START_TRGT_DT="5/11/2022" DSGN_START_ACTL_DT="7/20/2022" ENVCLR_TRGT_DT="9/15/2022" ENVCLR_ACTL_DT="3/14/2023" UTIL_TRGT_DT="9/8/2022" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="4/4/2023" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="4/4/2023" PE_SPENT_AMT="35828.52" CNSTR_SPENT_AMT="3518681.66" CE_SPENT_AMT="128656.26" TOT_SPENT_AMT="3683166.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2774668.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000220010" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 10-D" CNTY_NM="Culberson" LIMITS_FROM_DSCR="GOLF COURSE DR" LIMITS_TO_DSCR="ROSS DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="374601" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/4/2023" PSE_30_ACTL_DT="3/8/2023" PSE_60_TRGT_DT="7/5/2023" PSE_60_ACTL_DT="4/27/2023" PSE_100_TRGT_DT="11/10/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="PMI PAVEMENT MARKING, LLC" CNSTR_NTPD_DT="1/17/2024" CNSTR_WKBG_DT="4/15/2024" CNSTR_PCT_TIME_USED="156.03" CNSTR_PCT_COMPLETE="98.86" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="7/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/6/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/6/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/11/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="142768.99" CE_SPENT_AMT="23155.90" TOT_SPENT_AMT="165924.89" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000220012" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301058" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.3 MI E OF WILD HORSE RD" LIMITS_TO_DSCR="2.8 MI E OF WILD HORSE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28870" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/2/2022" PSE_30_ACTL_DT="10/26/2022" PSE_60_TRGT_DT="12/5/2022" PSE_60_ACTL_DT="11/17/2022" PSE_100_TRGT_DT="6/29/2023" PSE_100_ACTL_DT="3/31/2023" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="11/13/2023" CNSTR_PCT_TIME_USED="87.04" CNSTR_PCT_COMPLETE="72.56" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="10/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/5/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/5/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/28/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18.46" CNSTR_SPENT_AMT="28870.00" CE_SPENT_AMT="117.21" TOT_SPENT_AMT="29005.67" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="RRP" FUND_CAT1_AMT="110840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301060" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.75 MI W OF WILD HORSE RD" LIMITS_TO_DSCR="2.25 MI E OF WILD HORSE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="36370" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/2/2022" PSE_30_ACTL_DT="10/26/2022" PSE_60_TRGT_DT="12/5/2022" PSE_60_ACTL_DT="11/17/2022" PSE_100_TRGT_DT="6/29/2023" PSE_100_ACTL_DT="3/31/2023" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.998 (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="11/13/2023" CNSTR_PCT_TIME_USED="87.04" CNSTR_PCT_COMPLETE="72.56" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="10/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/5/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/5/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/28/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18.45" CNSTR_SPENT_AMT="36370.00" CE_SPENT_AMT="147.66" TOT_SPENT_AMT="36536.11" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="RRP" FUND_CAT1_AMT="48726.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301061" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="US 90" LIMITS_TO_DSCR="13.267 MI E OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1380458" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.296 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/2/2021" CNSTR_PCT_TIME_USED="154.29" CNSTR_PCT_COMPLETE="85.55" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="89.91" CNSTR_SPENT_AMT="1430549.55" CE_SPENT_AMT="435074.37" TOT_SPENT_AMT="1865713.83" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1572962.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="US 90" LIMITS_TO_DSCR="1 MI E OF BI 10D" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/19/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="216396" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.909 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/21/2020" CNSTR_PCT_TIME_USED="137.50" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="136.06" CNSTR_SPENT_AMT="222331.00" CE_SPENT_AMT="5775.71" TOT_SPENT_AMT="228242.77" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="173000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301063" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.6 MI W OF EVERGREEN RD" LIMITS_TO_DSCR="EVERGREEN ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/19/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57298" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.555 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/21/2020" CNSTR_PCT_TIME_USED="137.50" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="195.17" CNSTR_SPENT_AMT="57758.59" CE_SPENT_AMT="1500.61" TOT_SPENT_AMT="59454.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="80000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301064" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.014 MI E OF US 90" LIMITS_TO_DSCR="13.3 MI E OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25550897" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/2/2021" PSE_30_ACTL_DT="10/4/2021" PSE_60_TRGT_DT="12/3/2021" PSE_60_ACTL_DT="11/23/2021" PSE_100_TRGT_DT="4/6/2022" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="100.26" DSGN_START_TRGT_DT="10/18/2021" DSGN_START_ACTL_DT="9/13/2021" ENVCLR_TRGT_DT="5/5/2022" ENVCLR_ACTL_DT="1/25/2022" UTIL_TRGT_DT="11/12/2021" UTIL_ACTL_DT="4/11/2022" ROW_TRGT_DT="3/18/2022" ROW_ACTL_DT="4/11/2022" RTL_TRGT_DT="5/5/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="93171.30" CNSTR_SPENT_AMT="27134467.63" CE_SPENT_AMT="305413.25" TOT_SPENT_AMT="27533052.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="24134936.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301065" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.01 MI E OF US 90" LIMITS_TO_DSCR="0.01 MI E OF EVERGREEN RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1101635" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1233831.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301066" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="1.71 MI W OF WILD HORSE RD" LIMITS_TO_DSCR="0.32 MI W OF WILD HORSE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="251950" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="272106.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301067" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="8.5 MI E OF VAN HORN" LIMITS_TO_DSCR="EVERGREEN RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1923077" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Communication System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="134460.70" TOT_SPENT_AMT="134460.70" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2610)" FUND_CAT1_PID="BBD" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301068" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.5 MI W OF MICHIGAN FLAT (EXIT 153)" LIMITS_TO_DSCR="MICHIGAN FLAT (EXIT 153)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="678404" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000301069" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302046" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="13.267 MI E OF US 90" LIMITS_TO_DSCR="10.3 MI W OF SH 118" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183512" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.879 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/2/2021" CNSTR_PCT_TIME_USED="154.29" CNSTR_PCT_COMPLETE="85.55" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="89.90" CNSTR_SPENT_AMT="175632.50" CE_SPENT_AMT="37385.88" TOT_SPENT_AMT="213108.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1523630.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="EVERGREEN RD" LIMITS_TO_DSCR="0.2 MI W OF BORACHO STATION" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/19/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1219368" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="12.879 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/21/2020" CNSTR_PCT_TIME_USED="137.50" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="76.83" CNSTR_SPENT_AMT="1235479.74" CE_SPENT_AMT="32093.30" TOT_SPENT_AMT="1267649.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1850000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302049" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="13.3 MI E OF US 90" LIMITS_TO_DSCR="15.4 MI E OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4015365" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/2/2021" PSE_30_ACTL_DT="10/4/2021" PSE_60_TRGT_DT="12/3/2021" PSE_60_ACTL_DT="11/23/2021" PSE_100_TRGT_DT="4/6/2022" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="100.26" DSGN_START_TRGT_DT="10/18/2021" DSGN_START_ACTL_DT="9/13/2021" ENVCLR_TRGT_DT="5/5/2022" ENVCLR_ACTL_DT="1/25/2022" UTIL_TRGT_DT="11/12/2021" UTIL_ACTL_DT="4/11/2022" ROW_TRGT_DT="3/18/2022" ROW_ACTL_DT="4/11/2022" RTL_TRGT_DT="5/5/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="189.72" CNSTR_SPENT_AMT="4282074.75" CE_SPENT_AMT="48197.19" TOT_SPENT_AMT="4330461.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3771703.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302050" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.01 MI E OF EVERGREEN RD" LIMITS_TO_DSCR="0.15 MI W OF MOON RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="527360" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/24/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="590643.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302051" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="15.4 MI E OF VAN HORN" LIMITS_TO_DSCR="400 FT E OF BORRACHO RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23459363" DIST_LET_DATE="11/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="10/31/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/30/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/7/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/25/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/18/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/13/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/25/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3555.32" TOT_SPENT_AMT="3555.32" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302052" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.5 MI W OF PLATEAU (EXIT 159)" LIMITS_TO_DSCR="0.5 MI E OF PLATEAU (EXIT 159)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="747333" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302053" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="MICHIGAN FLAT (EXIT 153)" LIMITS_TO_DSCR="0.5 MI E OF MICHIGAN FLAT (EXIT 153)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="678404" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000302054" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="10.3 MI W OF SH 118" LIMITS_TO_DSCR="2.3 MI E OF SH 118" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1361397" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.611 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/2/2021" CNSTR_PCT_TIME_USED="154.29" CNSTR_PCT_COMPLETE="85.55" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="70.49" CNSTR_SPENT_AMT="1170600.50" CE_SPENT_AMT="424283.08" TOT_SPENT_AMT="1594954.07" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1491924.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303048" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.2 MI W OF BORACHO STATION" LIMITS_TO_DSCR="CULBERSON/JEFF DAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/19/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="336247" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="12.612 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/21/2020" CNSTR_PCT_TIME_USED="137.50" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="136.04" CNSTR_SPENT_AMT="311342.52" CE_SPENT_AMT="8088.02" TOT_SPENT_AMT="319566.58" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1820000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303049" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="BORRACHO STA" LIMITS_TO_DSCR="0.873 MI E OF BORRACHO STA" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80571" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="11/22/2022" PSE_60_TRGT_DT="3/3/2023" PSE_60_ACTL_DT="3/23/2023" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2024" CNSTR_WKBG_DT="7/8/2024" CNSTR_PCT_TIME_USED="34.62" CNSTR_PCT_COMPLETE="92.88" DSGN_START_TRGT_DT="8/30/2022" DSGN_START_ACTL_DT="8/30/2022" ENVCLR_TRGT_DT="12/16/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/9/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38.68" CNSTR_SPENT_AMT="86157.30" CE_SPENT_AMT="589.62" TOT_SPENT_AMT="86785.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="85328.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303050" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="400 FT E OF BORACHO RD" LIMITS_TO_DSCR="CULBERSON/JEFF DAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26359030" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/2/2021" PSE_30_ACTL_DT="9/16/2021" PSE_60_TRGT_DT="12/3/2021" PSE_60_ACTL_DT="11/23/2021" PSE_100_TRGT_DT="4/6/2022" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/18/2021" DSGN_START_ACTL_DT="9/13/2021" ENVCLR_TRGT_DT="5/5/2022" ENVCLR_ACTL_DT="2/1/2022" UTIL_TRGT_DT="11/12/2021" UTIL_ACTL_DT="5/5/2022" ROW_TRGT_DT="3/18/2022" ROW_ACTL_DT="5/5/2022" RTL_TRGT_DT="5/5/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="99527.16" TOT_SPENT_AMT="99527.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="28467752.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303051" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Culberson" LIMITS_FROM_DSCR="35.255 MI E OF VAN HORN" LIMITS_TO_DSCR="37.885 MI E OF VAN HORN" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="177285" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="198559.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000303053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304054" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="2.3 MI E OF SH 118" LIMITS_TO_DSCR="JEFF DAVIS/REEVES CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="956818" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.831 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/2/2021" CNSTR_PCT_TIME_USED="154.29" CNSTR_PCT_COMPLETE="85.55" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="70.48" CNSTR_SPENT_AMT="1076345.00" CE_SPENT_AMT="294970.24" TOT_SPENT_AMT="1371385.72" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="808130.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304055" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="CULBERSON/JEFF DAVIS COUNTY LINE" LIMITS_TO_DSCR="JEFF DAVIS/REEVES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/19/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52170" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.977 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="LESNA CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/21/2020" CNSTR_PCT_TIME_USED="137.50" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="358.01" CNSTR_SPENT_AMT="32439.76" CE_SPENT_AMT="842.87" TOT_SPENT_AMT="33640.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304056" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="38.182 MI E OF VAN HORN" LIMITS_TO_DSCR="44.634 MI E OF VAN HORN" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="610061" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="683268.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304057" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="1.4 MI W OF CHERRY CREEK RD" LIMITS_TO_DSCR="0.5 MI E OF CHERRY CREEK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4309521" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="353661.50" TOT_SPENT_AMT="353661.50" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4826664.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304058" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="1.4 MI W OF CHERRY CREEK RD" LIMITS_TO_DSCR="0.5 MI E OF CHERRY CREEK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4309521" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1352.39" TOT_SPENT_AMT="1352.39" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4826664.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304059" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="0.5 MI W OF EXIT 185" LIMITS_TO_DSCR="0.5 MI E OF EXIT 185" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="661035" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000304060" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000305055" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="9 MI EAST OF IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35981315" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/30/2022" PSE_30_ACTL_DT="4/20/2022" PSE_60_TRGT_DT="9/20/2022" PSE_60_ACTL_DT="5/18/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="12/22/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.696 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="3/6/2023" CNSTR_WKBG_DT="7/24/2023" CNSTR_PCT_TIME_USED="94.85" CNSTR_PCT_COMPLETE="92.12" DSGN_START_TRGT_DT="8/2/2021" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/11/2022" UTIL_TRGT_DT="10/27/2022" UTIL_ACTL_DT="12/30/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/30/2022" RTL_ACTL_DT="10/17/2022" PE_SPENT_AMT="161506.49" CNSTR_SPENT_AMT="32327168.45" CE_SPENT_AMT="1694379.58" TOT_SPENT_AMT="34183054.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="23300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000306098" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT 4.50 MI NE OF FM 2903" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8926436" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/9/2025" PSE_30_ACTL_DT="3/7/2023" PSE_60_TRGT_DT="5/7/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/11/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="2/12/2024" CNSTR_PCT_TIME_USED="63.39" CNSTR_PCT_COMPLETE="102.18" DSGN_START_TRGT_DT="3/13/2025" DSGN_START_ACTL_DT="9/19/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/11/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="636383.19" CNSTR_SPENT_AMT="9011451.21" CE_SPENT_AMT="861370.37" TOT_SPENT_AMT="10509204.77" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="8000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000306100" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT CR 414" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="509754" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17083.09" CNSTR_SPENT_AMT="477284.76" TOT_SPENT_AMT="494367.85" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="509754.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000306101" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="0.35 MILES W OF CR 210" LIMITS_TO_DSCR="0.15 MI W OF CR 209" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/11/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27293608" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="4/26/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/16/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/30/2025" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="23.66" DSGN_START_TRGT_DT="2/16/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="72279.59" CNSTR_SPENT_AMT="7053943.91" CE_SPENT_AMT="88939.77" TOT_SPENT_AMT="7215163.27" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="40529175.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000306103" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="3.5 MI W OF FM 2903" LIMITS_TO_DSCR="0.35 MI W OF CR 210" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/26/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="31497131" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/14/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="12/4/2024" CNSTR_WKBG_DT="1/22/2025" CNSTR_PCT_TIME_USED="25.31" CNSTR_PCT_COMPLETE="53.99" DSGN_START_TRGT_DT="5/20/2024" DSGN_START_ACTL_DT="4/24/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25011.19" CNSTR_SPENT_AMT="18508418.20" CE_SPENT_AMT="428620.46" TOT_SPENT_AMT="18962049.85" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="41114320.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000306106" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="9 MI E OF IH 10" LIMITS_TO_DSCR="3.5 MI W OF FM 2903" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="37300000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="41776000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000307059" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="SH 17" LIMITS_TO_DSCR="US 285" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/28/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="212258" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.396 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="10/21/2019" CNSTR_WKBG_DT="6/2/2020" CNSTR_PCT_TIME_USED="28.95" CNSTR_PCT_COMPLETE="97.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="29404.21" TOT_SPENT_AMT="29404.21" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000307060" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="CR 409" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="395985" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="350846.96" CE_SPENT_AMT="64.42" TOT_SPENT_AMT="350911.38" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="395985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000307061" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="COUNTRY CLUB" LIMITS_TO_DSCR="1.5 MILES W OF FM 516" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18857194" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/16/2022" PSE_30_ACTL_DT="4/5/2022" PSE_60_TRGT_DT="9/2/2022" PSE_60_ACTL_DT="5/10/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="11/28/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="KIEWIT INFRASTRUCTURE SOUTH CO." CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="3/10/2024" CNSTR_PCT_TIME_USED="90.17" CNSTR_PCT_COMPLETE="105.73" DSGN_START_TRGT_DT="4/7/2022" DSGN_START_ACTL_DT="11/9/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/29/2022" UTIL_TRGT_DT="10/3/2022" UTIL_ACTL_DT="12/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/16/2022" RTL_ACTL_DT="10/13/2022" PE_SPENT_AMT="98175.62" CNSTR_SPENT_AMT="20982625.40" CE_SPENT_AMT="1316560.63" TOT_SPENT_AMT="22397361.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="23100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000307062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="0.15 MI WEST OF CR 209" LIMITS_TO_DSCR="COUNTRY CLUB" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/11/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="650027" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="4/26/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/16/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/30/2025" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="23.66" DSGN_START_TRGT_DT="2/16/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/27/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="2430.43" TOT_SPENT_AMT="2430.43" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1210952.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000307065" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT SH 17" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2087854" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="2/8/2022" PSE_30_ACTL_DT="1/31/2022" PSE_60_TRGT_DT="3/8/2022" PSE_60_ACTL_DT="3/9/2022" PSE_100_TRGT_DT="5/10/2022" PSE_100_ACTL_DT="3/30/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/20/2022" CNSTR_WKBG_DT="9/13/2022" CNSTR_PCT_TIME_USED="70.61" CNSTR_PCT_COMPLETE="101.04" DSGN_START_TRGT_DT="1/12/2022" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/11/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/10/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="2187241.44" CE_SPENT_AMT="185349.44" TOT_SPENT_AMT="2372590.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000308064" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-B" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT CR 117" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="229096" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/20/2021" PSE_30_ACTL_DT="12/20/2021" PSE_60_TRGT_DT="1/10/2022" PSE_60_ACTL_DT="1/10/2022" PSE_100_TRGT_DT="4/28/2022" PSE_100_ACTL_DT="4/28/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="APOLLO CONSTRUCTORS, INC." CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="2/28/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.65" DSGN_START_TRGT_DT="12/8/2021" DSGN_START_ACTL_DT="12/8/2021" ENVCLR_TRGT_DT="2/8/2022" ENVCLR_ACTL_DT="2/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/3/2022" RTL_ACTL_DT="5/3/2022" CNSTR_SPENT_AMT="235864.00" CE_SPENT_AMT="42025.85" TOT_SPENT_AMT="277889.85" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="157121.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000308065" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-B" CNTY_NM="Reeves" LIMITS_FROM_DSCR="WEST INTERCHANGE" LIMITS_TO_DSCR="PECOS RIVER" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17782450" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/2/2023" PSE_30_ACTL_DT="3/22/2023" PSE_60_TRGT_DT="7/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="7/24/2024" CNSTR_WKBG_DT="10/14/2024" CNSTR_PCT_TIME_USED="62.13" CNSTR_PCT_COMPLETE="49.29" DSGN_START_TRGT_DT="2/22/2023" DSGN_START_ACTL_DT="1/5/2023" ENVCLR_TRGT_DT="10/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/9/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/30/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="507518.37" CNSTR_SPENT_AMT="9233066.61" CE_SPENT_AMT="731294.51" TOT_SPENT_AMT="10471879.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="11520000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000401035" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-B" CNTY_NM="Ward" LIMITS_FROM_DSCR="CR 137" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="329937" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="291461.23" TOT_SPENT_AMT="291461.23" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="329937.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000401036" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-B" CNTY_NM="Ward" LIMITS_FROM_DSCR="CR 135" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="469332" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="463511.70" CE_SPENT_AMT="52.00" TOT_SPENT_AMT="463563.70" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="469332.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000401038" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-B" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT PECOS RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4104187" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="118448.02" TOT_SPENT_AMT="118448.02" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4104187.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402063" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="0.10 MI NE OF REEVES C/L (PECOS RIVER)" LIMITS_TO_DSCR="0.25 MI SW OF FM 516" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4519397" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" PE_SPENT_AMT="1434280.24" CNSTR_SPENT_AMT="4621652.13" CE_SPENT_AMT="143703.91" TOT_SPENT_AMT="6199636.28" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1702633.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402064" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.15 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2343948" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="666718.37" CE_SPENT_AMT="125082.76" TOT_SPENT_AMT="791801.13" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1702633.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402065" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.30 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1656894" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="742165.97" CE_SPENT_AMT="88233.42" TOT_SPENT_AMT="830399.39" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1808387.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402066" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.30 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1729143" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="85379.88" CE_SPENT_AMT="90602.31" TOT_SPENT_AMT="175982.19" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1808387.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402067" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.45 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2020448" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="603314.86" CE_SPENT_AMT="107362.89" TOT_SPENT_AMT="710677.75" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2297497.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402068" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.60 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2098486" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="102364.43" CE_SPENT_AMT="109991.63" TOT_SPENT_AMT="212356.06" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2292650.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402069" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.45 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2025596" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="616187.55" CE_SPENT_AMT="107738.38" TOT_SPENT_AMT="723925.93" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2292650.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402070" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.60 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2075377" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="99462.35" CE_SPENT_AMT="108851.61" TOT_SPENT_AMT="208313.96" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2287803.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402071" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.75 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1983792" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="501868.13" CE_SPENT_AMT="105249.16" TOT_SPENT_AMT="607117.29" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2388709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402072" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.75 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2043652" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="99872.14" CE_SPENT_AMT="107160.97" TOT_SPENT_AMT="207033.11" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2383642.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402073" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.90 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2896278" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="945016.02" CE_SPENT_AMT="154740.94" TOT_SPENT_AMT="1099756.96" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2388709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402074" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="AT 0.90 MI NE OF REEVES C/L" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3352645" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="12/8/2022" PSE_60_TRGT_DT="4/25/2024" PSE_60_ACTL_DT="2/13/2023" PSE_100_TRGT_DT="6/27/2024" PSE_100_ACTL_DT="4/11/2023" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="63.16" CNSTR_PCT_COMPLETE="33.09" DSGN_START_TRGT_DT="3/1/2024" DSGN_START_ACTL_DT="7/12/2022" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="12/19/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/27/2024" RTL_ACTL_DT="4/11/2023" CNSTR_SPENT_AMT="573791.25" CE_SPENT_AMT="178568.40" TOT_SPENT_AMT="752359.65" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2388709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000402075" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="REEVES COUNTY LINE" LIMITS_TO_DSCR="1.495 MI W OF FM 1927" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1727517" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/9/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21209.41" TOT_SPENT_AMT="21209.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1934819.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/21/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000403052" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 57" CNTY_NM="Ward" LIMITS_FROM_DSCR="CEMETERY RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="315094" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="291757.32" CE_SPENT_AMT="1287.56" TOT_SPENT_AMT="293044.88" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2108RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="31509.00" FUND_CAT2_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2108RX)" FUND_CAT2_PID="FRS" FUND_CAT2_AMT="283585.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000403055" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-D" CNTY_NM="Ward" LIMITS_FROM_DSCR="W IH 20 INTERCHANGE" LIMITS_TO_DSCR="IH 20 E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44400000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="49728000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000404090" PT_PHASE="Feasibility Studies" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="BI 20 - D WEST OF MONAHANS" LIMITS_TO_DSCR="BI 20 - D EAST OF MONAHANS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TBD" PROJ_LENGTH="8.435 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="20000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000404094" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="0.17 MI W OF PR 41" LIMITS_TO_DSCR="CRANE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/28/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="149744" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="10/21/2019" CNSTR_WKBG_DT="6/2/2020" CNSTR_PCT_TIME_USED="28.95" CNSTR_PCT_COMPLETE="97.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="146001.28" CE_SPENT_AMT="3119.63" TOT_SPENT_AMT="149120.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="30529.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000404095" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ward" LIMITS_FROM_DSCR="BI 20E (MONAHANS)" LIMITS_TO_DSCR="CRANE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/23/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1181414" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="2.92" DSGN_START_TRGT_DT="3/9/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="40397.50" CE_SPENT_AMT="1832.09" TOT_SPENT_AMT="42229.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="602559.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/21/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000405031" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Crane" LIMITS_FROM_DSCR="WARD COUNTY LINE" LIMITS_TO_DSCR="ECTOR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="171533" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="178394.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000406040" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="CRANE COUNTY LINE" LIMITS_TO_DSCR="0.12 MILES E OF FM 1053" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/28/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="130111" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="10/21/2019" CNSTR_WKBG_DT="6/2/2020" CNSTR_PCT_TIME_USED="28.95" CNSTR_PCT_COMPLETE="97.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="127216.87" CE_SPENT_AMT="2712.13" TOT_SPENT_AMT="129929.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="26435.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000406041" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="CRANE COUNTY LINE" LIMITS_TO_DSCR="2.4 MI W OF FM 1601" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="955793" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="994025.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407135" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="WEST OF FM 1936" LIMITS_TO_DSCR="MONAHANS DRAW" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="338283484" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/5/2020" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="3/4/2021" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.410 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/7/2018" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/15/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10144700.90" TOT_SPENT_AMT="10144700.90" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="PER" FUND_CAT1_AMT="91050000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW2" FUND_CAT2_AMT="11750000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="183087112.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="30855424.00" FUND_CAT5_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT5_AMT="62134966.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407137" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="N IH 20 SERVICE ROAD/MURPHY STREET" LIMITS_TO_DSCR="IH 20/MOSS AVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="669643" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407138" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="MOSS AVENUE" LIMITS_TO_DSCR="EAST OF FM 1936" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="24827053" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="4/25/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/13/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="4/5/2024" CNSTR_WKBG_DT="7/29/2024" CNSTR_PCT_TIME_USED="51.01" CNSTR_PCT_COMPLETE="78.39" DSGN_START_TRGT_DT="2/14/2023" DSGN_START_ACTL_DT="2/14/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/10/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/26/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11319.17" CNSTR_SPENT_AMT="22807760.43" CE_SPENT_AMT="704798.10" TOT_SPENT_AMT="23523877.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="17552580.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407139" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="UP RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="454289" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="3/30/2023" PSE_60_TRGT_DT="2/2/2024" PSE_60_ACTL_DT="5/1/2023" PSE_100_TRGT_DT="4/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="SCOTT TUCKER CONSTRUCTION COMPANY, LLC" CNSTR_NTPD_DT="3/28/2024" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="73.23" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="12/11/2023" DSGN_START_ACTL_DT="1/25/2023" ENVCLR_TRGT_DT="4/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="251121.53" CNSTR_SPENT_AMT="710908.07" CE_SPENT_AMT="10148.82" TOT_SPENT_AMT="972178.42" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="822293.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407140" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="UP RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="145368" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="3/30/2023" PSE_60_TRGT_DT="2/2/2024" PSE_60_ACTL_DT="5/1/2023" PSE_100_TRGT_DT="4/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="SCOTT TUCKER CONSTRUCTION COMPANY, LLC" CNSTR_NTPD_DT="3/28/2024" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="73.23" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="12/11/2023" DSGN_START_ACTL_DT="1/25/2023" ENVCLR_TRGT_DT="4/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="210529.09" CE_SPENT_AMT="9704.11" TOT_SPENT_AMT="220233.20" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="181026.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407141" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="0.8 MI W OF FM 1601" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="95685" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="3/30/2023" PSE_60_TRGT_DT="2/2/2024" PSE_60_ACTL_DT="5/1/2023" PSE_100_TRGT_DT="4/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="SCOTT TUCKER CONSTRUCTION COMPANY, LLC" CNSTR_NTPD_DT="3/28/2024" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="73.23" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="12/11/2023" DSGN_START_ACTL_DT="1/25/2023" ENVCLR_TRGT_DT="4/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="153301.51" CE_SPENT_AMT="6437.94" TOT_SPENT_AMT="159739.45" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="134394.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407142" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="0.8 MI W OF FM 1601" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="102572" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="3/30/2023" PSE_60_TRGT_DT="2/2/2024" PSE_60_ACTL_DT="5/1/2023" PSE_100_TRGT_DT="4/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="SCOTT TUCKER CONSTRUCTION COMPANY, LLC" CNSTR_NTPD_DT="3/28/2024" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="73.23" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="12/11/2023" DSGN_START_ACTL_DT="1/25/2023" ENVCLR_TRGT_DT="4/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="94650.19" CE_SPENT_AMT="6696.95" TOT_SPENT_AMT="101347.14" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="142194.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407143" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="AT MOSS AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1437682" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="8/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/22/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/24/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/29/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/9/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/9/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8381.78" TOT_SPENT_AMT="8381.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000407144" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="2.4 MI W OF FM 1601" LIMITS_TO_DSCR="3.3 MI E OF FM 866" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/23/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2476310" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="2.92" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="65043.51" CE_SPENT_AMT="2850.04" TOT_SPENT_AMT="67893.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="2210963.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000501110" PT_PHASE="Planning, 10+ years" HWY_NBR="BI 20-E" CNTY_NM="Ector" LIMITS_FROM_DSCR="0.7 MILES WEST OF IH 20 OVERPASS" LIMITS_TO_DSCR="MIDLAND COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1400000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.892 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="396649.55" TOT_SPENT_AMT="396649.55" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2508RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="1400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000501113" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Ector" LIMITS_FROM_DSCR="8TH STREET" LIMITS_TO_DSCR="ODESSA COUNTRY CLUB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/12/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10365115" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2020" PSE_30_ACTL_DT="3/30/2020" PSE_60_TRGT_DT="1/25/2022" PSE_60_ACTL_DT="1/25/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.644 (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="10/16/2023" CNSTR_PCT_TIME_USED="66.22" CNSTR_PCT_COMPLETE="80.65" DSGN_START_TRGT_DT="12/13/2019" DSGN_START_ACTL_DT="12/13/2019" ENVCLR_TRGT_DT="6/23/2022" ENVCLR_ACTL_DT="6/23/2022" UTIL_TRGT_DT="9/16/2022" UTIL_ACTL_DT="12/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/19/2022" RTL_ACTL_DT="7/19/2022" PE_SPENT_AMT="1884414.69" CNSTR_SPENT_AMT="7221580.38" CE_SPENT_AMT="163149.70" TOT_SPENT_AMT="9269144.77" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="5250000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="6437376.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000501115" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Ector" LIMITS_FROM_DSCR="SH302/SL338" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="703025" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="11/22/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="12/15/2021" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="3/18/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.316 (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="10/11/2022" CNSTR_PCT_TIME_USED="99.17" CNSTR_PCT_COMPLETE="112.60" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="10/18/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/14/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="3/31/2022" PE_SPENT_AMT="476743.00" CNSTR_SPENT_AMT="785772.21" CE_SPENT_AMT="262157.07" TOT_SPENT_AMT="1524672.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="844695.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000501116" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Ector" LIMITS_FROM_DSCR="FM 1882" LIMITS_TO_DSCR="HANCOCK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2412948" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/1/2023" PSE_30_ACTL_DT="10/27/2022" PSE_60_TRGT_DT="8/18/2023" PSE_60_ACTL_DT="12/13/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="FNH CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/25/2023" CNSTR_WKBG_DT="3/19/2024" CNSTR_PCT_TIME_USED="89.72" CNSTR_PCT_COMPLETE="93.30" DSGN_START_TRGT_DT="3/23/2023" DSGN_START_ACTL_DT="9/5/2022" ENVCLR_TRGT_DT="11/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/7/2023" UTIL_ACTL_DT="3/21/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="97637.81" CNSTR_SPENT_AMT="3032062.89" CE_SPENT_AMT="76212.04" TOT_SPENT_AMT="3205912.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1888155.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502111" PT_PHASE="Planning, 10+ years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="MIDLAND COUNTY LINE" LIMITS_TO_DSCR="MIDKIFF RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1150000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="12.203 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2508RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="1150000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502112" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT CR 1250" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6346155" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="4/8/2020" PSE_30_ACTL_DT="2/10/2020" PSE_60_TRGT_DT="5/7/2020" PSE_60_ACTL_DT="7/1/2020" PSE_100_TRGT_DT="7/2/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.600 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="10/30/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/2/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/2/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="642415.02" TOT_SPENT_AMT="642415.02" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2608RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502113" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT CR 1250" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1800000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2408RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="1800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502116" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="FAUDREE" LIMITS_TO_DSCR="FM 1788" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/12/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9740029" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2020" PSE_30_ACTL_DT="3/30/2020" PSE_60_TRGT_DT="1/25/2022" PSE_60_ACTL_DT="1/25/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="10/16/2023" CNSTR_PCT_TIME_USED="66.22" CNSTR_PCT_COMPLETE="80.65" DSGN_START_TRGT_DT="12/13/2019" DSGN_START_ACTL_DT="12/13/2019" ENVCLR_TRGT_DT="6/23/2022" ENVCLR_ACTL_DT="6/23/2022" UTIL_TRGT_DT="9/16/2022" UTIL_ACTL_DT="12/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/19/2022" RTL_ACTL_DT="7/19/2022" PE_SPENT_AMT="169.65" CNSTR_SPENT_AMT="10095892.05" CE_SPENT_AMT="228085.80" TOT_SPENT_AMT="10324147.50" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="6800000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="4038065.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502117" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="FM 1788" LIMITS_TO_DSCR="1 MILE EAST OF FM 1788" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/12/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3032154" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2020" PSE_30_ACTL_DT="3/30/2020" PSE_60_TRGT_DT="1/25/2022" PSE_60_ACTL_DT="1/25/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.987 (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="10/16/2023" CNSTR_PCT_TIME_USED="66.22" CNSTR_PCT_COMPLETE="80.65" DSGN_START_TRGT_DT="12/13/2019" DSGN_START_ACTL_DT="12/13/2019" ENVCLR_TRGT_DT="6/23/2022" ENVCLR_ACTL_DT="6/23/2022" UTIL_TRGT_DT="9/16/2022" UTIL_ACTL_DT="12/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/19/2022" RTL_ACTL_DT="7/19/2022" PE_SPENT_AMT="56.35" CNSTR_SPENT_AMT="3140262.32" CE_SPENT_AMT="70944.72" TOT_SPENT_AMT="3211263.39" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="1930000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="785108.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502119" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT FAUDREE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44642857" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="8/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/23/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/4/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/31/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/4/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/10/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/6/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1481945.58" TOT_SPENT_AMT="1481945.58" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="22080000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="2000000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="10750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502125" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT AVALON DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3928572" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000502127" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT SH 158 (GARFIELD ROAD)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="633346" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="257241.00" FUND_CAT2_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT2_PID="FRS" FUND_CAT2_AMT="376105.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503068" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT FAIRGROUNDS ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/3/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5021945" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="10/12/2018" PSE_30_ACTL_DT="10/12/2018" PSE_60_TRGT_DT="5/29/2019" PSE_60_ACTL_DT="5/29/2019" PSE_100_TRGT_DT="6/3/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="4/20/2023" CNSTR_PCT_TIME_USED="64.40" CNSTR_PCT_COMPLETE="87.80" DSGN_START_TRGT_DT="12/18/2017" DSGN_START_ACTL_DT="12/18/2017" ENVCLR_TRGT_DT="12/12/2019" ENVCLR_ACTL_DT="12/12/2019" UTIL_TRGT_DT="9/26/2022" UTIL_ACTL_DT="9/26/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/18/2022" RTL_ACTL_DT="5/18/2022" PE_SPENT_AMT="556106.15" CNSTR_SPENT_AMT="11207824.07" CE_SPENT_AMT="645077.33" TOT_SPENT_AMT="12409007.55" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="679948.00" FUND_CAT2_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT2_PID="FRS" FUND_CAT2_AMT="620673.00" FUND_CAT3_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT3_PID="FRS" FUND_CAT3_AMT="2343555.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503069" PT_PHASE="Planning, 10+ years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="EAST WALL ST" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5050000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.906 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2508RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="4000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503070" PT_PHASE="Planning, 10+ years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT 0.5 MILES EAST OF E. SL 250" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="800000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503071" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT 0.5 MILES EAST OF E. SL 250" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2608RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503072" PT_PHASE="Planning, 10+ years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT CR 1140" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="800000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2308RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503073" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT CR 1140" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2608RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503079" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="@ E SL 250" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="772468" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/19/2021" CNSTR_PCT_TIME_USED="90.57" CNSTR_PCT_COMPLETE="91.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="753923.02" CE_SPENT_AMT="122553.10" TOT_SPENT_AMT="876476.12" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="699049.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000503081" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT FAIRGROUNDS ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="633858" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="202631.00" FUND_CAT2_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT2_PID="FRS" FUND_CAT2_AMT="431227.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000504074" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Martin" LIMITS_FROM_DSCR="BI 20 - F WEST" LIMITS_TO_DSCR="BI 20 - F EAST" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50435715" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TBD" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="870693.09" TOT_SPENT_AMT="870693.09" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="56488000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000504082" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Martin" LIMITS_FROM_DSCR="SH 137" LIMITS_TO_DSCR="BI 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/14/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="575910" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/23/2022" PSE_30_ACTL_DT="10/20/2022" PSE_60_TRGT_DT="9/20/2022" PSE_60_ACTL_DT="11/9/2022" PSE_100_TRGT_DT="11/21/2022" PSE_100_ACTL_DT="3/27/2023" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="MIJELUM, L.L.C." CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="11/6/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="94.49" DSGN_START_TRGT_DT="7/8/2022" DSGN_START_ACTL_DT="9/26/2022" ENVCLR_TRGT_DT="11/21/2022" ENVCLR_ACTL_DT="11/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/15/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/21/2022" RTL_ACTL_DT="3/27/2023" PE_SPENT_AMT="191278.14" CNSTR_SPENT_AMT="642228.40" CE_SPENT_AMT="110026.20" TOT_SPENT_AMT="943532.74" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="600476.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000504083" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Martin" LIMITS_FROM_DSCR="STANTON (EAST INTERCHANGE)" LIMITS_TO_DSCR="HOWARD COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22292964" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/10/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/7/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/19/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/9/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/19/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4430.89" TOT_SPENT_AMT="4430.89" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_AMT="24076401.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000504084" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Martin" LIMITS_FROM_DSCR="SH 137" LIMITS_TO_DSCR="BI20-F EAST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6900000" DIST_LET_DATE="7/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="161316.49" TOT_SPENT_AMT="161316.49" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="7176000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000505113" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="0.38 MILES EAST OF US 87 RELIEF ROUTE" LIMITS_TO_DSCR=".5 MILES WEST OF SH 350" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/15/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4006119" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="7/1/2022" PSE_30_ACTL_DT="9/20/2021" PSE_60_TRGT_DT="10/7/2022" PSE_60_ACTL_DT="1/14/2022" PSE_100_TRGT_DT="12/2/2022" PSE_100_ACTL_DT="9/19/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.329 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="3/28/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="70.83" CNSTR_PCT_COMPLETE="93.97" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="10/20/2022" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="2/9/2022" UTIL_TRGT_DT="12/2/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="12/2/2022" ROW_ACTL_DT="3/8/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="9/19/2022" CNSTR_SPENT_AMT="3781933.78" CE_SPENT_AMT="23066.43" TOT_SPENT_AMT="3805000.21" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="3703889.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000505115" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="MARTIN CO LINE" LIMITS_TO_DSCR="0.404 MILES EAST OF US 87" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="769821" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="800614.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000505116" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="IH 20 @ BU 87" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7187923" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="7/4/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/16/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/17/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/9/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.34" DSGN_START_TRGT_DT="11/18/2022" DSGN_START_ACTL_DT="10/24/2022" ENVCLR_TRGT_DT="11/30/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/30/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/30/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/17/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="860783.90" TOT_SPENT_AMT="860783.90" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6515000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000505117" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="WEST END OF FRONTAGE SFR" LIMITS_TO_DSCR="N SCURRY LANE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="12/14/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/14/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/14/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="30771.14" TOT_SPENT_AMT="30771.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1620000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000505119" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="EXIT 165 EB" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="778551" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="871977.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506121" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="EAST SIDE FM 700 BRIDGE" LIMITS_TO_DSCR="MITCHELL COUNTY (WB LANES)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/14/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8336657" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="7/27/2022" PSE_30_ACTL_DT="8/11/2022" PSE_60_TRGT_DT="8/26/2022" PSE_60_ACTL_DT="8/31/2022" PSE_100_TRGT_DT="10/21/2022" PSE_100_ACTL_DT="10/20/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.786 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/4/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.74" DSGN_START_TRGT_DT="3/3/2022" DSGN_START_ACTL_DT="3/3/2022" ENVCLR_TRGT_DT="10/21/2022" ENVCLR_ACTL_DT="10/20/2022" UTIL_TRGT_DT="10/21/2022" UTIL_ACTL_DT="3/3/2022" ROW_TRGT_DT="10/21/2022" ROW_ACTL_DT="3/3/2022" RTL_TRGT_DT="10/21/2022" RTL_ACTL_DT="11/24/2022" PE_SPENT_AMT="18290.04" CNSTR_SPENT_AMT="8951275.97" CE_SPENT_AMT="102664.19" TOT_SPENT_AMT="9072230.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="7578533.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506122" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR=".5 MILES WEST OF SH 350" LIMITS_TO_DSCR=".24 MILES WEST OF FM 700" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/15/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2303236" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="7/1/2022" PSE_30_ACTL_DT="9/20/2021" PSE_60_TRGT_DT="10/7/2022" PSE_60_ACTL_DT="1/14/2022" PSE_100_TRGT_DT="12/2/2022" PSE_100_ACTL_DT="9/19/2022" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.128 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="3/28/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="70.83" CNSTR_PCT_COMPLETE="93.97" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="10/20/2022" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="2/9/2022" UTIL_TRGT_DT="12/2/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="12/2/2022" ROW_ACTL_DT="3/8/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="9/19/2022" CNSTR_SPENT_AMT="2627037.22" CE_SPENT_AMT="16022.62" TOT_SPENT_AMT="2643059.84" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2149693.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506124" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="0.404 MILES EAST OF US 87" LIMITS_TO_DSCR="MITCHELL CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="864449" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="899027.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506125" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="SH 350" LIMITS_TO_DSCR="@ IH 20" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9397608" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="7/4/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/16/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/17/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/9/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.34" DSGN_START_TRGT_DT="11/18/2022" DSGN_START_ACTL_DT="10/24/2022" ENVCLR_TRGT_DT="11/30/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/30/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/30/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/17/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="899193.99" CNSTR_SPENT_AMT="48914.00" TOT_SPENT_AMT="948107.99" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6295707.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="3146901.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506126" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="WEST END OF SANDY DRAW BRIDGE" LIMITS_TO_DSCR="MITCHELL COUNTY (EB LANES)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7152987" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/10/2023" PSE_30_ACTL_DT="4/10/2023" PSE_60_TRGT_DT="8/14/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="16.064 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="7/24/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="97.22" CNSTR_PCT_COMPLETE="100.83" DSGN_START_TRGT_DT="1/3/2023" DSGN_START_ACTL_DT="1/3/2023" ENVCLR_TRGT_DT="10/23/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/23/2023" UTIL_ACTL_DT="10/23/2023" ROW_TRGT_DT="10/23/2023" ROW_ACTL_DT="10/23/2023" RTL_TRGT_DT="12/8/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35689.53" CNSTR_SPENT_AMT="7446334.54" CE_SPENT_AMT="39334.23" TOT_SPENT_AMT="7521358.30" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="7500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506128" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="N SCURRY LANE" LIMITS_TO_DSCR="ON RAMP PAST SH 350" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/14/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/14/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/14/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="179.01" TOT_SPENT_AMT="179.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1620000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506129" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="NEAR FM 700 ON N FRT RD" LIMITS_TO_DSCR="NEAR MIDWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3500000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="3920000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000506131" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Howard" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="EXIT 188 EB" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="778079" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="871448.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000508107" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="FM 670" LIMITS_TO_DSCR="0.168 MILES EAST OF SH 208" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="535593" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="578440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000508109" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="WESTBROOK" LIMITS_TO_DSCR="COLORADO CITY EAST CITY LIMITS" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10500000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="69394.20" TOT_SPENT_AMT="69394.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="11760000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000509020" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT SH 158 (GARFIELD ROAD)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/3/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3783569" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="10/12/2018" PSE_30_ACTL_DT="10/12/2018" PSE_60_TRGT_DT="5/29/2019" PSE_60_ACTL_DT="5/29/2019" PSE_100_TRGT_DT="6/3/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="4/20/2023" CNSTR_PCT_TIME_USED="64.40" CNSTR_PCT_COMPLETE="87.80" DSGN_START_TRGT_DT="12/18/2017" DSGN_START_ACTL_DT="12/18/2017" ENVCLR_TRGT_DT="12/12/2019" ENVCLR_ACTL_DT="12/12/2019" UTIL_TRGT_DT="9/26/2022" UTIL_ACTL_DT="9/26/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/18/2022" RTL_ACTL_DT="5/18/2022" PE_SPENT_AMT="698926.38" CNSTR_SPENT_AMT="375105.47" CE_SPENT_AMT="668893.52" TOT_SPENT_AMT="1742925.37" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000509021" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-E" CNTY_NM="Midland" LIMITS_FROM_DSCR="GARFIELD ST" LIMITS_TO_DSCR="EAST WALL ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TBD" PROJ_LENGTH="1.546 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (1908RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="5050000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000510027" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000510028" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-G" CNTY_NM="Howard" LIMITS_FROM_DSCR="EAST OF FM 700" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1632180" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/23/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="110787.93" TOT_SPENT_AMT="110787.93" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1773554.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000511029" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-H" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="FM 670" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="69130" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.069 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="74660.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000512015" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-J" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="I-20 WEST" LIMITS_TO_DSCR="BI-20 EAST" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="625000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="675000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000512016" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-J" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="BI 20J WB" LIMITS_TO_DSCR="@ IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="168850" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="6/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/4/2023" DSGN_START_ACTL_DT="1/4/2023" ENVCLR_TRGT_DT="8/16/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/16/2023" UTIL_ACTL_DT="3/9/2023" ROW_TRGT_DT="8/16/2023" ROW_ACTL_DT="1/4/2023" RTL_TRGT_DT="2/5/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000513063" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="MONAHANS DRAW" LIMITS_TO_DSCR="EAST OF JBS PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="240150931" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/5/2020" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="3/4/2021" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.443 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/7/2018" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/15/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6827644.81" TOT_SPENT_AMT="6827644.81" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="PER" FUND_CAT1_AMT="44200000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW2" FUND_CAT2_AMT="11750000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="162695832.00" FUND_CAT4_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT4_AMT="19467787.00" FUND_CAT5_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT5_AMT="30855424.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000513064" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Ector" LIMITS_FROM_DSCR="EAST OF JBS PARKWAY" LIMITS_TO_DSCR="MIDLAND COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="101117728" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/11/2025" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="11/26/2025" PSE_60_ACTL_DT="11/16/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="SUNDT CONSTRUCTION, INC." CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="5/16/2024" CNSTR_PCT_TIME_USED="30.11" CNSTR_PCT_COMPLETE="31.30" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/17/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/21/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3016334.03" CNSTR_SPENT_AMT="26623262.87" CE_SPENT_AMT="1404644.83" TOT_SPENT_AMT="31044241.73" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="PER" FUND_CAT1_AMT="20000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="2958000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="28955195.00" FUND_CAT4_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT4_PID="PES" FUND_CAT4_AMT="15112029.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514067" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="SL 250" LIMITS_TO_DSCR="0.5 MILES EAST OF MIDKIFF RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="36305216" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="12/12/2018" PSE_30_ACTL_DT="12/12/2018" PSE_60_TRGT_DT="3/20/2019" PSE_60_ACTL_DT="3/20/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.739 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="3/25/2021" CNSTR_WKBG_DT="9/14/2021" CNSTR_PCT_TIME_USED="98.51" CNSTR_PCT_COMPLETE="96.49" DSGN_START_TRGT_DT="4/2/2014" DSGN_START_ACTL_DT="7/30/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/27/2020" UTIL_ACTL_DT="2/9/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/6/2019" RTL_ACTL_DT="2/27/2020" PE_SPENT_AMT="3323629.04" CNSTR_SPENT_AMT="45006953.70" CE_SPENT_AMT="4443244.33" TOT_SPENT_AMT="52773827.07" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="2000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="12000000.00" FUND_CAT3_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT3_PID="PES" FUND_CAT3_AMT="8640000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514084" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT CR 1250" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59101873" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/6/2019" PSE_100_TRGT_DT="1/7/2019" PSE_100_ACTL_DT="8/12/2020" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="PULICE CONSTRUCTION, INC." CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="5/24/2021" CNSTR_PCT_TIME_USED="99.86" CNSTR_PCT_COMPLETE="99.40" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/1/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/16/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="1711005.84" CNSTR_SPENT_AMT="76635734.11" CE_SPENT_AMT="4634888.82" TOT_SPENT_AMT="82981628.77" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_PID="017" FUND_CAT1_AMT="19840000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="9710000.00" FUND_CAT3_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT3_PID="PES" FUND_CAT3_AMT="20450000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514092" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="EAST OF CR 1250" LIMITS_TO_DSCR="EAST OF SH 349" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="206054285" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/2/2020" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="3/26/2021" PSE_60_ACTL_DT="11/18/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/7/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/3/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6928991.41" TOT_SPENT_AMT="6928991.41" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="179148763.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="PER" FUND_CAT2_AMT="31049071.00" FUND_CAT3_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT3_PID="PES" FUND_CAT3_AMT="2.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514093" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="ECTOR COUNTY LINE" LIMITS_TO_DSCR="EAST OF CR 1300" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="136743461" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/11/2025" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="11/26/2025" PSE_60_ACTL_DT="11/16/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.402 (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="SUNDT CONSTRUCTION, INC." CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="5/16/2024" CNSTR_PCT_TIME_USED="30.11" CNSTR_PCT_COMPLETE="31.30" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/17/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/21/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4027293.60" CNSTR_SPENT_AMT="48711380.19" CE_SPENT_AMT="2591009.85" TOT_SPENT_AMT="55329683.64" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="14286477.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="2000000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_PID="PER" FUND_CAT3_AMT="99300000.00" FUND_CAT4_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT4_AMT="6913600.00" FUND_CAT5_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT5_PID="PES" FUND_CAT5_AMT="21213049.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514094" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="EAST OF CR 1300" LIMITS_TO_DSCR="EAST OF CR 1250" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/23/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="162898983" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/2/2020" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="11/16/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.372 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="SUNDT CONSTRUCTION, INC." CNSTR_NTPD_DT="4/11/2024" CNSTR_WKBG_DT="7/29/2024" CNSTR_PCT_TIME_USED="25.71" CNSTR_PCT_COMPLETE="27.80" DSGN_START_TRGT_DT="9/4/2018" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/10/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/22/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5916587.28" CNSTR_SPENT_AMT="45963205.90" CE_SPENT_AMT="1766251.80" TOT_SPENT_AMT="53646044.98" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="PER" FUND_CAT1_AMT="69700929.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="48600000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="18171391.00" FUND_CAT4_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT4_PID="PES" FUND_CAT4_AMT="59977514.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514100" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT COTTON FLAT RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="68497620" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="10/26/2021" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="1/10/2022" PSE_60_ACTL_DT="9/15/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="9/27/2022" CNSTR_PCT_TIME_USED="93.00" CNSTR_PCT_COMPLETE="87.94" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="3/30/2022" PE_SPENT_AMT="203564.92" CNSTR_SPENT_AMT="65973389.81" CE_SPENT_AMT="5070792.66" TOT_SPENT_AMT="71247747.39" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT1_PID="BLD" FUND_CAT1_AMT="25000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="13885000.00" FUND_CAT3_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT3_AMT="19370739.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT4_AMT="10241882.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000514103" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="AT FM 1788" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/6/2019" PSE_100_TRGT_DT="1/7/2019" PSE_100_ACTL_DT="8/12/2020" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_CMPNY_NM="PULICE CONSTRUCTION, INC." CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="5/24/2021" CNSTR_PCT_TIME_USED="99.86" CNSTR_PCT_COMPLETE="99.40" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/1/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/16/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/2/2020" CNSTR_SPENT_AMT="118105.51" TOT_SPENT_AMT="118105.51" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000515093" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Midland" LIMITS_FROM_DSCR="EAST OF SH 349" LIMITS_TO_DSCR="EAST OF FM 1208" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="516013253" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/30/2027" PSE_30_ACTL_DT="6/24/2021" PSE_60_TRGT_DT="12/17/2027" PSE_60_ACTL_DT="11/16/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.763 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2017" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/9/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/26/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12297530.26" CNSTR_SPENT_AMT="2093.60" TOT_SPENT_AMT="12299623.86" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="PER" FUND_CAT1_AMT="58250000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW2" FUND_CAT2_AMT="13750000.00" FUND_CAT3_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT3_AMT="505934843.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000516016" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-F" CNTY_NM="Martin" LIMITS_FROM_DSCR="AT SH 137" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/3/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3137861" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="10/12/2018" PSE_30_ACTL_DT="10/12/2018" PSE_60_TRGT_DT="5/29/2019" PSE_60_ACTL_DT="5/29/2019" PSE_100_TRGT_DT="6/3/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="4/20/2023" CNSTR_PCT_TIME_USED="64.40" CNSTR_PCT_COMPLETE="87.80" DSGN_START_TRGT_DT="12/18/2017" DSGN_START_ACTL_DT="12/18/2017" ENVCLR_TRGT_DT="12/12/2019" ENVCLR_ACTL_DT="12/12/2019" UTIL_TRGT_DT="9/26/2022" UTIL_ACTL_DT="9/26/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/18/2022" RTL_ACTL_DT="5/18/2022" PE_SPENT_AMT="502823.15" CNSTR_SPENT_AMT="2657672.18" CE_SPENT_AMT="564116.17" TOT_SPENT_AMT="3724611.50" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000516017" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-F" CNTY_NM="Martin" LIMITS_FROM_DSCR="SH 137" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1066494" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="180554.00" FUND_CAT2_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2208RX)" FUND_CAT2_PID="FRS" FUND_CAT2_AMT="885940.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000516019" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-F" CNTY_NM="Martin" LIMITS_FROM_DSCR="IH 20 WEST" LIMITS_TO_DSCR="IH 20 EAST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="289628" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="324383.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000601106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="0.40 MILE EAST OF FM 644" LIMITS_TO_DSCR="NEAR CR 424" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1243856" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="3/19/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="ROADWAY SPECIALTIES, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="12/4/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/21/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/21/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13542.44" CE_SPENT_AMT="705.19" TOT_SPENT_AMT="14247.63" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000601107" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="COLORADO CITY EAST CITY LIMITS" LIMITS_TO_DSCR="NOLAN COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/19/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10261309" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="1/2/2023" PSE_30_ACTL_DT="1/2/2023" PSE_60_TRGT_DT="2/17/2023" PSE_60_ACTL_DT="2/22/2023" PSE_100_TRGT_DT="6/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="1/17/2024" CNSTR_WKBG_DT="6/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.35" DSGN_START_TRGT_DT="11/2/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/14/2023" ENVCLR_ACTL_DT="2/22/2023" UTIL_TRGT_DT="11/2/2022" UTIL_ACTL_DT="11/2/2022" ROW_TRGT_DT="11/2/2022" ROW_ACTL_DT="11/2/2022" RTL_TRGT_DT="6/6/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24594.49" CNSTR_SPENT_AMT="10723444.42" CE_SPENT_AMT="134292.14" TOT_SPENT_AMT="10882331.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="10554776.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000601108" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="EXIT 217 WB" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="792884" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="888030.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000601109" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="EXIT 226B WB" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="769889" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="862275.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000602114" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="EAST OF CR 111" LIMITS_TO_DSCR="WEST OF LP 170" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/23/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="115985812" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="3/22/2021" PSE_30_ACTL_DT="3/22/2021" PSE_60_TRGT_DT="9/3/2021" PSE_60_ACTL_DT="9/3/2021" PSE_100_TRGT_DT="5/27/2022" PSE_100_ACTL_DT="5/27/2022" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.290 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="SUNDT CONSTRUCTION, INC." CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="1/3/2023" CNSTR_PCT_TIME_USED="71.17" CNSTR_PCT_COMPLETE="97.60" DSGN_START_TRGT_DT="9/14/2020" DSGN_START_ACTL_DT="9/14/2020" ENVCLR_TRGT_DT="4/1/2022" ENVCLR_ACTL_DT="5/27/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/29/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="1/31/2022" RTL_TRGT_DT="5/27/2022" RTL_ACTL_DT="5/27/2022" PE_SPENT_AMT="6317176.24" CNSTR_SPENT_AMT="112523490.67" CE_SPENT_AMT="4479809.35" TOT_SPENT_AMT="123320476.26" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="35000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="69560000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT3_AMT="3486107.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000602126" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="MITCHELL CO LINE" LIMITS_TO_DSCR="FM 608" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="772055" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="864702.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000602127" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000602129" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="NEAR SL 170" LIMITS_TO_DSCR="NEAR SH 70" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="48000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="9/15/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/29/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/31/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.200 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/19/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/19/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/19/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="693468.70" TOT_SPENT_AMT="693468.70" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="53760000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000602130" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="SFR EB EXIT TO HOPKINS RD INTERSECTION" LIMITS_TO_DSCR="NFR WB EXIT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6255552" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/6/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/5/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.444 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="BONTKE BROTHERS CONSTRUCTION COMPANY" CNSTR_NTPD_DT="6/19/2024" CNSTR_WKBG_DT="9/5/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.74" DSGN_START_TRGT_DT="4/3/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/21/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/21/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="193675.98" CNSTR_SPENT_AMT="6179388.50" CE_SPENT_AMT="25325.10" TOT_SPENT_AMT="6398389.58" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="4983040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000602131" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000603121" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="FROM 0.7 MILES EAST OF CR 226" LIMITS_TO_DSCR="1.9 MILES EAST OF CR 226" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34593730" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SRA" PROJ_DSCR="Construct Rest Area" PSE_30_TRGT_DT="12/3/2021" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="5/24/2022" PSE_60_ACTL_DT="3/6/2023" PSE_100_TRGT_DT="7/19/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.340 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="12/4/2024" CNSTR_WKBG_DT="5/1/2025" CNSTR_PCT_TIME_USED="4.94" CNSTR_PCT_COMPLETE="9.45" DSGN_START_TRGT_DT="1/2/2019" DSGN_START_ACTL_DT="1/2/2019" ENVCLR_TRGT_DT="7/19/2022" ENVCLR_ACTL_DT="12/7/2022" UTIL_TRGT_DT="7/19/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/19/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2143850.39" CNSTR_SPENT_AMT="3312196.53" CE_SPENT_AMT="38062.54" TOT_SPENT_AMT="5494109.46" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000603145" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="IH 20 WEST BOUND" LIMITS_TO_DSCR="AT SWEETWATER CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1029780" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/29/2022" PSE_30_ACTL_DT="10/3/2022" PSE_60_TRGT_DT="11/3/2022" PSE_60_ACTL_DT="11/22/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="2/17/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/27/2023" CNSTR_PCT_TIME_USED="99.38" CNSTR_PCT_COMPLETE="99.58" DSGN_START_TRGT_DT="8/17/2022" DSGN_START_ACTL_DT="11/21/2022" ENVCLR_TRGT_DT="12/21/2022" ENVCLR_ACTL_DT="12/5/2022" UTIL_TRGT_DT="12/21/2022" UTIL_ACTL_DT="2/16/2023" ROW_TRGT_DT="8/17/2022" ROW_ACTL_DT="8/17/2022" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="2/17/2023" PE_SPENT_AMT="19013.29" CNSTR_SPENT_AMT="1079792.02" CE_SPENT_AMT="16759.63" TOT_SPENT_AMT="1115564.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="522010.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000603146" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000603148" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="NEAR SH 70" LIMITS_TO_DSCR="NEAR FM 1856" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="48000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="9/15/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/29/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/31/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.673 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/19/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/19/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/19/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="693464.29" TOT_SPENT_AMT="693464.29" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="53760000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000603149" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Nolan" LIMITS_FROM_DSCR="RAMPS WEST OF SH 70" LIMITS_TO_DSCR="SH 70" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1156794" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="5/15/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="80767.18" TOT_SPENT_AMT="80767.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000604080" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NOLAN COUNTY LINE" LIMITS_TO_DSCR="NEAR WELLS LANE (WB)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/20/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6846269" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="1/6/2023" PSE_30_ACTL_DT="4/3/2023" PSE_60_TRGT_DT="4/14/2023" PSE_60_ACTL_DT="4/28/2023" PSE_100_TRGT_DT="6/9/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.435 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="2/22/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.97" DSGN_START_TRGT_DT="11/14/2022" DSGN_START_ACTL_DT="8/18/2022" ENVCLR_TRGT_DT="6/9/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/9/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/9/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/9/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16600.94" CNSTR_SPENT_AMT="7193301.19" CE_SPENT_AMT="89312.12" TOT_SPENT_AMT="7299214.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="8061787.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000604083" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000604084" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NOLAN COUNTY LINE" LIMITS_TO_DSCR="NEAR WELLS LANE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/20/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5259462" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="1/6/2023" PSE_30_ACTL_DT="4/3/2023" PSE_60_TRGT_DT="4/14/2023" PSE_60_ACTL_DT="4/28/2023" PSE_100_TRGT_DT="6/9/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="2/22/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.97" DSGN_START_TRGT_DT="11/14/2022" DSGN_START_ACTL_DT="8/18/2022" ENVCLR_TRGT_DT="6/9/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/9/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/9/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/9/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="275.70" CNSTR_SPENT_AMT="5469469.58" CE_SPENT_AMT="109305.77" TOT_SPENT_AMT="5579051.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="7280000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000604085" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT FM 1235" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="328000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="328000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000604086" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT FM 1235" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="328000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="328000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605090" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="ABILENE WEST CITY LIMITS" LIMITS_TO_DSCR="NEAR CATCLAW CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="400000000" DIST_LET_DATE="4/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/14/2029" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/16/2030" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/24/2030" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.283 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/20/2029" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/16/2030" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/12/2030" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/14/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/12/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4331624.71" TOT_SPENT_AMT="4331624.71" FUND_CAT1_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT1_AMT="60000000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="164000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/21/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605117" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR=".75 MI E OF HATER RD" LIMITS_TO_DSCR="WEST OF OLD ANSON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2867300" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/23/2021" PSE_30_ACTL_DT="9/30/2021" PSE_60_TRGT_DT="11/9/2021" PSE_60_ACTL_DT="11/12/2021" PSE_100_TRGT_DT="1/10/2022" PSE_100_ACTL_DT="1/7/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.665 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="NOBLES ROAD CONSTRUCTION, INC." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/31/2022" CNSTR_PCT_TIME_USED="124.29" CNSTR_PCT_COMPLETE="105.03" DSGN_START_TRGT_DT="8/2/2021" DSGN_START_ACTL_DT="8/2/2021" ENVCLR_TRGT_DT="1/10/2022" ENVCLR_ACTL_DT="12/14/2021" UTIL_TRGT_DT="1/10/2022" UTIL_ACTL_DT="2/9/2022" ROW_TRGT_DT="1/10/2022" ROW_ACTL_DT="1/7/2022" RTL_TRGT_DT="1/10/2022" RTL_ACTL_DT="1/7/2022" PE_SPENT_AMT="56023.63" CNSTR_SPENT_AMT="2909634.57" CE_SPENT_AMT="101302.13" TOT_SPENT_AMT="3066960.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="11500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605123" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="0.76 MILES EAST OF CR 287" LIMITS_TO_DSCR="CATCLAW CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="615714" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="689600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605124" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605128" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NEAR US 83" LIMITS_TO_DSCR="NEAR CATCLAW CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8928571" DIST_LET_DATE="1/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="4/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/29/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/31/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.610 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/28/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/13/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/28/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/12/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1949491.39" TOT_SPENT_AMT="1949491.39" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="12/5/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605129" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="SOUTH FRONTAGE RD NEAR N WILLIS" LIMITS_TO_DSCR="NEAR CATCLAW CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="700000" DIST_LET_DATE="12/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/23/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7951.66" TOT_SPENT_AMT="7951.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="728000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605131" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="WB ENTRANCE RAMP OLD ANSON RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="713590" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="799220.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605132" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="EXIT 285 EB" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="770440" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="862892.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605133" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="IH 20 WB EXIT RAMP" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="307000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="578000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605134" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="US 83/US 277" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="578000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="578000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000605135" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT US 83/US 277" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="542000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="542000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606081" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="SH 351" LIMITS_TO_DSCR="CALLAHAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="239428346" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/28/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/24/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.000 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/29/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/24/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5974117.13" TOT_SPENT_AMT="5974117.13" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="200959748.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="14050000.00" FUND_CAT3_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT3_AMT="53149999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606105" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NEAR CATCLAW CREEK" LIMITS_TO_DSCR="FM 600" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="220000000" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="4/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/29/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/31/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.634 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/28/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/13/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/28/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/12/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4906465.69" TOT_SPENT_AMT="4906465.69" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="184800000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="39463861.00" FUND_CAT3_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT3_AMT="50000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="WEST OF OLD ANSON ROAD" LIMITS_TO_DSCR="CALLAHAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6631296" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/23/2021" PSE_30_ACTL_DT="9/30/2021" PSE_60_TRGT_DT="11/9/2021" PSE_60_ACTL_DT="11/12/2021" PSE_100_TRGT_DT="1/10/2022" PSE_100_ACTL_DT="1/7/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.275 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="NOBLES ROAD CONSTRUCTION, INC." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/31/2022" CNSTR_PCT_TIME_USED="124.29" CNSTR_PCT_COMPLETE="105.03" DSGN_START_TRGT_DT="8/2/2021" DSGN_START_ACTL_DT="8/2/2021" ENVCLR_TRGT_DT="1/10/2022" ENVCLR_ACTL_DT="12/14/2021" UTIL_TRGT_DT="1/10/2022" UTIL_ACTL_DT="2/9/2022" ROW_TRGT_DT="1/10/2022" ROW_ACTL_DT="1/7/2022" RTL_TRGT_DT="1/10/2022" RTL_ACTL_DT="1/7/2022" CNSTR_SPENT_AMT="7379030.80" CE_SPENT_AMT="256908.51" TOT_SPENT_AMT="7635939.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="8275000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606108" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="ELMDALE RD" LIMITS_TO_DSCR="CALLAHAN CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7795" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.270 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/15/2020" CNSTR_WKBG_DT="5/4/2020" CNSTR_PCT_TIME_USED="92.23" CNSTR_PCT_COMPLETE="95.10" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="410.34" CNSTR_SPENT_AMT="9137.26" CE_SPENT_AMT="126.47" TOT_SPENT_AMT="9674.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9338.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606109" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="FM 600" LIMITS_TO_DSCR="SH 351" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100736170" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/10/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.641 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/15/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/27/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/19/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/3/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5226088.18" TOT_SPENT_AMT="5226088.18" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="84765616.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606110" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="CATCLAW CREEK" LIMITS_TO_DSCR="SL 322" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="404000" DIST_LET_DATE="12/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="420160.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606116" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="CATCLAW CREEK" LIMITS_TO_DSCR="BU 83" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="404000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="436320.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606117" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NEAR CATCLAW CREEK" LIMITS_TO_DSCR="GRAPE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600000" DIST_LET_DATE="12/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/23/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/12/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="624000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000606118" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Taylor" LIMITS_FROM_DSCR="WEST OF SL 322" LIMITS_TO_DSCR="EAST OF SL 322" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30000000" DIST_LET_DATE="3/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.627 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607082" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="TAYLOR COUNTY LINE" LIMITS_TO_DSCR="BUCK CREEK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65905972" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/25/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/29/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/31/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.500 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/29/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/11/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/28/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/12/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1853664.92" TOT_SPENT_AMT="1853664.92" FUND_CAT1_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT1_AMT="73814688.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607083" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="TAYLOR CO LINE" LIMITS_TO_DSCR="0.096 MI EAST OF BI 20-T" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="301295" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.590 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/15/2020" CNSTR_WKBG_DT="5/4/2020" CNSTR_PCT_TIME_USED="92.23" CNSTR_PCT_COMPLETE="95.10" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="485.36" CNSTR_SPENT_AMT="307091.94" CE_SPENT_AMT="5168.77" TOT_SPENT_AMT="312746.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="356722.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607086" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="TAYLOR CO LINE" LIMITS_TO_DSCR="0.095 MILES EAST OF BI 20-T" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="716088" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/31/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/20/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/20/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="802019.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607087" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="BUCK CREEK" LIMITS_TO_DSCR="FM 1707" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2900000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/15/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/29/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/31/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/19/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/19/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/19/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2029" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607089" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="AT BI 20 &amp; FM 2047" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="278000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="278000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607090" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT BI 20 &amp; FM 2047" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="321000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="321000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000607091" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000608057" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SL 170" CNTY_NM="Nolan" LIMITS_FROM_DSCR="IH 20 NORTH FRONTAGE RD" LIMITS_TO_DSCR="BI 20-M" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63248" DIST_LET_DATE="12/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.209 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="65778.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000610011" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 18" CNTY_NM="Taylor" LIMITS_FROM_DSCR="SH 36" LIMITS_TO_DSCR="CALLAHAN CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2062833" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/18/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/2/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.060 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="7/16/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="93.64" CNSTR_PCT_COMPLETE="96.47" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/27/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="57000.29" CNSTR_SPENT_AMT="1762504.21" CE_SPENT_AMT="39762.79" TOT_SPENT_AMT="1859267.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2466087.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000611025" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 18" CNTY_NM="Callahan" LIMITS_FROM_DSCR="FM 604" LIMITS_TO_DSCR="TANGLEWOOD DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/13/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="883577" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/17/2021" PSE_30_ACTL_DT="12/17/2021" PSE_60_TRGT_DT="2/7/2022" PSE_60_ACTL_DT="2/7/2022" PSE_100_TRGT_DT="3/18/2022" PSE_100_ACTL_DT="4/14/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="1/3/2023" CNSTR_PCT_TIME_USED="91.23" CNSTR_PCT_COMPLETE="101.48" DSGN_START_TRGT_DT="10/11/2021" DSGN_START_ACTL_DT="10/11/2021" ENVCLR_TRGT_DT="2/23/2022" ENVCLR_ACTL_DT="3/22/2022" UTIL_TRGT_DT="2/23/2022" UTIL_ACTL_DT="3/22/2022" ROW_TRGT_DT="2/23/2022" ROW_ACTL_DT="3/22/2022" RTL_TRGT_DT="3/18/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="318.59" CNSTR_SPENT_AMT="1016990.09" CE_SPENT_AMT="10617.32" TOT_SPENT_AMT="1027926.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="914813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000611026" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 18" CNTY_NM="Callahan" LIMITS_FROM_DSCR="TAYLOR COUNTY" LIMITS_TO_DSCR="NEAR FM 604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="602067" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/8/2023" PSE_30_ACTL_DT="3/8/2023" PSE_60_TRGT_DT="5/15/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.12" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="605291.62" CE_SPENT_AMT="7753.14" TOT_SPENT_AMT="613044.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="666914.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000611027" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 18" CNTY_NM="Callahan" LIMITS_FROM_DSCR="TANGLEWOOD DR" LIMITS_TO_DSCR="FM 2700" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60000" DIST_LET_DATE="12/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="62400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000611028" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 18" CNTY_NM="Callahan" LIMITS_FROM_DSCR="0.8 MILES WEST OF UPRR" LIMITS_TO_DSCR="MARKET STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="906394" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/18/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/2/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="7/16/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="93.64" CNSTR_PCT_COMPLETE="96.47" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/27/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/12/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1051801.97" CE_SPENT_AMT="23729.15" TOT_SPENT_AMT="1075531.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1038907.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000611030" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 18" CNTY_NM="Callahan" LIMITS_FROM_DSCR="FM 18" LIMITS_TO_DSCR="AT BUCK CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="99000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000613011" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-K" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="IH 20 NORTH FRONTAGE RD" LIMITS_TO_DSCR="IH 20 SOUTH FRONTAGE RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="107601" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.632 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="55837.13" CE_SPENT_AMT="69.72" TOT_SPENT_AMT="55906.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="107356.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000614006" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-L" CNTY_NM="Nolan" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="BU 84-J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="158589" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="177620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000615038" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 70" CNTY_NM="Nolan" LIMITS_FROM_DSCR="SH 70" LIMITS_TO_DSCR="BI 20 BRIDGE REPLACEMENT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8441703" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="2/16/2023" PSE_30_ACTL_DT="3/16/2023" PSE_60_TRGT_DT="5/11/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/26/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="HODGES AND SON CONSTRUCTION COMPANY, INC." CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="10/21/2024" CNSTR_PCT_TIME_USED="60.24" CNSTR_PCT_COMPLETE="44.71" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/26/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/26/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/26/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="662784.23" CNSTR_SPENT_AMT="3775561.00" CE_SPENT_AMT="16704.25" TOT_SPENT_AMT="4455049.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="250000.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="4610000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000615042" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-M" CNTY_NM="Nolan" LIMITS_FROM_DSCR="EAST 3RD STREET" LIMITS_TO_DSCR="SH 70" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="621191" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="695733.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000616005" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-N" CNTY_NM="Taylor" LIMITS_FROM_DSCR="IH 20 (WEST OF TRENT)" LIMITS_TO_DSCR="IH 20 (EAST OF TRENT)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150633" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="168709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000618062" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="BI 20-R" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="597017" DIST_LET_DATE="12/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.465 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="597017.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000618065" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 20-R" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT BIG ELM CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="173394" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/29/2022" PSE_30_ACTL_DT="10/3/2022" PSE_60_TRGT_DT="11/3/2022" PSE_60_ACTL_DT="11/22/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="2/17/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/27/2023" CNSTR_PCT_TIME_USED="99.38" CNSTR_PCT_COMPLETE="99.58" DSGN_START_TRGT_DT="8/17/2022" DSGN_START_ACTL_DT="11/21/2022" ENVCLR_TRGT_DT="12/21/2022" ENVCLR_ACTL_DT="12/5/2022" UTIL_TRGT_DT="12/21/2022" UTIL_ACTL_DT="2/16/2023" ROW_TRGT_DT="8/17/2022" ROW_ACTL_DT="8/17/2022" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="2/17/2023" CNSTR_SPENT_AMT="141679.57" CE_SPENT_AMT="4920.30" TOT_SPENT_AMT="146599.87" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="151960.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000618067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="@ IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="171000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="6/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/4/2023" DSGN_START_ACTL_DT="1/4/2023" ENVCLR_TRGT_DT="8/16/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/16/2023" UTIL_ACTL_DT="3/9/2023" ROW_TRGT_DT="8/16/2023" ROW_ACTL_DT="1/4/2023" RTL_TRGT_DT="2/5/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="350000.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000701062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 &amp; US 283" LIMITS_TO_DSCR="EAST BI 20T" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7267838" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="6/16/2022" PSE_30_ACTL_DT="6/16/2022" PSE_60_TRGT_DT="8/16/2022" PSE_60_ACTL_DT="8/19/2022" PSE_100_TRGT_DT="11/10/2022" PSE_100_ACTL_DT="11/17/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.111 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="6/1/2023" CNSTR_WKBG_DT="9/25/2023" CNSTR_PCT_TIME_USED="95.63" CNSTR_PCT_COMPLETE="95.78" DSGN_START_TRGT_DT="3/25/2022" DSGN_START_ACTL_DT="3/25/2022" ENVCLR_TRGT_DT="9/27/2022" ENVCLR_ACTL_DT="10/14/2022" UTIL_TRGT_DT="9/27/2022" UTIL_ACTL_DT="10/12/2022" ROW_TRGT_DT="9/27/2022" ROW_ACTL_DT="10/12/2022" RTL_TRGT_DT="11/10/2022" RTL_ACTL_DT="11/17/2022" PE_SPENT_AMT="1236208.57" CNSTR_SPENT_AMT="6440045.48" CE_SPENT_AMT="149438.46" TOT_SPENT_AMT="7825692.51" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="7100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000701063" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="0.095 MILES EAST OF BI 20-T" LIMITS_TO_DSCR="END OF FRONTAGE ROAD EAST OF BAIRD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="393636" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="440873.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000701065" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="FM 2228" LIMITS_TO_DSCR="0.3 MILES EAST OF MEXIA CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="7/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/20/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/25/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/25/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/25/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/5/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3729.05" TOT_SPENT_AMT="3729.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000701066" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702051" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="APPROX 0.3 MI EAST OF MEXIA CREEK" LIMITS_TO_DSCR="EASTLAND CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10411767" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="7/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/22/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="7/16/2024" CNSTR_WKBG_DT="2/25/2025" CNSTR_PCT_TIME_USED="29.44" CNSTR_PCT_COMPLETE="17.98" DSGN_START_TRGT_DT="4/24/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/17/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/17/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/17/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="348666.96" CNSTR_SPENT_AMT="1940742.10" CE_SPENT_AMT="80600.08" TOT_SPENT_AMT="2370009.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="9418068.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702057" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WEST BOUND" LIMITS_TO_DSCR="BRUSHY CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2975991" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="7/22/2022" PSE_30_ACTL_DT="7/22/2022" PSE_60_TRGT_DT="1/10/2023" PSE_60_ACTL_DT="9/12/2022" PSE_100_TRGT_DT="3/8/2023" PSE_100_ACTL_DT="1/2/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="99.36" CNSTR_PCT_COMPLETE="104.13" DSGN_START_TRGT_DT="2/22/2022" DSGN_START_ACTL_DT="2/22/2022" ENVCLR_TRGT_DT="3/8/2023" ENVCLR_ACTL_DT="10/27/2022" UTIL_TRGT_DT="3/8/2023" UTIL_ACTL_DT="11/18/2022" ROW_TRGT_DT="3/8/2023" ROW_ACTL_DT="10/27/2022" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="1/20/2023" PE_SPENT_AMT="860112.01" CNSTR_SPENT_AMT="3178388.86" CE_SPENT_AMT="72931.61" TOT_SPENT_AMT="4111432.48" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2925500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702058" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WEST BOUND" LIMITS_TO_DSCR="DEEP CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2617544" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="7/22/2022" PSE_30_ACTL_DT="7/22/2022" PSE_60_TRGT_DT="1/10/2023" PSE_60_ACTL_DT="9/12/2022" PSE_100_TRGT_DT="3/8/2023" PSE_100_ACTL_DT="1/2/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="99.36" CNSTR_PCT_COMPLETE="104.13" DSGN_START_TRGT_DT="2/22/2022" DSGN_START_ACTL_DT="2/22/2022" ENVCLR_TRGT_DT="3/8/2023" ENVCLR_ACTL_DT="10/27/2022" UTIL_TRGT_DT="3/8/2023" UTIL_ACTL_DT="11/18/2022" ROW_TRGT_DT="3/8/2023" ROW_ACTL_DT="10/27/2022" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="1/20/2023" PE_SPENT_AMT="197417.59" CNSTR_SPENT_AMT="2696845.01" CE_SPENT_AMT="95438.97" TOT_SPENT_AMT="2989701.57" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3045000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702059" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 EAST BOUND" LIMITS_TO_DSCR="UP RR BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9414000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="10/27/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/4/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/29/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/29/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/29/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/29/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="116190.53" TOT_SPENT_AMT="116190.53" FUND_CAT1_DSCR="Category DA - Develop Authority (6DA)" FUND_CAT1_AMT="9414000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702060" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WEST BOUND" LIMITS_TO_DSCR="UP RR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9414000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="10/27/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/4/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/29/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/29/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/29/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/29/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="114403.06" TOT_SPENT_AMT="114403.06" FUND_CAT1_DSCR="Category DA - Develop Authority (6DA)" FUND_CAT1_AMT="9414000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702065" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR=".3 MILES EAST OF MEXIA CREEK" LIMITS_TO_DSCR="FM 880" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="7/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/20/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/25/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/25/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/25/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/5/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702066" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="FM 880" LIMITS_TO_DSCR="EASTLAND COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="296259" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="331810.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702067" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="AT BATTLE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="461000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="461000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702068" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="AT BATTLE CREEK RELIEF" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="504000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="504000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702069" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="AT COOPER CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="339000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="339000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702070" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT BATTLE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="382000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="382000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702071" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT BATTLE CREEK RELIEF" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="388000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="388000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702072" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT COOPER CREEK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="370000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="370000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702073" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 EB" LIMITS_TO_DSCR="AT COOPER CREEK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="359000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="359000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000702074" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 WB" LIMITS_TO_DSCR="AT COOPER CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="295000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="295000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000703111" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR="1.2 MI W OF SH 6" LIMITS_TO_DSCR="0.3 MI E OF FM 570" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/18/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10965207" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.604 (mi)" TXDOT_CNTCT_NM="Jordan Perry, P.E" TXDOT_CNTCT_PH_NBR="(254)629-3845" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/6/2024" CNSTR_WKBG_DT="2/14/2025" CNSTR_PCT_TIME_USED="29.79" CNSTR_PCT_COMPLETE="36.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9219.77" CNSTR_SPENT_AMT="4398666.59" CE_SPENT_AMT="87104.85" TOT_SPENT_AMT="4494991.21" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6857138.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="5130401.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000703112" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR="AT LEON RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.413 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704128" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 6" CNTY_NM="Eastland" LIMITS_FROM_DSCR="HILLCREST" LIMITS_TO_DSCR="SH 112" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.839 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="172123.00" TOT_SPENT_AMT="172123.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="1680000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704130" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 112" CNTY_NM="Eastland" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 570" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104743" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="26425.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704136" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Eastland" LIMITS_FROM_DSCR="US 183 IN CISCO, E." LIMITS_TO_DSCR="AMERMAN ST. IN EASTLAND" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1207013" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.740 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35852.72" CNSTR_SPENT_AMT="145305.95" CE_SPENT_AMT="56.01" TOT_SPENT_AMT="181214.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1587044.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704138" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704140" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR=".3 MI E OF FM 570" LIMITS_TO_DSCR=".41 MI W OF FM 2461" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/18/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10662089" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jordan Perry, P.E" TXDOT_CNTCT_PH_NBR="(254)629-3845" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/6/2024" CNSTR_WKBG_DT="2/14/2025" CNSTR_PCT_TIME_USED="29.79" CNSTR_PCT_COMPLETE="36.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4447.37" CNSTR_SPENT_AMT="4294350.41" CE_SPENT_AMT="85039.29" TOT_SPENT_AMT="4383837.07" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2500000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="9091440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704141" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Eastland" LIMITS_FROM_DSCR="AMMERMAN STREET" LIMITS_TO_DSCR="SH 112" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33332" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.506 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="37332.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000704142" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 112" CNTY_NM="Eastland" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 570" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="147798" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.728 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="165534.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000705016" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 254" CNTY_NM="Eastland" LIMITS_FROM_DSCR="0.034 MI. S. OF IH 20 N. FRONTAGE RD. N." LIMITS_TO_DSCR="IH 20 S. FRONTAGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="400837" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.762 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="448937.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706256" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR="0.3 MI. W OF FM 2461" LIMITS_TO_DSCR="LP 254E" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12000000" DIST_LET_DATE="7/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.301 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26053.35" TOT_SPENT_AMT="26053.35" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="10745000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706257" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR="0.3 MI. W OF FM 2461" LIMITS_TO_DSCR="LP 254E" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12000000" DIST_LET_DATE="7/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.301 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="10745000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706267" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR="0.5 MI WEST FM 571" LIMITS_TO_DSCR="0.65 MI EAST FM 571" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4787223" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18831.29" TOT_SPENT_AMT="18831.29" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="1000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="538045.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="9/5/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706268" PT_PHASE="Construction begins within 4 years" CNTY_NM="Eastland" LIMITS_FROM_DSCR="0.4 MI W OF FM2461(CS) (MLW)" LIMITS_TO_DSCR="CRCP BEGIN" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="212850" DIST_LET_DATE="11/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.550 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="238392.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706273" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR="PARMER" LIMITS_TO_DSCR="MOPAC" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="ENV" PROJ_DSCR="Roadside Park Donation" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Concession (CONC15)" FUND_CAT1_PID="NC" FUND_CAT1_AMT="1500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706278" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR=".17 MI W OF SH16 (CRCP)" LIMITS_TO_DSCR=".6 MI E OF SH16 (CS)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1536327" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jordan Perry, P.E" TXDOT_CNTCT_PH_NBR="(254)629-3845" CNSTR_CMPNY_NM="STERLING DELAWARE HOLDING COMPANY" CNSTR_NTPD_DT="9/6/2023" CNSTR_WKBG_DT="2/3/2024" CNSTR_PCT_TIME_USED="99.25" CNSTR_PCT_COMPLETE="81.54" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2261.02" CNSTR_SPENT_AMT="212569.00" CE_SPENT_AMT="97049.69" TOT_SPENT_AMT="311879.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1537573.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706279" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR=".4 MI W OF FM 2461 (NFR)" LIMITS_TO_DSCR="END OF PAVEMENT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.951 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="168839.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706280" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Eastland" LIMITS_FROM_DSCR=".4 MI W OF FM 2461 (SFR)" LIMITS_TO_DSCR="END OF PAVEMENT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="140194" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.951 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="157017.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000706281" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000707028" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000708029" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 16" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="FM 207" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4691982" DIST_LET_DATE="9/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="12/13/2019" PSE_30_ACTL_DT="12/31/2019" PSE_60_TRGT_DT="3/3/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.551 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="10/18/2019" ENVCLR_TRGT_DT="10/22/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/31/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/31/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/7/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="262072.78" TOT_SPENT_AMT="262072.78" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="20089440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000708031" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 16" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="EASTLAND CO. LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="785571" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.964 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="879839.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000709021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="WEST OF SH 16 NORTH" LIMITS_TO_DSCR="EAST OF ROSS WATSON RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25446032" DIST_LET_DATE="4/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/6/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/15/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/13/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/11/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/11/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="980344.37" TOT_SPENT_AMT="980344.37" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="17500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000709024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="DODSON PRAIRIE RD" LIMITS_TO_DSCR=".3 MILES W OF MILL BRANCH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="498436" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.125 (mi)" TXDOT_CNTCT_NM="Janet Crawford, P. E." TXDOT_CNTCT_PH_NBR="(817)370-6521" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="5/21/2025" CNSTR_PCT_TIME_USED="15.74" CNSTR_PCT_COMPLETE="13.03" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1286059.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000710064" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="EAST OF ROSS WATSON RD" LIMITS_TO_DSCR="SW 12TH AVE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57677802" DIST_LET_DATE="4/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="10/6/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/15/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/13/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/11/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/11/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1933618.72" TOT_SPENT_AMT="1933618.72" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="36600000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="39046700.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000710068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="AT BRAZOS RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18587400" DIST_LET_DATE="4/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="10/6/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/15/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/13/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.758 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/11/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/11/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="448506.84" TOT_SPENT_AMT="448506.84" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000710070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR=".3 MILES W OF MILL BRANCH" LIMITS_TO_DSCR="S.W. 12TH AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1126526" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.809 (mi)" TXDOT_CNTCT_NM="Janet Crawford, P. E." TXDOT_CNTCT_PH_NBR="(817)370-6521" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="5/21/2025" CNSTR_PCT_TIME_USED="15.74" CNSTR_PCT_COMPLETE="13.03" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="543045.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000712009" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 20-T" CNTY_NM="Callahan" LIMITS_FROM_DSCR="IH 20 NFR (WEST OF BAIRD)" LIMITS_TO_DSCR="IH 20 NFR (EAST OF BAIRD)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="204448" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/31/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/20/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/20/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="228982.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000714008" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2945" CNTY_NM="Eastland" LIMITS_FROM_DSCR="CALLAHAN C/L" LIMITS_TO_DSCR="SH 206" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="199822" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.366 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="223801.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000714009" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2945" CNTY_NM="Eastland" LIMITS_FROM_DSCR="FM2945 AT SANDY CREEK UP RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7000000" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.365 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000715003" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 3363" CNTY_NM="Eastland" LIMITS_FROM_DSCR="IH 20 FRONTAGE ROAD E." LIMITS_TO_DSCR="IH 20 FRONTAGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74847" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.673 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="77841.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000801047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="NE 27TH" LIMITS_TO_DSCR="PARKER CO LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/19/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="236095" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.780 (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="TIGHT LINE CONSTRUCTION, LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="10/8/2024" CNSTR_PCT_TIME_USED="94.03" CNSTR_PCT_COMPLETE="86.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2602.98" CNSTR_SPENT_AMT="217046.10" CE_SPENT_AMT="39187.87" TOT_SPENT_AMT="258836.95" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="329922.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000802078" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 180" CNTY_NM="Parker" LIMITS_FROM_DSCR="WEST OF COOL JCT" LIMITS_TO_DSCR="EAST OF COOL JCT" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1228591" DIST_LET_DATE="9/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5444.20" TOT_SPENT_AMT="5444.20" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="1381622.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/4/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000802079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Parker" LIMITS_FROM_DSCR="FM 113 N" LIMITS_TO_DSCR="RIC WILLIAMSON HWY" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/22/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1239440" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="2/10/2025" CNSTR_PCT_TIME_USED="37.50" CNSTR_PCT_COMPLETE="45.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="680695.44" CE_SPENT_AMT="59326.41" TOT_SPENT_AMT="740021.85" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1539578.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000802080" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Parker" LIMITS_FROM_DSCR="PALO PINTO CO LN" LIMITS_TO_DSCR="WILLOW CREEK DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/19/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27260" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.961 (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="TIGHT LINE CONSTRUCTION, LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="10/8/2024" CNSTR_PCT_TIME_USED="94.03" CNSTR_PCT_COMPLETE="86.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="24990.30" CE_SPENT_AMT="3108.88" TOT_SPENT_AMT="28099.18" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="37921.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000802081" PT_PHASE="Construction begins in 5 to 10 years" CNTY_NM="Parker" LIMITS_FROM_DSCR="HOLIDAY HILLS DR" LIMITS_TO_DSCR="E OF WASHINGTON AVE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="909293" DIST_LET_DATE="9/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="1018409.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803094" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="IH 20/IH 30 SPLIT" LIMITS_TO_DSCR="TARRANT/PARKER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28293108" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="1/1/2021" PSE_30_ACTL_DT="6/30/2022" PSE_60_TRGT_DT="6/18/2021" PSE_60_ACTL_DT="9/29/2022" PSE_100_TRGT_DT="12/21/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="8/28/2023" CNSTR_PCT_TIME_USED="58.48" CNSTR_PCT_COMPLETE="69.35" DSGN_START_TRGT_DT="10/19/2020" DSGN_START_ACTL_DT="8/4/2021" ENVCLR_TRGT_DT="12/28/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/1/2021" UTIL_ACTL_DT="10/7/2022" ROW_TRGT_DT="6/18/2021" ROW_ACTL_DT="10/7/2022" RTL_TRGT_DT="12/21/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1248251.05" CNSTR_SPENT_AMT="18946645.35" CE_SPENT_AMT="535890.30" TOT_SPENT_AMT="20730786.70" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="20000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="8493108.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803119" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Parker" LIMITS_FROM_DSCR="AT EASTERN LOOP" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="790466" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.380 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1077380.21" TOT_SPENT_AMT="1077380.21" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2105)" FUND_CAT1_AMT="1225000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_PID="CC" FUND_CAT2_AMT="155000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803122" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="AT WESTBOUND EXIT" LIMITS_TO_DSCR="RANCH HOUSE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6044350" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="6/30/2020" PSE_30_ACTL_DT="7/17/2020" PSE_60_TRGT_DT="10/14/2020" PSE_60_ACTL_DT="10/14/2020" PSE_100_TRGT_DT="8/13/2021" PSE_100_ACTL_DT="10/18/2021" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/2/2020" DSGN_START_ACTL_DT="12/28/2022" ENVCLR_TRGT_DT="11/12/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/13/2021" UTIL_ACTL_DT="6/27/2022" ROW_TRGT_DT="12/18/2020" ROW_ACTL_DT="12/18/2020" RTL_TRGT_DT="9/7/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="500571.13" TOT_SPENT_AMT="500571.13" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6390124.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803123" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 180" CNTY_NM="Parker" LIMITS_FROM_DSCR="WEST OF SPUR 312" LIMITS_TO_DSCR="EAST OF ELM ST." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30963962" DIST_LET_DATE="9/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="6/10/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/21/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.160 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/21/2021" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="11/19/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/23/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/23/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2211983.65" TOT_SPENT_AMT="2211983.65" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="32935872.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803124" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="RANCH HOUSE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9336544" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="6/11/2021" PSE_30_ACTL_DT="12/4/2021" PSE_60_TRGT_DT="9/27/2021" PSE_60_ACTL_DT="1/10/2022" PSE_100_TRGT_DT="8/12/2022" PSE_100_ACTL_DT="9/13/2022" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/15/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="92.65" CNSTR_PCT_COMPLETE="95.49" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="9/11/2020" ENVCLR_ACTL_DT="9/15/2022" UTIL_TRGT_DT="6/2/2022" UTIL_ACTL_DT="10/12/2022" ROW_TRGT_DT="6/2/2022" ROW_ACTL_DT="10/12/2022" RTL_TRGT_DT="8/12/2022" RTL_ACTL_DT="10/12/2022" PE_SPENT_AMT="231628.20" CNSTR_SPENT_AMT="9035298.66" CE_SPENT_AMT="336998.95" TOT_SPENT_AMT="9603925.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="11718841.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803129" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="RANCH HOUSE RD" LIMITS_TO_DSCR="IH 30/IH 20 SPLIT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9239361" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="6/11/2021" PSE_30_ACTL_DT="12/4/2021" PSE_60_TRGT_DT="9/27/2021" PSE_60_ACTL_DT="1/10/2022" PSE_100_TRGT_DT="8/12/2022" PSE_100_ACTL_DT="9/13/2022" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.794 (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/15/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="92.65" CNSTR_PCT_COMPLETE="95.49" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="9/11/2020" ENVCLR_ACTL_DT="9/15/2022" UTIL_TRGT_DT="6/2/2022" UTIL_ACTL_DT="10/12/2022" ROW_TRGT_DT="6/2/2022" ROW_ACTL_DT="10/12/2022" RTL_TRGT_DT="8/12/2022" RTL_ACTL_DT="10/12/2022" PE_SPENT_AMT="86810.36" CNSTR_SPENT_AMT="8913248.54" CE_SPENT_AMT="619805.20" TOT_SPENT_AMT="9619864.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="11781603.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803130" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="FM 1187 BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2842072" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Theresa Poer, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6619" CNSTR_CMPNY_NM="SICE, INC." CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="2/20/2024" CNSTR_PCT_TIME_USED="169.59" CNSTR_PCT_COMPLETE="101.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/30/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="178039.69" CNSTR_SPENT_AMT="2845721.96" CE_SPENT_AMT="255874.44" TOT_SPENT_AMT="3279636.09" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2305)" FUND_CAT1_AMT="3400000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="16455.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803131" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="FM 1187" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="400000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1914.07" TOT_SPENT_AMT="1914.07" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803133" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="FM 1187/3325" LIMITS_TO_DSCR="IH 20/30 SPLIT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/5/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57093262" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="7/15/2022" PSE_30_ACTL_DT="7/15/2022" PSE_60_TRGT_DT="12/29/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/31/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="6/12/2024" CNSTR_WKBG_DT="9/25/2024" CNSTR_PCT_TIME_USED="20.79" CNSTR_PCT_COMPLETE="27.89" DSGN_START_TRGT_DT="8/4/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/21/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/21/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/21/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1906829.12" CNSTR_SPENT_AMT="23664516.73" CE_SPENT_AMT="456275.29" TOT_SPENT_AMT="26027621.14" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="52000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803138" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Parker" LIMITS_FROM_DSCR="SOUTH OF WINFIELD DR" LIMITS_TO_DSCR="EXIT 414" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/24/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="137202" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="2/14/2023" PSE_30_ACTL_DT="2/14/2023" PSE_60_TRGT_DT="3/15/2023" PSE_60_ACTL_DT="3/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="TIGHT LINE CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="3/18/2024" CNSTR_PCT_TIME_USED="102.53" CNSTR_PCT_COMPLETE="86.13" DSGN_START_TRGT_DT="2/13/2023" DSGN_START_ACTL_DT="2/13/2023" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/13/2023" UTIL_ACTL_DT="2/13/2023" ROW_TRGT_DT="2/13/2023" ROW_ACTL_DT="2/13/2023" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="126122.01" CE_SPENT_AMT="32472.51" TOT_SPENT_AMT="158594.52" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803140" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="RANCH HOUSE ROAD" LIMITS_TO_DSCR="FM 1187" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5900000" DIST_LET_DATE="8/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.510 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="250750.09" TOT_SPENT_AMT="250750.09" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000803141" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Parker" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="FM 1187" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/24/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4320372" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.100 (mi)" TXDOT_CNTCT_NM="Korey Coburn, P.E." TXDOT_CNTCT_PH_NBR="(806)620-6018" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="6.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22139.24" CNSTR_SPENT_AMT="672308.00" CE_SPENT_AMT="13200.11" TOT_SPENT_AMT="707647.35" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000804051" PT_PHASE="Construction begins within 4 years" CNTY_NM="Tarrant" LIMITS_FROM_DSCR=".1MILE W OF INTERSECTION" LIMITS_TO_DSCR=".1MILE E OF INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1871157" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.500 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="1871157.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000804053" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Tarrant" LIMITS_FROM_DSCR=".1 MILE W OF INTERSECTION" LIMITS_TO_DSCR=".1 MILE E OF INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2966700" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.198 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="2966700.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000804055" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000805029" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="LANCASTER AVE/SH 180; IH 35W" LIMITS_TO_DSCR="TIERNEY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91602009" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.623 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3656721.34" TOT_SPENT_AMT="3656721.34" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="25000000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="11430170.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000805031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 180" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="N. KENTUCKY AVE" LIMITS_TO_DSCR="BEACH ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1663320" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="10/20/2021" CNSTR_PCT_TIME_USED="98.62" CNSTR_PCT_COMPLETE="98.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="98288.44" CNSTR_SPENT_AMT="1702891.90" CE_SPENT_AMT="186996.63" TOT_SPENT_AMT="1988176.97" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="2130423.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000806052" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="LANCASTER AVENUE/SH 180; TIERNEY RD" LIMITS_TO_DSCR="IH 820" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="39352471" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.216 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1318258.44" TOT_SPENT_AMT="1318258.44" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000807034" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="COOPER STREET ON SH 180" LIMITS_TO_DSCR="COLLINS ST/FM 157; IN ARLINGTON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3604002" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Hike And/or Bike" PSE_30_TRGT_DT="11/18/2016" PSE_30_ACTL_DT="12/1/2020" PSE_60_TRGT_DT="1/9/2017" PSE_60_ACTL_DT="2/25/2021" PSE_100_TRGT_DT="4/7/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.990 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/3/2016" DSGN_START_ACTL_DT="10/1/2020" ENVCLR_TRGT_DT="10/11/2016" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/21/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/21/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/7/2017" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28087.29" CNSTR_SPENT_AMT="282003.74" CE_SPENT_AMT="5264.29" TOT_SPENT_AMT="315355.32" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2705)" FUND_CAT1_AMT="3600000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="639689.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808077" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Dallas" LIMITS_FROM_DSCR="EAST OF HENSLEY" LIMITS_TO_DSCR="GREAT SOUTHWEST PKWY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.708 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="53161.16" TOT_SPENT_AMT="53161.16" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="860745.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808078" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Dallas" LIMITS_FROM_DSCR="5TH STREET NE" LIMITS_TO_DSCR="6TH STREET NW" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21000000" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TBD" PROJ_LENGTH="0.032 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2405)" FUND_CAT1_AMT="1020000.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT2_AMT="4080000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT3_AMT="1500000.00" FUND_CAT4_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT4_AMT="16920000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808079" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT JEFFERSON STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6822500" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TBD" PROJ_LENGTH="0.202 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29351.17" TOT_SPENT_AMT="29351.17" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="3790000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="3032500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808080" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Dallas" LIMITS_FROM_DSCR="BAGDAD ROAD" LIMITS_TO_DSCR="MACARTHUR BOULEVARD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="322566" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="308592.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="18474.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808081" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Dallas" LIMITS_FROM_DSCR="6TH STREET" LIMITS_TO_DSCR="PGBT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1920000" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808082" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 180" CNTY_NM="Dallas" LIMITS_FROM_DSCR="ON MAIN STREET FROM 5TH STREET NE" LIMITS_TO_DSCR="BELT LINE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3101600" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000808083" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000809037" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1187" CNTY_NM="Parker" LIMITS_FROM_DSCR="MAVERICK ST" LIMITS_TO_DSCR="FM 5" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16099228" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/28/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/22/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/20/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.740 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/12/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/9/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/9/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="777549.01" TOT_SPENT_AMT="777549.01" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT1_AMT="1290000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT2_AMT="3291136.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000809039" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000809040" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1187" CNTY_NM="Parker" LIMITS_FROM_DSCR="UNDERWOOD RD" LIMITS_TO_DSCR="E. BANKHEAD HWY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="737534" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.400 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="641.70" TOT_SPENT_AMT="641.70" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="737533.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000809041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000812091" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AT BRYANT IRVIN" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2188282" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.371 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="559197.28" TOT_SPENT_AMT="559197.28" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="2450876.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000813124" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="N INTERCHANGE AT SH 121" LIMITS_TO_DSCR="RANDOL MILL ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250000000" DIST_LET_DATE="2/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Construct New Toll Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.100 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19799290.99" CNSTR_SPENT_AMT="710.00" TOT_SPENT_AMT="19800000.99" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000813125" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="RAMEY AVE." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="575822671" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="10/24/2058" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/24/2058" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/3/2059" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="SOUTH-POINT CONSTRUCTORS A JOINT VENTURE" CNSTR_NTPD_DT="3/2/2022" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="52.67" CNSTR_PCT_COMPLETE="44.33" DSGN_START_TRGT_DT="5/8/2058" DSGN_START_ACTL_DT="6/1/2017" ENVCLR_TRGT_DT="8/30/2059" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/2/2059" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2059" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/30/2059" RTL_ACTL_DT="TBD" PE_SPENT_AMT="65825024.94" CNSTR_SPENT_AMT="276914.67" CE_SPENT_AMT="2408.09" TOT_SPENT_AMT="66104347.70" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="280011716.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="149590284.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000813206" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 820/IH 20 INTERCHANGE" LIMITS_TO_DSCR="FOREST HILL DR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="142602716" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="10/24/2058" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/24/2058" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/3/2059" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.284 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="SOUTH-POINT CONSTRUCTORS A JOINT VENTURE" CNSTR_NTPD_DT="3/2/2022" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="52.67" CNSTR_PCT_COMPLETE="44.33" DSGN_START_TRGT_DT="5/8/2058" DSGN_START_ACTL_DT="6/1/2017" ENVCLR_TRGT_DT="8/30/2059" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/2/2059" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2059" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/30/2059" RTL_ACTL_DT="TBD" PE_SPENT_AMT="250351.04" CE_SPENT_AMT="3693.79" TOT_SPENT_AMT="254044.83" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000813243" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 20 CONN &quot;DD&quot; OVER IH 35W NB FR" LIMITS_TO_DSCR="&amp; SYCAMORE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="83518" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="16077.76" CNSTR_SPENT_AMT="84332.42" CE_SPENT_AMT="7219.11" TOT_SPENT_AMT="107629.29" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="189179.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000813248" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="TRE LINE (N OF TRINITY BLVD)" LIMITS_TO_DSCR="SH 10" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/18/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18792215" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="5/30/2022" PSE_30_ACTL_DT="4/29/2022" PSE_60_TRGT_DT="6/6/2022" PSE_60_ACTL_DT="10/26/2022" PSE_100_TRGT_DT="6/6/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="FLATIRON CONSTRUCTORS, INC." CNSTR_NTPD_DT="8/17/2023" CNSTR_WKBG_DT="12/7/2023" CNSTR_PCT_TIME_USED="82.29" CNSTR_PCT_COMPLETE="73.65" DSGN_START_TRGT_DT="1/27/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/13/2022" UTIL_ACTL_DT="11/15/2022" ROW_TRGT_DT="6/6/2022" ROW_ACTL_DT="11/15/2022" RTL_TRGT_DT="6/13/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1256300.39" CNSTR_SPENT_AMT="14425596.68" CE_SPENT_AMT="1242135.07" TOT_SPENT_AMT="16924032.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2328594.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000813250" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="RAMEY AVENUE" LIMITS_TO_DSCR="BRENTWOOD STAIR ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="451409000" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.484 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="4/7/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000814132" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NAVAJO TRAIL/CAHOBA DRIVE" LIMITS_TO_DSCR="MARINE CREEK PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="465346142" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.010 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1389504.07" TOT_SPENT_AMT="1389504.07" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000814135" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NORTH END OF LAKE WORTH" LIMITS_TO_DSCR="IH-35W" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="933415078" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.900 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2207008.07" TOT_SPENT_AMT="2207008.07" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000814136" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 35W" LIMITS_TO_DSCR="LAKE WORTH BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1164120" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="8/1/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="4/14/2023" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Theresa Poer, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6619" CNSTR_CMPNY_NM="ODUM SERVICES, LLC" CNSTR_NTPD_DT="8/9/2023" CNSTR_WKBG_DT="7/23/2024" CNSTR_PCT_TIME_USED="44.72" CNSTR_PCT_COMPLETE="98.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="6/27/2023" CNSTR_SPENT_AMT="989202.90" CE_SPENT_AMT="59231.90" TOT_SPENT_AMT="1048434.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1323600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000814138" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 35W" LIMITS_TO_DSCR="SH 121/SH 183/SH 26" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="83000000" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.150 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="83000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000814140" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000815057" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000815058" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="I-30" LIMITS_TO_DSCR="NORTH END OF LAKE WORTH ON I-820" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1211796609" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.420 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2235958.94" TOT_SPENT_AMT="2235958.94" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000815060" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 820" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="LAKE WORTH BRIDGE" LIMITS_TO_DSCR="TEAM RANCH" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="758280" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="8/1/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="4/14/2023" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Theresa Poer, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6619" CNSTR_CMPNY_NM="ODUM SERVICES, LLC" CNSTR_NTPD_DT="8/9/2023" CNSTR_WKBG_DT="7/23/2024" CNSTR_PCT_TIME_USED="44.72" CNSTR_PCT_COMPLETE="98.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="6/27/2023" CNSTR_SPENT_AMT="956292.01" CE_SPENT_AMT="57261.59" TOT_SPENT_AMT="1013553.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="668400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000815061" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000816043" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AT CHISHOLM TRAIL PARKWAY" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27754518" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="12/27/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/14/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.050 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2017" DSGN_START_ACTL_DT="3/1/2017" ENVCLR_TRGT_DT="6/2/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/27/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/23/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/2/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="36341.97" TOT_SPENT_AMT="36341.97" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000816044" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="TARRANT/PARKER COUNTY LINE" LIMITS_TO_DSCR="MARKUM RANCH ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26105384" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="1/1/2021" PSE_30_ACTL_DT="6/30/2022" PSE_60_TRGT_DT="6/18/2021" PSE_60_ACTL_DT="9/29/2022" PSE_100_TRGT_DT="12/21/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="8/28/2023" CNSTR_PCT_TIME_USED="58.48" CNSTR_PCT_COMPLETE="69.35" DSGN_START_TRGT_DT="10/19/2020" DSGN_START_ACTL_DT="8/4/2021" ENVCLR_TRGT_DT="12/28/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/1/2021" UTIL_ACTL_DT="10/7/2022" ROW_TRGT_DT="6/18/2021" ROW_ACTL_DT="10/7/2022" RTL_TRGT_DT="12/21/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="850417.39" CNSTR_SPENT_AMT="21624329.67" CE_SPENT_AMT="645005.43" TOT_SPENT_AMT="23119752.49" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="15000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="4640384.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="8058885.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000816047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 20 CONNECTION M OVER RAMP T AND" LIMITS_TO_DSCR="IH 820 SBFR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="54251" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="18681.43" CNSTR_SPENT_AMT="56297.02" CE_SPENT_AMT="4287.39" TOT_SPENT_AMT="79265.84" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="55847.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000816048" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 20 N COLLECTOR WB" LIMITS_TO_DSCR="OVER UPRR/WALNUT CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="700719" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="23798.78" CNSTR_SPENT_AMT="727553.84" CE_SPENT_AMT="64530.46" TOT_SPENT_AMT="815883.08" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="401250.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000816054" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902065" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 78" CNTY_NM="Dallas" LIMITS_FROM_DSCR="LEON RD" LIMITS_TO_DSCR="STRATFORD DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1025909" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="11/4/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/13/2020" PSE_60_ACTL_DT="7/13/2020" PSE_100_TRGT_DT="9/2/2020" PSE_100_ACTL_DT="9/2/2020" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.953 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="5/3/2022" CNSTR_PCT_TIME_USED="154.90" CNSTR_PCT_COMPLETE="84.67" DSGN_START_TRGT_DT="5/5/2016" DSGN_START_ACTL_DT="5/5/2016" ENVCLR_TRGT_DT="10/16/2020" ENVCLR_ACTL_DT="7/16/2020" UTIL_TRGT_DT="11/12/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/12/2020" ROW_ACTL_DT="9/2/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="103074.46" CNSTR_SPENT_AMT="937091.17" CE_SPENT_AMT="59851.00" TOT_SPENT_AMT="1100016.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1323913.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 78" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT GASTON AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6336367" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="10/1/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/1/2018" PSE_60_ACTL_DT="6/1/2019" PSE_100_TRGT_DT="10/1/2019" PSE_100_ACTL_DT="3/5/2021" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.286 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="10/26/2021" CNSTR_WKBG_DT="12/14/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.19" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/1/2018" ENVCLR_ACTL_DT="12/21/2018" UTIL_TRGT_DT="9/1/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2147525.27" CNSTR_SPENT_AMT="6736046.92" CE_SPENT_AMT="578191.39" TOT_SPENT_AMT="9461763.58" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2105)" FUND_CAT1_AMT="7000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902068" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 78" CNTY_NM="Dallas" LIMITS_FROM_DSCR="MILLER RD" LIMITS_TO_DSCR="SH 66" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="138425897" DIST_LET_DATE="8/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.032 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="277323.71" TOT_SPENT_AMT="277323.71" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902072" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 78" CNTY_NM="Dallas" LIMITS_FROM_DSCR="HASKELL DRIVE" LIMITS_TO_DSCR="GARLAND AVENUE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="329623" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RL" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="515117.45" TOT_SPENT_AMT="515117.45" FUND_CAT1_DSCR="Category 10 - State Railroad Grade Crossing (2310RX)" FUND_CAT1_PID="RGC" FUND_CAT1_AMT="329623.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902073" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 78" CNTY_NM="Dallas" LIMITS_FROM_DSCR="STRATFORD DRIVE" LIMITS_TO_DSCR="AVENUE F" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2754566" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="1/10/2024" CNSTR_WKBG_DT="2/12/2024" CNSTR_PCT_TIME_USED="68.93" CNSTR_PCT_COMPLETE="89.84" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="116234.40" CNSTR_SPENT_AMT="2647338.24" CE_SPENT_AMT="114155.12" TOT_SPENT_AMT="2877727.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3054010.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902074" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 78" CNTY_NM="Dallas" LIMITS_FROM_DSCR="E LAWTHER DRIVE" LIMITS_TO_DSCR="SAN RAFEAL DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="861720" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.474 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="IBCTX, LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="74.12" CNSTR_PCT_COMPLETE="90.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="96841.85" CNSTR_SPENT_AMT="857515.40" CE_SPENT_AMT="39100.61" TOT_SPENT_AMT="993457.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1154332.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902075" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13821.81" TOT_SPENT_AMT="13821.81" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000902076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="59216.00" TOT_SPENT_AMT="59216.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000903048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT DALROCK RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1982068" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="11/1/2018" PSE_30_ACTL_DT="11/1/2018" PSE_60_TRGT_DT="11/1/2018" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="11/1/2019" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.213 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="XIT PAVING AND CONSTRUCTION INC." CNSTR_NTPD_DT="6/7/2023" CNSTR_WKBG_DT="12/7/2023" CNSTR_PCT_TIME_USED="199.23" CNSTR_PCT_COMPLETE="86.24" DSGN_START_TRGT_DT="11/1/2018" DSGN_START_ACTL_DT="11/1/2018" ENVCLR_TRGT_DT="7/1/2019" ENVCLR_ACTL_DT="8/1/2019" UTIL_TRGT_DT="8/1/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2020" ROW_ACTL_DT="1/4/2023" RTL_TRGT_DT="8/1/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="199609.86" CNSTR_SPENT_AMT="1693095.71" CE_SPENT_AMT="142094.48" TOT_SPENT_AMT="2034800.05" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2305)" FUND_CAT1_AMT="1144000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="521840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000903051" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000904072" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="DALROCK" LIMITS_TO_DSCR="EAST OF DALROCK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2271708" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="11/1/2018" PSE_30_ACTL_DT="11/1/2018" PSE_60_TRGT_DT="11/1/2018" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="11/1/2019" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.252 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="XIT PAVING AND CONSTRUCTION INC." CNSTR_NTPD_DT="6/7/2023" CNSTR_WKBG_DT="12/7/2023" CNSTR_PCT_TIME_USED="199.23" CNSTR_PCT_COMPLETE="86.24" DSGN_START_TRGT_DT="11/1/2018" DSGN_START_ACTL_DT="11/1/2018" ENVCLR_TRGT_DT="7/1/2019" ENVCLR_ACTL_DT="8/1/2019" UTIL_TRGT_DT="8/1/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2020" ROW_ACTL_DT="1/4/2023" RTL_TRGT_DT="8/1/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1916146.90" CE_SPENT_AMT="160814.01" TOT_SPENT_AMT="2076960.91" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2305)" FUND_CAT1_AMT="1541000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="502104.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000904075" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="BEN PAYNE RD" LIMITS_TO_DSCR="ROCKWALL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3075231" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.302 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8361.89" CNSTR_SPENT_AMT="402872.84" CE_SPENT_AMT="3317.63" TOT_SPENT_AMT="414552.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2453750.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000904076" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="AT FM 1138" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/24/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1324496" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/1/2022" PSE_30_ACTL_DT="10/1/2022" PSE_60_TRGT_DT="1/16/2023" PSE_60_ACTL_DT="11/16/2022" PSE_100_TRGT_DT="5/19/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="FNH CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="11/28/2023" CNSTR_PCT_TIME_USED="140.10" CNSTR_PCT_COMPLETE="81.77" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="10/1/2022" ENVCLR_TRGT_DT="5/19/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/19/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/19/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25907.53" CNSTR_SPENT_AMT="1052881.83" CE_SPENT_AMT="87446.50" TOT_SPENT_AMT="1166235.86" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000904077" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="EAST OF DALROCK RD." LIMITS_TO_DSCR="WEST OF SH 205" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1300357" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.826 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="8/19/2024" CNSTR_PCT_TIME_USED="86.61" CNSTR_PCT_COMPLETE="94.27" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5129.16" CNSTR_SPENT_AMT="1265915.08" CE_SPENT_AMT="19724.66" TOT_SPENT_AMT="1290768.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2367964.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000905013" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Collin" LIMITS_FROM_DSCR="ROCKWALL CL" LIMITS_TO_DSCR="HUNT CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="155914" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="190479.64" CE_SPENT_AMT="1568.58" TOT_SPENT_AMT="192048.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="147229.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000906052" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 66" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FM 6" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1702842" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" PE_SPENT_AMT="46028.16" CNSTR_SPENT_AMT="1910897.62" CE_SPENT_AMT="3826.56" TOT_SPENT_AMT="1960752.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="560385.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000906056" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000906057" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000906058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000907043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 302" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SH 34" LIMITS_TO_DSCR="FM 499" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1755992" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/20/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="9/29/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="11/1/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.910 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="9/1/2022" CNSTR_WKBG_DT="11/21/2022" CNSTR_PCT_TIME_USED="93.50" CNSTR_PCT_COMPLETE="94.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/7/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/13/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/5/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="11/5/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="12/13/2021" PE_SPENT_AMT="81833.92" CNSTR_SPENT_AMT="1789505.93" CE_SPENT_AMT="33088.52" TOT_SPENT_AMT="1904428.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="590325.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000908032" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 24" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FM 499" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28575" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.248 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="2/19/2020" CNSTR_WKBG_DT="5/18/2020" CNSTR_PCT_TIME_USED="73.13" CNSTR_PCT_COMPLETE="94.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2641.57" CNSTR_SPENT_AMT="23339.90" CE_SPENT_AMT="6454.89" TOT_SPENT_AMT="32436.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="24708.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000908033" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 24" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FM 499" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="402172" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="418259.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000909111" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="2550 FT WEST OF SH 19" LIMITS_TO_DSCR="2600 FT EAST OF SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35000000" DIST_LET_DATE="8/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.019 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/11/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/8/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/29/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/25/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/21/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000909112" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="HUNT COUNTY LINE" LIMITS_TO_DSCR="SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91014" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13744.56" CNSTR_SPENT_AMT="106217.20" CE_SPENT_AMT="1038.10" TOT_SPENT_AMT="120999.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="94624.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000909113" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="HUNT COUNTY LINE" LIMITS_TO_DSCR="SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="93545" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="103803.68" CE_SPENT_AMT="1086.81" TOT_SPENT_AMT="104890.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="96619.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000909114" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911238" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="BASS PRO DRIVE IN GARLAND" LIMITS_TO_DSCR="DALROCK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13601005" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="8/2/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/2/2018" PSE_60_ACTL_DT="11/1/2019" PSE_100_TRGT_DT="4/13/2020" PSE_100_ACTL_DT="12/7/2020" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.379 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="4/21/2021" CNSTR_WKBG_DT="7/21/2021" CNSTR_PCT_TIME_USED="95.20" CNSTR_PCT_COMPLETE="94.22" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="9/1/2018" ENVCLR_ACTL_DT="9/7/2018" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2453651.03" CNSTR_SPENT_AMT="13316137.96" CE_SPENT_AMT="374180.24" TOT_SPENT_AMT="16143969.23" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="22355107.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911241" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="BASS PRO DRIVE" LIMITS_TO_DSCR="DALROCK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="120678632" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/2/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/2/2018" PSE_60_ACTL_DT="11/1/2019" PSE_100_TRGT_DT="4/13/2020" PSE_100_ACTL_DT="12/7/2020" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.686 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="4/21/2021" CNSTR_WKBG_DT="7/21/2021" CNSTR_PCT_TIME_USED="95.20" CNSTR_PCT_COMPLETE="94.22" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="9/1/2018" ENVCLR_ACTL_DT="9/7/2018" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9320801.49" CNSTR_SPENT_AMT="116866226.70" CE_SPENT_AMT="3282498.01" TOT_SPENT_AMT="129469526.20" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="120574879.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911248" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT BASS PRO DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="77348349" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="7/2/2020" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="1/1/2021" PSE_60_ACTL_DT="4/1/2022" PSE_100_TRGT_DT="11/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.051 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2019" DSGN_START_ACTL_DT="9/28/2020" ENVCLR_TRGT_DT="9/1/2020" ENVCLR_ACTL_DT="9/15/2020" UTIL_TRGT_DT="1/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2733406.90" TOT_SPENT_AMT="2733406.90" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="39573925.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911254" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 35E" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="674852854" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/2/2020" PSE_30_ACTL_DT="6/1/2021" PSE_60_TRGT_DT="11/2/2020" PSE_60_ACTL_DT="6/1/2021" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.256 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="BALFOUR BEATTY INFRASTRUCTURE, INC." CNSTR_NTPD_DT="3/31/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="7/7/2020" DSGN_START_ACTL_DT="7/1/2020" ENVCLR_TRGT_DT="12/1/2020" ENVCLR_ACTL_DT="12/7/2020" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25005995.77" CNSTR_SPENT_AMT="318900.00" CE_SPENT_AMT="47962.40" TOT_SPENT_AMT="25372858.17" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="9940011.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="85000000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="36538342.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="93939810.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911260" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="BASS PRO DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59691234" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="459976.20" TOT_SPENT_AMT="459976.20" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911262" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="FERGUSON RD" LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="401066162" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TBD" PROJ_LENGTH="2.740 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="289208.01" TOT_SPENT_AMT="289208.01" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911263" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="FERGUSON RD" LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="47501707" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TBD" PROJ_LENGTH="2.769 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911264" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="US 80" LIMITS_TO_DSCR="IH 635" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="236958396" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TBD" PROJ_LENGTH="3.079 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="517542.42" TOT_SPENT_AMT="517542.42" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911265" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="US 80" LIMITS_TO_DSCR="IH 635" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27792907" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TBD" PROJ_LENGTH="3.116 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911267" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="BASS PRO DRIVE (IN GARLAND)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150844770" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.548 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="125687.22" TOT_SPENT_AMT="125687.22" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="88707912.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="81918230.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911268" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="PGBT" LIMITS_TO_DSCR="BASS PRO DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="667456" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="ICOS MANAGEMENT, LLC" CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="10/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="89184.98" TOT_SPENT_AMT="89184.98" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911269" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="2ND AVE RAMP" LIMITS_TO_DSCR="1ST AVE RAMP" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="156800" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.953 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="212601.75" TOT_SPENT_AMT="212601.75" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="175616.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911270" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="ENT RAMP" LIMITS_TO_DSCR="SL 12" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26880" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2519.53" TOT_SPENT_AMT="2519.53" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="30106.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911274" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="EAST OF BASS PRO DRIVE" LIMITS_TO_DSCR="WEST OF DALROCK RD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="888539" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.305 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="8/19/2024" CNSTR_PCT_TIME_USED="86.61" CNSTR_PCT_COMPLETE="94.27" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4868.61" CNSTR_SPENT_AMT="1052542.23" CE_SPENT_AMT="18761.51" TOT_SPENT_AMT="1076172.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1775607.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911276" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT WHITE ROCK CREEK &amp; SAMUELL" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2131200" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="146223.37" TOT_SPENT_AMT="146223.37" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1385000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911277" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT WHITE ROCK CREEK &amp; SAMUELL" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2162100" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="133394.94" TOT_SPENT_AMT="133394.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1554000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000911278" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT HUNNICUT ROAD" LIMITS_TO_DSCR="IN DALLAS COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1734605" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.115 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="695000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT2_AMT="1108989.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000912215" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="DALROCK RD (DALLAS C/L)" LIMITS_TO_DSCR="SH 205" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/2/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="113230273" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="1/1/2019" PSE_30_ACTL_DT="3/21/2018" PSE_60_TRGT_DT="1/1/2019" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="4/13/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.506 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="12/21/2022" CNSTR_WKBG_DT="3/27/2023" CNSTR_PCT_TIME_USED="56.52" CNSTR_PCT_COMPLETE="53.79" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="12/1/2018" ENVCLR_ACTL_DT="3/19/2019" UTIL_TRGT_DT="9/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3033990.86" CNSTR_SPENT_AMT="62903187.30" CE_SPENT_AMT="711117.20" TOT_SPENT_AMT="66648295.36" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="38100000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="8137397.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000912219" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="SH 205" LIMITS_TO_DSCR="WEST OF FM 2642 (HUNT C/L)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/8/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="342870407" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/3/2019" PSE_30_ACTL_DT="3/21/2018" PSE_60_TRGT_DT="4/3/2019" PSE_60_ACTL_DT="5/1/2020" PSE_100_TRGT_DT="3/1/2021" PSE_100_ACTL_DT="5/1/2022" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.390 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="9/22/2023" CNSTR_PCT_TIME_USED="43.21" CNSTR_PCT_COMPLETE="33.66" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="3/1/2018" ENVCLR_TRGT_DT="3/19/2019" ENVCLR_ACTL_DT="7/13/2020" UTIL_TRGT_DT="12/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="7/1/2021" RTL_TRGT_DT="12/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19802342.59" CNSTR_SPENT_AMT="116535638.35" CE_SPENT_AMT="3722433.00" TOT_SPENT_AMT="140060413.94" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="177820386.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="28437307.00" FUND_CAT3_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2305)" FUND_CAT3_AMT="50000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000912220" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="DALROCK ROAD" LIMITS_TO_DSCR="EAST OF HORIZON" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/2/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="199292314" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="1/1/2019" PSE_30_ACTL_DT="3/21/2018" PSE_60_TRGT_DT="1/1/2019" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="4/13/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.149 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="12/21/2022" CNSTR_WKBG_DT="3/27/2023" CNSTR_PCT_TIME_USED="56.52" CNSTR_PCT_COMPLETE="53.79" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="12/1/2018" ENVCLR_ACTL_DT="3/19/2019" UTIL_TRGT_DT="9/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9057474.72" CNSTR_SPENT_AMT="108248633.00" CE_SPENT_AMT="1223368.21" TOT_SPENT_AMT="118529475.93" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="146424272.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="20822443.00" FUND_CAT3_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT3_AMT="32000000.00" FUND_CAT4_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT4_AMT="4550599.00" FUND_CAT5_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT5_AMT="3235377.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000912221" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Rockwall" LIMITS_FROM_DSCR="DALROCK RD (ROCKWALL C/L)" LIMITS_TO_DSCR="EAST OF DALROCK RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8124858" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="8/2/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/2/2018" PSE_60_ACTL_DT="11/1/2019" PSE_100_TRGT_DT="4/13/2020" PSE_100_ACTL_DT="12/7/2020" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.530 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="4/21/2021" CNSTR_WKBG_DT="7/21/2021" CNSTR_PCT_TIME_USED="95.20" CNSTR_PCT_COMPLETE="94.22" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="9/1/2018" ENVCLR_ACTL_DT="9/7/2018" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="817460.17" CNSTR_SPENT_AMT="7942091.45" CE_SPENT_AMT="223075.47" TOT_SPENT_AMT="8982627.09" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="7000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000912226" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913166" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="MONTY STRATTON PKWY" LIMITS_TO_DSCR="FM 513" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="173300000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6377527.86" CE_SPENT_AMT="8973.09" TOT_SPENT_AMT="6386500.95" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913167" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="1.2 MILES EAST OF FM 1903" LIMITS_TO_DSCR="1.0 MILES EAST OF FM 1570" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/15/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64767102" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="2/26/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="2/28/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/5/2019" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.990 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="11/28/2022" CNSTR_WKBG_DT="3/15/2023" CNSTR_PCT_TIME_USED="52.66" CNSTR_PCT_COMPLETE="44.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/25/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/28/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/19/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/19/2019" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/28/2022" PE_SPENT_AMT="5430392.59" CNSTR_SPENT_AMT="41670891.12" CE_SPENT_AMT="1268926.50" TOT_SPENT_AMT="48370210.21" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="22000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="5800000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="1199999.00" FUND_CAT4_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT4_AMT="6500000.00" FUND_CAT5_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT5_AMT="1951028.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913168" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="EAST OF FM 1565" LIMITS_TO_DSCR="EAST OF FM 36" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/10/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="76034120" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.117 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="3/11/2024" CNSTR_PCT_TIME_USED="30.56" CNSTR_PCT_COMPLETE="26.85" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4714953.41" CNSTR_SPENT_AMT="31235776.21" CE_SPENT_AMT="568034.28" TOT_SPENT_AMT="36518763.90" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="14320723.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="12610366.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="8373452.00" FUND_CAT4_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT4_AMT="27397461.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913169" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="1.3 MILES EAST OF CR 2511" LIMITS_TO_DSCR="1.6 MILES EAST OF FM 1565" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/10/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53725783" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.028 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="3/11/2024" CNSTR_PCT_TIME_USED="30.56" CNSTR_PCT_COMPLETE="26.85" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16937.99" CNSTR_SPENT_AMT="8538737.40" CE_SPENT_AMT="592756.52" TOT_SPENT_AMT="9148431.91" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="34411337.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="11700000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913170" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="0.75 MILES WEST OF CR 2511" LIMITS_TO_DSCR="1.3 MILES EAST OF CR 2511" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/10/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58708987" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.893 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="3/11/2024" CNSTR_PCT_TIME_USED="30.56" CNSTR_PCT_COMPLETE="26.85" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14088.53" CNSTR_SPENT_AMT="11331613.75" CE_SPENT_AMT="655750.56" TOT_SPENT_AMT="12001452.84" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="41756272.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="11340000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="5000000.00" FUND_CAT4_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT4_AMT="2025.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913173" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="1.0 MILES WEST OF FM 1903" LIMITS_TO_DSCR="1.2 MILES EAST OF FM 1903" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/15/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44670227" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="2/26/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="2/28/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/5/2019" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.856 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="11/28/2022" CNSTR_WKBG_DT="3/15/2023" CNSTR_PCT_TIME_USED="52.66" CNSTR_PCT_COMPLETE="44.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/25/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/28/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/19/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/19/2019" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/28/2022" PE_SPENT_AMT="39887.85" CNSTR_SPENT_AMT="10880027.46" CE_SPENT_AMT="1149318.79" TOT_SPENT_AMT="12069234.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2587489.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913174" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FM 2642" LIMITS_TO_DSCR="MONTY STRATTON PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="170605016" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/11/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/8/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/29/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/25/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/21/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="53870.93" TOT_SPENT_AMT="53870.93" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="68500000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="96077618.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913175" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="1.0 MILES EAST OF FM 1570" LIMITS_TO_DSCR="0.1 MILES EAST OF MONTY STRATTON" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/15/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18638110" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="2/26/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="2/28/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/5/2019" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.678 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="11/28/2022" CNSTR_WKBG_DT="3/15/2023" CNSTR_PCT_TIME_USED="52.66" CNSTR_PCT_COMPLETE="44.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/25/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/28/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/19/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/19/2019" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/28/2022" PE_SPENT_AMT="1440.17" CNSTR_SPENT_AMT="5612990.17" CE_SPENT_AMT="255601.28" TOT_SPENT_AMT="5870031.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2196626.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913176" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="ROCKWALL COUNTY LINE (N FR)" LIMITS_TO_DSCR="MONTY STRATTON (N FRONTAGE RD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1338266" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="70477.76" CNSTR_SPENT_AMT="1267658.03" CE_SPENT_AMT="2959.99" TOT_SPENT_AMT="1341095.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="576090.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913177" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="ROCKWALL COUNTY LINE (S FRONTAGE)" LIMITS_TO_DSCR="MONTY STRATTON (S FRONTAGE RD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="294104" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="255681.16" CE_SPENT_AMT="4527.34" TOT_SPENT_AMT="260208.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="576090.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913178" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SH 24 (NFR)" LIMITS_TO_DSCR="HOPKINS COUNTY LINE (NFR)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="272831" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.324 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="239475.10" CE_SPENT_AMT="4209.27" TOT_SPENT_AMT="243684.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="336645.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913179" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SH 24 (SFR)" LIMITS_TO_DSCR="HOPKINS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="323351" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="272571.30" CE_SPENT_AMT="5218.37" TOT_SPENT_AMT="277789.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="336645.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913180" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="ROCKWALL COUNTY LINE (N FR)" LIMITS_TO_DSCR="MONTY STRATTON (N FRONTAGE RD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="62392" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="58951.79" CE_SPENT_AMT="1032.45" TOT_SPENT_AMT="59984.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="62335.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913181" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="ROCKWALL COUNTY LINE (S FR)" LIMITS_TO_DSCR="MONTY STRATTON (S FRONTAGE RD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="66185" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="73211.31" CE_SPENT_AMT="1143.73" TOT_SPENT_AMT="74355.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="66563.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913182" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SH 24 (NFR)" LIMITS_TO_DSCR="HOPKINS COUNTY LINE (NFR)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63307" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="61322.05" CE_SPENT_AMT="1064.21" TOT_SPENT_AMT="62386.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="51268.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913192" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SS 302 (NFR)" LIMITS_TO_DSCR="SH 24 (NFR)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2407819" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17014.66" CNSTR_SPENT_AMT="2545318.60" CE_SPENT_AMT="4433.82" TOT_SPENT_AMT="2566767.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1573107.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913193" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SS 302 E  (SFR)" LIMITS_TO_DSCR="SH 24 (SFR)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="264418" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="181009.56" CE_SPENT_AMT="3046.58" TOT_SPENT_AMT="184056.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="279480.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913199" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 30" CNTY_NM="Hunt" LIMITS_FROM_DSCR="NFR SH 24" LIMITS_TO_DSCR="HOPKINS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="421330" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="471890.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000913200" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000914002" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 302" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FM 499" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="171355" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/20/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="9/29/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="11/1/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.670 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="9/1/2022" CNSTR_WKBG_DT="11/21/2022" CNSTR_PCT_TIME_USED="93.50" CNSTR_PCT_COMPLETE="94.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/7/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/13/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/5/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="11/5/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="12/13/2021" PE_SPENT_AMT="6123.35" CNSTR_SPENT_AMT="215633.90" CE_SPENT_AMT="5108.95" TOT_SPENT_AMT="226866.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="104175.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000915031" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 69" CNTY_NM="Hunt" LIMITS_FROM_DSCR="CREEK CROSSING DR." LIMITS_TO_DSCR="BU 69 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5700000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6384000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="000918021" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 67-V" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3647913" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.720 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="76440.00" CE_SPENT_AMT="143.06" TOT_SPENT_AMT="76583.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2000757.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001002102" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="2750 FT WEST OF SH 154" LIMITS_TO_DSCR="2200 FT EAST OF SH 154" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45000000" DIST_LET_DATE="8/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.918 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/11/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/8/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/29/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/25/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/21/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001002103" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="LP 301" LIMITS_TO_DSCR="0.913 MI W OF US 67" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="55756" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="61751.50" CE_SPENT_AMT="636.93" TOT_SPENT_AMT="62388.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="58229.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001002104" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="LP 301" LIMITS_TO_DSCR="0.913 MI W OF US 67" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49474" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="55582.04" CE_SPENT_AMT="570.12" TOT_SPENT_AMT="56152.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="52930.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001002105" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001002107" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 30" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="700' WEST OF BILL BRADFORD RD" LIMITS_TO_DSCR="150' EAST OF BILL BRADFORD RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1068480" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="GRANITE CONSTRUCTION COMPANY" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="111.21" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="412654.11" CE_SPENT_AMT="7756.55" TOT_SPENT_AMT="420410.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1100534.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001003015" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="FRANKLIN COUNTY LINE" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="222228" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.399 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1777.53" CNSTR_SPENT_AMT="216786.02" CE_SPENT_AMT="3471.76" TOT_SPENT_AMT="222035.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="333000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001003017" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="FRANKLIN C/L" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="472729" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="529456.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001004022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Franklin" LIMITS_FROM_DSCR="SH 37" LIMITS_TO_DSCR="HOPKINS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="130624" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.639 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="126221.35" CE_SPENT_AMT="2021.82" TOT_SPENT_AMT="128243.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="208890.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001004024" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Franklin" LIMITS_FROM_DSCR="SH 37" LIMITS_TO_DSCR="HOPKINS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="435917" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="488227.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001005025" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Franklin" LIMITS_FROM_DSCR="CR 2010" LIMITS_TO_DSCR="TITUS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="255823" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="222170.06" CE_SPENT_AMT="3108.51" TOT_SPENT_AMT="225278.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="269796.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001006044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Titus" LIMITS_FROM_DSCR="0.1 MI E OF FM 1734 (W)" LIMITS_TO_DSCR="0.1 MI W OF US 271" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2499962" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2022" PSE_100_ACTL_DT="7/14/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.381 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/26/2023" CNSTR_WKBG_DT="5/25/2023" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="90.17" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="2/18/2022" ENVCLR_TRGT_DT="5/4/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="1/3/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/3/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2022" RTL_ACTL_DT="8/5/2022" PE_SPENT_AMT="42489.42" CNSTR_SPENT_AMT="605710.19" CE_SPENT_AMT="7307.63" TOT_SPENT_AMT="655507.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1245123.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001006045" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001006046" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001007053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Titus" LIMITS_FROM_DSCR="MORRIS C/L" LIMITS_TO_DSCR="BU 271" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="714984" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2022" PSE_100_ACTL_DT="7/14/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.366 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/26/2023" CNSTR_WKBG_DT="5/25/2023" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="90.17" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="2/18/2022" ENVCLR_TRGT_DT="5/4/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="1/3/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/3/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2022" RTL_ACTL_DT="8/5/2022" CNSTR_SPENT_AMT="791423.00" CE_SPENT_AMT="9546.95" TOT_SPENT_AMT="800969.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="21725.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="31911.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_PID="PM" FUND_CAT3_AMT="30173.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT4_PID="PM" FUND_CAT4_AMT="526813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001007054" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001007055" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001008060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Morris" LIMITS_FROM_DSCR="0.5 MI E OF US 259" LIMITS_TO_DSCR="0.5 MI W OF US 259" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="281938" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/10/2024" CNSTR_WKBG_DT="1/23/2025" CNSTR_PCT_TIME_USED="55.33" CNSTR_PCT_COMPLETE="63.52" DSGN_START_TRGT_DT="12/8/2022" DSGN_START_ACTL_DT="12/8/2022" ENVCLR_TRGT_DT="3/8/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/9/2022" UTIL_ACTL_DT="12/9/2022" ROW_TRGT_DT="12/9/2022" ROW_ACTL_DT="12/9/2022" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17327.38" CNSTR_SPENT_AMT="381103.08" CE_SPENT_AMT="708.45" TOT_SPENT_AMT="399138.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="140190.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001008061" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Morris" LIMITS_FROM_DSCR="US 259" LIMITS_TO_DSCR="TITUS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="471744" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="528353.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001008063" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Morris" LIMITS_FROM_DSCR="US 259" LIMITS_TO_DSCR="CASS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="588445" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.832 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="659059.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001009009" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 185" CNTY_NM="Titus" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1600000" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.704 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001010031" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Cass" LIMITS_FROM_DSCR="BOWIE C/L" LIMITS_TO_DSCR="MORRIS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="210280" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.051 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="235513.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001011076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="CASS C/L" LIMITS_TO_DSCR="0.8 MI W OF SH 8" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2228040" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.675 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2495405.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001012075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.5 MI E OF SH 8" LIMITS_TO_DSCR="0.5 MI W OF SH 8" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="228527" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="10/13/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="12/4/2023" CNSTR_PCT_TIME_USED="108.14" CNSTR_PCT_COMPLETE="99.98" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="2/2/2022" ENVCLR_TRGT_DT="3/2/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="3/1/2022" UTIL_ACTL_DT="11/4/2022" ROW_TRGT_DT="3/1/2022" ROW_ACTL_DT="11/4/2022" RTL_TRGT_DT="11/4/2022" RTL_ACTL_DT="11/1/2022" PE_SPENT_AMT="15032.01" CNSTR_SPENT_AMT="221183.58" CE_SPENT_AMT="41626.58" TOT_SPENT_AMT="277842.17" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="133279.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001012076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.5 MI E OF FM 3098" LIMITS_TO_DSCR="0.5 MI W OF FM 3098" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="87189" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="10/13/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="12/4/2023" CNSTR_PCT_TIME_USED="108.14" CNSTR_PCT_COMPLETE="99.98" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="2/2/2022" ENVCLR_TRGT_DT="3/2/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="3/1/2022" UTIL_ACTL_DT="11/4/2022" ROW_TRGT_DT="3/1/2022" ROW_ACTL_DT="11/4/2022" RTL_TRGT_DT="11/4/2022" RTL_ACTL_DT="11/1/2022" PE_SPENT_AMT="430.93" CNSTR_SPENT_AMT="86155.34" CE_SPENT_AMT="327.95" TOT_SPENT_AMT="86914.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="108883.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001012077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="1.4 MI W OF FM 991W" LIMITS_TO_DSCR="FM 991W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="141192" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.484 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="152487.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013056" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.2 MI W OF FM 989" LIMITS_TO_DSCR="FM 2148(S)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72670000" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/23/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1066982.80" TOT_SPENT_AMT="1066982.80" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.5 MI W OF FM 2148S" LIMITS_TO_DSCR="0.5 MI E OF FM 2148S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="81934" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="10/13/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="12/4/2023" CNSTR_PCT_TIME_USED="108.14" CNSTR_PCT_COMPLETE="99.98" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="2/2/2022" ENVCLR_TRGT_DT="3/2/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="3/1/2022" UTIL_ACTL_DT="11/4/2022" ROW_TRGT_DT="3/1/2022" ROW_ACTL_DT="11/4/2022" RTL_TRGT_DT="11/4/2022" RTL_ACTL_DT="11/1/2022" PE_SPENT_AMT="363.72" CNSTR_SPENT_AMT="80901.03" CE_SPENT_AMT="307.55" TOT_SPENT_AMT="81572.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="134679.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013098" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT SH 93" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13302" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2690.30" TOT_SPENT_AMT="2690.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="14898.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013099" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT FM 989" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19858" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.87" TOT_SPENT_AMT="100.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="22241.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013100" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT ROBINSON RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22167" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.003 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.86" TOT_SPENT_AMT="100.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="24827.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013101" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT WAKE VILLAGE RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78694" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="415.50" TOT_SPENT_AMT="415.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="88138.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013102" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT SH 93" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13302" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.87" TOT_SPENT_AMT="100.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="14898.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT US 82" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13831" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.300 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.86" TOT_SPENT_AMT="100.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="15491.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013104" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.1 MI E OF FM 2148N" LIMITS_TO_DSCR="1.4 MI E OF FM 991W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="437940" DIST_LET_DATE="10/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.501 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001013105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 991E" LIMITS_TO_DSCR="1.46 MI E OF FM 991W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8600000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.167 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="9632000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001019014" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 991" CNTY_NM="Bowie" LIMITS_FROM_DSCR="US 67 W" LIMITS_TO_DSCR="US 67 E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1803523" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.795 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="88.68" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="5/3/2023" ENVCLR_ACTL_DT="2/27/2023" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="4/10/2023" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="4/10/2023" RTL_TRGT_DT="7/28/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34299.01" CNSTR_SPENT_AMT="708023.38" CE_SPENT_AMT="7273.04" TOT_SPENT_AMT="749595.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1547085.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001101040" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 351" CNTY_NM="Taylor" LIMITS_FROM_DSCR="ABILENE CITY LIMITS" LIMITS_TO_DSCR="CALLAHAN CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1456903" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/10/2025" CNSTR_PCT_TIME_USED="18.69" CNSTR_PCT_COMPLETE="32.88" DSGN_START_TRGT_DT="1/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/20/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2026" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="637900.37" CE_SPENT_AMT="4833.81" TOT_SPENT_AMT="642734.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1995903.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001102017" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 351" CNTY_NM="Callahan" LIMITS_FROM_DSCR="AT DEADMAN CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="365430" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/29/2022" PSE_30_ACTL_DT="10/3/2022" PSE_60_TRGT_DT="11/3/2022" PSE_60_ACTL_DT="11/22/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="2/17/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/27/2023" CNSTR_PCT_TIME_USED="99.38" CNSTR_PCT_COMPLETE="99.58" DSGN_START_TRGT_DT="8/17/2022" DSGN_START_ACTL_DT="11/21/2022" ENVCLR_TRGT_DT="12/21/2022" ENVCLR_ACTL_DT="12/5/2022" UTIL_TRGT_DT="12/21/2022" UTIL_ACTL_DT="2/16/2023" ROW_TRGT_DT="8/17/2022" ROW_ACTL_DT="8/17/2022" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="2/17/2023" CNSTR_SPENT_AMT="346085.40" CE_SPENT_AMT="10581.47" TOT_SPENT_AMT="356666.87" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="310000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001102019" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 351" CNTY_NM="Callahan" LIMITS_FROM_DSCR="TAYLOR COUNTY" LIMITS_TO_DSCR="JONES COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="263982" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/10/2025" CNSTR_PCT_TIME_USED="18.69" CNSTR_PCT_COMPLETE="32.88" DSGN_START_TRGT_DT="1/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/20/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2026" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="115433.69" CE_SPENT_AMT="874.72" TOT_SPENT_AMT="116308.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="433818.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001103015" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 351" CNTY_NM="Jones" LIMITS_FROM_DSCR="CALLAHAN COUNTY" LIMITS_TO_DSCR="SHACKELFORD COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="207763" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/10/2025" CNSTR_PCT_TIME_USED="18.69" CNSTR_PCT_COMPLETE="32.88" DSGN_START_TRGT_DT="1/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/20/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2026" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="90882.49" CE_SPENT_AMT="688.68" TOT_SPENT_AMT="91571.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="361173.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001104028" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 351" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="4.5 MILES EAST OF FM 604" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="836523" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="869984.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001104029" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 351" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="JONES COUNTY" LIMITS_TO_DSCR="4.5 MILES EAST OF FM 604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3730620" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/10/2025" CNSTR_PCT_TIME_USED="18.69" CNSTR_PCT_COMPLETE="32.88" DSGN_START_TRGT_DT="1/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/20/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39795.66" CNSTR_SPENT_AMT="1309397.13" CE_SPENT_AMT="9922.21" TOT_SPENT_AMT="1359115.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="6051609.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001105052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="US 180 REF 448" LIMITS_TO_DSCR="US 180 FER 452" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="289698" DIST_LET_DATE="1/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="24809.54" TOT_SPENT_AMT="24809.54" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2010)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="24810.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001105053" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="N PRONG HUBBARD CRK BRIDGE" LIMITS_TO_DSCR="SOUTH 4TH ST." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="371542" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/20/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="386404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001106050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="S 4TH ST" LIMITS_TO_DSCR="ALBANY EAST CITY LIMIT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/20/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/20/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18459.96" TOT_SPENT_AMT="18459.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001106051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="US 180" LIMITS_TO_DSCR="AT NEWCOMB CREEK" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="380000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="380000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107053" PT_PHASE="Planning, 10+ years" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="FM 3201" LIMITS_TO_DSCR="FM 2231" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="55000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TBD" PROJ_LENGTH="3.135 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107055" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="SUNSET ST." LIMITS_TO_DSCR="FM 3099" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.466 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="2800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107056" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="SHACKELFORD C/L" LIMITS_TO_DSCR="W. SIDE OF US 180 BRIDGE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="505770" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="59881.21" CE_SPENT_AMT="23.44" TOT_SPENT_AMT="59904.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="168175.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107057" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="0.5 MI W OF FM 2231" LIMITS_TO_DSCR="FM 3099" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183089" DIST_LET_DATE="11/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.091 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107058" PT_PHASE="Planning, 10+ years" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="1.7 MI W OF FM 2231" LIMITS_TO_DSCR="FM 3099" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.249 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="2340000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="NEAR FM 3099" LIMITS_TO_DSCR="HARDING AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1694941" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jordan Perry, P.E" TXDOT_CNTCT_PH_NBR="(254)629-3845" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="5/10/2024" CNSTR_PCT_TIME_USED="56.00" CNSTR_PCT_COMPLETE="95.59" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11690.30" CNSTR_SPENT_AMT="2119556.36" CE_SPENT_AMT="12082.13" TOT_SPENT_AMT="2143328.79" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1865238.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001107061" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="1.7 MI. WEST OF FM 2231" LIMITS_TO_DSCR="NEAR FM 3099" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2610780" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jordan Perry, P.E" TXDOT_CNTCT_PH_NBR="(254)629-3845" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="5/10/2024" CNSTR_PCT_TIME_USED="56.00" CNSTR_PCT_COMPLETE="95.59" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4495.00" CNSTR_SPENT_AMT="2665278.16" CE_SPENT_AMT="42222.98" TOT_SPENT_AMT="2711996.14" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2784128.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001108029" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="HARDING AVE." LIMITS_TO_DSCR="ROSE AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2344247" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.930 (mi)" TXDOT_CNTCT_NM="Jordan Perry, P.E" TXDOT_CNTCT_PH_NBR="(254)629-3845" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="5/10/2024" CNSTR_PCT_TIME_USED="56.00" CNSTR_PCT_COMPLETE="95.59" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2538.79" CNSTR_SPENT_AMT="2348013.08" CE_SPENT_AMT="27608.17" TOT_SPENT_AMT="2378160.04" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2285056.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001108030" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="MERRILL ST" LIMITS_TO_DSCR="FM 287" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63363" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.872 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="65898.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2024" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001109076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Stephens" LIMITS_FROM_DSCR="FM 287" LIMITS_TO_DSCR=".132 MI E OF SH 67" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183424" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.754 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="21516.64" CE_SPENT_AMT="8.42" TOT_SPENT_AMT="21525.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="109483.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001110028" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Palo Pinto" LIMITS_FROM_DSCR="STEPHENS COUNTY LINE" LIMITS_TO_DSCR="WEST OF SH 16N" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="54911537" DIST_LET_DATE="4/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="10/6/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/15/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/13/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.895 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/11/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/11/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1832524.93" TOT_SPENT_AMT="1832524.93" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="45500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001112007" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 252" CNTY_NM="Stephens" LIMITS_FROM_DSCR="US 180, W. OF CADDO" LIMITS_TO_DSCR="US 180, E. OF CADDO" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52524" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.512 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="6089.61" CE_SPENT_AMT="2.38" TOT_SPENT_AMT="6091.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="49579.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001302024" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Montague" LIMITS_FROM_DSCR="0.1 MILES NORTH OF SL 19" LIMITS_TO_DSCR="RED RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12940.98" TOT_SPENT_AMT="12940.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2160000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001303038" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Montague" LIMITS_FROM_DSCR="FM 1806 W" LIMITS_TO_DSCR="0.1 MILES NORTH OF SL 19" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5459.24" TOT_SPENT_AMT="5459.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2160000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001304023" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Montague" LIMITS_FROM_DSCR="POLK RD IN BOWIE" LIMITS_TO_DSCR="FM 1806 W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1860000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5747.03" TOT_SPENT_AMT="5747.03" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2008800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001305046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Montague" LIMITS_FROM_DSCR="ON US 287 8 MILES SOUTH OF BOWIE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30000000" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SRA" PROJ_DSCR="Construct Rest Area" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/4/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="724974.31" TOT_SPENT_AMT="724974.31" FUND_CAT1_DSCR="Category 9 - Transportation Alternative Program (TAP), STP-Flex (2609FX)" FUND_CAT1_PID="SW" FUND_CAT1_AMT="30000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001305066" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Montague" LIMITS_FROM_DSCR="NEAR WAGGONSELLER RD" LIMITS_TO_DSCR="WISE CL (FRONTAGE ROADS ONLY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1723583" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11574.16" CNSTR_SPENT_AMT="2112408.71" CE_SPENT_AMT="10.97" TOT_SPENT_AMT="2123993.84" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1678303.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001305067" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Montague" LIMITS_FROM_DSCR="NEAR FRUITLAND ROAD" LIMITS_TO_DSCR="WISE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22000000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/6/2023" DSGN_START_ACTL_DT="4/6/2023" ENVCLR_TRGT_DT="4/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/30/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="258962.53" TOT_SPENT_AMT="258962.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="24640000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001306047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="0.3 MILES NORTH OF CR 1591" LIMITS_TO_DSCR="CR 1591" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/27/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19051" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.300 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="8/9/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.78" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="219285.11" CNSTR_SPENT_AMT="97206.67" CE_SPENT_AMT="308.26" TOT_SPENT_AMT="316800.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="91775.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001306048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR=".455 MILES NORTH OF CR 1596" LIMITS_TO_DSCR=".057 MILES NORTH OF CR 1596" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/27/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="699023" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.398 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="8/9/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.78" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="56819.18" CNSTR_SPENT_AMT="786176.16" CE_SPENT_AMT="29236.75" TOT_SPENT_AMT="872232.09" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="729100.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001306050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="MONTAGUE COUNTY LINE" LIMITS_TO_DSCR="FM 1655" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1095808" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.300 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="101.48" CNSTR_PCT_COMPLETE="88.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1092950.50" CE_SPENT_AMT="17461.82" TOT_SPENT_AMT="1110412.32" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1085334.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT2_AMT="312217.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001306051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="FM 1655" LIMITS_TO_DSCR="BU 81 C" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="163857" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.543 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="183520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001306052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="N END OF FRONTAGE RD" LIMITS_TO_DSCR="FM 1655" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="125760" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="140851.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001307083" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="NORTH OF CR 2195" LIMITS_TO_DSCR="NORTH OF US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91373735" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="9/13/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/25/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.810 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/21/2017" DSGN_START_ACTL_DT="8/21/2017" ENVCLR_TRGT_DT="4/5/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/7/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/7/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="766717.95" TOT_SPENT_AMT="766717.95" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="55000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001307086" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="FM 1655" LIMITS_TO_DSCR="BU 380F" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3226388" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="101.48" CNSTR_PCT_COMPLETE="88.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2870796.15" CE_SPENT_AMT="25689.42" TOT_SPENT_AMT="2896485.57" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1085334.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT2_AMT="2011850.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308111" PT_PHASE="Planning, 10+ years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="NORTH OF PIONEER RD." LIMITS_TO_DSCR="TARRANT/WISE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="338289605" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="6/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/27/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/5/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/5/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4454525.17" TOT_SPENT_AMT="4454525.17" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308130" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="NORTH OF CR 4228" LIMITS_TO_DSCR="SOUTH OF NRS RANCH ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="94634950" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.570 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/8/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1566678.67" TOT_SPENT_AMT="1566678.67" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308131" PT_PHASE="Planning, 10+ years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="N. OF RAMHORN HILL RD." LIMITS_TO_DSCR="S. OF RAMHORN HILL RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106538342" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/22/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.200 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/7/2017" DSGN_START_ACTL_DT="4/7/2017" ENVCLR_TRGT_DT="12/20/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/22/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/29/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8750.31" TOT_SPENT_AMT="8750.31" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="119322943.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/8/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308132" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="2.687 MI NORTH OF FM 407" LIMITS_TO_DSCR="0.125 MI NORTH OF FM 407" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6579664" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="10/29/2020" PSE_30_ACTL_DT="7/22/2020" PSE_60_TRGT_DT="2/26/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="6/25/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.197 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="3/15/2023" CNSTR_WKBG_DT="5/18/2023" CNSTR_PCT_TIME_USED="88.03" CNSTR_PCT_COMPLETE="93.44" DSGN_START_TRGT_DT="2/28/2020" DSGN_START_ACTL_DT="2/28/2020" ENVCLR_TRGT_DT="9/16/2021" ENVCLR_ACTL_DT="9/24/2021" UTIL_TRGT_DT="9/3/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/6/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="283977.58" CNSTR_SPENT_AMT="7296683.43" CE_SPENT_AMT="274687.40" TOT_SPENT_AMT="7855348.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="4960580.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308133" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="0.466 MI SOUTH OF FM 2264" LIMITS_TO_DSCR="2.687 MI NORTH OF FM 407" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13816879" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="10/29/2020" PSE_30_ACTL_DT="7/22/2020" PSE_60_TRGT_DT="2/26/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="6/25/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.518 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="3/15/2023" CNSTR_WKBG_DT="5/18/2023" CNSTR_PCT_TIME_USED="88.03" CNSTR_PCT_COMPLETE="93.44" DSGN_START_TRGT_DT="2/28/2020" DSGN_START_ACTL_DT="2/28/2020" ENVCLR_TRGT_DT="9/16/2021" ENVCLR_ACTL_DT="9/24/2021" UTIL_TRGT_DT="9/3/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/6/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="547652.08" CNSTR_SPENT_AMT="14908954.07" CE_SPENT_AMT="561255.08" TOT_SPENT_AMT="16017861.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="11823863.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308140" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="0.466 MI SOUTH OF FM 2264" LIMITS_TO_DSCR="CR 4421" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5326472" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="10/29/2020" PSE_30_ACTL_DT="7/22/2020" PSE_60_TRGT_DT="2/26/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="6/25/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.360 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="3/15/2023" CNSTR_WKBG_DT="5/18/2023" CNSTR_PCT_TIME_USED="88.03" CNSTR_PCT_COMPLETE="93.44" DSGN_START_TRGT_DT="2/28/2020" DSGN_START_ACTL_DT="2/28/2020" ENVCLR_TRGT_DT="9/16/2021" ENVCLR_ACTL_DT="9/24/2021" UTIL_TRGT_DT="9/3/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/6/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="421772.58" CNSTR_SPENT_AMT="3244949.88" CE_SPENT_AMT="122157.82" TOT_SPENT_AMT="3788880.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="4291548.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308141" PT_PHASE="Planning, 10+ years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="RAMHORN HILL ROAD" LIMITS_TO_DSCR="CR 4838" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18992360" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.640 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20404.86" TOT_SPENT_AMT="20404.86" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="21271444.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/8/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308145" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="BU 380F" LIMITS_TO_DSCR="0.5 MI. SOUTH OF CR 4228" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1564638" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="101.48" CNSTR_PCT_COMPLETE="88.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1270709.43" CE_SPENT_AMT="20741.92" TOT_SPENT_AMT="1291451.35" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1085334.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT2_AMT="469346.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308147" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="N OF NORTHSTAR PARKWAY" LIMITS_TO_DSCR="WISE/TARRANT COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75609098" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.550 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="43282188.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308149" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Wise" LIMITS_FROM_DSCR="FM 407" LIMITS_TO_DSCR="TARRANT COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11433337" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7498.64" TOT_SPENT_AMT="7498.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="12805338.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001308151" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001309012" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 81-D" CNTY_NM="Wise" LIMITS_FROM_DSCR="CR 1160- REALIGNED FM 1810 INTERSEC" LIMITS_TO_DSCR="NORTH OF CR 2090" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6247239" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="9/13/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/25/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.414 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/21/2017" DSGN_START_ACTL_DT="8/21/2017" ENVCLR_TRGT_DT="4/5/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/7/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/7/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="163353.48" TOT_SPENT_AMT="163353.48" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="2400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001310082" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287P" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AT W. BAILEY BOSWELL RD" LIMITS_TO_DSCR="IN SAGINAW" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11000000" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.043 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="12/7/2015" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15191.96" CE_SPENT_AMT="1332.59" TOT_SPENT_AMT="16524.55" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_PID="CC" FUND_CAT1_AMT="11000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001310089" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287P" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="MINTON ROAD" LIMITS_TO_DSCR="SAGINAW CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="406338" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="APEX LANDSCAPE &amp; IRRIGATION, LLC" CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="11/7/2022" CNSTR_PCT_TIME_USED="92.94" CNSTR_PCT_COMPLETE="89.34" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="7/4/2022" PE_SPENT_AMT="3319.56" CNSTR_SPENT_AMT="462818.01" CE_SPENT_AMT="85623.36" TOT_SPENT_AMT="551760.93" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="392606.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001310091" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287P" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WJ BOAZ RD" LIMITS_TO_DSCR="BAILEY BOSWELL RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="307805" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="TIGHT LINE CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="3/4/2024" CNSTR_PCT_TIME_USED="97.92" CNSTR_PCT_COMPLETE="86.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9563.08" CNSTR_SPENT_AMT="299449.47" CE_SPENT_AMT="110615.03" TOT_SPENT_AMT="419627.58" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="411433.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001310093" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001310096" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 287P" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="CITY OF SAGINAW LIMIT" LIMITS_TO_DSCR="PALOMINO DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="400000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2535.67" TOT_SPENT_AMT="2535.67" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="849130.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001311007" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001312008" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001313007" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 101" CNTY_NM="Montague" LIMITS_FROM_DSCR="0.4 MI SOUTH OF US 81" LIMITS_TO_DSCR="FM 1749" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7950754" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="EUROVIA ATLANTIC COAST LLC" CNSTR_NTPD_DT="5/1/2025" CNSTR_WKBG_DT="5/27/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="990399.65" TOT_SPENT_AMT="990399.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001401026" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 287P" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="MAIN STREET (BUS 287) FROM THE TRINITY R" LIMITS_TO_DSCR="WEATHERFORD STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8200000" DIST_LET_DATE="7/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/2/2023" PE_SPENT_AMT="9946.78" TOT_SPENT_AMT="9946.78" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2405)" FUND_CAT1_AMT="5000000.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT2_AMT="3300000.00" FUND_CAT3_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT3_AMT="884000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001401033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001402050" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="S OF ALTAMESA BLVD" LIMITS_TO_DSCR="SH 174" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="738303914" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/5/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7175419.53" CE_SPENT_AMT="167.64" TOT_SPENT_AMT="7175587.17" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001402055" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="SOUTH OF GARDEN ACRES" LIMITS_TO_DSCR="SOUTH OF ALSBURY BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151785714" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.500 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81.38" TOT_SPENT_AMT="81.38" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001402057" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="0.2 MI S OF ALTAMESA BRIDGE" LIMITS_TO_DSCR="JOHNSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2733798" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Safety Assurance Reviews" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2843150.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001403088" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="BETHESDA ROAD" LIMITS_TO_DSCR="ASHER ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65361000" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="12/13/2021" PSE_30_ACTL_DT="6/17/2022" PSE_60_TRGT_DT="3/4/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/26/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.500 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/25/2021" DSGN_START_ACTL_DT="1/25/2021" ENVCLR_TRGT_DT="3/4/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/27/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/27/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3904871.15" CE_SPENT_AMT="3446.52" TOT_SPENT_AMT="3908317.67" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="68000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT2_AMT="608.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001403098" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="FM 3391/ E. RENFRO ST" LIMITS_TO_DSCR="S OF US 67" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="574405813" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/24/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5512442.22" CE_SPENT_AMT="58.39" TOT_SPENT_AMT="5512500.61" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001403102" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="CR 604" LIMITS_TO_DSCR="NORTH OF W. COTTER ST." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1169932" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(817)202-2900" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/7/2024" CNSTR_WKBG_DT="9/11/2024" CNSTR_PCT_TIME_USED="29.14" CNSTR_PCT_COMPLETE="49.76" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="87.90" CNSTR_SPENT_AMT="596544.34" CE_SPENT_AMT="11583.72" TOT_SPENT_AMT="608215.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1378693.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001403103" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="NORTH OF WOODBINE DR" LIMITS_TO_DSCR="SOUTH OF CR 530B" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5522613" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/5/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/7/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/13/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/11/2022" DSGN_START_ACTL_DT="4/8/2022" ENVCLR_TRGT_DT="3/13/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/25/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/23/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="692617.62" TOT_SPENT_AMT="692617.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="5743518.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001403106" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="SH 174" LIMITS_TO_DSCR="FM 3391/E RENFRO STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="105349261" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/5/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001404084" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="IH 35W SB OVER S CHAMBERS CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="796220" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.064 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="46326.52" CNSTR_SPENT_AMT="798356.68" CE_SPENT_AMT="76966.02" TOT_SPENT_AMT="921649.22" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="716980.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001404086" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="NORTH OF COTTER ST" LIMITS_TO_DSCR="NORTH OF CR 201A" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12566830" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(817)202-2900" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/7/2024" CNSTR_WKBG_DT="9/11/2024" CNSTR_PCT_TIME_USED="29.14" CNSTR_PCT_COMPLETE="49.76" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="510847.94" CNSTR_SPENT_AMT="8249623.03" CE_SPENT_AMT="100102.38" TOT_SPENT_AMT="8860573.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="13871477.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001404089" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="S OF US 67" LIMITS_TO_DSCR="S OF CR 401" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="130018091" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/24/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001404091" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 81" CNTY_NM="Johnson" LIMITS_FROM_DSCR="IH 35 W" LIMITS_TO_DSCR="HILL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="212225" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.868 (mi)" TXDOT_CNTCT_NM="Janet Crawford, P. E." TXDOT_CNTCT_PH_NBR="(817)370-6521" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="12.88" CNSTR_PCT_COMPLETE="2.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="16.91" TOT_SPENT_AMT="16.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="201815.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001404092" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="AT TURKEY CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1264563" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8486.63" TOT_SPENT_AMT="8486.63" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1264563.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001405040" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 81" CNTY_NM="Hill" LIMITS_FROM_DSCR="JOHNSON COUNTY LINE" LIMITS_TO_DSCR="CR 4251" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="434293" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.248 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="486397.02" CE_SPENT_AMT="4218.15" TOT_SPENT_AMT="490615.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="375000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001406043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 81" CNTY_NM="Hill" LIMITS_FROM_DSCR="CR" LIMITS_TO_DSCR="LOOP 579" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="239421" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.646 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="268326.04" CE_SPENT_AMT="2326.97" TOT_SPENT_AMT="270653.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="375000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001406047" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 81" CNTY_NM="Hill" LIMITS_FROM_DSCR="@ PECAN CREEK" LIMITS_TO_DSCR="@ PECAN CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="240348" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="240348.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001406048" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 81" CNTY_NM="Hill" LIMITS_FROM_DSCR="@ BOND CREEK" LIMITS_TO_DSCR="@ BOND CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="389508" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="389508.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001406049" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 81" CNTY_NM="Hill" LIMITS_FROM_DSCR="@ PECAN CREEK" LIMITS_TO_DSCR="@ PECAN CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="240348" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="240348.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001406050" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 81" CNTY_NM="Hill" LIMITS_FROM_DSCR="@ SH 81 NB" LIMITS_TO_DSCR="@ SH 81 NB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150216" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="150216.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001406051" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001407107" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hill" LIMITS_FROM_DSCR="0.4 MI N OF FM 310 (PATTON MILLS RD)" LIMITS_TO_DSCR="0.6 MI N OF FM 310" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50000" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="0.062 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33187.53" TOT_SPENT_AMT="33187.53" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001407108" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hill" LIMITS_FROM_DSCR="FM 310" LIMITS_TO_DSCR="MCLENNAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="11/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/25/2022" PSE_100_ACTL_DT="5/25/2022" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="8.679 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/18/2019" DSGN_START_ACTL_DT="9/18/2019" ENVCLR_TRGT_DT="3/1/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/22/2022" RTL_ACTL_DT="6/22/2022" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1120000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001407109" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001407110" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hill" LIMITS_FROM_DSCR="SH 81" LIMITS_TO_DSCR="FM 1304" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27000000" DIST_LET_DATE="9/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001407111" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001407112" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001408091" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001408092" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410064" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-L" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="FM 434" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20000000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="7/30/2031" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/5/2031" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/11/2032" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/10/2020" DSGN_START_ACTL_DT="6/10/2020" ENVCLR_TRGT_DT="8/6/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/17/2032" RTL_ACTL_DT="TBD" PE_SPENT_AMT="826058.99" TOT_SPENT_AMT="826058.99" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410066" PT_PHASE="Planning, 10+ years" HWY_NBR="US 77" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="18TH STREET" LIMITS_TO_DSCR="TRAFFIC CIRCLE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="10/1/2049" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="2/12/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/22/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.614 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/14/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/4/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410067" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-L" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ BRAZOS RV (SB)" LIMITS_TO_DSCR="(STR #170)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7000000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="7/30/2031" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/5/2031" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/11/2032" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/10/2020" DSGN_START_ACTL_DT="6/10/2020" ENVCLR_TRGT_DT="8/6/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/17/2032" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_AMT="7000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410068" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-L" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ 3RD STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="466802" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="5/17/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/12/2023" PSE_60_ACTL_DT="5/2/2023" PSE_100_TRGT_DT="10/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="11/11/2024" CNSTR_PCT_TIME_USED="26.00" CNSTR_PCT_COMPLETE="59.52" DSGN_START_TRGT_DT="4/2/2018" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/25/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/8/2018" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/15/2018" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/15/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3425.17" CNSTR_SPENT_AMT="215423.96" CE_SPENT_AMT="20664.39" TOT_SPENT_AMT="239513.52" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="353760.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="12642.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410069" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-L" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="WACO TRAFFIC CIRCLE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="4/13/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/21/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/5/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/18/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="808368.27" TOT_SPENT_AMT="808368.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="5040000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410071" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-L" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ POTTS INTERCHANGE" LIMITS_TO_DSCR="@ POTTS INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/9/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1121181" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Removal And/or Replacement And/or Disposal" PSE_30_TRGT_DT="5/10/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="8/12/2024" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="97.28" DSGN_START_TRGT_DT="1/4/2016" DSGN_START_ACTL_DT="4/28/2023" ENVCLR_TRGT_DT="3/1/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/15/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="115679.22" CNSTR_SPENT_AMT="1206857.45" CE_SPENT_AMT="25732.49" TOT_SPENT_AMT="1348269.16" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="511425.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="771206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001410078" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NORTH OF HARMON ROAD" LIMITS_TO_DSCR="NORTH OF IH 35W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10800001" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="3/25/2021" PSE_30_ACTL_DT="4/15/2021" PSE_60_TRGT_DT="8/23/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="3/7/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.263 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/28/2020" DSGN_START_ACTL_DT="9/28/2020" ENVCLR_TRGT_DT="10/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/31/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="379823.43" TOT_SPENT_AMT="379823.43" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="6016331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NORTH OF HARMON ROAD" LIMITS_TO_DSCR="NORTH OF IH 35W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16129684" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="3/25/2021" PSE_30_ACTL_DT="4/15/2021" PSE_60_TRGT_DT="8/23/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="3/7/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.351 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/28/2020" DSGN_START_ACTL_DT="9/28/2020" ENVCLR_TRGT_DT="10/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/31/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="518579.78" TOT_SPENT_AMT="518579.78" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="7227821.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415035" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NORTH OF HARMON ROAD" LIMITS_TO_DSCR="NORTH OF IH 35W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1838179" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="3/25/2021" PSE_30_ACTL_DT="4/15/2021" PSE_60_TRGT_DT="8/23/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="3/7/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.263 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/28/2020" DSGN_START_ACTL_DT="9/28/2020" ENVCLR_TRGT_DT="10/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/31/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="340790.99" TOT_SPENT_AMT="340790.99" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NORTH OF FM 3479" LIMITS_TO_DSCR="NORTH OF IH 35W INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18856480" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="3/25/2021" PSE_30_ACTL_DT="4/15/2021" PSE_60_TRGT_DT="8/23/2021" PSE_60_ACTL_DT="10/25/2021" PSE_100_TRGT_DT="3/7/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.590 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/28/2020" DSGN_START_ACTL_DT="9/28/2020" ENVCLR_TRGT_DT="10/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/31/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="340787.60" TOT_SPENT_AMT="340787.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="771636.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415037" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AVONDALE-HASLET RD" LIMITS_TO_DSCR="IH 35W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="453103771" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/27/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/11/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/11/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7950012.15" CNSTR_SPENT_AMT="21889.50" TOT_SPENT_AMT="7971901.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415076" PT_PHASE="Planning, 10+ years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="TARRANT/WISE COUNTY LINE" LIMITS_TO_DSCR="SOUTH OF AVONDALE-HASLET RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106765333" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="6/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/27/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.674 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/5/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/5/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1826857.78" TOT_SPENT_AMT="1826857.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WISE COUNTY LINE" LIMITS_TO_DSCR="HARMON RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11690590" DIST_LET_DATE="4/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="11/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/30/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/17/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/17/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="317829.17" TOT_SPENT_AMT="317829.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="12625838.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="8/20/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415078" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AVONDALE-HASLET RD" LIMITS_TO_DSCR="SOUTH OF NORTH TARRANT PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="205337148" DIST_LET_DATE="4/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="11/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/30/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/17/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/17/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4344977.02" TOT_SPENT_AMT="4344977.02" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="113377606.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001415087" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 81" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WISE/TARRANT COUNTY LINE" LIMITS_TO_DSCR="AVONDALE HASLET ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30998047" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.850 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="34717812.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416252" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 820" LIMITS_TO_DSCR="US 81/287" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="535714286" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.839 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6309417.69" TOT_SPENT_AMT="6309417.69" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416268" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="IH 820" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1600000000" DIST_LET_DATE="12/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.495 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="30097.01" TOT_SPENT_AMT="30097.01" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416280" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 35W RAMP H OVER" LIMITS_TO_DSCR="E. FT. RD &amp; SYCAMORE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35906" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="12428.57" CNSTR_SPENT_AMT="35866.56" CE_SPENT_AMT="2673.64" TOT_SPENT_AMT="50968.77" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="171788.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416281" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 35W CONN 'C'" LIMITS_TO_DSCR="IH 35W AT SYCAMORE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="155855" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="20735.70" CNSTR_SPENT_AMT="155544.34" CE_SPENT_AMT="13702.26" TOT_SPENT_AMT="189982.30" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="404118.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416282" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 35W CONN &quot;CC&quot;" LIMITS_TO_DSCR="OVER IH 35W SOUTHBOUND FR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57131" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="7/15/2019" PSE_60_TRGT_DT="1/14/2020" PSE_60_ACTL_DT="11/11/2019" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="4/9/2020" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="3/15/2021" CNSTR_PCT_TIME_USED="95.54" CNSTR_PCT_COMPLETE="103.69" DSGN_START_TRGT_DT="6/26/2019" DSGN_START_ACTL_DT="6/26/2019" ENVCLR_TRGT_DT="10/5/2020" ENVCLR_ACTL_DT="2/3/2020" UTIL_TRGT_DT="12/6/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/27/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/22/2020" RTL_ACTL_DT="5/18/2020" PE_SPENT_AMT="14338.07" CNSTR_SPENT_AMT="55586.99" CE_SPENT_AMT="4915.41" TOT_SPENT_AMT="74840.47" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="55847.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416285" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="S OF ALTAMESA" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="90228581" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/5/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001416288" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="LUELLA BRIDGE" LIMITS_TO_DSCR="0.2 MI S OF ALTAMESA BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4375086" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31962.99" CNSTR_SPENT_AMT="2200.00" TOT_SPENT_AMT="34162.99" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="4498524.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001417078" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1242" CNTY_NM="Hill" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="BORDEN STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="200432" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="1/13/2021" PSE_30_ACTL_DT="1/13/2021" PSE_60_TRGT_DT="3/17/2021" PSE_60_ACTL_DT="3/17/2021" PSE_100_TRGT_DT="6/2/2021" PSE_100_ACTL_DT="6/2/2021" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.767 (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/26/2021" CNSTR_WKBG_DT="5/31/2022" CNSTR_PCT_TIME_USED="193.33" CNSTR_PCT_COMPLETE="103.83" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="5/3/2021" ENVCLR_ACTL_DT="5/3/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/16/2021" RTL_ACTL_DT="6/16/2021" PE_SPENT_AMT="500.99" CNSTR_SPENT_AMT="44301.73" CE_SPENT_AMT="667.98" TOT_SPENT_AMT="45470.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="1/28/2025" LAST_CNSTR_UPDATE_DT="1/28/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001422034" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Johnson" LIMITS_FROM_DSCR="NORTH OF CR 201A" LIMITS_TO_DSCR="HILL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/28/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4977062" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(817)202-2900" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="3/7/2024" CNSTR_WKBG_DT="9/11/2024" CNSTR_PCT_TIME_USED="29.14" CNSTR_PCT_COMPLETE="49.76" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="116.70" CNSTR_SPENT_AMT="1382500.38" CE_SPENT_AMT="45266.18" TOT_SPENT_AMT="1427883.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="5005408.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001423037" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35W" CNTY_NM="Hill" LIMITS_FROM_DSCR="IH 35E" LIMITS_TO_DSCR="JOHNSON CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="265000000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct And Widen From Four To Six Lanes, Reconstruct And Realign Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="14.284 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="220000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001423039" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001423040" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Hill" LIMITS_FROM_DSCR="JOHNSON COUNTY LINE" LIMITS_TO_DSCR="HILLSBORO SPLIT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="294000000" DIST_LET_DATE="9/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4009.26" TOT_SPENT_AMT="4009.26" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001423041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001423042" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001424065" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hill" LIMITS_FROM_DSCR="0.14 MI N OF OLD BRANDON RD" LIMITS_TO_DSCR="E/W SPLIT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/5/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6648202" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/17/2022" PSE_30_ACTL_DT="11/17/2022" PSE_60_TRGT_DT="1/15/2023" PSE_60_ACTL_DT="1/15/2023" PSE_100_TRGT_DT="2/6/2023" PSE_100_ACTL_DT="2/6/2023" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="6/12/2023" CNSTR_PCT_TIME_USED="57.81" CNSTR_PCT_COMPLETE="100.36" DSGN_START_TRGT_DT="7/21/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="9/8/2022" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/6/2023" RTL_ACTL_DT="2/6/2023" PE_SPENT_AMT="87412.22" CNSTR_SPENT_AMT="6819582.81" CE_SPENT_AMT="306894.80" TOT_SPENT_AMT="7213889.83" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6573206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001424066" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hill" LIMITS_FROM_DSCR="HILLSBORO SPLIT" LIMITS_TO_DSCR="SH 81" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="159000000" DIST_LET_DATE="9/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001424067" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501171" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="S LP 340" LIMITS_TO_DSCR="N LP 340" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="200000000" DIST_LET_DATE="10/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="12/29/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/26/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/20/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.436 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/6/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/10/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/23/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/9/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/2/2029" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29283464.13" CNSTR_SPENT_AMT="41938.72" CE_SPENT_AMT="6886.61" TOT_SPENT_AMT="29332289.46" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501246" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="S LP 340" LIMITS_TO_DSCR="12TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/1/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="215758467" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="3/3/2017" PSE_30_ACTL_DT="3/3/2017" PSE_60_TRGT_DT="10/19/2017" PSE_60_ACTL_DT="10/19/2017" PSE_100_TRGT_DT="7/12/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.285 (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/27/2025" CNSTR_PCT_TIME_USED="6.42" CNSTR_PCT_COMPLETE="5.49" DSGN_START_TRGT_DT="6/15/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/10/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8526223.51" CNSTR_SPENT_AMT="11667794.93" CE_SPENT_AMT="824758.06" TOT_SPENT_AMT="21018776.50" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="1927720.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="131250000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="77628190.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501253" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="BU 77L" LIMITS_TO_DSCR="12TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/9/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6126287" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="12/19/2022" PSE_30_ACTL_DT="12/19/2022" PSE_60_TRGT_DT="1/15/2023" PSE_60_ACTL_DT="1/15/2023" PSE_100_TRGT_DT="2/6/2023" PSE_100_ACTL_DT="2/6/2023" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="8/16/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="106.10" DSGN_START_TRGT_DT="7/21/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="10/25/2022" ENVCLR_ACTL_DT="10/25/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/6/2023" RTL_ACTL_DT="2/6/2023" PE_SPENT_AMT="125018.87" CNSTR_SPENT_AMT="6852312.92" CE_SPENT_AMT="487670.27" TOT_SPENT_AMT="7465002.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6607061.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501256" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="0.1 MI S OF FORREST DR" LIMITS_TO_DSCR="0.1 MI N OF FORREST DR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="341697" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="3/24/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/19/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/3/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="2/13/2024" CNSTR_PCT_TIME_USED="104.44" CNSTR_PCT_COMPLETE="98.56" DSGN_START_TRGT_DT="11/20/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2021" ENVCLR_ACTL_DT="4/19/2023" UTIL_TRGT_DT="4/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/8/2016" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29.99" CNSTR_SPENT_AMT="335530.59" CE_SPENT_AMT="25685.84" TOT_SPENT_AMT="361246.42" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="261483.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501257" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="0.10 MI S OF MLK" LIMITS_TO_DSCR="0.10 MI N OF MLK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="193551" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="37554.97" TOT_SPENT_AMT="37554.97" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501258" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="ALLIANCE PARKWAY" LIMITS_TO_DSCR="ALLIANCE PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="787764" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="7/9/2024" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="96.43" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26149.06" CNSTR_SPENT_AMT="759616.26" CE_SPENT_AMT="42327.33" TOT_SPENT_AMT="828092.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501261" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001501262" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001502063" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ SOUTH COW BAYOU" LIMITS_TO_DSCR="(STR #011)(SB FRTG RD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="450000" DIST_LET_DATE="8/1/2010" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Replace Bridge And Approaches" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001502064" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ SOUTH COW BAYOU" LIMITS_TO_DSCR="(STR #153)(NB FRTG RD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="480000" DIST_LET_DATE="8/1/2010" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Replace Bridge And Approaches" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001504090" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="@ FM 935" LIMITS_TO_DSCR="(STR #145)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="512000" DIST_LET_DATE="8/1/2010" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Replace Bridge And Approaches" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001504091" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="@ BIG ELM CRK (SB FR)" LIMITS_TO_DSCR="(STR #170)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="805000" DIST_LET_DATE="8/1/2010" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Replace Bridge And Approaches" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001505051" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 93" CNTY_NM="Bell" LIMITS_FROM_DSCR="SH 317" LIMITS_TO_DSCR="FM 817" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="637620" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1498.83" TOT_SPENT_AMT="1498.83" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="637620.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="76514.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001505052" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 93" CNTY_NM="Bell" LIMITS_FROM_DSCR="SH 317" LIMITS_TO_DSCR="817" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="107129.75" TOT_SPENT_AMT="107129.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1680000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001505053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001506088" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001507087" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12103561" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SRA" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Yates, P.E." TXDOT_CNTCT_PH_NBR="(254)933-6201" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="11/8/2024" CNSTR_PCT_TIME_USED="70.67" CNSTR_PCT_COMPLETE="62.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12512.45" CNSTR_SPENT_AMT="7717256.39" CE_SPENT_AMT="355670.24" TOT_SPENT_AMT="8085439.08" FUND_CAT1_DSCR="Category 9 - Transportation Alternative Program (TAP), STP-Flex (2409FX)" FUND_CAT1_PID="SW" FUND_CAT1_AMT="8100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001507088" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508143" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="NORTH OF SH 130" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="139600000" DIST_LET_DATE="8/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.771 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_PID="ADM" FUND_CAT1_AMT="124172800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508144" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SOUTH OF LAKEWAY DRIVE" LIMITS_TO_DSCR="SOUTH OF WILLIAMS DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/11/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26581636" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="6/13/2018" PSE_30_ACTL_DT="6/13/2018" PSE_60_TRGT_DT="1/24/2019" PSE_60_ACTL_DT="1/24/2019" PSE_100_TRGT_DT="1/31/2020" PSE_100_ACTL_DT="1/31/2020" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.928 (mi)" TXDOT_CNTCT_NM="Kyle Russell, P.E." TXDOT_CNTCT_PH_NBR="(512)930-5402" CNSTR_CMPNY_NM="J.D. ABRAMS, L.P." CNSTR_NTPD_DT="8/18/2020" CNSTR_WKBG_DT="10/5/2020" CNSTR_PCT_TIME_USED="104.90" CNSTR_PCT_COMPLETE="103.66" DSGN_START_TRGT_DT="7/14/2017" DSGN_START_ACTL_DT="7/14/2017" ENVCLR_TRGT_DT="1/25/2020" ENVCLR_ACTL_DT="1/25/2020" UTIL_TRGT_DT="6/30/2020" UTIL_ACTL_DT="5/5/2020" ROW_TRGT_DT="4/3/2020" ROW_ACTL_DT="5/5/2020" RTL_TRGT_DT="6/4/2020" RTL_ACTL_DT="5/14/2020" PE_SPENT_AMT="1856195.98" CNSTR_SPENT_AMT="27471214.78" CE_SPENT_AMT="4014910.11" TOT_SPENT_AMT="33342320.87" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="14050000.00" FUND_CAT2_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT2_AMT="12850000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508147" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="AT WILLIAMS DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/11/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27029358" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/13/2018" PSE_30_ACTL_DT="6/13/2018" PSE_60_TRGT_DT="1/24/2019" PSE_60_ACTL_DT="1/24/2019" PSE_100_TRGT_DT="1/31/2020" PSE_100_ACTL_DT="1/31/2020" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.763 (mi)" TXDOT_CNTCT_NM="Kyle Russell, P.E." TXDOT_CNTCT_PH_NBR="(512)930-5402" CNSTR_CMPNY_NM="J.D. ABRAMS, L.P." CNSTR_NTPD_DT="8/18/2020" CNSTR_WKBG_DT="10/5/2020" CNSTR_PCT_TIME_USED="104.90" CNSTR_PCT_COMPLETE="103.66" DSGN_START_TRGT_DT="7/14/2017" DSGN_START_ACTL_DT="7/14/2017" ENVCLR_TRGT_DT="1/25/2020" ENVCLR_ACTL_DT="1/25/2020" UTIL_TRGT_DT="6/30/2020" UTIL_ACTL_DT="5/5/2020" ROW_TRGT_DT="4/3/2020" ROW_ACTL_DT="5/5/2020" RTL_TRGT_DT="6/4/2020" RTL_ACTL_DT="5/14/2020" PE_SPENT_AMT="5390014.69" CNSTR_SPENT_AMT="32674601.44" CE_SPENT_AMT="1041137.25" TOT_SPENT_AMT="39105753.38" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_PID="017" FUND_CAT1_AMT="26000000.00" FUND_CAT2_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT2_AMT="17100000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT3_AMT="2.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508430" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="CR 146" LIMITS_TO_DSCR="0.5 MI N OF CR 310" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2683837" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/6/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/6/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23650.21" TOT_SPENT_AMT="23650.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2898544.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508431" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="LAKEWAY DR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4034382" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Russell, P.E." TXDOT_CNTCT_PH_NBR="(512)930-5402" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="36.19" CNSTR_PCT_COMPLETE="108.95" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/8/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/8/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/8/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="49214.63" CNSTR_SPENT_AMT="4472724.47" CE_SPENT_AMT="134884.17" TOT_SPENT_AMT="4656823.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="4944164.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508432" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SAN GABRIEL RIVER" LIMITS_TO_DSCR="NORTHWEST BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1048839" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="3/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/9/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="APEX LANDSCAPE &amp; IRRIGATION, LLC" CNSTR_NTPD_DT="6/12/2024" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="97.46" CNSTR_PCT_COMPLETE="85.75" DSGN_START_TRGT_DT="12/8/2022" DSGN_START_ACTL_DT="12/8/2022" ENVCLR_TRGT_DT="10/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35641.09" CNSTR_SPENT_AMT="858968.96" CE_SPENT_AMT="87770.67" TOT_SPENT_AMT="982380.72" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="400000.00" FUND_CAT2_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT2_PID="GR" FUND_CAT2_AMT="1046813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508433" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="BELL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8389000" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Upgrades To Existing Computerized Transportation Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW2" FUND_CAT1_AMT="9395680.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001508434" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="0.5 MI NORTH OF SE INNER LOOP" LIMITS_TO_DSCR="1 MI SOUTH OF SE  INNER LOOP" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12479038" DIST_LET_DATE="12/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509178" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="RM 1431" LIMITS_TO_DSCR="SH 45N" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="374558271" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.560 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9062630.61" TOT_SPENT_AMT="9062630.61" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="311844623.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="107660641.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509183" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="RM 1431" LIMITS_TO_DSCR="SH 29" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="122300000" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3147725.58" TOT_SPENT_AMT="3147725.58" FUND_CAT1_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT1_AMT="78100000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW4" FUND_CAT2_AMT="21676000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_PID="SW2" FUND_CAT3_AMT="20491201.00" FUND_CAT4_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT4_PID="SW2" FUND_CAT4_AMT="16708799.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509185" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="NORTH OF RM 2243" LIMITS_TO_DSCR="SE INNER LOOP" PRJ_TIER="" ENERGY="" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33214286" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.250 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2016" DSGN_START_ACTL_DT="5/1/2016" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2167595.59" CE_SPENT_AMT="238.38" TOT_SPENT_AMT="2167833.97" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509194" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="US 79" LIMITS_TO_DSCR="SH 45N" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/11/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9323423" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/21/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="10/23/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="7/7/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Kyle Russell, P.E." TXDOT_CNTCT_PH_NBR="(512)930-5402" CNSTR_CMPNY_NM="J.D. ABRAMS, L.P." CNSTR_NTPD_DT="11/23/2021" CNSTR_WKBG_DT="2/28/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.49" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="3/13/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/16/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="7/8/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/13/2019" RTL_TRGT_DT="TBD" RTL_ACTL_DT="7/8/2021" PE_SPENT_AMT="1587557.57" CNSTR_SPENT_AMT="9176600.00" CE_SPENT_AMT="557470.07" TOT_SPENT_AMT="11321627.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="7589285.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509199" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SOUTHWEST BYPASS AT INNER LOOP" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32000" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4217.13" TOT_SPENT_AMT="4217.13" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="32000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509200" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="US 79" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/29/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3173506" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="7/1/2020" PSE_60_ACTL_DT="7/1/2020" PSE_100_TRGT_DT="2/1/2021" PSE_100_ACTL_DT="2/1/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="8/18/2021" CNSTR_WKBG_DT="2/28/2022" CNSTR_PCT_TIME_USED="126.44" CNSTR_PCT_COMPLETE="102.21" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="9/1/2020" ENVCLR_ACTL_DT="10/21/2020" UTIL_TRGT_DT="4/2/2020" UTIL_ACTL_DT="4/2/2020" ROW_TRGT_DT="4/2/2020" ROW_ACTL_DT="4/2/2020" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="2/19/2021" PE_SPENT_AMT="493629.61" CNSTR_SPENT_AMT="3302688.66" CE_SPENT_AMT="132444.20" TOT_SPENT_AMT="3928762.47" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="5423293.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509204" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="RM 2243" LIMITS_TO_DSCR="SH 29" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1364847" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Russell, P.E." TXDOT_CNTCT_PH_NBR="(512)930-5402" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="36.19" CNSTR_PCT_COMPLETE="108.95" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/8/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/8/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/8/2025" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1470305.65" CE_SPENT_AMT="44340.09" TOT_SPENT_AMT="1514645.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1617407.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509206" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="AT LAKE CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/14/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="234700" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="5/10/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/10/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Russell, P.E." TXDOT_CNTCT_PH_NBR="(512)930-5402" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="3/17/2025" CNSTR_PCT_TIME_USED="124.00" CNSTR_PCT_COMPLETE="26.02" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="11/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81651.47" CNSTR_SPENT_AMT="58792.00" CE_SPENT_AMT="18365.44" TOT_SPENT_AMT="158808.91" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="375000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509207" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="SH 45" LIMITS_TO_DSCR="SH 29" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5447000" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Upgrades To Existing Computerized Transportation Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW2" FUND_CAT1_AMT="6100640.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001509208" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Williamson" LIMITS_FROM_DSCR="INNER LOOP ENTRANCE" LIMITS_TO_DSCR="WESTINGHOUSE RD EXIT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3035714" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="499096.01" TOT_SPENT_AMT="499096.01" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001510062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="SH 45N" LIMITS_TO_DSCR="FM 1825" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/14/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="179241480" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/30/2020" PSE_30_ACTL_DT="10/30/2020" PSE_60_TRGT_DT="3/26/2021" PSE_60_ACTL_DT="3/26/2021" PSE_100_TRGT_DT="12/6/2021" PSE_100_ACTL_DT="11/19/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.800 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="PULICE CONSTRUCTION, INC." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="35.19" CNSTR_PCT_COMPLETE="41.12" DSGN_START_TRGT_DT="2/17/2020" DSGN_START_ACTL_DT="2/17/2020" ENVCLR_TRGT_DT="6/21/2021" ENVCLR_ACTL_DT="12/17/2021" UTIL_TRGT_DT="12/6/2021" UTIL_ACTL_DT="12/6/2021" ROW_TRGT_DT="12/6/2021" ROW_ACTL_DT="12/6/2021" RTL_TRGT_DT="12/6/2021" RTL_ACTL_DT="12/6/2021" PE_SPENT_AMT="10181010.99" CNSTR_SPENT_AMT="127562124.00" CE_SPENT_AMT="2941139.56" TOT_SPENT_AMT="140684274.55" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="14850000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="2121761.00" FUND_CAT3_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT3_AMT="11375000.00" FUND_CAT4_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT4_AMT="333000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511067" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="HOWARD LANE" LIMITS_TO_DSCR="US 183" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34000000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.050 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="89352.46" TOT_SPENT_AMT="89352.46" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511068" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="HOWARD LANE" LIMITS_TO_DSCR="PARMER LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.863 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17278.93" TOT_SPENT_AMT="17278.93" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="14579100.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511069" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="RUNDBERG LANE" LIMITS_TO_DSCR="US 183" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23000000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="24840000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511070" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="PARMER LANE" LIMITS_TO_DSCR="RUNDBERG LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="41000000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="44280000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511071" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="HOWARD LANE" LIMITS_TO_DSCR="800 LF SOUTH OF HOWARD LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2596154" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="2700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511072" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="170' S OF WALMART/TWIN OAKS DRWY" LIMITS_TO_DSCR="WALMART/TWIN OAKS DRIVEWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="535714" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511073" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="W BRAKER LANE" LIMITS_TO_DSCR="PAYTON GIN ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/22/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1029125" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/24/2023" PSE_100_ACTL_DT="4/12/2023" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="11/2/2023" CNSTR_PCT_TIME_USED="40.00" CNSTR_PCT_COMPLETE="114.35" DSGN_START_TRGT_DT="3/27/2023" DSGN_START_ACTL_DT="3/27/2023" ENVCLR_TRGT_DT="4/13/2023" ENVCLR_ACTL_DT="4/4/2023" UTIL_TRGT_DT="4/24/2023" UTIL_ACTL_DT="4/12/2023" ROW_TRGT_DT="4/24/2023" ROW_ACTL_DT="4/12/2023" RTL_TRGT_DT="4/24/2023" RTL_ACTL_DT="4/12/2023" PE_SPENT_AMT="9634.60" CNSTR_SPENT_AMT="1229118.83" CE_SPENT_AMT="21761.47" TOT_SPENT_AMT="1260514.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1066720.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511074" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="PARMER LANE" LIMITS_TO_DSCR="BRAKER LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1409887" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="3/7/2024" CNSTR_WKBG_DT="8/21/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="30840.11" CNSTR_SPENT_AMT="1365912.12" CE_SPENT_AMT="42924.18" TOT_SPENT_AMT="1439676.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1266362.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001511075" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="BRAKER LANE" LIMITS_TO_DSCR="MORROW ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2169819" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2343404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513077" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290W/SH 71" LIMITS_TO_DSCR="LP 275-SLAUGHTER LANE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/28/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="307134590" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/29/2021" PSE_30_ACTL_DT="2/25/2021" PSE_60_TRGT_DT="7/12/2021" PSE_60_ACTL_DT="6/14/2021" PSE_100_TRGT_DT="11/29/2021" PSE_100_ACTL_DT="10/1/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.340 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="FLUOR HEAVY CIVIL, LLC" CNSTR_NTPD_DT="6/30/2022" CNSTR_WKBG_DT="3/6/2023" CNSTR_PCT_TIME_USED="42.35" CNSTR_PCT_COMPLETE="38.48" DSGN_START_TRGT_DT="1/24/2020" DSGN_START_ACTL_DT="1/24/2020" ENVCLR_TRGT_DT="6/30/2021" ENVCLR_ACTL_DT="12/21/2021" UTIL_TRGT_DT="11/29/2021" UTIL_ACTL_DT="10/4/2021" ROW_TRGT_DT="11/29/2021" ROW_ACTL_DT="10/4/2021" RTL_TRGT_DT="11/29/2021" RTL_ACTL_DT="10/4/2021" PE_SPENT_AMT="35936022.97" CNSTR_SPENT_AMT="145048642.39" CE_SPENT_AMT="8185472.20" TOT_SPENT_AMT="189170137.56" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="13192294.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="142132546.00" FUND_CAT3_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT3_AMT="32918879.00" FUND_CAT4_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT4_AMT="5433621.00" FUND_CAT5_DSCR="Category 11 - District Discretionary (2211)" FUND_CAT5_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513388" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290E" LIMITS_TO_DSCR="US 290W/SH 71" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="7/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.792 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/8/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/10/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="73400481.03" CE_SPENT_AMT="13648.75" TOT_SPENT_AMT="73414129.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513389" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="FM 1825" LIMITS_TO_DSCR="US 290E" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/14/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="353258933" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/30/2020" PSE_30_ACTL_DT="10/30/2020" PSE_60_TRGT_DT="3/26/2021" PSE_60_ACTL_DT="3/26/2021" PSE_100_TRGT_DT="12/6/2021" PSE_100_ACTL_DT="11/19/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="PULICE CONSTRUCTION, INC." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="35.19" CNSTR_PCT_COMPLETE="41.12" DSGN_START_TRGT_DT="2/17/2020" DSGN_START_ACTL_DT="2/17/2020" ENVCLR_TRGT_DT="6/21/2021" ENVCLR_ACTL_DT="12/17/2021" UTIL_TRGT_DT="12/6/2021" UTIL_ACTL_DT="12/6/2021" ROW_TRGT_DT="12/6/2021" ROW_ACTL_DT="12/6/2021" RTL_TRGT_DT="12/6/2021" RTL_ACTL_DT="12/6/2021" PE_SPENT_AMT="25925903.96" CNSTR_SPENT_AMT="85967385.34" CE_SPENT_AMT="9164560.79" TOT_SPENT_AMT="121057850.09" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="83600000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="7224432.00" FUND_CAT3_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT3_AMT="7850000.00" FUND_CAT4_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT4_AMT="678371.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513416" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="WOODWARD STREET" LIMITS_TO_DSCR="TERI ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/10/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1367724" DIST_LET_DATE="2/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="4/28/2020" CNSTR_WKBG_DT="7/12/2021" CNSTR_PCT_TIME_USED="84.00" CNSTR_PCT_COMPLETE="106.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20985.34" CNSTR_SPENT_AMT="1489315.46" CE_SPENT_AMT="72876.01" TOT_SPENT_AMT="1583176.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="895000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513417" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="0.05 MILES NORTH OF 41ST STREET" LIMITS_TO_DSCR="0.14 MILES NORTH OF MLK BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1735347" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="11/19/2021" PSE_60_TRGT_DT="5/19/2022" PSE_60_ACTL_DT="11/19/2021" PSE_100_TRGT_DT="6/2/2022" PSE_100_ACTL_DT="1/20/2023" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="8/19/2024" CNSTR_PCT_TIME_USED="82.72" CNSTR_PCT_COMPLETE="100.50" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="5/27/2022" ENVCLR_ACTL_DT="11/9/2021" UTIL_TRGT_DT="6/2/2022" UTIL_ACTL_DT="12/20/2021" ROW_TRGT_DT="6/2/2022" ROW_ACTL_DT="12/20/2021" RTL_TRGT_DT="6/2/2022" RTL_ACTL_DT="12/20/2021" PE_SPENT_AMT="47653.81" CNSTR_SPENT_AMT="1957884.66" CE_SPENT_AMT="289696.62" TOT_SPENT_AMT="2295235.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1453522.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513419" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="WOODWARD STREET" LIMITS_TO_DSCR="RIVER STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1419858" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/23/2021" PSE_30_ACTL_DT="3/8/2021" PSE_60_TRGT_DT="6/18/2021" PSE_60_ACTL_DT="3/26/2021" PSE_100_TRGT_DT="8/5/2021" PSE_100_ACTL_DT="4/8/2021" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="11/15/2021" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="86.15" CNSTR_PCT_COMPLETE="98.72" DSGN_START_TRGT_DT="3/1/2021" DSGN_START_ACTL_DT="3/1/2021" ENVCLR_TRGT_DT="8/5/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="4/8/2021" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="4/8/2021" RTL_TRGT_DT="8/5/2021" RTL_ACTL_DT="4/8/2021" PE_SPENT_AMT="36709.40" CNSTR_SPENT_AMT="1985392.18" CE_SPENT_AMT="122492.65" TOT_SPENT_AMT="2144594.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="1710000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513420" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="TERI ROAD" LIMITS_TO_DSCR="SLAUGHTER LANE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2140788" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/23/2021" PSE_30_ACTL_DT="3/8/2021" PSE_60_TRGT_DT="6/18/2021" PSE_60_ACTL_DT="3/26/2021" PSE_100_TRGT_DT="8/5/2021" PSE_100_ACTL_DT="4/8/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="11/15/2021" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="86.15" CNSTR_PCT_COMPLETE="98.72" DSGN_START_TRGT_DT="3/1/2021" DSGN_START_ACTL_DT="3/1/2021" ENVCLR_TRGT_DT="8/5/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="4/8/2021" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="4/8/2021" RTL_TRGT_DT="8/5/2021" RTL_ACTL_DT="4/8/2021" CNSTR_SPENT_AMT="2190059.94" CE_SPENT_AMT="203536.73" TOT_SPENT_AMT="2393596.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="2320000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513423" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="51ST ST." LIMITS_TO_DSCR="MARTIN LUTHER KING BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1479807692" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/2/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/2/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.792 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/2/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="45819910.81" CNSTR_SPENT_AMT="904511.25" TOT_SPENT_AMT="46724422.06" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="89000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="890816206.00" FUND_CAT3_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT3_AMT="4000000.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="182179949.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513425" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="DEAN KEETON" LIMITS_TO_DSCR="NORTH OF AIRPORT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1696442" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="11/19/2021" PSE_60_TRGT_DT="5/19/2022" PSE_60_ACTL_DT="11/19/2021" PSE_100_TRGT_DT="6/2/2022" PSE_100_ACTL_DT="1/20/2023" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="8/19/2024" CNSTR_PCT_TIME_USED="82.72" CNSTR_PCT_COMPLETE="100.50" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="5/27/2022" ENVCLR_ACTL_DT="11/9/2021" UTIL_TRGT_DT="6/2/2022" UTIL_ACTL_DT="12/20/2021" ROW_TRGT_DT="6/2/2022" ROW_ACTL_DT="12/20/2021" RTL_TRGT_DT="6/2/2022" RTL_ACTL_DT="12/20/2021" PE_SPENT_AMT="6488.35" CNSTR_SPENT_AMT="1501877.75" CE_SPENT_AMT="5213.40" TOT_SPENT_AMT="1513579.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1469662.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513428" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="HOLLY STREET" LIMITS_TO_DSCR="US 290W / SH 71" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/8/2033" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="629607223" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/24/2022" PSE_30_ACTL_DT="8/24/2022" PSE_60_TRGT_DT="5/16/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/16/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="BALFOUR BEATTY INFRASTRUCTURE, INC." CNSTR_NTPD_DT="10/31/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="1.39" CNSTR_PCT_COMPLETE="8.18" DSGN_START_TRGT_DT="1/15/2022" DSGN_START_ACTL_DT="1/15/2022" ENVCLR_TRGT_DT="8/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/6/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25785384.93" CNSTR_SPENT_AMT="65016433.48" CE_SPENT_AMT="465520.90" TOT_SPENT_AMT="91267339.31" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="28566712.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="9933288.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="188713165.00" FUND_CAT4_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT4_AMT="157535339.00" FUND_CAT5_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT5_AMT="147874335.00" FUND_CAT6_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2507)" FUND_CAT6_AMT="662671.00" FUND_CAT7_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2507)" FUND_CAT7_AMT="8685876.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513432" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="AIRPORT BLVD" LIMITS_TO_DSCR="MARTIN LUTHER KING JR BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53846154" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="7/17/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/27/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/15/2022" DSGN_START_ACTL_DT="1/15/2022" ENVCLR_TRGT_DT="8/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1514551.02" CNSTR_SPENT_AMT="2233056.82" TOT_SPENT_AMT="3747607.84" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="45600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513433" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="MARTIN LUTHER KING JR BLVD" LIMITS_TO_DSCR="HOLLY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="246091172" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="7/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/22/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="SAK CONSTRUCTION, LLC" CNSTR_NTPD_DT="2/13/2025" CNSTR_WKBG_DT="5/14/2025" CNSTR_PCT_TIME_USED="0.82" CNSTR_PCT_COMPLETE="6.00" DSGN_START_TRGT_DT="12/29/2022" DSGN_START_ACTL_DT="12/29/2022" ENVCLR_TRGT_DT="8/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/12/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/12/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17878667.72" CNSTR_SPENT_AMT="15417829.92" CE_SPENT_AMT="152046.55" TOT_SPENT_AMT="33448544.19" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="72645808.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2507)" FUND_CAT2_AMT="5738348.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT3_AMT="13762262.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513436" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290 (NORTH)" LIMITS_TO_DSCR="SH 71 (SOUTH)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1666667" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513437" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT 4TH STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50000000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway/railroad Improvement" PSE_30_TRGT_DT="5/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9572698.88" TOT_SPENT_AMT="9572698.88" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="22000000.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT2_AMT="4000000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="23000000.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT4_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513438" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT MARTIN LUTHER KING JR. BLVD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/16/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34382133" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/15/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="HARPER BROTHERS CONSTRUCTION LLC" CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="10/7/2024" CNSTR_PCT_TIME_USED="41.63" CNSTR_PCT_COMPLETE="21.17" DSGN_START_TRGT_DT="1/15/2022" DSGN_START_ACTL_DT="1/15/2022" ENVCLR_TRGT_DT="8/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/4/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/4/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2940129.80" CNSTR_SPENT_AMT="8597717.96" CE_SPENT_AMT="1132339.05" TOT_SPENT_AMT="12670186.81" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT1_AMT="9644972.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="22821695.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="772787.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513440" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="AIRPORT BLVD" LIMITS_TO_DSCR="9TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="204434873" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="7/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/22/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="SAK CONSTRUCTION, LLC" CNSTR_NTPD_DT="2/13/2025" CNSTR_WKBG_DT="5/14/2025" CNSTR_PCT_TIME_USED="0.82" CNSTR_PCT_COMPLETE="6.00" DSGN_START_TRGT_DT="12/29/2022" DSGN_START_ACTL_DT="12/29/2022" ENVCLR_TRGT_DT="8/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/12/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/12/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="662785.90" CNSTR_SPENT_AMT="12999796.22" CE_SPENT_AMT="128279.99" TOT_SPENT_AMT="13790862.11" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="122453260.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="11858050.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513441" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290E" LIMITS_TO_DSCR="51ST STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="211538462" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/2/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/2/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/2/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4775727.55" TOT_SPENT_AMT="4775727.55" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="220000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513442" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="MARTIN LUTHER KING JR. BLVD" LIMITS_TO_DSCR="HOLLY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1355666385" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/2/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/2/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/2/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/2/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="46936828.12" CNSTR_SPENT_AMT="179103.33" TOT_SPENT_AMT="47115931.45" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="85000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="606254880.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="675720320.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="2017839.00" FUND_CAT5_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT5_AMT="54226656.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513452" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290 EAST" LIMITS_TO_DSCR="HOLLY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="24038462" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="MSC" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1527119.66" TOT_SPENT_AMT="1527119.66" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="25000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513455" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513456" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513457" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513458" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001513459" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT SOUTH OF US 290 INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2410)" FUND_CAT1_PID="DMO" FUND_CAT1_AMT="555555.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001514109" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="US 190 IN BELTON" LIMITS_TO_DSCR="S LP 363 IN TEMPLE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="625000000" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/5/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/4/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/19/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.839 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/9/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/7/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/20/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/29/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4143479.67" TOT_SPENT_AMT="4143479.67" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="79966792.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="100000000.00" FUND_CAT3_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT3_AMT="274719999.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="119069988.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001514131" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="AT SH 53/FM 2305" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="7/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2808.54" CNSTR_SPENT_AMT="489004.91" TOT_SPENT_AMT="491813.45" FUND_CAT1_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1910LI)" FUND_CAT1_PID="LIA" FUND_CAT1_AMT="270000.00" FUND_CAT2_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1510LI)" FUND_CAT2_PID="LIA" FUND_CAT2_AMT="270000.00" FUND_CAT3_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT3_AMT="2460000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001514133" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="WB US 190" LIMITS_TO_DSCR="SB IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="232043.43" TOT_SPENT_AMT="232043.43" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001514134" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="NB IH 35" LIMITS_TO_DSCR="EB US 190" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="37500000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.213 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="226443.14" TOT_SPENT_AMT="226443.14" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001514135" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001514136" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Bell" LIMITS_FROM_DSCR="I-35 FRONTAGE RD INTERSECTION WITH SL363" LIMITS_TO_DSCR="I-35 FRONTAGE RD INTERSECTION WITH SL363" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12000000" DIST_LET_DATE="1/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2610)" FUND_CAT1_PID="DMO" FUND_CAT1_AMT="12960000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001517029" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 26" CNTY_NM="Williamson" LIMITS_FROM_DSCR="FM 1460" LIMITS_TO_DSCR="SE INNER LOOP" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11875000" DIST_LET_DATE="6/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="2/5/2029" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/5/2029" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/5/2029" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/5/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/5/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/5/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/5/2029" RTL_ACTL_DT="TBD" PE_SPENT_AMT="994490.82" TOT_SPENT_AMT="994490.82" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="600000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="12700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001517030" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 158" CNTY_NM="Williamson" LIMITS_FROM_DSCR="FM 971" LIMITS_TO_DSCR="LAKEWAY DR." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1862340" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/6/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/6/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2157.55" TOT_SPENT_AMT="2157.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2011327.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001518007" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 93" CNTY_NM="Bell" LIMITS_FROM_DSCR="FM 817" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1530288" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="1912860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/28/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001518008" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 93" CNTY_NM="Bell" LIMITS_FROM_DSCR="817" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1566737" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="166081.06" TOT_SPENT_AMT="166081.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1754745.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601113" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="LP 275-SLAUGHTER LANE" LIMITS_TO_DSCR="SH 45SE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/28/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="199183730" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/29/2021" PSE_30_ACTL_DT="2/25/2021" PSE_60_TRGT_DT="7/12/2021" PSE_60_ACTL_DT="6/14/2021" PSE_100_TRGT_DT="11/29/2021" PSE_100_ACTL_DT="10/1/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.926 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="FLUOR HEAVY CIVIL, LLC" CNSTR_NTPD_DT="6/30/2022" CNSTR_WKBG_DT="3/6/2023" CNSTR_PCT_TIME_USED="42.35" CNSTR_PCT_COMPLETE="38.48" DSGN_START_TRGT_DT="1/24/2020" DSGN_START_ACTL_DT="1/24/2020" ENVCLR_TRGT_DT="6/30/2021" ENVCLR_ACTL_DT="12/21/2021" UTIL_TRGT_DT="11/29/2021" UTIL_ACTL_DT="10/4/2021" ROW_TRGT_DT="11/29/2021" ROW_ACTL_DT="10/4/2021" RTL_TRGT_DT="11/29/2021" RTL_ACTL_DT="10/4/2021" PE_SPENT_AMT="16636598.79" CNSTR_SPENT_AMT="55368186.94" CE_SPENT_AMT="6611890.41" TOT_SPENT_AMT="78616676.14" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="53933980.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT2_AMT="3352500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601120" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="HAYS COUNTY LINE" LIMITS_TO_DSCR="SH 45SE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="41700000" DIST_LET_DATE="8/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.770 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_PID="ADM" FUND_CAT1_AMT="30504829.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601136" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="MOCKINGBIRD LANE" LIMITS_TO_DSCR="LITTLE TEXAS LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2366071" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="4786.36" TOT_SPENT_AMT="4786.36" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="2366071.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601139" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT ONION CREEK PARKWAY BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="584866" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="3/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="3/14/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="3/22/2023" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42070.19" CNSTR_SPENT_AMT="533488.02" TOT_SPENT_AMT="575558.21" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="704183.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601140" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="SLAUGHTER LANE" LIMITS_TO_DSCR="350 FT NORTH OF SLAUGHTER LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/28/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/29/2021" PSE_30_ACTL_DT="2/25/2021" PSE_60_TRGT_DT="7/12/2021" PSE_60_ACTL_DT="6/14/2021" PSE_100_TRGT_DT="11/29/2021" PSE_100_ACTL_DT="10/1/2021" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_CMPNY_NM="FLUOR HEAVY CIVIL, LLC" CNSTR_NTPD_DT="6/30/2022" CNSTR_WKBG_DT="3/6/2023" CNSTR_PCT_TIME_USED="42.35" CNSTR_PCT_COMPLETE="38.48" DSGN_START_TRGT_DT="1/24/2020" DSGN_START_ACTL_DT="1/24/2020" ENVCLR_TRGT_DT="6/30/2021" ENVCLR_ACTL_DT="12/21/2021" UTIL_TRGT_DT="11/29/2021" UTIL_ACTL_DT="10/4/2021" ROW_TRGT_DT="11/29/2021" ROW_ACTL_DT="10/4/2021" RTL_TRGT_DT="11/29/2021" RTL_ACTL_DT="10/4/2021" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="190000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601141" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Travis" LIMITS_FROM_DSCR="SLAUGHTER LANE" LIMITS_TO_DSCR="HAYS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2507000" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Upgrades To Existing Computerized Transportation Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW2" FUND_CAT1_AMT="2807840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601142" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 275" CNTY_NM="Travis" LIMITS_FROM_DSCR="WILLIAMSON CREEK" LIMITS_TO_DSCR="SLAUGHTER LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2682267" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2896848.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001601143" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602149" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="NORTH OF RIVER RIDGE PARKWAY" LIMITS_TO_DSCR="LOOP 82" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/19/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11341188" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.260 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="1/4/2021" CNSTR_PCT_TIME_USED="76.91" CNSTR_PCT_COMPLETE="100.99" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2385488.35" CNSTR_SPENT_AMT="11588576.06" CE_SPENT_AMT="261762.87" TOT_SPENT_AMT="14235827.28" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="8427053.00" FUND_CAT2_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT2_AMT="2106763.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602150" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="BLANCO RIVER" LIMITS_TO_DSCR="RIVER RIDGE PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8200000" DIST_LET_DATE="11/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.870 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="8200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="12/5/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602152" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="KYLE CROSSING" LIMITS_TO_DSCR="RM 150" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21837044" DIST_LET_DATE="4/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="10/27/2016" PSE_30_ACTL_DT="10/27/2016" PSE_60_TRGT_DT="3/31/2017" PSE_60_ACTL_DT="3/31/2017" PSE_100_TRGT_DT="12/6/2019" PSE_100_ACTL_DT="2/6/2020" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.293 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="6/9/2020" CNSTR_WKBG_DT="9/28/2020" CNSTR_PCT_TIME_USED="97.61" CNSTR_PCT_COMPLETE="104.71" DSGN_START_TRGT_DT="3/1/2016" DSGN_START_ACTL_DT="3/1/2016" ENVCLR_TRGT_DT="6/27/2019" ENVCLR_ACTL_DT="6/27/2019" UTIL_TRGT_DT="1/10/2020" UTIL_ACTL_DT="4/7/2020" ROW_TRGT_DT="6/28/2019" ROW_ACTL_DT="6/28/2019" RTL_TRGT_DT="12/4/2019" RTL_ACTL_DT="12/4/2019" PE_SPENT_AMT="2532862.84" CNSTR_SPENT_AMT="24302457.17" CE_SPENT_AMT="845032.25" TOT_SPENT_AMT="27680352.26" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="21395668.00" FUND_CAT2_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT2_AMT="5348917.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602153" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="SOUTH OF ROBERT S LIGHT" LIMITS_TO_DSCR="HAYS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="165400000" DIST_LET_DATE="8/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.050 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="120829822.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602155" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="SOUTH OF ROBERT S LIGHT BLVD" LIMITS_TO_DSCR="NORTH OF YARRINGTON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="257400000" DIST_LET_DATE="8/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.767 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_PID="ADM" FUND_CAT1_AMT="237975900.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602167" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="YARRINGTON ROAD" LIMITS_TO_DSCR="SL 82" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/29/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2072155" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="7/1/2020" PSE_60_ACTL_DT="7/1/2020" PSE_100_TRGT_DT="2/1/2021" PSE_100_ACTL_DT="2/1/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="8/18/2021" CNSTR_WKBG_DT="2/28/2022" CNSTR_PCT_TIME_USED="126.44" CNSTR_PCT_COMPLETE="102.21" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="9/1/2020" ENVCLR_ACTL_DT="10/21/2020" UTIL_TRGT_DT="4/2/2020" UTIL_ACTL_DT="4/2/2020" ROW_TRGT_DT="4/2/2020" ROW_ACTL_DT="4/2/2020" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="2/19/2021" PE_SPENT_AMT="8562.61" CNSTR_SPENT_AMT="2177465.50" CE_SPENT_AMT="83822.55" TOT_SPENT_AMT="2269850.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="3684980.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602169" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR=" SOUTH OF CHUCK NASH LOOP" LIMITS_TO_DSCR="YARRINGTON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="915989" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="11/8/2023" CNSTR_WKBG_DT="7/15/2024" CNSTR_PCT_TIME_USED="21.74" CNSTR_PCT_COMPLETE="90.43" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6242.83" CNSTR_SPENT_AMT="841231.36" CE_SPENT_AMT="11996.51" TOT_SPENT_AMT="859470.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1059294.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602170" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="LP 82/ AQUARENA SPRINGS BLVD" LIMITS_TO_DSCR="YARRINGTON RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/13/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4186522" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/7/2022" PSE_100_ACTL_DT="10/27/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="9/11/2023" CNSTR_PCT_TIME_USED="89.06" CNSTR_PCT_COMPLETE="121.67" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="9/13/2022" ENVCLR_TRGT_DT="9/20/2022" ENVCLR_ACTL_DT="9/13/2022" UTIL_TRGT_DT="10/7/2022" UTIL_ACTL_DT="10/6/2022" ROW_TRGT_DT="10/7/2022" ROW_ACTL_DT="10/6/2022" RTL_TRGT_DT="10/7/2022" RTL_ACTL_DT="10/6/2022" PE_SPENT_AMT="1153.31" CNSTR_SPENT_AMT="4449682.27" CE_SPENT_AMT="234620.22" TOT_SPENT_AMT="4685455.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="5228590.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602172" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="WINDY HILL RD" LIMITS_TO_DSCR="YARRINGTON RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="435142" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="5/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/9/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="APEX LANDSCAPE &amp; IRRIGATION, LLC" CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="10/7/2024" CNSTR_PCT_TIME_USED="57.14" CNSTR_PCT_COMPLETE="77.69" DSGN_START_TRGT_DT="4/20/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35469.15" CNSTR_SPENT_AMT="349720.00" CE_SPENT_AMT="66558.31" TOT_SPENT_AMT="451747.46" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="635000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602173" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="HAYS COUNTY LINE" LIMITS_TO_DSCR="SL 82" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7812000" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Upgrades To Existing Computerized Transportation Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW2" FUND_CAT1_AMT="8749440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602174" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="KYLE CROSSING" LIMITS_TO_DSCR="TRAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6258780" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6759482.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602175" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="S OF KOHLER'S CROSSING - SETON PKWY" LIMITS_TO_DSCR="N OF KOHLER'S CROSSING - SETON PKWY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="7/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6632.93" TOT_SPENT_AMT="6632.93" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602176" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="BRIARWOOD CT" LIMITS_TO_DSCR="RIVER RIDGE PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="521487" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1269.07" TOT_SPENT_AMT="1269.07" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="563206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001602177" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603107" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="LOOP 82" LIMITS_TO_DSCR="SOUTH OF SH 80" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72600000" DIST_LET_DATE="8/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Corridor Planning Management" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.160 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_PID="ADM" FUND_CAT1_AMT="64507910.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603110" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="LOOP 82" LIMITS_TO_DSCR="SOUTH OF LOOP 82" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/19/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1140444" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="1/4/2021" CNSTR_PCT_TIME_USED="76.91" CNSTR_PCT_COMPLETE="100.99" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="217433.48" CNSTR_SPENT_AMT="1297148.66" CE_SPENT_AMT="37991.40" TOT_SPENT_AMT="1552573.54" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="1020000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603111" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="SOUTH OF SH 80" LIMITS_TO_DSCR="NORTH OF POSEY ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64800000" DIST_LET_DATE="8/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Corridor Planning Management" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.042 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_PID="ADM" FUND_CAT1_AMT="57559700.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603113" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="NORTH OF SH 123" LIMITS_TO_DSCR="SOUTH OF POSEY ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="219600000" DIST_LET_DATE="10/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.010 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/25/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3218866.94" TOT_SPENT_AMT="3218866.94" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603114" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="SOUTH OF SH 80" LIMITS_TO_DSCR="NORTH OF RM 12" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78491641" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/19/2017" PSE_30_ACTL_DT="9/21/2018" PSE_60_TRGT_DT="5/17/2018" PSE_60_ACTL_DT="8/8/2019" PSE_100_TRGT_DT="8/23/2018" PSE_100_ACTL_DT="2/5/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.580 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="8/18/2021" CNSTR_PCT_TIME_USED="99.55" CNSTR_PCT_COMPLETE="99.70" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="8/28/2017" ENVCLR_TRGT_DT="6/15/2018" ENVCLR_ACTL_DT="6/1/2018" UTIL_TRGT_DT="6/14/2018" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="6/15/2018" ROW_ACTL_DT="12/1/2020" RTL_TRGT_DT="8/23/2018" RTL_ACTL_DT="12/1/2020" PE_SPENT_AMT="9349286.41" CNSTR_SPENT_AMT="83713167.04" CE_SPENT_AMT="6382029.94" TOT_SPENT_AMT="99444483.39" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="5822990.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603123" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="SL 82" LIMITS_TO_DSCR="SH 80" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/29/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="532047" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="7/1/2020" PSE_60_ACTL_DT="7/1/2020" PSE_100_TRGT_DT="2/1/2021" PSE_100_ACTL_DT="2/1/2021" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="8/18/2021" CNSTR_WKBG_DT="2/28/2022" CNSTR_PCT_TIME_USED="126.44" CNSTR_PCT_COMPLETE="102.21" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="9/1/2020" ENVCLR_ACTL_DT="10/21/2020" UTIL_TRGT_DT="4/2/2020" UTIL_ACTL_DT="4/2/2020" ROW_TRGT_DT="4/2/2020" ROW_ACTL_DT="4/2/2020" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="2/19/2021" CNSTR_SPENT_AMT="501893.87" CE_SPENT_AMT="19320.76" TOT_SPENT_AMT="521214.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="864998.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603124" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="COMAL COUNTY LINE" LIMITS_TO_DSCR="0.73 MI N OF POSEY RD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1002855" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/10/2023" PSE_100_ACTL_DT="11/29/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="8/8/2024" CNSTR_PCT_TIME_USED="51.72" CNSTR_PCT_COMPLETE="97.51" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="10/3/2022" ENVCLR_TRGT_DT="7/10/2023" ENVCLR_ACTL_DT="10/11/2022" UTIL_TRGT_DT="7/10/2023" UTIL_ACTL_DT="2/1/2023" ROW_TRGT_DT="7/10/2023" ROW_ACTL_DT="2/1/2023" RTL_TRGT_DT="7/10/2023" RTL_ACTL_DT="2/1/2023" PE_SPENT_AMT="22952.17" CNSTR_SPENT_AMT="1097857.26" CE_SPENT_AMT="25120.91" TOT_SPENT_AMT="1145930.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1086373.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603125" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="0.73 MI N OF POSEY RD" LIMITS_TO_DSCR="0.19 MI S OF SH 123" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3565819" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/8/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/8/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/8/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="3708451.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603127" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="SL 82" LIMITS_TO_DSCR="COMAL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4450000" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Upgrades To Existing Computerized Transportation Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW2" FUND_CAT1_AMT="4984000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603128" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="SAN MARCOS RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1062562" DIST_LET_DATE="8/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2509TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="1219506.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603129" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Hays" LIMITS_FROM_DSCR="S OF SH 80" LIMITS_TO_DSCR="S OF SH 123" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="270000" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="270000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001603130" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001604112" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="GUADALUPE RIVER" LIMITS_TO_DSCR="HAYS / COMAL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="97400000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.598 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8961446.89" TOT_SPENT_AMT="8961446.89" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001604121" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="FM 306" LIMITS_TO_DSCR="HAYS/COMAL C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11860560" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.298 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="12809405.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001604122" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="GUADALUPE RIVER" LIMITS_TO_DSCR="SH 46" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1936350" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.992 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001604123" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605111" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="GUADALUPE/COMAL COUNTY LINE" LIMITS_TO_DSCR="FM 1103" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151016992" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.551 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="7/2/2015" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="36260277.77" CNSTR_SPENT_AMT="409351.01" TOT_SPENT_AMT="36669628.78" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="101717576.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW4" FUND_CAT2_AMT="35858168.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="18914733.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605114" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="GUADALUPE RIVER" LIMITS_TO_DSCR="FM 1103" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.269 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5276601.27" TOT_SPENT_AMT="5276601.27" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605120" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="AT FM 725" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/9/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5144829" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/2/2018" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="11/1/2018" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="2/1/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.276 (mi)" TXDOT_CNTCT_NM="Will Lockett, P.E. " TXDOT_CNTCT_PH_NBR="(830)609-0707" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="1/10/2022" CNSTR_PCT_TIME_USED="135.20" CNSTR_PCT_COMPLETE="81.40" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/1/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="11/20/2018" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/1/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/1/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/1/2021" PE_SPENT_AMT="43711.92" CNSTR_SPENT_AMT="4630987.52" CE_SPENT_AMT="242631.04" TOT_SPENT_AMT="4917330.48" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605126" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="SCHWAB RD" LIMITS_TO_DSCR="SOLMS RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2520343" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.000 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2468500.62" CE_SPENT_AMT="874.36" TOT_SPENT_AMT="2469374.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1968241.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605128" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="SBFR IH 35 AT LOMA VISTA" LIMITS_TO_DSCR="SBFR IH 35 AT PEACH AVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15000000" DIST_LET_DATE="7/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.533 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1259057.34" TOT_SPENT_AMT="1259057.34" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="6967412.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605129" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605131" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="AT SOLMS RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20255565" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.277 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="975000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_AMT="2430668.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001605133" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Comal" LIMITS_FROM_DSCR="SCHWAB RD." LIMITS_TO_DSCR="GUADALUPE RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19175000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.336 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="20709000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001606047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="BEXAR/GUADALUPE COUNTY LINE" LIMITS_TO_DSCR="FM 3009" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="227800000" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.006 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="ALAMO NEX CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/22/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="57.81" CNSTR_PCT_COMPLETE="57.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="36138612.68" CNSTR_SPENT_AMT="44549.14" CE_SPENT_AMT="1036717.28" TOT_SPENT_AMT="37219879.10" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="81000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="51000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001606115" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 3009" LIMITS_TO_DSCR="GUADALUPE/COMAL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="306049645" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.321 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="7/2/2015" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="119492.20" TOT_SPENT_AMT="119492.20" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW2" FUND_CAT1_AMT="38814608.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW4" FUND_CAT2_AMT="33855224.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT3_PID="SW2" FUND_CAT3_AMT="43068480.00" FUND_CAT4_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT4_AMT="163071424.00" FUND_CAT5_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT5_AMT="38332423.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001607113" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410 N" LIMITS_TO_DSCR="GUADALUPE/BEXAR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1285739839" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.512 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="ALAMO NEX CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/22/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="57.81" CNSTR_PCT_COMPLETE="57.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17633203.83" CE_SPENT_AMT="11042901.71" TOT_SPENT_AMT="28676105.54" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="642000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="100600000.00" FUND_CAT3_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT3_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608034" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="MULBERRY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22000000" DIST_LET_DATE="12/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.243 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3708154.60" TOT_SPENT_AMT="3708154.60" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT1_AMT="9000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT2_AMT="5000000.00" FUND_CAT3_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT3_AMT="10640000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT SALADO CREEK AND IRA LEE RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6694602" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/9/2018" PSE_30_ACTL_DT="11/9/2018" PSE_60_TRGT_DT="3/14/2019" PSE_60_ACTL_DT="3/14/2019" PSE_100_TRGT_DT="11/1/2019" PSE_100_ACTL_DT="12/1/2020" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.140 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/12/2021" CNSTR_PCT_TIME_USED="102.03" CNSTR_PCT_COMPLETE="86.84" DSGN_START_TRGT_DT="8/1/2018" DSGN_START_ACTL_DT="8/1/2018" ENVCLR_TRGT_DT="2/24/2020" ENVCLR_ACTL_DT="2/24/2020" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="12/1/2020" RTL_TRGT_DT="1/4/2021" RTL_ACTL_DT="12/1/2020" PE_SPENT_AMT="730551.28" CNSTR_SPENT_AMT="6266813.49" CE_SPENT_AMT="735345.60" TOT_SPENT_AMT="7732710.37" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6099600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608041" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="NEW BRAUNFELS ST." LIMITS_TO_DSCR="BURR ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27000000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.308 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4879117.73" TOT_SPENT_AMT="4879117.73" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2807)" FUND_CAT1_AMT="10000000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="13000000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT3_AMT="7240000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="WALZEM RD" LIMITS_TO_DSCR="CORINNE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="672360" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="8/2/2021" PSE_60_TRGT_DT="11/1/2021" PSE_60_ACTL_DT="11/1/2021" PSE_100_TRGT_DT="3/1/2022" PSE_100_ACTL_DT="3/7/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.168 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="79.81" CNSTR_PCT_COMPLETE="106.38" DSGN_START_TRGT_DT="12/1/2020" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="3/3/2022" UTIL_TRGT_DT="3/1/2022" UTIL_ACTL_DT="3/1/2022" ROW_TRGT_DT="3/1/2022" ROW_ACTL_DT="3/7/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="3/7/2022" CNSTR_SPENT_AMT="889107.36" CE_SPENT_AMT="1308.16" TOT_SPENT_AMT="890415.52" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="641213.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608047" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="ROY SMITH" LIMITS_TO_DSCR="BURR RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10471625" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.307 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="12/13/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="85.31" CNSTR_PCT_COMPLETE="98.34" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="10/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1027440.50" CNSTR_SPENT_AMT="10741825.55" CE_SPENT_AMT="1206956.18" TOT_SPENT_AMT="12976222.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1222982.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="11826106.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608049" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="NEW BRAUNFELS AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14000000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="14560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608050" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608051" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 368" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AUSTIN HWY" LIMITS_TO_DSCR="BURR ROAD" PRJ_TIER="" ENERGY="" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8541012" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="1/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.674 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2809TP)" FUND_CAT1_AMT="9802546.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001608053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001609040" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 82" CNTY_NM="Hays" LIMITS_FROM_DSCR="0.02 MI. NORTH OF UNIVERSITY DRIVE" LIMITS_TO_DSCR="0.02 MI. SOUTH OF GROVE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183274" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.180 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="10374.46" TOT_SPENT_AMT="10374.46" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001609044" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001609045" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001616028" PT_PHASE="Construction underway or begins soon" HWY_NBR="RM 967" CNTY_NM="Hays" LIMITS_FROM_DSCR="GOFORTH RD (CR 228)" LIMITS_TO_DSCR="IH 35 SBFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8474686" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="9/1/2019" PSE_30_ACTL_DT="9/1/2019" PSE_60_TRGT_DT="12/31/2019" PSE_60_ACTL_DT="12/31/2019" PSE_100_TRGT_DT="12/15/2022" PSE_100_ACTL_DT="12/15/2022" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.606 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="6/21/2023" CNSTR_WKBG_DT="8/28/2023" CNSTR_PCT_TIME_USED="75.00" CNSTR_PCT_COMPLETE="99.53" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="10/5/2021" ENVCLR_ACTL_DT="10/5/2021" UTIL_TRGT_DT="12/7/2022" UTIL_ACTL_DT="12/7/2022" ROW_TRGT_DT="12/7/2022" ROW_ACTL_DT="12/7/2022" RTL_TRGT_DT="12/7/2022" RTL_ACTL_DT="12/7/2022" PE_SPENT_AMT="61843.59" CNSTR_SPENT_AMT="9095919.99" CE_SPENT_AMT="220247.14" TOT_SPENT_AMT="9378010.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2650000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="5983533.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001617013" PT_PHASE="Construction begins within 4 years" HWY_NBR="RM 150" CNTY_NM="Hays" LIMITS_FROM_DSCR="BURLESON ST IN KYLE" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2700000" DIST_LET_DATE="6/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.297 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="997.79" TOT_SPENT_AMT="997.79" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="3024000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/14/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001617015" PT_PHASE="Construction underway or begins soon" HWY_NBR="RM 150" CNTY_NM="Hays" LIMITS_FROM_DSCR="FRONT STREET" LIMITS_TO_DSCR="BUSINESS 81" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="153846" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="206.02" TOT_SPENT_AMT="206.02" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="153846.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001701025" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 353" CNTY_NM="Bexar" LIMITS_FROM_DSCR="CASS AVE." LIMITS_TO_DSCR="PITLUK AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6300000" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.639 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="287212.75" TOT_SPENT_AMT="287212.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="6300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001701026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 353" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 13" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="685291" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.719 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" PE_SPENT_AMT="57347.74" CNSTR_SPENT_AMT="138276.20" CE_SPENT_AMT="2193.77" TOT_SPENT_AMT="197817.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="210480.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001702078" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="OUSSETT ROAD" LIMITS_TO_DSCR="0.3 MI N OF IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7186869" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/7/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="12/12/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="7/31/2023" CNSTR_PCT_TIME_USED="95.88" CNSTR_PCT_COMPLETE="98.59" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/28/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/1/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="9/1/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="12/12/2022" PE_SPENT_AMT="320543.41" CNSTR_SPENT_AMT="7372091.88" CE_SPENT_AMT="389919.93" TOT_SPENT_AMT="8082555.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="5781648.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001702080" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="1.8 MI. EAST OF LP 1604 (QUEST RD.)" LIMITS_TO_DSCR="0.3 MI. NORTH OF IH 410" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="146973" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2020" PSE_30_ACTL_DT="9/1/2020" PSE_60_TRGT_DT="10/1/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="11/2/2020" PSE_100_ACTL_DT="11/2/2020" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.118 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="4/8/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="90.61" CNSTR_PCT_COMPLETE="105.60" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="4/24/2020" ENVCLR_ACTL_DT="4/24/2020" UTIL_TRGT_DT="11/2/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="11/2/2020" ROW_ACTL_DT="11/2/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" CNSTR_SPENT_AMT="1220721.99" CE_SPENT_AMT="980.37" TOT_SPENT_AMT="1221702.36" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="471000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001702081" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="OUSSETT ROAD" LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183930" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.736 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="134376.72" CE_SPENT_AMT="700.60" TOT_SPENT_AMT="135077.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="99190.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001702082" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="OUSSETT ROAD" LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="223477" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.772 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="846.34" TOT_SPENT_AMT="846.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="101080.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001703068" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.42 MI S. OF KINNEY ROAD" LIMITS_TO_DSCR="OUSSETT ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6132154" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/7/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="12/12/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.460 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="7/31/2023" CNSTR_PCT_TIME_USED="95.88" CNSTR_PCT_COMPLETE="98.59" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/28/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/1/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="9/1/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="12/12/2022" PE_SPENT_AMT="276822.36" CNSTR_SPENT_AMT="5835494.69" CE_SPENT_AMT="391065.56" TOT_SPENT_AMT="6503382.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="6617548.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001703069" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 1604" LIMITS_TO_DSCR="1.8 MI. NORTH OF LP 1604 (QUEST RD." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79024" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2020" PSE_30_ACTL_DT="9/1/2020" PSE_60_TRGT_DT="10/1/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="11/2/2020" PSE_100_ACTL_DT="11/2/2020" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.749 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="4/8/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="90.61" CNSTR_PCT_COMPLETE="105.60" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="4/24/2020" ENVCLR_ACTL_DT="4/24/2020" UTIL_TRGT_DT="11/2/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="11/2/2020" ROW_ACTL_DT="11/2/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" CNSTR_SPENT_AMT="136035.25" CE_SPENT_AMT="1494.96" TOT_SPENT_AMT="137530.21" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001703070" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="ATASCOSA/BEXAR COUNTY LINE" LIMITS_TO_DSCR="OUSSETT ROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="352123" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.665 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="408540.86" CE_SPENT_AMT="1339.53" TOT_SPENT_AMT="409880.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="314100.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001703071" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="ATASCOSA/BEXAR COUNTY LINE" LIMITS_TO_DSCR="OUSSETT ROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="439850" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.275 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="457030.11" CE_SPENT_AMT="1675.82" TOT_SPENT_AMT="458705.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="303240.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001704043" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="MEDINA COUNTY LINE (WFR)" LIMITS_TO_DSCR="ATASCOSA RIVER (NORTH PRONG)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="922102" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.903 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/6/2019" CNSTR_WKBG_DT="1/6/2020" CNSTR_PCT_TIME_USED="99.02" CNSTR_PCT_COMPLETE="100.21" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="48016.75" CE_SPENT_AMT="512.22" TOT_SPENT_AMT="48528.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="20131.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001704044" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="0.5 MI SOUTH OF FM 3175" LIMITS_TO_DSCR="FM 2790" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6383622" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="9/1/2020" PSE_60_ACTL_DT="9/1/2020" PSE_100_TRGT_DT="5/3/2021" PSE_100_ACTL_DT="4/8/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.039 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="10/14/2021" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="104.29" CNSTR_PCT_COMPLETE="102.85" DSGN_START_TRGT_DT="9/3/2019" DSGN_START_ACTL_DT="9/3/2019" ENVCLR_TRGT_DT="7/1/2021" ENVCLR_ACTL_DT="5/10/2021" UTIL_TRGT_DT="5/3/2021" UTIL_ACTL_DT="4/8/2021" ROW_TRGT_DT="5/3/2021" ROW_ACTL_DT="4/8/2021" RTL_TRGT_DT="7/1/2021" RTL_ACTL_DT="5/10/2021" PE_SPENT_AMT="973751.52" CNSTR_SPENT_AMT="7811965.47" CE_SPENT_AMT="1218557.81" TOT_SPENT_AMT="10004274.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="5189600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001704049" PT_PHASE="Construction begins within 4 years" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="MEDINA / ATASCOSA COUNTY LINE" LIMITS_TO_DSCR="FM 3175" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="48811" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="54668.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001704050" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="MEDINA/ATASCOSA CL" LIMITS_TO_DSCR="ATASCOSA/BEXAR CL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19480" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="700.71" TOT_SPENT_AMT="700.71" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="19480.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001705096" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Medina" LIMITS_FROM_DSCR="AT CHACON CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12823667" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/3/2022" PSE_30_ACTL_DT="1/3/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="4/1/2022" PSE_100_TRGT_DT="11/14/2022" PSE_100_ACTL_DT="11/14/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.440 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.57" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="1/11/2023" ENVCLR_ACTL_DT="1/11/2023" UTIL_TRGT_DT="11/14/2022" UTIL_ACTL_DT="11/14/2022" ROW_TRGT_DT="11/14/2022" ROW_ACTL_DT="11/14/2022" RTL_TRGT_DT="8/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="880450.44" CNSTR_SPENT_AMT="73417.50" CE_SPENT_AMT="2511.96" TOT_SPENT_AMT="956379.90" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="6580635.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT2_PID="BSP" FUND_CAT2_AMT="7560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001705102" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Medina" LIMITS_FROM_DSCR="MEDINA/FRIO C.L." LIMITS_TO_DSCR="CR 770" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3042492" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.929 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="133549.62" CNSTR_SPENT_AMT="407689.00" CE_SPENT_AMT="3069.40" TOT_SPENT_AMT="544308.02" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2411801.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001705103" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Medina" LIMITS_FROM_DSCR="MEDINA/FRIO C.L." LIMITS_TO_DSCR="FM 463" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="251306" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.051 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="261153.09" CE_SPENT_AMT="1966.17" TOT_SPENT_AMT="263119.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="316566.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001705107" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Medina" LIMITS_FROM_DSCR="CR 770" LIMITS_TO_DSCR="MEDINA / ATASCOSA COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="328064" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="367432.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001705108" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Medina" LIMITS_FROM_DSCR="MEDINA / ATASCOSA COUNTY LINE" LIMITS_TO_DSCR="0.2 MILES SOUTH OF CR 6717" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="105277" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="117910.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001705110" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Medina" LIMITS_FROM_DSCR="0.3 N OF CR 7611" LIMITS_TO_DSCR="MEDINA/ATASCOSA CL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="66779" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.774 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="66779.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001706086" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="US 57" LIMITS_TO_DSCR="FRIO/MEDINA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11872495" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/4/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="10/13/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="10/21/2024" CNSTR_PCT_TIME_USED="18.12" CNSTR_PCT_COMPLETE="42.84" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="202912.27" CNSTR_SPENT_AMT="5120052.01" CE_SPENT_AMT="181327.69" TOT_SPENT_AMT="5504291.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="13651477.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001706088" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="FM 462" LIMITS_TO_DSCR="FRIO/MEDINA COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="196403" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.571 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="205081.92" CE_SPENT_AMT="745.40" TOT_SPENT_AMT="205827.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="136369.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001706089" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="FM 462" LIMITS_TO_DSCR="FRIO/MEDINA COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="152260" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.521 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="127518.17" CE_SPENT_AMT="577.32" TOT_SPENT_AMT="128095.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="139489.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001706093" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="FM 140" LIMITS_TO_DSCR="FM 3352" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="779821" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="873400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001706094" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001707137" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="FRIO RIVER" LIMITS_TO_DSCR="FM 140" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="395983" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.620 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="396037.48" CE_SPENT_AMT="6426.03" TOT_SPENT_AMT="402463.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="398539.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001707138" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="1.0 MI NORTH OF CR 4450" LIMITS_TO_DSCR="1.75 MI NORTH OF CR 4450" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19198" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.710 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="91.29" CNSTR_PCT_COMPLETE="105.02" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="19198.00" CE_SPENT_AMT="113.79" TOT_SPENT_AMT="19311.79" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="52693.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001707139" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="FM 1583" LIMITS_TO_DSCR="SS 581" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="54566" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.894 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="54208.03" CE_SPENT_AMT="879.64" TOT_SPENT_AMT="55087.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="31649.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001707140" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Frio" LIMITS_FROM_DSCR="BI 35-D" LIMITS_TO_DSCR="FM 1583" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="565916" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.062 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="633826.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708096" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="NUECES RIVER BRIDGE (EFR)" LIMITS_TO_DSCR="IH 35/BI 35C NORTH INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6597484" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/19/2017" PSE_30_ACTL_DT="4/19/2017" PSE_60_TRGT_DT="6/30/2017" PSE_60_ACTL_DT="6/30/2017" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="J. CARROLL WEAVER, INC." CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="9/7/2021" CNSTR_PCT_TIME_USED="98.84" CNSTR_PCT_COMPLETE="105.38" DSGN_START_TRGT_DT="8/1/2016" DSGN_START_ACTL_DT="8/1/2016" ENVCLR_TRGT_DT="7/8/2019" ENVCLR_ACTL_DT="7/8/2019" UTIL_TRGT_DT="4/20/2020" UTIL_ACTL_DT="1/29/2021" ROW_TRGT_DT="8/1/2016" ROW_ACTL_DT="8/1/2016" RTL_TRGT_DT="4/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="875974.46" CNSTR_SPENT_AMT="8589700.62" CE_SPENT_AMT="1071913.39" TOT_SPENT_AMT="10537588.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="7329840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708103" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="NUECES RIVER (WFR)" LIMITS_TO_DSCR="0.1 MI N OF IH 35/BI 35C NORTH INT (WFR)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4838609" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/19/2017" PSE_30_ACTL_DT="4/19/2017" PSE_60_TRGT_DT="6/30/2017" PSE_60_ACTL_DT="6/30/2017" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.076 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="J. CARROLL WEAVER, INC." CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="9/7/2021" CNSTR_PCT_TIME_USED="98.84" CNSTR_PCT_COMPLETE="105.38" DSGN_START_TRGT_DT="8/1/2016" DSGN_START_ACTL_DT="8/1/2016" ENVCLR_TRGT_DT="7/8/2019" ENVCLR_ACTL_DT="7/8/2019" UTIL_TRGT_DT="4/20/2020" UTIL_ACTL_DT="1/29/2021" ROW_TRGT_DT="8/1/2016" ROW_ACTL_DT="8/1/2016" RTL_TRGT_DT="4/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="639163.77" CNSTR_SPENT_AMT="7104983.55" CE_SPENT_AMT="950157.04" TOT_SPENT_AMT="8694304.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="5151295.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708104" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="1.67 MILES NORTH OF FM 468 (NBML)" LIMITS_TO_DSCR="8.5 MI SOUTH OF FRIO CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2551896" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/28/2022" PSE_30_ACTL_DT="8/2/2022" PSE_60_TRGT_DT="9/9/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="11/3/2022" PSE_100_ACTL_DT="12/2/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.460 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="8/3/2023" CNSTR_PCT_TIME_USED="99.05" CNSTR_PCT_COMPLETE="100.02" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="11/3/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="11/3/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/3/2022" ROW_ACTL_DT="11/1/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="12/2/2022" PE_SPENT_AMT="6297.35" CNSTR_SPENT_AMT="1472605.68" CE_SPENT_AMT="118032.62" TOT_SPENT_AMT="1596935.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="3002689.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708107" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="NUECES RIVER BRIDGE" LIMITS_TO_DSCR="FRIO COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="462000000" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="15.694 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708112" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="4.70 MILES SOUTH OF FRIO COUNTY LINE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29000000" DIST_LET_DATE="7/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/17/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/13/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/10/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.094 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/24/2023" DSGN_START_ACTL_DT="1/5/2023" ENVCLR_TRGT_DT="6/24/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/24/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/24/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1159533.99" TOT_SPENT_AMT="1159533.99" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="9000000.00" FUND_CAT2_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT2_PID="PES" FUND_CAT2_AMT="22320000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708115" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="1.09 MI NORTH OF FM 3408 (SBML)" LIMITS_TO_DSCR="8.5 MI SOUTH OF FRIO COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5581944" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/28/2022" PSE_30_ACTL_DT="8/2/2022" PSE_60_TRGT_DT="9/9/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="11/3/2022" PSE_100_ACTL_DT="12/2/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.210 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="8/3/2023" CNSTR_PCT_TIME_USED="99.05" CNSTR_PCT_COMPLETE="100.02" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="11/3/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="11/3/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/3/2022" ROW_ACTL_DT="11/1/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="12/2/2022" PE_SPENT_AMT="2326.19" CNSTR_SPENT_AMT="5483333.41" CE_SPENT_AMT="283965.87" TOT_SPENT_AMT="5769625.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6314860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708116" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="8.5 MILES SOUTH OF FRIO CL (SBML)" LIMITS_TO_DSCR="LASALLE/FRIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5090113" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.500 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="5/27/2024" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="97.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="504.31" CNSTR_SPENT_AMT="5223661.84" CE_SPENT_AMT="107621.55" TOT_SPENT_AMT="5331787.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9393642.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708117" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="8.5 MILES SOUTH OF FRIO COUNTY LINE NBML" LIMITS_TO_DSCR="LA SALLE/FRIO COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11043218" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.500 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="11926675.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708118" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="RM 73+0.125" LIMITS_TO_DSCR="RM 73+0.675" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1863389" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="12/13/2022" PSE_30_ACTL_DT="12/13/2022" PSE_60_TRGT_DT="1/3/2023" PSE_60_ACTL_DT="1/3/2023" PSE_100_TRGT_DT="1/30/2023" PSE_100_ACTL_DT="1/27/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.541 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="7/12/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="84.09" CNSTR_PCT_COMPLETE="106.07" DSGN_START_TRGT_DT="1/17/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/10/2023" RTL_ACTL_DT="2/13/2023" PE_SPENT_AMT="33691.21" CNSTR_SPENT_AMT="2114362.44" CE_SPENT_AMT="69737.00" TOT_SPENT_AMT="2217790.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1628623.00" TXDOT_CNTCT_LAST_UPDATE_DT="11/5/2024" LAST_CNSTR_UPDATE_DT="11/5/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001708119" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="0.1 MI N OF IH35/BI35C N INT (WFR)" LIMITS_TO_DSCR="LASALLE/FRIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="863884" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.636 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/1/2024" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="103.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1010666.83" CE_SPENT_AMT="10197.17" TOT_SPENT_AMT="1020864.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="995626.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709102" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="70' SOUTHWEST OF ZARZAMORA" LIMITS_TO_DSCR="990' NORTHEAST OF ZARZAMORA" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2408RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709103" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="233' SOUTHWEST OF ZARZAMORA" LIMITS_TO_DSCR="820' NORTHEAST OF ZARZAMORA" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2408RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709106" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="W. MAYFIELD DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="24846825" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1169929.94" TOT_SPENT_AMT="1169929.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="25840698.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709110" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.3 MI. NORTH OF IH 410" LIMITS_TO_DSCR="LP 13 (SW MILITARY)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="260981" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2020" PSE_30_ACTL_DT="9/1/2020" PSE_60_TRGT_DT="10/1/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="11/2/2020" PSE_100_ACTL_DT="11/2/2020" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.145 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="4/8/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="90.61" CNSTR_PCT_COMPLETE="105.60" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="4/24/2020" ENVCLR_ACTL_DT="4/24/2020" UTIL_TRGT_DT="11/2/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="11/2/2020" ROW_ACTL_DT="11/2/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" CNSTR_SPENT_AMT="267475.86" CE_SPENT_AMT="4180.76" TOT_SPENT_AMT="271656.62" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="779000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709111" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.34 MI WEST OF SOMERSET RD" LIMITS_TO_DSCR="0.71 MI WEST OF CASSIN RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="382033" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="10/1/2021" PSE_60_ACTL_DT="10/1/2021" PSE_100_TRGT_DT="12/1/2021" PSE_100_ACTL_DT="12/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.620 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="5/12/2022" CNSTR_WKBG_DT="1/23/2023" CNSTR_PCT_TIME_USED="146.02" CNSTR_PCT_COMPLETE="99.59" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="3/11/2022" ENVCLR_ACTL_DT="12/8/2021" UTIL_TRGT_DT="12/1/2021" UTIL_ACTL_DT="12/1/2021" ROW_TRGT_DT="12/1/2021" ROW_ACTL_DT="12/1/2021" RTL_TRGT_DT="3/11/2022" RTL_ACTL_DT="12/8/2021" PE_SPENT_AMT="4584.36" CNSTR_SPENT_AMT="370055.00" CE_SPENT_AMT="310.33" TOT_SPENT_AMT="374949.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="280027.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709112" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.34 MI WEST OF SOMERSET RD" LIMITS_TO_DSCR="0.71 MI WEST OF CASSIN RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="728835" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="10/1/2021" PSE_60_ACTL_DT="10/1/2021" PSE_100_TRGT_DT="12/1/2021" PSE_100_ACTL_DT="12/1/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.619 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="5/12/2022" CNSTR_WKBG_DT="1/23/2023" CNSTR_PCT_TIME_USED="146.02" CNSTR_PCT_COMPLETE="99.59" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="3/11/2022" ENVCLR_ACTL_DT="12/8/2021" UTIL_TRGT_DT="12/1/2021" UTIL_ACTL_DT="12/1/2021" ROW_TRGT_DT="12/1/2021" ROW_ACTL_DT="12/1/2021" RTL_TRGT_DT="3/11/2022" RTL_ACTL_DT="12/8/2021" CNSTR_SPENT_AMT="730360.93" CE_SPENT_AMT="3506.47" TOT_SPENT_AMT="733867.40" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="753911.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709114" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SOMERSET ROAD" LIMITS_TO_DSCR="LP 13" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8628000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.876 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38518.14" TOT_SPENT_AMT="38518.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8973120.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709118" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT SOUTHCROSS BLVD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2234489" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.093 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="135801.05" TOT_SPENT_AMT="135801.05" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2705)" FUND_CAT1_AMT="2234489.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_AMT="268139.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709119" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT SP 422" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2439042" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.599 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="193321.17" TOT_SPENT_AMT="193321.17" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2705)" FUND_CAT1_AMT="2439042.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_AMT="292685.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001709120" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT ZARZAMORA ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9998204" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.337 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="296243.68" TOT_SPENT_AMT="296243.68" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2805)" FUND_CAT1_AMT="9998204.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT2_AMT="1199784.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001710168" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410 S" LIMITS_TO_DSCR="IH 410 N" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="699862000" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.949 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="LONE STAR CONSTRUCTORS, NEX" CNSTR_NTPD_DT="9/5/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="35.36" CNSTR_PCT_COMPLETE="39.12" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20570317.29" CE_SPENT_AMT="3400541.50" TOT_SPENT_AMT="23970858.79" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="202300000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="276463776.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="35509384.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001710180" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="US 281/IH 37, EAST" LIMITS_TO_DSCR="IH 410 S" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="225000000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Expand From 6 Lane To 10 Lane ExpresswaY-Add 4 New Express Lanes Including 2 HoV-Special Use Lanes;from 6 To 6 Fr Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TBD" PROJ_LENGTH="5.549 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1605820.79" TOT_SPENT_AMT="1605820.79" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="60000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001710289" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LAREDO ST." LIMITS_TO_DSCR="AUSTIN ST." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7801107" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="5/3/2021" PSE_30_ACTL_DT="5/3/2021" PSE_60_TRGT_DT="9/1/2021" PSE_60_ACTL_DT="9/1/2021" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="4/29/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.133 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="11/9/2022" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="58.55" CNSTR_PCT_COMPLETE="52.01" DSGN_START_TRGT_DT="9/1/2020" DSGN_START_ACTL_DT="9/1/2020" ENVCLR_TRGT_DT="4/11/2022" ENVCLR_ACTL_DT="4/11/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" PE_SPENT_AMT="82061.70" CNSTR_SPENT_AMT="7815104.26" CE_SPENT_AMT="514640.64" TOT_SPENT_AMT="8411806.60" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="4998090.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="155150.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="468357.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT4_AMT="4372.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001710292" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="N. WALTERS ST." LIMITS_TO_DSCR="IH 410 S" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327000000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.332 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="9/23/2022" ENVCLR_TRGT_DT="7/3/2015" ENVCLR_ACTL_DT="7/3/2015" UTIL_TRGT_DT="5/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20927097.73" TOT_SPENT_AMT="20927097.73" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="69688224.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="28200000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="48810464.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001710294" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="VARIOUS LOCATIONS ON IH 35" LIMITS_TO_DSCR="NEAR DOWNTOWN" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12000000" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Install/upgrade Drainage Structure(s)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2807.98" TOT_SPENT_AMT="2807.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="480000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001710295" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT IH 410 CONN F" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="323000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="323000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001711040" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 536" CNTY_NM="Bexar" LIMITS_FROM_DSCR="ALAMO ST." LIMITS_TO_DSCR="STEVES AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17300000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/8/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.726 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2059.83" TOT_SPENT_AMT="2059.83" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2500000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_PID="CC" FUND_CAT2_AMT="16876000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001713012" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 132" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="AT FM 2790" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="698637" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/1/2021" PSE_30_ACTL_DT="11/1/2021" PSE_60_TRGT_DT="2/1/2022" PSE_60_ACTL_DT="2/1/2022" PSE_100_TRGT_DT="3/1/2022" PSE_100_ACTL_DT="3/3/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="9/1/2022" CNSTR_PCT_TIME_USED="70.98" CNSTR_PCT_COMPLETE="95.80" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="3/3/2022" UTIL_TRGT_DT="3/1/2022" UTIL_ACTL_DT="3/3/2022" ROW_TRGT_DT="3/1/2022" ROW_ACTL_DT="3/3/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="3/3/2022" PE_SPENT_AMT="6693.45" CNSTR_SPENT_AMT="686788.87" CE_SPENT_AMT="28499.34" TOT_SPENT_AMT="721981.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="900000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001713013" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 132" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="BEXAR/ATASCOSA C/L" LIMITS_TO_DSCR="FM 2790 (MCDONALD ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44959" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.972 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="50354.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001714021" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 132" CNTY_NM="Medina" LIMITS_FROM_DSCR="WALLACE AVE" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="67107" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.503 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="69640.83" CE_SPENT_AMT="524.35" TOT_SPENT_AMT="70165.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="79568.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001715026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 581" CNTY_NM="Frio" LIMITS_FROM_DSCR="FM 1582" LIMITS_TO_DSCR="0.9 MI N OF FM 1583" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="379648" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.537 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="379456.17" CE_SPENT_AMT="6156.92" TOT_SPENT_AMT="385613.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="388165.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001715028" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 35-E" CNTY_NM="Frio" LIMITS_FROM_DSCR="0.3 MI NORTH OF FIELDS ST" LIMITS_TO_DSCR="E. FLORIDA ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1111692" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="10/28/2024" CNSTR_PCT_TIME_USED="60.67" CNSTR_PCT_COMPLETE="53.95" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="1/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13204.05" CNSTR_SPENT_AMT="128144.60" CE_SPENT_AMT="37673.04" TOT_SPENT_AMT="179021.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1035320.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001716008" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 35-D" CNTY_NM="Frio" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="LA SALLE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5067580" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.059 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="5675690.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001717011" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 35-C" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="NORTH END OF NUECES RIVER BRIDGE" LIMITS_TO_DSCR="0.1 MI N OF IH35/BI35C N INT" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/11/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1289024" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/15/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/26/2022" PSE_60_ACTL_DT="1/24/2022" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="2/11/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.800 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="84.14" CNSTR_PCT_COMPLETE="102.82" DSGN_START_TRGT_DT="6/2/2022" DSGN_START_ACTL_DT="12/6/2021" ENVCLR_TRGT_DT="12/12/2022" ENVCLR_ACTL_DT="1/31/2022" UTIL_TRGT_DT="12/12/2022" UTIL_ACTL_DT="1/24/2022" ROW_TRGT_DT="12/12/2022" ROW_ACTL_DT="1/24/2022" RTL_TRGT_DT="12/12/2022" RTL_ACTL_DT="3/3/2022" PE_SPENT_AMT="2179.87" CNSTR_SPENT_AMT="1524316.46" CE_SPENT_AMT="124968.64" TOT_SPENT_AMT="1651464.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1042567.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001801099" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="FM 133" LIMITS_TO_DSCR="NUECES RIVER BRIDGE" PRJ_TIER="" ENERGY="Y" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="315000000" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.681 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001801101" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="2.80 MI N OF FM 133 (UPR UNDERPASS -EFR)" LIMITS_TO_DSCR="0.295 MI N OF FM 3408" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="603883" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/29/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/30/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.142 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/21/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="628039.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="4/29/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001801102" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="FM 133 (SBML)" LIMITS_TO_DSCR="0.287 MI SOUTH OF FM 3408" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12045982" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.319 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="13009661.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001801103" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="FM 133 (WFR)" LIMITS_TO_DSCR="IH 35/BI 35 SOUTH INTERSECTION" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="581109" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.918 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="604353.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001801104" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="FM133 (NBML)" LIMITS_TO_DSCR="0.287 MI SOUTH OF FM 3408" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12202656" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.308 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="13178868.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802086" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="FM 133" LIMITS_TO_DSCR="7.288 MI S OF FM 133 (EFR)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/18/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11045138" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/19/2017" PSE_30_ACTL_DT="7/19/2017" PSE_60_TRGT_DT="9/22/2017" PSE_60_ACTL_DT="9/22/2017" PSE_100_TRGT_DT="1/10/2018" PSE_100_ACTL_DT="1/10/2018" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.251 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="4/19/2022" CNSTR_WKBG_DT="6/6/2022" CNSTR_PCT_TIME_USED="114.34" CNSTR_PCT_COMPLETE="101.74" DSGN_START_TRGT_DT="7/27/2016" DSGN_START_ACTL_DT="7/27/2016" ENVCLR_TRGT_DT="2/8/2018" ENVCLR_ACTL_DT="2/8/2018" UTIL_TRGT_DT="12/19/2017" UTIL_ACTL_DT="12/19/2017" ROW_TRGT_DT="2/6/2018" ROW_ACTL_DT="2/6/2018" RTL_TRGT_DT="2/8/2018" RTL_ACTL_DT="2/8/2018" PE_SPENT_AMT="468807.44" CNSTR_SPENT_AMT="11579666.66" CE_SPENT_AMT="386527.27" TOT_SPENT_AMT="12435001.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="12901200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802087" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="4.885 MI N OF WEBB CL (NBML)" LIMITS_TO_DSCR="6.52 MI SOUTH OF FM 133" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/11/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4236619" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/15/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/26/2022" PSE_60_ACTL_DT="1/24/2022" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="2/11/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.321 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="84.14" CNSTR_PCT_COMPLETE="102.82" DSGN_START_TRGT_DT="6/2/2022" DSGN_START_ACTL_DT="12/6/2021" ENVCLR_TRGT_DT="12/12/2022" ENVCLR_ACTL_DT="1/31/2022" UTIL_TRGT_DT="12/12/2022" UTIL_ACTL_DT="1/24/2022" ROW_TRGT_DT="12/12/2022" ROW_ACTL_DT="1/24/2022" RTL_TRGT_DT="12/12/2022" RTL_ACTL_DT="3/3/2022" PE_SPENT_AMT="1206.09" CNSTR_SPENT_AMT="5011794.85" CE_SPENT_AMT="368487.61" TOT_SPENT_AMT="5381488.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="3699969.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802088" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="WEBB COUNTY LINE" LIMITS_TO_DSCR="FM 133" PRJ_TIER="" ENERGY="" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="532000000" DIST_LET_DATE="8/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TBD" PROJ_LENGTH="17.735 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802089" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="WEBB/LA SALLE COUNTY LINE" LIMITS_TO_DSCR="5.000 MI S OF FM133" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1081952" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/10/2021" PSE_30_ACTL_DT="1/11/2022" PSE_60_TRGT_DT="11/26/2021" PSE_60_ACTL_DT="1/26/2022" PSE_100_TRGT_DT="3/14/2022" PSE_100_ACTL_DT="3/24/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.058 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="MIJELUM, L.L.C." CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="104.04" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="12/10/2021" ENVCLR_TRGT_DT="4/4/2022" ENVCLR_ACTL_DT="3/24/2022" UTIL_TRGT_DT="4/4/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/4/2022" ROW_ACTL_DT="3/24/2022" RTL_TRGT_DT="4/4/2022" RTL_ACTL_DT="3/25/2022" PE_SPENT_AMT="23322.96" CNSTR_SPENT_AMT="1128761.19" CE_SPENT_AMT="57840.93" TOT_SPENT_AMT="1209925.08" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1134390.00" TXDOT_CNTCT_LAST_UPDATE_DT="11/5/2024" LAST_CNSTR_UPDATE_DT="11/5/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802090" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="6.52 MI SOUTH OF FM 133 NBSBML" LIMITS_TO_DSCR="FM 133" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8449300" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/28/2022" PSE_30_ACTL_DT="8/2/2022" PSE_60_TRGT_DT="9/9/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="11/3/2022" PSE_100_ACTL_DT="12/2/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.524 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="8/3/2023" CNSTR_PCT_TIME_USED="99.05" CNSTR_PCT_COMPLETE="100.02" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="11/3/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="11/3/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/3/2022" ROW_ACTL_DT="11/1/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="12/2/2022" PE_SPENT_AMT="1218.24" CNSTR_SPENT_AMT="7153693.07" CE_SPENT_AMT="358967.47" TOT_SPENT_AMT="7513878.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="8232961.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802091" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="WEBB/LASALLE COUNTY LINE (NBML)" LIMITS_TO_DSCR="4.885 MI NORTH OF WEBB COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5600024" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.881 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="5/27/2024" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="97.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="176176.48" CNSTR_SPENT_AMT="6898888.13" CE_SPENT_AMT="51772.77" TOT_SPENT_AMT="7126837.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="5222571.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802092" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="WEBB/ LASALLE COUNTY LINE (SBML)" LIMITS_TO_DSCR="4.885 MI N OF WEBB" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6155113" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.832 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6647522.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001802093" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="4.885 MI N OF WEBB CL (SBML)" LIMITS_TO_DSCR="6.52 MI S OF FM 133" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8080244" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.344 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="8726663.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803057" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="9.8 MI SOUTH OF LASALLE CL" LIMITS_TO_DSCR="8.3 MI SOUTH OF LASALLE CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43775603" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.514 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="934004.33" TOT_SPENT_AMT="934004.33" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="49028676.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803060" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="8.3 MI S OF WEBB/LASALLE CO LINE" LIMITS_TO_DSCR="WEBB/LA SALLE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="279000000" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.791 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="9.791 SOUTH OF THE LA SALLE COUNTY" LIMITS_TO_DSCR="LA SALLE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1440926" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2021" PSE_100_ACTL_DT="4/9/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.791 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="SJ&amp;J CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="79.09" CNSTR_PCT_COMPLETE="98.59" DSGN_START_TRGT_DT="2/1/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="6/4/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="6/4/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/4/2021" RTL_ACTL_DT="6/14/2021" PE_SPENT_AMT="160.61" CNSTR_SPENT_AMT="1197110.20" CE_SPENT_AMT="70545.58" TOT_SPENT_AMT="1267816.39" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="500000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT2_AMT="821380.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803063" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="9.906 MILES NORTH OF US 83 (NBML)" LIMITS_TO_DSCR="MILE MARKER 31" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/11/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1633942" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/15/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/26/2022" PSE_60_ACTL_DT="1/24/2022" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="2/11/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.500 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="84.14" CNSTR_PCT_COMPLETE="102.82" DSGN_START_TRGT_DT="6/2/2022" DSGN_START_ACTL_DT="12/6/2021" ENVCLR_TRGT_DT="12/12/2022" ENVCLR_ACTL_DT="1/31/2022" UTIL_TRGT_DT="12/12/2022" UTIL_ACTL_DT="1/24/2022" ROW_TRGT_DT="12/12/2022" ROW_ACTL_DT="1/24/2022" RTL_TRGT_DT="12/12/2022" RTL_ACTL_DT="3/3/2022" PE_SPENT_AMT="454.65" CNSTR_SPENT_AMT="1932711.46" CE_SPENT_AMT="141385.05" TOT_SPENT_AMT="2074551.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1428272.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803065" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.7 MI NORTH OF CALLAGHAN ROAD (SBML)" LIMITS_TO_DSCR="MILE MARKER 35" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3937854" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/28/2022" PSE_30_ACTL_DT="8/2/2022" PSE_60_TRGT_DT="9/9/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="11/3/2022" PSE_100_ACTL_DT="12/2/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.515 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="8/3/2023" CNSTR_PCT_TIME_USED="99.05" CNSTR_PCT_COMPLETE="100.02" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="11/3/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="11/3/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/3/2022" ROW_ACTL_DT="11/1/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="12/2/2022" PE_SPENT_AMT="2503.08" CNSTR_SPENT_AMT="3814405.82" CE_SPENT_AMT="179759.60" TOT_SPENT_AMT="3996668.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="4443623.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803066" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="MILE MARKER 31 (NBML)" LIMITS_TO_DSCR="MILE MARKER 34" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11538462" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/27/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/9/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.000 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/4/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/4/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="118126.68" TOT_SPENT_AMT="118126.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="12000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803067" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="MILE MARKER 34 (NBML)" LIMITS_TO_DSCR="WEBB/LA SALLE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14000000" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.238 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="15680000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001803068" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="9.8 MI SOUTH OF LASALLE CL" LIMITS_TO_DSCR="8.3 MI SOUTH OF LASALLE CL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13392857" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.515 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="15000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804058" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.2 MI NORTH OF US 83 INT" LIMITS_TO_DSCR="7.0 MI NORTH OF US 83 INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="143160000" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.800 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2714655.96" TOT_SPENT_AMT="2714655.96" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804061" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="7.0 MI NORTH OF US 83 INT" LIMITS_TO_DSCR="9.8 MI SOUTH OF LA SALLE CL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="77687952" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.891 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6743.22" TOT_SPENT_AMT="6743.22" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="87010506.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804063" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.1 MI NORTH OF US 83" LIMITS_TO_DSCR="MILE MARKER 23 (SBML)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1654912" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/22/2020" PSE_100_ACTL_DT="2/22/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.228 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="83.21" CNSTR_PCT_COMPLETE="105.16" DSGN_START_TRGT_DT="6/1/2020" DSGN_START_ACTL_DT="5/15/2020" ENVCLR_TRGT_DT="1/15/2021" ENVCLR_ACTL_DT="6/1/2020" UTIL_TRGT_DT="1/15/2021" UTIL_ACTL_DT="6/1/2020" ROW_TRGT_DT="1/15/2021" ROW_ACTL_DT="6/1/2020" RTL_TRGT_DT="1/15/2021" RTL_ACTL_DT="2/22/2021" PE_SPENT_AMT="30765.44" CNSTR_SPENT_AMT="2014533.07" CE_SPENT_AMT="200048.56" TOT_SPENT_AMT="2245347.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804064" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.2 MILES NORTH OF US 83" LIMITS_TO_DSCR="9.791 SOUTH OF LA SALLE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1181830" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2021" PSE_100_ACTL_DT="4/9/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.701 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="SJ&amp;J CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="79.09" CNSTR_PCT_COMPLETE="98.59" DSGN_START_TRGT_DT="2/1/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="6/4/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="6/4/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/4/2021" RTL_ACTL_DT="6/14/2021" PE_SPENT_AMT="55562.98" CNSTR_SPENT_AMT="1285155.64" CE_SPENT_AMT="46802.91" TOT_SPENT_AMT="1387521.53" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="325000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT2_AMT="804093.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804065" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.200 MILES NORTH OF US 83 (NBML)" LIMITS_TO_DSCR="9.906 MILES NORTH OF US 83" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/11/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8989651" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/15/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/26/2022" PSE_60_ACTL_DT="1/24/2022" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="2/11/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.706 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="84.14" CNSTR_PCT_COMPLETE="102.82" DSGN_START_TRGT_DT="6/2/2022" DSGN_START_ACTL_DT="12/6/2021" ENVCLR_TRGT_DT="12/12/2022" ENVCLR_ACTL_DT="1/31/2022" UTIL_TRGT_DT="12/12/2022" UTIL_ACTL_DT="1/24/2022" ROW_TRGT_DT="12/12/2022" ROW_ACTL_DT="1/24/2022" RTL_TRGT_DT="12/12/2022" RTL_ACTL_DT="3/3/2022" PE_SPENT_AMT="93056.87" CNSTR_SPENT_AMT="9443238.83" CE_SPENT_AMT="504113.89" TOT_SPENT_AMT="10040409.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="7615839.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804066" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="MILE MARKER 23 (SBML)" LIMITS_TO_DSCR="1.7 MI NORTH OF CALLAGHAN ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4781733" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/28/2022" PSE_30_ACTL_DT="8/2/2022" PSE_60_TRGT_DT="9/9/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="11/3/2022" PSE_100_ACTL_DT="12/2/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.475 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="8/3/2023" CNSTR_PCT_TIME_USED="99.05" CNSTR_PCT_COMPLETE="100.02" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="11/3/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="11/3/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/3/2022" ROW_ACTL_DT="11/1/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="12/2/2022" PE_SPENT_AMT="1771.33" CNSTR_SPENT_AMT="4537803.58" CE_SPENT_AMT="212922.34" TOT_SPENT_AMT="4752497.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="4541458.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804067" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.1 MI NORTH OF US 83 (WFR)" LIMITS_TO_DSCR="0.945 MI NORTH OF CALLAGHAN INTCHG" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="694617" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.705 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="722402.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804068" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="7.0 MI NORTH OF US 83 INT" LIMITS_TO_DSCR="9.8 MI SOUTH OF LA SALLE CL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49107143" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.896 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="55000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804069" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001804070" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805089" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.47 MI S OF UNIROYAL INTERCHANGE" LIMITS_TO_DSCR="3.22  MI N OF UNIROYAL INTERCHANGE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="244358954" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="10/16/2018" PSE_30_ACTL_DT="4/29/2022" PSE_60_TRGT_DT="3/29/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/4/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.030 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/31/2017" DSGN_START_ACTL_DT="10/27/2020" ENVCLR_TRGT_DT="10/7/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/20/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/5/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/20/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11298034.05" CNSTR_SPENT_AMT="60241.54" CE_SPENT_AMT="353.83" TOT_SPENT_AMT="11358629.42" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="6698797.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="210434514.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="37000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805090" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.09 MI N OF UNIROYAL DRIVE (WFR)" LIMITS_TO_DSCR="0.40 MI S OF HWY US 83 (WFR)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3289937" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="7/8/2024" CNSTR_PCT_TIME_USED="79.17" CNSTR_PCT_COMPLETE="104.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="157576.31" CNSTR_SPENT_AMT="3614472.97" CE_SPENT_AMT="116686.20" TOT_SPENT_AMT="3888735.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="7920000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805094" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="2.68 MI N OF UNIROYAL INT(MM 16.0)" LIMITS_TO_DSCR="1.2 MI N OF US 83 INT(MM 19.787)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250696301" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/16/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/13/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/26/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.782 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/29/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/22/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8486135.81" CNSTR_SPENT_AMT="30342.45" CE_SPENT_AMT="60.91" TOT_SPENT_AMT="8516539.17" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="38466073.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_PID="CNN" FUND_CAT2_AMT="232285931.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805098" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.353 MILES SOUTH OF CARRIERS RD" LIMITS_TO_DSCR="UNIROYAL INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4464286" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Widen Bridge" PSE_30_TRGT_DT="3/22/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/26/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/11/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.904 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/7/2022" DSGN_START_ACTL_DT="12/7/2022" ENVCLR_TRGT_DT="8/5/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/22/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/13/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/11/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1762248.55" TOT_SPENT_AMT="1762248.55" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805103" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="MILE MARKER 16 (SBML)" LIMITS_TO_DSCR="1.1 MI NORTH OF US 83" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1533751" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/22/2020" PSE_100_ACTL_DT="2/22/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.782 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="83.21" CNSTR_PCT_COMPLETE="105.16" DSGN_START_TRGT_DT="6/1/2020" DSGN_START_ACTL_DT="5/15/2020" ENVCLR_TRGT_DT="1/15/2021" ENVCLR_ACTL_DT="6/1/2020" UTIL_TRGT_DT="1/15/2021" UTIL_ACTL_DT="6/1/2020" ROW_TRGT_DT="1/15/2021" ROW_ACTL_DT="6/1/2020" RTL_TRGT_DT="1/15/2021" RTL_ACTL_DT="2/22/2021" CNSTR_SPENT_AMT="2256259.95" CE_SPENT_AMT="238118.82" TOT_SPENT_AMT="2494378.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805104" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.19 MI SOUTH OF CARRIER RD (SBML)" LIMITS_TO_DSCR="MILE MARKER 16" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3824923" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/14/2021" PSE_100_TRGT_DT="11/18/2021" PSE_100_ACTL_DT="12/14/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.490 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/11/2022" CNSTR_WKBG_DT="8/10/2022" CNSTR_PCT_TIME_USED="95.92" CNSTR_PCT_COMPLETE="93.31" DSGN_START_TRGT_DT="5/3/2021" DSGN_START_ACTL_DT="6/15/2021" ENVCLR_TRGT_DT="12/10/2021" ENVCLR_ACTL_DT="12/20/2021" UTIL_TRGT_DT="12/10/2021" UTIL_ACTL_DT="12/14/2021" ROW_TRGT_DT="12/10/2021" ROW_ACTL_DT="12/14/2021" RTL_TRGT_DT="12/10/2021" RTL_ACTL_DT="12/20/2021" PE_SPENT_AMT="39553.95" CNSTR_SPENT_AMT="3185416.42" CE_SPENT_AMT="110410.00" TOT_SPENT_AMT="3335380.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="2974456.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001805105" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.19 MI SOUTH OF CARRIER RD (NBML)" LIMITS_TO_DSCR="UNIROYAL INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1616234" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/14/2021" PSE_100_TRGT_DT="11/18/2021" PSE_100_ACTL_DT="12/14/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.806 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/11/2022" CNSTR_WKBG_DT="8/10/2022" CNSTR_PCT_TIME_USED="95.92" CNSTR_PCT_COMPLETE="93.31" DSGN_START_TRGT_DT="5/3/2021" DSGN_START_ACTL_DT="6/15/2021" ENVCLR_TRGT_DT="12/10/2021" ENVCLR_ACTL_DT="12/20/2021" UTIL_TRGT_DT="12/10/2021" UTIL_ACTL_DT="12/14/2021" ROW_TRGT_DT="12/10/2021" ROW_ACTL_DT="12/14/2021" RTL_TRGT_DT="12/10/2021" RTL_ACTL_DT="12/20/2021" PE_SPENT_AMT="193.52" CNSTR_SPENT_AMT="1751047.61" CE_SPENT_AMT="60693.32" TOT_SPENT_AMT="1811934.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1773305.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806136" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="SHILOH DRIVE" LIMITS_TO_DSCR="0.38 MILES S. OF US 59/ IH 35 INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57667973" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.072 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="1/4/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="105.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5730453.91" CNSTR_SPENT_AMT="71683669.95" CE_SPENT_AMT="1421620.86" TOT_SPENT_AMT="78835744.72" FUND_CAT1_DSCR="Category 4 - Proposition 1 (17P104)" FUND_CAT1_AMT="2780000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="017" FUND_CAT2_AMT="18000000.00" FUND_CAT3_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT3_PID="017" FUND_CAT3_AMT="30667973.00" FUND_CAT4_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT4_AMT="9000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806175" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.8 MI NORTH OF US59 CONC SEC (NBML)" LIMITS_TO_DSCR="1.19 MI SOUTH OF CARRIER RD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2853361" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/14/2021" PSE_100_TRGT_DT="11/18/2021" PSE_100_ACTL_DT="12/14/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.174 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/11/2022" CNSTR_WKBG_DT="8/10/2022" CNSTR_PCT_TIME_USED="95.92" CNSTR_PCT_COMPLETE="93.31" DSGN_START_TRGT_DT="5/3/2021" DSGN_START_ACTL_DT="6/15/2021" ENVCLR_TRGT_DT="12/10/2021" ENVCLR_ACTL_DT="12/20/2021" UTIL_TRGT_DT="12/10/2021" UTIL_ACTL_DT="12/14/2021" ROW_TRGT_DT="12/10/2021" ROW_ACTL_DT="12/14/2021" RTL_TRGT_DT="12/10/2021" RTL_ACTL_DT="12/20/2021" CNSTR_SPENT_AMT="3092275.59" CE_SPENT_AMT="107181.64" TOT_SPENT_AMT="3199457.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1678843.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806181" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.010 MI S OF SANCHEZ (SBML)" LIMITS_TO_DSCR="0.28 MILES SOUTH OF SHILOH DRIVE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7949527" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.698 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="113446.70" TOT_SPENT_AMT="113446.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="7949528.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806183" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.454 MILE SOUTH OF IH35 / US59-SL20 INT" LIMITS_TO_DSCR="0.732 MILE EAST OF US59-SL20 / IH35 INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29180593" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.117 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="1/4/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="105.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2143620.86" CNSTR_SPENT_AMT="36189952.59" CE_SPENT_AMT="980654.28" TOT_SPENT_AMT="39314227.73" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="30000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806184" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.207 MILE WEST OF US59-SL20 / IH35 INT" LIMITS_TO_DSCR="0.197 MILE SOUTH OF IH35 / US59-SL20 INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21894481" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.265 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="1/4/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="105.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1292463.87" CNSTR_SPENT_AMT="11633642.47" CE_SPENT_AMT="234415.09" TOT_SPENT_AMT="13160521.43" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="22000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806185" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.50 MI EAST OF IH35" LIMITS_TO_DSCR="0.50 MI NORTH OF US59" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="109139744" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="9/16/2019" PSE_30_ACTL_DT="8/14/2019" PSE_60_TRGT_DT="1/16/2020" PSE_60_ACTL_DT="4/16/2020" PSE_100_TRGT_DT="4/2/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/31/2017" DSGN_START_ACTL_DT="6/27/2019" ENVCLR_TRGT_DT="2/24/2020" ENVCLR_ACTL_DT="11/12/2019" UTIL_TRGT_DT="1/25/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/9/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/25/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2058190.90" CNSTR_SPENT_AMT="9962.71" TOT_SPENT_AMT="2068153.61" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="93505334.00" FUND_CAT2_DSCR="Category 11 - Rider (16B11)" FUND_CAT2_PID="R11" FUND_CAT2_AMT="20000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806187" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.50 MI SOUTH OF US59" LIMITS_TO_DSCR="0.50 MI EAST OF IH35" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18000000" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1642596.31" TOT_SPENT_AMT="1642596.31" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806193" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="SCOTT STREET (EFR)" LIMITS_TO_DSCR="0.222 MILE NORTH OF SHILOH RD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4890970" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.567 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="5/27/2024" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="97.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="5614796.12" CE_SPENT_AMT="106632.09" TOT_SPENT_AMT="5721428.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="4504211.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806198" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.38 MILES SOUTH OF US59/IH35 INT" LIMITS_TO_DSCR="0.80 MILES NORTH OF US59/IH35 INT" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6141898" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.178 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="1/4/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="105.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="650307.26" CNSTR_SPENT_AMT="7574512.89" CE_SPENT_AMT="152774.15" TOT_SPENT_AMT="8377594.30" FUND_CAT1_DSCR="Category 11 - Rider (16B11)" FUND_CAT1_PID="R11" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806212" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.795 MI NORTH OF SL 20 (SBML)" LIMITS_TO_DSCR="1.19 MI SOUTH OF CARRIER RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4447305" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/28/2022" PSE_30_ACTL_DT="8/2/2022" PSE_60_TRGT_DT="9/9/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="11/3/2022" PSE_100_ACTL_DT="12/2/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.175 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="8/3/2023" CNSTR_PCT_TIME_USED="99.05" CNSTR_PCT_COMPLETE="100.02" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="11/3/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="11/3/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/3/2022" ROW_ACTL_DT="11/1/2022" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="12/2/2022" PE_SPENT_AMT="141903.77" CNSTR_SPENT_AMT="8255934.21" CE_SPENT_AMT="64911.40" TOT_SPENT_AMT="8462749.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="5146743.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806214" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 35-A" CNTY_NM="Webb" LIMITS_FROM_DSCR="US 83 (NB)" LIMITS_TO_DSCR="INTERNATIONAL BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="253440" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.520 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="283853.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806215" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.4 MI N OF KILLAM" LIMITS_TO_DSCR="KILLAM" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="142685" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="2/22/2022" PSE_30_ACTL_DT="3/14/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="3/25/2022" PSE_100_TRGT_DT="5/31/2022" PSE_100_ACTL_DT="6/14/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.342 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="B &amp; MS CONSTRUCTION, INC." CNSTR_NTPD_DT="9/28/2022" CNSTR_WKBG_DT="11/30/2022" CNSTR_PCT_TIME_USED="220.37" CNSTR_PCT_COMPLETE="100.24" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="2/28/2022" ENVCLR_TRGT_DT="6/21/2022" ENVCLR_ACTL_DT="6/20/2022" UTIL_TRGT_DT="6/21/2022" UTIL_ACTL_DT="6/14/2022" ROW_TRGT_DT="6/21/2022" ROW_ACTL_DT="6/14/2022" RTL_TRGT_DT="6/21/2022" RTL_ACTL_DT="6/20/2022" CNSTR_SPENT_AMT="157072.26" CE_SPENT_AMT="652.66" TOT_SPENT_AMT="157724.92" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="150001.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806218" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.50 MI NORTH OF VALLECILLO ROAD" LIMITS_TO_DSCR="0.50 MI SOUTH OF VALLECILLO ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65000000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7147.52" TOT_SPENT_AMT="7147.52" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="56800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001806219" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.212 MI S OF SANCHEZ (NBML)" LIMITS_TO_DSCR="SHILOH DRIVE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8293494" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.154 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="8956974.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001808030" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 35-A" CNTY_NM="Webb" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="IH 35 (NORTH OF CALTON RD)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2176628" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.758 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="2437823.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001808031" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 35-A" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.35 MILES NORTH OF CALTON RD" LIMITS_TO_DSCR="MATAMOROS ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="683100" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="5/20/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.944 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/26/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="765072.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001809007" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 35-C" CNTY_NM="Lasalle" LIMITS_FROM_DSCR="0.850 MI S OF SH97 AT NUECES BRIDGE" LIMITS_TO_DSCR="1.110 MI S OF SH 97" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4842440" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="8/16/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/10/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/11/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.259 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/6/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/25/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/25/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/25/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/18/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1008428.54" TOT_SPENT_AMT="1008428.54" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001901146" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 174" CNTY_NM="Johnson" LIMITS_FROM_DSCR="WICKER HILL RD" LIMITS_TO_DSCR="NORTH OF ELK DR." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18406076" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/17/2022" PSE_30_ACTL_DT="9/30/2022" PSE_60_TRGT_DT="5/19/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/15/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="131123.26" TOT_SPENT_AMT="131123.26" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="22179782.00" FUND_CAT2_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT2_AMT="900000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001901149" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 174" CNTY_NM="Johnson" LIMITS_FROM_DSCR="IH 35W" LIMITS_TO_DSCR="RENFRO ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="103218467" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/5/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001902034" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 171" CNTY_NM="Johnson" LIMITS_FROM_DSCR="HILL COUNTY LINE" LIMITS_TO_DSCR="SH 174" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/6/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6387249" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/10/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/6/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/25/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(817)202-2900" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="3/25/2021" CNSTR_WKBG_DT="6/9/2021" CNSTR_PCT_TIME_USED="90.94" CNSTR_PCT_COMPLETE="84.13" DSGN_START_TRGT_DT="1/6/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/16/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/23/2020" RTL_ACTL_DT="11/23/2020" PE_SPENT_AMT="337053.14" CNSTR_SPENT_AMT="4088450.85" CE_SPENT_AMT="201045.92" TOT_SPENT_AMT="4626549.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="4455324.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001902036" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001903028" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 171" CNTY_NM="Hill" LIMITS_FROM_DSCR="JOHNSON COUNTY LINE" LIMITS_TO_DSCR="FM 2719" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2332900" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/23/2021" PSE_60_TRGT_DT="2/23/2022" PSE_60_ACTL_DT="2/23/2022" PSE_100_TRGT_DT="5/18/2022" PSE_100_ACTL_DT="5/18/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Josh Voiles, P.E." TXDOT_CNTCT_PH_NBR="(254)582-5432" CNSTR_CMPNY_NM="BEAR CREEK CONTRACTING, LLC" CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="1/9/2023" CNSTR_PCT_TIME_USED="95.56" CNSTR_PCT_COMPLETE="104.75" DSGN_START_TRGT_DT="2/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/30/2022" ENVCLR_ACTL_DT="3/30/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/25/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="331033.28" CNSTR_SPENT_AMT="2484785.52" CE_SPENT_AMT="86342.08" TOT_SPENT_AMT="2902160.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1487500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001903029" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 171" CNTY_NM="Hill" LIMITS_FROM_DSCR="JOHNSON COUNTY LINE" LIMITS_TO_DSCR="SH 171E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="2/12/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/18/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.988 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/14/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/12/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="4480000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="001903030" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 171" CNTY_NM="Hill" LIMITS_FROM_DSCR="FM 2719" LIMITS_TO_DSCR="JOHNSON CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3763500" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="167577.05" TOT_SPENT_AMT="167577.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="4064580.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002001021" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Culberson" LIMITS_FROM_DSCR="830 FT S OF BI 10D (BROADWAY ST)" LIMITS_TO_DSCR="750 FT S OF IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2974452" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="10/27/2022" PSE_60_TRGT_DT="11/2/2022" PSE_60_ACTL_DT="1/3/2023" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="4/3/2023" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.190 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="97.78" CNSTR_PCT_COMPLETE="102.11" DSGN_START_TRGT_DT="5/11/2022" DSGN_START_ACTL_DT="7/20/2022" ENVCLR_TRGT_DT="9/15/2022" ENVCLR_ACTL_DT="3/14/2023" UTIL_TRGT_DT="9/8/2022" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="4/4/2023" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="4/4/2023" PE_SPENT_AMT="1148947.96" CNSTR_SPENT_AMT="3286281.44" CE_SPENT_AMT="119332.11" TOT_SPENT_AMT="4554561.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2905641.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002002020" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Culberson" LIMITS_FROM_DSCR="3.950 MI N OF FM 1523" LIMITS_TO_DSCR="JEFF DAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="697109" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="120.76" CNSTR_SPENT_AMT="742233.77" CE_SPENT_AMT="12929.85" TOT_SPENT_AMT="755284.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="542662.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002002021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Culberson" LIMITS_FROM_DSCR="3.950 MI N OF FM 1523" LIMITS_TO_DSCR="JEFF DAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1056071" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002003022" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="CULBERSON COUNTY LINE" LIMITS_TO_DSCR="9.2 MI S OF CULBERSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="807612" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="904525.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002004018" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="9.2 MI S OF CULBERSON COUNTY LINE" LIMITS_TO_DSCR="7.7 MI N OF PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="773229" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="866016.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002005017" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="7.7 MI N OF PRESIDIO COUNTY LINE" LIMITS_TO_DSCR="PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="659080" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="738170.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002006018" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Presidio" LIMITS_FROM_DSCR="JEFF DAVIS COUNTY LINE" LIMITS_TO_DSCR="14.1 MI S OF JEFF DAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1188308" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="52405.36" TOT_SPENT_AMT="52405.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1283373.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002007032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Presidio" LIMITS_FROM_DSCR="14.1 MI S OF JEFF DAVIS COUNTY LINE" LIMITS_TO_DSCR="SH 17" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15555064" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="164163.76" TOT_SPENT_AMT="164163.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="17421672.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002008046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="1.061 MI W OF BREWSTER CL" LIMITS_TO_DSCR="2.486 MI W OF BREWSTER CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/15/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="653493" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.425 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="10/25/2021" CNSTR_PCT_TIME_USED="216.19" CNSTR_PCT_COMPLETE="84.53" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="3208.38" CNSTR_SPENT_AMT="310942.38" CE_SPENT_AMT="166673.29" TOT_SPENT_AMT="480824.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="308048.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002008048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="PRESIDIO / BREWSTER COUNTY LINE" LIMITS_TO_DSCR="SH 17 INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14287895" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/28/2023" PSE_30_ACTL_DT="11/29/2022" PSE_60_TRGT_DT="5/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="4/5/2024" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="87.26" CNSTR_PCT_COMPLETE="29.11" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="7/13/2022" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/4/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/25/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1288554.72" CNSTR_SPENT_AMT="4356812.77" CE_SPENT_AMT="157033.98" TOT_SPENT_AMT="5802401.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="13422756.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002008050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="PRESIDIO/BREWSTER COUNTY LINE" LIMITS_TO_DSCR="US 67/S HIGHLAND AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58802" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="12/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42.05" TOT_SPENT_AMT="42.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="58802.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002009018" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="PRESIDIO COUNTY LINE" LIMITS_TO_DSCR="PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="136667" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="229.31" CNSTR_SPENT_AMT="102351.28" CE_SPENT_AMT="2352.48" TOT_SPENT_AMT="104933.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="92808.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002009019" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="PRESIDIO COUNTY LINE" LIMITS_TO_DSCR="PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="114464" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002010018" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="PRESIDIO/BREWSTER CL" LIMITS_TO_DSCR="PRESIDIO/BREWSTER CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/15/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="97696" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/2/2020" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="1/28/2021" PSE_100_ACTL_DT="2/12/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.496 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="10/25/2021" CNSTR_PCT_TIME_USED="216.19" CNSTR_PCT_COMPLETE="84.53" DSGN_START_TRGT_DT="1/30/2020" DSGN_START_ACTL_DT="1/30/2020" ENVCLR_TRGT_DT="11/18/2020" ENVCLR_ACTL_DT="3/3/2021" UTIL_TRGT_DT="6/10/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="1/11/2021" ROW_ACTL_DT="2/12/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="70.36" CNSTR_SPENT_AMT="92734.87" CE_SPENT_AMT="15977.45" TOT_SPENT_AMT="108782.68" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="305303.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002010019" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="BREWSTER COUNTY LINE" LIMITS_TO_DSCR="PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="101957" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="71.33" CNSTR_SPENT_AMT="172605.23" CE_SPENT_AMT="2152.13" TOT_SPENT_AMT="174828.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="107928.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002010020" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="BREWSTER COUNTY LINE" LIMITS_TO_DSCR="PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="133750" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002011049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="ALPINE CITY LIMITS" LIMITS_TO_DSCR="PRESIDIO COUNTYLINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="486242" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="765.87" CNSTR_SPENT_AMT="504202.92" CE_SPENT_AMT="8910.10" TOT_SPENT_AMT="513878.89" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="506736.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002011050" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002011051" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002011052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="ALPINE CITY LIMITS" LIMITS_TO_DSCR="PRESIDIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="628393" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002011053" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="0.02 MI W OF N 7TH ST" LIMITS_TO_DSCR="ALPINE WEST CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4367252" DIST_LET_DATE="1/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002101059" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Brewster" LIMITS_FROM_DSCR="INTERSECTION OF US 67/90" LIMITS_TO_DSCR="7.3 MI S OF US 67/90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1214767" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="91.46" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="69423.51" CNSTR_SPENT_AMT="738404.75" CE_SPENT_AMT="485.19" TOT_SPENT_AMT="808313.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="619735.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002101060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="INTERSECTION OF US 67/90" LIMITS_TO_DSCR="ALPINE EAST CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="584874" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="91.46" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="62.46" CNSTR_SPENT_AMT="592303.27" CE_SPENT_AMT="389.19" TOT_SPENT_AMT="592754.92" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="531080.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002101061" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="ALPINE EAST CITY LIMITS" LIMITS_TO_DSCR="0.02 MI W OF N 7TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4367252" DIST_LET_DATE="1/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002102026" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Brewster" LIMITS_FROM_DSCR="7.3 MI S OF US 67/90 INTERSECTION" LIMITS_TO_DSCR="AVENUE E IN MARATHON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1385380" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="91.46" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81.90" CNSTR_SPENT_AMT="1404040.81" CE_SPENT_AMT="922.50" TOT_SPENT_AMT="1405045.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1267775.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002103026" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Brewster" LIMITS_FROM_DSCR="AVENUE E IN MARATHON" LIMITS_TO_DSCR="13.6 MI E OF OF AVENUE E IN MARATHON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1267727" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="91.46" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81.93" CNSTR_SPENT_AMT="1283323.76" CE_SPENT_AMT="843.24" TOT_SPENT_AMT="1284248.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1155490.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002104024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Brewster" LIMITS_FROM_DSCR="13.6 MI E OF AVENUE E IN MARATHON" LIMITS_TO_DSCR="18.1 MI E OF AVENUE E IN MARATHON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="420873" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="91.46" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81.91" CNSTR_SPENT_AMT="425894.26" CE_SPENT_AMT="279.84" TOT_SPENT_AMT="426256.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="387005.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002105020" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Brewster" LIMITS_FROM_DSCR="12.9 MI W OF PECOS COUNTY LINE" LIMITS_TO_DSCR="PECOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1182055" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="91.46" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/21/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19.47" CNSTR_SPENT_AMT="1197016.71" CE_SPENT_AMT="786.55" TOT_SPENT_AMT="1197822.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1081710.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002107063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="PECOS COUNTY LINE" LIMITS_TO_DSCR="SANDERSON CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2102388" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/12/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="5/20/2025" CNSTR_PCT_TIME_USED="13.10" CNSTR_PCT_COMPLETE="66.35" DSGN_START_TRGT_DT="3/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/15/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21847.53" CNSTR_SPENT_AMT="620630.28" CE_SPENT_AMT="1658.15" TOT_SPENT_AMT="644135.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="2115939.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002201032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="AT 2 MI EAST OF US 285" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/11/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3702726" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="3/24/2023" PSE_30_ACTL_DT="4/20/2023" PSE_60_TRGT_DT="7/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/10/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="STX CIVIL" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="12/20/2022" DSGN_START_ACTL_DT="12/15/2022" ENVCLR_TRGT_DT="10/10/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/16/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/16/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="706968.91" CE_SPENT_AMT="229.48" TOT_SPENT_AMT="707198.39" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3472000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002201033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="SANDERSON CREEK" LIMITS_TO_DSCR="DYER ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="801349" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/12/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="5/20/2025" CNSTR_PCT_TIME_USED="13.10" CNSTR_PCT_COMPLETE="66.35" DSGN_START_TRGT_DT="3/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/15/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="586938.92" CE_SPENT_AMT="1568.15" TOT_SPENT_AMT="588507.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="794612.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002201034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="SANDERSON CANYON AND UNION PACIFIC RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="782111.30" TOT_SPENT_AMT="782111.30" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002201037" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002202027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="DYER ROAD" LIMITS_TO_DSCR="15.5 MI W OF VAL VERDE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1206238" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/12/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="5/20/2025" CNSTR_PCT_TIME_USED="13.10" CNSTR_PCT_COMPLETE="66.35" DSGN_START_TRGT_DT="3/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/15/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="883954.83" CE_SPENT_AMT="2361.72" TOT_SPENT_AMT="886316.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1190886.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002202028" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002202029" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002203031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="15.5 MI W OF VAL VERDE COUNTY LINE" LIMITS_TO_DSCR="VAL VERDE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1096176" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/12/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="5/20/2025" CNSTR_PCT_TIME_USED="13.10" CNSTR_PCT_COMPLETE="66.35" DSGN_START_TRGT_DT="3/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/15/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="803272.90" CE_SPENT_AMT="2146.19" TOT_SPENT_AMT="805419.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1083242.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002203032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Terrell" LIMITS_FROM_DSCR="AT 19.6 MI E OF SH 349" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="530411" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="744.08" TOT_SPENT_AMT="744.08" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="530411.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002203033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002203034" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002204021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="TERRELL CO LINE" LIMITS_TO_DSCR="SL 25 (NORTH)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11022865" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="8/27/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/9/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/4/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.329 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/4/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/4/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/6/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="11904695.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="4/30/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002205025" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="SL 25 (NORTH)" LIMITS_TO_DSCR="9.4 MI EAST OF SL 25 (NORTH)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10143063" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/18/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/29/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/7/2022" PSE_100_ACTL_DT="2/17/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.433 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="10/7/2022" CNSTR_PCT_TIME_USED="113.78" CNSTR_PCT_COMPLETE="105.35" DSGN_START_TRGT_DT="6/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/13/2022" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="12/13/2022" UTIL_ACTL_DT="1/21/2022" ROW_TRGT_DT="12/13/2022" ROW_ACTL_DT="1/21/2022" RTL_TRGT_DT="12/13/2022" RTL_ACTL_DT="3/22/2022" PE_SPENT_AMT="30223.70" CNSTR_SPENT_AMT="10494486.24" CE_SPENT_AMT="433755.97" TOT_SPENT_AMT="10958465.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="7344719.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002206052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="9.4 MI EAST OF SL25 NORTH" LIMITS_TO_DSCR="0.802 MI EAST OF PECOS BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4640670" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/23/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="9/20/2021" PSE_100_TRGT_DT="1/20/2022" PSE_100_ACTL_DT="12/16/2021" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.466 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="4/21/2022" CNSTR_WKBG_DT="5/20/2022" CNSTR_PCT_TIME_USED="94.55" CNSTR_PCT_COMPLETE="105.93" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="1/20/2022" ENVCLR_ACTL_DT="1/3/2022" UTIL_TRGT_DT="1/20/2022" UTIL_ACTL_DT="1/3/2022" ROW_TRGT_DT="1/20/2022" ROW_ACTL_DT="1/3/2022" RTL_TRGT_DT="1/20/2022" RTL_ACTL_DT="1/3/2022" PE_SPENT_AMT="55799.40" CNSTR_SPENT_AMT="4851533.14" CE_SPENT_AMT="141408.38" TOT_SPENT_AMT="5048740.92" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="4892930.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002206054" PT_PHASE="Construction underway or begins soon" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7455.68" TOT_SPENT_AMT="7455.68" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002206055" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002207032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="0.802 MILES EAST OF PECOS BRIDGE" LIMITS_TO_DSCR="MM 382+00" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3088267" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.061 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1222.13" TOT_SPENT_AMT="1222.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3088267.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002208027" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002209055" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="0.28 MI EAST OF SPUR 349" LIMITS_TO_DSCR="0.205 MI WEST OF US 277" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10738213" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/20/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/17/2023" PSE_60_ACTL_DT="2/6/2023" PSE_100_TRGT_DT="4/18/2023" PSE_100_ACTL_DT="2/28/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.236 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="1/22/2024" CNSTR_PCT_TIME_USED="95.80" CNSTR_PCT_COMPLETE="100.73" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="3/20/2023" ENVCLR_ACTL_DT="2/2/2023" UTIL_TRGT_DT="11/30/2022" UTIL_ACTL_DT="1/30/2023" ROW_TRGT_DT="4/13/2023" ROW_ACTL_DT="1/30/2023" RTL_TRGT_DT="4/24/2023" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="63959.15" CNSTR_SPENT_AMT="10569941.66" CE_SPENT_AMT="209664.83" TOT_SPENT_AMT="10843565.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="9025125.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002209056" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="0.19 MILES NORTH OF LAS BRISAS BLVD" LIMITS_TO_DSCR="0.25 MILES SOUTH OF SL 79" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="551802" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.821 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="127423.37" TOT_SPENT_AMT="127423.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="551802.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002210076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="0.1 MI N OF KINGSWAY" LIMITS_TO_DSCR="0.1 MI S OF KINGSWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/26/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52491" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="1/26/2022" PSE_60_TRGT_DT="2/1/2022" PSE_60_ACTL_DT="1/27/2022" PSE_100_TRGT_DT="3/7/2022" PSE_100_ACTL_DT="3/14/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.199 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="10/31/2022" CNSTR_WKBG_DT="3/21/2023" CNSTR_PCT_TIME_USED="97.83" CNSTR_PCT_COMPLETE="98.28" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="1/25/2022" ENVCLR_TRGT_DT="3/28/2022" ENVCLR_ACTL_DT="3/14/2022" UTIL_TRGT_DT="3/28/2022" UTIL_ACTL_DT="3/14/2022" ROW_TRGT_DT="3/28/2022" ROW_ACTL_DT="3/14/2022" RTL_TRGT_DT="3/28/2022" RTL_ACTL_DT="3/30/2022" PE_SPENT_AMT="21557.64" CNSTR_SPENT_AMT="52548.38" CE_SPENT_AMT="2145.88" TOT_SPENT_AMT="76251.90" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="69780.00" TXDOT_CNTCT_LAST_UPDATE_DT="11/5/2024" LAST_CNSTR_UPDATE_DT="11/5/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002210077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="AGARITA DR" LIMITS_TO_DSCR="0.7 MI N OF US 277 INT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1853349" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/18/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/29/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/7/2022" PSE_100_ACTL_DT="2/17/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.303 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="10/7/2022" CNSTR_PCT_TIME_USED="113.78" CNSTR_PCT_COMPLETE="105.35" DSGN_START_TRGT_DT="6/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/13/2022" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="12/13/2022" UTIL_ACTL_DT="1/21/2022" ROW_TRGT_DT="12/13/2022" ROW_ACTL_DT="1/21/2022" RTL_TRGT_DT="12/13/2022" RTL_ACTL_DT="3/22/2022" PE_SPENT_AMT="2169.54" CNSTR_SPENT_AMT="2230055.41" CE_SPENT_AMT="92178.81" TOT_SPENT_AMT="2324403.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1691024.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002301096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="BEDELL" LIMITS_TO_DSCR="LONGORIA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="454653" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.440 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="VECTOR UTILITIES LLC" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="112.31" CNSTR_PCT_COMPLETE="98.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="440615.26" CE_SPENT_AMT="22269.35" TOT_SPENT_AMT="462884.61" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="849039.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002301101" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Val Verde" LIMITS_FROM_DSCR="STATE LOOP 79 SOUTH" LIMITS_TO_DSCR="VAL VERDE/KINNEY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="87371055" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.011 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002302040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="VAL VERDE/KINNEY COUNTY LINE" LIMITS_TO_DSCR="2.055 MI WEST OF FM 693" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11982900" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.806 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16359.36" TOT_SPENT_AMT="16359.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="12941532.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002302042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="VALVERDE COUNTY LINE" LIMITS_TO_DSCR="AT SYCAMORE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/27/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="578266" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="2/8/2021" CNSTR_PCT_TIME_USED="132.38" CNSTR_PCT_COMPLETE="103.78" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1610.37" CNSTR_SPENT_AMT="608470.79" CE_SPENT_AMT="38288.06" TOT_SPENT_AMT="648369.22" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="775030.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002302045" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="VAL VERDE/KINNEY COUNTY LINE" LIMITS_TO_DSCR="15 MILES EAST OF VAL VERDE/KINNEY CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="221566500" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.007 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002302046" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002303049" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="2.055 MI WEST OF FM 693" LIMITS_TO_DSCR="0.375 MI EAST OF SH 131" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3982882" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.459 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1150.12" TOT_SPENT_AMT="1150.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="4301513.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002303052" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="15 MILES EAST OF VAL VERDE COUNTY LINE" LIMITS_TO_DSCR="18 MILES WEST OF THE KINNEY/UVALDE CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="67297131" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.556 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002304067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="0.375 MILES EAST OF SH 131" LIMITS_TO_DSCR="KINNEY/UVALDE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1401680" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/29/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/26/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/23/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.360 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/1/2023" CNSTR_WKBG_DT="3/18/2024" CNSTR_PCT_TIME_USED="97.74" CNSTR_PCT_COMPLETE="104.35" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/14/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/14/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/14/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/14/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="110.09" CNSTR_SPENT_AMT="1632217.15" CE_SPENT_AMT="14027.43" TOT_SPENT_AMT="1646354.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1829709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002304068" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Kinney" LIMITS_FROM_DSCR="18 MILES WEST OF THE KINNEY/UVALDE CL" LIMITS_TO_DSCR="KINNEY/UVALDE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327739371" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.360 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002305088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="KINNEY/UVALDE CL" LIMITS_TO_DSCR="FM 481" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1016268" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="18.603 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="787735.92" CE_SPENT_AMT="4063.40" TOT_SPENT_AMT="791799.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="888764.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002305091" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="KINNEY/UVALDE COUNTY LINE" LIMITS_TO_DSCR="FM 481" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="359000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.613 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="616275.31" TOT_SPENT_AMT="616275.31" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002305092" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002307017" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 166" CNTY_NM="Kinney" LIMITS_FROM_DSCR="US 90" LIMITS_TO_DSCR="US 90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1172566" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.791 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1786.22" TOT_SPENT_AMT="1786.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1219469.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002401109" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FM 2369" LIMITS_TO_DSCR="0.682 MI WEST OF FM 1049 (RAILROAD)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="177324" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.567 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="9/18/2023" CNSTR_PCT_TIME_USED="98.33" CNSTR_PCT_COMPLETE="100.99" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="8/29/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="8/29/2022" PE_SPENT_AMT="4574.76" CNSTR_SPENT_AMT="185236.74" CE_SPENT_AMT="121.96" TOT_SPENT_AMT="189933.46" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="149125.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002401110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FRIO RIVER" LIMITS_TO_DSCR="EAST FM 2369" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="376843" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.564 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="390278.81" CE_SPENT_AMT="3146.20" TOT_SPENT_AMT="393425.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="528861.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002401112" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FM 2369" LIMITS_TO_DSCR="FRIO RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="127000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1020852.69" TOT_SPENT_AMT="1020852.69" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002401113" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FM 481" LIMITS_TO_DSCR="WOOD ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3116066" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.861 (mi)" TXDOT_CNTCT_NM="Andres Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="(830)257-8444" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="3/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="479837.43" TOT_SPENT_AMT="479837.43" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2510CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="2940000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002402077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="0.682 MI WEST OF FM 1049 (RAILROAD)" LIMITS_TO_DSCR="0.1 MI WEST OF MIYA KAWA RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17796" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.315 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="9/18/2023" CNSTR_PCT_TIME_USED="98.33" CNSTR_PCT_COMPLETE="100.99" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="8/29/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="8/29/2022" CNSTR_SPENT_AMT="17795.70" CE_SPENT_AMT="85.02" TOT_SPENT_AMT="17880.72" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="8513.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002402078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FRIO RIVER" LIMITS_TO_DSCR="FM 1049" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57189" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.779 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="58034.02" CE_SPENT_AMT="436.94" TOT_SPENT_AMT="58470.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="81100.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002402080" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FRIO RIVER" LIMITS_TO_DSCR="UVALDE/MEDINA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="272000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.835 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1378714.65" TOT_SPENT_AMT="1378714.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002402081" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FM 1049 (KNIPPA)" LIMITS_TO_DSCR="UVALDE/MEDINA C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="874879" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.024 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="979864.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002404068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="3.45 MI EAST OF RM 187" LIMITS_TO_DSCR="0.1 MI EAST OF NESTER LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1936457" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="2/1/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="3/1/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="5/4/2022" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.480 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="2/3/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="98.53" CNSTR_PCT_COMPLETE="98.59" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="9/1/2022" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="5/4/2022" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="5/4/2022" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="9/8/2022" PE_SPENT_AMT="105791.32" CNSTR_SPENT_AMT="1984607.15" CE_SPENT_AMT="29262.92" TOT_SPENT_AMT="2119661.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1394668.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002404071" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="MEDINA/UVALDE COUNTY LINE" LIMITS_TO_DSCR="1.3 MI. EAST OF MEDINA/UVALDE CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.330 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="270505.66" TOT_SPENT_AMT="270505.66" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002404072" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="UVALDE/MEDINA C/L" LIMITS_TO_DSCR="CR 512 (NESTER LN)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1131719" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.453 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1267525.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002404073" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="MEDINA / UVALDE COUNTY LINE" LIMITS_TO_DSCR="0.11 MILES EAST OF CR 424" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1684578" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1886727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002405099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="SH 173" LIMITS_TO_DSCR="CR 4643 DUNLAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="560401" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.677 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="560574.75" CE_SPENT_AMT="9095.64" TOT_SPENT_AMT="569670.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="894230.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002405102" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="CASTRO ST" LIMITS_TO_DSCR="VETERANS BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="272405" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.964 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="37.15" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12476.01" CNSTR_SPENT_AMT="829685.79" CE_SPENT_AMT="136.00" TOT_SPENT_AMT="842297.80" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="221835.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002405104" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="0.3 MI. WEST OF FM 1250" LIMITS_TO_DSCR="0.5 MI. EAST OF SH 173" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8282536" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9276440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002405105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="0.11 MI. E. OF CR 424" LIMITS_TO_DSCR="0.3 MILES W OF FM 1250" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="344000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.314 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="385280.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002406069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="ZINSMEYER" LIMITS_TO_DSCR="FM 471" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="674926" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="10/1/2021" PSE_60_ACTL_DT="10/1/2021" PSE_100_TRGT_DT="12/1/2021" PSE_100_ACTL_DT="12/1/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.115 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="5/12/2022" CNSTR_WKBG_DT="1/23/2023" CNSTR_PCT_TIME_USED="146.02" CNSTR_PCT_COMPLETE="99.59" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="3/11/2022" ENVCLR_ACTL_DT="12/8/2021" UTIL_TRGT_DT="12/1/2021" UTIL_ACTL_DT="12/1/2021" ROW_TRGT_DT="12/1/2021" ROW_ACTL_DT="12/1/2021" RTL_TRGT_DT="3/11/2022" RTL_ACTL_DT="12/8/2021" PE_SPENT_AMT="69.76" CNSTR_SPENT_AMT="673741.07" CE_SPENT_AMT="3301.81" TOT_SPENT_AMT="677112.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="797809.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002406070" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="FM 1343" LIMITS_TO_DSCR="FM 471 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17000000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="1/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.769 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="2/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2071170.85" TOT_SPENT_AMT="2071170.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="18360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002406071" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="FM 471" LIMITS_TO_DSCR="MEDINA/BEXAR C.L." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="264096" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.122 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="274210.77" CE_SPENT_AMT="2064.53" TOT_SPENT_AMT="276275.30" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="312371.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002406075" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="FM 471 SOUTH" LIMITS_TO_DSCR="MEDINA/BEXAR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.117 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1449236.04" TOT_SPENT_AMT="1449236.04" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002406076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Medina" LIMITS_FROM_DSCR="CR 4712" LIMITS_TO_DSCR="MEDINA/BEXAR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72711" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.182 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="72711.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407059" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 1604" LIMITS_TO_DSCR="0.8 MILES W OF IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="125550000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.559 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/26/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9303143.48" TOT_SPENT_AMT="9303143.48" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="58298680.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT MONTGOMERY ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/3/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2885971" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.072 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="1/3/2022" CNSTR_PCT_TIME_USED="99.20" CNSTR_PCT_COMPLETE="100.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="73815.01" CNSTR_SPENT_AMT="3079965.28" CE_SPENT_AMT="207034.07" TOT_SPENT_AMT="3360814.36" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407064" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT LP 1604 WEST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="310000000" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407066" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SH 211" LIMITS_TO_DSCR="ZINSMEYER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="664622" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="2/1/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="3/1/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="5/4/2022" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.496 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="2/3/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="98.53" CNSTR_PCT_COMPLETE="98.59" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="9/1/2022" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="5/4/2022" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="5/4/2022" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="9/8/2022" PE_SPENT_AMT="100066.58" CNSTR_SPENT_AMT="554354.55" CE_SPENT_AMT="14484.37" TOT_SPENT_AMT="668905.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="871377.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SH 211" LIMITS_TO_DSCR="LP 1604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="254000000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.377 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8046197.57" TOT_SPENT_AMT="8046197.57" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="133125350.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT SH 211" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6869482" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.494 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="J3 COMPANY, LLC" CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="6/3/2024" CNSTR_PCT_TIME_USED="68.08" CNSTR_PCT_COMPLETE="84.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="454277.82" CNSTR_SPENT_AMT="6453143.97" CE_SPENT_AMT="314760.28" TOT_SPENT_AMT="7222182.07" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3687442.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407072" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="BEXAR/MEDINA COUNTY LINE" LIMITS_TO_DSCR="SH 211" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="261000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.490 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1625439.66" TOT_SPENT_AMT="1625439.66" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="MONTGOMERY RD." LIMITS_TO_DSCR="SL 1604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7190700" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.300 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="5/8/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="612388.66" TOT_SPENT_AMT="612388.66" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="3999593.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002407076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="MEDINA/BEXAR COUNTY LINE" LIMITS_TO_DSCR="SL 1604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="214743" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.417 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="214743.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408138" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.8 MILES W OF IH 410" LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19008000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.081 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/26/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2698215.47" TOT_SPENT_AMT="2698215.47" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="8826295.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408141" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="HORAL ST." LIMITS_TO_DSCR="SL 353" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28447459" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/1/2020" PSE_30_ACTL_DT="5/1/2020" PSE_60_TRGT_DT="7/1/2020" PSE_60_ACTL_DT="7/1/2020" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="10/1/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.706 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="10/13/2022" CNSTR_WKBG_DT="1/3/2023" CNSTR_PCT_TIME_USED="97.67" CNSTR_PCT_COMPLETE="97.45" DSGN_START_TRGT_DT="9/3/2019" DSGN_START_ACTL_DT="9/3/2019" ENVCLR_TRGT_DT="7/9/2020" ENVCLR_ACTL_DT="7/9/2020" UTIL_TRGT_DT="9/1/2021" UTIL_ACTL_DT="10/1/2021" ROW_TRGT_DT="9/1/2021" ROW_ACTL_DT="10/8/2021" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="10/1/2021" PE_SPENT_AMT="865914.66" CNSTR_SPENT_AMT="27953399.06" CE_SPENT_AMT="1733009.71" TOT_SPENT_AMT="30552323.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="31030949.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408143" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.8 MI WEST OF IH 410 WEST" LIMITS_TO_DSCR="LP 13" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="115000000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.475 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408144" PT_PHASE="Planning, 10+ years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 13" LIMITS_TO_DSCR="SL 353" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80000000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TBD" PROJ_LENGTH="6.948 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3028622.75" TOT_SPENT_AMT="3028622.75" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408145" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="FRIO CITY RD" LIMITS_TO_DSCR="SL 353 (NOGALITOS ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="408069" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="4/3/2023" PSE_30_ACTL_DT="4/13/2023" PSE_60_TRGT_DT="7/13/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.841 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="LCR TOTAL TRANSPORT LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="84.38" CNSTR_PCT_COMPLETE="172.92" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1155185.00" CE_SPENT_AMT="971.75" TOT_SPENT_AMT="1156156.75" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="224512.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408148" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.8 MILES WEST OF SH 151" LIMITS_TO_DSCR="1.1 MILES EAST OF SH 151" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="484934" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.930 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="APEX LANDSCAPE &amp; IRRIGATION, LLC" CNSTR_NTPD_DT="6/12/2024" CNSTR_WKBG_DT="10/7/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="83.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2330.05" CNSTR_SPENT_AMT="406749.87" CE_SPENT_AMT="1345.17" TOT_SPENT_AMT="410425.09" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="621664.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002408150" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Bexar" LIMITS_FROM_DSCR="US 90 WBML" LIMITS_TO_DSCR="AT LP 13 (MILITARY DR.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="405000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="405000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002409028" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 371" CNTY_NM="Bexar" LIMITS_FROM_DSCR="US 90" LIMITS_TO_DSCR="BILLY MITCHELL BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2474400" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Infrastructure Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.781 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="68866.88" TOT_SPENT_AMT="68866.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="296928.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502215" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="GRAYTOWN RD" LIMITS_TO_DSCR="GUADALUPE/BEXAR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/9/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="140318445" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/19/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/2/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/3/2020" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.039 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="1/25/2021" CNSTR_PCT_TIME_USED="77.38" CNSTR_PCT_COMPLETE="86.68" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/1/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="8/15/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/3/2020" RTL_TRGT_DT="TBD" RTL_ACTL_DT="4/2/2020" PE_SPENT_AMT="11251020.29" CNSTR_SPENT_AMT="139604149.53" CE_SPENT_AMT="11130001.17" TOT_SPENT_AMT="161985170.99" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="154000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502220" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LOOP 1604" LIMITS_TO_DSCR="GUADALUPE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="401308" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.857 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/6/2019" CNSTR_WKBG_DT="1/6/2020" CNSTR_PCT_TIME_USED="99.02" CNSTR_PCT_COMPLETE="100.21" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="409476.05" CE_SPENT_AMT="4366.76" TOT_SPENT_AMT="413842.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="280570.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502225" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 37" LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="641405" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="2/1/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="4/1/2022" PSE_100_TRGT_DT="6/1/2022" PSE_100_ACTL_DT="6/10/2022" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.990 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="D&amp;G ENERGY CORPORATION" CNSTR_NTPD_DT="4/25/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="65.63" CNSTR_PCT_COMPLETE="100.17" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="10/28/2022" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="6/10/2022" ROW_TRGT_DT="6/1/2022" ROW_ACTL_DT="6/10/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="11/1/2022" PE_SPENT_AMT="3646.21" CNSTR_SPENT_AMT="820753.66" CE_SPENT_AMT="1346.62" TOT_SPENT_AMT="825746.49" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="863664.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502226" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SOUTH HACKBERRY ST" LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9598054" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.939 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="DEAN WORD COMPANY, LTD." CNSTR_NTPD_DT="4/4/2025" CNSTR_WKBG_DT="5/18/2025" CNSTR_PCT_TIME_USED="5.34" CNSTR_PCT_COMPLETE="14.70" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="205897.71" CNSTR_SPENT_AMT="1164409.50" TOT_SPENT_AMT="1370307.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="17223032.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502229" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 1604" LIMITS_TO_DSCR="GUADALUPE C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="299541" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.882 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="335486.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502230" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT S. NEW BRAUNFELS AVE." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="522000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="522000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002502231" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 10 WB" LIMITS_TO_DSCR="AT LP 13" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="614000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="614000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002503097" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="BEXAR/GUADALUPE COUNTY LINE" LIMITS_TO_DSCR="FM 465" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/9/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="125021001" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/2/2020" PSE_30_ACTL_DT="11/2/2020" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="3/1/2021" PSE_100_TRGT_DT="7/1/2021" PSE_100_ACTL_DT="7/1/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.966 (mi)" TXDOT_CNTCT_NM="Will Lockett, P.E. " TXDOT_CNTCT_PH_NBR="(830)609-0707" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="5/16/2022" CNSTR_PCT_TIME_USED="67.19" CNSTR_PCT_COMPLETE="95.96" DSGN_START_TRGT_DT="2/6/2020" DSGN_START_ACTL_DT="2/6/2020" ENVCLR_TRGT_DT="8/15/2019" ENVCLR_ACTL_DT="8/15/2019" UTIL_TRGT_DT="6/2/2025" UTIL_ACTL_DT="7/1/2021" ROW_TRGT_DT="7/1/2021" ROW_ACTL_DT="7/1/2021" RTL_TRGT_DT="6/2/2025" RTL_ACTL_DT="7/1/2021" PE_SPENT_AMT="9329928.72" CNSTR_SPENT_AMT="128618929.16" CE_SPENT_AMT="7192182.69" TOT_SPENT_AMT="145141040.57" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="150000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002503101" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 465" LIMITS_TO_DSCR="PIONEER RD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="221922000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/3/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/3/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/2/2025" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.959 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/2/2031" ENVCLR_ACTL_DT="8/15/2019" UTIL_TRGT_DT="9/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/2/2031" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1416135.98" TOT_SPENT_AMT="1416135.98" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="253523693.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002503102" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="PIONEER RD." LIMITS_TO_DSCR="US 90A" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82064098" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/1/2022" PSE_30_ACTL_DT="11/10/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.600 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="8/15/2019" ENVCLR_ACTL_DT="8/15/2019" UTIL_TRGT_DT="5/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2800394.90" TOT_SPENT_AMT="2800394.90" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="46875013.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="46875013.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002503104" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 725" LIMITS_TO_DSCR="FM 464" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65892" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.004 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="37.15" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="74.22" TOT_SPENT_AMT="74.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="131403.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002503105" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="AT VAUGHAN" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="247333" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="9/8/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="11/10/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="8/7/2024" CNSTR_PCT_TIME_USED="63.12" CNSTR_PCT_COMPLETE="107.20" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33772.89" CNSTR_SPENT_AMT="444209.13" CE_SPENT_AMT="16389.41" TOT_SPENT_AMT="494371.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="313552.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002503108" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 725" LIMITS_TO_DSCR="UA 90A" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="127920" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="143270.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002504051" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="500 FT EAST OF WEBER RD" LIMITS_TO_DSCR="500 FT WEST OF CR 202 (AUX AIRPORT RD)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2221434" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="10/13/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="11/10/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="2/1/2023" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.173 (mi)" TXDOT_CNTCT_NM="Will Lockett, P.E. " TXDOT_CNTCT_PH_NBR="(830)609-0707" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="78.21" CNSTR_PCT_COMPLETE="101.86" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="3/15/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="2/1/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="2/1/2023" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="3/15/2023" PE_SPENT_AMT="7854.97" CNSTR_SPENT_AMT="2383206.03" CE_SPENT_AMT="84936.01" TOT_SPENT_AMT="2475997.01" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1282414.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002504053" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="SH 123" LIMITS_TO_DSCR="GUADALUPE/GONZALES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="612004" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.855 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="635472.53" CE_SPENT_AMT="4784.30" TOT_SPENT_AMT="640256.83" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="741386.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002506058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002507067" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 97" CNTY_NM="Gonzales" LIMITS_FROM_DSCR="0.29 MI. N. OF CR 421" LIMITS_TO_DSCR="US 90A" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="365837" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.399 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="395104.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002507068" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 97" CNTY_NM="Gonzales" LIMITS_FROM_DSCR="US 90A (GONZALES)" LIMITS_TO_DSCR="US 90 (WAELDER)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16500000" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.424 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="505428.65" TOT_SPENT_AMT="505428.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="18480000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509081" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="SL 1604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25352976" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/3/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1617759.43" TOT_SPENT_AMT="1617759.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="25507897.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509082" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 1604" LIMITS_TO_DSCR="BEXAR/GUADALUPE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8306072" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.191 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/3/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="187471.13" TOT_SPENT_AMT="187471.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8358345.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509083" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="CRESTWAY DR" LIMITS_TO_DSCR="BRUCKS DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="356786" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/3/2022" PSE_30_ACTL_DT="2/1/2022" PSE_60_TRGT_DT="3/1/2022" PSE_60_ACTL_DT="3/1/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="5/2/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.290 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="110.41" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="7/3/2023" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/3/2023" RTL_ACTL_DT="8/3/2022" PE_SPENT_AMT="2133.77" CNSTR_SPENT_AMT="391224.50" CE_SPENT_AMT="635.40" TOT_SPENT_AMT="393993.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="260367.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509084" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.1 MILE EAST OF FIRESTONE PKWY" LIMITS_TO_DSCR="0.1 MILE WEST OF FIRESTONE PKWY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82835" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.190 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="91.29" CNSTR_PCT_COMPLETE="105.02" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="92139.03" CE_SPENT_AMT="528.95" TOT_SPENT_AMT="92667.98" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="79309.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509085" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.1 MI WEST OF GIBBS SPRAWL RD" LIMITS_TO_DSCR="0.1 MI EAST OF GIBBS SPRAWL RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="315274" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="91.29" CNSTR_PCT_COMPLETE="105.02" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="314333.00" CE_SPENT_AMT="1867.82" TOT_SPENT_AMT="316200.82" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="339581.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509086" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.1 MI WEST OF BEECH TRAIL" LIMITS_TO_DSCR="0.1 MI EAST OF BEECH TRAIL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="326155" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.129 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="91.29" CNSTR_PCT_COMPLETE="105.02" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="334145.20" CE_SPENT_AMT="1953.46" TOT_SPENT_AMT="336098.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="402439.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002509091" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 78" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="SL 1604" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="284950" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.250 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/3/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="525000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510097" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FLEMING ST" LIMITS_TO_DSCR="200' EAST OF 8TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1371679" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="9/8/2022" PSE_60_TRGT_DT="11/1/2022" PSE_60_ACTL_DT="11/10/2022" PSE_100_TRGT_DT="12/1/2022" PSE_100_ACTL_DT="12/12/2022" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.644 (mi)" TXDOT_CNTCT_NM="Will Lockett, P.E. " TXDOT_CNTCT_PH_NBR="(830)609-0707" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="6/26/2023" CNSTR_PCT_TIME_USED="95.35" CNSTR_PCT_COMPLETE="96.70" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="2/24/2023" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="418525.41" CNSTR_SPENT_AMT="1358822.23" CE_SPENT_AMT="28990.40" TOT_SPENT_AMT="1806338.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1392031.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510098" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="0.38 MILES WEST OF FM 465" LIMITS_TO_DSCR="US90/KINGSBURY ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="639556" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.841 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="664489.54" CE_SPENT_AMT="5002.74" TOT_SPENT_AMT="669492.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="767796.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510100" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 1518" LIMITS_TO_DSCR="EAST OF FM 465" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="639099" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.037 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="150139.41" CE_SPENT_AMT="2432.42" TOT_SPENT_AMT="152571.83" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="331986.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510101" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="AT GUADALUPE RIVER" LIMITS_TO_DSCR="0.10 MI NE OF FM 725" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13565000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.145 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="350935.55" TOT_SPENT_AMT="350935.55" FUND_CAT1_DSCR="Category DA - Develop Authority (6DA)" FUND_CAT1_AMT="13565000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510104" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510105" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510106" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 3009" LIMITS_TO_DSCR="WEST SIDE OF LP 539" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86830" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="97250.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002510107" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="EAST SIDE OF LP 539" LIMITS_TO_DSCR="SANTA CLARA CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="279110" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.136 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="312603.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002511002" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 78" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="WEST SIDE OF LP 539" LIMITS_TO_DSCR="EAST SIDE OF LP 539" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="68209" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.830 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="76394.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002601028" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Gonzales" LIMITS_FROM_DSCR="FM 1680" LIMITS_TO_DSCR="FAYETTE C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5172151" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Covey Morrow, P.E. " TXDOT_CNTCT_PH_NBR="(361)293-4378" CNSTR_CMPNY_NM="STX CIVIL" CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="698236.09" TOT_SPENT_AMT="698236.09" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002602037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="MARKET STREET(IN FLATONIA)" LIMITS_TO_DSCR="0.4 MI E OF ELM STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="783906" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/27/2021" PSE_100_ACTL_DT="1/27/2021" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.783 (mi)" TXDOT_CNTCT_NM="Covey Morrow, P.E. " TXDOT_CNTCT_PH_NBR="(361)293-4378" CNSTR_CMPNY_NM="TREVWAY, INC." CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="2/6/2023" CNSTR_PCT_TIME_USED="194.76" CNSTR_PCT_COMPLETE="73.45" DSGN_START_TRGT_DT="11/4/2019" DSGN_START_ACTL_DT="11/4/2019" ENVCLR_TRGT_DT="3/9/2021" ENVCLR_ACTL_DT="3/9/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2021" RTL_ACTL_DT="10/1/2021" PE_SPENT_AMT="235570.04" CNSTR_SPENT_AMT="220221.50" CE_SPENT_AMT="22545.89" TOT_SPENT_AMT="478337.43" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2210CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="588926.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002602039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="GONZALES C/L" LIMITS_TO_DSCR="0.12 MI W OF SH 95" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2413619" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/2/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.985 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="5/21/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.01" DSGN_START_TRGT_DT="2/17/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/17/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26070.50" CNSTR_SPENT_AMT="259875.08" CE_SPENT_AMT="2694.18" TOT_SPENT_AMT="288639.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2386069.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002602040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="@ SH 95" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="275000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.010 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12704.86" TOT_SPENT_AMT="12704.86" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002602041" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="ELM STREET" LIMITS_TO_DSCR="BRYANT RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="549534" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.075 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="615478.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002603046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="AT WEST NAVIDAD RIVER" LIMITS_TO_DSCR="STR # 0026-03-034" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5073582" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/16/2023" PSE_100_ACTL_DT="1/16/2023" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Covey Morrow, P.E. " TXDOT_CNTCT_PH_NBR="(361)293-4378" CNSTR_CMPNY_NM="ACME BRIDGE COMPANY, INC." CNSTR_NTPD_DT="5/25/2023" CNSTR_WKBG_DT="8/18/2023" CNSTR_PCT_TIME_USED="121.25" CNSTR_PCT_COMPLETE="101.59" DSGN_START_TRGT_DT="4/26/2019" DSGN_START_ACTL_DT="4/26/2019" ENVCLR_TRGT_DT="2/3/2023" ENVCLR_ACTL_DT="1/25/2023" UTIL_TRGT_DT="1/16/2023" UTIL_ACTL_DT="1/16/2023" ROW_TRGT_DT="1/16/2023" ROW_ACTL_DT="1/16/2023" RTL_TRGT_DT="2/3/2023" RTL_ACTL_DT="2/2/2023" PE_SPENT_AMT="297924.02" CNSTR_SPENT_AMT="5203544.87" CE_SPENT_AMT="119715.01" TOT_SPENT_AMT="5621183.90" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="5315000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002603047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="AT FOSTER CREEK" LIMITS_TO_DSCR="STR # 0026-03-035" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1981766" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/16/2023" PSE_100_ACTL_DT="1/16/2023" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Covey Morrow, P.E. " TXDOT_CNTCT_PH_NBR="(361)293-4378" CNSTR_CMPNY_NM="ACME BRIDGE COMPANY, INC." CNSTR_NTPD_DT="5/25/2023" CNSTR_WKBG_DT="8/18/2023" CNSTR_PCT_TIME_USED="121.25" CNSTR_PCT_COMPLETE="101.59" DSGN_START_TRGT_DT="4/26/2019" DSGN_START_ACTL_DT="4/26/2019" ENVCLR_TRGT_DT="2/3/2023" ENVCLR_ACTL_DT="1/25/2023" UTIL_TRGT_DT="1/16/2023" UTIL_ACTL_DT="1/16/2023" ROW_TRGT_DT="1/16/2023" ROW_ACTL_DT="1/16/2023" RTL_TRGT_DT="2/3/2023" RTL_ACTL_DT="2/2/2023" PE_SPENT_AMT="245327.37" CNSTR_SPENT_AMT="2066905.02" CE_SPENT_AMT="65457.88" TOT_SPENT_AMT="2377690.27" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BSP" FUND_CAT1_AMT="1950000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002603049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="0.130 MI E OF SCHULTZ" LIMITS_TO_DSCR="COLORADO C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2245858" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.611 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="5/28/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="12.79" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33354.02" CNSTR_SPENT_AMT="81535.39" CE_SPENT_AMT="178.51" TOT_SPENT_AMT="115067.92" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3283682.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002603051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="125 MILES W OF US 77" LIMITS_TO_DSCR="FM 1579" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2200000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.343 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4086.68" TOT_SPENT_AMT="4086.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="2376000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002603052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Fayette" LIMITS_FROM_DSCR="BRYANT RD" LIMITS_TO_DSCR="125 MILES W OF US 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="203687" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.006 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="228129.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002604047" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="CR 210" LIMITS_TO_DSCR="1 MI W OF HATTERMANN LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600000" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.320 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/19/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15379.52" TOT_SPENT_AMT="15379.52" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002604048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="WEIMAR ISD" LIMITS_TO_DSCR="N GROHMANN STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="761576" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="12/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.969 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="12/9/2024" CNSTR_PCT_TIME_USED="38.15" CNSTR_PCT_COMPLETE="64.76" DSGN_START_TRGT_DT="8/29/2023" DSGN_START_ACTL_DT="5/11/2022" ENVCLR_TRGT_DT="7/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/25/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="159801.55" CNSTR_SPENT_AMT="352606.41" CE_SPENT_AMT="6047.11" TOT_SPENT_AMT="518455.07" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2510CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="951600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002605024" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="1 MI W OF HATTERMANN LN" LIMITS_TO_DSCR="0.745 MI W OF FM 2434" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2250000" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.729 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/19/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10112.63" TOT_SPENT_AMT="10112.63" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002606031" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR=".02 MI WEST OF FRONT STREET" LIMITS_TO_DSCR="0.10 MI W. OF LEGION DR." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="984278" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="4/18/2023" PSE_30_ACTL_DT="7/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2023" PSE_100_ACTL_DT="2/3/2023" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.946 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="6/18/2024" CNSTR_PCT_TIME_USED="231.67" CNSTR_PCT_COMPLETE="94.07" DSGN_START_TRGT_DT="3/8/2021" DSGN_START_ACTL_DT="10/26/2020" ENVCLR_TRGT_DT="10/6/2023" ENVCLR_ACTL_DT="10/12/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/3/2023" RTL_TRGT_DT="10/6/2023" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="28275.13" CNSTR_SPENT_AMT="681037.36" CE_SPENT_AMT="21046.49" TOT_SPENT_AMT="730358.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1127052.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002606034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="FM 806" LIMITS_TO_DSCR="FRONT STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="779897" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2021" PSE_100_ACTL_DT="12/1/2021" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.503 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="1/4/2023" CNSTR_PCT_TIME_USED="54.17" CNSTR_PCT_COMPLETE="114.55" DSGN_START_TRGT_DT="4/7/2020" DSGN_START_ACTL_DT="4/7/2020" ENVCLR_TRGT_DT="3/4/2022" ENVCLR_ACTL_DT="3/4/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/4/2022" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="216132.17" CNSTR_SPENT_AMT="915354.15" CE_SPENT_AMT="27033.71" TOT_SPENT_AMT="1158520.03" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2210CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="475822.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002606036" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="0.745 MI W OF FM 2434" LIMITS_TO_DSCR="FM 2434" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="450000" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.745 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/19/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8654.24" TOT_SPENT_AMT="8654.24" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002701042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="AT COLORADO RIVER" LIMITS_TO_DSCR="STR # 0027-01-001" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7530900" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.478 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="CEKRA INC." CNSTR_NTPD_DT="10/10/2024" CNSTR_WKBG_DT="11/18/2024" CNSTR_PCT_TIME_USED="69.33" CNSTR_PCT_COMPLETE="51.05" DSGN_START_TRGT_DT="12/20/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="156625.33" CNSTR_SPENT_AMT="3874367.51" CE_SPENT_AMT="38981.88" TOT_SPENT_AMT="4069974.72" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="5700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002701045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="COLORADO RIVER RELIEF 1, 2 &amp; 3" LIMITS_TO_DSCR="STR# 0027-01-044, -045 &amp; -046" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/6/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14983031" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/30/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="12/11/2020" PSE_60_ACTL_DT="12/11/2020" PSE_100_TRGT_DT="1/12/2023" PSE_100_ACTL_DT="12/21/2022" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.820 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="PULICE CONSTRUCTION, INC." CNSTR_NTPD_DT="6/19/2024" CNSTR_WKBG_DT="10/14/2024" CNSTR_PCT_TIME_USED="12.55" CNSTR_PCT_COMPLETE="26.53" DSGN_START_TRGT_DT="4/2/2019" DSGN_START_ACTL_DT="4/2/2019" ENVCLR_TRGT_DT="8/7/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/12/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/12/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="727440.65" CNSTR_SPENT_AMT="4602257.02" CE_SPENT_AMT="16245.97" TOT_SPENT_AMT="5345943.64" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="12000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="1141725.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002702034" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 102" CNTY_NM="Colorado" LIMITS_FROM_DSCR="I 10" LIMITS_TO_DSCR=".66 MI S. OF FM 949" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8200000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.427 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2133269.26" TOT_SPENT_AMT="2133269.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="9184000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002703074" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 102" CNTY_NM="Colorado" LIMITS_FROM_DSCR="0.067 MI S OF RAMSEY RD" LIMITS_TO_DSCR="N MCCARTY AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="256664" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.942 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="5/28/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="12.79" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1497.76" CNSTR_SPENT_AMT="50462.52" CE_SPENT_AMT="113.54" TOT_SPENT_AMT="52073.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="295436.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002703075" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="306 FEET W. OF THIRD ST." LIMITS_TO_DSCR="FM 3013" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63356" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.803 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5483.35" TOT_SPENT_AMT="5483.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="65890.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002703077" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Colorado" LIMITS_FROM_DSCR="FM 3013" LIMITS_TO_DSCR="WHARTON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="221277" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.248 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="238979.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002704041" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Wharton" LIMITS_FROM_DSCR="2.58 MI W OF FM 1164" LIMITS_TO_DSCR="SH 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="496857" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/16/2019" PSE_100_ACTL_DT="4/16/2019" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.341 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="10/21/2019" CNSTR_WKBG_DT="11/20/2019" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.74" DSGN_START_TRGT_DT="10/2/2017" DSGN_START_ACTL_DT="10/2/2017" ENVCLR_TRGT_DT="5/17/2019" ENVCLR_ACTL_DT="5/17/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/17/2019" RTL_ACTL_DT="5/17/2019" PE_SPENT_AMT="116687.73" CNSTR_SPENT_AMT="728234.54" CE_SPENT_AMT="26935.16" TOT_SPENT_AMT="871857.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="339620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002704042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90A" CNTY_NM="Wharton" LIMITS_FROM_DSCR="COLORADO C/L" LIMITS_TO_DSCR="SH 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1124512" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/14/2021" PSE_100_ACTL_DT="1/14/2021" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.300 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="SJ&amp;J CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="3/31/2022" CNSTR_PCT_TIME_USED="161.33" CNSTR_PCT_COMPLETE="95.91" DSGN_START_TRGT_DT="1/7/2020" DSGN_START_ACTL_DT="1/7/2020" ENVCLR_TRGT_DT="3/5/2021" ENVCLR_ACTL_DT="3/5/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/4/2021" RTL_ACTL_DT="6/1/2021" PE_SPENT_AMT="392945.05" CNSTR_SPENT_AMT="905601.33" CE_SPENT_AMT="41677.73" TOT_SPENT_AMT="1340224.11" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1055827.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002704045" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Wharton" LIMITS_FROM_DSCR="COLORADO C/L" LIMITS_TO_DSCR="FORT BEND C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="830830" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.187 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="930530.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002706062" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="WHARTON COUNTY LINE" LIMITS_TO_DSCR="FM 723" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="301674" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/28/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/13/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.023 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/12/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/12/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="178514.82" TOT_SPENT_AMT="178514.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="329028.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002706063" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="0.037 MILES WEST OF RUDE STREET" LIMITS_TO_DSCR="FROST STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/16/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75430" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/23/2022" PSE_100_ACTL_DT="5/23/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.557 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="10/19/2022" CNSTR_WKBG_DT="1/9/2023" CNSTR_PCT_TIME_USED="64.44" CNSTR_PCT_COMPLETE="93.06" DSGN_START_TRGT_DT="5/20/2022" DSGN_START_ACTL_DT="5/20/2022" ENVCLR_TRGT_DT="1/24/2022" ENVCLR_ACTL_DT="1/24/2022" UTIL_TRGT_DT="5/17/2022" UTIL_ACTL_DT="5/17/2022" ROW_TRGT_DT="5/17/2022" ROW_ACTL_DT="5/17/2022" RTL_TRGT_DT="5/24/2022" RTL_ACTL_DT="5/24/2022" PE_SPENT_AMT="1327.17" CNSTR_SPENT_AMT="82905.48" CE_SPENT_AMT="15929.37" TOT_SPENT_AMT="100162.02" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="93065.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002707044" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="FM 723" LIMITS_TO_DSCR="FM 762" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="111360" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/28/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/13/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.152 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/12/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/12/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22807.01" TOT_SPENT_AMT="22807.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="115814.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002707045" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="AUSTIN STREET" LIMITS_TO_DSCR="GEORGINA STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/16/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="61455" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/23/2022" PSE_100_ACTL_DT="5/23/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.250 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="10/19/2022" CNSTR_WKBG_DT="1/9/2023" CNSTR_PCT_TIME_USED="64.44" CNSTR_PCT_COMPLETE="93.06" DSGN_START_TRGT_DT="5/20/2022" DSGN_START_ACTL_DT="5/20/2022" ENVCLR_TRGT_DT="1/24/2022" ENVCLR_ACTL_DT="1/24/2022" UTIL_TRGT_DT="5/17/2022" UTIL_ACTL_DT="5/17/2022" ROW_TRGT_DT="5/17/2022" ROW_ACTL_DT="5/17/2022" RTL_TRGT_DT="5/24/2022" RTL_ACTL_DT="5/24/2022" PE_SPENT_AMT="1032.01" CNSTR_SPENT_AMT="67508.73" CE_SPENT_AMT="12971.03" TOT_SPENT_AMT="81511.77" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="145691.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002707046" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="FM 723" LIMITS_TO_DSCR="FM 762" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/22/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="658000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.700 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="9/13/2024" CNSTR_PCT_TIME_USED="73.76" CNSTR_PCT_COMPLETE="80.69" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="12/12/2022" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="117780.01" CNSTR_SPENT_AMT="839246.33" CE_SPENT_AMT="4655.57" TOT_SPENT_AMT="961681.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="392582.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002707047" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="0.21 MILES WEST OF LANE DRIVE" LIMITS_TO_DSCR="FM 3155" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/27/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27926487" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.595 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="97618.28" CE_SPENT_AMT="1863.28" TOT_SPENT_AMT="99481.56" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_PID="NC" FUND_CAT1_AMT="2042160.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT2_PID="NC" FUND_CAT2_AMT="27620000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT3_AMT="525943.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708146" PT_PHASE="Planning, 10+ years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="FS 762" LIMITS_TO_DSCR="FM 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17857143" DIST_LET_DATE="3/1/2038" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/28/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.875 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/27/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/21/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/21/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/30/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="624378.05" TOT_SPENT_AMT="624378.05" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="20000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708147" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="FM 359" LIMITS_TO_DSCR="W OF SH 99" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="61803274" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="7/28/2021" PSE_30_ACTL_DT="12/9/2022" PSE_60_TRGT_DT="7/30/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/27/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/21/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/21/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/16/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3252394.02" TOT_SPENT_AMT="3252394.02" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT1_AMT="1953440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708180" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="AT SH 99" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="46697179" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="7/28/2021" PSE_30_ACTL_DT="7/28/2021" PSE_60_TRGT_DT="7/30/2021" PSE_60_ACTL_DT="7/30/2021" PSE_100_TRGT_DT="2/23/2023" PSE_100_ACTL_DT="2/23/2023" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.976 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="SER CONSTRUCTION PARTNERS, LLC" CNSTR_NTPD_DT="6/1/2023" CNSTR_WKBG_DT="9/18/2023" CNSTR_PCT_TIME_USED="73.59" CNSTR_PCT_COMPLETE="70.38" DSGN_START_TRGT_DT="7/27/2021" DSGN_START_ACTL_DT="7/27/2021" ENVCLR_TRGT_DT="1/5/2023" ENVCLR_ACTL_DT="1/5/2023" UTIL_TRGT_DT="7/21/2021" UTIL_ACTL_DT="7/21/2021" ROW_TRGT_DT="7/21/2021" ROW_ACTL_DT="7/21/2021" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="4/3/2023" PE_SPENT_AMT="491481.36" CNSTR_SPENT_AMT="32632873.01" CE_SPENT_AMT="2549315.41" TOT_SPENT_AMT="35673669.78" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="7222550.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="1773368.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708182" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="IH 69" LIMITS_TO_DSCR="PRESENT STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="572449" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="2/5/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="51.67" CNSTR_PCT_COMPLETE="43.92" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16123.29" CNSTR_SPENT_AMT="260229.95" CE_SPENT_AMT="725.16" TOT_SPENT_AMT="277078.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708183" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR=" IH 69" LIMITS_TO_DSCR="GESSNER ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/20/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="56023" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2021" PSE_100_ACTL_DT="1/12/2024" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.583 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="101.03" DSGN_START_TRGT_DT="8/7/2020" DSGN_START_ACTL_DT="8/7/2020" ENVCLR_TRGT_DT="2/5/2021" ENVCLR_ACTL_DT="7/27/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2020" ROW_ACTL_DT="9/5/2023" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="744.85" CNSTR_SPENT_AMT="81191.54" CE_SPENT_AMT="2625.63" TOT_SPENT_AMT="84562.02" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="42315.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708184" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="AT JOHN SHARP DRIVE (CIRCLE DRIVE)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2146600" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="14627.91" TOT_SPENT_AMT="14627.91" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="2146600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708185" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708186" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="FM 762" LIMITS_TO_DSCR="SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="264849" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/28/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/13/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/12/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/12/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13282.65" TOT_SPENT_AMT="13282.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="275443.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708187" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="HARLEM RD" LIMITS_TO_DSCR="PITTS RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="241600" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.260 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="1/20/2025" CNSTR_PCT_TIME_USED="86.21" CNSTR_PCT_COMPLETE="91.44" DSGN_START_TRGT_DT="9/7/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/11/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16244.58" CNSTR_SPENT_AMT="239200.00" CE_SPENT_AMT="8689.37" TOT_SPENT_AMT="264133.95" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="170290.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708190" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="UA 90 WB AT BRAZOS RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="684597" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14876.26" TOT_SPENT_AMT="14876.26" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="711981.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708191" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="IH 69" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1013111" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.732 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="CENTRAL NORTH CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="8/26/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="70.69" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1987.09" CNSTR_SPENT_AMT="787256.06" CE_SPENT_AMT="46396.22" TOT_SPENT_AMT="835639.37" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1369668.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708192" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="PITTS ROAD" LIMITS_TO_DSCR="CRAVENS ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1407100" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Furnish &amp; Install Dynamic Message Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2707)" FUND_CAT1_AMT="1407100.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="112568.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002708194" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709104" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90A" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND COUNTY LINE" LIMITS_TO_DSCR="IH 610S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5773290" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.895 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="SICE, INC." CNSTR_NTPD_DT="1/12/2022" CNSTR_WKBG_DT="8/9/2022" CNSTR_PCT_TIME_USED="93.33" CNSTR_PCT_COMPLETE="108.74" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="878188.39" CNSTR_SPENT_AMT="7004814.58" CE_SPENT_AMT="180318.68" TOT_SPENT_AMT="8063321.65" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2205)" FUND_CAT1_AMT="9400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709105" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="ST AUGUSTINE STREET" LIMITS_TO_DSCR="EAST OF GRIGGS ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/1/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3584925" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="MC2 CIVIL, LLC" CNSTR_NTPD_DT="11/13/2024" CNSTR_WKBG_DT="3/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="15.91" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="675461.47" CNSTR_SPENT_AMT="540000.00" CE_SPENT_AMT="10045.47" TOT_SPENT_AMT="1225506.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4099133.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709107" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="SH 288" LIMITS_TO_DSCR="EAST OF GRIGGS ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/1/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14904973" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="MC2 CIVIL, LLC" CNSTR_NTPD_DT="11/13/2024" CNSTR_WKBG_DT="3/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="15.91" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1061094.80" CNSTR_SPENT_AMT="1416313.74" CE_SPENT_AMT="27050.44" TOT_SPENT_AMT="2504458.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="19633802.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709109" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8 (S)" LIMITS_TO_DSCR="IH 610 (S)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="583946" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.700 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="STRIPE LINES, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="76.47" CNSTR_PCT_COMPLETE="74.51" DSGN_START_TRGT_DT="9/7/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77686.38" CNSTR_SPENT_AMT="454769.79" CE_SPENT_AMT="778.82" TOT_SPENT_AMT="533234.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="625000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="107109.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709111" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT GRIGGS RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/1/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5763070" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="MC2 CIVIL, LLC" CNSTR_NTPD_DT="11/13/2024" CNSTR_WKBG_DT="3/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="15.91" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="771664.20" CNSTR_SPENT_AMT="217564.15" CE_SPENT_AMT="30793.19" TOT_SPENT_AMT="1020021.54" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="6818475.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709113" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND COUNTY LINE" LIMITS_TO_DSCR="FARISS STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="257499" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/12/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="7/12/2022" PSE_100_TRGT_DT="7/18/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.441 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="TEXAS WALL &amp; LANDSCAPE" CNSTR_NTPD_DT="6/19/2023" CNSTR_WKBG_DT="7/31/2023" CNSTR_PCT_TIME_USED="89.71" CNSTR_PCT_COMPLETE="79.59" DSGN_START_TRGT_DT="7/15/2022" DSGN_START_ACTL_DT="9/28/2022" ENVCLR_TRGT_DT="7/15/2022" ENVCLR_ACTL_DT="8/9/2022" UTIL_TRGT_DT="7/12/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/12/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/19/2022" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="242405.02" CE_SPENT_AMT="28432.87" TOT_SPENT_AMT="270837.89" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709114" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 610 SOUTH" LIMITS_TO_DSCR="SH 288" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8500000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/6/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/6/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/10/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="9180000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002709115" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002710074" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="UA 90 SB AT BUFFALO BAYOU" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5779069" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/27/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/27/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="12/27/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/29/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/29/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/26/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/26/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/3/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="479930.85" CE_SPENT_AMT="2132.54" TOT_SPENT_AMT="482063.39" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="4749532.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002710075" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="POLK STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12079143" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/9/2019" PSE_30_ACTL_DT="1/9/2019" PSE_60_TRGT_DT="3/3/2022" PSE_60_ACTL_DT="3/3/2022" PSE_100_TRGT_DT="2/17/2023" PSE_100_ACTL_DT="2/17/2023" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.122 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="SER CONSTRUCTION PARTNERS, LLC" CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="7/5/2023" CNSTR_PCT_TIME_USED="98.67" CNSTR_PCT_COMPLETE="99.89" DSGN_START_TRGT_DT="1/8/2019" DSGN_START_ACTL_DT="1/8/2019" ENVCLR_TRGT_DT="1/5/2023" ENVCLR_ACTL_DT="1/5/2023" UTIL_TRGT_DT="1/2/2019" UTIL_ACTL_DT="1/2/2019" ROW_TRGT_DT="1/2/2019" ROW_ACTL_DT="1/2/2019" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="4/3/2023" PE_SPENT_AMT="1572593.32" CNSTR_SPENT_AMT="12398083.00" CE_SPENT_AMT="418837.77" TOT_SPENT_AMT="14389514.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="14200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002710076" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="EAST OF GRIGGS ROAD" LIMITS_TO_DSCR="SPUR 5" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/1/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9875275" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="MC2 CIVIL, LLC" CNSTR_NTPD_DT="11/13/2024" CNSTR_WKBG_DT="3/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="15.91" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1198707.91" CNSTR_SPENT_AMT="1101914.80" CE_SPENT_AMT="22539.33" TOT_SPENT_AMT="2323162.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="13620026.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002710077" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT BELVEDERE STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/1/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3908948" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.030 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="MC2 CIVIL, LLC" CNSTR_NTPD_DT="11/13/2024" CNSTR_WKBG_DT="3/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="15.91" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21515.68" CNSTR_SPENT_AMT="2837456.23" CE_SPENT_AMT="141.01" TOT_SPENT_AMT="2859112.92" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="220020.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002710080" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="POLK STREET" LIMITS_TO_DSCR="IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6561872" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="109028.34" TOT_SPENT_AMT="109028.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="7349297.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712152" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="EAST OF SS 529" LIMITS_TO_DSCR="SH 99" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1642892" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.494 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="11/1/2023" CNSTR_PCT_TIME_USED="75.78" CNSTR_PCT_COMPLETE="74.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="175014.31" CNSTR_SPENT_AMT="1748216.10" CE_SPENT_AMT="13038.06" TOT_SPENT_AMT="1936268.47" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712161" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="US 90A" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/20/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="243526" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2021" PSE_100_ACTL_DT="1/12/2024" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.933 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="101.03" DSGN_START_TRGT_DT="8/7/2020" DSGN_START_ACTL_DT="8/7/2020" ENVCLR_TRGT_DT="2/5/2021" ENVCLR_ACTL_DT="7/27/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2020" ROW_ACTL_DT="9/5/2023" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="1578.80" CNSTR_SPENT_AMT="354705.49" CE_SPENT_AMT="11592.61" TOT_SPENT_AMT="367876.90" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="373996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712163" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="AT INTERSECTION WITH RANSOM ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150000" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TBD" PROJ_LENGTH="0.032 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="150000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712164" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="E OF SS 529" LIMITS_TO_DSCR="HARRIS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2269169" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="19.703 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="449024.33" TOT_SPENT_AMT="449024.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2359936.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712166" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="0.094 MILES WEST OF READING ROAD" LIMITS_TO_DSCR="GREATWOOD PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/16/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="640668" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/23/2022" PSE_100_ACTL_DT="5/23/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.553 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="10/19/2022" CNSTR_WKBG_DT="1/9/2023" CNSTR_PCT_TIME_USED="64.44" CNSTR_PCT_COMPLETE="93.06" DSGN_START_TRGT_DT="5/20/2022" DSGN_START_ACTL_DT="5/20/2022" ENVCLR_TRGT_DT="1/24/2022" ENVCLR_ACTL_DT="1/24/2022" UTIL_TRGT_DT="5/17/2022" UTIL_ACTL_DT="5/17/2022" ROW_TRGT_DT="5/17/2022" ROW_ACTL_DT="5/17/2022" RTL_TRGT_DT="5/24/2022" RTL_ACTL_DT="5/24/2022" PE_SPENT_AMT="120341.55" CNSTR_SPENT_AMT="670265.25" CE_SPENT_AMT="128782.59" TOT_SPENT_AMT="919389.39" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="774548.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712167" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="BAMORE ROAD" LIMITS_TO_DSCR="WEST FAIRGROUNDS ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="560000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.367 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712168" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="SS 529" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2105911" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14522.67" TOT_SPENT_AMT="14522.67" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712169" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="BRAZOS CANYON DRIVE" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1191584" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.984 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="CENTRAL NORTH CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="8/26/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="70.69" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="159286.28" CNSTR_SPENT_AMT="790774.93" CE_SPENT_AMT="46603.32" TOT_SPENT_AMT="996664.53" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1088633.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002712170" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="SH 99" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="714600" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="60330.80" TOT_SPENT_AMT="60330.80" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713200" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="SH 288" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600868910" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/10/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/11/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/16/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.365 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="10/1/2024" CNSTR_WKBG_DT="1/8/2025" CNSTR_PCT_TIME_USED="5.70" CNSTR_PCT_COMPLETE="20.84" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="9/23/2022" ENVCLR_TRGT_DT="8/11/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/3/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/23/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="37080430.24" CNSTR_SPENT_AMT="134947023.34" CE_SPENT_AMT="1062732.77" TOT_SPENT_AMT="173090186.35" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="164806033.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="16483967.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="443015559.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713201" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="SH 288" LIMITS_TO_DSCR="SPUR 527" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="666435874" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/1/2019" PSE_30_ACTL_DT="3/1/2019" PSE_60_TRGT_DT="2/28/2020" PSE_60_ACTL_DT="12/27/2022" PSE_100_TRGT_DT="3/18/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/8/2018" DSGN_START_ACTL_DT="1/8/2018" ENVCLR_TRGT_DT="2/3/2021" ENVCLR_ACTL_DT="2/3/2021" UTIL_TRGT_DT="1/2/2018" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2018" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="27234254.97" CE_SPENT_AMT="42921.12" TOT_SPENT_AMT="27277176.09" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="457960000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="50000000.00" FUND_CAT3_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT3_AMT="30000000.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="131400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713218" PT_PHASE="Feasibility Studies" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="BELTWAY 8" LIMITS_TO_DSCR="SPUR 527" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Corridor Planning Management" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/17/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.240 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/16/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/16/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/11/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/18/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1411019.00" TOT_SPENT_AMT="1411019.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="5200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713221" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT MCGOWEN, TUAM AND ELGIN" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80948879" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="8/10/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/11/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/16/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.365 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="10/1/2024" CNSTR_WKBG_DT="1/8/2025" CNSTR_PCT_TIME_USED="5.70" CNSTR_PCT_COMPLETE="20.84" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="9/23/2022" ENVCLR_TRGT_DT="8/11/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/3/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/23/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5790868.09" CNSTR_SPENT_AMT="7660000.00" CE_SPENT_AMT="53880.77" TOT_SPENT_AMT="13504748.86" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="63900000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="19898879.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713232" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="E OF SOUTH RICE AVE" LIMITS_TO_DSCR="W OF NEWCASTLE DR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3876523" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.870 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="48375.97" CNSTR_SPENT_AMT="254531.38" CE_SPENT_AMT="6235.94" TOT_SPENT_AMT="309143.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3876523.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713233" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="MANDELL STREET (NORTH BOUND)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="46646" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2010)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="46646.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713237" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="S OF BISSONNET ST." LIMITS_TO_DSCR="N OF SOUTH RICE AVE." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25048620" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.535 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="854019.07" CNSTR_SPENT_AMT="1319983.08" CE_SPENT_AMT="32339.06" TOT_SPENT_AMT="2206341.21" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2507)" FUND_CAT1_AMT="25348620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713238" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH OF BISSONNET STREET" LIMITS_TO_DSCR="NORTH OF CHIMNEY ROCK ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/13/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7540358" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="6/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.560 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="5/13/2024" CNSTR_PCT_TIME_USED="208.70" CNSTR_PCT_COMPLETE="98.82" DSGN_START_TRGT_DT="6/6/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/10/2020" ENVCLR_ACTL_DT="4/10/2020" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="101113.46" CNSTR_SPENT_AMT="6886239.04" CE_SPENT_AMT="407118.98" TOT_SPENT_AMT="7394471.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="7942996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713239" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND / HARRIS C/L" LIMITS_TO_DSCR="CLAY ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/20/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="386799" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2021" PSE_100_ACTL_DT="1/12/2024" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="15.600 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="101.03" DSGN_START_TRGT_DT="8/7/2020" DSGN_START_ACTL_DT="8/7/2020" ENVCLR_TRGT_DT="2/5/2021" ENVCLR_ACTL_DT="7/27/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2020" ROW_ACTL_DT="9/5/2023" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="4231.93" CNSTR_SPENT_AMT="563266.22" CE_SPENT_AMT="18214.33" TOT_SPENT_AMT="585712.48" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="545519.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713241" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8 (WEST)" LIMITS_TO_DSCR="S OF WESTPARK DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2016505" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Replace Guardrail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.600 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="180722.18" CE_SPENT_AMT="4427.62" TOT_SPENT_AMT="185149.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="2016505.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713242" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT HAZARD STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7155904" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="8/18/2021" PSE_30_ACTL_DT="10/18/2021" PSE_60_TRGT_DT="8/20/2021" PSE_60_ACTL_DT="12/21/2022" PSE_100_TRGT_DT="8/25/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/20/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/11/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="646545.60" TOT_SPENT_AMT="646545.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="8014612.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713243" PT_PHASE="Construction begins within 4 years" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT MANDELL STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="" FREIGHT="" TRUNK_SYS_FLAG="" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1052528" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="8/18/2021" PSE_30_ACTL_DT="10/18/2021" PSE_60_TRGT_DT="8/20/2021" PSE_60_ACTL_DT="12/21/2022" PSE_100_TRGT_DT="8/25/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/20/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/11/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="284063.28" TOT_SPENT_AMT="284063.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1178831.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713244" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 610 W" LIMITS_TO_DSCR="SS 527" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60000" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.311 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="60000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713245" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND C/L" LIMITS_TO_DSCR="E OF SL 8" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183059" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.583 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7200.53" TOT_SPENT_AMT="7200.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="190381.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713246" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH OF BISSONNET STREET" LIMITS_TO_DSCR="SOUTH OF RICE AVENUE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6974216" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="542411.77" CE_SPENT_AMT="13288.85" TOT_SPENT_AMT="555700.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="6974216.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713247" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND COUNTY LINE" LIMITS_TO_DSCR="SS 527" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3313300" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713248" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT RICE AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="416071" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="478.19" CNSTR_SPENT_AMT="30651.66" CE_SPENT_AMT="750.95" TOT_SPENT_AMT="31880.80" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1651060.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713249" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT FOUNTAIN VIEW DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="255421" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="23785.69" CE_SPENT_AMT="582.74" TOT_SPENT_AMT="24368.43" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="2104469.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713250" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT FOUNTAIN VIEW DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="328621" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="28935.17" CE_SPENT_AMT="708.90" TOT_SPENT_AMT="29644.07" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="2107747.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713251" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT CHIMNEY ROCK RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="234371" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="633.38" CNSTR_SPENT_AMT="21088.34" CE_SPENT_AMT="516.64" TOT_SPENT_AMT="22238.36" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1837733.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713252" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT CHIMNEY ROCK RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="270921" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2375.04" CNSTR_SPENT_AMT="21088.34" CE_SPENT_AMT="516.64" TOT_SPENT_AMT="23980.02" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1929167.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713253" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT RICE AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="374871" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.96" CNSTR_PCT_COMPLETE="5.43" DSGN_START_TRGT_DT="7/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/6/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="28935.17" CE_SPENT_AMT="708.90" TOT_SPENT_AMT="29644.07" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1607830.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713255" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8 WEST" LIMITS_TO_DSCR="IH 610 WEST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="670070" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC" CNSTR_NTPD_DT="5/3/2024" CNSTR_WKBG_DT="9/7/2024" CNSTR_PCT_TIME_USED="146.60" CNSTR_PCT_COMPLETE="92.67" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29415.89" CNSTR_SPENT_AMT="563710.94" CE_SPENT_AMT="59524.94" TOT_SPENT_AMT="652651.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="967478.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713256" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND COUNTY LINE" LIMITS_TO_DSCR="BEECHNUT STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="256000" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.004 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="CENTRAL NORTH CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="8/26/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="70.69" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1519.80" CNSTR_SPENT_AMT="198817.84" CE_SPENT_AMT="11717.17" TOT_SPENT_AMT="212054.81" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="181500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713257" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND COUNTY LINE" LIMITS_TO_DSCR="CLAY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1759992" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="15.585 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="11.85" CNSTR_PCT_COMPLETE="8.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="479804.27" CNSTR_SPENT_AMT="244794.28" CE_SPENT_AMT="1201.93" TOT_SPENT_AMT="725800.48" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1834992.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713259" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69" CNTY_NM="Harris" LIMITS_FROM_DSCR="MAIN STREET TO ALMEDA ROAD" LIMITS_TO_DSCR="AND AT ELGIN, TUAM, AND MCGOWEN BRIDGES" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78800000" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="81952000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002713260" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1651.00" TOT_SPENT_AMT="1651.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002715029" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 527" CNTY_NM="Harris" LIMITS_FROM_DSCR=" IH 69" LIMITS_TO_DSCR="ELGIN STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/20/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30372" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2021" PSE_100_ACTL_DT="1/12/2024" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.904 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="101.03" DSGN_START_TRGT_DT="8/7/2020" DSGN_START_ACTL_DT="8/7/2020" ENVCLR_TRGT_DT="2/5/2021" ENVCLR_ACTL_DT="7/27/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2020" ROW_ACTL_DT="9/5/2023" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="521.22" CNSTR_SPENT_AMT="44147.98" CE_SPENT_AMT="1427.64" TOT_SPENT_AMT="46096.84" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="32429.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002715030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 527" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 69" LIMITS_TO_DSCR="ELGIN STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="133253" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.907 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="11.85" CNSTR_PCT_COMPLETE="8.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="3069.28" CE_SPENT_AMT="152.20" TOT_SPENT_AMT="3221.48" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="133253.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801067" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 610, NE" LIMITS_TO_DSCR="E OF MESA RD (OLD FM 527)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="46879928" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/6/2007" PSE_30_ACTL_DT="8/10/2009" PSE_60_TRGT_DT="12/17/2009" PSE_60_ACTL_DT="12/23/2009" PSE_100_TRGT_DT="4/27/2022" PSE_100_ACTL_DT="2/16/2023" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.162 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="BALFOUR BEATTY INFRASTRUCTURE, INC." CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="3/1/2024" CNSTR_PCT_TIME_USED="2.53" CNSTR_PCT_COMPLETE="18.16" DSGN_START_TRGT_DT="4/27/2009" DSGN_START_ACTL_DT="4/27/2009" ENVCLR_TRGT_DT="9/7/2018" ENVCLR_ACTL_DT="9/7/2018" UTIL_TRGT_DT="8/24/2021" UTIL_ACTL_DT="8/24/2021" ROW_TRGT_DT="7/6/2021" ROW_ACTL_DT="7/6/2021" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5037213.85" CNSTR_SPENT_AMT="9492126.08" CE_SPENT_AMT="1026224.49" TOT_SPENT_AMT="15555564.42" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="7000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="17739404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801104" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT JOHN RALSTON ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18066" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.010 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2010)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="18066.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801105" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.13 MILES WEST OF FM 526" LIMITS_TO_DSCR="FM 2100" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8121312" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/26/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.850 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.32" CNSTR_PCT_COMPLETE="106.43" DSGN_START_TRGT_DT="5/25/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/27/2019" ENVCLR_ACTL_DT="12/27/2019" UTIL_TRGT_DT="5/20/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/20/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="210448.05" CNSTR_SPENT_AMT="9069977.24" CE_SPENT_AMT="173859.45" TOT_SPENT_AMT="9454284.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="9583599.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801106" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801108" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801109" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="SHELDON ROAD" LIMITS_TO_DSCR="CHAMPION PAPER DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="271016" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="271016.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801110" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT SAN JACINTO RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18695223" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33514.33" TOT_SPENT_AMT="33514.33" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801111" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT SAN JACINTO BRIDGE RELIEF #1" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="384436" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2664.68" TOT_SPENT_AMT="2664.68" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801112" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 90-U" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT SAN JACINTO BRIDGE RELIEF #2" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151475" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2419.81" TOT_SPENT_AMT="2419.81" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002801116" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.22 MILES WEST OF PURPLE SAGE" LIMITS_TO_DSCR="0.61 MILES EAST OF PURPLE SAGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/29/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="39623073" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.828 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="SER CONSTRUCTION PARTNERS, LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="11/12/2024" CNSTR_PCT_TIME_USED="11.66" CNSTR_PCT_COMPLETE="15.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1197400.39" CNSTR_SPENT_AMT="1376959.38" CE_SPENT_AMT="123303.83" TOT_SPENT_AMT="2697663.60" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="42473168.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT GREENS BAYOU" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/29/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27365283" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.373 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="SER CONSTRUCTION PARTNERS, LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="11/12/2024" CNSTR_PCT_TIME_USED="11.66" CNSTR_PCT_COMPLETE="15.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1125357.92" CNSTR_SPENT_AMT="8855178.54" CE_SPENT_AMT="42173.02" TOT_SPENT_AMT="10022709.48" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT1_AMT="27690963.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802098" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="EAST OF FM 2100" LIMITS_TO_DSCR="WEST OF LIBERTY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11754262" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/30/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.692 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="6/17/2024" CNSTR_PCT_TIME_USED="152.24" CNSTR_PCT_COMPLETE="112.29" DSGN_START_TRGT_DT="3/29/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/6/2020" ENVCLR_ACTL_DT="1/6/2020" UTIL_TRGT_DT="3/24/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/24/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="998448.71" CNSTR_SPENT_AMT="13117164.50" CE_SPENT_AMT="342027.19" TOT_SPENT_AMT="14457640.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="10000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="90000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.42 MILES EAST OF BW 8" LIMITS_TO_DSCR="0.03 MILES EAST OF FM 2100" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10229817" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/30/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.397 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/7/2024" CNSTR_WKBG_DT="4/30/2024" CNSTR_PCT_TIME_USED="188.06" CNSTR_PCT_COMPLETE="179.90" DSGN_START_TRGT_DT="3/29/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/6/2020" ENVCLR_ACTL_DT="1/6/2020" UTIL_TRGT_DT="3/24/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/24/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="120315.19" CNSTR_SPENT_AMT="18464773.00" CE_SPENT_AMT="485045.75" TOT_SPENT_AMT="19070133.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="11000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802105" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.1 MILES WEST OF BOHEMIAN HALL RD." LIMITS_TO_DSCR="0.1 MILES EAST OF BOHEMIAN HALL RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="236908" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/30/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="6/17/2024" CNSTR_PCT_TIME_USED="152.24" CNSTR_PCT_COMPLETE="112.29" DSGN_START_TRGT_DT="3/29/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/6/2020" ENVCLR_ACTL_DT="1/6/2020" UTIL_TRGT_DT="3/24/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/24/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11734.62" CNSTR_SPENT_AMT="273286.39" CE_SPENT_AMT="9421.06" TOT_SPENT_AMT="294442.07" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="304551.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802107" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 10(E)" LIMITS_TO_DSCR="LIBERTY C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3321000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/6/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="21.690 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/5/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="3719520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802108" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8" LIMITS_TO_DSCR="LIBERTY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4291543" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="74164.53" TOT_SPENT_AMT="74164.53" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3367252.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802109" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="LIBERTY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1200000" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="KRENEK ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="137782" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.323 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="89.17" CNSTR_PCT_COMPLETE="78.41" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="323.71" CNSTR_SPENT_AMT="148678.23" CE_SPENT_AMT="7832.83" TOT_SPENT_AMT="156834.77" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="82196.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002802111" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8" LIMITS_TO_DSCR="LIBERTY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11213336" DIST_LET_DATE="7/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1650.99" TOT_SPENT_AMT="1650.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="12558936.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803107" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="AT FM 1413" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22054430" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.800 (mi)" TXDOT_CNTCT_NM="Roberto Rodriguez, P.E." TXDOT_CNTCT_PH_NBR="(409)336-2244" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="3/10/2022" CNSTR_PCT_TIME_USED="84.75" CNSTR_PCT_COMPLETE="89.66" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="1857735.50" CNSTR_SPENT_AMT="38273730.99" CE_SPENT_AMT="2052813.26" TOT_SPENT_AMT="42184279.75" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="14000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803108" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="HARRIS COUNTY LINE, EAST" LIMITS_TO_DSCR="UPRR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2829817" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.000 (mi)" TXDOT_CNTCT_NM="Roberto Rodriguez, P.E." TXDOT_CNTCT_PH_NBR="(409)336-2244" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="3/10/2022" CNSTR_PCT_TIME_USED="84.75" CNSTR_PCT_COMPLETE="89.66" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="54949.79" CNSTR_SPENT_AMT="3025363.24" CE_SPENT_AMT="268712.83" TOT_SPENT_AMT="3349025.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803109" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="SH 146(W), EAST" LIMITS_TO_DSCR="0.44 MI E OF FM 1409" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/9/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1615491" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="3/1/2022" PSE_30_ACTL_DT="3/1/2022" PSE_60_TRGT_DT="3/31/2022" PSE_60_ACTL_DT="3/31/2022" PSE_100_TRGT_DT="5/27/2022" PSE_100_ACTL_DT="5/27/2022" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.968 (mi)" TXDOT_CNTCT_NM="Roberto Rodriguez, P.E." TXDOT_CNTCT_PH_NBR="(409)336-2244" CNSTR_CMPNY_NM="VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="10/19/2022" CNSTR_PCT_TIME_USED="101.72" CNSTR_PCT_COMPLETE="101.30" DSGN_START_TRGT_DT="1/31/2022" DSGN_START_ACTL_DT="1/31/2022" ENVCLR_TRGT_DT="5/4/2022" ENVCLR_ACTL_DT="5/4/2022" UTIL_TRGT_DT="5/15/2022" UTIL_ACTL_DT="5/15/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/27/2022" RTL_ACTL_DT="5/30/2022" PE_SPENT_AMT="283709.27" CNSTR_SPENT_AMT="1207027.93" CE_SPENT_AMT="12977.43" TOT_SPENT_AMT="1503714.63" FUND_CAT1_DSCR="Category 11 - District Discretionary (2211)" FUND_CAT1_AMT="1928169.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="SH 146, EAST" LIMITS_TO_DSCR="S.COLBERT ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="336017" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="8/8/2019" PSE_30_ACTL_DT="8/8/2019" PSE_60_TRGT_DT="11/16/2019" PSE_60_ACTL_DT="12/16/2019" PSE_100_TRGT_DT="4/16/2020" PSE_100_ACTL_DT="5/15/2020" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.806 (mi)" TXDOT_CNTCT_NM="Roberto Rodriguez, P.E." TXDOT_CNTCT_PH_NBR="(409)336-2244" CNSTR_CMPNY_NM="TRIPLE B SERVICES LLP" CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="1/11/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="90.48" DSGN_START_TRGT_DT="5/1/2019" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="3/29/2020" ENVCLR_ACTL_DT="3/29/2020" UTIL_TRGT_DT="10/22/2019" UTIL_ACTL_DT="10/22/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/16/2020" RTL_ACTL_DT="5/15/2020" PE_SPENT_AMT="7230.17" CNSTR_SPENT_AMT="1020228.84" CE_SPENT_AMT="11057.03" TOT_SPENT_AMT="1038516.04" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="82930.00" FUND_CAT2_DSCR="Category 10 - Curb Ramp Program (2110CR)" FUND_CAT2_PID="ADA" FUND_CAT2_AMT="930929.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803111" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="AT UP RAILROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27266206" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="6/26/2023" PSE_30_ACTL_DT="12/7/2022" PSE_60_TRGT_DT="12/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.769 (mi)" TXDOT_CNTCT_NM="Roberto Rodriguez, P.E." TXDOT_CNTCT_PH_NBR="(409)336-2244" CNSTR_CMPNY_NM="SER CONSTRUCTION PARTNERS, LLC" CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="10/30/2022" DSGN_START_ACTL_DT="3/16/2023" ENVCLR_TRGT_DT="1/12/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2551387.39" CE_SPENT_AMT="13605.37" TOT_SPENT_AMT="2564992.76" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="1106391.00" FUND_CAT2_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT2_AMT="86502.00" FUND_CAT3_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT3_AMT="118606.00" FUND_CAT4_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT4_AMT="30138099.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803116" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="0.42 MI EAST OF FM 1409" LIMITS_TO_DSCR="1.65 MI WEST OF LP 227" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1654703" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.620 (mi)" TXDOT_CNTCT_NM="Roberto Rodriguez, P.E." TXDOT_CNTCT_PH_NBR="(409)336-2244" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="12/2/2024" CNSTR_PCT_TIME_USED="71.05" CNSTR_PCT_COMPLETE="95.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1583671.85" CE_SPENT_AMT="3891.37" TOT_SPENT_AMT="1587563.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1413101.00" FUND_CAT2_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT2_PID="PES" FUND_CAT2_AMT="840000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803117" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803118" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="EASTBOUND CR 493 / ROLKE ROAD" LIMITS_TO_DSCR="WESTBOUND CR 492 /ROLKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="528666" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.280 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="549813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803119" PT_PHASE="Construction begins within 4 years" CNTY_NM="Liberty" LIMITS_FROM_DSCR="AT TRINITY RIVER BRIDGE" LIMITS_TO_DSCR="(STR 201460002803128)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="708835" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.280 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="708835.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002803120" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002804069" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="FM 160, EAST" LIMITS_TO_DSCR="SH 61" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="98214287" DIST_LET_DATE="2/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/29/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.781 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/23/2018" DSGN_START_ACTL_DT="7/23/2018" ENVCLR_TRGT_DT="4/17/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/19/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/29/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5413212.31" CNSTR_SPENT_AMT="37114.30" TOT_SPENT_AMT="5450326.61" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="70000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW4" FUND_CAT2_AMT="24310000.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="1689838.00" FUND_CAT4_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT4_AMT="14000162.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002804077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="FM 563" LIMITS_TO_DSCR="FM 160" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="31250000" DIST_LET_DATE="2/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/29/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.382 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/23/2018" DSGN_START_ACTL_DT="7/23/2018" ENVCLR_TRGT_DT="4/17/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/19/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/29/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1960378.70" TOT_SPENT_AMT="1960378.70" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="PER" FUND_CAT1_AMT="26750000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="8250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002804082" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="SH 146, EAST" LIMITS_TO_DSCR="SH 61" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1057982" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/3/2023" PSE_30_ACTL_DT="1/18/2023" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.482 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="44.00" CNSTR_PCT_COMPLETE="91.57" DSGN_START_TRGT_DT="3/5/2023" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="6/17/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1155387.12" CE_SPENT_AMT="16058.46" TOT_SPENT_AMT="1171445.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1365201.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002804083" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="TRINITY RIVER BRIDGE, EAST" LIMITS_TO_DSCR="0.14 MI. W. OF SH 146 N." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5010800" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.613 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14018.52" TOT_SPENT_AMT="14018.52" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002804084" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="FM 2830, EAST" LIMITS_TO_DSCR="FM 770 NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3260000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.538 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3520800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002805057" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Liberty" LIMITS_FROM_DSCR="0.406 MILES WEST OF FM 1009" LIMITS_TO_DSCR="0.36 MILES WEST OF JEFFERSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="404078" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.605 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="436404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT FM 364" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="152495" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.020 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="33347.18" CNSTR_SPENT_AMT="534406.33" CE_SPENT_AMT="22549.38" TOT_SPENT_AMT="590302.89" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="152032.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806084" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT FM 364" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42074" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.020 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="5554.75" CNSTR_SPENT_AMT="148491.29" CE_SPENT_AMT="6892.97" TOT_SPENT_AMT="160939.01" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="29880.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="MEEKER RD, EAST" LIMITS_TO_DSCR="FM 364" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2866356" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/3/2023" PSE_30_ACTL_DT="1/18/2023" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.446 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/6/2023" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="44.00" CNSTR_PCT_COMPLETE="91.57" DSGN_START_TRGT_DT="3/5/2023" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="6/17/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14179.82" CNSTR_SPENT_AMT="782347.34" CE_SPENT_AMT="10873.69" TOT_SPENT_AMT="807400.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2518815.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="LIBERTY COUNTY LINE" LIMITS_TO_DSCR="0.38 MILES EAST OF FM 365(EB ONLY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1860058" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/28/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.582 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="4/30/2025" CNSTR_PCT_TIME_USED="31.67" CNSTR_PCT_COMPLETE="75.91" DSGN_START_TRGT_DT="3/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3907.70" CNSTR_SPENT_AMT="7568355.76" CE_SPENT_AMT="162.35" TOT_SPENT_AMT="7572425.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1161672.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806090" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="HOWARD ST., EAST" LIMITS_TO_DSCR="FM 364" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2959261" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/27/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.975 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="265797.14" TOT_SPENT_AMT="265797.14" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3196002.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="0.37 MI E OF FM 365" LIMITS_TO_DSCR="3.22 MI EAST (EASTBOUND)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4493709" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/27/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.076 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="108500.16" TOT_SPENT_AMT="108500.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="3061075.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806093" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="KEITH ROAD, EAST" LIMITS_TO_DSCR="WOOTEN ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="147953" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/27/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.569 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26321.56" TOT_SPENT_AMT="26321.56" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="165707.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806094" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="0.1 MI W OF KEITH" LIMITS_TO_DSCR="0.1 MI E OF KEITH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="277353" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/27/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3053.24" TOT_SPENT_AMT="3053.24" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="310635.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806095" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="0.1 MI W OF WOOTEN" LIMITS_TO_DSCR="0.1 MI E OF WOOTEN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="303118" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/27/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.199 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6706.74" TOT_SPENT_AMT="6706.74" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="339492.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806096" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="LIBERTY COUNTY LINE, EAST" LIMITS_TO_DSCR="HOWARD STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7000000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/31/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/27/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.317 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="201812.25" TOT_SPENT_AMT="201812.25" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002806097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="4.65 MILES EAST OF FM 365, EAST" LIMITS_TO_DSCR="MEEKER RD.(EB ONLY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="159416" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/28/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.162 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="4/30/2025" CNSTR_PCT_TIME_USED="31.67" CNSTR_PCT_COMPLETE="75.91" DSGN_START_TRGT_DT="3/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="432.16" TOT_SPENT_AMT="432.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="237427.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002807056" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT LANGHAM RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="179642" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="21089.12" CNSTR_SPENT_AMT="191314.54" CE_SPENT_AMT="27051.21" TOT_SPENT_AMT="239454.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="181548.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002807057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT LINDBERGH DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="193171" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="21172.11" CNSTR_SPENT_AMT="213104.21" CE_SPENT_AMT="29374.64" TOT_SPENT_AMT="263650.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="157253.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002807058" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="S MAJOR DRIVE, EAST" LIMITS_TO_DSCR="IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="405482" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="6/30/2020" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="11/2/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.299 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/14/2021" CNSTR_PCT_TIME_USED="94.87" CNSTR_PCT_COMPLETE="113.24" DSGN_START_TRGT_DT="5/4/2020" DSGN_START_ACTL_DT="5/4/2020" ENVCLR_TRGT_DT="11/6/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/6/2020" UTIL_ACTL_DT="5/6/2020" ROW_TRGT_DT="5/5/2020" ROW_ACTL_DT="5/5/2020" RTL_TRGT_DT="11/6/2020" RTL_ACTL_DT="11/19/2020" CNSTR_SPENT_AMT="497449.58" CE_SPENT_AMT="290597.96" TOT_SPENT_AMT="788047.54" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1138510.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="2/6/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002809123" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="EAST OF NECHES RIVER BRIDGE, EAST" LIMITS_TO_DSCR="FM 105" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2887472" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" PE_SPENT_AMT="69359.10" CNSTR_SPENT_AMT="2757537.52" CE_SPENT_AMT="7206.12" TOT_SPENT_AMT="2834102.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2330856.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002811207" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="AT SH 62" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="124473" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="6/1/2020" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="6/30/2020" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="11/2/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/14/2021" CNSTR_PCT_TIME_USED="94.87" CNSTR_PCT_COMPLETE="113.24" DSGN_START_TRGT_DT="5/4/2020" DSGN_START_ACTL_DT="5/4/2020" ENVCLR_TRGT_DT="11/6/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/6/2020" UTIL_ACTL_DT="5/6/2020" ROW_TRGT_DT="5/5/2020" ROW_ACTL_DT="5/5/2020" RTL_TRGT_DT="11/6/2020" RTL_ACTL_DT="11/19/2020" CNSTR_SPENT_AMT="136287.30" CE_SPENT_AMT="99578.43" TOT_SPENT_AMT="235865.73" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="136932.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="2/6/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002811209" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="0.13 MILES EAST OF FM 105(FRTG RD), EAST" LIMITS_TO_DSCR="0.4 MILES EAST OF KCS RR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="298073" DIST_LET_DATE="9/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002811211" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="1.5 MILES WEST OF FM 1132, EAST" LIMITS_TO_DSCR="FM 1132 (EB ONLY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30613" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002813135" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="HOLLYWOOD OVERPASS, EAST" LIMITS_TO_DSCR="7TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/7/2029" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="533247313" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/17/2022" PSE_30_ACTL_DT="8/8/2022" PSE_60_TRGT_DT="11/11/2022" PSE_60_ACTL_DT="3/14/2023" PSE_100_TRGT_DT="10/26/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.456 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="6/5/2024" CNSTR_WKBG_DT="7/10/2024" CNSTR_PCT_TIME_USED="1.76" CNSTR_PCT_COMPLETE="23.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/4/2020" ENVCLR_ACTL_DT="8/4/2020" UTIL_TRGT_DT="10/27/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21736014.54" CNSTR_SPENT_AMT="125598328.67" CE_SPENT_AMT="1445751.93" TOT_SPENT_AMT="148780095.14" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="ADM" FUND_CAT1_AMT="287749999.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="158460758.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002813139" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="US 90, EAST" LIMITS_TO_DSCR="HOLLYWOOD OVERPASS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/27/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3040257" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/13/2020" PSE_30_ACTL_DT="1/28/2021" PSE_60_TRGT_DT="2/8/2021" PSE_60_ACTL_DT="2/9/2021" PSE_100_TRGT_DT="4/23/2021" PSE_100_ACTL_DT="9/30/2021" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.474 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="4/4/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="33.06" CNSTR_PCT_COMPLETE="45.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/4/2020" ENVCLR_ACTL_DT="8/4/2020" UTIL_TRGT_DT="5/3/2021" UTIL_ACTL_DT="1/13/2022" ROW_TRGT_DT="5/3/2021" ROW_ACTL_DT="1/3/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="1/13/2022" CNSTR_SPENT_AMT="1404000.00" CE_SPENT_AMT="80807.03" TOT_SPENT_AMT="1484807.03" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002813141" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="US 90, EAST" LIMITS_TO_DSCR="PINE ST." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/20/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="916598" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/5/2021" PSE_30_ACTL_DT="9/5/2021" PSE_60_TRGT_DT="10/5/2021" PSE_60_ACTL_DT="10/5/2021" PSE_100_TRGT_DT="12/1/2021" PSE_100_ACTL_DT="12/1/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.510 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="4/12/2022" CNSTR_WKBG_DT="5/14/2022" CNSTR_PCT_TIME_USED="91.67" CNSTR_PCT_COMPLETE="95.85" DSGN_START_TRGT_DT="8/7/2021" DSGN_START_ACTL_DT="8/7/2021" ENVCLR_TRGT_DT="11/8/2021" ENVCLR_ACTL_DT="11/8/2021" UTIL_TRGT_DT="11/19/2021" UTIL_ACTL_DT="11/19/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2021" RTL_ACTL_DT="12/3/2021" PE_SPENT_AMT="235.00" CNSTR_SPENT_AMT="1267012.61" CE_SPENT_AMT="317583.48" TOT_SPENT_AMT="1584831.09" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="768700.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002813142" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="US 90, EAST" LIMITS_TO_DSCR="AT UPRR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="83928571" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/17/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/6/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/22/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.029 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/12/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/24/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/2/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/6/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="743.60" TOT_SPENT_AMT="743.60" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="47500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002813143" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="0.3 MILES EAST OF SPUR 380, EAST" LIMITS_TO_DSCR="WEST OF NECHES RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="969969" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="10/17/2022" PSE_30_ACTL_DT="10/17/2022" PSE_60_TRGT_DT="1/4/2023" PSE_60_ACTL_DT="1/4/2023" PSE_100_TRGT_DT="5/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.559 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THE TRUESDELL CORPORATION" CNSTR_NTPD_DT="9/8/2023" CNSTR_WKBG_DT="11/1/2023" CNSTR_PCT_TIME_USED="56.00" CNSTR_PCT_COMPLETE="87.51" DSGN_START_TRGT_DT="9/12/2022" DSGN_START_ACTL_DT="9/12/2022" ENVCLR_TRGT_DT="2/23/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/30/2022" UTIL_ACTL_DT="12/30/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/2/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="513.99" CNSTR_SPENT_AMT="1120283.50" CE_SPENT_AMT="16915.02" TOT_SPENT_AMT="1137712.51" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="1845410.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002814091" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="0.54 MILES EAST OF FM 3247" LIMITS_TO_DSCR="SABINE RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/24/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52363934" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/24/2018" PSE_30_ACTL_DT="8/24/2018" PSE_60_TRGT_DT="4/20/2019" PSE_60_ACTL_DT="4/20/2019" PSE_100_TRGT_DT="12/14/2019" PSE_100_ACTL_DT="12/14/2019" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.187 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="9/16/2020" CNSTR_PCT_TIME_USED="86.45" CNSTR_PCT_COMPLETE="84.80" DSGN_START_TRGT_DT="4/2/2018" DSGN_START_ACTL_DT="4/2/2018" ENVCLR_TRGT_DT="11/7/2019" ENVCLR_ACTL_DT="11/7/2019" UTIL_TRGT_DT="10/12/2019" UTIL_ACTL_DT="10/12/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2019" RTL_ACTL_DT="12/15/2019" PE_SPENT_AMT="1164076.95" CNSTR_SPENT_AMT="47314795.22" CE_SPENT_AMT="4681437.89" TOT_SPENT_AMT="53160310.06" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="18400000.00" FUND_CAT2_DSCR="Category 2U - Urban Area Corridor (1902U)" FUND_CAT2_AMT="31670000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002814116" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="AT SABINE RIVER" LIMITS_TO_DSCR="._(EAST BOUND)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/20/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2353382" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="7/8/2019" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="12/2/2019" PSE_60_ACTL_DT="8/10/2020" PSE_100_TRGT_DT="7/21/2020" PSE_100_ACTL_DT="10/1/2020" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.231 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="3/13/2023" CNSTR_WKBG_DT="8/9/2023" CNSTR_PCT_TIME_USED="21.36" CNSTR_PCT_COMPLETE="20.47" DSGN_START_TRGT_DT="2/13/2019" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="9/27/2020" ENVCLR_ACTL_DT="12/21/2020" UTIL_TRGT_DT="9/21/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/27/2020" RTL_ACTL_DT="11/27/2020" PE_SPENT_AMT="130931.77" CNSTR_SPENT_AMT="970785.24" CE_SPENT_AMT="4609.25" TOT_SPENT_AMT="1106326.26" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="2072057.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="1163312.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002814117" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="AT SABINE RIVER" LIMITS_TO_DSCR=". (WEST BOUND)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/20/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2388859" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="7/8/2019" PSE_30_ACTL_DT="6/1/2020" PSE_60_TRGT_DT="12/2/2019" PSE_60_ACTL_DT="8/10/2020" PSE_100_TRGT_DT="7/21/2020" PSE_100_ACTL_DT="10/1/2020" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.231 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="3/13/2023" CNSTR_WKBG_DT="8/9/2023" CNSTR_PCT_TIME_USED="21.36" CNSTR_PCT_COMPLETE="20.47" DSGN_START_TRGT_DT="2/13/2019" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="9/27/2020" ENVCLR_ACTL_DT="12/21/2020" UTIL_TRGT_DT="9/21/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/27/2020" RTL_ACTL_DT="11/27/2020" PE_SPENT_AMT="41515.66" CE_SPENT_AMT="6167.60" TOT_SPENT_AMT="47683.26" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1826609.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="1810311.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002814121" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Orange" LIMITS_FROM_DSCR="FM 3247, EAST" LIMITS_TO_DSCR="SH 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002814122" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002815059" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 90-Y" CNTY_NM="Orange" LIMITS_FROM_DSCR="16TH STREET, EAST" LIMITS_TO_DSCR="SIMMONS DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2977919" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="10/4/2021" PSE_30_ACTL_DT="10/4/2021" PSE_60_TRGT_DT="11/8/2021" PSE_60_ACTL_DT="11/8/2021" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="11/22/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.187 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/13/2023" CNSTR_WKBG_DT="5/12/2023" CNSTR_PCT_TIME_USED="108.05" CNSTR_PCT_COMPLETE="97.29" DSGN_START_TRGT_DT="8/24/2021" DSGN_START_ACTL_DT="8/24/2021" ENVCLR_TRGT_DT="1/24/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/21/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2022" RTL_ACTL_DT="11/22/2022" PE_SPENT_AMT="17468.92" CNSTR_SPENT_AMT="2994575.34" CE_SPENT_AMT="71887.74" TOT_SPENT_AMT="3083932.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2692308.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002815062" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 90-Y" CNTY_NM="Orange" LIMITS_FROM_DSCR="SIMMONS DRIVE, NORTH" LIMITS_TO_DSCR="1.62 MILES NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5100000" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.620 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="334.21" TOT_SPENT_AMT="334.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="5100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002815063" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002901030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 464" LIMITS_TO_DSCR="BS 123B" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75530" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.335 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="37.15" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="85.27" TOT_SPENT_AMT="85.27" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="153929.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002901031" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="UA 90A" LIMITS_TO_DSCR="PREXY DR." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="102880" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.286 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="115226.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002902057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="BS 123B" LIMITS_TO_DSCR="SH 123" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50020" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/3/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.397 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="37.15" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="56.37" TOT_SPENT_AMT="56.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="90105.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002902058" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="AT HEIDEKE ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="302580" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/13/2022" PSE_30_ACTL_DT="10/13/2022" PSE_60_TRGT_DT="11/10/2022" PSE_60_ACTL_DT="11/10/2022" PSE_100_TRGT_DT="1/2/2023" PSE_100_ACTL_DT="12/22/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="5/17/2023" CNSTR_WKBG_DT="9/11/2023" CNSTR_PCT_TIME_USED="98.71" CNSTR_PCT_COMPLETE="105.72" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="1/30/2023" UTIL_TRGT_DT="1/2/2023" UTIL_ACTL_DT="12/22/2022" ROW_TRGT_DT="1/2/2023" ROW_ACTL_DT="12/22/2022" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="1/30/2023" PE_SPENT_AMT="26508.86" CNSTR_SPENT_AMT="390939.60" CE_SPENT_AMT="42146.38" TOT_SPENT_AMT="459594.84" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="341773.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002902060" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="SH 123" LIMITS_TO_DSCR="CALDWELL C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="998593" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="16.316 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1118424.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002903055" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Caldwell" LIMITS_FROM_DSCR="SOUTH MESQUITE" LIMITS_TO_DSCR="0.20 W OF PLUM CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5474610" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Diana Schulze, P.E." TXDOT_CNTCT_PH_NBR="(512)321-2195" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="78887.13" TOT_SPENT_AMT="78887.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="5474610.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002903056" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 90" CNTY_NM="Caldwell" LIMITS_FROM_DSCR="AT SAN MARCOS RIVER" LIMITS_TO_DSCR="#14-028-0-0029-03-009." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1697888" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1333.70" TOT_SPENT_AMT="1333.70" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1901634.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002903057" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="002905028" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 90" CNTY_NM="Gonzales" LIMITS_FROM_DSCR="CALDWELL C/L" LIMITS_TO_DSCR="WAELDER C-L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="977830" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.906 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="5/28/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="12.79" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1098.04" CNSTR_SPENT_AMT="192225.73" CE_SPENT_AMT="432.53" TOT_SPENT_AMT="193756.30" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1373525.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003005066" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 60" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="C&amp;G NORTH OF CANADIAN" LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/19/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1602281" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="5/13/2022" PSE_30_ACTL_DT="5/13/2022" PSE_60_TRGT_DT="5/17/2022" PSE_60_ACTL_DT="5/17/2022" PSE_100_TRGT_DT="8/1/2022" PSE_100_ACTL_DT="8/11/2022" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.588 (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="12/5/2022" CNSTR_WKBG_DT="7/17/2023" CNSTR_PCT_TIME_USED="87.32" CNSTR_PCT_COMPLETE="100.91" DSGN_START_TRGT_DT="4/15/2022" DSGN_START_ACTL_DT="4/15/2022" ENVCLR_TRGT_DT="8/1/2022" ENVCLR_ACTL_DT="7/26/2022" UTIL_TRGT_DT="8/1/2022" UTIL_ACTL_DT="8/1/2022" ROW_TRGT_DT="6/30/2022" ROW_ACTL_DT="6/30/2022" RTL_TRGT_DT="8/26/2022" RTL_ACTL_DT="8/19/2022" PE_SPENT_AMT="8483.21" CNSTR_SPENT_AMT="1904017.62" CE_SPENT_AMT="48798.76" TOT_SPENT_AMT="1961299.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1665552.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003005073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 60" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="AT CANADIAN RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/16/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1928685" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="4/29/2021" PSE_30_ACTL_DT="4/29/2021" PSE_60_TRGT_DT="6/24/2021" PSE_60_ACTL_DT="9/15/2021" PSE_100_TRGT_DT="11/1/2021" PSE_100_ACTL_DT="12/6/2021" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.566 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="4/19/2022" CNSTR_WKBG_DT="3/27/2023" CNSTR_PCT_TIME_USED="91.13" CNSTR_PCT_COMPLETE="104.30" DSGN_START_TRGT_DT="4/1/2021" DSGN_START_ACTL_DT="4/1/2021" ENVCLR_TRGT_DT="11/1/2021" ENVCLR_ACTL_DT="11/22/2021" UTIL_TRGT_DT="11/1/2021" UTIL_ACTL_DT="9/16/2021" ROW_TRGT_DT="7/29/2021" ROW_ACTL_DT="7/29/2021" RTL_TRGT_DT="12/1/2021" RTL_ACTL_DT="12/22/2021" PE_SPENT_AMT="60058.04" CNSTR_SPENT_AMT="2094073.04" CE_SPENT_AMT="41394.56" TOT_SPENT_AMT="2195525.64" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="2750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003005074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="LIPSCOMB COUNTY LINE" LIMITS_TO_DSCR="HORSE CREEK" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="632200" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="2/13/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="9.17" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="256.55" CE_SPENT_AMT="2.88" TOT_SPENT_AMT="259.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="536636.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003006060" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 60" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="BIRCH STREET IN CANADIAN" LIMITS_TO_DSCR="FM 2388" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13300305" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/8/2017" PSE_30_ACTL_DT="12/22/2017" PSE_60_TRGT_DT="6/8/2018" PSE_60_ACTL_DT="6/11/2018" PSE_100_TRGT_DT="4/29/2019" PSE_100_ACTL_DT="6/3/2019" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.850 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="5/11/2023" CNSTR_PCT_TIME_USED="98.03" CNSTR_PCT_COMPLETE="97.84" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="4/29/2019" ENVCLR_ACTL_DT="3/19/2019" UTIL_TRGT_DT="10/15/2021" UTIL_ACTL_DT="12/12/2022" ROW_TRGT_DT="11/7/2018" ROW_ACTL_DT="11/7/2018" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="12/12/2022" PE_SPENT_AMT="1170254.23" CNSTR_SPENT_AMT="13589038.88" CE_SPENT_AMT="321710.83" TOT_SPENT_AMT="15081003.94" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="343000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="9582813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003006067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 60" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="FM 2388" LIMITS_TO_DSCR="C&amp;G N OF CANADIAN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="105296" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/8/2017" PSE_30_ACTL_DT="12/22/2017" PSE_60_TRGT_DT="6/8/2018" PSE_60_ACTL_DT="6/11/2018" PSE_100_TRGT_DT="4/29/2019" PSE_100_ACTL_DT="6/3/2019" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="5/11/2023" CNSTR_PCT_TIME_USED="98.03" CNSTR_PCT_COMPLETE="97.84" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="4/29/2019" ENVCLR_ACTL_DT="3/19/2019" UTIL_TRGT_DT="10/15/2021" UTIL_ACTL_DT="12/12/2022" ROW_TRGT_DT="11/7/2018" ROW_ACTL_DT="11/7/2018" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="12/12/2022" PE_SPENT_AMT="2009.60" CNSTR_SPENT_AMT="181863.48" CE_SPENT_AMT="3392.17" TOT_SPENT_AMT="187265.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="30000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003007022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="FM 277" LIMITS_TO_DSCR="WHEELER COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/19/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3780349" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="5/13/2022" PSE_30_ACTL_DT="5/13/2022" PSE_60_TRGT_DT="5/17/2022" PSE_60_ACTL_DT="5/17/2022" PSE_100_TRGT_DT="8/1/2022" PSE_100_ACTL_DT="8/11/2022" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.340 (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="12/5/2022" CNSTR_WKBG_DT="7/17/2023" CNSTR_PCT_TIME_USED="87.32" CNSTR_PCT_COMPLETE="100.91" DSGN_START_TRGT_DT="4/15/2022" DSGN_START_ACTL_DT="4/15/2022" ENVCLR_TRGT_DT="8/1/2022" ENVCLR_ACTL_DT="7/26/2022" UTIL_TRGT_DT="8/1/2022" UTIL_ACTL_DT="8/1/2022" ROW_TRGT_DT="6/30/2022" ROW_ACTL_DT="6/30/2022" RTL_TRGT_DT="8/26/2022" RTL_ACTL_DT="8/19/2022" PE_SPENT_AMT="42879.83" CNSTR_SPENT_AMT="3740861.13" CE_SPENT_AMT="93517.09" TOT_SPENT_AMT="3877258.05" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="3918342.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003007023" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Hemphill" LIMITS_FROM_DSCR="FM 277" LIMITS_TO_DSCR="WHEELER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="320400" DIST_LET_DATE="11/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/4/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/25/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/25/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/25/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/25/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/30/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="346032.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003008038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Wheeler" LIMITS_FROM_DSCR="@ SWEETWATER CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5746110" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/4/2022" PSE_30_ACTL_DT="8/1/2022" PSE_60_TRGT_DT="4/4/2022" PSE_60_ACTL_DT="11/1/2022" PSE_100_TRGT_DT="4/4/2022" PSE_100_ACTL_DT="4/26/2023" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="EARTH BUILDERS, L.P." CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="3/11/2024" CNSTR_PCT_TIME_USED="63.84" CNSTR_PCT_COMPLETE="62.13" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="4/4/2022" ENVCLR_TRGT_DT="4/4/2022" ENVCLR_ACTL_DT="3/2/2023" UTIL_TRGT_DT="4/4/2022" UTIL_ACTL_DT="12/7/2022" ROW_TRGT_DT="4/4/2022" ROW_ACTL_DT="2/28/2023" RTL_TRGT_DT="4/4/2022" RTL_ACTL_DT="4/26/2023" PE_SPENT_AMT="223228.65" CNSTR_SPENT_AMT="6662796.26" CE_SPENT_AMT="39487.78" TOT_SPENT_AMT="6925512.69" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003008040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Wheeler" LIMITS_FROM_DSCR="HEMPHILL C/L, SOUTH" LIMITS_TO_DSCR="SH 152" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1141360" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3875.74" TOT_SPENT_AMT="3875.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1232669.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003101022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Wheeler" LIMITS_FROM_DSCR="CR 15, SOUTH" LIMITS_TO_DSCR="COLLINGSWORTH C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2011072" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/20/2021" PSE_30_ACTL_DT="9/16/2021" PSE_60_TRGT_DT="10/1/2021" PSE_60_ACTL_DT="5/6/2022" PSE_100_TRGT_DT="11/19/2021" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="1/12/2023" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="88.09" CNSTR_PCT_COMPLETE="103.41" DSGN_START_TRGT_DT="6/21/2021" DSGN_START_ACTL_DT="8/16/2021" ENVCLR_TRGT_DT="11/5/2021" ENVCLR_ACTL_DT="8/4/2022" UTIL_TRGT_DT="6/21/2021" UTIL_ACTL_DT="6/6/2022" ROW_TRGT_DT="6/21/2021" ROW_ACTL_DT="6/6/2022" RTL_TRGT_DT="11/19/2021" RTL_ACTL_DT="8/5/2022" PE_SPENT_AMT="460780.36" CNSTR_SPENT_AMT="2310279.10" CE_SPENT_AMT="8084.10" TOT_SPENT_AMT="2779143.56" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="1860356.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="488316.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003101024" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Wheeler" LIMITS_FROM_DSCR="CR SC (CR 15), NORTH" LIMITS_TO_DSCR="BUS IH 40" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1600000" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="5/22/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/20/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/2/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/15/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/29/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10292.54" TOT_SPENT_AMT="10292.54" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="1792000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003102029" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Collingsworth" LIMITS_FROM_DSCR="WHEELER C/L, SOUTH" LIMITS_TO_DSCR="7.551 MILES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6427153" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/20/2021" PSE_30_ACTL_DT="9/16/2021" PSE_60_TRGT_DT="10/1/2021" PSE_60_ACTL_DT="5/6/2022" PSE_100_TRGT_DT="11/19/2021" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="1/12/2023" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="88.09" CNSTR_PCT_COMPLETE="103.41" DSGN_START_TRGT_DT="6/21/2021" DSGN_START_ACTL_DT="8/16/2021" ENVCLR_TRGT_DT="11/5/2021" ENVCLR_ACTL_DT="8/4/2022" UTIL_TRGT_DT="6/21/2021" UTIL_ACTL_DT="6/6/2022" ROW_TRGT_DT="6/21/2021" ROW_ACTL_DT="6/6/2022" RTL_TRGT_DT="11/19/2021" RTL_ACTL_DT="8/5/2022" PE_SPENT_AMT="7073.50" CNSTR_SPENT_AMT="6289563.65" CE_SPENT_AMT="90309.21" TOT_SPENT_AMT="6386946.36" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="6344000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="83152.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003103044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Collingsworth" LIMITS_FROM_DSCR="7.551 MILES SOUTH OF WHEELER C/L, S" LIMITS_TO_DSCR="FM 1439" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/6/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3753664" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/20/2021" PSE_30_ACTL_DT="9/16/2021" PSE_60_TRGT_DT="10/1/2021" PSE_60_ACTL_DT="5/6/2022" PSE_100_TRGT_DT="11/19/2021" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="1/12/2023" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="88.09" CNSTR_PCT_COMPLETE="103.41" DSGN_START_TRGT_DT="6/21/2021" DSGN_START_ACTL_DT="8/16/2021" ENVCLR_TRGT_DT="11/5/2021" ENVCLR_ACTL_DT="8/4/2022" UTIL_TRGT_DT="6/21/2021" UTIL_ACTL_DT="6/6/2022" ROW_TRGT_DT="6/21/2021" ROW_ACTL_DT="6/6/2022" RTL_TRGT_DT="11/19/2021" RTL_ACTL_DT="8/5/2022" PE_SPENT_AMT="5739.06" CNSTR_SPENT_AMT="3848131.12" CE_SPENT_AMT="53477.30" TOT_SPENT_AMT="3907347.48" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="1456000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="1843621.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="454044.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003103047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Collingsworth" LIMITS_FROM_DSCR="865' NORTH OF SALT FORK RR BRIDGE, NORTH" LIMITS_TO_DSCR="4.190 MILES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="315262" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="353093.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003104057" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Collingsworth" LIMITS_FROM_DSCR="PIONEER PARK, SOUTH" LIMITS_TO_DSCR="WELLINGTON NCL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13000000" DIST_LET_DATE="2/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="14560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003104058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003105047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 62" CNTY_NM="Childress" LIMITS_FROM_DSCR="RED RIVER BRIDGE, NORTH" LIMITS_TO_DSCR="1968' SOUTH OF US 62" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="640678" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="11/28/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="61.40" CNSTR_PCT_COMPLETE="109.22" DSGN_START_TRGT_DT="11/28/2022" DSGN_START_ACTL_DT="11/28/2022" ENVCLR_TRGT_DT="11/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/28/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/28/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="490.13" CNSTR_SPENT_AMT="736617.00" CE_SPENT_AMT="9596.57" TOT_SPENT_AMT="746703.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="596472.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003105048" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003106034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Childress" LIMITS_FROM_DSCR="US 287, NORTH" LIMITS_TO_DSCR="RED RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="809600" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5483.49" TOT_SPENT_AMT="5483.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="841984.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003202035" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Cottle" LIMITS_FROM_DSCR="CHILDRESS C/L, SOUTH" LIMITS_TO_DSCR="7.631 MILES SOUTH OF CHILDRESS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="691114" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="774048.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003203040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Cottle" LIMITS_FROM_DSCR="7.631 MILES SOUTH OF CHILDRESS C/L, S" LIMITS_TO_DSCR="US 62/70 INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1190970" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1333886.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003204034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Cottle" LIMITS_FROM_DSCR="FM 1038, SOUTH" LIMITS_TO_DSCR="KING C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14847000" DIST_LET_DATE="7/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="997320.32" TOT_SPENT_AMT="997320.32" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="16628640.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003205044" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="King" LIMITS_FROM_DSCR="COTTLE C/L, SOUTH" LIMITS_TO_DSCR="4TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17769000" DIST_LET_DATE="7/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1177749.23" TOT_SPENT_AMT="1177749.23" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="19901280.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003206040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="King" LIMITS_FROM_DSCR="US 82 OVERPASS, SOUTH" LIMITS_TO_DSCR="STONEWALL C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17400001" DIST_LET_DATE="7/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1128277.69" TOT_SPENT_AMT="1128277.69" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="19488000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003207029" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="KING COUNTY LINE" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18131775" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/8/2013" PSE_30_ACTL_DT="8/8/2013" PSE_60_TRGT_DT="10/31/2013" PSE_60_ACTL_DT="10/31/2013" PSE_100_TRGT_DT="1/17/2014" PSE_100_ACTL_DT="1/17/2014" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="15.516 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="DELHUR INDUSTRIES, INC." CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/20/2013" DSGN_START_ACTL_DT="3/20/2013" ENVCLR_TRGT_DT="2/6/2014" ENVCLR_ACTL_DT="2/6/2014" UTIL_TRGT_DT="3/16/2021" UTIL_ACTL_DT="3/16/2021" ROW_TRGT_DT="1/17/2014" ROW_ACTL_DT="1/17/2014" RTL_TRGT_DT="11/5/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="1284571.78" CNSTR_SPENT_AMT="16775405.80" CE_SPENT_AMT="754327.87" TOT_SPENT_AMT="18814305.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="21700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003207036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1006572" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="9/9/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/25/2021" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/9/2021" CNSTR_PCT_TIME_USED="95.49" CNSTR_PCT_COMPLETE="101.27" DSGN_START_TRGT_DT="6/15/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/25/2021" ENVCLR_ACTL_DT="12/31/2020" UTIL_TRGT_DT="2/25/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/25/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/25/2021" RTL_ACTL_DT="3/4/2021" CNSTR_SPENT_AMT="1198640.89" CE_SPENT_AMT="31825.20" TOT_SPENT_AMT="1230466.09" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="465000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003301038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="FISHER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11546267" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/8/2013" PSE_30_ACTL_DT="8/8/2013" PSE_60_TRGT_DT="10/31/2013" PSE_60_ACTL_DT="10/31/2013" PSE_100_TRGT_DT="1/20/2014" PSE_100_ACTL_DT="1/20/2014" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="13.133 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="4/28/2022" CNSTR_PCT_TIME_USED="99.76" CNSTR_PCT_COMPLETE="95.74" DSGN_START_TRGT_DT="3/20/2013" DSGN_START_ACTL_DT="3/20/2013" ENVCLR_TRGT_DT="2/6/2014" ENVCLR_ACTL_DT="2/6/2014" UTIL_TRGT_DT="3/16/2021" UTIL_ACTL_DT="3/16/2021" ROW_TRGT_DT="1/20/2014" ROW_ACTL_DT="1/20/2014" RTL_TRGT_DT="11/5/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="916698.64" CNSTR_SPENT_AMT="11373495.67" CE_SPENT_AMT="522035.80" TOT_SPENT_AMT="12812230.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="14600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003301040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="AT DOUBLE MTN FORK OF BRAZOS RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4007232" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/18/2018" PSE_30_ACTL_DT="1/18/2018" PSE_60_TRGT_DT="3/19/2018" PSE_60_ACTL_DT="3/19/2018" PSE_100_TRGT_DT="6/14/2018" PSE_100_ACTL_DT="9/3/2020" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.137 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="GREAT MIDWEST INSURANCE COMPANY" CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/27/2021" CNSTR_PCT_TIME_USED="121.16" CNSTR_PCT_COMPLETE="98.93" DSGN_START_TRGT_DT="1/18/2018" DSGN_START_ACTL_DT="1/18/2018" ENVCLR_TRGT_DT="6/14/2018" ENVCLR_ACTL_DT="9/22/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="1/18/2018" ROW_TRGT_DT="TBD" ROW_ACTL_DT="9/30/2019" RTL_TRGT_DT="6/14/2018" RTL_ACTL_DT="9/3/2020" PE_SPENT_AMT="442874.81" CNSTR_SPENT_AMT="3945497.30" CE_SPENT_AMT="193482.51" TOT_SPENT_AMT="4581854.62" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="5367648.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003302017" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Fisher" LIMITS_FROM_DSCR="STONEWALL COUNTY LINE" LIMITS_TO_DSCR="JONES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1900232" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/8/2013" PSE_30_ACTL_DT="8/8/2013" PSE_60_TRGT_DT="10/31/2013" PSE_60_ACTL_DT="10/31/2013" PSE_100_TRGT_DT="1/20/2014" PSE_100_ACTL_DT="1/20/2014" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.616 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="4/28/2022" CNSTR_PCT_TIME_USED="99.76" CNSTR_PCT_COMPLETE="95.74" DSGN_START_TRGT_DT="3/20/2013" DSGN_START_ACTL_DT="3/20/2013" ENVCLR_TRGT_DT="2/6/2014" ENVCLR_ACTL_DT="2/6/2014" UTIL_TRGT_DT="3/16/2021" UTIL_ACTL_DT="3/16/2021" ROW_TRGT_DT="1/20/2014" ROW_ACTL_DT="1/20/2014" RTL_TRGT_DT="11/5/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="112177.51" CNSTR_SPENT_AMT="1954639.55" CE_SPENT_AMT="90172.32" TOT_SPENT_AMT="2156989.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="2200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003303026" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="FISHER COUNTY LINE" LIMITS_TO_DSCR="HAMLIN CITY LIMIT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1046355" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/8/2013" PSE_30_ACTL_DT="8/8/2013" PSE_60_TRGT_DT="10/31/2013" PSE_60_ACTL_DT="10/31/2013" PSE_100_TRGT_DT="1/20/2014" PSE_100_ACTL_DT="1/20/2014" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.640 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="4/28/2022" CNSTR_PCT_TIME_USED="99.76" CNSTR_PCT_COMPLETE="95.74" DSGN_START_TRGT_DT="3/20/2013" DSGN_START_ACTL_DT="3/20/2013" ENVCLR_TRGT_DT="2/6/2014" ENVCLR_ACTL_DT="2/6/2014" UTIL_TRGT_DT="3/16/2021" UTIL_ACTL_DT="3/16/2021" ROW_TRGT_DT="1/20/2014" ROW_ACTL_DT="1/20/2014" RTL_TRGT_DT="11/5/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="158484.51" CNSTR_SPENT_AMT="1075988.08" CE_SPENT_AMT="50476.97" TOT_SPENT_AMT="1284949.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003303033" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="N HAMLIN CITY LIMIT" LIMITS_TO_DSCR="SH 92" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="218471" DIST_LET_DATE="12/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="235949.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003304072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="NEAR 10TH ST" LIMITS_TO_DSCR="NEAR 13TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/13/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500942" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/17/2021" PSE_30_ACTL_DT="12/17/2021" PSE_60_TRGT_DT="2/7/2022" PSE_60_ACTL_DT="2/7/2022" PSE_100_TRGT_DT="3/18/2022" PSE_100_ACTL_DT="4/14/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="1/3/2023" CNSTR_PCT_TIME_USED="91.23" CNSTR_PCT_COMPLETE="101.48" DSGN_START_TRGT_DT="10/11/2021" DSGN_START_ACTL_DT="10/11/2021" ENVCLR_TRGT_DT="2/23/2022" ENVCLR_ACTL_DT="3/22/2022" UTIL_TRGT_DT="2/23/2022" UTIL_ACTL_DT="3/22/2022" ROW_TRGT_DT="2/23/2022" ROW_ACTL_DT="3/22/2022" RTL_TRGT_DT="3/18/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1947.47" CNSTR_SPENT_AMT="182709.69" CE_SPENT_AMT="1907.53" TOT_SPENT_AMT="186564.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="940300.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003305089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="1.0 MILES NORTH OF FM 3034" LIMITS_TO_DSCR="TAYLOR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/6/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25029717" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="3/10/2022" PSE_30_ACTL_DT="2/21/2022" PSE_60_TRGT_DT="8/25/2022" PSE_60_ACTL_DT="7/25/2022" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.104 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="14.02" CNSTR_PCT_COMPLETE="20.54" DSGN_START_TRGT_DT="4/15/2019" DSGN_START_ACTL_DT="4/15/2019" ENVCLR_TRGT_DT="4/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/12/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/10/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2258150.12" CNSTR_SPENT_AMT="5669689.47" CE_SPENT_AMT="174863.37" TOT_SPENT_AMT="8102702.96" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="27524999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003305094" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="0.185 MILES NORTH OF US 180" LIMITS_TO_DSCR="TAYLOR CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2452243" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/31/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/20/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/20/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2746512.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003305096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="FM 707" LIMITS_TO_DSCR="0.25 MI NORTH OF FM 3034" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3628354" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/19/2022" PSE_30_ACTL_DT="10/25/2022" PSE_60_TRGT_DT="8/2/2022" PSE_60_ACTL_DT="11/29/2022" PSE_100_TRGT_DT="4/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="ROADWAY SPECIALTIES, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="10/2/2023" CNSTR_PCT_TIME_USED="74.40" CNSTR_PCT_COMPLETE="70.35" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="2/20/2023" ENVCLR_ACTL_DT="2/2/2023" UTIL_TRGT_DT="2/20/2023" UTIL_ACTL_DT="2/20/2023" ROW_TRGT_DT="2/20/2023" ROW_ACTL_DT="4/4/2022" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="3/14/2023" PE_SPENT_AMT="1108705.88" CNSTR_SPENT_AMT="3894397.66" CE_SPENT_AMT="39370.04" TOT_SPENT_AMT="5042473.58" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3088824.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003305098" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Jones" LIMITS_FROM_DSCR="AT FM 605" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="272039" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="123894.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306120" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="1300 FT N OF AMBLER" LIMITS_TO_DSCR="N 10TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="680583" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/19/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/14/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="ICOS MANAGEMENT, LLC" CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/21/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/21/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="62104.67" TOT_SPENT_AMT="62104.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="717558.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306121" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="JONES COUNTY LINE" LIMITS_TO_DSCR="NEAR W SUMMIT RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/6/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8903761" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="3/10/2022" PSE_30_ACTL_DT="2/21/2022" PSE_60_TRGT_DT="8/25/2022" PSE_60_ACTL_DT="7/25/2022" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.689 (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="14.02" CNSTR_PCT_COMPLETE="20.54" DSGN_START_TRGT_DT="4/15/2019" DSGN_START_ACTL_DT="4/15/2019" ENVCLR_TRGT_DT="4/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/12/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/10/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12232.33" CNSTR_SPENT_AMT="1180538.08" CE_SPENT_AMT="36409.95" TOT_SPENT_AMT="1229180.36" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="10077999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306123" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="BUS 83 INTERCHANGE" LIMITS_TO_DSCR="1300' NORTH OF AMBLER AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2056618" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/19/2022" PSE_30_ACTL_DT="10/25/2022" PSE_60_TRGT_DT="8/2/2022" PSE_60_ACTL_DT="11/29/2022" PSE_100_TRGT_DT="4/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="ROADWAY SPECIALTIES, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="10/2/2023" CNSTR_PCT_TIME_USED="74.40" CNSTR_PCT_COMPLETE="70.35" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="2/20/2023" ENVCLR_ACTL_DT="2/2/2023" UTIL_TRGT_DT="2/20/2023" UTIL_ACTL_DT="2/20/2023" ROW_TRGT_DT="2/20/2023" ROW_ACTL_DT="4/4/2022" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="3/14/2023" CNSTR_SPENT_AMT="1640195.77" CE_SPENT_AMT="36777.83" TOT_SPENT_AMT="1676973.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1701865.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306124" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT N 10TH ST" LIMITS_TO_DSCR="NB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="290847" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/29/2022" PSE_30_ACTL_DT="10/3/2022" PSE_60_TRGT_DT="11/3/2022" PSE_60_ACTL_DT="11/22/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="2/17/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/27/2023" CNSTR_PCT_TIME_USED="99.38" CNSTR_PCT_COMPLETE="99.58" DSGN_START_TRGT_DT="8/17/2022" DSGN_START_ACTL_DT="11/21/2022" ENVCLR_TRGT_DT="12/21/2022" ENVCLR_ACTL_DT="12/5/2022" UTIL_TRGT_DT="12/21/2022" UTIL_ACTL_DT="2/16/2023" ROW_TRGT_DT="8/17/2022" ROW_ACTL_DT="8/17/2022" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="2/17/2023" CNSTR_SPENT_AMT="309173.60" CE_SPENT_AMT="8455.57" TOT_SPENT_AMT="317629.17" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="139480.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306125" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT N 10TH ST" LIMITS_TO_DSCR="SB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="230687" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/29/2022" PSE_30_ACTL_DT="10/3/2022" PSE_60_TRGT_DT="11/3/2022" PSE_60_ACTL_DT="11/22/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="2/17/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/27/2023" CNSTR_PCT_TIME_USED="99.38" CNSTR_PCT_COMPLETE="99.58" DSGN_START_TRGT_DT="8/17/2022" DSGN_START_ACTL_DT="11/21/2022" ENVCLR_TRGT_DT="12/21/2022" ENVCLR_ACTL_DT="12/5/2022" UTIL_TRGT_DT="12/21/2022" UTIL_ACTL_DT="2/16/2023" ROW_TRGT_DT="8/17/2022" ROW_ACTL_DT="8/17/2022" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="2/17/2023" CNSTR_SPENT_AMT="228267.40" CE_SPENT_AMT="6613.15" TOT_SPENT_AMT="234880.55" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="206320.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306126" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NEAR N WILLIS" LIMITS_TO_DSCR="AMBLER AVENUE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="700000" DIST_LET_DATE="12/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="2/23/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/12/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="784000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306127" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="I-20" LIMITS_TO_DSCR="BI-20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="930000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1041600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306129" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 83 SB" LIMITS_TO_DSCR="@ BU 84 UPRR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003306130" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 83 NB" LIMITS_TO_DSCR="@ BU 84 UPRR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003308041" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="BU 83-D" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="BI 20-R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="318213" DIST_LET_DATE="12/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="356399.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003308045" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 83-D" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="PINE ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5185185" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.761 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16500.17" TOT_SPENT_AMT="16500.17" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003401130" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT" LIMITS_TO_DSCR="US 83/84 &quot;Y&quot; INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42001599" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="7/16/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/30/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/30/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/17/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/30/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2988870.26" TOT_SPENT_AMT="2988870.26" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="42001599.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT2_AMT="1680064.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003401135" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="JUST NORTH OF CR 154" LIMITS_TO_DSCR="JUST SOUTH OF CR 154" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="2/23/2029" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2029" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/27/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.962 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2029" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/27/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/27/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/27/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/27/2029" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="3360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003401140" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="SL 322" LIMITS_TO_DSCR="SOUTH END OF FRONTAGE RDS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="360131" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="187348.27" CE_SPENT_AMT="233.92" TOT_SPENT_AMT="187582.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="302308.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003401141" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="AT CR 150" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="204301" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="194301.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003401143" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="NEAR INDUSTRIAL BL" LIMITS_TO_DSCR="FM 89" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5000000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003401144" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003402044" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="CR 160" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44691199" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="7/16/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/30/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/30/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/17/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/30/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2384417.41" TOT_SPENT_AMT="2384417.41" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="44691199.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT2_AMT="1787648.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003402048" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="RUNNELS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13392800" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="1/29/2026" PSE_30_ACTL_DT="3/3/2017" PSE_60_TRGT_DT="5/7/2026" PSE_60_ACTL_DT="8/7/2017" PSE_100_TRGT_DT="7/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2025" DSGN_START_ACTL_DT="3/5/2017" ENVCLR_TRGT_DT="7/2/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="61013.64" TOT_SPENT_AMT="61013.64" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003402051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="RAILROAD CROSSING" LIMITS_TO_DSCR="TUSCOLA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="492936" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - State Railroad Grade Crossing (2410RX)" FUND_CAT1_PID="RGC" FUND_CAT1_AMT="492936.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003402053" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Taylor" LIMITS_FROM_DSCR="TUSCOLA" LIMITS_TO_DSCR="RUNNELS COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18000000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/15/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/29/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/30/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.026 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/18/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/18/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/30/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="78008.62" TOT_SPENT_AMT="78008.62" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="18000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003403019" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Runnels" LIMITS_FROM_DSCR="TAYLOR COUNTY LINE" LIMITS_TO_DSCR="6.9 MILES S OF TAYLOR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5473202" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/15/2018" PSE_30_ACTL_DT="5/15/2018" PSE_60_TRGT_DT="9/6/2019" PSE_60_ACTL_DT="3/5/2020" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="8/28/2020" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="4/12/2021" CNSTR_PCT_TIME_USED="99.49" CNSTR_PCT_COMPLETE="100.94" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="6/5/2020" UTIL_TRGT_DT="3/20/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="2088584.76" CNSTR_SPENT_AMT="5735890.32" CE_SPENT_AMT="184725.78" TOT_SPENT_AMT="8009200.86" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="2760000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="4416000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003404039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Runnels" LIMITS_FROM_DSCR="6.9 MILES S OF TAYLOR COUNTY LINE" LIMITS_TO_DSCR="15.4 MILES S OF TAYLOR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11165053" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/15/2018" PSE_30_ACTL_DT="5/15/2018" PSE_60_TRGT_DT="9/6/2019" PSE_60_ACTL_DT="3/5/2020" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="8/28/2020" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.482 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="4/12/2021" CNSTR_PCT_TIME_USED="99.49" CNSTR_PCT_COMPLETE="100.94" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="6/5/2020" UTIL_TRGT_DT="3/20/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="3579.67" CNSTR_SPENT_AMT="11849401.41" CE_SPENT_AMT="382970.47" TOT_SPENT_AMT="12235951.55" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="3400000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="5440000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003405040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Runnels" LIMITS_FROM_DSCR="15.4 MI S OF TAYLOR CO LINE" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35702" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/15/2018" PSE_30_ACTL_DT="5/15/2018" PSE_60_TRGT_DT="9/6/2019" PSE_60_ACTL_DT="3/5/2020" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="8/28/2020" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.839 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="4/12/2021" CNSTR_PCT_TIME_USED="99.49" CNSTR_PCT_COMPLETE="100.94" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="6/5/2020" UTIL_TRGT_DT="3/20/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="41.24" CNSTR_SPENT_AMT="5206.62" CE_SPENT_AMT="15.04" TOT_SPENT_AMT="5262.90" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="231225.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003405041" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Runnels" LIMITS_FROM_DSCR="15.4 MI S OF TAYLOR CO LINE" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7823154" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/15/2018" PSE_30_ACTL_DT="5/15/2018" PSE_60_TRGT_DT="9/6/2019" PSE_60_ACTL_DT="3/5/2020" PSE_100_TRGT_DT="3/20/2020" PSE_100_ACTL_DT="8/28/2020" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.839 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="J. H. STRAIN &amp; SONS, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="4/12/2021" CNSTR_PCT_TIME_USED="99.49" CNSTR_PCT_COMPLETE="100.94" DSGN_START_TRGT_DT="8/1/2017" DSGN_START_ACTL_DT="8/1/2017" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="6/5/2020" UTIL_TRGT_DT="3/20/2020" UTIL_ACTL_DT="11/2/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="226.86" CNSTR_SPENT_AMT="8176087.11" CE_SPENT_AMT="263395.95" TOT_SPENT_AMT="8439709.92" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="3535000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="5656000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003405042" PT_PHASE="Construction begins within 4 years" CNTY_NM="Runnels" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="ELM CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="593131" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="640581.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003406014" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2887" CNTY_NM="Runnels" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SH 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="188140" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/5/2021" PSE_30_ACTL_DT="11/5/2021" PSE_60_TRGT_DT="2/25/2022" PSE_60_ACTL_DT="2/25/2022" PSE_100_TRGT_DT="4/22/2022" PSE_100_ACTL_DT="4/22/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.796 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="11/7/2022" CNSTR_PCT_TIME_USED="77.95" CNSTR_PCT_COMPLETE="88.84" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="8/10/2021" ENVCLR_TRGT_DT="3/15/2022" ENVCLR_ACTL_DT="3/15/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/22/2022" RTL_ACTL_DT="4/22/2022" PE_SPENT_AMT="61677.86" CNSTR_SPENT_AMT="232464.99" CE_SPENT_AMT="41634.88" TOT_SPENT_AMT="335777.73" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="501973.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003406015" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2887" CNTY_NM="Runnels" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SH 158 ETC" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="300308" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/12/2022" CNSTR_WKBG_DT="7/26/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.66" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="92189.72" CNSTR_SPENT_AMT="284152.05" CE_SPENT_AMT="2642.49" TOT_SPENT_AMT="378984.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1491636.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003406016" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2887" CNTY_NM="Runnels" LIMITS_FROM_DSCR="AT COYOTE CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1450000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="BSP" FUND_CAT1_AMT="1450000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003501036" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Runnels" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="CONCHO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16300000" DIST_LET_DATE="4/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="18256000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003502038" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="RUNNELS COUNTY LINE" LIMITS_TO_DSCR="11.4 MI S OF RUNNELS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18200000" DIST_LET_DATE="4/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.359 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="20384000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003502039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="AT CONCHO RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/19/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1332457" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="6/25/2024" CNSTR_PCT_TIME_USED="48.49" CNSTR_PCT_COMPLETE="42.99" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="314011.52" CE_SPENT_AMT="7054.21" TOT_SPENT_AMT="321065.73" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1507325.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003503047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="WEST BRYAN STREET IN EDEN" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2231936" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/28/2012" PSE_30_ACTL_DT="12/28/2012" PSE_60_TRGT_DT="9/30/2016" PSE_60_ACTL_DT="9/30/2016" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.143 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="1/27/2025" CNSTR_PCT_TIME_USED="23.20" CNSTR_PCT_COMPLETE="34.93" DSGN_START_TRGT_DT="6/20/2011" DSGN_START_ACTL_DT="6/20/2011" ENVCLR_TRGT_DT="1/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/8/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/28/2017" ROW_ACTL_DT="2/28/2017" RTL_TRGT_DT="1/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1300963.90" CNSTR_SPENT_AMT="514231.49" CE_SPENT_AMT="9714.26" TOT_SPENT_AMT="1824909.65" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="2237935.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003503051" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="11.4 MI S OF RUNNELS COUNTY LINE" LIMITS_TO_DSCR="WEST BRYAN STREET IN EDEN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25800000" DIST_LET_DATE="4/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="14.173 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="28896000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003503053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="CR 1115" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="637515" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/5/2021" PSE_30_ACTL_DT="11/5/2021" PSE_60_TRGT_DT="2/25/2022" PSE_60_ACTL_DT="2/25/2022" PSE_100_TRGT_DT="4/22/2022" PSE_100_ACTL_DT="4/22/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="11/7/2022" CNSTR_PCT_TIME_USED="77.95" CNSTR_PCT_COMPLETE="88.84" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="8/10/2021" ENVCLR_TRGT_DT="3/15/2022" ENVCLR_ACTL_DT="3/15/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/22/2022" RTL_ACTL_DT="4/22/2022" CNSTR_SPENT_AMT="622570.87" CE_SPENT_AMT="142584.93" TOT_SPENT_AMT="765155.80" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="766619.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003503054" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="11.429 MI S OF RUNNELS COUNTY LINE" LIMITS_TO_DSCR="US 87 IN EDEN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2449715" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" PE_SPENT_AMT="60747.37" CNSTR_SPENT_AMT="2463686.79" CE_SPENT_AMT="4177.59" TOT_SPENT_AMT="2528611.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1745121.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003504032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="0.5 MILES SOUTH OF US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9258102" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/28/2012" PSE_30_ACTL_DT="12/28/2012" PSE_60_TRGT_DT="9/30/2016" PSE_60_ACTL_DT="9/30/2016" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.469 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="1/27/2025" CNSTR_PCT_TIME_USED="23.20" CNSTR_PCT_COMPLETE="34.93" DSGN_START_TRGT_DT="6/20/2011" DSGN_START_ACTL_DT="6/20/2011" ENVCLR_TRGT_DT="1/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/8/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/28/2017" ROW_ACTL_DT="2/28/2017" RTL_TRGT_DT="1/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="217084.33" CNSTR_SPENT_AMT="4080709.62" CE_SPENT_AMT="46422.86" TOT_SPENT_AMT="4344216.81" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="9258102.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003504038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Concho" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="MENARD COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="711127" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="50.00" CNSTR_PCT_COMPLETE="99.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="86176.46" CNSTR_SPENT_AMT="685690.25" CE_SPENT_AMT="5038.20" TOT_SPENT_AMT="776904.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="675000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003504040" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003504041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003505059" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Menard" LIMITS_FROM_DSCR="CONCHO COUNTY LINE" LIMITS_TO_DSCR="US 190 NORTH OF MENARD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="40846004" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1788442.58" TOT_SPENT_AMT="1788442.58" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="45747524.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003505060" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Menard" LIMITS_FROM_DSCR="RM 2291" LIMITS_TO_DSCR="0.5 MILES SOUTH OF RM 2291" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1963114" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.458 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="85731.18" TOT_SPENT_AMT="85731.18" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="2198688.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003505062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Menard" LIMITS_FROM_DSCR="RM 2291" LIMITS_TO_DSCR="MENARD CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1133844" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="14.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1083.65" CNSTR_SPENT_AMT="1667173.47" CE_SPENT_AMT="27.24" TOT_SPENT_AMT="1668284.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1117263.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003505065" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003506033" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Menard" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="KIMBLE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="41560907" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.796 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1972774.34" TOT_SPENT_AMT="1972774.34" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="46548216.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003506034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Menard" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="KIMBLE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="876691" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="14.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="545.88" TOT_SPENT_AMT="545.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="319225.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003507045" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Kimble" LIMITS_FROM_DSCR="MENARD COUNTY LINE" LIMITS_TO_DSCR="IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58910752" DIST_LET_DATE="11/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.744 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2315956.81" TOT_SPENT_AMT="2315956.81" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="57703320.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="8276521.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003507046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Kimble" LIMITS_FROM_DSCR="MENARD COUNTY LINE" LIMITS_TO_DSCR="124 FT S OF EB IH-10 ON RAMP IN JUNCTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1020406" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="6/10/2004" CNSTR_PCT_TIME_USED="77.55" CNSTR_PCT_COMPLETE="103.59" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/9/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1164975.07" TOT_SPENT_AMT="1164975.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1020406.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003602010" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Kerr" LIMITS_FROM_DSCR="10.762 MI S OF IH 10" LIMITS_TO_DSCR="17.091 MI S OF IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="196101" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.329 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/24/2020" CNSTR_WKBG_DT="7/22/2020" CNSTR_PCT_TIME_USED="96.59" CNSTR_PCT_COMPLETE="96.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="193795.95" CE_SPENT_AMT="1229.15" TOT_SPENT_AMT="195025.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="254000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003602011" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003603036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Real" LIMITS_FROM_DSCR="KERR COUNTY LINE" LIMITS_TO_DSCR="15.981 MI S OF KERR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1039479" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="1069927.88" CE_SPENT_AMT="9388.37" TOT_SPENT_AMT="1079316.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1247494.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003605044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Real" LIMITS_FROM_DSCR="15.886 MILES SO OF KERR COUNTY LINE" LIMITS_TO_DSCR="RM 336 (IN LEAKEY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1511952" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="6/10/2004" CNSTR_PCT_TIME_USED="77.55" CNSTR_PCT_COMPLETE="103.59" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/9/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15904.38" CNSTR_SPENT_AMT="1521687.36" CE_SPENT_AMT="4412.81" TOT_SPENT_AMT="1542004.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2100877.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003606030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Real" LIMITS_FROM_DSCR="FM 1120 (IN LEAKEY)" LIMITS_TO_DSCR="UVALDE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="369392" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="6/10/2004" CNSTR_PCT_TIME_USED="77.55" CNSTR_PCT_COMPLETE="103.59" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/9/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="370094.62" CE_SPENT_AMT="3620.48" TOT_SPENT_AMT="373715.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="395227.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003607039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="RM 1050" LIMITS_TO_DSCR="SH 127" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="394388" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.200 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="9/18/2023" CNSTR_PCT_TIME_USED="98.33" CNSTR_PCT_COMPLETE="100.99" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="8/29/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="8/29/2022" CNSTR_SPENT_AMT="395388.50" CE_SPENT_AMT="1797.52" TOT_SPENT_AMT="397186.02" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="387434.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003607040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="REAL/UVALDE CL" LIMITS_TO_DSCR="11.44 MILES SOUTH OF REAL/UVALDE COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="438111" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.870 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="454116.21" CE_SPENT_AMT="3418.91" TOT_SPENT_AMT="457535.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="519209.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003607042" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003608056" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="0.4 MILES NORTH OF SH 55" LIMITS_TO_DSCR="1.6 MILES SOUTH OF SH 127" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="155226" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.884 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="173853.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003610011" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003701046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Uvalde" LIMITS_FROM_DSCR="FM 117" LIMITS_TO_DSCR="UVALDE / ZAVALA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="666418" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="746388.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003702060" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Zavala" LIMITS_FROM_DSCR="1.80 MILES SOUTH OF UVALDE COUNTY LINE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30000000" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/8/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/14/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/20/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.701 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/29/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/29/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/29/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/27/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="467018.37" TOT_SPENT_AMT="467018.37" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BSP" FUND_CAT1_AMT="15000000.00" FUND_CAT2_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT2_PID="PES" FUND_CAT2_AMT="16200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003702061" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003703089" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Zavala" LIMITS_FROM_DSCR="US 57" LIMITS_TO_DSCR="2.33 MI S OF FM 1025" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8534808" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.000 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="9217593.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003704019" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 155" CNTY_NM="Zavala" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="FM 65" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="631609" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.622 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="5/27/2024" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="97.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="521107.58" CE_SPENT_AMT="12872.29" TOT_SPENT_AMT="533979.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="688593.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003704021" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 582" CNTY_NM="Zavala" LIMITS_FROM_DSCR="FM 65" LIMITS_TO_DSCR="FM 1433" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="321124" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.487 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="5/27/2024" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="97.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="294781.25" CE_SPENT_AMT="6658.31" TOT_SPENT_AMT="301439.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003705058" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="ZAVALA/DIMMIT CO LINE" LIMITS_TO_DSCR="SL 517" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="635302" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.284 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="660715.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003705060" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="SL 517" LIMITS_TO_DSCR="0.028 MI NORTH OF US 277" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1956168" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.567 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4984.93" TOT_SPENT_AMT="4984.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2034415.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/25/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003705062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="LOOP 517" LIMITS_TO_DSCR="0.87 MI SOUTH OF  LOOP 517" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2887281" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="11/21/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/15/2023" PSE_100_ACTL_DT="4/28/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="3/25/2024" CNSTR_PCT_TIME_USED="84.21" CNSTR_PCT_COMPLETE="62.25" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="11/1/2022" ENVCLR_ACTL_DT="4/7/2023" UTIL_TRGT_DT="11/1/2022" UTIL_ACTL_DT="5/3/2023" ROW_TRGT_DT="11/1/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/29/2023" RTL_ACTL_DT="5/3/2023" PE_SPENT_AMT="513658.36" CNSTR_SPENT_AMT="1911434.85" CE_SPENT_AMT="131216.85" TOT_SPENT_AMT="2556310.06" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="2404140.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003706099" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="0.472 MI SOUTH OF FM 190 (SOUTH INT)" LIMITS_TO_DSCR="1.485 MI SOUTH OF FM 2688" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="41550804" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="5/2/2018" PSE_30_ACTL_DT="5/2/2018" PSE_60_TRGT_DT="1/31/2019" PSE_60_ACTL_DT="1/31/2019" PSE_100_TRGT_DT="11/4/2019" PSE_100_ACTL_DT="11/4/2019" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.915 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/15/2017" DSGN_START_ACTL_DT="9/15/2017" ENVCLR_TRGT_DT="2/7/2019" ENVCLR_ACTL_DT="2/7/2019" UTIL_TRGT_DT="1/26/2021" UTIL_ACTL_DT="1/26/2021" ROW_TRGT_DT="9/29/2020" ROW_ACTL_DT="9/29/2020" RTL_TRGT_DT="1/27/2021" RTL_ACTL_DT="1/27/2021" PE_SPENT_AMT="1671046.64" CE_SPENT_AMT="1022.22" TOT_SPENT_AMT="1672068.86" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003706106" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="1.485 MI SOUTH OF FM 2688" LIMITS_TO_DSCR="1.741 MI SOUTH OF FM 2688" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/19/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3008396" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/29/2018" PSE_30_ACTL_DT="6/29/2018" PSE_60_TRGT_DT="1/31/2019" PSE_60_ACTL_DT="1/31/2019" PSE_100_TRGT_DT="11/4/2019" PSE_100_ACTL_DT="11/4/2019" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.256 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="12/9/2024" CNSTR_PCT_TIME_USED="7.82" CNSTR_PCT_COMPLETE="12.85" DSGN_START_TRGT_DT="9/15/2017" DSGN_START_ACTL_DT="9/15/2017" ENVCLR_TRGT_DT="2/7/2019" ENVCLR_ACTL_DT="2/7/2019" UTIL_TRGT_DT="1/26/2021" UTIL_ACTL_DT="1/26/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/27/2021" RTL_ACTL_DT="1/27/2021" CNSTR_SPENT_AMT="425205.37" CE_SPENT_AMT="13303.09" TOT_SPENT_AMT="438508.46" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1585676.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003706109" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="10 MILES NORTH OF WEBB/DIMMIT CL" LIMITS_TO_DSCR="CITY OF CARRIZO SPRINGS" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="280650900" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="19.013 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003706110" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="0.028 MILES NORTH OF US 277" LIMITS_TO_DSCR="REFERENCE MARKER 642+0.687" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5921115" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.531 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6394804.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003706111" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="RM 646" LIMITS_TO_DSCR="RM 650" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3386454" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.927 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="3792828.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003707020" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 225" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SH 85/US 83 INTERSECTION" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="750225" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/18/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/29/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/7/2022" PSE_100_ACTL_DT="2/17/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.885 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="10/7/2022" CNSTR_PCT_TIME_USED="113.78" CNSTR_PCT_COMPLETE="105.35" DSGN_START_TRGT_DT="6/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/13/2022" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="12/13/2022" UTIL_ACTL_DT="1/21/2022" ROW_TRGT_DT="12/13/2022" ROW_ACTL_DT="1/21/2022" RTL_TRGT_DT="12/13/2022" RTL_ACTL_DT="3/22/2022" PE_SPENT_AMT="1473.74" CNSTR_SPENT_AMT="901941.70" CE_SPENT_AMT="37279.18" TOT_SPENT_AMT="940694.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="558969.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003708042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="1.741 MI SOUTH OF FM 2688" LIMITS_TO_DSCR="WEBB/DIMMIT CO LINE (SURVEYED MONUMENT)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/19/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43851263" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/29/2018" PSE_30_ACTL_DT="6/29/2018" PSE_60_TRGT_DT="1/31/2019" PSE_60_ACTL_DT="1/31/2019" PSE_100_TRGT_DT="11/4/2019" PSE_100_ACTL_DT="11/4/2019" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.577 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="12/9/2024" CNSTR_PCT_TIME_USED="7.82" CNSTR_PCT_COMPLETE="12.85" DSGN_START_TRGT_DT="9/15/2017" DSGN_START_ACTL_DT="9/15/2017" ENVCLR_TRGT_DT="2/7/2019" ENVCLR_ACTL_DT="2/7/2019" UTIL_TRGT_DT="1/26/2021" UTIL_ACTL_DT="1/26/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/27/2021" RTL_ACTL_DT="1/27/2021" PE_SPENT_AMT="2798571.34" CNSTR_SPENT_AMT="5675302.20" CE_SPENT_AMT="177558.51" TOT_SPENT_AMT="8651432.05" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="52540359.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003708045" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Dimmit" LIMITS_FROM_DSCR="WEBB/DIMMIT COUNTY LINE" LIMITS_TO_DSCR="10 MILES NORTH OF WEBB/DIMMIT CL" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="157459926" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.662 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003709035" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="3.6 MILES SOUTH OF SH 44 INTERSECTION" LIMITS_TO_DSCR="WEBB/DIMMIT COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="243723150" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="16.576 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003710038" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.613 MI SOUTH OF SS 255" LIMITS_TO_DSCR="0.032 MI NORTH OF US 83/IH 35 UNDRP" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="379944" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.971 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="425537.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003710040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="1 MI NORTH OF SH 255" LIMITS_TO_DSCR="LOS BOTINES LN" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45000000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.286 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1848046.61" CE_SPENT_AMT="39.26" TOT_SPENT_AMT="1848085.87" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="50400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003710041" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="LOS BOTINES LN" LIMITS_TO_DSCR="US83 / IH35 UNDERPASS" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34520500" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/16/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/13/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/26/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.428 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/13/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/29/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/22/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="25609195.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="11672944.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003710044" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="4.5 MILES NORTH OF SH 255 INTERSECTION" LIMITS_TO_DSCR="3.6 MILES SOUTH OF SH 44 INTERSECTION" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="166068921" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.034 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31607.88" TOT_SPENT_AMT="31607.88" FUND_CAT1_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT1_AMT="185997192.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="CIELITO-LINDO BLVD. (NB)" LIMITS_TO_DSCR="ESPEJO MOLINA ROAD (NB)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="375514" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/29/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/28/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.989 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.91" CNSTR_PCT_COMPLETE="21.92" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/16/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/27/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="454.00" TOT_SPENT_AMT="454.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="440911.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801089" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="PALO BLANCO NBML" LIMITS_TO_DSCR="CIELITO LINDO BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2261755" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="8/27/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/9/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/4/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.814 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/4/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/4/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/6/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3492.52" TOT_SPENT_AMT="3492.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2352225.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="4/30/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801094" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.05 MILE S OF SL20 (ZACATECAS ST)" LIMITS_TO_DSCR="4.45 MI S OF SL20(0.2 S OF CIELITO)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9000000" DIST_LET_DATE="2/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.400 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="7135000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="LOMAS DEL SUR INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104725" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="6/21/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="10/6/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="64.71" CNSTR_PCT_COMPLETE="98.23" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="10/6/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/19/2022" RTL_ACTL_DT="10/11/2022" PE_SPENT_AMT="59011.95" CNSTR_SPENT_AMT="134454.45" CE_SPENT_AMT="59150.37" TOT_SPENT_AMT="252616.77" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="118377.00" TXDOT_CNTCT_LAST_UPDATE_DT="9/4/2024" LAST_CNSTR_UPDATE_DT="9/4/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.1 MILES NORTH OF CIELITO LINDO BLVD" LIMITS_TO_DSCR="0.1 MILES SOUTH OF ESPEJO MOLINA RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1040125" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.169 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="46.30" CNSTR_PCT_COMPLETE="98.80" DSGN_START_TRGT_DT="12/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/23/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/23/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/23/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24345.77" CNSTR_SPENT_AMT="1027607.50" CE_SPENT_AMT="58230.26" TOT_SPENT_AMT="1110183.53" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1066325.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801098" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="RIVERHILL DR INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="77956" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="6/21/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="10/6/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.199 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="64.71" CNSTR_PCT_COMPLETE="98.23" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="10/6/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/19/2022" RTL_ACTL_DT="10/11/2022" CNSTR_SPENT_AMT="96736.00" CE_SPENT_AMT="299.33" TOT_SPENT_AMT="97035.33" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="96759.00" TXDOT_CNTCT_LAST_UPDATE_DT="9/4/2024" LAST_CNSTR_UPDATE_DT="9/4/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="LA PITA MANGANA RD INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92815" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="6/21/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="10/6/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.199 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="64.71" CNSTR_PCT_COMPLETE="98.23" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="10/6/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/19/2022" RTL_ACTL_DT="10/11/2022" CNSTR_SPENT_AMT="112124.80" CE_SPENT_AMT="361.80" TOT_SPENT_AMT="112486.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="123475.00" TXDOT_CNTCT_LAST_UPDATE_DT="9/4/2024" LAST_CNSTR_UPDATE_DT="9/4/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801100" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="SIERRA VISTA BLVD INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79197" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="6/21/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="10/6/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="64.71" CNSTR_PCT_COMPLETE="98.23" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="10/6/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/19/2022" RTL_ACTL_DT="10/11/2022" CNSTR_SPENT_AMT="100427.70" CE_SPENT_AMT="314.32" TOT_SPENT_AMT="100742.02" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="119898.00" TXDOT_CNTCT_LAST_UPDATE_DT="9/4/2024" LAST_CNSTR_UPDATE_DT="9/4/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="CANONES BLVD INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74389" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="6/21/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="10/6/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.199 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="64.71" CNSTR_PCT_COMPLETE="98.23" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="10/6/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/19/2022" RTL_ACTL_DT="10/11/2022" CNSTR_SPENT_AMT="94439.30" CE_SPENT_AMT="290.00" TOT_SPENT_AMT="94729.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="118378.00" TXDOT_CNTCT_LAST_UPDATE_DT="9/4/2024" LAST_CNSTR_UPDATE_DT="9/4/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801102" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.2 MILES NORTH OF SORIA DR" LIMITS_TO_DSCR="0.2 MILES SOUTH OF SORIA DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="383394" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="6/21/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="10/6/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.399 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="64.71" CNSTR_PCT_COMPLETE="98.23" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="10/6/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/19/2022" RTL_ACTL_DT="10/11/2022" CNSTR_SPENT_AMT="454385.92" CE_SPENT_AMT="1751.39" TOT_SPENT_AMT="456137.31" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="485243.00" TXDOT_CNTCT_LAST_UPDATE_DT="9/4/2024" LAST_CNSTR_UPDATE_DT="9/4/2024" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="LA PITA MANGANA" LIMITS_TO_DSCR="PRADA MACHINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="656203" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="5/20/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.976 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/26/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34822.66" TOT_SPENT_AMT="34822.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="734947.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801104" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003801105" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003802033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="WEBB/ZAPATA COUNTY LINE" LIMITS_TO_DSCR="9.407 MI S OF WEBB/ZAPATA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30834726" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.900 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_AMT="34054326.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003802034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="ZAPATA/WEBB COUNTY LINE" LIMITS_TO_DSCR="1.611 MI S OF LA PERLA RANCH RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="799509" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.406 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/13/2023" CNSTR_WKBG_DT="4/1/2024" CNSTR_PCT_TIME_USED="77.00" CNSTR_PCT_COMPLETE="98.04" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="5/2/2022" ENVCLR_TRGT_DT="6/7/2023" ENVCLR_ACTL_DT="8/11/2022" UTIL_TRGT_DT="7/14/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/14/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39.29" CNSTR_SPENT_AMT="910038.61" CE_SPENT_AMT="17607.80" TOT_SPENT_AMT="927685.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="825206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003803038" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="9.407 MI S OF WEBB/ZAPATA COUNTY LINE" LIMITS_TO_DSCR="0.405 MI N OF FM 3169" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30834725" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003803039" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="1.475 MI N OF FM 3169" LIMITS_TO_DSCR="0.975 MI S OF FM 3169" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10980000" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.709 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003803041" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.45 MI N OF BUS 83N (N. INT.)" LIMITS_TO_DSCR="FM 3169" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/7/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="279320" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="8/26/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/15/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2020" PSE_100_ACTL_DT="3/3/2020" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.895 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="7/20/2020" CNSTR_WKBG_DT="9/2/2020" CNSTR_PCT_TIME_USED="98.81" CNSTR_PCT_COMPLETE="94.02" DSGN_START_TRGT_DT="1/28/2019" DSGN_START_ACTL_DT="1/28/2019" ENVCLR_TRGT_DT="3/10/2020" ENVCLR_ACTL_DT="2/11/2020" UTIL_TRGT_DT="3/24/2020" UTIL_ACTL_DT="3/3/2020" ROW_TRGT_DT="3/24/2020" ROW_ACTL_DT="3/3/2020" RTL_TRGT_DT="5/7/2020" RTL_ACTL_DT="3/3/2020" PE_SPENT_AMT="108260.91" CNSTR_SPENT_AMT="313678.25" CE_SPENT_AMT="27804.33" TOT_SPENT_AMT="449743.49" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="292795.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003803043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="1.611 MI S OF LA PERLA RANCH RD." LIMITS_TO_DSCR="0.917 MI S OF FM 3169" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1187870" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.341 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/13/2023" CNSTR_WKBG_DT="4/1/2024" CNSTR_PCT_TIME_USED="77.00" CNSTR_PCT_COMPLETE="98.04" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="5/2/2022" ENVCLR_TRGT_DT="6/7/2023" ENVCLR_ACTL_DT="8/11/2022" UTIL_TRGT_DT="7/14/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/14/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1355089.27" CE_SPENT_AMT="26218.14" TOT_SPENT_AMT="1381307.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1215791.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003804064" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="3.685 MI S OF FM 3169" LIMITS_TO_DSCR="9.723 MI S OF FM 3169" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73000900" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/16/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/21/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/25/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2007" DSGN_START_ACTL_DT="1/1/2007" ENVCLR_TRGT_DT="5/6/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2032" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2032" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2032" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2405588.85" CE_SPENT_AMT="523.17" TOT_SPENT_AMT="2406112.02" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="81770079.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003804069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="17TH ST." LIMITS_TO_DSCR="1ST ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="549124" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="12/31/2020" PSE_30_ACTL_DT="1/5/2021" PSE_60_TRGT_DT="1/29/2021" PSE_60_ACTL_DT="1/29/2021" PSE_100_TRGT_DT="3/31/2021" PSE_100_ACTL_DT="4/28/2021" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="8/18/2021" CNSTR_WKBG_DT="1/17/2022" CNSTR_PCT_TIME_USED="94.00" CNSTR_PCT_COMPLETE="90.66" DSGN_START_TRGT_DT="10/1/2020" DSGN_START_ACTL_DT="10/1/2020" ENVCLR_TRGT_DT="4/8/2021" ENVCLR_ACTL_DT="3/29/2021" UTIL_TRGT_DT="5/14/2021" UTIL_ACTL_DT="4/29/2021" ROW_TRGT_DT="5/14/2021" ROW_ACTL_DT="4/29/2021" RTL_TRGT_DT="5/14/2021" RTL_ACTL_DT="4/29/2021" PE_SPENT_AMT="91355.16" CNSTR_SPENT_AMT="612849.34" CE_SPENT_AMT="105501.89" TOT_SPENT_AMT="809706.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="743800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.22 MI S OF LASSO LN" LIMITS_TO_DSCR="0.28 MI N OF FM 2687" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33170887" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="5/26/2021" PSE_30_ACTL_DT="5/26/2021" PSE_60_TRGT_DT="8/31/2021" PSE_60_ACTL_DT="8/31/2021" PSE_100_TRGT_DT="6/6/2022" PSE_100_ACTL_DT="2/9/2023" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="IOC COMPANY LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="9/12/2023" CNSTR_PCT_TIME_USED="60.73" CNSTR_PCT_COMPLETE="39.11" DSGN_START_TRGT_DT="10/4/2007" DSGN_START_ACTL_DT="10/4/2007" ENVCLR_TRGT_DT="9/1/2022" ENVCLR_ACTL_DT="8/12/2009" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="4/5/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="4/5/2023" RTL_TRGT_DT="3/1/2023" RTL_ACTL_DT="4/5/2023" PE_SPENT_AMT="4169590.91" CNSTR_SPENT_AMT="13275067.69" CE_SPENT_AMT="1382940.91" TOT_SPENT_AMT="18827599.51" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="31117441.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="2133446.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805041" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.70 MI S OF FM 2687" LIMITS_TO_DSCR="0.05 MI N OF LOPENO AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42252000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/16/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/21/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/25/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2007" DSGN_START_ACTL_DT="1/1/2007" ENVCLR_TRGT_DT="5/6/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2032" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2032" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2032" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1107783.55" TOT_SPENT_AMT="1107783.55" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="47322240.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805042" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.05 MI N OF LOPENO AVE." LIMITS_TO_DSCR="0.77 MI S OF LOPENO AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8246000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/6/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2007" DSGN_START_ACTL_DT="2/1/2007" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2031" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/3/2031" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2031" RTL_ACTL_DT="TBD" PE_SPENT_AMT="162224.27" TOT_SPENT_AMT="162224.27" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="9235520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805043" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.77 MI S OF LOPENO AVE." LIMITS_TO_DSCR="1.955 MI N OF ZAPATA/STARR COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42621000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/6/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.630 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2007" DSGN_START_ACTL_DT="2/1/2007" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2031" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/3/2031" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2031" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2449750.19" TOT_SPENT_AMT="2449750.19" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="47735520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805044" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="1.955 MI N OF ZAPATA/STARR COUNTY" LIMITS_TO_DSCR="0.255 MI N OF ZAPATA/STARR COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15639000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/6/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.700 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2007" DSGN_START_ACTL_DT="2/1/2007" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2031" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/3/2031" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2031" RTL_ACTL_DT="TBD" PE_SPENT_AMT="327872.63" TOT_SPENT_AMT="327872.63" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="17515680.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.30 MI N OF FM 2687" LIMITS_TO_DSCR="0.30 MI S OF FM 2687" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/7/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="139902" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="8/26/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/15/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2020" PSE_100_ACTL_DT="3/3/2020" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="7/20/2020" CNSTR_WKBG_DT="9/2/2020" CNSTR_PCT_TIME_USED="98.81" CNSTR_PCT_COMPLETE="94.02" DSGN_START_TRGT_DT="1/28/2019" DSGN_START_ACTL_DT="1/28/2019" ENVCLR_TRGT_DT="3/10/2020" ENVCLR_ACTL_DT="2/11/2020" UTIL_TRGT_DT="3/24/2020" UTIL_ACTL_DT="3/3/2020" ROW_TRGT_DT="3/24/2020" ROW_ACTL_DT="3/3/2020" RTL_TRGT_DT="5/7/2020" RTL_ACTL_DT="3/3/2020" PE_SPENT_AMT="132.01" CNSTR_SPENT_AMT="132224.14" CE_SPENT_AMT="22480.75" TOT_SPENT_AMT="154836.90" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="209091.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003805052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Zapata" LIMITS_FROM_DSCR="0.28 MILES NORTH OF FM 2687" LIMITS_TO_DSCR="ZAPATA/STARR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1200031" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/19/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="17.949 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="3/31/2025" CNSTR_PCT_TIME_USED="37.50" CNSTR_PCT_COMPLETE="43.98" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5788.45" CNSTR_SPENT_AMT="595005.34" CE_SPENT_AMT="5178.74" TOT_SPENT_AMT="605972.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1445570.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003806045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR=".255 MI NORTH OF STARR/ZAPATA CL" LIMITS_TO_DSCR=".31 MI NORTH OF FM 2098 (SOUTH LEG)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/26/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="24806299" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/4/2018" PSE_30_ACTL_DT="6/4/2018" PSE_60_TRGT_DT="7/30/2018" PSE_60_ACTL_DT="7/30/2018" PSE_100_TRGT_DT="7/31/2019" PSE_100_ACTL_DT="7/31/2019" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.175 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="IOC COMPANY LLC" CNSTR_NTPD_DT="1/12/2022" CNSTR_WKBG_DT="2/22/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.89" DSGN_START_TRGT_DT="10/1/2007" DSGN_START_ACTL_DT="10/1/2007" ENVCLR_TRGT_DT="8/12/2019" ENVCLR_ACTL_DT="8/12/2019" UTIL_TRGT_DT="10/1/2021" UTIL_ACTL_DT="10/1/2021" ROW_TRGT_DT="10/1/2021" ROW_ACTL_DT="10/1/2021" RTL_TRGT_DT="10/1/2021" RTL_ACTL_DT="10/1/2021" PE_SPENT_AMT="3696337.35" CNSTR_SPENT_AMT="26934107.44" CE_SPENT_AMT="3485656.87" TOT_SPENT_AMT="34116101.66" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="28532190.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003806047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.31 MI SOUTH OF MARGARITO RD." LIMITS_TO_DSCR="0.09 MI NORTH OF LOMA BLANCA RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32096791" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/4/2018" PSE_30_ACTL_DT="6/4/2018" PSE_60_TRGT_DT="7/30/2018" PSE_60_ACTL_DT="7/30/2018" PSE_100_TRGT_DT="7/31/2019" PSE_100_ACTL_DT="7/31/2019" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.170 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="IOC COMPANY LLC" CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="33.26" CNSTR_PCT_COMPLETE="24.38" DSGN_START_TRGT_DT="10/1/2007" DSGN_START_ACTL_DT="10/1/2007" ENVCLR_TRGT_DT="8/12/2019" ENVCLR_ACTL_DT="8/12/2019" UTIL_TRGT_DT="2/9/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/9/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3174403.17" CNSTR_SPENT_AMT="8236334.90" CE_SPENT_AMT="557075.84" TOT_SPENT_AMT="11967813.91" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="13101240.00" FUND_CAT2_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT2_PID="PES" FUND_CAT2_AMT="6879729.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003806050" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="LOMA BLANCA RD." LIMITS_TO_DSCR="W GONZALEZ AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23520000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.354 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003806051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="ROMA HIGH SCHOOL" LIMITS_TO_DSCR="GUTIERREZ ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1619082" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="12/14/2022" PSE_30_ACTL_DT="4/7/2023" PSE_60_TRGT_DT="3/10/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/26/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="REIM CONSTRUCTION, INC." CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="10/13/2021" ENVCLR_TRGT_DT="5/19/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="230938.80" TOT_SPENT_AMT="230938.80" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2510CR)" FUND_CAT1_PID="MAS" FUND_CAT1_AMT="1487149.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003806052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.20 MILES NORTH OF LA MINA RD." LIMITS_TO_DSCR="0.12 MILES SOUTH OF LA MINA RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="117182" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/15/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/16/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="399.49" TOT_SPENT_AMT="399.49" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="126556.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003806053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.31 MI N FM 2098 (SOUTH LEG)" LIMITS_TO_DSCR="0.31 S OF MARGARITO RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1873148" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="FOREMOST PAVING, INC." CNSTR_NTPD_DT="5/27/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="629.61" TOT_SPENT_AMT="629.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1873148.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807076" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="ARROYO ROMA" LIMITS_TO_DSCR="EFREN RAMIREZ, AVENUE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15000000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Proposed 4 Lane Divided Urban" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TBD" PROJ_LENGTH="1.711 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="15000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807077" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="INTERSECTION OF N GARCIA ST. &amp; N GRANT S" LIMITS_TO_DSCR="FM 3167" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91000000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.248 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="FM 3167" LIMITS_TO_DSCR="CHARCO BLANCO RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1696278" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/19/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.550 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="IOC COMPANY LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="3/18/2024" CNSTR_PCT_TIME_USED="95.83" CNSTR_PCT_COMPLETE="107.50" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11316.17" CNSTR_SPENT_AMT="1873404.57" CE_SPENT_AMT="60079.08" TOT_SPENT_AMT="1944799.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1923051.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807079" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="FM 3167" LIMITS_TO_DSCR="FAIRGROUNDS RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14133000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.019 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807080" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="CHARCO BLANCO RD." LIMITS_TO_DSCR="FAIRGROUNDS RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="377983" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.459 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/9/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/18/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/18/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/18/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8865.74" TOT_SPENT_AMT="8865.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="393102.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.1 MI W. OF FM 3167" LIMITS_TO_DSCR="0.1 MI E. OF FM 3167" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="208003" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/18/2022" PSE_30_ACTL_DT="3/28/2022" PSE_60_TRGT_DT="3/7/2022" PSE_60_ACTL_DT="4/26/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="D&amp;G ENERGY CORPORATION" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="93.83" DSGN_START_TRGT_DT="1/31/2022" DSGN_START_ACTL_DT="3/7/2022" ENVCLR_TRGT_DT="4/18/2022" ENVCLR_ACTL_DT="5/27/2022" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="6/1/2022" ROW_TRGT_DT="6/1/2022" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="124.55" CNSTR_SPENT_AMT="189851.74" CE_SPENT_AMT="67157.93" TOT_SPENT_AMT="257134.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="230179.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.1 MILES W. OF SUNTEX RD./MIDWAY RD." LIMITS_TO_DSCR="0.1 MILES E. OF SUNTEX RD./MIDWAY RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="301665" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="11/10/2022" PSE_30_ACTL_DT="11/10/2022" PSE_60_TRGT_DT="12/29/2022" PSE_60_ACTL_DT="12/29/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="6/7/2023" CNSTR_WKBG_DT="11/1/2023" CNSTR_PCT_TIME_USED="55.00" CNSTR_PCT_COMPLETE="85.58" DSGN_START_TRGT_DT="10/3/2022" DSGN_START_ACTL_DT="10/3/2022" ENVCLR_TRGT_DT="11/8/2022" ENVCLR_ACTL_DT="11/8/2022" UTIL_TRGT_DT="3/28/2023" UTIL_ACTL_DT="3/28/2023" ROW_TRGT_DT="3/28/2023" ROW_ACTL_DT="3/28/2023" RTL_TRGT_DT="3/28/2023" RTL_ACTL_DT="3/28/2023" PE_SPENT_AMT="4734.06" CNSTR_SPENT_AMT="305287.73" CE_SPENT_AMT="71824.61" TOT_SPENT_AMT="381846.40" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="282558.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807084" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.3 MILES E. OF FM 3167" LIMITS_TO_DSCR="0.2 MILES W. OF RIVER RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="351488" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="11/12/2024" CNSTR_PCT_TIME_USED="93.33" CNSTR_PCT_COMPLETE="82.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11281.21" CNSTR_SPENT_AMT="294751.92" CE_SPENT_AMT="29758.18" TOT_SPENT_AMT="335791.31" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003807085" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.1 MI. W OF REV. RICHARD T. PEEL ST." LIMITS_TO_DSCR="0.1 MI. E OF REV. RICHARD T. PEEL ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="324811" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="151.55" TOT_SPENT_AMT="151.55" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="324811.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003810012" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 650" CNTY_NM="Starr" LIMITS_FROM_DSCR="PLAZA ST." LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="136188" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Replace Guardrail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/5/2020" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.720 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="3/8/2021" CNSTR_PCT_TIME_USED="215.23" CNSTR_PCT_COMPLETE="105.38" DSGN_START_TRGT_DT="4/13/2020" DSGN_START_ACTL_DT="4/13/2020" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="6/3/2020" UTIL_TRGT_DT="6/23/2020" UTIL_ACTL_DT="6/5/2020" ROW_TRGT_DT="6/23/2020" ROW_ACTL_DT="6/5/2020" RTL_TRGT_DT="6/23/2020" RTL_ACTL_DT="6/5/2020" PE_SPENT_AMT="1561.93" CNSTR_SPENT_AMT="135174.05" CE_SPENT_AMT="58245.85" TOT_SPENT_AMT="194981.83" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="86799.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003810013" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 650" CNTY_NM="Starr" LIMITS_FROM_DSCR="US 83 WEST 2.452 MILES" LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4195063" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="868765.01" TOT_SPENT_AMT="868765.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="4362866.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901097" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="FAIRGROUNDS RD." LIMITS_TO_DSCR="INTERSECTION OF W 2ND ST. &amp; W MAIN ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7280000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901098" PT_PHASE="Planning, 10+ years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="INTERSECTION OF E 2ND ST. &amp; E MAIN ST." LIMITS_TO_DSCR="EMBASSY ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20132000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.876 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901099" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="FAIRGROUNDS RD." LIMITS_TO_DSCR="SAN BENITO ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1475565" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/9/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/18/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/18/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/18/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="297.67" TOT_SPENT_AMT="297.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1534588.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901100" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="@ SAN ANTONIO AVE." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="121274" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="72.96" CNSTR_SPENT_AMT="116218.80" CE_SPENT_AMT="29457.08" TOT_SPENT_AMT="145748.84" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="188103.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="@ HIDALGO AVE." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="46068" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="49.17" CNSTR_SPENT_AMT="35152.50" CE_SPENT_AMT="11486.74" TOT_SPENT_AMT="46688.41" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="51867.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901102" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.1 MILES WEST OF E FM 1430" LIMITS_TO_DSCR="0.1 MILES EAST OF E FM 1430" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="302664" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/15/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/16/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="THE LEVY COMPANY, INC." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="10/15/2024" CNSTR_PCT_TIME_USED="85.47" CNSTR_PCT_COMPLETE="74.32" DSGN_START_TRGT_DT="9/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39.28" CNSTR_SPENT_AMT="240032.81" CE_SPENT_AMT="15789.71" TOT_SPENT_AMT="255861.80" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="347202.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003901104" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Starr" LIMITS_FROM_DSCR="0.1 MILES W. OF FM 1430" LIMITS_TO_DSCR="0.1 MILES E. OF FM 1430" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="205215" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="2/7/2025" CNSTR_PCT_TIME_USED="18.25" CNSTR_PCT_COMPLETE="46.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="51.73" CNSTR_SPENT_AMT="57716.21" CE_SPENT_AMT="2856.52" TOT_SPENT_AMT="60624.46" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="P.J. GARZA RD" LIMITS_TO_DSCR="1/2 MI E OF P.J. GARZA RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/7/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="113486" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="8/26/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/15/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2020" PSE_100_ACTL_DT="3/3/2020" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="7/20/2020" CNSTR_WKBG_DT="9/2/2020" CNSTR_PCT_TIME_USED="98.81" CNSTR_PCT_COMPLETE="94.02" DSGN_START_TRGT_DT="1/28/2019" DSGN_START_ACTL_DT="1/28/2019" ENVCLR_TRGT_DT="3/10/2020" ENVCLR_ACTL_DT="2/11/2020" UTIL_TRGT_DT="3/24/2020" UTIL_ACTL_DT="3/3/2020" ROW_TRGT_DT="3/24/2020" ROW_ACTL_DT="3/3/2020" RTL_TRGT_DT="5/7/2020" RTL_ACTL_DT="3/3/2020" PE_SPENT_AMT="18.55" CNSTR_SPENT_AMT="109889.74" CE_SPENT_AMT="18254.39" TOT_SPENT_AMT="128162.68" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="201442.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902074" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="@ FM 886" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902075" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="US 83 &amp; N COYOTE BLVD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902076" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="US 83 &amp; 1.92 MI W OF FM 2221" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="0.3 MILES EAST OF VANDERPOOL RD." LIMITS_TO_DSCR="TABASCO RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1886967" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/15/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/16/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17299.96" TOT_SPENT_AMT="17299.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2037924.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="0.1 MILES WEST OF EL PINTO RD." LIMITS_TO_DSCR="0.1 MILES EAST OF EL PINTO RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="317340" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/15/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/16/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="THE LEVY COMPANY, INC." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="10/15/2024" CNSTR_PCT_TIME_USED="85.47" CNSTR_PCT_COMPLETE="74.32" DSGN_START_TRGT_DT="9/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="249751.50" CE_SPENT_AMT="18092.36" TOT_SPENT_AMT="267843.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="329917.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902079" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="0.1 MILES N. OF SCOTT LN." LIMITS_TO_DSCR="0.1 MILES S. OF SCOTT LN." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="271931" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="2/7/2025" CNSTR_PCT_TIME_USED="18.25" CNSTR_PCT_COMPLETE="46.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="51.72" CNSTR_SPENT_AMT="104078.72" CE_SPENT_AMT="3850.12" TOT_SPENT_AMT="107980.56" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902080" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="1200 FEET WEST OF FM 886" LIMITS_TO_DSCR="1300 FEET EAST OF FM 886" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="205724" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42.04" TOT_SPENT_AMT="42.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="205724.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003902081" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003903107" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003903108" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003903109" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="FM 396" LIMITS_TO_DSCR="FM 2220" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="442255" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22781.06" TOT_SPENT_AMT="22781.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="459945.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003903110" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="IH 2" LIMITS_TO_DSCR="FM 396" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1772225" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7369.47" TOT_SPENT_AMT="7369.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1772225.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003904129" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="AT SS 433" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="306457" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="3/2/2021" CNSTR_PCT_TIME_USED="99.53" CNSTR_PCT_COMPLETE="95.10" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="65825.18" CNSTR_SPENT_AMT="310321.91" CE_SPENT_AMT="9685.03" TOT_SPENT_AMT="385832.12" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="155852.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003904130" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="@VICTORIA RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="102331" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="65691.42" CNSTR_SPENT_AMT="125812.82" CE_SPENT_AMT="24362.76" TOT_SPENT_AMT="215867.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="154057.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003904131" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003904132" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="0.1 MILES N. OF MILE 1 E. RD." LIMITS_TO_DSCR="0.1 MILES S. OF MILE 1 E. RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="213780" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="2/7/2025" CNSTR_PCT_TIME_USED="18.25" CNSTR_PCT_COMPLETE="46.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77615.23" CNSTR_SPENT_AMT="61898.54" CE_SPENT_AMT="3063.58" TOT_SPENT_AMT="142577.35" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003904133" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 83-S" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="0.1 MILES N. OF FM 1425" LIMITS_TO_DSCR="0.1 MILES S. OF FM 1425" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="219162" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="2/7/2025" CNSTR_PCT_TIME_USED="18.25" CNSTR_PCT_COMPLETE="46.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1135.81" CNSTR_SPENT_AMT="62799.34" CE_SPENT_AMT="3108.12" TOT_SPENT_AMT="67043.27" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003904134" PT_PHASE="Construction underway or begins soon" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="0.1 MILES W. OF IOWA ST." LIMITS_TO_DSCR="0.1 MILES E. OF IOWA ST." PRJ_TIER="" ENERGY="" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="247076" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="2/7/2025" CNSTR_PCT_TIME_USED="18.25" CNSTR_PCT_COMPLETE="46.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="107816.77" CE_SPENT_AMT="3487.08" TOT_SPENT_AMT="111303.85" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003906048" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907253" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ FM 801/SL 499" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="181134" DIST_LET_DATE="1/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2019" PSE_100_ACTL_DT="11/7/2019" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="4/21/2020" CNSTR_WKBG_DT="10/12/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.09" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="5/23/2019" ENVCLR_ACTL_DT="5/23/2019" UTIL_TRGT_DT="11/1/2019" UTIL_ACTL_DT="11/14/2019" ROW_TRGT_DT="11/1/2019" ROW_ACTL_DT="11/14/2019" RTL_TRGT_DT="11/1/2019" RTL_ACTL_DT="11/14/2019" PE_SPENT_AMT="9711.27" CNSTR_SPENT_AMT="171434.09" CE_SPENT_AMT="3994.26" TOT_SPENT_AMT="185139.62" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="313352.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907256" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="WHALEN RD." LIMITS_TO_DSCR="FM 2994" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/29/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2248369" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="3/29/2019" PSE_30_ACTL_DT="3/29/2019" PSE_60_TRGT_DT="6/21/2019" PSE_60_ACTL_DT="7/23/2019" PSE_100_TRGT_DT="9/13/2019" PSE_100_ACTL_DT="6/9/2020" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="EARTHWORKS ENTERPRISE" CNSTR_NTPD_DT="9/24/2020" CNSTR_WKBG_DT="10/26/2020" CNSTR_PCT_TIME_USED="107.01" CNSTR_PCT_COMPLETE="93.02" DSGN_START_TRGT_DT="11/5/2018" DSGN_START_ACTL_DT="11/5/2018" ENVCLR_TRGT_DT="6/15/2020" ENVCLR_ACTL_DT="6/5/2020" UTIL_TRGT_DT="7/1/2020" UTIL_ACTL_DT="6/9/2020" ROW_TRGT_DT="7/1/2020" ROW_ACTL_DT="6/9/2020" RTL_TRGT_DT="8/6/2020" RTL_ACTL_DT="6/9/2020" PE_SPENT_AMT="104236.99" CNSTR_SPENT_AMT="2158190.99" CE_SPENT_AMT="134323.15" TOT_SPENT_AMT="2396751.13" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="28383.00" FUND_CAT2_DSCR="Category 10 - Curb Ramp Program (2010CR)" FUND_CAT2_PID="MAS" FUND_CAT2_AMT="1106945.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907257" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="INDUSTRIAL BLVD." LIMITS_TO_DSCR="LOOP 499 (PRIMERA RD.)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4138511" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="5/5/2022" PSE_30_ACTL_DT="5/5/2022" PSE_60_TRGT_DT="7/1/2022" PSE_60_ACTL_DT="7/1/2022" PSE_100_TRGT_DT="11/30/2022" PSE_100_ACTL_DT="11/30/2022" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="FOREMOST PAVING, INC." CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="9/5/2023" CNSTR_PCT_TIME_USED="135.78" CNSTR_PCT_COMPLETE="90.08" DSGN_START_TRGT_DT="2/3/2020" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="11/30/2022" ENVCLR_ACTL_DT="11/30/2022" UTIL_TRGT_DT="12/2/2022" UTIL_ACTL_DT="12/2/2022" ROW_TRGT_DT="12/2/2022" ROW_ACTL_DT="12/2/2022" RTL_TRGT_DT="2/2/2023" RTL_ACTL_DT="2/2/2023" PE_SPENT_AMT="915153.07" CNSTR_SPENT_AMT="3994124.19" CE_SPENT_AMT="241662.92" TOT_SPENT_AMT="5150940.18" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="395639.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907260" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FM 732" LIMITS_TO_DSCR=".05 MI S OF BU 77" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9102" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/3/2023" PSE_30_ACTL_DT="2/3/2023" PSE_60_TRGT_DT="3/3/2023" PSE_60_ACTL_DT="3/3/2023" PSE_100_TRGT_DT="5/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="PAVEMENT MARKINGS INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="23.81" CNSTR_PCT_COMPLETE="87.72" DSGN_START_TRGT_DT="12/5/2022" DSGN_START_ACTL_DT="12/5/2022" ENVCLR_TRGT_DT="3/17/2023" ENVCLR_ACTL_DT="3/1/2023" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9398.05" CNSTR_SPENT_AMT="11476.50" CE_SPENT_AMT="237.45" TOT_SPENT_AMT="21112.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907261" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907262" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MILES SOUTH OF IH-69E" LIMITS_TO_DSCR="0.1 MILES NORTH OF IH-69E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="450000" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19974.52" TOT_SPENT_AMT="19974.52" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907263" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="SL 499 (SOUTH INTERSECTION)" LIMITS_TO_DSCR="FM 2994" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4329549" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="4502731.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907264" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 SB @ SPUR 54" LIMITS_TO_DSCR="1.1 MI S OF FM 2994 NBI# 210310003907209" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="211690" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="166.20" TOT_SPENT_AMT="166.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="376135.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907265" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ M ST" LIMITS_TO_DSCR="0.7 MI NW OF FM 1479 NBI#210310003907304" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1725" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="2.97" TOT_SPENT_AMT="2.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="575.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907266" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ RESACA DE LOS FRESNOS" LIMITS_TO_DSCR="0.5 MI NW OF FM 2520 NBI#210310003907366" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52515" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="90.38" TOT_SPENT_AMT="90.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="17505.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907267" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ F ST" LIMITS_TO_DSCR="0.2 MI NW OF FM 1479 NBI#210310003907305" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18240" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="31.34" TOT_SPENT_AMT="31.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="144000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907268" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 SB @ F ST" LIMITS_TO_DSCR="0.2 MI NW OF FM 1479 NBI#210310003907306" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21033" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="36.18" TOT_SPENT_AMT="36.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="166050.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907269" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ FM 509 (HELEN MOORE RD)" LIMITS_TO_DSCR="1.50 MI SE OF FM 801 NBI#210310003907330" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12768" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="21.91" TOT_SPENT_AMT="21.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="100800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907270" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 SB @ FM 509 (HELEN MOORE RD)" LIMITS_TO_DSCR="1.5 MI SE OF FM 801 NBI#210310003907331" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12768" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="21.91" TOT_SPENT_AMT="21.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="100800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907271" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 SB @ FM 732 UPRR US 77 BUS" LIMITS_TO_DSCR="2.15 MI SE OF SH 345 NBI#210310003907376" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73644" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="126.76" TOT_SPENT_AMT="126.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="581400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907272" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ FM 732 UP RR US 77 BUS" LIMITS_TO_DSCR="2.15 MI SE OF SH 345 NBI#210310003907377" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73644" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="126.76" TOT_SPENT_AMT="126.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="581400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907273" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 SB @ RESACA DE LOS FRESNOS" LIMITS_TO_DSCR="0.5 MI NW OF FM 2520 NBI#210310003907367" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="383494" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="383494.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907274" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NBFR @ RESACA DE LOS FRESNOS" LIMITS_TO_DSCR="0.5 MI NW OF FM 2520 NBI#210310003907375" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19088" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="19088.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907275" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ RESACA DE LOS FRESNOS" LIMITS_TO_DSCR="0.5 MI NW OF FM 2520 NBI#210310003907366" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106872" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="106872.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907279" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907281" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003907282" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003908105" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR=".05 MI S OF BU 77" LIMITS_TO_DSCR="0.6 MI N OF FM 3248" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="102734" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/3/2023" PSE_30_ACTL_DT="2/3/2023" PSE_60_TRGT_DT="3/3/2023" PSE_60_ACTL_DT="3/3/2023" PSE_100_TRGT_DT="5/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="PAVEMENT MARKINGS INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="23.81" CNSTR_PCT_COMPLETE="87.72" DSGN_START_TRGT_DT="12/5/2022" DSGN_START_ACTL_DT="12/5/2022" ENVCLR_TRGT_DT="3/17/2023" ENVCLR_ACTL_DT="3/1/2023" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="100493.50" CE_SPENT_AMT="3312.44" TOT_SPENT_AMT="103805.94" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003908106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MILES N. OF FM 803" LIMITS_TO_DSCR="0.1 MILES S. OF FM 803" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="637818" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="2/7/2025" CNSTR_PCT_TIME_USED="18.25" CNSTR_PCT_COMPLETE="46.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="467678.74" CE_SPENT_AMT="9046.99" TOT_SPENT_AMT="476725.73" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003908107" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ RUNNELS ST (FR T/A)" LIMITS_TO_DSCR="1.05 MI NW OF SH 100 NBI#210310003908224" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12768" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="21.91" TOT_SPENT_AMT="21.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="100800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003908108" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.6 MI N OF FM 3248" LIMITS_TO_DSCR="IH 169" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4930820" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="5522518.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003908109" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="WEST RAIL TRAIL ON RAILROAD ST." LIMITS_TO_DSCR="SPORTS PARK BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="705.22" TOT_SPENT_AMT="705.22" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003908110" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003909064" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.6 MI N OF FM 3248" LIMITS_TO_DSCR="FM 3248" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6500" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/3/2023" PSE_30_ACTL_DT="2/3/2023" PSE_60_TRGT_DT="3/3/2023" PSE_60_ACTL_DT="3/3/2023" PSE_100_TRGT_DT="5/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="PAVEMENT MARKINGS INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="23.81" CNSTR_PCT_COMPLETE="87.72" DSGN_START_TRGT_DT="12/5/2022" DSGN_START_ACTL_DT="12/5/2022" ENVCLR_TRGT_DT="3/17/2023" ENVCLR_ACTL_DT="3/1/2023" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="5840.00" CE_SPENT_AMT="513.05" TOT_SPENT_AMT="6353.05" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003909065" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.5 MI N OF FM 802" LIMITS_TO_DSCR="0.6 MI N OF FM 3248" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3628700" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4064144.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910080" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FM 1419" LIMITS_TO_DSCR="REMEDIOS AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27558982" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/4/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/10/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="FOREMOST PAVING, INC." CNSTR_NTPD_DT="6/12/2024" CNSTR_WKBG_DT="3/4/2025" CNSTR_PCT_TIME_USED="10.63" CNSTR_PCT_COMPLETE="18.30" DSGN_START_TRGT_DT="9/3/2024" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="11/21/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1612068.41" CNSTR_SPENT_AMT="8853812.01" CE_SPENT_AMT="43406.97" TOT_SPENT_AMT="10509287.39" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="20560000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="5872983.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT3_AMT="697791.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910083" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="SH 48" LIMITS_TO_DSCR="FM 313" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14554788" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="1/23/2025" PSE_30_ACTL_DT="6/13/2022" PSE_60_TRGT_DT="6/2/2025" PSE_60_ACTL_DT="8/8/2022" PSE_100_TRGT_DT="10/29/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.242 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/31/2019" DSGN_START_ACTL_DT="10/31/2019" ENVCLR_TRGT_DT="2/6/2025" ENVCLR_ACTL_DT="6/3/2022" UTIL_TRGT_DT="6/1/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2029" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1765228.73" CE_SPENT_AMT="593.03" TOT_SPENT_AMT="1765821.76" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="8011634.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910085" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="SECURITY DR" LIMITS_TO_DSCR="FM 313" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17220000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.460 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910087" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-Z" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ US 281/SH 48" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="69940" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="72.96" CNSTR_SPENT_AMT="66689.80" CE_SPENT_AMT="16893.50" TOT_SPENT_AMT="83656.26" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="154057.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910088" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MI W. OF FM 511" LIMITS_TO_DSCR="0.1 MI E. OF FM 511" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="158327" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/18/2022" PSE_30_ACTL_DT="3/28/2022" PSE_60_TRGT_DT="3/7/2022" PSE_60_ACTL_DT="4/26/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="D&amp;G ENERGY CORPORATION" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="93.83" DSGN_START_TRGT_DT="1/31/2022" DSGN_START_ACTL_DT="3/7/2022" ENVCLR_TRGT_DT="4/18/2022" ENVCLR_ACTL_DT="5/27/2022" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="6/1/2022" ROW_TRGT_DT="6/1/2022" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="106.80" CNSTR_SPENT_AMT="154381.85" CE_SPENT_AMT="56819.80" TOT_SPENT_AMT="211308.45" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="151584.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910089" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MI W. OF CENTRAL AVE." LIMITS_TO_DSCR="0.1 MI E. OF CENTRAL AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="193559" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/18/2022" PSE_30_ACTL_DT="3/28/2022" PSE_60_TRGT_DT="3/7/2022" PSE_60_ACTL_DT="4/26/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="D&amp;G ENERGY CORPORATION" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="93.83" DSGN_START_TRGT_DT="1/31/2022" DSGN_START_ACTL_DT="3/7/2022" ENVCLR_TRGT_DT="4/18/2022" ENVCLR_ACTL_DT="5/27/2022" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="6/1/2022" ROW_TRGT_DT="6/1/2022" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="88.91" CNSTR_SPENT_AMT="201652.95" CE_SPENT_AMT="100447.21" TOT_SPENT_AMT="302189.07" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="154426.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910090" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.20 MILES WEST OF LBJ BLVD." LIMITS_TO_DSCR="0.05 MILES EAST OF LBJ BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="109086" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/15/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/28/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/16/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="75536.61" TOT_SPENT_AMT="75536.61" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="109086.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910091" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FM 1419" LIMITS_TO_DSCR="REMEDIOS AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65000000" DIST_LET_DATE="7/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="319945.19" TOT_SPENT_AMT="319945.19" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="40000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910092" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910093" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910094" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910095" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FM 313" LIMITS_TO_DSCR="FM 1419" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="253778" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="274080.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003910096" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 4" CNTY_NM="Cameron" LIMITS_FROM_DSCR="SH 4, NBI#210310003910094" LIMITS_TO_DSCR="@ DRAINAGE DITCH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2615512" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="80867.37" TOT_SPENT_AMT="80867.37" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2615512.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912057" PT_PHASE="Planning, 10+ years" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="ARROYO COLORADO BRIDGE" LIMITS_TO_DSCR="FM 510" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80810217" DIST_LET_DATE="8/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1124424.29" TOT_SPENT_AMT="1124424.29" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912252" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ FM 509" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="259251" DIST_LET_DATE="1/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2019" PSE_100_ACTL_DT="11/7/2019" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="4/21/2020" CNSTR_WKBG_DT="10/12/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.09" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="5/23/2019" ENVCLR_ACTL_DT="5/23/2019" UTIL_TRGT_DT="11/1/2019" UTIL_ACTL_DT="11/14/2019" ROW_TRGT_DT="11/1/2019" ROW_ACTL_DT="11/14/2019" RTL_TRGT_DT="11/1/2019" RTL_ACTL_DT="11/14/2019" PE_SPENT_AMT="64861.09" CNSTR_SPENT_AMT="310247.58" CE_SPENT_AMT="3172.29" TOT_SPENT_AMT="378280.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="214285.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912253" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ FM 1846" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="116441" DIST_LET_DATE="1/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2019" PSE_100_ACTL_DT="11/7/2019" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="4/21/2020" CNSTR_WKBG_DT="10/12/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.09" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="5/23/2019" ENVCLR_ACTL_DT="5/23/2019" UTIL_TRGT_DT="11/1/2019" UTIL_ACTL_DT="11/14/2019" ROW_TRGT_DT="11/1/2019" ROW_ACTL_DT="11/14/2019" RTL_TRGT_DT="11/1/2019" RTL_ACTL_DT="11/14/2019" PE_SPENT_AMT="10276.78" CNSTR_SPENT_AMT="116582.17" CE_SPENT_AMT="2742.02" TOT_SPENT_AMT="129600.97" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="214285.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912254" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="COMMERCE ST." LIMITS_TO_DSCR="ARROYO BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7335214" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="6/29/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/22/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/3/2020" DSGN_START_ACTL_DT="1/3/2020" ENVCLR_TRGT_DT="2/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="412848.16" CE_SPENT_AMT="46.82" TOT_SPENT_AMT="412894.98" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912255" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FLOODWAY BRIDGE" LIMITS_TO_DSCR="LOOP 499" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="226165" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/25/2020" PSE_100_ACTL_DT="2/25/2020" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="IOC COMPANY LLC" CNSTR_NTPD_DT="4/1/2021" CNSTR_WKBG_DT="5/24/2021" CNSTR_PCT_TIME_USED="97.39" CNSTR_PCT_COMPLETE="106.08" DSGN_START_TRGT_DT="8/1/2019" DSGN_START_ACTL_DT="8/1/2019" ENVCLR_TRGT_DT="11/6/2019" ENVCLR_ACTL_DT="11/6/2019" UTIL_TRGT_DT="12/1/2020" UTIL_ACTL_DT="12/1/2020" ROW_TRGT_DT="12/1/2020" ROW_ACTL_DT="12/1/2020" RTL_TRGT_DT="12/1/2020" RTL_ACTL_DT="12/1/2020" CNSTR_SPENT_AMT="221836.70" CE_SPENT_AMT="14274.78" TOT_SPENT_AMT="236111.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="438757.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912259" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="LOOP 499" LIMITS_TO_DSCR="IH-69E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3777968" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/3/2022" PSE_100_ACTL_DT="11/8/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.290 (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="FOREMOST PAVING, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="2/17/2023" CNSTR_PCT_TIME_USED="73.60" CNSTR_PCT_COMPLETE="99.53" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="9/26/2022" ENVCLR_TRGT_DT="11/8/2022" ENVCLR_ACTL_DT="8/11/2022" UTIL_TRGT_DT="11/4/2022" UTIL_ACTL_DT="11/7/2022" ROW_TRGT_DT="11/4/2022" ROW_ACTL_DT="11/7/2022" RTL_TRGT_DT="11/8/2022" RTL_ACTL_DT="11/8/2022" PE_SPENT_AMT="21028.26" CNSTR_SPENT_AMT="4144155.42" CE_SPENT_AMT="111047.69" TOT_SPENT_AMT="4276231.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4144736.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912264" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ FM 1846/SS 486" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="31882" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="54.68" CNSTR_SPENT_AMT="20981.00" CE_SPENT_AMT="7405.00" TOT_SPENT_AMT="28440.68" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="188102.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912265" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ IOWA GARDENS RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50853" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="131.11" CNSTR_SPENT_AMT="51498.20" CE_SPENT_AMT="12151.41" TOT_SPENT_AMT="63780.72" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="100555.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912266" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ CAMINO REAL BLVD./YOAKUM ST." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="36515" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="32.80" CNSTR_SPENT_AMT="33886.30" CE_SPENT_AMT="8303.41" TOT_SPENT_AMT="42222.51" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="54652.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003912267" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-X" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MILES NORTH OF FM 732/FM 510" LIMITS_TO_DSCR="0.1 MILES SOUTH OF FM 732/FM 510" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="267603" DIST_LET_DATE="8/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2985.56" TOT_SPENT_AMT="2985.56" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003914013" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003916069" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FM 802" LIMITS_TO_DSCR="0.49 MI S OF SH 4" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4814320" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/1/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/2/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2826.70" TOT_SPENT_AMT="2826.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="5006893.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003916071" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="@ 14TH ST." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="114398" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" CNSTR_SPENT_AMT="178665.45" CE_SPENT_AMT="28278.24" TOT_SPENT_AMT="206943.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="188103.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003916072" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="US 77 NB @ 24TH ST." LIMITS_TO_DSCR="12TH ST., NBI#210310003916170" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74617" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="128.46" TOT_SPENT_AMT="128.46" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="40300.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003916073" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 69E" CNTY_NM="Cameron" LIMITS_FROM_DSCR="FM 802" LIMITS_TO_DSCR="0.5 MI N OF FM 802" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="817020" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="915062.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003917210" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="US 83 EB ML &amp; FR @ EDINBURG MAIN CANAL" LIMITS_TO_DSCR="2.2 MI SE OF FM 492 NBI#211090003917315" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7822" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Andres A. Espinoza P.E." TXDOT_CNTCT_PH_NBR="(956)399-5103" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="26.09" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="13.41" TOT_SPENT_AMT="13.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3592.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003917211" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="US 83 WB ML &amp; FR @ EDINBURG MAIN CANAL" LIMITS_TO_DSCR="2.20 MI SE OF FM 492 NBI#211090003917316" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="602081" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="602081.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003918122" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="FM 2557" LIMITS_TO_DSCR="FM 1423" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4336150" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/1/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/2/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.760 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/2/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50132.37" TOT_SPENT_AMT="50132.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="4509596.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003918123" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="FM 2557" LIMITS_TO_DSCR="FM 1423" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1339046" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.768 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/13/2023" CNSTR_WKBG_DT="4/1/2024" CNSTR_PCT_TIME_USED="77.00" CNSTR_PCT_COMPLETE="98.04" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="5/2/2022" ENVCLR_TRGT_DT="6/7/2023" ENVCLR_ACTL_DT="8/11/2022" UTIL_TRGT_DT="7/14/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/14/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/14/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1117.42" CNSTR_SPENT_AMT="566603.57" CE_SPENT_AMT="10962.89" TOT_SPENT_AMT="578683.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="881650.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="81294.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003918124" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="FM 493" LIMITS_TO_DSCR="FM 1015" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9794400" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.433 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/18/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/18/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12983.16" TOT_SPENT_AMT="12983.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="10577952.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003918125" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="@ SS 433" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="148542" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/7/2021" PSE_60_TRGT_DT="11/10/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="3/4/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus A. Noriega, P.E." TXDOT_CNTCT_PH_NBR="(956)702-6251" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="3/20/2023" CNSTR_PCT_TIME_USED="74.26" CNSTR_PCT_COMPLETE="87.81" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="4/26/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="4/1/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="4/1/2022" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" CNSTR_SPENT_AMT="148306.50" CE_SPENT_AMT="36428.13" TOT_SPENT_AMT="184734.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="188103.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003918126" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="FM 1423" LIMITS_TO_DSCR="FM 493" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3976200" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4453344.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003918128" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 2" CNTY_NM="Hidalgo" LIMITS_FROM_DSCR="FM 2557" LIMITS_TO_DSCR="FM 1423" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1040000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003919063" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003920009" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 54" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MILES WEST OF BASS PRO DRIVE" LIMITS_TO_DSCR="0.1 MILES EAST OF BASS PRO DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="279569" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15609.64" TOT_SPENT_AMT="15609.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="279570.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="003920010" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 54" CNTY_NM="Cameron" LIMITS_FROM_DSCR="0.1 MILES WEST OF PALM COURT" LIMITS_TO_DSCR="0.1 MILES EAST OF PALM COURT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="279569" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2002.03" TOT_SPENT_AMT="2002.03" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="279570.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004001051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Dallam" LIMITS_FROM_DSCR="NEW MEXICO STATE LINE" LIMITS_TO_DSCR="3.6 MILES N OF FM 3110" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1311760" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1416701.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004002028" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Dallam" LIMITS_FROM_DSCR="3.6 MILES NW OF FM 3110" LIMITS_TO_DSCR="1.0 MILE N OF FM 1879" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1433816" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1548521.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004003068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Dallam" LIMITS_FROM_DSCR="AT BU 87-B (7TH STREET)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="290393" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="12/13/2019" PSE_30_ACTL_DT="12/13/2019" PSE_60_TRGT_DT="1/30/2020" PSE_60_ACTL_DT="1/30/2020" PSE_100_TRGT_DT="12/9/2020" PSE_100_ACTL_DT="12/9/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.190 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="AMERICAN LIGHTING AND SIGNALIZATION, LLC" CNSTR_NTPD_DT="2/3/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="182.95" CNSTR_PCT_COMPLETE="87.48" DSGN_START_TRGT_DT="10/10/2019" DSGN_START_ACTL_DT="10/10/2019" ENVCLR_TRGT_DT="4/30/2020" ENVCLR_ACTL_DT="4/30/2020" UTIL_TRGT_DT="12/9/2020" UTIL_ACTL_DT="12/9/2020" ROW_TRGT_DT="10/10/2019" ROW_ACTL_DT="10/10/2019" RTL_TRGT_DT="3/1/2021" RTL_ACTL_DT="3/29/2021" CNSTR_SPENT_AMT="290408.32" CE_SPENT_AMT="1179.03" TOT_SPENT_AMT="291587.35" FUND_CAT1_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004003070" PT_PHASE="Construction begins within 4 years" CNTY_NM="Dallam" LIMITS_FROM_DSCR="1 MILES N OF FM 1879" LIMITS_TO_DSCR="1.23 MILES S OF FM 1727" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2781600" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3115392.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004101048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Hartley" LIMITS_FROM_DSCR="AT 16TH STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="248963" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/13/2019" PSE_30_ACTL_DT="12/13/2019" PSE_60_TRGT_DT="1/30/2020" PSE_60_ACTL_DT="1/30/2020" PSE_100_TRGT_DT="12/9/2020" PSE_100_ACTL_DT="12/9/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="AMERICAN LIGHTING AND SIGNALIZATION, LLC" CNSTR_NTPD_DT="2/3/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="182.95" CNSTR_PCT_COMPLETE="87.48" DSGN_START_TRGT_DT="10/10/2019" DSGN_START_ACTL_DT="10/10/2019" ENVCLR_TRGT_DT="4/30/2020" ENVCLR_ACTL_DT="4/30/2020" UTIL_TRGT_DT="12/9/2020" UTIL_ACTL_DT="12/9/2020" ROW_TRGT_DT="10/10/2019" ROW_ACTL_DT="10/10/2019" RTL_TRGT_DT="3/1/2021" RTL_ACTL_DT="3/29/2021" PE_SPENT_AMT="143702.16" CNSTR_SPENT_AMT="296289.03" CE_SPENT_AMT="53031.50" TOT_SPENT_AMT="493022.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="205134.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004101049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Hartley" LIMITS_FROM_DSCR="AT 16TH STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64600" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="12/13/2019" PSE_30_ACTL_DT="12/13/2019" PSE_60_TRGT_DT="1/30/2020" PSE_60_ACTL_DT="1/30/2020" PSE_100_TRGT_DT="12/9/2020" PSE_100_ACTL_DT="12/9/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.032 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="AMERICAN LIGHTING AND SIGNALIZATION, LLC" CNSTR_NTPD_DT="2/3/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="182.95" CNSTR_PCT_COMPLETE="87.48" DSGN_START_TRGT_DT="10/10/2019" DSGN_START_ACTL_DT="10/10/2019" ENVCLR_TRGT_DT="4/30/2020" ENVCLR_ACTL_DT="4/30/2020" UTIL_TRGT_DT="12/9/2020" UTIL_ACTL_DT="12/9/2020" ROW_TRGT_DT="10/10/2019" ROW_ACTL_DT="10/10/2019" RTL_TRGT_DT="3/1/2021" RTL_ACTL_DT="3/29/2021" CNSTR_SPENT_AMT="101135.87" CE_SPENT_AMT="410.63" TOT_SPENT_AMT="101546.50" FUND_CAT1_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT1_AMT="40000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004101052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Hartley" LIMITS_FROM_DSCR="NORTH HARTLEY CITY LIMITS" LIMITS_TO_DSCR="US 385" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="830000" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.856 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="863200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004101053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004102016" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 385" CNTY_NM="Hartley" LIMITS_FROM_DSCR="US 87 IN HARTLEY" LIMITS_TO_DSCR="CHANNING" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5530312" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/31/2020" PSE_30_ACTL_DT="8/31/2020" PSE_60_TRGT_DT="9/28/2020" PSE_60_ACTL_DT="9/28/2020" PSE_100_TRGT_DT="1/11/2021" PSE_100_ACTL_DT="1/11/2021" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="13.936 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="11/1/2021" CNSTR_PCT_TIME_USED="95.33" CNSTR_PCT_COMPLETE="66.48" DSGN_START_TRGT_DT="6/1/2020" DSGN_START_ACTL_DT="6/1/2020" ENVCLR_TRGT_DT="1/11/2021" ENVCLR_ACTL_DT="1/6/2021" UTIL_TRGT_DT="1/11/2021" UTIL_ACTL_DT="2/1/2021" ROW_TRGT_DT="11/2/2020" ROW_ACTL_DT="12/11/2020" RTL_TRGT_DT="2/9/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="1203029.91" CNSTR_SPENT_AMT="6496977.95" CE_SPENT_AMT="139456.68" TOT_SPENT_AMT="7839464.54" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="5200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004102020" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 385" CNTY_NM="Hartley" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="SH 354 IN CHANNING" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1574950" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.677 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1574950.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004102021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 385" CNTY_NM="Hartley" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="SH 354 IN CHANNING" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11500000" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.677 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="175400.98" TOT_SPENT_AMT="175400.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="11960000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004105053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="CANADIAN RIVER BRIDGE" LIMITS_TO_DSCR="0.56 MILES SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1149485" DIST_LET_DATE="3/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.560 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="4/16/2021" CNSTR_WKBG_DT="7/7/2021" CNSTR_PCT_TIME_USED="97.22" CNSTR_PCT_COMPLETE="98.21" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="46830.22" CNSTR_SPENT_AMT="1189942.23" CE_SPENT_AMT="192385.31" TOT_SPENT_AMT="1429157.76" FUND_CAT1_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT1_AMT="178020.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004105054" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="MOORE COUNTY LINE" LIMITS_TO_DSCR="NORTH SIDE OF AMARILLO CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2650880" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1453.10" TOT_SPENT_AMT="1453.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2756915.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="7/18/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004105055" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="1.75 MI NORTH OF CANADIAN RIVER" LIMITS_TO_DSCR="5.0 MI NORTH OF FM 1719" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1814587" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.327 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="4/11/2024" CNSTR_WKBG_DT="9/17/2024" CNSTR_PCT_TIME_USED="50.31" CNSTR_PCT_COMPLETE="99.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32162.78" CNSTR_SPENT_AMT="1818952.76" CE_SPENT_AMT="48113.49" TOT_SPENT_AMT="1899229.03" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2077582.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107113" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="CENTRAL AVE. NB BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3086684" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/16/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="1/2/2023" PSE_100_ACTL_DT="12/30/2022" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.072 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="5/17/2023" CNSTR_WKBG_DT="12/1/2023" CNSTR_PCT_TIME_USED="108.61" CNSTR_PCT_COMPLETE="68.08" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="1/24/2023" UTIL_TRGT_DT="1/2/2023" UTIL_ACTL_DT="12/12/2022" ROW_TRGT_DT="10/31/2022" ROW_ACTL_DT="10/31/2022" RTL_TRGT_DT="1/27/2023" RTL_ACTL_DT="1/27/2023" PE_SPENT_AMT="751219.06" CNSTR_SPENT_AMT="2316631.57" CE_SPENT_AMT="59667.28" TOT_SPENT_AMT="3127517.91" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107114" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="CENTRAL AVE. SB BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2901074" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/16/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="1/2/2023" PSE_100_ACTL_DT="12/30/2022" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.072 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="5/17/2023" CNSTR_WKBG_DT="12/1/2023" CNSTR_PCT_TIME_USED="108.61" CNSTR_PCT_COMPLETE="68.08" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="1/24/2023" UTIL_TRGT_DT="1/2/2023" UTIL_ACTL_DT="12/12/2022" ROW_TRGT_DT="10/31/2022" ROW_ACTL_DT="10/31/2022" RTL_TRGT_DT="1/27/2023" RTL_ACTL_DT="1/27/2023" PE_SPENT_AMT="297.67" CNSTR_SPENT_AMT="1694679.43" CE_SPENT_AMT="57153.62" TOT_SPENT_AMT="1752130.72" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107115" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="HASTINGS AVE. NB BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2834564" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/16/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="1/2/2023" PSE_100_ACTL_DT="12/30/2022" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.125 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="5/17/2023" CNSTR_WKBG_DT="12/1/2023" CNSTR_PCT_TIME_USED="108.61" CNSTR_PCT_COMPLETE="68.08" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="1/24/2023" UTIL_TRGT_DT="1/2/2023" UTIL_ACTL_DT="12/12/2022" ROW_TRGT_DT="10/31/2022" ROW_ACTL_DT="10/31/2022" RTL_TRGT_DT="1/27/2023" RTL_ACTL_DT="1/27/2023" PE_SPENT_AMT="2328.77" CNSTR_SPENT_AMT="2232931.25" CE_SPENT_AMT="59474.71" TOT_SPENT_AMT="2294734.73" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107116" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="HASTINGS AVE. SB BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2843410" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/16/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="9/23/2022" PSE_100_TRGT_DT="1/2/2023" PSE_100_ACTL_DT="12/30/2022" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.125 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="5/17/2023" CNSTR_WKBG_DT="12/1/2023" CNSTR_PCT_TIME_USED="108.61" CNSTR_PCT_COMPLETE="68.08" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="1/24/2023" UTIL_TRGT_DT="1/2/2023" UTIL_ACTL_DT="12/12/2022" ROW_TRGT_DT="10/31/2022" ROW_ACTL_DT="10/31/2022" RTL_TRGT_DT="1/27/2023" RTL_ACTL_DT="1/27/2023" PE_SPENT_AMT="249.49" CNSTR_SPENT_AMT="1546101.02" CE_SPENT_AMT="55019.12" TOT_SPENT_AMT="1601369.63" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107117" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="US 87 AT S 15TH AVE BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1343374" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="6/1/2022" PSE_30_ACTL_DT="6/1/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/19/2022" PSE_100_TRGT_DT="12/1/2022" PSE_100_ACTL_DT="11/30/2022" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.037 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="4/25/2023" CNSTR_WKBG_DT="8/29/2023" CNSTR_PCT_TIME_USED="128.35" CNSTR_PCT_COMPLETE="90.30" DSGN_START_TRGT_DT="4/18/2022" DSGN_START_ACTL_DT="4/18/2022" ENVCLR_TRGT_DT="12/1/2022" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="12/1/2022" ROW_TRGT_DT="10/3/2022" ROW_ACTL_DT="10/3/2022" RTL_TRGT_DT="12/30/2022" RTL_ACTL_DT="12/16/2022" PE_SPENT_AMT="108161.88" CNSTR_SPENT_AMT="967748.66" CE_SPENT_AMT="41108.86" TOT_SPENT_AMT="1117019.40" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="920000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107118" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="US 87 AT 15TH AVE NB BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1346900" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="6/1/2022" PSE_30_ACTL_DT="6/1/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="8/19/2022" PSE_100_TRGT_DT="12/1/2022" PSE_100_ACTL_DT="11/30/2022" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.037 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="4/25/2023" CNSTR_WKBG_DT="8/29/2023" CNSTR_PCT_TIME_USED="128.35" CNSTR_PCT_COMPLETE="90.30" DSGN_START_TRGT_DT="4/18/2022" DSGN_START_ACTL_DT="4/18/2022" ENVCLR_TRGT_DT="12/1/2022" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="12/1/2022" ROW_TRGT_DT="10/3/2022" ROW_ACTL_DT="10/3/2022" RTL_TRGT_DT="12/30/2022" RTL_ACTL_DT="12/16/2022" PE_SPENT_AMT="81595.74" CNSTR_SPENT_AMT="1339233.43" CE_SPENT_AMT="44624.89" TOT_SPENT_AMT="1465454.06" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="920000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107121" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="AMARILLO CREEK" LIMITS_TO_DSCR="11 TH STREET IN AMARILLO" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21000000" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/6/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/12/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/11/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.816 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/11/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/11/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/11/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="200576.07" TOT_SPENT_AMT="200576.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="22230000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107122" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="5.0 MI NORTH OF FM 1719" LIMITS_TO_DSCR="FM 1719" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1080198" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.004 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="4/11/2024" CNSTR_WKBG_DT="9/17/2024" CNSTR_PCT_TIME_USED="50.31" CNSTR_PCT_COMPLETE="99.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1057932.25" CE_SPENT_AMT="29009.51" TOT_SPENT_AMT="1086941.76" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1444657.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004107123" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Potter" LIMITS_FROM_DSCR="0.815 MI NORTH OF SL 335" LIMITS_TO_DSCR="SL 335" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="925020" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="925020.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004201031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Potter" LIMITS_FROM_DSCR="IH 40" LIMITS_TO_DSCR="CARSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="612524" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="2/13/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="9.17" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="182.74" CE_SPENT_AMT="2.79" TOT_SPENT_AMT="185.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="679112.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004201032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Potter" LIMITS_FROM_DSCR="AT SS 228 INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.374 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="63221.41" TOT_SPENT_AMT="63221.41" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="2600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004201033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004202021" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004203044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="AT SH 207" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2102433" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="10/7/2021" PSE_30_ACTL_DT="10/12/2021" PSE_60_TRGT_DT="11/4/2021" PSE_60_ACTL_DT="11/10/2021" PSE_100_TRGT_DT="2/1/2022" PSE_100_ACTL_DT="1/19/2022" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.029 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="8/8/2022" CNSTR_WKBG_DT="8/29/2022" CNSTR_PCT_TIME_USED="141.35" CNSTR_PCT_COMPLETE="89.40" DSGN_START_TRGT_DT="8/2/2021" DSGN_START_ACTL_DT="8/2/2021" ENVCLR_TRGT_DT="2/1/2022" ENVCLR_ACTL_DT="12/20/2021" UTIL_TRGT_DT="2/1/2022" UTIL_ACTL_DT="1/18/2022" ROW_TRGT_DT="12/2/2021" ROW_ACTL_DT="12/2/2021" RTL_TRGT_DT="3/1/2022" RTL_ACTL_DT="2/17/2022" PE_SPENT_AMT="192930.40" CNSTR_SPENT_AMT="2103848.46" CE_SPENT_AMT="125836.23" TOT_SPENT_AMT="2422615.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1260000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004203047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="CARSON CO LINE" LIMITS_TO_DSCR="8.6 MILES EAST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18049268" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/6/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.168 (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="3.22" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/9/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/13/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/10/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="48050.95" CNSTR_SPENT_AMT="642512.75" CE_SPENT_AMT="1072.25" TOT_SPENT_AMT="691635.95" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="4000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="13625301.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004203048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="CARSON CO LINE" LIMITS_TO_DSCR="CR 4" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1842206" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/6/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.114 (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="3.22" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/9/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/13/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/10/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="113.22" TOT_SPENT_AMT="113.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1548274.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004204045" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="1.5 WEST OF FM 2889" LIMITS_TO_DSCR="FM 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="582482" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="629081.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004204046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="2.0 MI WEST OF FM 2889" LIMITS_TO_DSCR="FM 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1696073" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.614 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1696073.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004205033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="FM 294" LIMITS_TO_DSCR="3.6 MI EAST OF FM 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1724935" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6262.60" TOT_SPENT_AMT="6262.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1724935.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004205034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Armstrong" LIMITS_FROM_DSCR="1.4 MI EAST OF FM 294" LIMITS_TO_DSCR="3.6 MI EAST OF FM 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24498.93" TOT_SPENT_AMT="24498.93" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004205035" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004206073" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="0.1 MILE WEST OF BUGBEE STREET, EAST" LIMITS_TO_DSCR="0.1 MILE EAST OF CLARENDON ECL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16785573" DIST_LET_DATE="10/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/6/2020" PSE_30_ACTL_DT="1/31/2020" PSE_60_TRGT_DT="1/6/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="1/6/2020" PSE_100_ACTL_DT="12/22/2020" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/6/2020" DSGN_START_ACTL_DT="1/6/2020" ENVCLR_TRGT_DT="1/6/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/6/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/6/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/6/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="874402.48" TOT_SPENT_AMT="874402.48" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="17821440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004206075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="ARMSTRONG C/L, EAST" LIMITS_TO_DSCR="CLARENDON NCL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="836547" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="11/28/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="61.40" CNSTR_PCT_COMPLETE="109.22" DSGN_START_TRGT_DT="11/28/2022" DSGN_START_ACTL_DT="11/28/2022" ENVCLR_TRGT_DT="11/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/28/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/28/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32.26" CNSTR_SPENT_AMT="969752.35" CE_SPENT_AMT="10944.58" TOT_SPENT_AMT="980729.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="788756.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004206076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="ARMSTRONG C/L, EAST" LIMITS_TO_DSCR="CLARENDON ECL (SBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6446301" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/13/2022" PSE_30_ACTL_DT="12/30/2022" PSE_60_TRGT_DT="12/13/2022" PSE_60_ACTL_DT="1/25/2023" PSE_100_TRGT_DT="12/13/2022" PSE_100_ACTL_DT="3/29/2023" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="81.05" CNSTR_PCT_COMPLETE="105.54" DSGN_START_TRGT_DT="12/13/2022" DSGN_START_ACTL_DT="12/13/2022" ENVCLR_TRGT_DT="12/13/2022" ENVCLR_ACTL_DT="3/2/2023" UTIL_TRGT_DT="12/13/2022" UTIL_ACTL_DT="3/2/2023" ROW_TRGT_DT="12/13/2022" ROW_ACTL_DT="3/2/2023" RTL_TRGT_DT="12/13/2022" RTL_ACTL_DT="3/29/2023" PE_SPENT_AMT="26230.35" CNSTR_SPENT_AMT="6627654.34" CE_SPENT_AMT="71252.44" TOT_SPENT_AMT="6725137.13" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="8408608.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004206079" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004207071" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="SOUTH THURMAN STREET, EAST" LIMITS_TO_DSCR="FM 1260" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="576583" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matthew Herbstritt , P.E." TXDOT_CNTCT_PH_NBR="(940)937-7283" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="9/4/2024" CNSTR_PCT_TIME_USED="25.00" CNSTR_PCT_COMPLETE="101.79" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8828.60" CNSTR_SPENT_AMT="586894.57" CE_SPENT_AMT="4618.33" TOT_SPENT_AMT="600341.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1302467.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004207072" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="FM 1755, SOUTH" LIMITS_TO_DSCR="3500'" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="191188" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10264.99" TOT_SPENT_AMT="10264.99" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="210074.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004207073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="CLARENDON ECL, S" LIMITS_TO_DSCR="HEDLEY WCL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1053846" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="13.54" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="257.77" CNSTR_SPENT_AMT="148725.93" CE_SPENT_AMT="464.48" TOT_SPENT_AMT="149448.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="959862.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004207074" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="CLARENDON ECL, EAST" LIMITS_TO_DSCR="HEDLEY WCL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9400000" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="10528000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004207075" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004207076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004208059" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Donley" LIMITS_FROM_DSCR="HEDLEY ECL, SOUTH" LIMITS_TO_DSCR="HALL C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="732149" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="13.54" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="257.77" CNSTR_SPENT_AMT="103334.19" CE_SPENT_AMT="322.72" TOT_SPENT_AMT="103914.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="681641.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004208060" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004209124" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Hall" LIMITS_FROM_DSCR="348' SOUTH OF 2ND STREET, SOUTH" LIMITS_TO_DSCR="1.718 MILES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13478723" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/3/2019" PSE_30_ACTL_DT="5/20/2019" PSE_60_TRGT_DT="8/30/2019" PSE_60_ACTL_DT="7/1/2019" PSE_100_TRGT_DT="7/2/2020" PSE_100_ACTL_DT="7/2/2020" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="8/17/2021" CNSTR_PCT_TIME_USED="101.69" CNSTR_PCT_COMPLETE="108.23" DSGN_START_TRGT_DT="2/28/2018" DSGN_START_ACTL_DT="2/28/2018" ENVCLR_TRGT_DT="11/26/2019" ENVCLR_ACTL_DT="4/27/2020" UTIL_TRGT_DT="2/28/2018" UTIL_ACTL_DT="5/5/2021" ROW_TRGT_DT="2/28/2018" ROW_ACTL_DT="4/27/2020" RTL_TRGT_DT="7/2/2020" RTL_ACTL_DT="5/5/2021" PE_SPENT_AMT="494685.77" CNSTR_SPENT_AMT="14968712.86" CE_SPENT_AMT="365015.92" TOT_SPENT_AMT="15828414.55" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="10300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004209128" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Hall" LIMITS_FROM_DSCR="MEDICAL DRIVE (END OF DIV SECT), SOUTH" LIMITS_TO_DSCR="FM 1547 (EXISTING CONC SECT)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9360000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/26/2024" PSE_30_ACTL_DT="6/12/2019" PSE_60_TRGT_DT="9/6/2024" PSE_60_ACTL_DT="8/26/2019" PSE_100_TRGT_DT="10/18/2024" PSE_100_ACTL_DT="12/11/2019" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.049 (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/1/2024" DSGN_START_ACTL_DT="4/11/2019" ENVCLR_TRGT_DT="11/8/2024" ENVCLR_ACTL_DT="3/9/2022" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="3/9/2022" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="3/9/2022" RTL_TRGT_DT="11/8/2024" RTL_ACTL_DT="3/9/2022" PE_SPENT_AMT="476303.53" TOT_SPENT_AMT="476303.53" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="10483200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004209134" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Hall" LIMITS_FROM_DSCR="RM 202, SOUTH" LIMITS_TO_DSCR="FM 1619" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="338081" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="11/28/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="61.40" CNSTR_PCT_COMPLETE="109.22" DSGN_START_TRGT_DT="11/28/2022" DSGN_START_ACTL_DT="11/28/2022" ENVCLR_TRGT_DT="11/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/28/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/28/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32.26" CNSTR_SPENT_AMT="388812.27" CE_SPENT_AMT="4054.00" TOT_SPENT_AMT="392898.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="278221.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004209135" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Hall" LIMITS_FROM_DSCR="RED RIVER BRIDGE, SOUTH" LIMITS_TO_DSCR="1600' SOUTH OF SH 86 INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="168002" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="11/28/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="61.40" CNSTR_PCT_COMPLETE="109.22" DSGN_START_TRGT_DT="11/28/2022" DSGN_START_ACTL_DT="11/28/2022" ENVCLR_TRGT_DT="11/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/28/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/28/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32.26" CNSTR_SPENT_AMT="192887.35" CE_SPENT_AMT="2369.32" TOT_SPENT_AMT="195288.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="139110.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004209136" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Hall" LIMITS_FROM_DSCR="RED RIVER BRIDGE, SOUTH" LIMITS_TO_DSCR="CHILDRESS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="283289" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="11/28/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="61.40" CNSTR_PCT_COMPLETE="109.22" DSGN_START_TRGT_DT="11/28/2022" DSGN_START_ACTL_DT="11/28/2022" ENVCLR_TRGT_DT="11/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/28/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/28/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32.26" CNSTR_SPENT_AMT="325782.15" CE_SPENT_AMT="3886.71" TOT_SPENT_AMT="329701.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="278221.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004209137" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004211006" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 395" CNTY_NM="Potter" LIMITS_FROM_DSCR="GARFIELD ST" LIMITS_TO_DSCR="ROSS ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5976375" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="5/11/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/8/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/4/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.607 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="L A FULLER &amp; SONS CONSTRUCTION, LTD." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="10/28/2024" CNSTR_PCT_TIME_USED="74.34" CNSTR_PCT_COMPLETE="38.89" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="3/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/4/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/12/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/29/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12901.81" CNSTR_SPENT_AMT="2328078.93" CE_SPENT_AMT="74929.43" TOT_SPENT_AMT="2415910.17" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="902168.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004212083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="@ FM 164" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/22/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="469425" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC" CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="9/14/2021" CNSTR_PCT_TIME_USED="77.36" CNSTR_PCT_COMPLETE="97.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="47080.32" CNSTR_SPENT_AMT="433764.25" CE_SPENT_AMT="14911.37" TOT_SPENT_AMT="495755.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004212084" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="@ FM 164" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/22/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="469425" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC" CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="9/14/2021" CNSTR_PCT_TIME_USED="77.36" CNSTR_PCT_COMPLETE="97.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32386.18" CNSTR_SPENT_AMT="400110.10" CE_SPENT_AMT="14758.85" TOT_SPENT_AMT="447255.13" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004212086" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="2732' W OF FM 164 (NBL &amp; SBL) (RAMPS), E" LIMITS_TO_DSCR="CHILDRESS WCL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15308760" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/24/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="114.92" CNSTR_PCT_COMPLETE="81.93" DSGN_START_TRGT_DT="4/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/19/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="63688.74" CNSTR_SPENT_AMT="12496064.47" CE_SPENT_AMT="172385.74" TOT_SPENT_AMT="12732138.95" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="12619922.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="1848061.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004212096" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="HALL C/L, EAST" LIMITS_TO_DSCR="2100' WEST OF FM 164" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6500000" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19311.77" TOT_SPENT_AMT="19311.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="7020000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004301083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="335' EAST OF FM 2530, EAST" LIMITS_TO_DSCR="HARDEMAN C/L (NBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6175664" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/18/2023" PSE_60_ACTL_DT="8/11/2021" PSE_100_TRGT_DT="6/13/2023" PSE_100_ACTL_DT="10/11/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="4/5/2023" CNSTR_PCT_TIME_USED="99.26" CNSTR_PCT_COMPLETE="109.42" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="9/26/2022" ENVCLR_TRGT_DT="5/16/2023" ENVCLR_ACTL_DT="9/16/2021" UTIL_TRGT_DT="2/1/2023" UTIL_ACTL_DT="9/16/2021" ROW_TRGT_DT="2/1/2023" ROW_ACTL_DT="9/16/2021" RTL_TRGT_DT="6/13/2023" RTL_ACTL_DT="1/28/2022" PE_SPENT_AMT="68174.93" CNSTR_SPENT_AMT="6839469.17" CE_SPENT_AMT="111010.88" TOT_SPENT_AMT="7018654.98" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="230000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="6505231.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004301084" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="CHILDRESS ECL, EAST" LIMITS_TO_DSCR="HARDEMAN C/L (SBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5800000" DIST_LET_DATE="6/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/23/2033" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2033" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2033" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/18/2033" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2033" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2033" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2033" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="6496000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004301085" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Childress" LIMITS_FROM_DSCR="335' EAST OF FM 2530, E" LIMITS_TO_DSCR="HARDEMAN C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="780490" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3992.66" TOT_SPENT_AMT="3992.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="842929.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004302078" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 287" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="SL 285, EAST" LIMITS_TO_DSCR="ONE BLOCK EAST OF SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18800000" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/15/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/26/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/19/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/4/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/4/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/26/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="639688.69" TOT_SPENT_AMT="639688.69" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="9856000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004302080" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="@ BNSF RR &amp; LP 285" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/7/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28987860" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/4/2022" PSE_30_ACTL_DT="7/29/2022" PSE_60_TRGT_DT="4/4/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MORTMARA CONSTRUCTION, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="9/16/2024" CNSTR_PCT_TIME_USED="25.18" CNSTR_PCT_COMPLETE="41.97" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="4/4/2022" ENVCLR_TRGT_DT="4/4/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/4/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/4/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1320260.98" CNSTR_SPENT_AMT="12431022.47" CE_SPENT_AMT="353039.81" TOT_SPENT_AMT="14104323.26" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="22600000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="2999723.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004302081" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="CHILDRESS C/L, E" LIMITS_TO_DSCR="QUANAH WCL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1136320" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="350.58" TOT_SPENT_AMT="350.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1181773.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004304083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="65' WEST OF FM 2568, EAST" LIMITS_TO_DSCR="WILBARGER C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8059391" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="4/29/2024" CNSTR_PCT_TIME_USED="92.13" CNSTR_PCT_COMPLETE="104.94" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="40736.71" CNSTR_SPENT_AMT="8740552.12" CE_SPENT_AMT="133789.40" TOT_SPENT_AMT="8915078.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="8052930.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004304085" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305115" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305116" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305117" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305118" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305119" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305120" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004305121" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004306081" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 70" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="AT BNSF AND DUGAN CREEK (NB)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.233 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/7/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2030" RTL_ACTL_DT="11/7/2030" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004306082" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 70" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="AT BNSF AND DUGAN CREEK (SB)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.233 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/7/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2030" RTL_ACTL_DT="11/7/2030" PE_SPENT_AMT="54.00" TOT_SPENT_AMT="54.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004306083" PT_PHASE="Planning, 10+ years" HWY_NBR="US 70" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="AT FM 433" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/18/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/17/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/15/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.232 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/5/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/9/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2028" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="2500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004307118" PT_PHASE="Feasibility Studies" HWY_NBR="US 287" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="COUNTY ROAD 138 E" LIMITS_TO_DSCR="COUNTY ROAD 127 N" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150000" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="58626.24" TOT_SPENT_AMT="58626.24" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="150000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004307120" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004308086" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Wichita" LIMITS_FROM_DSCR="NEAR HARMONY ROAD" LIMITS_TO_DSCR="NEAR QUAIL VALLEY ROAD (NB FR AND RAMPS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73469" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3412.58" CE_SPENT_AMT="1.38" TOT_SPENT_AMT="3413.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="87213.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004308088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Wichita" LIMITS_FROM_DSCR="HARMONY RD" LIMITS_TO_DSCR="QUAIL VALLEY RD" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5428568" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="91.18" CNSTR_PCT_COMPLETE="82.96" DSGN_START_TRGT_DT="10/21/2022" DSGN_START_ACTL_DT="10/21/2022" ENVCLR_TRGT_DT="10/19/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/17/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="582074.96" CNSTR_SPENT_AMT="4510221.85" CE_SPENT_AMT="83979.31" TOT_SPENT_AMT="5176276.12" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004308090" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1485.74" TOT_SPENT_AMT="1485.74" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004309127" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 287" CNTY_NM="Wichita" LIMITS_FROM_DSCR="AT LP 11 (NB)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5900000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/25/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.302 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/4/2024" DSGN_START_ACTL_DT="9/20/2022" ENVCLR_TRGT_DT="7/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="2/24/2023" RTL_TRGT_DT="2/28/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="618598.70" TOT_SPENT_AMT="618598.70" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004309128" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 287" CNTY_NM="Wichita" LIMITS_FROM_DSCR="AT LP 11 (SB)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6300000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/25/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.302 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/4/2024" DSGN_START_ACTL_DT="9/20/2022" ENVCLR_TRGT_DT="7/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="2/24/2023" RTL_TRGT_DT="2/28/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="565691.15" TOT_SPENT_AMT="565691.15" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004309145" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Wichita" LIMITS_FROM_DSCR="NEAR QUAIL VALLEY RD" LIMITS_TO_DSCR="JOHNSON RD (NB FR AND RAMPS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="47174" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2840.81" CE_SPENT_AMT="0.89" TOT_SPENT_AMT="2841.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="58767.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004309146" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Wichita" LIMITS_FROM_DSCR="NEAR JOHNSON RD" LIMITS_TO_DSCR="IH 44" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7338061" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="7/24/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="5.35" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28254.88" CE_SPENT_AMT="4200.63" TOT_SPENT_AMT="32455.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="190061.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004314028" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5515.75" TOT_SPENT_AMT="5515.75" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004314029" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004317031" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287J" CNTY_NM="Wichita" LIMITS_FROM_DSCR="FM 368" LIMITS_TO_DSCR="SL 11" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9386787" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/16/2022" PSE_100_ACTL_DT="11/16/2022" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.991 (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="6/22/2023" CNSTR_WKBG_DT="7/31/2023" CNSTR_PCT_TIME_USED="154.42" CNSTR_PCT_COMPLETE="103.57" DSGN_START_TRGT_DT="7/6/2022" DSGN_START_ACTL_DT="10/1/2021" ENVCLR_TRGT_DT="7/6/2022" ENVCLR_ACTL_DT="11/30/2022" UTIL_TRGT_DT="7/1/2022" UTIL_ACTL_DT="11/16/2022" ROW_TRGT_DT="7/1/2022" ROW_ACTL_DT="10/1/2021" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="11/30/2022" PE_SPENT_AMT="57907.81" CNSTR_SPENT_AMT="9667767.04" CE_SPENT_AMT="683051.02" TOT_SPENT_AMT="10408725.87" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="9460938.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004317035" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287J" CNTY_NM="Wichita" LIMITS_FROM_DSCR="SL 11" LIMITS_TO_DSCR="IH 44" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/20/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1028501" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="6/6/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="76.65" CNSTR_PCT_COMPLETE="86.09" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2949.78" CNSTR_SPENT_AMT="894014.75" CE_SPENT_AMT="33910.40" TOT_SPENT_AMT="930874.93" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2410CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="1240286.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004317036" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 287J" CNTY_NM="Wichita" LIMITS_FROM_DSCR="CITY VIEW DR" LIMITS_TO_DSCR="SL 11 WFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="244629.58" TOT_SPENT_AMT="244629.58" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2710CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="1680000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004322012" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 287H" CNTY_NM="Wichita" LIMITS_FROM_DSCR="FM 1739" LIMITS_TO_DSCR="US 287" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="340800" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="368064.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004322013" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287H" CNTY_NM="Wichita" LIMITS_FROM_DSCR="AT DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="629985" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/20/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="4/3/2025" CNSTR_WKBG_DT="5/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="18.15" DSGN_START_TRGT_DT="4/4/2023" DSGN_START_ACTL_DT="4/4/2023" ENVCLR_TRGT_DT="4/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/21/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="271256.42" CNSTR_SPENT_AMT="153156.80" CE_SPENT_AMT="322.17" TOT_SPENT_AMT="424735.39" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="702143.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004323008" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 285" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="@ DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1836659" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/5/2023" PSE_60_ACTL_DT="8/26/2022" PSE_100_TRGT_DT="8/2/2023" PSE_100_ACTL_DT="12/30/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.035 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="HODGES AND SON CONSTRUCTION COMPANY, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="8/21/2023" CNSTR_PCT_TIME_USED="99.25" CNSTR_PCT_COMPLETE="101.85" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="5/13/2022" ENVCLR_TRGT_DT="8/2/2023" ENVCLR_ACTL_DT="8/29/2022" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="8/30/2022" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="8/29/2022" RTL_TRGT_DT="8/2/2023" RTL_ACTL_DT="12/30/2022" PE_SPENT_AMT="356472.77" CNSTR_SPENT_AMT="1871339.50" CE_SPENT_AMT="56837.20" TOT_SPENT_AMT="2284649.47" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1398600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004401110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Wichita" LIMITS_FROM_DSCR="WINDTHORST RD" LIMITS_TO_DSCR="FISHER RD (INTERCHANGE AREA FR/RAMPS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1039434" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.87" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8098.89" CNSTR_SPENT_AMT="963914.70" CE_SPENT_AMT="864.14" TOT_SPENT_AMT="972877.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1259434.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004401111" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Wichita" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="AT US 281" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004402101" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004403039" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Clay" LIMITS_FROM_DSCR="NEAR BRYANT EDWARDS ROAD" LIMITS_TO_DSCR="MONTAGUE CL" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29000000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="5/13/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/18/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/26/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.498 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/22/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/4/2027" RTL_ACTL_DT="11/4/2027" PE_SPENT_AMT="2553447.77" CNSTR_SPENT_AMT="93.06" TOT_SPENT_AMT="2553540.83" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="32984000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004403048" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Clay" LIMITS_FROM_DSCR="AT DRY FORK LITTLE WICHITA RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1350000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/29/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/3/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/5/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/20/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/20/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77601.18" TOT_SPENT_AMT="77601.18" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004403051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Clay" LIMITS_FROM_DSCR="FM 1197/BRIDGE STREET" LIMITS_TO_DSCR="NEAR BRYANT EDWARDS ROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="36138600" DIST_LET_DATE="10/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/12/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/17/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/13/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.192 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/22/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/22/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/30/2026" RTL_ACTL_DT="11/1/2029" PE_SPENT_AMT="277860.33" TOT_SPENT_AMT="277860.33" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="31417661.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="6662340.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004403054" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Clay" LIMITS_FROM_DSCR="HENRIETTA CITY LIMITS" LIMITS_TO_DSCR="MONTAGUE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="918701" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.87" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="941.56" CNSTR_SPENT_AMT="926037.75" CE_SPENT_AMT="7537.38" TOT_SPENT_AMT="934516.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="917025.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004404047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Montague" LIMITS_FROM_DSCR="SH 175 / MONTAGUE STREET" LIMITS_TO_DSCR="NEAR FM 1816" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27683391" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/15/2021" PSE_30_ACTL_DT="1/15/2021" PSE_60_TRGT_DT="2/15/2021" PSE_60_ACTL_DT="2/15/2021" PSE_100_TRGT_DT="3/25/2021" PSE_100_ACTL_DT="3/25/2021" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.100 (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="8/19/2021" CNSTR_WKBG_DT="10/25/2021" CNSTR_PCT_TIME_USED="92.91" CNSTR_PCT_COMPLETE="102.23" DSGN_START_TRGT_DT="12/1/2020" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="10/3/2019" ENVCLR_ACTL_DT="10/3/2019" UTIL_TRGT_DT="12/1/2020" UTIL_ACTL_DT="4/1/2021" ROW_TRGT_DT="1/28/2021" ROW_ACTL_DT="4/1/2021" RTL_TRGT_DT="4/1/2021" RTL_ACTL_DT="4/1/2021" PE_SPENT_AMT="2593261.43" CNSTR_SPENT_AMT="29838287.22" CE_SPENT_AMT="498253.95" TOT_SPENT_AMT="32929802.60" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="357260.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="35042740.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004404048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Montague" LIMITS_FROM_DSCR="CLAY COUNTY LINE" LIMITS_TO_DSCR="APPROX 0.5 MI. E OF US 81 (RINGGOLD)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="38961339" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/15/2022" PSE_30_ACTL_DT="10/18/2021" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="3/16/2022" PSE_100_TRGT_DT="10/4/2022" PSE_100_ACTL_DT="3/6/2023" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="7/17/2024" CNSTR_WKBG_DT="11/11/2024" CNSTR_PCT_TIME_USED="19.54" CNSTR_PCT_COMPLETE="22.90" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="8/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/19/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/26/2022" ROW_ACTL_DT="5/11/2023" RTL_TRGT_DT="10/11/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2277394.19" CNSTR_SPENT_AMT="8977377.36" CE_SPENT_AMT="115741.47" TOT_SPENT_AMT="11370513.02" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="39111339.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004404049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Montague" LIMITS_FROM_DSCR="0.5 MI EAST OF US 81" LIMITS_TO_DSCR="NEAR FM 1816" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20779023" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/15/2021" PSE_30_ACTL_DT="1/15/2021" PSE_60_TRGT_DT="2/15/2021" PSE_60_ACTL_DT="2/15/2021" PSE_100_TRGT_DT="3/25/2021" PSE_100_ACTL_DT="3/25/2021" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.829 (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="8/19/2021" CNSTR_WKBG_DT="10/25/2021" CNSTR_PCT_TIME_USED="92.91" CNSTR_PCT_COMPLETE="102.23" DSGN_START_TRGT_DT="12/1/2020" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="10/3/2019" ENVCLR_ACTL_DT="10/3/2019" UTIL_TRGT_DT="12/1/2020" UTIL_ACTL_DT="4/1/2021" ROW_TRGT_DT="1/28/2021" ROW_ACTL_DT="4/1/2021" RTL_TRGT_DT="4/1/2021" RTL_ACTL_DT="4/1/2021" PE_SPENT_AMT="2340591.03" CNSTR_SPENT_AMT="21575070.12" CE_SPENT_AMT="596969.72" TOT_SPENT_AMT="24512630.87" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="28200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004404065" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004404066" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004406077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Montague" LIMITS_FROM_DSCR="1.25 MI E OF FM 103" LIMITS_TO_DSCR="0.25 MI W OF SH 59" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2018680" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="SCOUT 5 CONSTRUCTION LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="61.34" CNSTR_PCT_COMPLETE="93.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11549.87" CNSTR_SPENT_AMT="1838391.45" CE_SPENT_AMT="41850.24" TOT_SPENT_AMT="1891791.56" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2749268.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004406078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Montague" LIMITS_FROM_DSCR="0.50 MI E OF FM 677" LIMITS_TO_DSCR="COOKE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="322111" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="SCOUT 5 CONSTRUCTION LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="61.34" CNSTR_PCT_COMPLETE="93.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5178.11" CNSTR_SPENT_AMT="287621.12" CE_SPENT_AMT="7685.25" TOT_SPENT_AMT="300484.48" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="480054.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004407074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Cooke" LIMITS_FROM_DSCR="ASH STREET" LIMITS_TO_DSCR="MAPLE STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53300" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/8/2022" PSE_100_ACTL_DT="2/28/2023" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="TIGHT LINE CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="20.88" CNSTR_PCT_COMPLETE="90.89" DSGN_START_TRGT_DT="9/1/2021" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="12/8/2021" ENVCLR_ACTL_DT="12/8/2021" UTIL_TRGT_DT="9/1/2021" UTIL_ACTL_DT="12/28/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/24/2022" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="20830.65" CNSTR_SPENT_AMT="84059.50" CE_SPENT_AMT="10613.31" TOT_SPENT_AMT="115503.46" FUND_CAT1_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (2110LI)" FUND_CAT1_PID="LIA" FUND_CAT1_AMT="90000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004407075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Cooke" LIMITS_FROM_DSCR="MONTAGUE COUNTY LINE" LIMITS_TO_DSCR="0.65 MI W OF FM 373" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="942876" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Colby Shelton, P.E." TXDOT_CNTCT_PH_NBR="(940)665-5071" CNSTR_CMPNY_NM="SCOUT 5 CONSTRUCTION LLC" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="61.34" CNSTR_PCT_COMPLETE="93.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5991.04" CNSTR_SPENT_AMT="935496.24" CE_SPENT_AMT="22842.45" TOT_SPENT_AMT="964329.73" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1430678.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004407076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Cooke" LIMITS_FROM_DSCR="MUENSTER EAST CL" LIMITS_TO_DSCR="FM 2739" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="267398" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="299486.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004408065" PT_PHASE="Feasibility Studies" HWY_NBR="US 82" CNTY_NM="Cooke" LIMITS_FROM_DSCR="FM 2739" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.609 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/3/2018" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/27/2019" RTL_ACTL_DT="TBD" PE_SPENT_AMT="963349.83" TOT_SPENT_AMT="963349.83" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004408073" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Cooke" LIMITS_FROM_DSCR="FM 2739" LIMITS_TO_DSCR="FM 1199N" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="875820" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="980918.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004411004" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287J" CNTY_NM="Wichita" LIMITS_FROM_DSCR="SS 213 (PETROLIA RD)" LIMITS_TO_DSCR="CLAY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/11/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1444298" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="EUROVIA ATLANTIC COAST LLC" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="4/1/2025" CNSTR_PCT_TIME_USED="35.00" CNSTR_PCT_COMPLETE="78.38" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5760.70" CNSTR_SPENT_AMT="1067217.81" CE_SPENT_AMT="7370.47" TOT_SPENT_AMT="1080348.98" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004412003" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287J" CNTY_NM="Clay" LIMITS_FROM_DSCR="WICHITA COUNTY LINE" LIMITS_TO_DSCR="US 82/287" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/11/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1111418" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="EUROVIA ATLANTIC COAST LLC" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="4/1/2025" CNSTR_PCT_TIME_USED="35.00" CNSTR_PCT_COMPLETE="78.38" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7552.94" CNSTR_SPENT_AMT="945128.85" CE_SPENT_AMT="4496.34" TOT_SPENT_AMT="957178.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1135820.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004501055" PT_PHASE="Feasibility Studies" HWY_NBR="US 82" CNTY_NM="Cooke" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="GRAYSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.916 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/3/2018" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/27/2019" RTL_ACTL_DT="TBD" PE_SPENT_AMT="471847.85" TOT_SPENT_AMT="471847.85" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004501064" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004502037" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="CHESTNUT ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14808" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.401 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="2/19/2020" CNSTR_WKBG_DT="5/18/2020" CNSTR_PCT_TIME_USED="73.13" CNSTR_PCT_COMPLETE="94.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="11432.65" CE_SPENT_AMT="122.56" TOT_SPENT_AMT="11555.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="12573.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004502038" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SS 129" LIMITS_TO_DSCR="0.282 MI E OF CHRISTI LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="71851" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.631 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="2/19/2020" CNSTR_WKBG_DT="5/18/2020" CNSTR_PCT_TIME_USED="73.13" CNSTR_PCT_COMPLETE="94.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="60128.89" CE_SPENT_AMT="620.86" TOT_SPENT_AMT="60749.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="54897.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004502040" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="UNION STREET" LIMITS_TO_DSCR="COLLINSVILLE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="732932" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="4/15/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/21/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/19/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="THK CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="1/9/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="93.27" DSGN_START_TRGT_DT="11/9/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/21/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/17/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/10/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/13/2022" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="736394.80" CE_SPENT_AMT="28388.41" TOT_SPENT_AMT="764783.21" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2309TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="225211.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2309TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="345870.00" FUND_CAT3_DSCR="Category 9 - Transportation Alternatives Program (2309TP)" FUND_CAT3_PID="TP" FUND_CAT3_AMT="13972.00" FUND_CAT4_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT4_AMT="40763.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004502041" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SS 129" LIMITS_TO_DSCR="3.63 MI W OF SH 289" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="787720" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="819228.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004503053" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="0.282 MI E OF CHRISTI LN" LIMITS_TO_DSCR="SH 289" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27494" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.626 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="2/19/2020" CNSTR_WKBG_DT="5/18/2020" CNSTR_PCT_TIME_USED="73.13" CNSTR_PCT_COMPLETE="94.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="27830.42" CE_SPENT_AMT="236.08" TOT_SPENT_AMT="28066.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="19325.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004503057" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="3.63. MI W OF SH 289" LIMITS_TO_DSCR="FM 1417 W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="696134" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="723979.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004504071" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Grayson" LIMITS_FROM_DSCR="S. COLBERT ST" LIMITS_TO_DSCR="FANNIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91552" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="106447.64" CE_SPENT_AMT="1126.47" TOT_SPENT_AMT="107574.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="92083.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004504072" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004505052" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Fannin" LIMITS_FROM_DSCR="500' WEST OF CANEY CREEK" LIMITS_TO_DSCR="500' EAST OF HUTCHINS CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/9/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1428964" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.261 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="DCC CONSTRUCTION AND SERVICES, L.L.C." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="7/15/2024" CNSTR_PCT_TIME_USED="271.43" CNSTR_PCT_COMPLETE="108.36" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="43780.63" CNSTR_SPENT_AMT="329769.98" CE_SPENT_AMT="26413.86" TOT_SPENT_AMT="399964.47" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="435000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004505053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004506053" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Fannin" LIMITS_FROM_DSCR="SL 205" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="638839" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="17.584 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="627909.89" CE_SPENT_AMT="9436.24" TOT_SPENT_AMT="637346.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="801765.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004506055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 56" CNTY_NM="Fannin" LIMITS_FROM_DSCR="SL 205" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96263" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="104853.30" CE_SPENT_AMT="1679.08" TOT_SPENT_AMT="106532.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="123088.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004506056" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 56" CNTY_NM="Fannin" LIMITS_FROM_DSCR="SL 205" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1839665" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2060424.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004508039" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="LAMAR/FANNIN COUNTY LINE" LIMITS_TO_DSCR="FM 38" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="93486757" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="4/13/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="4/15/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="4/20/2020" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.190 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/10/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/15/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/6/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="4/6/2020" RTL_TRGT_DT="TBD" RTL_ACTL_DT="4/3/2023" PE_SPENT_AMT="7598042.39" TOT_SPENT_AMT="7598042.39" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="14750000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="1389999.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT3_AMT="84825698.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="FM 38" LIMITS_TO_DSCR="SL 286" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="70127672" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="4/13/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="4/15/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="4/20/2020" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.820 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/10/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/15/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/6/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="4/6/2020" RTL_TRGT_DT="TBD" RTL_ACTL_DT="4/3/2023" PE_SPENT_AMT="4850199.29" TOT_SPENT_AMT="4850199.29" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="15000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="999999.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT3_AMT="59737887.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509109" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="42ND ST" LIMITS_TO_DSCR="DIVISION ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4740741" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.700 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RICHARD DRAKE CONSTRUCTION COMPANY, L.P." CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33383.15" CE_SPENT_AMT="5043.46" TOT_SPENT_AMT="38426.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3877921.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="LOOP 286" LIMITS_TO_DSCR="42ND STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1433532" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/6/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.411 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="12/13/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="87.39" CNSTR_PCT_COMPLETE="96.01" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="11/23/2020" ROW_ACTL_DT="11/23/2020" RTL_TRGT_DT="11/10/2023" RTL_ACTL_DT="11/10/2023" PE_SPENT_AMT="280336.79" CNSTR_SPENT_AMT="1398109.57" CE_SPENT_AMT="75036.83" TOT_SPENT_AMT="1753483.19" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="997908.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509111" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 82-H" CNTY_NM="Lamar" LIMITS_FROM_DSCR="33RD STREET" LIMITS_TO_DSCR="LOOP 286" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="651543" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/6/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.308 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="12/13/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="87.39" CNSTR_PCT_COMPLETE="96.01" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="11/23/2020" ROW_ACTL_DT="11/23/2020" RTL_TRGT_DT="11/10/2023" RTL_ACTL_DT="11/10/2023" PE_SPENT_AMT="44404.88" CNSTR_SPENT_AMT="705122.80" CE_SPENT_AMT="77877.64" TOT_SPENT_AMT="827405.32" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="997908.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509113" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 82-H" CNTY_NM="Lamar" LIMITS_FROM_DSCR="SL 286" LIMITS_TO_DSCR="33RD ST SE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3335124" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="57602.96" TOT_SPENT_AMT="57602.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3468529.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509114" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 82-H" CNTY_NM="Lamar" LIMITS_FROM_DSCR="LOOP 286" LIMITS_TO_DSCR="11TH NW ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2770387" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="83442.62" TOT_SPENT_AMT="83442.62" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="996930.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509116" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="LOOP 286" LIMITS_TO_DSCR="4,971 FT WEST OF FM 196" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="499615" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.258 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="2/21/2024" CNSTR_PCT_TIME_USED="52.85" CNSTR_PCT_COMPLETE="55.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="325057.50" CE_SPENT_AMT="11766.24" TOT_SPENT_AMT="336823.74" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="291270.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004509118" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR=".05 W OF LP 286" LIMITS_TO_DSCR=".05 E OF LP 286" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="437200" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_AMT="489664.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004510020" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2573" CNTY_NM="Red River" LIMITS_FROM_DSCR="US 82 (DETROIT)" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="345385" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="265680.09" CE_SPENT_AMT="5461.45" TOT_SPENT_AMT="271141.54" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="391860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004510022" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004511042" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="WEST DIVISION STREET IN BLOSSOM" LIMITS_TO_DSCR="RED RIVER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22000000" DIST_LET_DATE="8/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3839255.60" TOT_SPENT_AMT="3839255.60" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="24640000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004511045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="AT FM 1502" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="241070" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="3/19/2024" CNSTR_PCT_TIME_USED="90.71" CNSTR_PCT_COMPLETE="97.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="240619.00" CE_SPENT_AMT="2200.95" TOT_SPENT_AMT="242819.95" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="63851.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004511046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Lamar" LIMITS_FROM_DSCR="4,971 FT WEST OF FM 196" LIMITS_TO_DSCR="RED RIVER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="481776" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.329 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="2/21/2024" CNSTR_PCT_TIME_USED="52.85" CNSTR_PCT_COMPLETE="55.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="319510.50" CE_SPENT_AMT="30148.90" TOT_SPENT_AMT="349659.40" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="291270.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512086" PT_PHASE="Planning, 10+ years" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="LAMAR COUNTY LINE" LIMITS_TO_DSCR="SH 37" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59000000" DIST_LET_DATE="8/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="16.065 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7263.67" TOT_SPENT_AMT="7263.67" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="66080000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="10/30/2024" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512090" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37 SOUTH" LIMITS_TO_DSCR="SH 37 NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20740741" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="22400000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2811)" FUND_CAT2_AMT="829630.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512091" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37" LIMITS_TO_DSCR="BU 37" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3730274" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="3786624.20" CE_SPENT_AMT="160.12" TOT_SPENT_AMT="3786784.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1138946.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512092" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="FM 410" LIMITS_TO_DSCR="SH 37 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14157000" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="15855840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512093" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37 SOUTH" LIMITS_TO_DSCR="SH 37 NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12112" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.656 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="2/21/2024" CNSTR_PCT_TIME_USED="52.85" CNSTR_PCT_COMPLETE="55.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="5000.00" CE_SPENT_AMT="445.78" TOT_SPENT_AMT="5445.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="50449.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512094" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="RED RIVER COUNTY LINE" LIMITS_TO_DSCR="SH 37 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="864977" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.836 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="2/21/2024" CNSTR_PCT_TIME_USED="52.85" CNSTR_PCT_COMPLETE="55.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="752040.40" CE_SPENT_AMT="54605.97" TOT_SPENT_AMT="806646.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="811131.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512096" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 82-J" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37" LIMITS_TO_DSCR="N HIGH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="792196" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="AAD CONTRACTING INC." CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="5/29/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="123169.63" CE_SPENT_AMT="536.40" TOT_SPENT_AMT="123706.03" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004512097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="FM 2825" LIMITS_TO_DSCR="SH 37" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="966077" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="AAD CONTRACTING INC." CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="5/29/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19430.45" CE_SPENT_AMT="854.68" TOT_SPENT_AMT="20285.13" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004515013" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1510" CNTY_NM="Lamar" LIMITS_FROM_DSCR="FM 38" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33065" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="33846.11" CE_SPENT_AMT="378.49" TOT_SPENT_AMT="34224.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="33137.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004516012" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 194" CNTY_NM="Lamar" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="RED RIVER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="213677" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="172633.24" CE_SPENT_AMT="2552.21" TOT_SPENT_AMT="175185.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="255459.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004517007" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 194" CNTY_NM="Red River" LIMITS_FROM_DSCR="LAMAR COUNTY LINE" LIMITS_TO_DSCR="FM 410" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73168" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="59538.61" CE_SPENT_AMT="865.75" TOT_SPENT_AMT="60404.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="90246.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004518039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT POST OAK CREEK" LIMITS_TO_DSCR="WESTBOUND LANES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151681" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/10/2021" PSE_30_ACTL_DT="9/10/2021" PSE_60_TRGT_DT="3/25/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/21/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.025 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="3/28/2023" CNSTR_WKBG_DT="4/14/2023" CNSTR_PCT_TIME_USED="107.84" CNSTR_PCT_COMPLETE="121.05" DSGN_START_TRGT_DT="4/7/2021" DSGN_START_ACTL_DT="4/7/2021" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/4/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2022" RTL_ACTL_DT="11/7/2022" PE_SPENT_AMT="1194.46" CNSTR_SPENT_AMT="138201.20" CE_SPENT_AMT="5194.67" TOT_SPENT_AMT="144590.33" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="RRP" FUND_CAT1_AMT="102000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="69274.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004518040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT POST OAK CREEK" LIMITS_TO_DSCR="EASTBOUND LANES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="152931" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="9/10/2021" PSE_30_ACTL_DT="9/10/2021" PSE_60_TRGT_DT="3/25/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/21/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.025 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="3/28/2023" CNSTR_WKBG_DT="4/14/2023" CNSTR_PCT_TIME_USED="107.84" CNSTR_PCT_COMPLETE="121.05" DSGN_START_TRGT_DT="4/7/2021" DSGN_START_ACTL_DT="4/7/2021" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/4/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2022" RTL_ACTL_DT="11/7/2022" CNSTR_SPENT_AMT="159130.00" CE_SPENT_AMT="5322.96" TOT_SPENT_AMT="164452.96" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="RRP" FUND_CAT1_AMT="102000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="71679.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004518042" PT_PHASE="Feasibility Studies" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="COOK COUNTY LINE" LIMITS_TO_DSCR="FM 1417" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1200000" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Feasibility Study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH="17.514 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1282790.68" TOT_SPENT_AMT="1282790.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (1901)" FUND_CAT1_AMT="1200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004518043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="COOKE COUNTY LINE" LIMITS_TO_DSCR="FM 901" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/22/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5645404" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.696 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="6/17/2024" CNSTR_PCT_TIME_USED="83.54" CNSTR_PCT_COMPLETE="102.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81406.44" CNSTR_SPENT_AMT="6253832.36" CE_SPENT_AMT="62909.00" TOT_SPENT_AMT="6398147.80" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="4720000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004518046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="COOKE COUNTY LINE" LIMITS_TO_DSCR="FM 1417" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4127328" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/10/2021" PSE_30_ACTL_DT="9/10/2021" PSE_60_TRGT_DT="3/25/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/21/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="17.730 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="3/28/2023" CNSTR_WKBG_DT="4/14/2023" CNSTR_PCT_TIME_USED="107.84" CNSTR_PCT_COMPLETE="121.05" DSGN_START_TRGT_DT="4/7/2021" DSGN_START_ACTL_DT="4/7/2021" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/4/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2022" RTL_ACTL_DT="11/7/2022" PE_SPENT_AMT="83892.84" CNSTR_SPENT_AMT="5114222.88" CE_SPENT_AMT="111087.48" TOT_SPENT_AMT="5309203.20" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2589568.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004518047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 901" LIMITS_TO_DSCR="FM 1417" PRJ_TIER="" ENERGY="" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3108058" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3356702.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004519051" PT_PHASE="Planning, 10+ years" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT SKAGGS ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6000000" DIST_LET_DATE="9/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="6/25/2012" PSE_30_ACTL_DT="8/1/2013" PSE_60_TRGT_DT="2/20/2013" PSE_60_ACTL_DT="9/23/2013" PSE_100_TRGT_DT="12/31/2013" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/16/2012" DSGN_START_ACTL_DT="5/1/2013" ENVCLR_TRGT_DT="2/19/2013" ENVCLR_ACTL_DT="1/13/2014" UTIL_TRGT_DT="10/28/2013" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/28/2013" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/12/2014" RTL_ACTL_DT="TBD" PE_SPENT_AMT="75006.62" TOT_SPENT_AMT="75006.62" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004519060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="BETHANY RD" LIMITS_TO_DSCR="FANNIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86522" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.869 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="2/19/2020" CNSTR_WKBG_DT="5/18/2020" CNSTR_PCT_TIME_USED="73.13" CNSTR_PCT_COMPLETE="94.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="92241.65" CE_SPENT_AMT="1140.16" TOT_SPENT_AMT="93381.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="74499.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004519062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 1417" LIMITS_TO_DSCR="FM 131" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1549100" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/10/2021" PSE_30_ACTL_DT="9/10/2021" PSE_60_TRGT_DT="3/25/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/21/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.430 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="3/28/2023" CNSTR_WKBG_DT="4/14/2023" CNSTR_PCT_TIME_USED="107.84" CNSTR_PCT_COMPLETE="121.05" DSGN_START_TRGT_DT="4/7/2021" DSGN_START_ACTL_DT="4/7/2021" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/18/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/4/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2022" RTL_ACTL_DT="11/7/2022" CNSTR_SPENT_AMT="2006527.25" CE_SPENT_AMT="55858.81" TOT_SPENT_AMT="2062386.06" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="207985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004519064" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="1.3 MI W OF FM 1417" LIMITS_TO_DSCR="GRAYSON/FANNIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/22/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10591400" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.330 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="OVERLAND CORPORATION" CNSTR_NTPD_DT="7/17/2024" CNSTR_WKBG_DT="4/2/2025" CNSTR_PCT_TIME_USED="90.43" CNSTR_PCT_COMPLETE="20.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25972.52" CNSTR_SPENT_AMT="2298382.20" CE_SPENT_AMT="9405.94" TOT_SPENT_AMT="2333760.66" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="5269983.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="2649329.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004519065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 1417" LIMITS_TO_DSCR="SKAGGS RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3393359" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.450 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="FNH CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="12/19/2023" CNSTR_PCT_TIME_USED="87.82" CNSTR_PCT_COMPLETE="91.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38868.24" CNSTR_SPENT_AMT="3138362.90" CE_SPENT_AMT="83535.09" TOT_SPENT_AMT="3260766.23" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004519066" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Fannin" LIMITS_FROM_DSCR="GRAYSON COUNTY LINE (WB)" LIMITS_TO_DSCR="SH 121" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="681677" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="642236.99" CE_SPENT_AMT="11692.52" TOT_SPENT_AMT="653929.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="496800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Fannin" LIMITS_FROM_DSCR="GRAYSON COUNTY LINE (EB)" LIMITS_TO_DSCR="SH 121" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="568559" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="573337.76" CE_SPENT_AMT="9595.71" TOT_SPENT_AMT="582933.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="496800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520025" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Fannin" LIMITS_FROM_DSCR="SH 121 (BONHAM)" LIMITS_TO_DSCR="SH 78" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="97021" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="108663.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520026" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520027" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520028" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520029" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004520030" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004521021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Fannin" LIMITS_FROM_DSCR="SH 78" LIMITS_TO_DSCR="LAMAR C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1647210" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1844875.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004521022" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004521023" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004521024" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004601066" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="BU 82 J" LIMITS_TO_DSCR="0.155 MI W OF CR 4310" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/14/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7600" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/7/2017" PSE_30_ACTL_DT="8/7/2017" PSE_60_TRGT_DT="8/9/2017" PSE_60_ACTL_DT="8/9/2017" PSE_100_TRGT_DT="8/14/2017" PSE_100_ACTL_DT="8/14/2017" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.880 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="10/21/2020" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="93.78" DSGN_START_TRGT_DT="8/4/2017" DSGN_START_ACTL_DT="8/4/2017" ENVCLR_TRGT_DT="8/9/2017" ENVCLR_ACTL_DT="8/9/2017" UTIL_TRGT_DT="7/31/2017" UTIL_ACTL_DT="7/31/2017" ROW_TRGT_DT="7/31/2017" ROW_ACTL_DT="7/31/2017" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2601.27" CNSTR_SPENT_AMT="7606.02" CE_SPENT_AMT="31.74" TOT_SPENT_AMT="10239.03" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="114848.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004601069" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="BU 82 J" LIMITS_TO_DSCR="FM 114" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4562964" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="4928000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2811)" FUND_CAT2_AMT="182520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004601071" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="US 82 J" LIMITS_TO_DSCR="BOWIE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="668412" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="2/21/2024" CNSTR_PCT_TIME_USED="52.85" CNSTR_PCT_COMPLETE="55.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="102450.00" CE_SPENT_AMT="40600.37" TOT_SPENT_AMT="143050.37" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="522950.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004603038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.1 MI W OF US 259" LIMITS_TO_DSCR="FM 992" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30548475" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="8/31/2021" PSE_30_ACTL_DT="8/31/2021" PSE_60_TRGT_DT="3/15/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.700 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="DRAKE COMPANIES LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="15.92" CNSTR_PCT_COMPLETE="14.39" DSGN_START_TRGT_DT="5/25/2018" DSGN_START_ACTL_DT="11/23/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2751270.66" CNSTR_SPENT_AMT="4288122.41" CE_SPENT_AMT="361766.22" TOT_SPENT_AMT="7401159.29" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="23666134.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004603040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.1 MI W OF CR 3403" LIMITS_TO_DSCR="0.1 MI W OF US 259" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="71301173" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="10/12/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/19/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/12/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.870 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/3/2017" DSGN_START_ACTL_DT="10/3/2017" ENVCLR_TRGT_DT="7/14/2022" ENVCLR_ACTL_DT="4/26/2023" UTIL_TRGT_DT="5/23/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/23/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5460611.11" TOT_SPENT_AMT="5460611.11" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="74153220.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004603044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.1 MI W OF US 259" LIMITS_TO_DSCR="0.1 MI E OF US 259" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1475585" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="8/31/2021" PSE_30_ACTL_DT="8/31/2021" PSE_60_TRGT_DT="3/15/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="DRAKE COMPANIES LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="15.92" CNSTR_PCT_COMPLETE="14.39" DSGN_START_TRGT_DT="5/25/2018" DSGN_START_ACTL_DT="11/23/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="49313.60" CNSTR_SPENT_AMT="63688.00" CE_SPENT_AMT="224.82" TOT_SPENT_AMT="113226.42" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1389595.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004604061" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 992" LIMITS_TO_DSCR="FM 1840" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12164579" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="8/31/2021" PSE_30_ACTL_DT="8/31/2021" PSE_60_TRGT_DT="3/15/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.400 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="DRAKE COMPANIES LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="15.92" CNSTR_PCT_COMPLETE="14.39" DSGN_START_TRGT_DT="5/25/2018" DSGN_START_ACTL_DT="11/23/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1180977.04" CNSTR_SPENT_AMT="1752676.76" CE_SPENT_AMT="159834.52" TOT_SPENT_AMT="3093488.32" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="10138443.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004604062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 1840" LIMITS_TO_DSCR="SH 98" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42529705" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="8/31/2021" PSE_30_ACTL_DT="8/31/2021" PSE_60_TRGT_DT="3/15/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.650 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="DRAKE COMPANIES LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="15.92" CNSTR_PCT_COMPLETE="14.39" DSGN_START_TRGT_DT="5/25/2018" DSGN_START_ACTL_DT="11/23/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1437826.42" CNSTR_SPENT_AMT="6148427.54" CE_SPENT_AMT="518770.28" TOT_SPENT_AMT="8105024.24" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="37091804.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004604063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="SH 98" LIMITS_TO_DSCR="0.4 MI S OF IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23821731" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="8/31/2021" PSE_30_ACTL_DT="8/31/2021" PSE_60_TRGT_DT="3/15/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.200 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="DRAKE COMPANIES LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="15.92" CNSTR_PCT_COMPLETE="14.39" DSGN_START_TRGT_DT="5/25/2018" DSGN_START_ACTL_DT="11/23/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1515125.36" CNSTR_SPENT_AMT="3431934.78" CE_SPENT_AMT="294133.88" TOT_SPENT_AMT="5241194.02" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="19690589.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004604072" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004605048" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="SS 86" LIMITS_TO_DSCR="FM 1398" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6100000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.451 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="73894.47" TOT_SPENT_AMT="73894.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="6832000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004605051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="SS 86" LIMITS_TO_DSCR="FM 1398" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/15/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64678" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/17/2021" PSE_100_ACTL_DT="5/17/2021" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.436 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="STRIPE-A-ZONE, LLC" CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="11/15/2021" CNSTR_PCT_TIME_USED="105.59" CNSTR_PCT_COMPLETE="92.29" DSGN_START_TRGT_DT="6/1/2020" DSGN_START_ACTL_DT="6/1/2020" ENVCLR_TRGT_DT="4/23/2020" ENVCLR_ACTL_DT="4/23/2020" UTIL_TRGT_DT="6/2/2020" UTIL_ACTL_DT="6/2/2020" ROW_TRGT_DT="6/2/2020" ROW_ACTL_DT="6/2/2020" RTL_TRGT_DT="6/4/2021" RTL_ACTL_DT="6/3/2021" CNSTR_SPENT_AMT="65434.19" CE_SPENT_AMT="960.78" TOT_SPENT_AMT="66394.97" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="91674.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004605053" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="SS 86" LIMITS_TO_DSCR="FM 1398W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="383256" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.408 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="429247.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004605054" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004605055" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.5 MI E OF SH 8" LIMITS_TO_DSCR="SS 86" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="268860" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.984 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="301123.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606040" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.9 MI W OF FM 989" LIMITS_TO_DSCR="IH 369 WEST FRONTAGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50717306" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="3/25/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/7/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/18/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.800 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/19/2017" DSGN_START_ACTL_DT="6/19/2017" ENVCLR_TRGT_DT="9/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2917315.43" TOT_SPENT_AMT="2917315.43" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="16103384.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="27890580.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/14/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606078" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 1398" LIMITS_TO_DSCR="FM 989" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6785714" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.637 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="6/8/2016" ROW_TRGT_DT="TBD" ROW_ACTL_DT="6/8/2016" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10315.57" TOT_SPENT_AMT="10315.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="7600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606081" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT FM 2148 INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4094225" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="1/29/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/14/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/11/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/6/2019" DSGN_START_ACTL_DT="9/6/2019" ENVCLR_TRGT_DT="6/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/26/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/27/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/11/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="201179.86" TOT_SPENT_AMT="201179.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="4585532.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="5/30/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606083" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT 14TH ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16434" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.553 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.86" TOT_SPENT_AMT="100.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="18406.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606084" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT MILAM ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13009" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="495.70" TOT_SPENT_AMT="495.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="14570.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606085" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT ROBINSON RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22167" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.989 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.86" TOT_SPENT_AMT="100.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="24827.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606086" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT US 67" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13831" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.533 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.87" TOT_SPENT_AMT="100.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="15491.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606087" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT SL 14" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="24026" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.066 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.86" TOT_SPENT_AMT="100.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="26909.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606088" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT SPRUCE ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9113" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.066 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="226.69" TOT_SPENT_AMT="226.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="10206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606089" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT WESTLAWN DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18214" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.989 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100.87" TOT_SPENT_AMT="100.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="20399.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606090" PT_PHASE="Planning, 10+ years" HWY_NBR="US 82" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 1398W" LIMITS_TO_DSCR="0.2 MI W OF IH 369" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="642528" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.380 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004606092" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004608017" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 14" CNTY_NM="Bowie" LIMITS_FROM_DSCR="ARKANSAS S/L" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2085347" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.223 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20487.79" CNSTR_SPENT_AMT="4052671.48" CE_SPENT_AMT="446.13" TOT_SPENT_AMT="4073605.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="631845.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004608018" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 14" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT 24TH ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15904" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.651 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="163.83" TOT_SPENT_AMT="163.83" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="17813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004608019" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 14" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT 40TH ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12244" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="159.43" TOT_SPENT_AMT="159.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="13713.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004608020" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 14" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT COLLEGE DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19858" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="67.28" TOT_SPENT_AMT="67.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="22241.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004608021" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 14" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT ELIZABETH ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15904" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.881 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33.60" TOT_SPENT_AMT="33.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="17813.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004610003" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37_NORTH" LIMITS_TO_DSCR="BU 82 J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20740741" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="76148.04" TOT_SPENT_AMT="76148.04" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="22400000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2811)" FUND_CAT2_AMT="829630.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004610004" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37" LIMITS_TO_DSCR="BU 82 J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/14/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26316" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/7/2017" PSE_30_ACTL_DT="8/7/2017" PSE_60_TRGT_DT="8/9/2017" PSE_60_ACTL_DT="8/9/2017" PSE_100_TRGT_DT="8/14/2017" PSE_100_ACTL_DT="8/14/2017" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.526 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="10/21/2020" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="93.78" DSGN_START_TRGT_DT="8/4/2017" DSGN_START_ACTL_DT="8/4/2017" ENVCLR_TRGT_DT="8/9/2017" ENVCLR_ACTL_DT="8/9/2017" UTIL_TRGT_DT="7/31/2017" UTIL_ACTL_DT="7/31/2017" ROW_TRGT_DT="7/31/2017" ROW_ACTL_DT="7/31/2017" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="24318.02" CE_SPENT_AMT="969.23" TOT_SPENT_AMT="25287.25" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="16022.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004610006" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="AT BU 82 J (EAST)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58775" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="3/19/2024" CNSTR_PCT_TIME_USED="90.71" CNSTR_PCT_COMPLETE="97.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="60150.00" CE_SPENT_AMT="2479.88" TOT_SPENT_AMT="62629.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="74609.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004610007" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Red River" LIMITS_FROM_DSCR="SH 37 NORTH" LIMITS_TO_DSCR="BU 82 J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82234" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.562 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="2/21/2024" CNSTR_PCT_TIME_USED="52.85" CNSTR_PCT_COMPLETE="55.89" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="4792.11" TOT_SPENT_AMT="4792.11" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="47519.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701066" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="STATE LINE" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35826" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH="1.515 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="37178.86" TOT_SPENT_AMT="37178.86" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="35826.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 75 (NB)" LIMITS_TO_DSCR="MLK/SH 91 (NB)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99314" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.941 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="90990.16" CE_SPENT_AMT="1408.44" TOT_SPENT_AMT="92398.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="132345.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701071" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 75 (SB)" LIMITS_TO_DSCR="MLK/SH 91 (SB)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="97868" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.941 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="83569.59" CE_SPENT_AMT="1396.50" TOT_SPENT_AMT="84966.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="132345.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 75 (NB)" LIMITS_TO_DSCR="MLK/SH 91 (NB)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15362" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="14557.40" CE_SPENT_AMT="252.05" TOT_SPENT_AMT="14809.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="19278.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 69 (SB)" LIMITS_TO_DSCR="MLK/SH 91 (SB)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17648" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="712.80" CE_SPENT_AMT="220.16" TOT_SPENT_AMT="932.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="19278.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701074" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="STATE LINE" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="81810.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="RED RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5726089" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.488 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="5/4/2025" CNSTR_PCT_TIME_USED="8.59" CNSTR_PCT_COMPLETE="4.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="104904.26" CNSTR_SPENT_AMT="269605.95" CE_SPENT_AMT="2629.39" TOT_SPENT_AMT="377139.60" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="520000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="5694327.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004701076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 69" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 75" LIMITS_TO_DSCR="MLK/SH 91" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="565927" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="633838.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702141" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 91" LIMITS_TO_DSCR="0.651 MI S OF CENTER STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49920" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH="2.111 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="119902.97" TOT_SPENT_AMT="119902.97" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="49920.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702146" PT_PHASE="Planning, 10+ years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 91" LIMITS_TO_DSCR="0.651 MI S OF CENTER STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14857819" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.111 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1564717.57" TOT_SPENT_AMT="1564717.57" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702148" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT FM 131" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="329182" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/30/2018" PSE_30_ACTL_DT="5/30/2018" PSE_60_TRGT_DT="7/13/2018" PSE_60_ACTL_DT="7/13/2018" PSE_100_TRGT_DT="9/6/2018" PSE_100_ACTL_DT="9/6/2018" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="10/10/2019" CNSTR_WKBG_DT="1/13/2020" CNSTR_PCT_TIME_USED="122.47" CNSTR_PCT_COMPLETE="115.36" DSGN_START_TRGT_DT="3/7/2018" DSGN_START_ACTL_DT="3/7/2018" ENVCLR_TRGT_DT="7/13/2018" ENVCLR_ACTL_DT="7/13/2018" UTIL_TRGT_DT="3/5/2018" UTIL_ACTL_DT="3/5/2018" ROW_TRGT_DT="3/5/2018" ROW_ACTL_DT="3/5/2018" RTL_TRGT_DT="9/6/2019" RTL_ACTL_DT="9/6/2019" CNSTR_SPENT_AMT="214811.21" CE_SPENT_AMT="25842.55" TOT_SPENT_AMT="240653.76" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="281298.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702149" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT SH 56" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="516136" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/30/2018" PSE_30_ACTL_DT="5/30/2018" PSE_60_TRGT_DT="7/13/2018" PSE_60_ACTL_DT="7/13/2018" PSE_100_TRGT_DT="9/6/2018" PSE_100_ACTL_DT="9/6/2018" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="10/10/2019" CNSTR_WKBG_DT="1/13/2020" CNSTR_PCT_TIME_USED="122.47" CNSTR_PCT_COMPLETE="115.36" DSGN_START_TRGT_DT="3/7/2018" DSGN_START_ACTL_DT="3/7/2018" ENVCLR_TRGT_DT="7/13/2018" ENVCLR_ACTL_DT="7/13/2018" UTIL_TRGT_DT="3/5/2018" UTIL_ACTL_DT="3/5/2018" ROW_TRGT_DT="3/5/2018" ROW_ACTL_DT="3/5/2018" RTL_TRGT_DT="9/6/2019" RTL_ACTL_DT="9/6/2019" CNSTR_SPENT_AMT="600790.58" CE_SPENT_AMT="41249.10" TOT_SPENT_AMT="642039.68" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="254238.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702150" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 91" LIMITS_TO_DSCR="0.651 MI S OF CENTER STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="84308516" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="5/30/2018" PSE_30_ACTL_DT="5/30/2018" PSE_60_TRGT_DT="7/13/2018" PSE_60_ACTL_DT="7/13/2018" PSE_100_TRGT_DT="9/6/2018" PSE_100_ACTL_DT="9/6/2018" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.111 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="10/10/2019" CNSTR_WKBG_DT="1/13/2020" CNSTR_PCT_TIME_USED="122.47" CNSTR_PCT_COMPLETE="115.36" DSGN_START_TRGT_DT="3/7/2018" DSGN_START_ACTL_DT="3/7/2018" ENVCLR_TRGT_DT="7/13/2018" ENVCLR_ACTL_DT="7/13/2018" UTIL_TRGT_DT="3/5/2018" UTIL_ACTL_DT="3/5/2018" ROW_TRGT_DT="3/5/2018" ROW_ACTL_DT="3/5/2018" RTL_TRGT_DT="9/6/2019" RTL_ACTL_DT="9/6/2019" PE_SPENT_AMT="6909280.53" CNSTR_SPENT_AMT="117124209.29" CE_SPENT_AMT="5532738.94" TOT_SPENT_AMT="129566228.76" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="1920000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="38569500.00" FUND_CAT3_DSCR="Category 2U - Urban Area Corridor (1902U)" FUND_CAT3_AMT="14553938.00" FUND_CAT4_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT4_AMT="27869201.00" FUND_CAT5_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT5_AMT="4439465.00" FUND_CAT6_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT6_AMT="2560535.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702157" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702158" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 503" CNTY_NM="Grayson" LIMITS_FROM_DSCR="NFR SH 91" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64523" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="44.38" TOT_SPENT_AMT="44.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="103460.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702159" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 503" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SFR SH 91" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="69317" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="47.44" TOT_SPENT_AMT="47.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="103460.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004702160" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 503" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 91 (EB/WB LANES)" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="246698" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.000 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="169.84" TOT_SPENT_AMT="169.84" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="325240.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703085" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="0.651 MI S OF CENTER STREET" LIMITS_TO_DSCR="FM 902" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="152100" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH="6.432 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="263060.48" TOT_SPENT_AMT="263060.48" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="152100.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703086" PT_PHASE="Planning, 10+ years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="0.651 MI S OF CENTER STREET" LIMITS_TO_DSCR="0.5 MILE SOUTH OF FM 1417" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72043568" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.341 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1579408.82" TOT_SPENT_AMT="1579408.82" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="0.651 MI S OF CENTER STREET" LIMITS_TO_DSCR="FM 1417" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50574095" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="5/30/2018" PSE_30_ACTL_DT="5/30/2018" PSE_60_TRGT_DT="7/13/2018" PSE_60_ACTL_DT="7/13/2018" PSE_100_TRGT_DT="9/6/2018" PSE_100_ACTL_DT="9/6/2018" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.060 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="10/10/2019" CNSTR_WKBG_DT="1/13/2020" CNSTR_PCT_TIME_USED="122.47" CNSTR_PCT_COMPLETE="115.36" DSGN_START_TRGT_DT="3/7/2018" DSGN_START_ACTL_DT="3/7/2018" ENVCLR_TRGT_DT="7/13/2018" ENVCLR_ACTL_DT="7/13/2018" UTIL_TRGT_DT="3/5/2018" UTIL_ACTL_DT="3/5/2018" ROW_TRGT_DT="3/5/2018" ROW_ACTL_DT="3/5/2018" RTL_TRGT_DT="9/6/2019" RTL_ACTL_DT="9/6/2019" PE_SPENT_AMT="663589.66" CNSTR_SPENT_AMT="59936455.70" CE_SPENT_AMT="6831525.62" TOT_SPENT_AMT="67431570.98" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_PID="017" FUND_CAT1_AMT="13750000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="30043500.00" FUND_CAT3_DSCR="Category 2U - Urban Area Corridor (1902U)" FUND_CAT3_AMT="12506062.00" FUND_CAT4_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT4_AMT="6563360.00" FUND_CAT5_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT5_AMT="3646703.00" FUND_CAT6_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT6_AMT="2103297.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 902" LIMITS_TO_DSCR="FM 1417" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96523567" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4983266.96" TOT_SPENT_AMT="4983266.96" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="6174270.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="13000000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="67571509.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703094" PT_PHASE="Planning, 10+ years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 1417" LIMITS_TO_DSCR="0.651 MILES S OF CENTER ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16000000" DIST_LET_DATE="9/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.830 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="16000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703096" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Grayson" LIMITS_FROM_DSCR="NEWPORT DR AT PARTIN ELEMENTARY SCHOOL" LIMITS_TO_DSCR="0.645 MI S OF FM 3133 AT MOORE PARK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/9/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="662920" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/16/2021" PSE_100_ACTL_DT="11/16/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.427 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="THE FAIN GROUP, INC." CNSTR_NTPD_DT="2/15/2022" CNSTR_WKBG_DT="4/20/2022" CNSTR_PCT_TIME_USED="91.40" CNSTR_PCT_COMPLETE="89.49" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/13/2021" RTL_ACTL_DT="12/13/2021" PE_SPENT_AMT="22320.23" CNSTR_SPENT_AMT="772821.42" CE_SPENT_AMT="36217.52" TOT_SPENT_AMT="831359.17" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2209TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="765000.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2209TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="209112.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703099" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 75" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="384871" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="393214.61" CE_SPENT_AMT="4891.24" TOT_SPENT_AMT="398105.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="309390.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703100" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Grayson" LIMITS_FROM_DSCR="WILLIAMS WAY" LIMITS_TO_DSCR="E VAN ALSTYNE PKWY (FM 121)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1226270" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="9/18/2024" CNSTR_PCT_TIME_USED="105.00" CNSTR_PCT_COMPLETE="90.68" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="347548.13" CNSTR_SPENT_AMT="1109712.92" CE_SPENT_AMT="27157.16" TOT_SPENT_AMT="1484418.21" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2409TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="9941.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2409TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="279027.00" FUND_CAT3_DSCR="Category 9 - Transportation Alternatives Program (2409TP)" FUND_CAT3_PID="TP" FUND_CAT3_AMT="1416649.00" FUND_CAT4_DSCR="Category 9 - Transportation Alternatives Program (2409TP)" FUND_CAT4_PID="TP" FUND_CAT4_AMT="58000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703104" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Grayson" LIMITS_FROM_DSCR=".05 MI NORTH OF N FM 121" LIMITS_TO_DSCR=".05 MI SOUTH OF N FM 121" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50862" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="1/14/2025" CNSTR_PCT_TIME_USED="72.73" CNSTR_PCT_COMPLETE="98.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="52430.00" CE_SPENT_AMT="3523.04" TOT_SPENT_AMT="55953.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="47853.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703105" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Grayson" LIMITS_FROM_DSCR=".05 MI NORTH OF S FM 121" LIMITS_TO_DSCR=".05 MI SOUTH OF S FM 121" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="51134" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="1/14/2025" CNSTR_PCT_TIME_USED="72.73" CNSTR_PCT_COMPLETE="98.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="53160.40" CE_SPENT_AMT="3545.01" TOT_SPENT_AMT="56705.41" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="47853.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703106" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 5" CNTY_NM="Grayson" LIMITS_FROM_DSCR="NEWPORT DRIVE" LIMITS_TO_DSCR="UMPHRESS STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2463364" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10572.75" TOT_SPENT_AMT="10572.75" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2609TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="212400.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2609TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="2638156.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004703107" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004704031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 121" LIMITS_TO_DSCR="NORTH OF COLLIN COUNTY OUTER LOOP" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="39271527" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="4/1/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/1/2018" PSE_60_ACTL_DT="9/1/2018" PSE_100_TRGT_DT="5/1/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="HARPER BROTHERS CONSTRUCTION LLC" CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="6/12/2023" CNSTR_PCT_TIME_USED="69.23" CNSTR_PCT_COMPLETE="44.43" DSGN_START_TRGT_DT="3/18/2013" DSGN_START_ACTL_DT="9/27/2022" ENVCLR_TRGT_DT="9/26/2018" ENVCLR_ACTL_DT="9/26/2018" UTIL_TRGT_DT="10/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="474684.17" CNSTR_SPENT_AMT="17892275.78" CE_SPENT_AMT="1063390.84" TOT_SPENT_AMT="19430350.79" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="371537.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="39479990.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004704032" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="NORTH OF COLLIN COUNTY OUTER LOOP" LIMITS_TO_DSCR="FM 455 W/TRANSITION  N OF HACKBERRY DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="51567119" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="4/1/2020" PSE_30_ACTL_DT="7/5/2018" PSE_60_TRGT_DT="9/1/2018" PSE_60_ACTL_DT="9/1/2018" PSE_100_TRGT_DT="5/1/2020" PSE_100_ACTL_DT="4/6/2023" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.560 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/18/2013" DSGN_START_ACTL_DT="3/18/2013" ENVCLR_TRGT_DT="9/26/2018" ENVCLR_ACTL_DT="9/26/2018" UTIL_TRGT_DT="1/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="11/1/2021" RTL_TRGT_DT="1/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="187793.77" TOT_SPENT_AMT="187793.77" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="58404773.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004704033" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="NORTH OF HACKBERRY DR" LIMITS_TO_DSCR="CR 375" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45797084" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="4/1/2020" PSE_30_ACTL_DT="7/5/2018" PSE_60_TRGT_DT="9/1/2018" PSE_60_ACTL_DT="9/1/2018" PSE_100_TRGT_DT="5/1/2020" PSE_100_ACTL_DT="4/6/2023" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.800 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/18/2013" DSGN_START_ACTL_DT="3/18/2013" ENVCLR_TRGT_DT="9/26/2018" ENVCLR_ACTL_DT="9/26/2018" UTIL_TRGT_DT="1/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="11/1/2021" RTL_TRGT_DT="1/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="200112.39" TOT_SPENT_AMT="200112.39" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="32473108.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="18819625.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004704041" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 121" LIMITS_TO_DSCR="CR 275" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="912375" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.490 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1021860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004704042" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004704043" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004705057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="STEWART ROAD" LIMITS_TO_DSCR="ELDORADO PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63793866" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="10/26/2020" PSE_30_ACTL_DT="10/26/2020" PSE_60_TRGT_DT="12/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="7/21/2020" ENVCLR_ACTL_DT="7/21/2020" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6639630.34" CE_SPENT_AMT="7154.22" TOT_SPENT_AMT="6646784.56" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="29683367.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="1206587.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT3_AMT="9073300.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004705058" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 5 /SPUR 399 INTERSECTION" LIMITS_TO_DSCR="STEWART RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18634223" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="10/26/2020" PSE_30_ACTL_DT="10/26/2020" PSE_60_TRGT_DT="12/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.479 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="7/21/2020" ENVCLR_ACTL_DT="7/21/2020" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="275853.06" CE_SPENT_AMT="2093.84" TOT_SPENT_AMT="277946.90" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004705061" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="N ELDORADO PKWY" LIMITS_TO_DSCR="POWER HOUSE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52099916" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="UGN" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.447 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="366584.63" TOT_SPENT_AMT="366584.63" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="9072498.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT2_AMT="2083996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004705062" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="CR 275" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2128872" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.490 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2384337.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004705063" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="VIRGINIA ST" LIMITS_TO_DSCR="LOUISIANA STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2625000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2807)" FUND_CAT1_AMT="4424472.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706158" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="BETHANY DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28234183" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/1/2020" PSE_30_ACTL_DT="2/1/2019" PSE_60_TRGT_DT="6/1/2019" PSE_60_ACTL_DT="6/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="11/1/2023" CNSTR_WKBG_DT="3/4/2024" CNSTR_PCT_TIME_USED="44.87" CNSTR_PCT_COMPLETE="65.35" DSGN_START_TRGT_DT="2/1/2019" DSGN_START_ACTL_DT="2/1/2019" ENVCLR_TRGT_DT="6/1/2020" ENVCLR_ACTL_DT="4/26/2023" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="12/1/2022" ROW_TRGT_DT="6/2/2020" ROW_ACTL_DT="4/1/2019" RTL_TRGT_DT="6/2/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2670671.78" CNSTR_SPENT_AMT="25875329.93" CE_SPENT_AMT="492022.36" TOT_SPENT_AMT="29038024.07" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT1_AMT="27533498.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706161" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT RIDGEVIEW DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43578574" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="10/8/2019" PSE_30_ACTL_DT="5/15/2019" PSE_60_TRGT_DT="3/1/2020" PSE_60_ACTL_DT="4/1/2020" PSE_100_TRGT_DT="11/1/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.186 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="INDUS ROAD &amp; BRIDGE, INC." CNSTR_NTPD_DT="7/20/2022" CNSTR_WKBG_DT="10/3/2022" CNSTR_PCT_TIME_USED="86.22" CNSTR_PCT_COMPLETE="97.67" DSGN_START_TRGT_DT="5/1/2019" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="6/20/2019" ENVCLR_ACTL_DT="6/20/2019" UTIL_TRGT_DT="9/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2021" RTL_ACTL_DT="6/1/2022" PE_SPENT_AMT="1595844.75" CNSTR_SPENT_AMT="48869049.13" CE_SPENT_AMT="1204481.40" TOT_SPENT_AMT="51669375.28" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2207)" FUND_CAT1_AMT="8945594.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706163" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="BETHANY DRIVE" LIMITS_TO_DSCR="SH 121" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13671101" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/1/2020" PSE_30_ACTL_DT="2/1/2019" PSE_60_TRGT_DT="6/1/2019" PSE_60_ACTL_DT="6/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.847 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="11/1/2023" CNSTR_WKBG_DT="3/4/2024" CNSTR_PCT_TIME_USED="44.87" CNSTR_PCT_COMPLETE="65.35" DSGN_START_TRGT_DT="2/1/2019" DSGN_START_ACTL_DT="2/1/2019" ENVCLR_TRGT_DT="6/1/2020" ENVCLR_ACTL_DT="4/26/2023" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="12/1/2022" ROW_TRGT_DT="6/2/2020" ROW_ACTL_DT="4/1/2019" RTL_TRGT_DT="6/2/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="406306.58" CNSTR_SPENT_AMT="7890862.11" CE_SPENT_AMT="301662.40" TOT_SPENT_AMT="8598831.09" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT1_AMT="13339964.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706164" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT ALLEN DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3672466" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.595 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="80169.15" CE_SPENT_AMT="1023.78" TOT_SPENT_AMT="81192.93" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_PID="CC" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706166" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="COLLIN COUNTY LINE" LIMITS_TO_DSCR="SH 121" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="813752" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="12/18/2019" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="4/14/2020" PSE_60_ACTL_DT="10/14/2019" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.705 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="MICA CORPORATION" CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="91.88" CNSTR_PCT_COMPLETE="110.63" DSGN_START_TRGT_DT="5/7/2019" DSGN_START_ACTL_DT="5/7/2019" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="11/17/2021" UTIL_TRGT_DT="9/22/2020" UTIL_ACTL_DT="8/19/2020" ROW_TRGT_DT="9/22/2020" ROW_ACTL_DT="8/19/2020" RTL_TRGT_DT="10/21/2020" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="23438.98" CNSTR_SPENT_AMT="954683.08" CE_SPENT_AMT="44171.32" TOT_SPENT_AMT="1022293.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="487823.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706171" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="SH 190" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1246884" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="6/1/2022" PSE_30_ACTL_DT="6/1/2022" PSE_60_TRGT_DT="11/1/2022" PSE_60_ACTL_DT="11/1/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="2/15/2023" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.310 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="8/28/2023" CNSTR_PCT_TIME_USED="86.27" CNSTR_PCT_COMPLETE="85.06" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="3/1/2023" ENVCLR_ACTL_DT="1/9/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="2/15/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="2/15/2023" RTL_TRGT_DT="3/1/2023" RTL_ACTL_DT="12/28/2022" PE_SPENT_AMT="49428.78" CNSTR_SPENT_AMT="1217567.11" CE_SPENT_AMT="39368.38" TOT_SPENT_AMT="1306364.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1109427.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706172" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT NORTH ALLEN DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1668247" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.086 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2792.83" CNSTR_SPENT_AMT="1213792.64" TOT_SPENT_AMT="1216585.47" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="797500.00" FUND_CAT2_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (2210LI)" FUND_CAT2_PID="LIA" FUND_CAT2_AMT="290000.00" FUND_CAT3_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1210LI)" FUND_CAT3_PID="LIA" FUND_CAT3_AMT="270000.00" FUND_CAT4_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1610LI)" FUND_CAT4_PID="LIA" FUND_CAT4_AMT="270000.00" FUND_CAT5_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT5_AMT="40747.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706174" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="VALLEY CREEK TRAIL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1306585" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="5/1/2022" PSE_30_ACTL_DT="5/1/2022" PSE_60_TRGT_DT="9/1/2022" PSE_60_ACTL_DT="10/25/2022" PSE_100_TRGT_DT="1/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.590 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="10/8/2023" CNSTR_PCT_TIME_USED="85.83" CNSTR_PCT_COMPLETE="94.58" DSGN_START_TRGT_DT="5/1/2022" DSGN_START_ACTL_DT="5/1/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="11/16/2022" UTIL_TRGT_DT="1/1/2023" UTIL_ACTL_DT="1/13/2023" ROW_TRGT_DT="1/1/2023" ROW_ACTL_DT="1/13/2023" RTL_TRGT_DT="1/1/2023" RTL_ACTL_DT="1/13/2023" PE_SPENT_AMT="38602.08" CNSTR_SPENT_AMT="1381812.51" CE_SPENT_AMT="57727.13" TOT_SPENT_AMT="1478141.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="921140.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706175" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="ALLEN DR" LIMITS_TO_DSCR="STACY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="156800" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.774 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2125.70" TOT_SPENT_AMT="2125.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="175616.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706176" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="DALLAS CL" LIMITS_TO_DSCR="PGBT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="165000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1115.18" TOT_SPENT_AMT="1115.18" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="82500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706177" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="VALLEY CREEK TRAIL" LIMITS_TO_DSCR="DALLAS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2253558" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.590 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="10/21/2024" CNSTR_PCT_TIME_USED="50.49" CNSTR_PCT_COMPLETE="57.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="46415.19" CNSTR_SPENT_AMT="1487885.27" CE_SPENT_AMT="51950.85" TOT_SPENT_AMT="1586251.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2922329.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706178" PT_PHASE="Construction begins within 4 years" CNTY_NM="Collin" LIMITS_FROM_DSCR="WILSON CREEK" LIMITS_TO_DSCR="EXCHANGE PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT1_AMT="1080000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706179" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="VALLEY CREEK TRAIL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1323060" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1428905.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706180" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="RIDGEVIEW ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.700 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3240000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004706182" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707228" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT NORTHAVEN RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/30/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3844283" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="10/9/2018" PSE_30_ACTL_DT="12/22/2020" PSE_60_TRGT_DT="10/9/2018" PSE_60_ACTL_DT="9/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="12/1/2020" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.114 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/8/2021" CNSTR_WKBG_DT="6/21/2021" CNSTR_PCT_TIME_USED="100.28" CNSTR_PCT_COMPLETE="90.43" DSGN_START_TRGT_DT="3/1/2019" DSGN_START_ACTL_DT="3/1/2019" ENVCLR_TRGT_DT="12/1/2019" ENVCLR_ACTL_DT="7/23/2020" UTIL_TRGT_DT="12/1/2019" UTIL_ACTL_DT="1/1/2021" ROW_TRGT_DT="10/9/2018" ROW_ACTL_DT="12/22/2020" RTL_TRGT_DT="12/1/2019" RTL_ACTL_DT="1/1/2021" PE_SPENT_AMT="4536821.38" CNSTR_SPENT_AMT="4831020.02" CE_SPENT_AMT="171603.63" TOT_SPENT_AMT="9539445.03" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2105)" FUND_CAT1_AMT="7100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707232" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="I-635" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16583379" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/1/2020" PSE_30_ACTL_DT="2/1/2019" PSE_60_TRGT_DT="6/1/2019" PSE_60_ACTL_DT="6/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.250 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="11/1/2023" CNSTR_WKBG_DT="3/4/2024" CNSTR_PCT_TIME_USED="44.87" CNSTR_PCT_COMPLETE="65.35" DSGN_START_TRGT_DT="2/1/2019" DSGN_START_ACTL_DT="2/1/2019" ENVCLR_TRGT_DT="6/1/2020" ENVCLR_ACTL_DT="4/26/2023" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="12/1/2022" ROW_TRGT_DT="6/2/2020" ROW_ACTL_DT="4/1/2019" RTL_TRGT_DT="6/2/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2047094.76" CNSTR_SPENT_AMT="5951592.75" CE_SPENT_AMT="357085.53" TOT_SPENT_AMT="8355773.04" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT1_AMT="15261268.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707236" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT CAMPBELL RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="309876" DIST_LET_DATE="3/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.116 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="212644.09" TOT_SPENT_AMT="212644.09" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2005)" FUND_CAT1_AMT="255024.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707237" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT CARUTH HAVEN LN" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="502781" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="4/1/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="107.25" CNSTR_PCT_COMPLETE="94.69" DSGN_START_TRGT_DT="9/11/2018" DSGN_START_ACTL_DT="9/11/2018" ENVCLR_TRGT_DT="4/1/2022" ENVCLR_ACTL_DT="1/10/2022" UTIL_TRGT_DT="12/2/2021" UTIL_ACTL_DT="12/2/2021" ROW_TRGT_DT="12/2/2021" ROW_ACTL_DT="12/2/2021" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="188538.64" CNSTR_SPENT_AMT="462259.42" CE_SPENT_AMT="5125.27" TOT_SPENT_AMT="655923.33" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="516365.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707238" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT FITZHUGH AVE" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500353" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="4/1/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="107.25" CNSTR_PCT_COMPLETE="94.69" DSGN_START_TRGT_DT="9/11/2018" DSGN_START_ACTL_DT="9/11/2018" ENVCLR_TRGT_DT="4/1/2022" ENVCLR_ACTL_DT="1/10/2022" UTIL_TRGT_DT="12/2/2021" UTIL_ACTL_DT="12/2/2021" ROW_TRGT_DT="12/2/2021" ROW_ACTL_DT="12/2/2021" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" PE_SPENT_AMT="188559.46" CNSTR_SPENT_AMT="507764.50" CE_SPENT_AMT="8777.34" TOT_SPENT_AMT="705101.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="535871.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707239" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="398546" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="12/18/2019" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="4/14/2020" PSE_60_ACTL_DT="10/14/2019" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.440 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="MICA CORPORATION" CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="91.88" CNSTR_PCT_COMPLETE="110.63" DSGN_START_TRGT_DT="5/7/2019" DSGN_START_ACTL_DT="5/7/2019" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="11/17/2021" UTIL_TRGT_DT="9/22/2020" UTIL_ACTL_DT="8/19/2020" ROW_TRGT_DT="9/22/2020" ROW_ACTL_DT="8/19/2020" RTL_TRGT_DT="10/21/2020" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="23582.85" CNSTR_SPENT_AMT="503742.25" CE_SPENT_AMT="26152.13" TOT_SPENT_AMT="553477.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="164760.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707242" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4325631" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="6/1/2022" PSE_30_ACTL_DT="6/1/2022" PSE_60_TRGT_DT="11/1/2022" PSE_60_ACTL_DT="11/1/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="2/15/2023" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.227 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="8/28/2023" CNSTR_PCT_TIME_USED="86.27" CNSTR_PCT_COMPLETE="85.06" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="3/1/2023" ENVCLR_ACTL_DT="1/9/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="2/15/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="2/15/2023" RTL_TRGT_DT="3/1/2023" RTL_ACTL_DT="12/28/2022" PE_SPENT_AMT="74958.41" CNSTR_SPENT_AMT="3948182.19" CE_SPENT_AMT="127658.81" TOT_SPENT_AMT="4150799.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="3914519.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707243" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT LEMMON AVE" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1552258" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="DURABLE SPECIALTIES, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="0.71" CNSTR_PCT_COMPLETE="6.40" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="517035.61" CNSTR_SPENT_AMT="528602.00" CE_SPENT_AMT="626.20" TOT_SPENT_AMT="1046263.81" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="640917.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="996685.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707244" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT ROYAL LANE" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1238478" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="DURABLE SPECIALTIES, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="0.71" CNSTR_PCT_COMPLETE="6.40" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4961.87" CE_SPENT_AMT="1164.52" TOT_SPENT_AMT="6126.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="603885.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="609454.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707245" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="KNOX HENDERSON" LIMITS_TO_DSCR="SS 366" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600871" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.921 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="SICE, INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="8.75" CNSTR_PCT_COMPLETE="29.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18009.43" CNSTR_SPENT_AMT="671790.50" CE_SPENT_AMT="1109.28" TOT_SPENT_AMT="690909.21" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="201731.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="517311.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707247" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="ARAPAHO RD" LIMITS_TO_DSCR="IN THE CITY OF RICHARDSON." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1096751" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="DURABLE SPECIALTIES, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="0.71" CNSTR_PCT_COMPLETE="6.40" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22324.10" CE_SPENT_AMT="1099.64" TOT_SPENT_AMT="23423.74" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="888703.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="209095.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707248" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="DALLAS CL" LIMITS_TO_DSCR="IH 635" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="165000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1959.00" TOT_SPENT_AMT="1959.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="268732.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707249" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SOUTH OF ROYAL LANE" LIMITS_TO_DSCR="CHURCHILL WAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32585410" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.699 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="411688.03" TOT_SPENT_AMT="411688.03" FUND_CAT1_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT1_AMT="21840000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="17119659.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004707250" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT LOVERS LN" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1005330" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TS" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="1125970.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004709034" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 5" CNTY_NM="Collin" LIMITS_FROM_DSCR="SS 399" LIMITS_TO_DSCR="SOUTH OF FM 1378" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15247463" DIST_LET_DATE="8/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/8/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/1/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1216062.91" TOT_SPENT_AMT="1216062.91" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004710002" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SS 399" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 5" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="796115095" DIST_LET_DATE="2/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="6/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15839404.45" TOT_SPENT_AMT="15839404.45" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="333841461.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW2" FUND_CAT2_AMT="150000000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="274355303.00" FUND_CAT4_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT4_AMT="78144397.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004710003" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 399" CNTY_NM="Collin" LIMITS_FROM_DSCR="ALIGNMENT AT MCKINNEY NATIONAL" LIMITS_TO_DSCR="AIRPORT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30000000" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="30135600.00" TOT_SPENT_AMT="30135600.00" FUND_CAT1_DSCR="Category 3 - Regional Toll Revenue (RTR121)" FUND_CAT1_AMT="30000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004710005" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SS 399" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 5" LIMITS_TO_DSCR="AIRPORT DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="172386298" DIST_LET_DATE="2/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="139689.96" TOT_SPENT_AMT="139689.96" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="150700697.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="42371957.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004710006" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SS 399" CNTY_NM="Collin" LIMITS_FROM_DSCR="AIRPORT DR" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="612422617" DIST_LET_DATE="2/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="53087.35" TOT_SPENT_AMT="53087.35" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004712022" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 91" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SCULLIN AVE" LIMITS_TO_DSCR="SPUR 503" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.745 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="68700.71" TOT_SPENT_AMT="68700.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004713032" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 902" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="225147" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH="9.521 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="408506.19" TOT_SPENT_AMT="408506.19" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="225147.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004713033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="COLLIN COUNTY LINE (MPO BOUNDARY)" LIMITS_TO_DSCR="FM 902" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/19/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92508383" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/19/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/25/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/8/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.818 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="RPM XCONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="5/5/2025" CNSTR_PCT_TIME_USED="1.56" CNSTR_PCT_COMPLETE="5.42" DSGN_START_TRGT_DT="2/13/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/26/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/4/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/13/2018" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6301558.41" CNSTR_SPENT_AMT="5259657.96" CE_SPENT_AMT="2832.22" TOT_SPENT_AMT="11564048.59" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="4710000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="83923631.00" FUND_CAT3_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT3_AMT="2283830.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004713046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="WEST FARMINGTON RD" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/19/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1780486" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="4/19/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/25/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/8/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="RPM XCONSTRUCTION, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="5/5/2025" CNSTR_PCT_TIME_USED="1.56" CNSTR_PCT_COMPLETE="5.42" DSGN_START_TRGT_DT="2/13/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/26/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/4/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/13/2018" RTL_ACTL_DT="TBD" CE_SPENT_AMT="60.17" TOT_SPENT_AMT="60.17" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1558500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004713047" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="NORTH OF CR 370" LIMITS_TO_DSCR="CR 375 (GRAYSON COUNTY LINE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80040840" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="10/3/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="MARIO SINACOLA &amp; SONS EXCAVATING, INC." CNSTR_NTPD_DT="2/8/2024" CNSTR_WKBG_DT="4/29/2024" CNSTR_PCT_TIME_USED="47.90" CNSTR_PCT_COMPLETE="72.23" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2005" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/5/2012" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2986922.43" CNSTR_SPENT_AMT="58668960.27" CE_SPENT_AMT="824456.44" TOT_SPENT_AMT="62480339.14" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="63799019.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="35266450.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="WEST UNIVERSITY DRIVE" LIMITS_TO_DSCR="SOUTH OF VIRGINIA PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="453568" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="10/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/16/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.609 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="3/13/2023" CNSTR_WKBG_DT="4/17/2023" CNSTR_PCT_TIME_USED="98.46" CNSTR_PCT_COMPLETE="91.42" DSGN_START_TRGT_DT="10/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4050.54" CNSTR_SPENT_AMT="441894.40" CE_SPENT_AMT="13042.92" TOT_SPENT_AMT="458987.86" FUND_CAT1_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1610LI)" FUND_CAT1_PID="LIA" FUND_CAT1_AMT="290000.00" FUND_CAT2_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (2110LI)" FUND_CAT2_PID="LIA" FUND_CAT2_AMT="310000.00" FUND_CAT3_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT3_PID="GR" FUND_CAT3_AMT="9335.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="VALLEY CREEK TRAIL" LIMITS_TO_DSCR="GRAYSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="190655" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="5/1/2022" PSE_30_ACTL_DT="5/1/2022" PSE_60_TRGT_DT="9/1/2022" PSE_60_ACTL_DT="10/25/2022" PSE_100_TRGT_DT="1/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.784 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="10/8/2023" CNSTR_PCT_TIME_USED="85.83" CNSTR_PCT_COMPLETE="94.58" DSGN_START_TRGT_DT="5/1/2022" DSGN_START_ACTL_DT="5/1/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="11/16/2022" UTIL_TRGT_DT="1/1/2023" UTIL_ACTL_DT="1/13/2023" ROW_TRGT_DT="1/1/2023" ROW_ACTL_DT="1/13/2023" RTL_TRGT_DT="1/1/2023" RTL_ACTL_DT="1/13/2023" CNSTR_SPENT_AMT="122017.74" CE_SPENT_AMT="9563.16" TOT_SPENT_AMT="131580.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="170000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714089" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT VIRGINIA PKWY" LIMITS_TO_DSCR="AT VIRGINIA PKWY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="560950" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.283 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="49.97" TOT_SPENT_AMT="49.97" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="431395.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714090" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="GRAYSON COUNTY LINE" LIMITS_TO_DSCR="VALLEY CREEK TRAIL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="693997" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.780 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="10/21/2024" CNSTR_PCT_TIME_USED="50.49" CNSTR_PCT_COMPLETE="57.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1273.48" CNSTR_SPENT_AMT="475024.05" CE_SPENT_AMT="16585.96" TOT_SPENT_AMT="492883.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="811771.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714091" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="US 75 AT OUTER LOOP/ FOSTER CROSSING" LIMITS_TO_DSCR="IN THE CITY OF ANNA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="540253" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="YUNEX LLC" CNSTR_NTPD_DT="6/12/2024" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="83.13" CNSTR_PCT_COMPLETE="94.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3045.70" CNSTR_SPENT_AMT="541098.89" CE_SPENT_AMT="13724.55" TOT_SPENT_AMT="557869.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="613034.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714092" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="SS 195/LAUD HOWELL PKWY" LIMITS_TO_DSCR="WILSON CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT1_AMT="1620000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714093" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="GRAYSON COUNTY LINE" LIMITS_TO_DSCR="VALLEY CREEK TRAIL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="390216" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.780 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18952.35" TOT_SPENT_AMT="18952.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="405825.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004714094" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT W. WHITE ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="180000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13581.56" TOT_SPENT_AMT="13581.56" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="220000.00" FUND_CAT2_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1210LI)" FUND_CAT2_PID="LIA" FUND_CAT2_AMT="180000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718080" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="SH 91" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="287008" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH="12.137 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="291041.12" TOT_SPENT_AMT="291041.12" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="287008.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718082" PT_PHASE="Planning, 10+ years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT US 82" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22785000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.192 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1598476.58" TOT_SPENT_AMT="1598476.58" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT US 82" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18955227" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="5/30/2018" PSE_30_ACTL_DT="5/30/2018" PSE_60_TRGT_DT="7/13/2018" PSE_60_ACTL_DT="7/13/2018" PSE_100_TRGT_DT="9/6/2018" PSE_100_ACTL_DT="9/6/2018" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.192 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="10/10/2019" CNSTR_WKBG_DT="1/13/2020" CNSTR_PCT_TIME_USED="122.47" CNSTR_PCT_COMPLETE="115.36" DSGN_START_TRGT_DT="3/7/2018" DSGN_START_ACTL_DT="3/7/2018" ENVCLR_TRGT_DT="7/13/2018" ENVCLR_ACTL_DT="7/13/2018" UTIL_TRGT_DT="3/5/2018" UTIL_ACTL_DT="3/5/2018" ROW_TRGT_DT="3/5/2018" ROW_ACTL_DT="3/5/2018" RTL_TRGT_DT="9/6/2019" RTL_ACTL_DT="9/6/2019" PE_SPENT_AMT="2458206.95" CNSTR_SPENT_AMT="20121270.44" CE_SPENT_AMT="2736911.56" TOT_SPENT_AMT="25316388.95" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="21700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="SH 91 (TEXOMA PARKWAY)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/7/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="145430024" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.690 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="INDUS ROAD &amp; BRIDGE, INC." CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="2/20/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="19.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10691543.17" CNSTR_SPENT_AMT="28946216.19" CE_SPENT_AMT="383410.09" TOT_SPENT_AMT="40021169.45" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="65957299.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="NORTH LOY LAKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/5/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="179371750" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.050 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="2/6/2024" CNSTR_PCT_TIME_USED="36.65" CNSTR_PCT_COMPLETE="34.95" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1382270.69" CNSTR_SPENT_AMT="67559070.13" CE_SPENT_AMT="2626823.98" TOT_SPENT_AMT="71568164.80" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="47559246.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="11889812.00" FUND_CAT3_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT3_AMT="10100000.00" FUND_CAT4_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT4_AMT="2000000.00" FUND_CAT5_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT5_AMT="17652540.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718090" PT_PHASE="Planning, 10+ years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 120" LIMITS_TO_DSCR="SH 91" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59380250" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.035 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718092" PT_PHASE="Planning, 10+ years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="NORTH LOY LAKE ROAD" LIMITS_TO_DSCR="NORTH OF FM 120" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="143148000" DIST_LET_DATE="8/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718093" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="LOY LAKE ROAD" LIMITS_TO_DSCR="NORTH LOY LAKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="220029" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="130.00" CE_SPENT_AMT="1867.88" TOT_SPENT_AMT="1997.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="178448.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718094" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="NORTH LOY LAKE ROAD" LIMITS_TO_DSCR="LOY LAKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="190629" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="1613.88" TOT_SPENT_AMT="1613.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="154569.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718095" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="LOY LAKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="374246" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="404186.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718096" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="LOY LAKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="374246" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="404186.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718098" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="UPRR BRIDGE OVERPASS" LIMITS_TO_DSCR="SH 91" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6984779" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.449 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="5/4/2025" CNSTR_PCT_TIME_USED="8.59" CNSTR_PCT_COMPLETE="4.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="441307.63" CE_SPENT_AMT="4216.49" TOT_SPENT_AMT="445524.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="10200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004718099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 75" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 91" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3230392" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.247 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="5/4/2025" CNSTR_PCT_TIME_USED="8.59" CNSTR_PCT_COMPLETE="4.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="15817.50" CE_SPENT_AMT="1912.93" TOT_SPENT_AMT="17730.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004719016" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 503" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 75 E FR" LIMITS_TO_DSCR="SH 91" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86546" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="733.63" TOT_SPENT_AMT="733.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="70145.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004719017" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 503" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SS 503 S FR" LIMITS_TO_DSCR="US 75 E FR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="66132" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="560.18" TOT_SPENT_AMT="560.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="53661.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004801067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 342" CNTY_NM="Dallas" LIMITS_FROM_DSCR="CEDARDALE RD" LIMITS_TO_DSCR="ALEXANDER AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1307026" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7704.73" CNSTR_SPENT_AMT="1268595.67" TOT_SPENT_AMT="1276300.40" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="2170456.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004801068" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 342" CNTY_NM="Dallas" LIMITS_FROM_DSCR="W BELTLINE RD" LIMITS_TO_DSCR="MOBBERLY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="247365" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="277049.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004801069" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 342" CNTY_NM="Dallas" LIMITS_FROM_DSCR="ELLIS COUNTY LINE" LIMITS_TO_DSCR="BELT LINE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/28/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7856752" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="8/1/2022" PSE_30_ACTL_DT="10/1/2022" PSE_60_TRGT_DT="1/1/2023" PSE_60_ACTL_DT="12/16/2022" PSE_100_TRGT_DT="5/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.098 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="4/1/2024" CNSTR_PCT_TIME_USED="84.52" CNSTR_PCT_COMPLETE="96.16" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="10/1/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="238882.94" CNSTR_SPENT_AMT="8318926.65" CE_SPENT_AMT="300554.19" TOT_SPENT_AMT="8858363.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="9142970.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004801070" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 342" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT SL 12 (LEDBETTER)" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="678273" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="759666.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004803099" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 77" CNTY_NM="Ellis" LIMITS_FROM_DSCR="US 287" LIMITS_TO_DSCR="IH 35E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8151030" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.640 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="70083.73" TOT_SPENT_AMT="70083.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8803112.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004803100" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 342" CNTY_NM="Ellis" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="US 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3627605" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="144712.41" TOT_SPENT_AMT="144712.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3772709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004803101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 77" CNTY_NM="Ellis" LIMITS_FROM_DSCR="FM 66" LIMITS_TO_DSCR="PARK HILLS DR/IH 35E NBFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73299" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="89340.02" CE_SPENT_AMT="735.71" TOT_SPENT_AMT="90075.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="67301.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004803102" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 342" CNTY_NM="Ellis" LIMITS_FROM_DSCR="DALLAS CL" LIMITS_TO_DSCR="FM 664" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96573" DIST_LET_DATE="10/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="104299.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004803103" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004804094" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35E" CNTY_NM="Ellis" LIMITS_FROM_DSCR="AT FM 387 (BUTCHER ROAD)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45984067" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="11/15/2017" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="9/1/2018" PSE_100_TRGT_DT="2/28/2019" PSE_100_ACTL_DT="12/25/2019" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.155 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="96.06" CNSTR_PCT_COMPLETE="101.20" DSGN_START_TRGT_DT="11/15/2017" DSGN_START_ACTL_DT="11/15/2017" ENVCLR_TRGT_DT="2/1/2019" ENVCLR_ACTL_DT="6/26/2019" UTIL_TRGT_DT="8/1/2020" UTIL_ACTL_DT="12/14/2021" ROW_TRGT_DT="11/1/2019" ROW_ACTL_DT="12/1/2020" RTL_TRGT_DT="8/1/2020" RTL_ACTL_DT="12/14/2021" PE_SPENT_AMT="2890994.01" CNSTR_SPENT_AMT="47819972.26" CE_SPENT_AMT="1654515.55" TOT_SPENT_AMT="52365481.82" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_PID="017" FUND_CAT1_AMT="42000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004804103" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 77" CNTY_NM="Ellis" LIMITS_FROM_DSCR="0.175 MI. N OF SOUTH PRONG CREEK" LIMITS_TO_DSCR="FM55" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="137221" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.688 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="166880.38" CE_SPENT_AMT="1374.27" TOT_SPENT_AMT="168254.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="124475.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004804106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35E" CNTY_NM="Ellis" LIMITS_FROM_DSCR="US 77 SOUTH" LIMITS_TO_DSCR="US 77 NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8132157" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.091 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="PEACHTREE CONSTRUCTION, LTD." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="1/20/2025" CNSTR_PCT_TIME_USED="22.92" CNSTR_PCT_COMPLETE="24.72" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77337.07" CNSTR_SPENT_AMT="1670117.17" CE_SPENT_AMT="31495.54" TOT_SPENT_AMT="1778949.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="8892054.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004804107" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35E" CNTY_NM="Ellis" LIMITS_FROM_DSCR="BU 287R (WAXAHACHIE CRK)" LIMITS_TO_DSCR="US 77" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="156268" DIST_LET_DATE="10/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="168769.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004804108" PT_PHASE="Construction begins within 4 years" CNTY_NM="Ellis" LIMITS_FROM_DSCR="N OF FM 55" LIMITS_TO_DSCR="FM 329" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="211410" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="236779.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004805043" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 77" CNTY_NM="Ellis" LIMITS_FROM_DSCR="FM 329" LIMITS_TO_DSCR="HILL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="587025" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="657468.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004806037" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 579" CNTY_NM="Hill" LIMITS_FROM_DSCR="1.02 MI W IH 35" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2800000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/17/2022" PSE_30_ACTL_DT="11/17/2022" PSE_60_TRGT_DT="4/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/21/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="9/8/2022" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="125445.59" TOT_SPENT_AMT="125445.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2912000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004808058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004809033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901091" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ TRIB OF SHAW CREEK" LIMITS_TO_DSCR="(STR #112)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="2/7/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/14/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.005 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/10/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7333.91" TOT_SPENT_AMT="7333.91" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_AMT="33000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="5/8/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901095" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="FM 1860" LIMITS_TO_DSCR="FALLS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1577645" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/15/2025" PSE_30_ACTL_DT="4/3/2023" PSE_60_TRGT_DT="4/30/2025" PSE_60_ACTL_DT="4/14/2023" PSE_100_TRGT_DT="10/15/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="107.88" CNSTR_PCT_COMPLETE="108.07" DSGN_START_TRGT_DT="10/7/2024" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="380671.43" CNSTR_SPENT_AMT="1644630.44" CE_SPENT_AMT="76194.27" TOT_SPENT_AMT="2101496.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2194349.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901096" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SH 6 NB @ TEHUACANA CREEK RELIEF" LIMITS_TO_DSCR="(STR # 004)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/17/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/14/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/22/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="327.352 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/8/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/8/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/8/2016" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/12/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26764.19" TOT_SPENT_AMT="26764.19" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901097" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SH 6 NB @ TEHUACANA CREEK RELIEF" LIMITS_TO_DSCR="(STR # 005)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/17/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/14/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/22/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/8/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/8/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/8/2016" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/12/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38860.15" TOT_SPENT_AMT="38860.15" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901101" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 484" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="BU 77" LIMITS_TO_DSCR="SL 484" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/29/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="850998" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/22/2023" PSE_30_ACTL_DT="2/22/2023" PSE_60_TRGT_DT="2/28/2023" PSE_60_ACTL_DT="2/28/2023" PSE_100_TRGT_DT="6/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="SCOUT 5 CONSTRUCTION LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.55" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/27/2015" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/27/2015" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/27/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1543.20" CNSTR_SPENT_AMT="696888.77" CE_SPENT_AMT="45806.36" TOT_SPENT_AMT="744238.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1000705.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901102" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SH 164" LIMITS_TO_DSCR="FALLS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="781508" DIST_LET_DATE="11/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="844028.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901103" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SL 484" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="BU 77L" LIMITS_TO_DSCR="SL 340" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="278788.86" TOT_SPENT_AMT="278788.86" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="14560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004901104" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SL 484" LIMITS_TO_DSCR="SH 164" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6217200" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="6963264.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004902018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Falls" LIMITS_FROM_DSCR="MCLENNAN COUNTY LINE" LIMITS_TO_DSCR="FM 2307" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7839632" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/15/2025" PSE_30_ACTL_DT="4/3/2023" PSE_60_TRGT_DT="4/30/2025" PSE_60_ACTL_DT="4/14/2023" PSE_100_TRGT_DT="10/15/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="107.88" CNSTR_PCT_COMPLETE="108.07" DSGN_START_TRGT_DT="10/7/2024" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="357162.23" CNSTR_SPENT_AMT="7821077.62" CE_SPENT_AMT="362343.41" TOT_SPENT_AMT="8540583.26" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="10130226.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004902020" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004903070" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004904064" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Falls" LIMITS_FROM_DSCR="BIG CREEK BRIDGE" LIMITS_TO_DSCR="ROBERTSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13435312" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/15/2025" PSE_30_ACTL_DT="4/3/2023" PSE_60_TRGT_DT="4/30/2025" PSE_60_ACTL_DT="4/14/2023" PSE_100_TRGT_DT="10/15/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="107.88" CNSTR_PCT_COMPLETE="108.07" DSGN_START_TRGT_DT="10/7/2024" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="352376.41" CNSTR_SPENT_AMT="14755653.38" CE_SPENT_AMT="683615.94" TOT_SPENT_AMT="15791645.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="16825316.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004906080" PT_PHASE="Feasibility Studies" HWY_NBR="SH 6" CNTY_NM="Robertson" LIMITS_FROM_DSCR="3 MILES NORTH OF FM 1644 EAST" LIMITS_TO_DSCR="2 MILES SOUTH OF FM 1644 WEST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="300000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.069 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004906084" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Robertson" LIMITS_FROM_DSCR="FM 979" LIMITS_TO_DSCR="2.44 MI S OF FM 979" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004906085" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Robertson" LIMITS_FROM_DSCR="FM 979" LIMITS_TO_DSCR="FALLS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2524277" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/9/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/9/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="11.94" CNSTR_PCT_COMPLETE="35.60" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/23/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/23/2022" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="375838.27" CE_SPENT_AMT="45.84" TOT_SPENT_AMT="375884.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1747440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004906086" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004907065" PT_PHASE="Feasibility Studies" HWY_NBR="US 79" CNTY_NM="Robertson" LIMITS_FROM_DSCR="US 79" LIMITS_TO_DSCR="FM 391" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.135 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1070671.38" TOT_SPENT_AMT="1070671.38" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004907069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 79" CNTY_NM="Robertson" LIMITS_FROM_DSCR="0.1 MI S OF 5TH STREET" LIMITS_TO_DSCR="0.1 MI N OF 5TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="467834" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="7/8/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/17/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="ELECNOR BELCO ELECTRIC, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="4/11/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="94.28" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/29/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/26/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="114077.48" CNSTR_SPENT_AMT="417333.67" CE_SPENT_AMT="28233.05" TOT_SPENT_AMT="559644.20" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="437766.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004907072" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908069" PT_PHASE="Feasibility Studies" HWY_NBR="US 190" CNTY_NM="Robertson" LIMITS_FROM_DSCR="US 79" LIMITS_TO_DSCR="OSR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="300000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.280 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="501631.32" TOT_SPENT_AMT="501631.32" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908071" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 190" CNTY_NM="Robertson" LIMITS_FROM_DSCR="HEARNE CITY LIMIT" LIMITS_TO_DSCR="OSR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="192853058" DIST_LET_DATE="9/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/4/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/9/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.687 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/8/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/25/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/25/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/19/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="353.90" TOT_SPENT_AMT="353.90" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="173203436.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="52511783.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Robertson" LIMITS_FROM_DSCR="FM 391" LIMITS_TO_DSCR="BRADFORD STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1052744" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="1/7/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="5/11/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="1/19/2023" CNSTR_PCT_TIME_USED="99.53" CNSTR_PCT_COMPLETE="106.62" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/1/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/20/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="9/15/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/4/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/1/2022" PE_SPENT_AMT="70648.95" CNSTR_SPENT_AMT="986168.69" CE_SPENT_AMT="12242.28" TOT_SPENT_AMT="1069059.92" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="313650.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT2_AMT="371108.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908075" PT_PHASE="Construction underway or begins soon" CNTY_NM="Robertson" LIMITS_FROM_DSCR="0.1 MI N OF SUTTON RD" LIMITS_TO_DSCR="0.1 MI S OF FM 2549" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="85485" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="9/27/2023" PSE_60_ACTL_DT="1/31/2023" PSE_100_TRGT_DT="12/15/2023" PSE_100_ACTL_DT="2/24/2023" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="8/7/2023" CNSTR_WKBG_DT="2/1/2024" CNSTR_PCT_TIME_USED="99.19" CNSTR_PCT_COMPLETE="99.78" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="9/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/29/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="78207.50" CE_SPENT_AMT="22210.25" TOT_SPENT_AMT="100417.75" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="118618.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Robertson" LIMITS_FROM_DSCR="0.15 MI N OF SPRING OAKS DR." LIMITS_TO_DSCR="0.1 MI S OF SADBERRY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2487591" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="8/26/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.654 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="10/3/2024" CNSTR_PCT_TIME_USED="74.53" CNSTR_PCT_COMPLETE="113.00" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/21/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/19/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="72619.81" CNSTR_SPENT_AMT="2841015.67" CE_SPENT_AMT="85432.85" TOT_SPENT_AMT="2999068.33" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2676821.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Robertson" LIMITS_FROM_DSCR="0.3 MI N OF SAN GABRIEL ACCESS DRIVEWAY" LIMITS_TO_DSCR="0.4 MI S OF SAN GABRIEL ACCESS DRIVEWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/19/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="435234" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="7/8/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/17/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="ELECNOR BELCO ELECTRIC, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="4/11/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="94.28" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/29/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/26/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="48138.38" CNSTR_SPENT_AMT="436937.10" CE_SPENT_AMT="42530.98" TOT_SPENT_AMT="527606.46" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="100000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT2_AMT="350000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004908078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Robertson" LIMITS_FROM_DSCR="1 MI N OF OSR" LIMITS_TO_DSCR="OSR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1275457" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BRAZOS PAVING, INC." CNSTR_NTPD_DT="8/2/2024" CNSTR_WKBG_DT="11/14/2024" CNSTR_PCT_TIME_USED="74.58" CNSTR_PCT_COMPLETE="97.28" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28697.90" CNSTR_SPENT_AMT="1261765.70" CE_SPENT_AMT="54242.43" TOT_SPENT_AMT="1344706.03" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="1357587.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909075" PT_PHASE="Feasibility Studies" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="OSR" LIMITS_TO_DSCR="BS-6R NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.825 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="497661.71" TOT_SPENT_AMT="497661.71" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909076" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="15TH STREET" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="284960" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/15/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/12/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/21/2022" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.754 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BRAZOS PAVING, INC." CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="2/20/2023" CNSTR_PCT_TIME_USED="87.50" CNSTR_PCT_COMPLETE="96.98" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="10/15/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/20/2022" PE_SPENT_AMT="896808.41" CNSTR_SPENT_AMT="405568.06" CE_SPENT_AMT="14.57" TOT_SPENT_AMT="1302391.04" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909081" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="OSR" LIMITS_TO_DSCR="BS-6R NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.825 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909087" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="OLD HEARNE ROAD" LIMITS_TO_DSCR="15TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4137993" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="9/29/2020" PSE_30_ACTL_DT="6/8/2020" PSE_60_TRGT_DT="12/11/2020" PSE_60_ACTL_DT="7/16/2020" PSE_100_TRGT_DT="4/7/2021" PSE_100_ACTL_DT="2/19/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="5/13/2022" CNSTR_PCT_TIME_USED="152.32" CNSTR_PCT_COMPLETE="101.52" DSGN_START_TRGT_DT="7/6/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="4/21/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/29/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/29/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/21/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50886.64" CNSTR_SPENT_AMT="4149827.82" CE_SPENT_AMT="197551.52" TOT_SPENT_AMT="4398265.98" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="219117.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="0.43 MI S OF FM 2818" LIMITS_TO_DSCR="0.61 MI S OF FM 2818" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="693810" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/14/2021" PSE_30_ACTL_DT="6/1/2021" PSE_60_TRGT_DT="3/9/2021" PSE_60_ACTL_DT="11/8/2021" PSE_100_TRGT_DT="9/6/2022" PSE_100_ACTL_DT="5/9/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="1/17/2023" CNSTR_PCT_TIME_USED="68.99" CNSTR_PCT_COMPLETE="77.30" DSGN_START_TRGT_DT="12/7/2021" DSGN_START_ACTL_DT="1/7/2021" ENVCLR_TRGT_DT="9/20/2022" ENVCLR_ACTL_DT="5/29/2022" UTIL_TRGT_DT="12/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/20/2022" RTL_ACTL_DT="5/29/2022" PE_SPENT_AMT="95360.08" CNSTR_SPENT_AMT="2523402.97" CE_SPENT_AMT="14883.27" TOT_SPENT_AMT="2633646.32" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="67029.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909092" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="OLD HEARNE ROAD" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2607643" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="8/31/2022" PSE_60_TRGT_DT="10/1/2024" PSE_60_ACTL_DT="12/6/2022" PSE_100_TRGT_DT="10/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2024" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="7/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/17/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="872012.21" TOT_SPENT_AMT="872012.21" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="387267.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909095" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 WFR FROM OSR" LIMITS_TO_DSCR="BS 6R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3048350" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2013.12" CNSTR_SPENT_AMT="155549.70" CE_SPENT_AMT="1831.44" TOT_SPENT_AMT="159394.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1157376.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 WFR" LIMITS_TO_DSCR="AT ELM FORK CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="231140" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="10/19/2023" PSE_30_ACTL_DT="11/7/2022" PSE_60_TRGT_DT="4/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="(INACTIVE)MB WESTERN INDUSTRIAL CONTRACTING COMPANY" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="7/18/2023" CNSTR_PCT_TIME_USED="102.94" CNSTR_PCT_COMPLETE="95.12" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/22/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/22/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1721.60" CNSTR_SPENT_AMT="222349.71" CE_SPENT_AMT="9293.36" TOT_SPENT_AMT="233364.67" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="375000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909098" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 EFR FROM OSR" LIMITS_TO_DSCR="BS 6R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10334" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="9601.84" CE_SPENT_AMT="113.12" TOT_SPENT_AMT="9714.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="9762.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 WFR FROM OSR" LIMITS_TO_DSCR="BS 6R" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="66200" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1692.16" CNSTR_SPENT_AMT="26756.83" CE_SPENT_AMT="370.48" TOT_SPENT_AMT="28819.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="288961.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909100" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 2818" LIMITS_TO_DSCR="BS 6R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1766" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1718.34" CE_SPENT_AMT="23.81" TOT_SPENT_AMT="1742.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1846.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 2818" LIMITS_TO_DSCR="0.55 MI S OF FM 2818" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96136" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="63.64" CNSTR_PCT_COMPLETE="93.90" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="96754.64" CE_SPENT_AMT="2702.79" TOT_SPENT_AMT="99457.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="345606.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909102" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="OLD HEARNE ROAD" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1141460" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="178877.44" TOT_SPENT_AMT="178877.44" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="2404938.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909103" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS 6 NB AT US 190" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="950000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="482.77" TOT_SPENT_AMT="482.77" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="950000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004909105" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912110" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="SH 21" LIMITS_TO_DSCR="BS-6R SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="459221131" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/14/2022" PSE_30_ACTL_DT="3/14/2022" PSE_60_TRGT_DT="7/18/2022" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="1/16/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.364 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="FLUOR HEAVY CIVIL, LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.60" DSGN_START_TRGT_DT="1/4/2022" DSGN_START_ACTL_DT="6/1/2021" ENVCLR_TRGT_DT="10/24/2022" ENVCLR_ACTL_DT="7/26/2022" UTIL_TRGT_DT="7/8/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/8/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/22/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26558855.66" CNSTR_SPENT_AMT="3487090.95" CE_SPENT_AMT="485.33" TOT_SPENT_AMT="30046431.94" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="350768900.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2507)" FUND_CAT2_AMT="18854604.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="35755233.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912112" PT_PHASE="Feasibility Studies" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS-6R NORTH" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.236 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="175337.87" TOT_SPENT_AMT="175337.87" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912118" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="AT FM 1179" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7200000" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="3/14/2022" PSE_30_ACTL_DT="3/14/2022" PSE_60_TRGT_DT="7/18/2022" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="1/16/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="FLUOR HEAVY CIVIL, LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.60" DSGN_START_TRGT_DT="1/4/2022" DSGN_START_ACTL_DT="6/1/2021" ENVCLR_TRGT_DT="10/24/2022" ENVCLR_ACTL_DT="7/26/2022" UTIL_TRGT_DT="7/8/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/8/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/22/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11633.99" TOT_SPENT_AMT="11633.99" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="7500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912124" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS-6R NORTH" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75000000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.236 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912137" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="0.61 MI S OF FM 2818" LIMITS_TO_DSCR="0.88 MI S OF FM 2818" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="555017" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/14/2021" PSE_30_ACTL_DT="6/1/2021" PSE_60_TRGT_DT="3/9/2021" PSE_60_ACTL_DT="11/8/2021" PSE_100_TRGT_DT="9/6/2022" PSE_100_ACTL_DT="5/9/2022" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="1/17/2023" CNSTR_PCT_TIME_USED="68.99" CNSTR_PCT_COMPLETE="77.30" DSGN_START_TRGT_DT="12/7/2021" DSGN_START_ACTL_DT="1/7/2021" ENVCLR_TRGT_DT="9/20/2022" ENVCLR_ACTL_DT="5/29/2022" UTIL_TRGT_DT="12/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/20/2022" RTL_ACTL_DT="5/29/2022" PE_SPENT_AMT="622.85" CNSTR_SPENT_AMT="774219.56" CE_SPENT_AMT="30975.49" TOT_SPENT_AMT="805817.90" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="67029.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912139" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 WFR FROM SH 21" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106982" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="111381.25" CE_SPENT_AMT="1311.43" TOT_SPENT_AMT="112692.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="102109.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912141" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH WFR FROM FM 158" LIMITS_TO_DSCR="BS 6R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="296747" DIST_LET_DATE="10/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912142" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH EFR FROM FM 158" LIMITS_TO_DSCR="BS 6R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="294307" DIST_LET_DATE="10/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912143" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 WFR FROM BS 6R" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="168761" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="176673.76" CE_SPENT_AMT="2080.23" TOT_SPENT_AMT="178753.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="160344.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912144" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 EFR FROM BS 6R" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="290908" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="305338.32" CE_SPENT_AMT="3595.02" TOT_SPENT_AMT="308933.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="275612.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912145" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 EFR FROM SH 21" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="144295" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="149788.61" CE_SPENT_AMT="1763.63" TOT_SPENT_AMT="151552.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="136876.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912146" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 WFR FROM SH 21" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8986" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="9573.55" CE_SPENT_AMT="132.56" TOT_SPENT_AMT="9706.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="10021.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912147" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 WFR FROM BS 6R" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25101" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="27002.30" CE_SPENT_AMT="373.87" TOT_SPENT_AMT="27376.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="27178.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912148" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON US 190 EFR FROM BS 6R" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33732" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="36330.36" CE_SPENT_AMT="503.01" TOT_SPENT_AMT="36833.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="39930.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912149" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 EFR FROM SH 21" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13201" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="14237.57" CE_SPENT_AMT="197.15" TOT_SPENT_AMT="14434.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="14878.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004912150" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="0.55 MI S OF FM 2818" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="924670" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="63.64" CNSTR_PCT_COMPLETE="93.90" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20131.28" CNSTR_SPENT_AMT="834847.51" CE_SPENT_AMT="16375.27" TOT_SPENT_AMT="871354.06" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2673103.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004913009" PT_PHASE="Planning, 10+ years" HWY_NBR="FM 46" CNTY_NM="Falls" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="ROBERTSON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135300" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="2.700 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="140712.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004913010" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 46" CNTY_NM="Falls" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="ROBERTSON CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4914109" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Josh Voiles, P.E." TXDOT_CNTCT_PH_NBR="(254)582-5432" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="8.00" CNSTR_PCT_COMPLETE="14.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="191661.85" CNSTR_SPENT_AMT="553082.00" CE_SPENT_AMT="782.88" TOT_SPENT_AMT="745526.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004914014" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 46" CNTY_NM="Robertson" LIMITS_FROM_DSCR="FALLS COUNTY LINE" LIMITS_TO_DSCR="SH 14" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12855" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/10/2021" PSE_30_ACTL_DT="1/1/2021" PSE_60_TRGT_DT="4/21/2021" PSE_60_ACTL_DT="3/3/2021" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="6/4/2021" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="STRIPE LINES, INC." CNSTR_NTPD_DT="6/22/2022" CNSTR_WKBG_DT="8/25/2022" CNSTR_PCT_TIME_USED="123.46" CNSTR_PCT_COMPLETE="100.03" DSGN_START_TRGT_DT="9/17/2020" DSGN_START_ACTL_DT="9/17/2020" ENVCLR_TRGT_DT="9/10/2021" ENVCLR_ACTL_DT="5/28/2021" UTIL_TRGT_DT="12/7/2020" UTIL_ACTL_DT="6/4/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/10/2021" RTL_ACTL_DT="6/4/2021" PE_SPENT_AMT="64383.62" CNSTR_SPENT_AMT="11464.44" CE_SPENT_AMT="404.88" TOT_SPENT_AMT="76252.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="NC" FUND_CAT1_AMT="26988.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004914015" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 46" CNTY_NM="Robertson" LIMITS_FROM_DSCR="FALLS COUNTY LINE" LIMITS_TO_DSCR="SH 14" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="62315" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="69793.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004915016" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="004916002" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Falls" LIMITS_FROM_DSCR="NORTH OF REAGAN" LIMITS_TO_DSCR="SOUTH OF REAGAN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="10/1/2049" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.720 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001083" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 158" LIMITS_TO_DSCR="FM 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/15/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/12/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/21/2022" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.112 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BRAZOS PAVING, INC." CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="2/20/2023" CNSTR_PCT_TIME_USED="87.50" CNSTR_PCT_COMPLETE="96.98" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="10/15/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/20/2022" PE_SPENT_AMT="5798.86" CE_SPENT_AMT="14.57" TOT_SPENT_AMT="5813.43" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001087" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="AT WALTON DRIVE/NEW MAIN DRIVE" LIMITS_TO_DSCR=".WA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="406063" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/7/2020" PSE_30_ACTL_DT="4/20/2020" PSE_60_TRGT_DT="3/20/2020" PSE_60_ACTL_DT="6/15/2020" PSE_100_TRGT_DT="7/15/2020" PSE_100_ACTL_DT="7/31/2020" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="4/20/2021" CNSTR_PCT_TIME_USED="106.33" CNSTR_PCT_COMPLETE="99.94" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="7/29/2020" ENVCLR_ACTL_DT="7/21/2020" UTIL_TRGT_DT="10/1/2019" UTIL_ACTL_DT="7/31/2020" ROW_TRGT_DT="10/1/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2020" RTL_ACTL_DT="7/31/2020" PE_SPENT_AMT="8522.27" CNSTR_SPENT_AMT="398596.44" CE_SPENT_AMT="131885.88" TOT_SPENT_AMT="539004.59" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="42367.00" FUND_CAT2_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT2_PID="HES" FUND_CAT2_AMT="378985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001088" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 158" LIMITS_TO_DSCR="FM 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4220937" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/15/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/12/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/21/2022" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.125 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BRAZOS PAVING, INC." CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="2/20/2023" CNSTR_PCT_TIME_USED="87.50" CNSTR_PCT_COMPLETE="96.98" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="10/15/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/20/2022" PE_SPENT_AMT="675.97" CNSTR_SPENT_AMT="4115534.95" CE_SPENT_AMT="141155.68" TOT_SPENT_AMT="4257366.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="4000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001094" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 158" LIMITS_TO_DSCR="FM 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10705205" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="8/31/2022" PSE_60_TRGT_DT="10/1/2024" PSE_60_ACTL_DT="12/6/2022" PSE_100_TRGT_DT="10/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.112 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2024" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="7/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/17/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1565240.16" TOT_SPENT_AMT="1565240.16" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2707)" FUND_CAT1_AMT="2452477.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="630731.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001095" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 60" LIMITS_TO_DSCR="NEW MAIN DR." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1450360" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1890.38" TOT_SPENT_AMT="1890.38" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_AMT="1683472.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001097" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="AT FM 2347" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Donation" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="1000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005001099" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-R" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 158" LIMITS_TO_DSCR="FM 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4103958" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.112 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="8365752.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002117" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS-6R SOUTH" LIMITS_TO_DSCR="SH 40" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100044717" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/14/2022" PSE_30_ACTL_DT="3/14/2022" PSE_60_TRGT_DT="7/18/2022" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="1/16/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.752 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="FLUOR HEAVY CIVIL, LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.60" DSGN_START_TRGT_DT="1/4/2022" DSGN_START_ACTL_DT="6/1/2021" ENVCLR_TRGT_DT="10/24/2022" ENVCLR_ACTL_DT="7/26/2022" UTIL_TRGT_DT="7/8/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/8/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/22/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7319328.24" CNSTR_SPENT_AMT="677096.95" CE_SPENT_AMT="94.25" TOT_SPENT_AMT="7996519.44" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="24991527.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="49518143.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002122" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH WFR FROM BS 6R" LIMITS_TO_DSCR="SH 40" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="70594" DIST_LET_DATE="10/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002123" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS 6R" LIMITS_TO_DSCR="SH 40" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="70594" DIST_LET_DATE="10/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="79065.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002124" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 SB" LIMITS_TO_DSCR="AT NAVASOTA RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="611941" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="10/19/2023" PSE_30_ACTL_DT="11/7/2022" PSE_60_TRGT_DT="4/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="(INACTIVE)MB WESTERN INDUSTRIAL CONTRACTING COMPANY" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="7/18/2023" CNSTR_PCT_TIME_USED="102.94" CNSTR_PCT_COMPLETE="95.12" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/22/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/22/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="148.50" CNSTR_SPENT_AMT="617693.60" CE_SPENT_AMT="28882.13" TOT_SPENT_AMT="646724.23" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="580000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002125" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 WFR" LIMITS_TO_DSCR="AT JONES CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="231627" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="10/19/2023" PSE_30_ACTL_DT="11/7/2022" PSE_60_TRGT_DT="4/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="(INACTIVE)MB WESTERN INDUSTRIAL CONTRACTING COMPANY" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="7/18/2023" CNSTR_PCT_TIME_USED="102.94" CNSTR_PCT_COMPLETE="95.12" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/22/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/22/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/18/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="227604.81" CE_SPENT_AMT="10241.02" TOT_SPENT_AMT="237845.83" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="120000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002126" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 WFR" LIMITS_TO_DSCR="AT MILLICAN CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="190680" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="10/19/2023" PSE_30_ACTL_DT="11/7/2022" PSE_60_TRGT_DT="4/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="(INACTIVE)MB WESTERN INDUSTRIAL CONTRACTING COMPANY" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="7/18/2023" CNSTR_PCT_TIME_USED="102.94" CNSTR_PCT_COMPLETE="95.12" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/22/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/22/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="106.65" CNSTR_SPENT_AMT="200431.83" CE_SPENT_AMT="8191.61" TOT_SPENT_AMT="208730.09" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="150000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002127" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 EFR FROM SH 40" LIMITS_TO_DSCR="0.5 MI N OF GRIMES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="689230" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="771938.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002128" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Brazos" LIMITS_FROM_DSCR="ON SH 6 WFR FROM SH 40" LIMITS_TO_DSCR="0.5 MI N OF GRIMES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="664526" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="744269.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005002129" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003096" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="AT FM 2" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/3/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18052622" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/16/2019" PSE_30_ACTL_DT="8/19/2020" PSE_60_TRGT_DT="8/20/2020" PSE_60_ACTL_DT="11/20/2020" PSE_100_TRGT_DT="4/5/2021" PSE_100_ACTL_DT="4/7/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.400 (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="11/1/2021" CNSTR_PCT_TIME_USED="102.76" CNSTR_PCT_COMPLETE="101.32" DSGN_START_TRGT_DT="7/8/2019" DSGN_START_ACTL_DT="7/20/2020" ENVCLR_TRGT_DT="9/17/2019" ENVCLR_ACTL_DT="6/9/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/28/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/14/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1406393.76" CNSTR_SPENT_AMT="19852609.66" CE_SPENT_AMT="900167.28" TOT_SPENT_AMT="22159170.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="18928599.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003101" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="AT GRASSY CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5500000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/19/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/8/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/3/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="640033.94" TOT_SPENT_AMT="640033.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003106" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="SH 6 SB AT RR UNDERPASS" LIMITS_TO_DSCR="SH 6 SB 0.04 MILES S OF UNDERPASS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135355" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.040 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2010)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="134355.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003108" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="AT FM 3090" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/8/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="67234" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="3/17/2020" PSE_30_ACTL_DT="1/31/2020" PSE_60_TRGT_DT="5/28/2020" PSE_60_ACTL_DT="2/21/2020" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="5/7/2020" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="12/11/2020" CNSTR_WKBG_DT="3/11/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.99" DSGN_START_TRGT_DT="1/3/2020" DSGN_START_ACTL_DT="1/1/2020" ENVCLR_TRGT_DT="10/20/2020" ENVCLR_ACTL_DT="6/5/2020" UTIL_TRGT_DT="6/3/2019" UTIL_ACTL_DT="3/18/2020" ROW_TRGT_DT="6/3/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2020" RTL_ACTL_DT="9/4/2020" CNSTR_SPENT_AMT="64714.00" CE_SPENT_AMT="2603.22" TOT_SPENT_AMT="67317.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="87871.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003109" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="0.3 MI N OF FM 2988" LIMITS_TO_DSCR="0.1 MI S OF FM 2988" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="620874" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/26/2024" PSE_30_ACTL_DT="7/8/2022" PSE_60_TRGT_DT="11/5/2024" PSE_60_ACTL_DT="10/1/2022" PSE_100_TRGT_DT="3/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="11/8/2023" CNSTR_PCT_TIME_USED="107.00" CNSTR_PCT_COMPLETE="127.89" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="6/10/2022" ENVCLR_TRGT_DT="2/21/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/19/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="78414.57" CNSTR_SPENT_AMT="575462.48" CE_SPENT_AMT="72117.49" TOT_SPENT_AMT="725994.54" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="180169.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003110" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="ON SH 6 EFR FROM BS 6S" LIMITS_TO_DSCR="0.47 MI S OF SH 105" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="142148" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="159206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003111" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="ON SH 6 WFR FROM BS 6S" LIMITS_TO_DSCR="0.47 MI S OF SH 105" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="179626" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="201181.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003112" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="ON SH 6 SB" LIMITS_TO_DSCR="AT SH 90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="449779" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1456.54" CNSTR_SPENT_AMT="422677.75" CE_SPENT_AMT="80764.27" TOT_SPENT_AMT="504898.56" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="350000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003113" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="ON SH 6 NB" LIMITS_TO_DSCR="AT SH 90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="432669" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="455333.61" CE_SPENT_AMT="77874.25" TOT_SPENT_AMT="533207.86" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="340000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005003114" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Grimes" LIMITS_FROM_DSCR="ON SH 6 SB" LIMITS_TO_DSCR="AT BS 6S NB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="991001" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1010.69" CNSTR_SPENT_AMT="1051563.07" CE_SPENT_AMT="135732.45" TOT_SPENT_AMT="1188306.21" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005004027" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Waller" LIMITS_FROM_DSCR="GRIMES COUNTY LINE" LIMITS_TO_DSCR="US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/30/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5294014" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/24/2020" PSE_100_ACTL_DT="8/24/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.034 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/12/2021" CNSTR_WKBG_DT="7/26/2021" CNSTR_PCT_TIME_USED="141.30" CNSTR_PCT_COMPLETE="111.41" DSGN_START_TRGT_DT="9/20/2019" DSGN_START_ACTL_DT="9/20/2019" ENVCLR_TRGT_DT="10/29/2020" ENVCLR_ACTL_DT="9/25/2018" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/29/2020" RTL_ACTL_DT="10/29/2020" PE_SPENT_AMT="99916.25" CNSTR_SPENT_AMT="5803854.60" CE_SPENT_AMT="383339.25" TOT_SPENT_AMT="6287110.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="5952985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005004029" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Waller" LIMITS_FROM_DSCR="GRIMES COUNTY LINE" LIMITS_TO_DSCR="US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5240429" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22405.09" TOT_SPENT_AMT="22405.09" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="5240429.00" TXDOT_CNTCT_LAST_UPDATE_DT="4/4/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005004030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Waller" LIMITS_FROM_DSCR="GRIMES COUNTY LINE" LIMITS_TO_DSCR="US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/29/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1561386" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="3/29/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="9/29/2022" PSE_100_TRGT_DT="3/30/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.982 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="26.77" CNSTR_PCT_COMPLETE="97.52" DSGN_START_TRGT_DT="8/23/2021" DSGN_START_ACTL_DT="8/23/2021" ENVCLR_TRGT_DT="2/23/2022" ENVCLR_ACTL_DT="2/23/2022" UTIL_TRGT_DT="8/18/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/18/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="96294.38" CNSTR_SPENT_AMT="1542213.81" CE_SPENT_AMT="52191.67" TOT_SPENT_AMT="1690699.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2052670.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005005067" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290H" CNTY_NM="Waller" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/27/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5433537" DIST_LET_DATE="2/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="9/20/2019" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="4/28/2020" CNSTR_WKBG_DT="9/9/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="105.79" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="8/1/2019" ENVCLR_TRGT_DT="12/1/2020" ENVCLR_ACTL_DT="6/26/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2020" RTL_ACTL_DT="12/2/2019" PE_SPENT_AMT="194208.25" CNSTR_SPENT_AMT="6214199.89" CE_SPENT_AMT="617943.52" TOT_SPENT_AMT="7026351.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="5680000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005005069" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290H" CNTY_NM="Waller" LIMITS_FROM_DSCR="AT 5TH ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="299332" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="1.16" DSGN_START_TRGT_DT="9/7/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/11/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2081.02" TOT_SPENT_AMT="2081.02" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="245807.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005005070" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290H" CNTY_NM="Waller" LIMITS_FROM_DSCR="AT FM 359" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="272523" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="1.16" DSGN_START_TRGT_DT="9/7/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/11/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16530.14" CNSTR_SPENT_AMT="11970.49" TOT_SPENT_AMT="28500.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="271901.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005005071" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 290H" CNTY_NM="Waller" LIMITS_FROM_DSCR="SH 159 (10TH STREET)" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1144025" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1281308.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="WEST OF BADTKE" LIMITS_TO_DSCR="MUESCHKE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1371760" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="ALLSTATE SIGNAL &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="9/30/2024" CNSTR_PCT_TIME_USED="57.04" CNSTR_PCT_COMPLETE="91.43" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38627.82" CNSTR_SPENT_AMT="1764824.11" CE_SPENT_AMT="109994.34" TOT_SPENT_AMT="1913446.27" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006092" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="US 290/GREENHOUSE RD, FROM MOUND RD" LIMITS_TO_DSCR="SKINNER RD AT US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42909245" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="7/29/2021" PSE_30_ACTL_DT="12/27/2022" PSE_60_TRGT_DT="8/2/2021" PSE_60_ACTL_DT="1/3/2023" PSE_100_TRGT_DT="8/5/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/28/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/22/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/22/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/29/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="835791.14" CNSTR_SPENT_AMT="7210.44" TOT_SPENT_AMT="843001.58" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT1_AMT="41380000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="4961985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006093" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT CYPRESS PARK &amp; RIDE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32109300" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="3/23/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/25/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/30/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.520 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/22/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/1/2020" UTIL_ACTL_DT="1/1/2020" ROW_TRGT_DT="3/16/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="30631448.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="5330968.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006096" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="BADTKE ROAD" LIMITS_TO_DSCR=" TELGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="446085" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2021" PSE_100_ACTL_DT="8/2/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.716 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="82.99" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="1/4/2021" ENVCLR_TRGT_DT="6/1/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="8/11/2021" ROW_TRGT_DT="8/2/2021" ROW_ACTL_DT="8/2/2021" RTL_TRGT_DT="8/2/2021" RTL_ACTL_DT="8/2/2021" PE_SPENT_AMT="43332.10" CNSTR_SPENT_AMT="477336.54" CE_SPENT_AMT="33989.35" TOT_SPENT_AMT="554657.99" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006099" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006101" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 290H" CNTY_NM="Harris" LIMITS_FROM_DSCR="FM 2920" LIMITS_TO_DSCR="WEST OF BADTKE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3876397" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/6/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/6/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/10/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11819.62" TOT_SPENT_AMT="11819.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="4186509.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006104" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="BU 290-H" LIMITS_TO_DSCR="TELGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2114618" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50114.08" TOT_SPENT_AMT="50114.08" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="W OF BARKER CYPRESS RD" LIMITS_TO_DSCR="E OF TELGE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3610226" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2462.63" TOT_SPENT_AMT="2462.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="4043453.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006106" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 290H" CNTY_NM="Harris" LIMITS_FROM_DSCR="WALLER COUNTY LINE" LIMITS_TO_DSCR="WARREN RANCH DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="589346" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="660068.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006107" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="US 290 / NORTHWEST FWY" LIMITS_TO_DSCR="TELGE ROAD AT UPRR COMPANY DOT #743 636M" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150000" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.009 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2508RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="150000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006108" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT CYPRESS CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5039069" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18045.37" TOT_SPENT_AMT="18045.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="5442195.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005006109" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="BADTKE RD" LIMITS_TO_DSCR="TELGE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2738670" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1495097.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005007016" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2" CNTY_NM="Grimes" LIMITS_FROM_DSCR="END OF STATE MAINTENANCE" LIMITS_TO_DSCR="SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="166780" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="186794.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005008101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="TELGE ROAD" LIMITS_TO_DSCR="FM 529" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="892125" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2021" PSE_100_ACTL_DT="8/2/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.362 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="82.99" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="1/4/2021" ENVCLR_TRGT_DT="6/1/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="8/11/2021" ROW_TRGT_DT="8/2/2021" ROW_ACTL_DT="8/2/2021" RTL_TRGT_DT="8/2/2021" RTL_ACTL_DT="8/2/2021" PE_SPENT_AMT="8987.16" CNSTR_SPENT_AMT="955608.23" CE_SPENT_AMT="68044.46" TOT_SPENT_AMT="1032639.85" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005008103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="TELGE ROAD" LIMITS_TO_DSCR="FM 529" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1058222" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.362 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25546.49" TOT_SPENT_AMT="25546.49" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005008104" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 529" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23646183" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="209.64" TOT_SPENT_AMT="209.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="26483725.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005008105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="TELGE RD" LIMITS_TO_DSCR="FM 529" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1371700" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="749414.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005009097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="FM 529" LIMITS_TO_DSCR="IH 610" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="125256" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2021" PSE_100_ACTL_DT="8/2/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.185 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="82.99" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="1/4/2021" ENVCLR_TRGT_DT="6/1/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="8/11/2021" ROW_TRGT_DT="8/2/2021" ROW_ACTL_DT="8/2/2021" RTL_TRGT_DT="8/2/2021" RTL_ACTL_DT="8/2/2021" PE_SPENT_AMT="11108.02" CNSTR_SPENT_AMT="133754.02" CE_SPENT_AMT="9524.21" TOT_SPENT_AMT="154386.25" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005009098" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="FM 529" LIMITS_TO_DSCR="IH 610" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1527160" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="63167.10" TOT_SPENT_AMT="63167.10" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005009099" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="FM 529" LIMITS_TO_DSCR="IH 610 (WEST)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2117840" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1230055.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005011023" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-S" CNTY_NM="Grimes" LIMITS_FROM_DSCR="SH 6 N" LIMITS_TO_DSCR="SH 6 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5948071" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/9/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/9/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="11.94" CNSTR_PCT_COMPLETE="35.60" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/23/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/23/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3377.52" CNSTR_SPENT_AMT="759994.74" CE_SPENT_AMT="3875.55" TOT_SPENT_AMT="767247.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="658315.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005011024" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-S" CNTY_NM="Grimes" LIMITS_FROM_DSCR="AT SANDY CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="261000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="253897.61" CE_SPENT_AMT="46010.31" TOT_SPENT_AMT="299907.92" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005011025" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 6-S" CNTY_NM="Grimes" LIMITS_FROM_DSCR="AT CEDAR CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/19/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="110862" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="85426.50" CE_SPENT_AMT="18156.58" TOT_SPENT_AMT="103583.08" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="210000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005011026" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-S" CNTY_NM="Grimes" LIMITS_FROM_DSCR="SH 6 N" LIMITS_TO_DSCR="SH 6 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59630" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7371.35" TOT_SPENT_AMT="7371.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="62015.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005011027" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 6-S" CNTY_NM="Grimes" LIMITS_FROM_DSCR="BS 6 NB" LIMITS_TO_DSCR="AT SH 6 SB" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="800000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4035.03" TOT_SPENT_AMT="4035.03" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005012002" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 290L" CNTY_NM="Harris" LIMITS_FROM_DSCR="W OF FRY ROAD" LIMITS_TO_DSCR="US 290 EB FRONTAGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1167748" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/13/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.308 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/12/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/12/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7518.81" TOT_SPENT_AMT="7518.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1261168.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005102104" PT_PHASE="Feasibility Studies" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="BROOKGLEN DRIVE" LIMITS_TO_DSCR="GALVESTON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="650000" DIST_LET_DATE="9/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Corridor Planning Management" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/20/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="13.285 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/19/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/16/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/16/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/23/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77783.75" TOT_SPENT_AMT="77783.75" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="650000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005102108" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH RICHEY STREET" LIMITS_TO_DSCR="GALVESTON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/30/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5256562" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/2/2022" PSE_100_ACTL_DT="3/2/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.330 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="4/19/2022" CNSTR_WKBG_DT="8/3/2022" CNSTR_PCT_TIME_USED="98.97" CNSTR_PCT_COMPLETE="65.52" DSGN_START_TRGT_DT="7/15/2020" DSGN_START_ACTL_DT="7/15/2020" ENVCLR_TRGT_DT="1/11/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="9/24/2021" UTIL_ACTL_DT="9/24/2021" ROW_TRGT_DT="9/24/2021" ROW_ACTL_DT="9/24/2021" RTL_TRGT_DT="3/2/2022" RTL_ACTL_DT="3/2/2022" PE_SPENT_AMT="867172.97" CNSTR_SPENT_AMT="4302968.99" CE_SPENT_AMT="364461.02" TOT_SPENT_AMT="5534602.98" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="5395513.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005102109" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8 SOUTH" LIMITS_TO_DSCR="GALVESTON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16324800" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.500 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/3/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/9/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="104878.59" TOT_SPENT_AMT="104878.59" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005102110" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT SOUTH RICHEY ST, EDGEBROOK DR, AND" LIMITS_TO_DSCR="AT EL DORADO BLVD, AND BAY AREA BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6043621" DIST_LET_DATE="7/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="8/17/2021" PSE_30_ACTL_DT="2/27/2023" PSE_60_TRGT_DT="8/18/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/23/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.785 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/16/2021" DSGN_START_ACTL_DT="8/16/2021" ENVCLR_TRGT_DT="8/18/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/10/2021" UTIL_ACTL_DT="8/10/2021" ROW_TRGT_DT="8/10/2021" ROW_ACTL_DT="8/10/2021" RTL_TRGT_DT="1/3/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="598321.41" CNSTR_SPENT_AMT="9125.78" TOT_SPENT_AMT="607447.19" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2707)" FUND_CAT1_AMT="6527111.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005102111" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="RICHEY STREET" LIMITS_TO_DSCR="NEVADA STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/20/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="238782" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="23.44" CNSTR_PCT_COMPLETE="29.27" DSGN_START_TRGT_DT="1/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="52205.16" CNSTR_SPENT_AMT="142627.69" TOT_SPENT_AMT="194832.85" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="276902.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005102112" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="EL DORADO BLVD" LIMITS_TO_DSCR="LANDOLT ST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="730832" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/12/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="7/12/2022" PSE_100_TRGT_DT="7/18/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.358 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="TEXAS WALL &amp; LANDSCAPE" CNSTR_NTPD_DT="6/19/2023" CNSTR_WKBG_DT="7/31/2023" CNSTR_PCT_TIME_USED="89.71" CNSTR_PCT_COMPLETE="79.59" DSGN_START_TRGT_DT="7/15/2022" DSGN_START_ACTL_DT="9/28/2022" ENVCLR_TRGT_DT="7/15/2022" ENVCLR_ACTL_DT="8/9/2022" UTIL_TRGT_DT="7/12/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/12/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/19/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10580.38" CNSTR_SPENT_AMT="687824.25" CE_SPENT_AMT="80678.05" TOT_SPENT_AMT="779082.68" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="650000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103117" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="N OF FM 1765" LIMITS_TO_DSCR="SH 146" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4384916" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/7/2019" PSE_100_ACTL_DT="3/7/2019" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.980 (mi)" TXDOT_CNTCT_NM="David R. Lazaro, P.E." TXDOT_CNTCT_PH_NBR="(409)978-2505" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="3/24/2022" CNSTR_WKBG_DT="5/14/2022" CNSTR_PCT_TIME_USED="81.76" CNSTR_PCT_COMPLETE="93.35" DSGN_START_TRGT_DT="3/6/2019" DSGN_START_ACTL_DT="3/6/2019" ENVCLR_TRGT_DT="1/6/2020" ENVCLR_ACTL_DT="1/6/2020" UTIL_TRGT_DT="3/1/2019" UTIL_ACTL_DT="3/1/2019" ROW_TRGT_DT="3/1/2019" ROW_ACTL_DT="3/1/2019" RTL_TRGT_DT="3/8/2019" RTL_ACTL_DT="3/8/2019" PE_SPENT_AMT="88509.77" CNSTR_SPENT_AMT="4335219.50" CE_SPENT_AMT="378111.52" TOT_SPENT_AMT="4801840.79" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="3530000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103119" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="HARRIS C/L" LIMITS_TO_DSCR="FM 646" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/12/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1131154" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/31/2021" PSE_100_ACTL_DT="8/31/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.700 (mi)" TXDOT_CNTCT_NM="David R. Lazaro, P.E." TXDOT_CNTCT_PH_NBR="(409)978-2505" CNSTR_CMPNY_NM="(INACTIVE)MAIN LANE INDUSTRIES LTD." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/23/2023" CNSTR_PCT_TIME_USED="81.23" CNSTR_PCT_COMPLETE="95.70" DSGN_START_TRGT_DT="8/30/2021" DSGN_START_ACTL_DT="8/30/2021" ENVCLR_TRGT_DT="4/20/2022" ENVCLR_ACTL_DT="4/20/2022" UTIL_TRGT_DT="8/24/2021" UTIL_ACTL_DT="8/24/2021" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="8/24/2021" RTL_TRGT_DT="9/1/2021" RTL_ACTL_DT="9/1/2021" PE_SPENT_AMT="52378.83" CNSTR_SPENT_AMT="1191789.50" CE_SPENT_AMT="369387.60" TOT_SPENT_AMT="1613555.93" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1740960.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103120" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="0.1 MILE WEST OF FM 517" LIMITS_TO_DSCR="0.1 MILE EAST OF FM 517" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="315582" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="6.06" CNSTR_PCT_COMPLETE="28.59" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17797.43" CNSTR_SPENT_AMT="95794.62" CE_SPENT_AMT="71.23" TOT_SPENT_AMT="113663.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="303576.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103121" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="DEATS STREET" LIMITS_TO_DSCR="HUGHES ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/20/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="255961" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="23.44" CNSTR_PCT_COMPLETE="29.27" DSGN_START_TRGT_DT="1/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14013.19" TOT_SPENT_AMT="14013.19" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="265016.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103122" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="FM 1765" LIMITS_TO_DSCR="SH 146" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600985" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="673103.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103123" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="S OF FM 517" LIMITS_TO_DSCR="N OF FM 1765" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9073088" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.570 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="95241.45" TOT_SPENT_AMT="95241.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="10161859.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103124" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 3" CNTY_NM="Galveston" LIMITS_FROM_DSCR="FM 1765" LIMITS_TO_DSCR="FM 519" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3639244" DIST_LET_DATE="8/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="167391.29" TOT_SPENT_AMT="167391.29" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2509TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="3909210.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2509TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="101000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005103126" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005104069" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 87" CNTY_NM="Galveston" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR=" SEAWALL BOULEVARD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2610GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="520000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005106018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="GALVESTON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/19/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2198720" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/6/2022" PSE_100_ACTL_DT="1/6/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.259 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="8/8/2022" CNSTR_PCT_TIME_USED="90.28" CNSTR_PCT_COMPLETE="103.70" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="8/9/2021" ENVCLR_TRGT_DT="1/6/2020" ENVCLR_ACTL_DT="1/6/2020" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="8/9/2021" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="8/9/2021" RTL_TRGT_DT="3/1/2022" RTL_ACTL_DT="3/1/2022" PE_SPENT_AMT="275804.79" CNSTR_SPENT_AMT="2432343.95" CE_SPENT_AMT="124891.81" TOT_SPENT_AMT="2833040.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005106019" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="SOUTH RICHEY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/30/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="193698" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/2/2022" PSE_100_ACTL_DT="3/2/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.256 (mi)" TXDOT_CNTCT_NM="Jamal Elahi, P.E." TXDOT_CNTCT_PH_NBR="(281)464-5500" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="4/19/2022" CNSTR_WKBG_DT="8/3/2022" CNSTR_PCT_TIME_USED="98.97" CNSTR_PCT_COMPLETE="65.52" DSGN_START_TRGT_DT="7/15/2020" DSGN_START_ACTL_DT="7/15/2020" ENVCLR_TRGT_DT="1/11/2022" ENVCLR_ACTL_DT="1/11/2022" UTIL_TRGT_DT="9/24/2021" UTIL_ACTL_DT="9/24/2021" ROW_TRGT_DT="9/24/2021" ROW_ACTL_DT="9/24/2021" RTL_TRGT_DT="3/2/2022" RTL_ACTL_DT="3/2/2022" PE_SPENT_AMT="5465.98" CNSTR_SPENT_AMT="173653.16" CE_SPENT_AMT="16803.53" TOT_SPENT_AMT="195922.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="494786.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005106020" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 3" CNTY_NM="Harris" LIMITS_FROM_DSCR="MAIN STREET" LIMITS_TO_DSCR="RICHEY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/20/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="85977" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="23.44" CNSTR_PCT_COMPLETE="29.27" DSGN_START_TRGT_DT="1/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9861.64" CNSTR_SPENT_AMT="59971.76" TOT_SPENT_AMT="69833.40" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="108000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005108019" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 342" CNTY_NM="Galveston" LIMITS_FROM_DSCR="AT HEARDS LANE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="243650" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2021" PSE_100_ACTL_DT="1/8/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="CITYLYNX, INC." CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="3/18/2022" CNSTR_PCT_TIME_USED="42.62" CNSTR_PCT_COMPLETE="72.16" DSGN_START_TRGT_DT="1/7/2021" DSGN_START_ACTL_DT="1/7/2021" ENVCLR_TRGT_DT="7/2/2019" ENVCLR_ACTL_DT="7/2/2019" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="1/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="1/4/2021" RTL_TRGT_DT="1/11/2021" RTL_ACTL_DT="1/11/2021" PE_SPENT_AMT="10683.50" CNSTR_SPENT_AMT="196978.35" CE_SPENT_AMT="12731.75" TOT_SPENT_AMT="220393.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="322114.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005108020" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 342" CNTY_NM="Galveston" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="FM 3005" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1942725" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/5/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/5/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/9/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="2175852.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005108021" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 342" CNTY_NM="Galveston" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR=" SEAWALL BOULEVARD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.674 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2610GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="104000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005109126" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3005" CNTY_NM="Galveston" LIMITS_FROM_DSCR="AT 89TH ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="277945" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/29/2022" PSE_100_ACTL_DT="3/29/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="ALLSTATE SIGNAL &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="9/12/2024" CNSTR_PCT_TIME_USED="59.30" CNSTR_PCT_COMPLETE="94.97" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="8/26/2021" ENVCLR_TRGT_DT="2/15/2022" ENVCLR_ACTL_DT="2/15/2022" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="8/23/2021" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="8/23/2021" RTL_TRGT_DT="3/30/2022" RTL_ACTL_DT="3/30/2022" PE_SPENT_AMT="13745.61" CNSTR_SPENT_AMT="235566.59" CE_SPENT_AMT="4090.69" TOT_SPENT_AMT="253402.89" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="237962.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005109127" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 3005" CNTY_NM="Galveston" LIMITS_FROM_DSCR="SS 342 (61ST STREET)" LIMITS_TO_DSCR="COVE VIEW BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2100000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/6/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/10/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="41603.00" TOT_SPENT_AMT="41603.00" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2710CR)" FUND_CAT1_AMT="2268000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005109128" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 3005" CNTY_NM="Galveston" LIMITS_FROM_DSCR="SEAWALL BLVD" LIMITS_TO_DSCR="BLUE WATER HIGHWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4316678" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="4834679.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005109129" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 3005" CNTY_NM="Galveston" LIMITS_FROM_DSCR="SAN LUIS PASS" LIMITS_TO_DSCR="SS 342" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="21.211 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2610GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="156000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005201042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Parmer" LIMITS_FROM_DSCR="NEW MEXICO STATE LINE" LIMITS_TO_DSCR="EAST CITY LIMITS OF FARWELL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/29/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4792719" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="10/28/2019" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.992 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY" CNSTR_NTPD_DT="2/24/2020" CNSTR_WKBG_DT="3/28/2020" CNSTR_PCT_TIME_USED="249.39" CNSTR_PCT_COMPLETE="85.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/2/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="9/18/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/12/2019" PE_SPENT_AMT="210482.25" CNSTR_SPENT_AMT="2336276.54" CE_SPENT_AMT="501501.77" TOT_SPENT_AMT="3048260.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="3412500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005201043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Parmer" LIMITS_FROM_DSCR="FARWELL EAST CITY LIMITS" LIMITS_TO_DSCR="BAILEY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="24000000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.696 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/6/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/7/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/7/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="131888.15" TOT_SPENT_AMT="131888.15" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="24000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005201044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Parmer" LIMITS_FROM_DSCR="2.06 MILES EAST OF FARWELL CITY LIMITS" LIMITS_TO_DSCR="2.49 MILES EAST OF FARWELL CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/9/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1937606" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway/railroad Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="3/12/2021" CNSTR_WKBG_DT="3/29/2021" CNSTR_PCT_TIME_USED="80.90" CNSTR_PCT_COMPLETE="72.94" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="68663.08" CNSTR_SPENT_AMT="1924691.11" CE_SPENT_AMT="100067.06" TOT_SPENT_AMT="2093421.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="1600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005201046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 70" CNTY_NM="Parmer" LIMITS_FROM_DSCR=".25 MI W OF N. CURRY RD. C, TEXICO, NM" LIMITS_TO_DSCR="3RD ST., FARWELL, TX" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73690000" DIST_LET_DATE="10/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/7/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="4/4/2022" ENVCLR_TRGT_DT="7/5/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1833084.10" TOT_SPENT_AMT="1833084.10" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="30000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="27200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005201048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Parmer" LIMITS_FROM_DSCR="FARWELL EAST CITY LIMITS" LIMITS_TO_DSCR="BAILEY CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3544884" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/6/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/7/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/7/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="67304.50" TOT_SPENT_AMT="67304.50" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005202037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Bailey" LIMITS_FROM_DSCR="0.2 MI WEST OF FM 1760" LIMITS_TO_DSCR="0.2 MI EAST OF FM 1760" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="305700" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.196 (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" PE_SPENT_AMT="10295.12" CNSTR_SPENT_AMT="449850.01" CE_SPENT_AMT="1215.68" TOT_SPENT_AMT="461360.81" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="132510.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005202038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Bailey" LIMITS_FROM_DSCR="UVALDE STREET" LIMITS_TO_DSCR="SH 214" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="585040" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="12/1/2022" CNSTR_WKBG_DT="7/21/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10708.28" CNSTR_SPENT_AMT="376023.86" CE_SPENT_AMT="5497.42" TOT_SPENT_AMT="392229.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="388341.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005202039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Bailey" LIMITS_FROM_DSCR="SH 214" LIMITS_TO_DSCR="6TH STREET IN MULESHOE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99751" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="12/1/2022" CNSTR_WKBG_DT="7/21/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="278.89" CNSTR_SPENT_AMT="118925.29" CE_SPENT_AMT="1738.78" TOT_SPENT_AMT="120942.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="82717.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005202040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 70" CNTY_NM="Bailey" LIMITS_FROM_DSCR="PARMER COUNTY LINE" LIMITS_TO_DSCR="UVALDE ST IN MULESHOE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/6/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/7/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/7/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31323.49" TOT_SPENT_AMT="31323.49" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005203030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Bailey" LIMITS_FROM_DSCR="6TH STREET IN MULESHOE" LIMITS_TO_DSCR="LAMB COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2233557" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="25172.87" CNSTR_SPENT_AMT="1031994.00" CE_SPENT_AMT="13483.91" TOT_SPENT_AMT="1070650.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2821942.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005204052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lamb" LIMITS_FROM_DSCR="WEST SUDAN CITY LIMITS" LIMITS_TO_DSCR="DEAN AVENUE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/29/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3286272" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="10/28/2019" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.209 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY" CNSTR_NTPD_DT="2/24/2020" CNSTR_WKBG_DT="3/28/2020" CNSTR_PCT_TIME_USED="249.39" CNSTR_PCT_COMPLETE="85.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/2/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="9/18/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/12/2019" CNSTR_SPENT_AMT="2227895.10" CE_SPENT_AMT="536700.29" TOT_SPENT_AMT="2764595.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="3432500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005204053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lamb" LIMITS_FROM_DSCR="BAILEY COUNTY LINE" LIMITS_TO_DSCR="WEST SUDAN CITY LIMITS" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2262136" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17782.85" CNSTR_SPENT_AMT="823826.83" CE_SPENT_AMT="10650.23" TOT_SPENT_AMT="852259.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2054063.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005204054" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005205046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lamb" LIMITS_FROM_DSCR="EAST LITTLEFIELD CITY LIMITS" LIMITS_TO_DSCR="HOCKLEY COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12770582" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="5/5/2025" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="5/6/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="120165.23" CE_SPENT_AMT="6966.62" TOT_SPENT_AMT="127131.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="15679953.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005205047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lamb" LIMITS_FROM_DSCR="FM 1072" LIMITS_TO_DSCR="HOCKLEY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="806188" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/5/2022" PSE_100_ACTL_DT="4/20/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.650 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="6/16/2022" CNSTR_WKBG_DT="2/6/2023" CNSTR_PCT_TIME_USED="76.65" CNSTR_PCT_COMPLETE="99.74" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/3/2022" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2022" RTL_ACTL_DT="4/20/2022" PE_SPENT_AMT="47503.97" CNSTR_SPENT_AMT="820319.67" CE_SPENT_AMT="26458.84" TOT_SPENT_AMT="894282.48" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="635237.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005205048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lamb" LIMITS_FROM_DSCR="N SL430" LIMITS_TO_DSCR="FM1072" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4472173" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="5/5/2025" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="5/6/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22255.32" CE_SPENT_AMT="2508.57" TOT_SPENT_AMT="24763.89" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005205051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Lamb" LIMITS_FROM_DSCR="0.3 MILES NW OF LP 430" LIMITS_TO_DSCR="0.36 MILES SE OF LP 430" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22000000" DIST_LET_DATE="8/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="497234.81" TOT_SPENT_AMT="497234.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="24640000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005205052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005206026" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Hockley" LIMITS_FROM_DSCR="LAMB COUNTY LINE" LIMITS_TO_DSCR="OHIO COUNTY ROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="603867" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/5/2022" PSE_100_ACTL_DT="4/20/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.297 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="6/16/2022" CNSTR_WKBG_DT="2/6/2023" CNSTR_PCT_TIME_USED="76.65" CNSTR_PCT_COMPLETE="99.74" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/3/2022" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2022" RTL_ACTL_DT="4/20/2022" CNSTR_SPENT_AMT="607217.51" CE_SPENT_AMT="32663.13" TOT_SPENT_AMT="639880.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="798987.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005206027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Hockley" LIMITS_FROM_DSCR="OHIO ROAD" LIMITS_TO_DSCR="LUBBOCK COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="786550" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/5/2022" PSE_100_ACTL_DT="4/20/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.362 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="6/16/2022" CNSTR_WKBG_DT="2/6/2023" CNSTR_PCT_TIME_USED="76.65" CNSTR_PCT_COMPLETE="99.74" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/3/2022" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2022" RTL_ACTL_DT="4/20/2022" CNSTR_SPENT_AMT="789220.42" CE_SPENT_AMT="42551.68" TOT_SPENT_AMT="831772.10" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1263159.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005206028" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005206029" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005206030" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207067" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="US 84 AT MILWAUKEE AVENUE" LIMITS_TO_DSCR="INTERCHANGE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/2/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2027" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2707)" FUND_CAT1_AMT="166666.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="HOCKLEY COUNTY LINE" LIMITS_TO_DSCR="SOUTH SL 388, SHALLOWATER" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8489021" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.151 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="5/5/2025" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="5/6/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20888.59" CE_SPENT_AMT="4479.50" TOT_SPENT_AMT="25368.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="10520471.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="INTERSECTION AT" LIMITS_TO_DSCR="FM 2641" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/18/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="139769" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2021" PSE_100_ACTL_DT="6/4/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="2/15/2022" CNSTR_WKBG_DT="5/16/2022" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="98.56" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="7/2/2021" ENVCLR_ACTL_DT="2/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/4/2021" RTL_ACTL_DT="6/28/2021" PE_SPENT_AMT="115.97" CNSTR_SPENT_AMT="67242.97" CE_SPENT_AMT="2112.59" TOT_SPENT_AMT="69471.53" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="84440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.20 MI WEST OF MILWAUKEE AVE" LIMITS_TO_DSCR="0.20 MI EAST OF MILWAUKEE AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151250" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.173 (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" PE_SPENT_AMT="1047.97" CNSTR_SPENT_AMT="151114.00" CE_SPENT_AMT="2352.22" TOT_SPENT_AMT="154514.19" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="200908.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207074" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.33 MILES NW OF LP 388" LIMITS_TO_DSCR="0.3 MILES SE OF LP 388" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22000000" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1023015.87" TOT_SPENT_AMT="1023015.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="23760000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207075" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005207076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005208016" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005211006" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 388" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="NORTH US 84" LIMITS_TO_DSCR="SOUTH US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="148492" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2507.95" TOT_SPENT_AMT="2507.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="163172.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301129" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 331" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="FM 3020 INTERSECTION" LIMITS_TO_DSCR="US 84 INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/18/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="202902" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2021" PSE_100_ACTL_DT="6/4/2021" DIST_NM="Lubbock" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.403 (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="2/15/2022" CNSTR_WKBG_DT="5/16/2022" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="98.56" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="7/2/2021" ENVCLR_ACTL_DT="2/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/4/2021" RTL_ACTL_DT="6/28/2021" CNSTR_SPENT_AMT="238377.61" CE_SPENT_AMT="7488.88" TOT_SPENT_AMT="245866.49" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="275365.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301131" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 331" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="659 FT NORTH OF FM 3020" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1570807" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/6/2022" PSE_100_ACTL_DT="5/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.573 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="ALLEN BUTLER CONSTRUCTION, INC." CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="8/15/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="80.89" DSGN_START_TRGT_DT="4/6/2020" DSGN_START_ACTL_DT="4/6/2020" ENVCLR_TRGT_DT="4/5/2022" ENVCLR_ACTL_DT="2/24/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/6/2022" RTL_ACTL_DT="5/6/2022" PE_SPENT_AMT="43974.49" CNSTR_SPENT_AMT="1546917.13" CE_SPENT_AMT="64264.34" TOT_SPENT_AMT="1655155.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1275400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301132" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.2 MI EAST OF FM 835" LIMITS_TO_DSCR="0.2 MI WEST OF FM 835" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="105400" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.140 (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" PE_SPENT_AMT="1361.92" CNSTR_SPENT_AMT="102570.00" CE_SPENT_AMT="1626.18" TOT_SPENT_AMT="105558.10" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="107284.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301135" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="CR 3300" LIMITS_TO_DSCR="FM 400" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1775971" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20628.04" CNSTR_SPENT_AMT="2637222.93" CE_SPENT_AMT="16856.22" TOT_SPENT_AMT="2674707.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1539801.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301136" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.37 MI NORTH OF LYNN COUNTY LINE" LIMITS_TO_DSCR="LYNN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="114616" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38169.56" CNSTR_SPENT_AMT="711401.80" CE_SPENT_AMT="1083.64" TOT_SPENT_AMT="750655.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301137" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Lynn" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="CR7200 (98TH ST.)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="138178" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="151393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301139" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 331" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="FM 835 (50TH STREET)" LIMITS_TO_DSCR="OLIVE AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150480" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="482.75" TOT_SPENT_AMT="482.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="156499.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301140" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="CR3100(POSEY)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="134284" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="147186.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301141" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="FM1585" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151125" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="167535.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301142" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005301143" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005303022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lynn" LIMITS_FROM_DSCR="LUBBOCK COUNTY LINE" LIMITS_TO_DSCR="GARZA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="911135" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6610.61" CNSTR_SPENT_AMT="808566.95" CE_SPENT_AMT="10073.22" TOT_SPENT_AMT="825250.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005304044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="LYNN COUNTY LINE" LIMITS_TO_DSCR="3800 FT WEST OF US 380E" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2541098" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1160.02" CNSTR_SPENT_AMT="2618076.11" CE_SPENT_AMT="33840.96" TOT_SPENT_AMT="2653077.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2627163.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005304045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="LYNN COUNTY LINE" LIMITS_TO_DSCR="POST (N. AVE. O)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3744511" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5911.26" CNSTR_SPENT_AMT="3287865.65" CE_SPENT_AMT="41134.17" TOT_SPENT_AMT="3334911.08" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="4804411.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005305050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="FM 2458" LIMITS_TO_DSCR="CR 386" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4999000" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="4/21/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/12/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="245101.59" TOT_SPENT_AMT="245101.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4999000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005305053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="SL 46" LIMITS_TO_DSCR="1.03 MI EAST OF FM 2458" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3432733" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.161 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6549.87" CNSTR_SPENT_AMT="480929.43" CE_SPENT_AMT="38349.51" TOT_SPENT_AMT="525828.81" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3903073.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005306029" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="CR 386" LIMITS_TO_DSCR="SCURRY COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15001000" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="4/21/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/12/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="303877.02" TOT_SPENT_AMT="303877.02" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="15001000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005306031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="0.18 MI EAST OF FM 1269" LIMITS_TO_DSCR="1.04 MI EAST OF FM 1269" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/19/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1791546" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="COPPELL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="99.57" DSGN_START_TRGT_DT="10/5/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="10/31/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" PE_SPENT_AMT="51712.69" CNSTR_SPENT_AMT="1977403.78" CE_SPENT_AMT="130750.88" TOT_SPENT_AMT="2159867.35" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005306032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Garza" LIMITS_FROM_DSCR="CR386" LIMITS_TO_DSCR="SCURRY COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1887698" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9358.75" CNSTR_SPENT_AMT="157189.00" CE_SPENT_AMT="20226.67" TOT_SPENT_AMT="186774.42" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2345039.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005307039" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="GARZA/SCURRY CO LINE" LIMITS_TO_DSCR=".778MI SOUTH OF FM 1142" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1348184" DIST_LET_DATE="12/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.520 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="975190.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005307043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="GARZA COUNTY LINE" LIMITS_TO_DSCR=".75 MILES S OF FM 1142" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2630891" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" PE_SPENT_AMT="1602830.86" CNSTR_SPENT_AMT="2603332.51" CE_SPENT_AMT="19337.81" TOT_SPENT_AMT="4225501.18" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2683422.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005307044" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="0.771 M SOUTH OF FM 1142" LIMITS_TO_DSCR="FM 1673" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="848510" DIST_LET_DATE="12/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="950331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="0.3 MI WEST OF SH 208" LIMITS_TO_DSCR="FM 1673" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1199883" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="930141.86" CE_SPENT_AMT="10730.53" TOT_SPENT_AMT="940872.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="314410.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308075" PT_PHASE="Construction underway or begins soon" CNTY_NM="Scurry" LIMITS_FROM_DSCR=".75 MILES S OF FM 1142" LIMITS_TO_DSCR="1.1 MI WEST OF SH 208" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="724256" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="785815.74" CE_SPENT_AMT="9248.86" TOT_SPENT_AMT="795064.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="919681.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="SOUTH OF FM 1142" LIMITS_TO_DSCR="FM 1673" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="314001" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="163103.20" CE_SPENT_AMT="203.65" TOT_SPENT_AMT="163306.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="299517.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="SH 208" LIMITS_TO_DSCR="FM 1673" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="988024" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1106587.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="0.6 MILES NORTH OF FM 1611" LIMITS_TO_DSCR="AVE E" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3127335" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="3.63" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42018.41" CNSTR_SPENT_AMT="102939.11" TOT_SPENT_AMT="144957.52" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="3227165.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005308079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="0.6 MILES NORTH OF FM 1611" LIMITS_TO_DSCR="US 180" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4196904" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="3.63" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12502.71" CNSTR_SPENT_AMT="103232.94" TOT_SPENT_AMT="115735.65" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="4311364.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="FM 1673" LIMITS_TO_DSCR="BUS 84-G INTERCHANGE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2531024" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="3191989.01" CE_SPENT_AMT="32035.13" TOT_SPENT_AMT="3224024.14" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2674406.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="BU 84-G INTERCHANGE" LIMITS_TO_DSCR="CR 4126" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1089691" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="1069047.98" CE_SPENT_AMT="12466.81" TOT_SPENT_AMT="1081514.79" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1355715.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="SNYDER EAST CITY LIMITS" LIMITS_TO_DSCR="CR 4126" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5348082" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/4/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="4/1/2025" CNSTR_PCT_TIME_USED="60.32" CNSTR_PCT_COMPLETE="49.66" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/31/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/31/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/31/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9574.36" CNSTR_SPENT_AMT="3029243.85" CE_SPENT_AMT="925.25" TOT_SPENT_AMT="3039743.46" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309080" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="AVE E" LIMITS_TO_DSCR="NEAR FEED MILL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2268217" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="3.63" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="75057.73" TOT_SPENT_AMT="75057.73" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2339347.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="AVE E" LIMITS_TO_DSCR="US 180" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1379628" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="3.63" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="45250.11" TOT_SPENT_AMT="45250.11" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1423493.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309082" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="FM 1673" LIMITS_TO_DSCR="SNYDER CITY LIMITS" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="259506" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="273331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005309083" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="AT ENNIS CREEK RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005310044" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="CR 4126" LIMITS_TO_DSCR="MITCHELL CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="565157" DIST_LET_DATE="12/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/31/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/20/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/20/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="632976.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/11/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005310046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="CR 4126" LIMITS_TO_DSCR="MITCHELL COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1386632" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="1503179.91" CE_SPENT_AMT="15634.76" TOT_SPENT_AMT="1518814.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1738576.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005310047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Scurry" LIMITS_FROM_DSCR="HERMLEIGH (US 84 WBL ONLY)" LIMITS_TO_DSCR="NEAR FM 1613 (US 84 WBL ONLY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3977215" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/4/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="4/1/2025" CNSTR_PCT_TIME_USED="60.32" CNSTR_PCT_COMPLETE="49.66" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/31/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/31/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/31/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20349.69" CNSTR_SPENT_AMT="1949789.45" CE_SPENT_AMT="595.53" TOT_SPENT_AMT="1970734.67" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005311026" PT_PHASE="Construction begins within 4 years" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="NOLAN CO LINE" LIMITS_TO_DSCR="SCURRY CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44592" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/16/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/31/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/20/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/20/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="49943.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005311027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mitchell" LIMITS_FROM_DSCR="SCURRY COUNTY" LIMITS_TO_DSCR="NOLAN COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75248" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="32205.78" CE_SPENT_AMT="767.28" TOT_SPENT_AMT="32973.06" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="107466.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005312073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Nolan" LIMITS_FROM_DSCR="MITCHELL CO LINE" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="676444" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/8/2023" PSE_30_ACTL_DT="3/8/2023" PSE_60_TRGT_DT="5/15/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.792 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.12" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="679567.33" CE_SPENT_AMT="8704.55" TOT_SPENT_AMT="688271.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1803735.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005312074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Nolan" LIMITS_FROM_DSCR="MITCHELL COUNTY" LIMITS_TO_DSCR="3.84 MI WEST OF IH 20" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1063876" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="979426.01" CE_SPENT_AMT="11655.26" TOT_SPENT_AMT="991081.27" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1358250.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005313002" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 45" CNTY_NM="Garza" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="REFERENCE MARKER 3125+0.49" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32136" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="33421.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005314014" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 46" CNTY_NM="Garza" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="77271" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.939 (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="322.01" CNSTR_SPENT_AMT="80100.61" CE_SPENT_AMT="1046.71" TOT_SPENT_AMT="81469.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="77639.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005314015" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005315067" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 608" CNTY_NM="Nolan" LIMITS_FROM_DSCR="BI 20" LIMITS_TO_DSCR="FM 1170" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8787859" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="3/8/2022" PSE_30_ACTL_DT="6/14/2022" PSE_60_TRGT_DT="4/12/2022" PSE_60_ACTL_DT="6/27/2022" PSE_100_TRGT_DT="6/17/2022" PSE_100_ACTL_DT="8/15/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="BONTKE BROTHERS CONSTRUCTION COMPANY" CNSTR_NTPD_DT="4/5/2023" CNSTR_WKBG_DT="5/8/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="96.15" DSGN_START_TRGT_DT="1/10/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/5/2022" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="5/5/2022" UTIL_ACTL_DT="7/29/2022" ROW_TRGT_DT="5/5/2022" ROW_ACTL_DT="7/29/2022" RTL_TRGT_DT="6/17/2022" RTL_ACTL_DT="8/15/2022" PE_SPENT_AMT="62864.92" CNSTR_SPENT_AMT="8072700.59" CE_SPENT_AMT="547215.96" TOT_SPENT_AMT="8682781.47" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="8957727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005315069" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 608" CNTY_NM="Nolan" LIMITS_FROM_DSCR="S OF CR 147" LIMITS_TO_DSCR="SH 70" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106510" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="106510.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005316007" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="BU 84-H" CNTY_NM="Scurry" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="CR 4106" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="123784" DIST_LET_DATE="12/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="133687.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005316008" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="BU 84-H" CNTY_NM="Scurry" LIMITS_FROM_DSCR="HERMILIEGH" LIMITS_TO_DSCR="BUSINESS ROUTE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5000000" DIST_LET_DATE="2/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="5600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005317037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 180" CNTY_NM="Scurry" LIMITS_FROM_DSCR="SH 350" LIMITS_TO_DSCR="SH 208" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1641492" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/8/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/22/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/24/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.659 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="3/28/2025" CNSTR_PCT_TIME_USED="35.29" CNSTR_PCT_COMPLETE="118.31" DSGN_START_TRGT_DT="1/22/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/13/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/13/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/13/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/24/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38654.69" CNSTR_SPENT_AMT="1895638.76" CE_SPENT_AMT="15349.06" TOT_SPENT_AMT="1949642.51" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1792358.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005318048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="IH 27" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9876827" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/7/2024" PSE_100_ACTL_DT="10/13/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.968 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="12/2/2022" CNSTR_WKBG_DT="1/2/2023" CNSTR_PCT_TIME_USED="84.46" CNSTR_PCT_COMPLETE="90.32" DSGN_START_TRGT_DT="10/4/2024" DSGN_START_ACTL_DT="8/6/2020" ENVCLR_TRGT_DT="10/7/2024" ENVCLR_ACTL_DT="9/14/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2024" RTL_ACTL_DT="10/13/2022" PE_SPENT_AMT="415352.25" CNSTR_SPENT_AMT="9173378.69" CE_SPENT_AMT="337781.17" TOT_SPENT_AMT="9926512.11" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2309)" FUND_CAT1_PID="TM" FUND_CAT1_AMT="520382.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2309)" FUND_CAT2_PID="TM" FUND_CAT2_AMT="459124.00" FUND_CAT3_DSCR="Category 9 - Transportation Alternatives Program (2309)" FUND_CAT3_PID="TM" FUND_CAT3_AMT="899286.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT4_AMT="3911089.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005319009" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 84-E" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="US 84 (NORTH)" LIMITS_TO_DSCR="LEFT FRONTAGE US 84 (SOUTH)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="245310" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1537.09" TOT_SPENT_AMT="1537.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="264547.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005320007" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 84-J" CNTY_NM="Nolan" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="CR 274" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="158589" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="177620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005320008" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 84-J" CNTY_NM="Nolan" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="SOUTH .25 MILES OF US 84" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3276529" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3669712.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005401033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Taylor" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="COLEMAN COUNTY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1898569" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/8/2023" PSE_30_ACTL_DT="3/8/2023" PSE_60_TRGT_DT="5/15/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.209 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.12" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1918973.92" CE_SPENT_AMT="24579.42" TOT_SPENT_AMT="1943553.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2269057.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005402037" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005403026" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="NEAR ROUGH CREEK" LIMITS_TO_DSCR="2 MILES WEST OF US 283" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="625653" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.032 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005403027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="ROUGH CREEK" LIMITS_TO_DSCR="2.0 MI N OF SH 206" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/12/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7832985" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.016 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="4/5/2024" CNSTR_WKBG_DT="8/12/2024" CNSTR_PCT_TIME_USED="134.78" CNSTR_PCT_COMPLETE="49.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31755.13" CNSTR_SPENT_AMT="4371166.34" CE_SPENT_AMT="56792.35" TOT_SPENT_AMT="4459713.82" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404111" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="BROWN C/L" LIMITS_TO_DSCR="SANTA ANNA CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25640483" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="11/5/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="6/9/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="9/1/2021" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.496 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="DELHUR INDUSTRIES, INC." CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="77.05" CNSTR_PCT_COMPLETE="64.90" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/20/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="9/1/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="9/1/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="9/1/2021" PE_SPENT_AMT="308135.77" CNSTR_SPENT_AMT="18768698.48" CE_SPENT_AMT="1085245.76" TOT_SPENT_AMT="20162080.01" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="22619237.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404113" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="US 84 WB HORDS CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="744126" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.298 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ICOS MANAGEMENT, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="27.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="92926.78" CNSTR_SPENT_AMT="69516.70" CE_SPENT_AMT="1909.66" TOT_SPENT_AMT="164353.14" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="609000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404114" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="US 84 EB AT HORDS CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="666668" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ICOS MANAGEMENT, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="27.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16578.59" CNSTR_SPENT_AMT="216351.00" CE_SPENT_AMT="1250.25" TOT_SPENT_AMT="234179.84" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="609000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404115" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="BNSF RAILROAD" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="481511" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.937 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="79.31" CNSTR_PCT_COMPLETE="61.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="538311.62" CE_SPENT_AMT="2072.33" TOT_SPENT_AMT="540383.95" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404116" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="0.6 MI W. US 283" LIMITS_TO_DSCR="FM 568" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65000000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="545414.59" TOT_SPENT_AMT="545414.59" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="72800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404117" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="2 MILES WEST OF US 283" LIMITS_TO_DSCR="US 283" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="116793" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.993 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404119" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="BROWN C/L" LIMITS_TO_DSCR="SANTA ANNA E.C.L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="454880" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404131" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="2.0 MI N OF SH 206" LIMITS_TO_DSCR="SH 206" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/12/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1569101" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.036 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="4/5/2024" CNSTR_WKBG_DT="8/12/2024" CNSTR_PCT_TIME_USED="134.78" CNSTR_PCT_COMPLETE="49.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="857567.34" CE_SPENT_AMT="11230.38" TOT_SPENT_AMT="868797.72" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005404133" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Coleman" LIMITS_FROM_DSCR="1.2 MI S OF FM 568" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="590000" DIST_LET_DATE="11/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.529 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005405015" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 206" CNTY_NM="Coleman" LIMITS_FROM_DSCR="BNSF RAILROAD" LIMITS_TO_DSCR="SH 153" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7800000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="5/2/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/19/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/12/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2018" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/13/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/26/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/13/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/12/2019" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1033093.43" TOT_SPENT_AMT="1033093.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8736000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005405027" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 153" CNTY_NM="Coleman" LIMITS_FROM_DSCR="N SH 206 E" LIMITS_TO_DSCR="US 84 BYPASS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72594" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.152 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="78402.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005405028" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 206" CNTY_NM="Coleman" LIMITS_FROM_DSCR="BNSF RR" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="76468" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="85644.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005406103" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="1.5 MI E OF COLEMAN COUNTY LINE" LIMITS_TO_DSCR="COLEMAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1721723" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="11/5/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="6/9/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="9/1/2021" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.569 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="DELHUR INDUSTRIES, INC." CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="77.05" CNSTR_PCT_COMPLETE="64.90" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/20/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="9/1/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="9/1/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="9/1/2021" CNSTR_SPENT_AMT="425482.31" CE_SPENT_AMT="72273.93" TOT_SPENT_AMT="497756.24" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="1721723.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005406109" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="ROMINE ST." LIMITS_TO_DSCR="BEAVER ST." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="98640" DIST_LET_DATE="11/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.776 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005406110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="BANGS WEST CITY LIMITS" LIMITS_TO_DSCR="COLEMAN C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="401561" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.752 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="47701.98" CE_SPENT_AMT="18.67" TOT_SPENT_AMT="47720.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005406112" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="CR 152" LIMITS_TO_DSCR="BANGS WEST CITY LIMITS" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5210426" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="4/11/2024" CNSTR_WKBG_DT="8/14/2024" CNSTR_PCT_TIME_USED="101.69" CNSTR_PCT_COMPLETE="91.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23125.88" CNSTR_SPENT_AMT="5222472.31" CE_SPENT_AMT="95795.05" TOT_SPENT_AMT="5341393.24" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2500000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="3172252.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005406113" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407086" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Brown" LIMITS_FROM_DSCR="FM 2126" LIMITS_TO_DSCR="NEAR FT. WORTH &amp; WESTERN RAILROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25000000" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="373101.42" TOT_SPENT_AMT="373101.42" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="28000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407087" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="US 84/183S" LIMITS_TO_DSCR="TRAFFIC T - US 377 S" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="204000" DIST_LET_DATE="11/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.166 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="228480.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407089" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407090" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1597271" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="2/8/2024" CNSTR_WKBG_DT="10/1/2024" CNSTR_PCT_TIME_USED="107.92" CNSTR_PCT_COMPLETE="62.09" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="95908.97" CNSTR_SPENT_AMT="2034491.64" CE_SPENT_AMT="51071.51" TOT_SPENT_AMT="2181472.12" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Brown" LIMITS_FROM_DSCR="NEAR FM 2126" LIMITS_TO_DSCR="MILLS C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="630405" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.083 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="706054.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407092" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Brown" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="TURTLE CREEK" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="715770" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="2/8/2024" CNSTR_WKBG_DT="10/1/2024" CNSTR_PCT_TIME_USED="107.92" CNSTR_PCT_COMPLETE="62.09" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="801432.02" CE_SPENT_AMT="20118.27" TOT_SPENT_AMT="821550.29" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005407094" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5778.44" TOT_SPENT_AMT="5778.44" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005408023" PT_PHASE="Planning, 10+ years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="BROWN C/L" LIMITS_TO_DSCR="FM 573" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="94642857" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="111252.47" TOT_SPENT_AMT="111252.47" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005408027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="BROWN C/L" LIMITS_TO_DSCR="FM 573" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/22/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5807232" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.541 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="88.57" CNSTR_PCT_COMPLETE="84.72" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="108134.82" CNSTR_SPENT_AMT="5580992.03" CE_SPENT_AMT="99554.90" TOT_SPENT_AMT="5788681.75" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6900000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="298872.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005408032" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="BROWN C/L" LIMITS_TO_DSCR="FM 573 E." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="477756" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.461 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005409031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="FM 573" LIMITS_TO_DSCR="US 183" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/22/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5881518" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.800 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="88.57" CNSTR_PCT_COMPLETE="84.72" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="108075.54" CNSTR_SPENT_AMT="5661941.13" CE_SPENT_AMT="101087.15" TOT_SPENT_AMT="5871103.82" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6900000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="86936.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005409035" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="FM 573" LIMITS_TO_DSCR="US 183" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="90714292" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.793 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9614.83" TOT_SPENT_AMT="9614.83" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="101600006.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005409041" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="FM 573" LIMITS_TO_DSCR="0.2 MI E OF US 183" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="172000" DIST_LET_DATE="11/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005409044" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="STUART ST." LIMITS_TO_DSCR="LOOP 15" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="119350" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_CMPNY_NM="TWELVE STARS CONSTRUCTION COMPANY LLC" CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="18.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24584.62" CNSTR_SPENT_AMT="19000.00" CE_SPENT_AMT="590.64" TOT_SPENT_AMT="44175.26" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="98132.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005501032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="LOOP 15" LIMITS_TO_DSCR="0.21 MI S OF LOOP 15" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="67000" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_CMPNY_NM="TWELVE STARS CONSTRUCTION COMPANY LLC" CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="13.89" CNSTR_PCT_COMPLETE="18.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="16250.00" CE_SPENT_AMT="279.26" TOT_SPENT_AMT="16529.26" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="98132.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005501033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mills" LIMITS_FROM_DSCR="0.2 MI E OF US 183" LIMITS_TO_DSCR="CR 332" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="107605" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.006 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="111909.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005502023" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Hamilton" LIMITS_FROM_DSCR="MILLS CO LINE" LIMITS_TO_DSCR="CORYELL CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8500000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="12/29/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/29/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/29/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.713 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/29/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/29/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/8/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/8/2016" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/29/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="60720.18" TOT_SPENT_AMT="60720.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="9520000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005502024" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005503028" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coryell" LIMITS_FROM_DSCR="FM 930" LIMITS_TO_DSCR="US 281" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1933927" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.918 (mi)" TXDOT_CNTCT_NM="Mark Davis, P.E." TXDOT_CNTCT_PH_NBR="(254)867-2800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="11/2/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="31.67" CNSTR_PCT_COMPLETE="72.54" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26768.98" CNSTR_SPENT_AMT="1323564.50" CE_SPENT_AMT="37507.82" TOT_SPENT_AMT="1387841.30" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2096555.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005503029" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005503030" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005504032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coryell" LIMITS_FROM_DSCR="FM 116" LIMITS_TO_DSCR="FM 930" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1053245" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.159 (mi)" TXDOT_CNTCT_NM="Mark Davis, P.E." TXDOT_CNTCT_PH_NBR="(254)867-2800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="376.66" TOT_SPENT_AMT="376.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="777874.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005504033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005505053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005505054" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005506035" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Coryell" LIMITS_FROM_DSCR="CORYELL/MCLENNAN CL" LIMITS_TO_DSCR="FM 1829" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="880924" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.457 (mi)" TXDOT_CNTCT_NM="Mark Davis, P.E." TXDOT_CNTCT_PH_NBR="(254)867-2800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="313.33" TOT_SPENT_AMT="313.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="963677.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005507065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="OAK CREEK CIRCLE" LIMITS_TO_DSCR="CORYELL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1595200" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/20/2022" PSE_60_ACTL_DT="4/20/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="8/22/2023" CNSTR_PCT_TIME_USED="88.33" CNSTR_PCT_COMPLETE="102.03" DSGN_START_TRGT_DT="2/2/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/8/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/8/2022" RTL_ACTL_DT="7/8/2022" CNSTR_SPENT_AMT="1683411.26" CE_SPENT_AMT="15042.21" TOT_SPENT_AMT="1698453.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1554392.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005507067" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="FM 938" LIMITS_TO_DSCR="WINDSOR ROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="40000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.000 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="358691.17" TOT_SPENT_AMT="358691.17" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="44800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005507068" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508114" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ SH 6 UP (NB FR)" LIMITS_TO_DSCR="(STR #82)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3200000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="6/12/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/25/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.006 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/12/2015" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508115" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ SH 6 UP (SB FR)" LIMITS_TO_DSCR="(STR #079)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3200000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="6/12/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/25/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.006 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/4/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/4/2016" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="0.00" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508120" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 298" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="SL 396" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44739110" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="11/9/2022" PSE_30_ACTL_DT="11/9/2022" PSE_60_TRGT_DT="4/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.108 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/12/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/12/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2386680.06" TOT_SPENT_AMT="2386680.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="10128675.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508121" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="FM 1695" LIMITS_TO_DSCR="SS 298" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="192170000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.512 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1873151.72" TOT_SPENT_AMT="1873151.72" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="63968000.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2811)" FUND_CAT2_AMT="10000000.00" FUND_CAT3_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT3_AMT="15000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508130" PT_PHASE="Planning, 10+ years" HWY_NBR="SS 298" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="SL 396" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32500000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508131" PT_PHASE="Planning, 10+ years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="FM 1695" LIMITS_TO_DSCR="SS 298" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73000000" DIST_LET_DATE="1/1/2040" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508132" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="0.15 MI EAST OF SUNWEST BLVD" LIMITS_TO_DSCR="OAK CREEK CIRCLE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="144374" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/20/2022" PSE_60_ACTL_DT="4/20/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="8/22/2023" CNSTR_PCT_TIME_USED="88.33" CNSTR_PCT_COMPLETE="102.03" DSGN_START_TRGT_DT="2/2/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/8/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/8/2022" RTL_ACTL_DT="7/8/2022" CNSTR_SPENT_AMT="151538.43" CE_SPENT_AMT="1354.20" TOT_SPENT_AMT="152892.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="832000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005508133" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="LAKE AIR DRIVE" LIMITS_TO_DSCR="VALLEY MILLS DR (SL 396)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2174993" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/25/2023" PSE_60_ACTL_DT="8/25/2021" PSE_100_TRGT_DT="12/13/2021" PSE_100_ACTL_DT="11/17/2021" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.809 (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="4/21/2022" CNSTR_WKBG_DT="7/6/2022" CNSTR_PCT_TIME_USED="80.95" CNSTR_PCT_COMPLETE="97.96" DSGN_START_TRGT_DT="5/17/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/19/2023" ENVCLR_ACTL_DT="9/6/2018" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="12/15/2021" PE_SPENT_AMT="104694.62" CNSTR_SPENT_AMT="2258382.58" CE_SPENT_AMT="67608.83" TOT_SPENT_AMT="2430686.03" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1500800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ BRAZOS RIVER" LIMITS_TO_DSCR="(STR #046)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="3/1/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/19/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/10/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/4/2016" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/1/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/16/2018" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24852.67" TOT_SPENT_AMT="24852.67" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="0.15 MI W OF LAKE AIR DRIVE" LIMITS_TO_DSCR="FM 933" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9930694" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/12/2020" PSE_30_ACTL_DT="8/12/2020" PSE_60_TRGT_DT="11/18/2020" PSE_60_ACTL_DT="11/18/2020" PSE_100_TRGT_DT="1/13/2021" PSE_100_ACTL_DT="12/22/2020" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.482 (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="CROSS PLUS CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/17/2021" CNSTR_WKBG_DT="9/22/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="106.27" DSGN_START_TRGT_DT="5/13/2020" DSGN_START_ACTL_DT="5/13/2020" ENVCLR_TRGT_DT="10/28/2020" ENVCLR_ACTL_DT="10/28/2020" UTIL_TRGT_DT="1/8/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/10/2021" RTL_ACTL_DT="12/22/2020" PE_SPENT_AMT="17531.71" CNSTR_SPENT_AMT="10889532.96" CE_SPENT_AMT="452218.06" TOT_SPENT_AMT="11359282.73" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="10500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="@ POTTS INTERCHANGE" LIMITS_TO_DSCR="@ POTTS INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="1/15/2031" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/15/2031" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/12/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="505606.50" TOT_SPENT_AMT="505606.50" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="15000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515078" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SS 298" LIMITS_TO_DSCR="LAKE AIR DRIVE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16500000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.512 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1070523.42" TOT_SPENT_AMT="1070523.42" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="19285728.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SL 396" LIMITS_TO_DSCR="BU 77" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/22/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8584310" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/12/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="16.30" CNSTR_PCT_COMPLETE="18.83" DSGN_START_TRGT_DT="7/21/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="9/8/2022" ENVCLR_ACTL_DT="9/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="174734.83" CNSTR_SPENT_AMT="1616035.85" CE_SPENT_AMT="33041.29" TOT_SPENT_AMT="1823811.97" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="6000000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="4950033.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515080" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005515081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="6TH ST" LIMITS_TO_DSCR="8TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/13/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="299986" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clayton Zacha, P.E." TXDOT_CNTCT_PH_NBR="(254)772-2890" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="7/17/2024" CNSTR_WKBG_DT="8/6/2024" CNSTR_PCT_TIME_USED="51.11" CNSTR_PCT_COMPLETE="97.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="92.35" CNSTR_SPENT_AMT="293120.63" CE_SPENT_AMT="13399.36" TOT_SPENT_AMT="306612.34" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="371162.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005601035" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Mclennan" LIMITS_FROM_DSCR="SH 31" LIMITS_TO_DSCR="LIMESTONE C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="869100" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="610.76" TOT_SPENT_AMT="610.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="903864.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005602034" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005603067" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005701028" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Limestone" LIMITS_FROM_DSCR="FM 1365" LIMITS_TO_DSCR="1.05 MI E OF FM 1365 (MEXIA C/L)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10869325" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/29/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/29/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.036 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/29/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/28/2022" ENVCLR_ACTL_DT="9/28/2022" UTIL_TRGT_DT="9/29/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/29/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="848701.07" TOT_SPENT_AMT="848701.07" FUND_CAT1_DSCR="Category 11 - District Discretionary (2811)" FUND_CAT1_AMT="12173644.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005701031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Limestone" LIMITS_FROM_DSCR="MEXIA CL" LIMITS_TO_DSCR="FREESTONE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="217360" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="1/13/2021" PSE_30_ACTL_DT="1/13/2021" PSE_60_TRGT_DT="3/17/2021" PSE_60_ACTL_DT="3/17/2021" PSE_100_TRGT_DT="6/2/2021" PSE_100_ACTL_DT="6/2/2021" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.015 (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/26/2021" CNSTR_WKBG_DT="5/31/2022" CNSTR_PCT_TIME_USED="193.33" CNSTR_PCT_COMPLETE="103.83" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="5/3/2021" ENVCLR_ACTL_DT="5/3/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/16/2021" RTL_ACTL_DT="6/16/2021" PE_SPENT_AMT="2381.80" CNSTR_SPENT_AMT="272143.97" CE_SPENT_AMT="7226.23" TOT_SPENT_AMT="281752.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="230000.00" TXDOT_CNTCT_LAST_UPDATE_DT="1/28/2025" LAST_CNSTR_UPDATE_DT="1/28/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005702038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="0.2 MI W OF FM 1366" LIMITS_TO_DSCR="0.2 MI E OF FM 1366" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/11/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="221187" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="12/26/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/11/2024" CNSTR_PCT_TIME_USED="60.98" CNSTR_PCT_COMPLETE="105.83" DSGN_START_TRGT_DT="10/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/22/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/16/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4083.53" CNSTR_SPENT_AMT="272273.98" CE_SPENT_AMT="16338.36" TOT_SPENT_AMT="292695.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="225000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005702039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="LIMESTONE COUNTY LINE" LIMITS_TO_DSCR="FM 1367" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="605362" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="635641.39" CE_SPENT_AMT="7483.91" TOT_SPENT_AMT="643125.30" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="608709.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005702040" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 84-R" CNTY_NM="Freestone" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="SH 179" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="115936" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="129848.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005702041" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="LIMESTONE COUNTY LINE" LIMITS_TO_DSCR="FM 1367" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74302" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="80515.94" CE_SPENT_AMT="1114.79" TOT_SPENT_AMT="81630.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="98199.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="0.1 MI W OF US 84R" LIMITS_TO_DSCR="0.1 MI E OF US 84R" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="180034" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="10/8/2020" PSE_30_ACTL_DT="7/11/2020" PSE_60_TRGT_DT="12/22/2020" PSE_60_ACTL_DT="9/16/2020" PSE_100_TRGT_DT="4/16/2021" PSE_100_ACTL_DT="4/1/2021" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="7/22/2021" CNSTR_WKBG_DT="12/8/2021" CNSTR_PCT_TIME_USED="116.67" CNSTR_PCT_COMPLETE="96.12" DSGN_START_TRGT_DT="7/29/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="5/14/2021" ENVCLR_ACTL_DT="4/5/2021" UTIL_TRGT_DT="1/2/2020" UTIL_ACTL_DT="4/1/2021" ROW_TRGT_DT="1/2/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2021" RTL_ACTL_DT="4/5/2021" CNSTR_SPENT_AMT="199510.36" CE_SPENT_AMT="32295.88" TOT_SPENT_AMT="231806.24" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="266350.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="AT SPUR 113" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="51260" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="9/27/2023" PSE_60_ACTL_DT="1/31/2023" PSE_100_TRGT_DT="12/15/2023" PSE_100_ACTL_DT="2/24/2023" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="8/7/2023" CNSTR_WKBG_DT="2/1/2024" CNSTR_PCT_TIME_USED="99.19" CNSTR_PCT_COMPLETE="99.78" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="9/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/29/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="47035.00" CE_SPENT_AMT="13318.88" TOT_SPENT_AMT="60353.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="47323.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="BU 84R" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="657959" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="691332.02" CE_SPENT_AMT="8139.54" TOT_SPENT_AMT="699471.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="661051.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="SH 75" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="88260" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="95321.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="BU 84R" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96916" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="105063.47" CE_SPENT_AMT="1454.65" TOT_SPENT_AMT="106518.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="96909.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703049" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 84-R" CNTY_NM="Freestone" LIMITS_FROM_DSCR="SH 179" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="69987" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="78386.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="0.5 MI E OF FM 553" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="68776" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Donation" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="68776.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005703051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="AT IH 45" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005704030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="AT CR 441" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35694" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="2/2/2021" PSE_60_TRGT_DT="9/13/2022" PSE_60_ACTL_DT="4/1/2021" PSE_100_TRGT_DT="3/28/2023" PSE_100_ACTL_DT="6/4/2021" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.400 (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="CITYLYNX, INC." CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="4/26/2022" CNSTR_PCT_TIME_USED="98.77" CNSTR_PCT_COMPLETE="98.38" DSGN_START_TRGT_DT="12/8/2021" DSGN_START_ACTL_DT="1/1/2021" ENVCLR_TRGT_DT="9/13/2022" ENVCLR_ACTL_DT="5/28/2021" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="6/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/12/2023" RTL_ACTL_DT="6/4/2021" PE_SPENT_AMT="28882.68" CNSTR_SPENT_AMT="34407.08" CE_SPENT_AMT="4821.63" TOT_SPENT_AMT="68111.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="84095.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005704032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="AT FM 1580" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="255874" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="1/7/2020" PSE_30_ACTL_DT="4/20/2020" PSE_60_TRGT_DT="3/20/2020" PSE_60_ACTL_DT="6/15/2020" PSE_100_TRGT_DT="7/15/2020" PSE_100_ACTL_DT="7/31/2020" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="4/20/2021" CNSTR_PCT_TIME_USED="106.33" CNSTR_PCT_COMPLETE="99.94" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="7/29/2020" ENVCLR_ACTL_DT="7/21/2020" UTIL_TRGT_DT="10/1/2019" UTIL_ACTL_DT="7/31/2020" ROW_TRGT_DT="10/1/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2020" RTL_ACTL_DT="7/31/2020" CNSTR_SPENT_AMT="302327.17" CE_SPENT_AMT="1264.70" TOT_SPENT_AMT="303591.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="303647.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005704033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="FM 1580" LIMITS_TO_DSCR="FM 1364" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="483880" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="522591.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005704034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="SH 75" LIMITS_TO_DSCR="FM 1580" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135806" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="152103.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005705032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="FM 489" LIMITS_TO_DSCR="US 79" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="687570" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="722057.88" CE_SPENT_AMT="8501.33" TOT_SPENT_AMT="730559.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="691918.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005705033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="0.2 MI E OF FM 489" LIMITS_TO_DSCR="0.2 MI W OF FM 489" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="412486" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="171400.79" TOT_SPENT_AMT="171400.79" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1453769.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005705034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="FM 489" LIMITS_TO_DSCR="US 79" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="84173" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="91071.38" CE_SPENT_AMT="1260.90" TOT_SPENT_AMT="92332.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="88493.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005707018" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Freestone" LIMITS_FROM_DSCR="FM 1367" LIMITS_TO_DSCR="BU 84R EAST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="101743" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="113952.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005801018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 294" CNTY_NM="Anderson" LIMITS_FROM_DSCR="US 79, E" LIMITS_TO_DSCR="FM 322" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/1/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="774780" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="1/25/2019" PSE_30_ACTL_DT="1/23/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/27/2019" PSE_100_ACTL_DT="9/20/2019" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.582 (mi)" TXDOT_CNTCT_NM="Danny Henderson, P.E." TXDOT_CNTCT_PH_NBR="(903)675-4196" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="2/24/2020" CNSTR_WKBG_DT="4/13/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="87.00" DSGN_START_TRGT_DT="8/20/2018" DSGN_START_ACTL_DT="8/20/2018" ENVCLR_TRGT_DT="10/30/2019" ENVCLR_ACTL_DT="7/8/2019" UTIL_TRGT_DT="9/20/2019" UTIL_ACTL_DT="9/20/2019" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/20/2019" RTL_ACTL_DT="9/20/2019" PE_SPENT_AMT="25350.26" CNSTR_SPENT_AMT="613125.23" CE_SPENT_AMT="44999.17" TOT_SPENT_AMT="683474.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="372695.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005802021" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 294" CNTY_NM="Anderson" LIMITS_FROM_DSCR="FM 322, E" LIMITS_TO_DSCR="US 287 IN ELKHART" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="188024" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.001 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="202994.29" CE_SPENT_AMT="3098.35" TOT_SPENT_AMT="206092.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="226000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005803023" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 294" CNTY_NM="Anderson" LIMITS_FROM_DSCR="US 287, E" LIMITS_TO_DSCR="CHEROKEE C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="558094" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="602392.11" CE_SPENT_AMT="9194.12" TOT_SPENT_AMT="611586.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="667000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005804019" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 294" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="BOWLES CREEK" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="715748" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="713215.13" TOT_SPENT_AMT="713215.13" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="715748.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005804020" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005804022" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 294" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="CR 2326" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3018318" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/20/2022" PSE_100_ACTL_DT="9/21/2022" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paul Schneider, P.E. " TXDOT_CNTCT_PH_NBR="(903)509-9066" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="115.79" CNSTR_PCT_COMPLETE="109.51" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="11/30/2022" ENVCLR_ACTL_DT="10/21/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/20/2022" RTL_ACTL_DT="9/21/2022" PE_SPENT_AMT="37068.55" CNSTR_SPENT_AMT="3347039.97" CE_SPENT_AMT="153043.12" TOT_SPENT_AMT="3537151.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3013393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005804023" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 294" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="ANDR CL" LIMITS_TO_DSCR="CR 2316" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="341404" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="382372.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005901061" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 7-N" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="BS 21P" LIMITS_TO_DSCR="CRESTWOOD ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="696171" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="19.13" CNSTR_PCT_COMPLETE="35.35" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/27/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/8/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="231688.79" CE_SPENT_AMT="2064.64" TOT_SPENT_AMT="233753.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="628641.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005901062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 7" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="SL 224" LIMITS_TO_DSCR="FM 2713" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1193784" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28976.01" CNSTR_SPENT_AMT="2276918.18" CE_SPENT_AMT="113.08" TOT_SPENT_AMT="2306007.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1046530.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005901063" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 2713" LIMITS_TO_DSCR="SAN AUGUSTINE C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="675174" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33031.13" TOT_SPENT_AMT="33031.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="729187.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005904050" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Shelby" LIMITS_FROM_DSCR="1.059 MI W OF FM 711" LIMITS_TO_DSCR="2.061 MI W OF FM 711" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="384615" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="3/6/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/12/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/4/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="6/12/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/4/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="82524.68" TOT_SPENT_AMT="82524.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="415385.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005904051" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Shelby" LIMITS_FROM_DSCR="0.91 MI SW OF SL 500" LIMITS_TO_DSCR="0.46 MI N OF SL 500" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="195008" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="210609.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005904053" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Shelby" LIMITS_FROM_DSCR="US 96" LIMITS_TO_DSCR="CENTER SQUARE (AUSTIN STREET)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="727752" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="104668.18" TOT_SPENT_AMT="104668.18" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="756862.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005905046" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Shelby" LIMITS_FROM_DSCR="0.284 MI E OF SH 87" LIMITS_TO_DSCR="SL 500" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="149398" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/14/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/7/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/10/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/9/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/7/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/7/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/4/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="167326.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005905047" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Shelby" LIMITS_FROM_DSCR="SL 500" LIMITS_TO_DSCR="FLAT FORK CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="653725" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/14/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/7/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/10/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/9/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/7/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/7/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/4/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="732172.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="005905048" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 7" CNTY_NM="Shelby" LIMITS_FROM_DSCR="FLAT FORK CREEK" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="683842" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="765903.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006001019" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="ARKANSAS S/L" LIMITS_TO_DSCR="2.9 MI S OF ARKANSAS S/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="269388" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.887 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3351.64" TOT_SPENT_AMT="3351.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="290939.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006002034" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1624684" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.049 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31657.23" CNSTR_SPENT_AMT="122827.30" CE_SPENT_AMT="2133.66" TOT_SPENT_AMT="156618.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="796678.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006002037" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="2.9 MI S OF ARKANSAS S/L" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="348192" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.734 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="376047.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006101025" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="FM 1840" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="71654" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.247 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="84307.49" CE_SPENT_AMT="1464.56" TOT_SPENT_AMT="85772.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="66366.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006102033" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT FM 1840" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="248376" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/23/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/10/2024" CNSTR_WKBG_DT="3/18/2025" CNSTR_PCT_TIME_USED="22.38" CNSTR_PCT_COMPLETE="37.30" DSGN_START_TRGT_DT="6/5/2023" DSGN_START_ACTL_DT="6/5/2023" ENVCLR_TRGT_DT="6/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/5/2023" UTIL_ACTL_DT="6/5/2023" ROW_TRGT_DT="6/5/2023" ROW_ACTL_DT="6/5/2023" RTL_TRGT_DT="10/23/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3582.05" CNSTR_SPENT_AMT="377262.00" CE_SPENT_AMT="375.08" TOT_SPENT_AMT="381219.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="74851.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006102035" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 1840" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="611784" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.254 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="660727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006201045" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 8" CNTY_NM="Bowie" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="CASS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="441288" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.223 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="494243.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006202028" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 8" CNTY_NM="Cass" LIMITS_FROM_DSCR="AT SH 77 INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3123388" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/21/2022" PSE_30_ACTL_DT="4/13/2022" PSE_60_TRGT_DT="4/6/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/6/2019" DSGN_START_ACTL_DT="9/6/2019" ENVCLR_TRGT_DT="4/8/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/6/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/27/2021" ROW_ACTL_DT="12/16/2022" RTL_TRGT_DT="6/2/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="241480.27" TOT_SPENT_AMT="241480.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="3498195.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006203047" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 8" CNTY_NM="Cass" LIMITS_FROM_DSCR="2.5 MILES NORTH OF FM 995" LIMITS_TO_DSCR="SH 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="137297" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.408 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="161347.10" CE_SPENT_AMT="2802.81" TOT_SPENT_AMT="164149.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="295933.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006203048" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 8" CNTY_NM="Cass" LIMITS_FROM_DSCR="AT SH 11" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="76619" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="85814.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006204050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Cass" LIMITS_FROM_DSCR="1.46 MI. S. OF SH 155" LIMITS_TO_DSCR="MARION COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="878177" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.990 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19180.93" CNSTR_SPENT_AMT="1010781.13" CE_SPENT_AMT="22341.42" TOT_SPENT_AMT="1052303.48" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1345995.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006204052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006205064" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Marion" LIMITS_FROM_DSCR="CASS COUNTY LINE" LIMITS_TO_DSCR="2.0 MI. N. OF SH 49" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="808795" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.929 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="855617.45" CE_SPENT_AMT="18912.50" TOT_SPENT_AMT="874529.95" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1468201.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006205065" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006206059" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Marion" LIMITS_FROM_DSCR="0.1 MI S OF SH 49" LIMITS_TO_DSCR="HARRISON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="418537" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2022" PSE_100_ACTL_DT="7/14/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.385 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/26/2023" CNSTR_WKBG_DT="5/25/2023" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="90.17" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="2/18/2022" ENVCLR_TRGT_DT="5/4/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="1/3/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/3/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2022" RTL_ACTL_DT="8/5/2022" CNSTR_SPENT_AMT="454282.64" CE_SPENT_AMT="5480.77" TOT_SPENT_AMT="459763.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="68457.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="39509.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_PID="PM" FUND_CAT3_AMT="16017.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT4_PID="PM" FUND_CAT4_AMT="225650.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006207090" PT_PHASE="Planning, 10+ years" HWY_NBR="US 59" CNTY_NM="Harrison" LIMITS_FROM_DSCR="AT N MARSHALL INDUSTRIAL AVENUE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="4/3/2018" PSE_30_ACTL_DT="3/3/2021" PSE_60_TRGT_DT="4/15/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.591 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="5/1/2017" ENVCLR_TRGT_DT="10/19/2022" ENVCLR_ACTL_DT="4/3/2023" UTIL_TRGT_DT="9/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/5/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="296976.17" TOT_SPENT_AMT="296976.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="3240000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006207093" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Harrison" LIMITS_FROM_DSCR="1.0 MI. S. OF FM 1997" LIMITS_TO_DSCR="FM 1793" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="609500" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.505 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="647254.64" CE_SPENT_AMT="14306.82" TOT_SPENT_AMT="661561.46" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1061397.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006207098" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Harrison" LIMITS_FROM_DSCR="1.0 MI S OF FM 1997" LIMITS_TO_DSCR="0.1 MI N OF SL 390" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3441132" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/4/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.522 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/15/2022" DSGN_START_ACTL_DT="7/15/2022" ENVCLR_TRGT_DT="5/30/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/4/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/21/2022" ROW_ACTL_DT="7/21/2022" RTL_TRGT_DT="11/22/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="266190.63" TOT_SPENT_AMT="266190.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="8080464.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006207103" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Harrison" LIMITS_FROM_DSCR="AT FM 1997" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="89804" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="11/5/2024" CNSTR_PCT_TIME_USED="61.18" CNSTR_PCT_COMPLETE="96.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3343.23" CNSTR_SPENT_AMT="89541.18" CE_SPENT_AMT="2926.16" TOT_SPENT_AMT="95810.57" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="97438.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006207106" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006208006" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 125" CNTY_NM="Cass" LIMITS_FROM_DSCR="SH 8" LIMITS_TO_DSCR="FS 125" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82120" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.001 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="79.05" TOT_SPENT_AMT="79.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="113727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006208007" PT_PHASE="Construction underway or begins soon" HWY_NBR="FS 125" CNTY_NM="Cass" LIMITS_FROM_DSCR="FM 125" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7152" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.085 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="6.15" TOT_SPENT_AMT="6.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8948.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006301105" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1186" CNTY_NM="Harrison" LIMITS_FROM_DSCR="US 59" LIMITS_TO_DSCR="PANOLA C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="276840" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.613 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="298987.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006302039" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2792" CNTY_NM="Panola" LIMITS_FROM_DSCR="FM 1794" LIMITS_TO_DSCR="US 59N" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="70020" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.332 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="76939.20" CE_SPENT_AMT="67.64" TOT_SPENT_AMT="77006.84" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="79560.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006302040" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1186" CNTY_NM="Panola" LIMITS_FROM_DSCR="HARRISON C/L" LIMITS_TO_DSCR="FM 1794W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82595" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.233 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="82436.35" CE_SPENT_AMT="79.90" TOT_SPENT_AMT="82516.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="116064.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006302041" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1794" CNTY_NM="Panola" LIMITS_FROM_DSCR="FM 2792" LIMITS_TO_DSCR="FM 1186" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="220068" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.600 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="246476.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006303062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="BU 59D" LIMITS_TO_DSCR="US 79" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="170540" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/12/2018" PSE_30_ACTL_DT="11/12/2018" PSE_60_TRGT_DT="12/18/2019" PSE_60_ACTL_DT="12/18/2019" PSE_100_TRGT_DT="4/20/2020" PSE_100_ACTL_DT="4/21/2020" DIST_NM="Atlanta" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.214 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="8/26/2020" CNSTR_WKBG_DT="9/25/2020" CNSTR_PCT_TIME_USED="98.82" CNSTR_PCT_COMPLETE="96.43" DSGN_START_TRGT_DT="8/30/2018" DSGN_START_ACTL_DT="8/30/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/18/2019" UTIL_ACTL_DT="12/18/2019" ROW_TRGT_DT="12/18/2019" ROW_ACTL_DT="12/18/2019" RTL_TRGT_DT="5/8/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="204.96" CNSTR_SPENT_AMT="21721.70" CE_SPENT_AMT="7540.01" TOT_SPENT_AMT="29466.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="138265.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006303065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="BU 59-D NORTH OF CARTHAGE" LIMITS_TO_DSCR="US 79 EAST OF CARTHAGE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8694246" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/12/2018" PSE_30_ACTL_DT="11/12/2018" PSE_60_TRGT_DT="12/18/2019" PSE_60_ACTL_DT="12/18/2019" PSE_100_TRGT_DT="4/20/2020" PSE_100_ACTL_DT="4/21/2020" DIST_NM="Atlanta" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.214 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="8/26/2020" CNSTR_WKBG_DT="9/25/2020" CNSTR_PCT_TIME_USED="98.82" CNSTR_PCT_COMPLETE="96.43" DSGN_START_TRGT_DT="8/30/2018" DSGN_START_ACTL_DT="8/30/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/18/2019" UTIL_ACTL_DT="12/18/2019" ROW_TRGT_DT="12/18/2019" ROW_ACTL_DT="12/18/2019" RTL_TRGT_DT="5/8/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="196422.38" CNSTR_SPENT_AMT="8814023.47" CE_SPENT_AMT="340754.43" TOT_SPENT_AMT="9351200.28" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="8315697.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006303068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="FM 2792" LIMITS_TO_DSCR="SL 149" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="729952" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.900 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="839854.80" CE_SPENT_AMT="18564.05" TOT_SPENT_AMT="858418.85" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1066322.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006304068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="US 79 N" LIMITS_TO_DSCR="US 59 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="393564" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.073 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="6/19/2024" CNSTR_WKBG_DT="7/29/2024" CNSTR_PCT_TIME_USED="92.96" CNSTR_PCT_COMPLETE="96.66" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6614.28" CNSTR_SPENT_AMT="407471.12" CE_SPENT_AMT="8265.81" TOT_SPENT_AMT="422351.21" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="725324.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006304069" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006305039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="FM 999" LIMITS_TO_DSCR="SHELBY C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="630620" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.909 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="752952.97" CE_SPENT_AMT="13078.56" TOT_SPENT_AMT="766031.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="605423.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006305040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="1.4 MI. N. OF SHELBY C/L" LIMITS_TO_DSCR="SHELBY C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="480465" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/4/2022" PSE_100_ACTL_DT="2/4/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.403 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="91.95" CNSTR_PCT_COMPLETE="95.97" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="8/2/2021" ENVCLR_TRGT_DT="7/2/2021" ENVCLR_ACTL_DT="9/10/2021" UTIL_TRGT_DT="7/1/2021" UTIL_ACTL_DT="8/2/2021" ROW_TRGT_DT="7/1/2021" ROW_ACTL_DT="8/2/2021" RTL_TRGT_DT="2/4/2022" RTL_ACTL_DT="2/4/2022" PE_SPENT_AMT="29160.24" CNSTR_SPENT_AMT="583741.12" CE_SPENT_AMT="5375.51" TOT_SPENT_AMT="618276.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="433477.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006305041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006306101" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 87" CNTY_NM="Shelby" LIMITS_FROM_DSCR="AT TIMPSON ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28935" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy King, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4472" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.33" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5055.91" CNSTR_SPENT_AMT="2200.00" TOT_SPENT_AMT="7255.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="12654.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006306103" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 87" CNTY_NM="Shelby" LIMITS_FROM_DSCR="US 96" LIMITS_TO_DSCR="CENTER SQUARE (LOGANSPORT ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="903932" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4562.38" TOT_SPENT_AMT="4562.38" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="940089.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006307003" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 157" CNTY_NM="Shelby" LIMITS_FROM_DSCR="US 59 NORTH" LIMITS_TO_DSCR="US 96 SOUTH" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="656157" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/29/2023" PSE_30_ACTL_DT="3/29/2023" PSE_60_TRGT_DT="5/31/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="96.23" CNSTR_PCT_COMPLETE="90.23" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="6/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="61644.17" CNSTR_SPENT_AMT="441132.98" CE_SPENT_AMT="3333.38" TOT_SPENT_AMT="506110.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="302309.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006309016" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Harrison" LIMITS_FROM_DSCR="FM 1186" LIMITS_TO_DSCR="PANOLA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="636063" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.197 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="722619.91" CE_SPENT_AMT="15972.75" TOT_SPENT_AMT="738592.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="807396.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006310015" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="AT INTERSECTION OF FM 1794" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="36905848" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="10/5/2018" PSE_30_ACTL_DT="10/5/2018" PSE_60_TRGT_DT="1/29/2019" PSE_60_ACTL_DT="1/29/2019" PSE_100_TRGT_DT="3/13/2023" PSE_100_ACTL_DT="3/14/2023" DIST_NM="Atlanta" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.458 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="7/13/2023" CNSTR_WKBG_DT="8/8/2023" CNSTR_PCT_TIME_USED="68.65" CNSTR_PCT_COMPLETE="78.60" DSGN_START_TRGT_DT="4/18/2016" DSGN_START_ACTL_DT="4/18/2016" ENVCLR_TRGT_DT="7/31/2020" ENVCLR_ACTL_DT="7/31/2020" UTIL_TRGT_DT="10/26/2022" UTIL_ACTL_DT="3/15/2023" ROW_TRGT_DT="10/26/2022" ROW_ACTL_DT="2/1/2023" RTL_TRGT_DT="3/31/2023" RTL_ACTL_DT="3/31/2023" PE_SPENT_AMT="1325707.55" CNSTR_SPENT_AMT="29107915.51" CE_SPENT_AMT="369922.92" TOT_SPENT_AMT="30803545.98" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="22284599.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="5571150.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="3500000.00" FUND_CAT4_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT4_AMT="3665614.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006310019" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Panola" LIMITS_FROM_DSCR="HARRISON COUNTY LINE" LIMITS_TO_DSCR="FM 2792" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="315545" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.290 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="340867.76" CE_SPENT_AMT="7534.52" TOT_SPENT_AMT="348402.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1033899.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006311054" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 149" CNTY_NM="Panola" LIMITS_FROM_DSCR="0.8 MI S OF SH 315" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29546263" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="6/11/2018" PSE_30_ACTL_DT="6/11/2018" PSE_60_TRGT_DT="4/2/2019" PSE_60_ACTL_DT="4/2/2019" PSE_100_TRGT_DT="6/6/2022" PSE_100_ACTL_DT="6/21/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.623 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="10/19/2022" CNSTR_WKBG_DT="11/3/2022" CNSTR_PCT_TIME_USED="91.25" CNSTR_PCT_COMPLETE="84.06" DSGN_START_TRGT_DT="3/1/2017" DSGN_START_ACTL_DT="3/1/2017" ENVCLR_TRGT_DT="12/20/2021" ENVCLR_ACTL_DT="12/20/2021" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="7/8/2022" ROW_TRGT_DT="3/22/2021" ROW_ACTL_DT="3/22/2021" RTL_TRGT_DT="7/11/2022" RTL_ACTL_DT="7/8/2022" PE_SPENT_AMT="1752516.21" CNSTR_SPENT_AMT="26572451.20" CE_SPENT_AMT="474472.83" TOT_SPENT_AMT="28799440.24" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="24370312.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="4125687.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT3_AMT="1875617.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006311061" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 79" CNTY_NM="Panola" LIMITS_FROM_DSCR="US 59 N" LIMITS_TO_DSCR="US 79 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="437564" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.602 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="6/19/2024" CNSTR_WKBG_DT="7/29/2024" CNSTR_PCT_TIME_USED="92.96" CNSTR_PCT_COMPLETE="96.66" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="426893.00" CE_SPENT_AMT="15124.06" TOT_SPENT_AMT="442017.06" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="857689.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006311062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 149" CNTY_NM="Panola" LIMITS_FROM_DSCR="US 79 S" LIMITS_TO_DSCR="0.8 MI S OF SH 315" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="274431" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.836 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="6/19/2024" CNSTR_WKBG_DT="7/29/2024" CNSTR_PCT_TIME_USED="92.96" CNSTR_PCT_COMPLETE="96.66" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="261697.50" CE_SPENT_AMT="9463.45" TOT_SPENT_AMT="271160.95" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="586275.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006401069" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 87" CNTY_NM="Shelby" LIMITS_FROM_DSCR="SH 7" LIMITS_TO_DSCR="SH 147" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1042356" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" PE_SPENT_AMT="21552.71" CNSTR_SPENT_AMT="866520.61" CE_SPENT_AMT="10010.07" TOT_SPENT_AMT="898083.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="558079.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="331961.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006401072" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 87" CNTY_NM="Shelby" LIMITS_FROM_DSCR="CENTER SQUARE (SH 7)" LIMITS_TO_DSCR="SL 500" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1007447" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4570.45" TOT_SPENT_AMT="4570.45" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1047744.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006402020" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 147" CNTY_NM="Shelby" LIMITS_FROM_DSCR="SH 87" LIMITS_TO_DSCR="SAN AUGUSTINE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="298031" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="321873.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006403022" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 147" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SHELBY COUNTY LINE" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="510955" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="40353.77" CE_SPENT_AMT="71.80" TOT_SPENT_AMT="40425.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="449389.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006404042" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 21" LIMITS_TO_DSCR="SABINE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="257559" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34272.13" CNSTR_SPENT_AMT="138114.18" CE_SPENT_AMT="1471.85" TOT_SPENT_AMT="173858.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="132607.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006404043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 147 N." LIMITS_TO_DSCR="FM 1" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="889307" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="6/10/2022" CNSTR_PCT_TIME_USED="91.80" CNSTR_PCT_COMPLETE="89.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38320.55" CNSTR_SPENT_AMT="655393.20" CE_SPENT_AMT="7936.18" TOT_SPENT_AMT="701649.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="240733.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006404045" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 147 N" LIMITS_TO_DSCR="FM 1" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1100238" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2022" PSE_100_ACTL_DT="7/7/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="5/8/2023" CNSTR_PCT_TIME_USED="86.47" CNSTR_PCT_COMPLETE="96.30" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="4/1/2022" ENVCLR_TRGT_DT="6/28/2022" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="9/30/2022" UTIL_ACTL_DT="9/30/2022" ROW_TRGT_DT="9/28/2022" ROW_ACTL_DT="9/28/2022" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" PE_SPENT_AMT="7409.94" CNSTR_SPENT_AMT="1004404.86" CE_SPENT_AMT="13177.16" TOT_SPENT_AMT="1024991.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1032187.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006404047" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 21" LIMITS_TO_DSCR="SABINE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="227871" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="255215.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006405062" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SH 103" LIMITS_TO_DSCR="SH 184" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="201665" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.597 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="824.64" CNSTR_SPENT_AMT="176524.65" CE_SPENT_AMT="4700.42" TOT_SPENT_AMT="182049.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="173503.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006405065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SH 184" LIMITS_TO_DSCR="FM 83" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="392111" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/29/2023" PSE_30_ACTL_DT="3/29/2023" PSE_60_TRGT_DT="5/31/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="96.23" CNSTR_PCT_COMPLETE="90.23" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="6/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="657.74" CNSTR_SPENT_AMT="359462.61" CE_SPENT_AMT="3276.32" TOT_SPENT_AMT="363396.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="360973.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006405068" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SAN AUGUSTINE COUNTY LINE" LIMITS_TO_DSCR="SH 103" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="156457" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="175232.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006405069" PT_PHASE="Construction begins within 4 years" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SH 103" LIMITS_TO_DSCR="SH 184" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="286444" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="320817.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006405071" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006406053" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Sabine" LIMITS_FROM_DSCR="FM 83" LIMITS_TO_DSCR="0.15 MI N OF SS 414" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19900000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/10/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/13/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/14/2019" DSGN_START_ACTL_DT="10/14/2019" ENVCLR_TRGT_DT="10/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/6/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/17/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1026431.51" TOT_SPENT_AMT="1026431.51" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="19899999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006406054" PT_PHASE="Planning, 10+ years" HWY_NBR="US 96" CNTY_NM="Sabine" LIMITS_FROM_DSCR="0.5 MI S OF SPUR 414" LIMITS_TO_DSCR="1.0 MI N OF JASPER COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.576 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="341662.12" TOT_SPENT_AMT="341662.12" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="64960000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="10/31/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006406057" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Sabine" LIMITS_FROM_DSCR="1 MILE NORTH OF JASPER COUNTY LINE" LIMITS_TO_DSCR="JASPER COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5370370" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="11/28/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/3/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/20/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2019" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="5/18/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/24/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/18/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/20/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="630796.46" TOT_SPENT_AMT="630796.46" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="1096001.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="4703999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006407044" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="SABINE CO/L, SOUTH" LIMITS_TO_DSCR="0.8 MILES NORTH OF RE 255" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="67925927" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/28/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/3/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/20/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.393 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2019" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="5/18/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/24/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/18/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/20/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2520152.24" TOT_SPENT_AMT="2520152.24" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="14000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="59360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006407046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="AT FM 1007" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49721" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="53698.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006408062" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="0.8 MILES NORTH OF RE 255, SOUTH" LIMITS_TO_DSCR="RE 255" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5385186" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/28/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/3/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/20/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.817 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2019" DSGN_START_ACTL_DT="5/1/2019" ENVCLR_TRGT_DT="5/18/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/24/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/18/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/20/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="647547.29" TOT_SPENT_AMT="647547.29" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="1000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="4816000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006408064" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="RE 255, SOUTH" LIMITS_TO_DSCR="FM 2799" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/26/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.488 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/30/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/26/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12794.62" TOT_SPENT_AMT="12794.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2160000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006408066" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="FM2800" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="242046" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="271092.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006410021" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1" CNTY_NM="Sabine" LIMITS_FROM_DSCR="FS 1" LIMITS_TO_DSCR="US 96" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="233177" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/29/2023" PSE_30_ACTL_DT="3/29/2023" PSE_60_TRGT_DT="5/31/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.690 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="96.23" CNSTR_PCT_COMPLETE="90.23" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="6/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="498.69" CNSTR_SPENT_AMT="175633.20" CE_SPENT_AMT="2797.19" TOT_SPENT_AMT="178929.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="195142.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006411009" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 1" CNTY_NM="Sabine" LIMITS_FROM_DSCR="AT TIMBER ROCK RAILROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6923740" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Replace Railroad Underpass And Approaches Replace Railroad Underpass" PSE_30_TRGT_DT="3/7/2029" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/6/2029" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/5/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/2/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/18/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/5/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/5/2029" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2029" RTL_ACTL_DT="TBD" PE_SPENT_AMT="555145.21" TOT_SPENT_AMT="555145.21" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="RGS" FUND_CAT1_AMT="1630000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006501059" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="SOUTH OF WALNUT RUN BRIDGE, SOUTH" LIMITS_TO_DSCR="FM 1005" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="571504" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.750 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" CNSTR_SPENT_AMT="595889.50" CE_SPENT_AMT="8986.69" TOT_SPENT_AMT="604876.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="510366.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006501060" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="150' SOUTH OF US 190, SOUTH" LIMITS_TO_DSCR="0.39 MILES SOUTH OF US 190" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="77564" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/26/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.341 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/30/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/26/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="80667.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006501061" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="FM 2799, SOUTH" LIMITS_TO_DSCR="US 190" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="101011" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/26/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.673 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/30/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/26/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="105051.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006501062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="0.36 MI S OF US 190, SOUTH" LIMITS_TO_DSCR="1.5 MILES SOUTH OF US 190" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/26/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1199254" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="6/4/2022" PSE_30_ACTL_DT="6/4/2022" PSE_60_TRGT_DT="7/4/2022" PSE_60_ACTL_DT="7/4/2022" PSE_100_TRGT_DT="8/30/2022" PSE_100_ACTL_DT="8/30/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.140 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="INTERSTATE IMPROVEMENT, INC." CNSTR_NTPD_DT="12/2/2022" CNSTR_WKBG_DT="1/2/2023" CNSTR_PCT_TIME_USED="94.23" CNSTR_PCT_COMPLETE="99.20" DSGN_START_TRGT_DT="5/6/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/7/2022" ENVCLR_ACTL_DT="8/7/2022" UTIL_TRGT_DT="8/18/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/30/2022" RTL_ACTL_DT="8/30/2022" PE_SPENT_AMT="479.53" CNSTR_SPENT_AMT="1189627.54" CE_SPENT_AMT="21402.97" TOT_SPENT_AMT="1211510.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1958567.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="2/6/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006502055" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="2.6 MILES N. OF FM 82" LIMITS_TO_DSCR="FM 1013" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1170460" DIST_LET_DATE="5/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="7/24/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/24/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/28/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.329 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/25/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/31/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/8/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/28/2027" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1310915.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006502058" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="0.2 MI S FM 1005" LIMITS_TO_DSCR="0.4MI S OF CR 441" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2417085" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.780 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="173.05" TOT_SPENT_AMT="173.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2707135.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006503044" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="FM 1013" LIMITS_TO_DSCR="FM 82" PRJ_TIER="" ENERGY="N" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1229540" DIST_LET_DATE="5/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="9/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.332 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/23/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/16/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/14/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/16/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1377085.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006504086" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Jasper" LIMITS_FROM_DSCR="AT NECHES RIVER RELIEF #2" LIMITS_TO_DSCR="(STR 201220006504076)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="142773" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="7/29/2023" PSE_30_ACTL_DT="7/29/2023" PSE_60_TRGT_DT="8/28/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/30/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.300 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="11/23/2024" CNSTR_PCT_TIME_USED="31.20" CNSTR_PCT_COMPLETE="20.29" DSGN_START_TRGT_DT="6/30/2023" DSGN_START_ACTL_DT="6/30/2023" ENVCLR_TRGT_DT="10/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/12/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/30/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="571.00" CE_SPENT_AMT="66.22" TOT_SPENT_AMT="637.22" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="416000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006504087" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006504088" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505148" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="AT EAST CHANCE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="149949" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="22167.84" CNSTR_SPENT_AMT="131103.25" CE_SPENT_AMT="21983.21" TOT_SPENT_AMT="175254.30" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="168271.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505149" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="AT RAIDER LN" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="220082" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="21076.94" CNSTR_SPENT_AMT="258064.81" CE_SPENT_AMT="33964.32" TOT_SPENT_AMT="313106.07" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="178778.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505150" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="AT FM 421" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="149953" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="23830.46" CNSTR_SPENT_AMT="136191.75" CE_SPENT_AMT="21984.30" TOT_SPENT_AMT="182006.51" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="188213.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505154" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="SH 327, SOUTH" LIMITS_TO_DSCR="BU 96 BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="241999" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.810 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" CNSTR_SPENT_AMT="235389.90" CE_SPENT_AMT="3739.60" TOT_SPENT_AMT="239129.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="223614.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505155" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="BNSF RAILROAD, SOUTH" LIMITS_TO_DSCR="1.0 MILE SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="110821" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" CNSTR_SPENT_AMT="90961.00" CE_SPENT_AMT="1647.51" TOT_SPENT_AMT="92608.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="98733.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505156" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="AT BNSF RR (STR#20-101-0-0065-05-090)" LIMITS_TO_DSCR=".(NORTHBOUND)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/15/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2144417" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="5/31/2022" PSE_30_ACTL_DT="5/31/2022" PSE_60_TRGT_DT="6/30/2022" PSE_60_ACTL_DT="6/30/2022" PSE_100_TRGT_DT="9/1/2022" PSE_100_ACTL_DT="9/1/2022" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.085 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="4/12/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="120.41" CNSTR_PCT_COMPLETE="90.88" DSGN_START_TRGT_DT="5/2/2022" DSGN_START_ACTL_DT="5/2/2022" ENVCLR_TRGT_DT="8/14/2022" ENVCLR_ACTL_DT="8/14/2022" UTIL_TRGT_DT="8/14/2022" UTIL_ACTL_DT="8/14/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="9/1/2022" PE_SPENT_AMT="91028.40" CNSTR_SPENT_AMT="2036211.82" CE_SPENT_AMT="30494.69" TOT_SPENT_AMT="2157734.91" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1506371.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505157" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="BU 96 OVERPASS, SOUTH" LIMITS_TO_DSCR="VILLAGE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="201792" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.399 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" CNSTR_SPENT_AMT="206205.85" CE_SPENT_AMT="3153.32" TOT_SPENT_AMT="209359.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="179816.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505158" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="AT NERREN LN" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="191202" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="10/14/2024" CNSTR_PCT_TIME_USED="94.96" CNSTR_PCT_COMPLETE="80.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="256173.21" CE_SPENT_AMT="475.52" TOT_SPENT_AMT="256648.73" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="37892.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505159" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 96" CNTY_NM="Hardin" LIMITS_FROM_DSCR="0.4 MI. N. OF SH 327, SOUTH" LIMITS_TO_DSCR="VILLAGE CREEK BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6530000" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.135 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="7313600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505160" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505161" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006505162" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006506067" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 69" CNTY_NM="Hardin" LIMITS_FROM_DSCR="US 96, SOUTH" LIMITS_TO_DSCR="JEFFERSON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58600000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="3/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/26/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.797 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/14/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/26/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2416203.99" TOT_SPENT_AMT="2416203.99" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="52710000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006506068" PT_PHASE="Planning, 10+ years" HWY_NBR="US 69" CNTY_NM="Hardin" LIMITS_FROM_DSCR="US 96, SOUTH" LIMITS_TO_DSCR="PINE ISLAND BAYOU (FRONTAGE ROADS)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="10/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/29/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/7/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/6/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/11/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/8/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/10/2022" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="5/1/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006506070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Hardin" LIMITS_FROM_DSCR="US 69 Y IN LUMBERTON, SOUTH" LIMITS_TO_DSCR="JEFFERSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/27/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6064303" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="8/9/2022" PSE_30_ACTL_DT="8/9/2022" PSE_60_TRGT_DT="9/8/2022" PSE_60_ACTL_DT="9/8/2022" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="11/4/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.883 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="5/29/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.03" DSGN_START_TRGT_DT="7/11/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="10/12/2022" ENVCLR_ACTL_DT="10/12/2022" UTIL_TRGT_DT="10/23/2022" UTIL_ACTL_DT="10/23/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/4/2022" RTL_ACTL_DT="11/4/2022" PE_SPENT_AMT="5018.07" CNSTR_SPENT_AMT="7105063.56" CE_SPENT_AMT="51540.91" TOT_SPENT_AMT="7161622.54" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4230769.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006506071" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006507063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT CHINN LN" LIMITS_TO_DSCR="(FRONTAGE ROADS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17749" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="7830.88" CNSTR_SPENT_AMT="32671.30" CE_SPENT_AMT="2120.60" TOT_SPENT_AMT="42622.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="21105.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006507065" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 69" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="HARDIN C/L, SOUTH" LIMITS_TO_DSCR="TRAM ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14720000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="3/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/26/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.531 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/14/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/26/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="662532.24" TOT_SPENT_AMT="662532.24" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006507067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="PINE ISLAND BAYOU, SOUTH" LIMITS_TO_DSCR="LNVA CANAL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="369574" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" CNSTR_SPENT_AMT="404170.40" CE_SPENT_AMT="5900.23" TOT_SPENT_AMT="410070.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="336568.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006507068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT CHINN. RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/29/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1241805" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/28/2020" PSE_30_ACTL_DT="7/24/2021" PSE_60_TRGT_DT="1/27/2021" PSE_60_ACTL_DT="7/24/2021" PSE_100_TRGT_DT="3/31/2021" PSE_100_ACTL_DT="7/24/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="100.00" DSGN_START_TRGT_DT="11/29/2020" DSGN_START_ACTL_DT="6/25/2021" ENVCLR_TRGT_DT="3/13/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="3/13/2021" UTIL_ACTL_DT="10/7/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2021" RTL_ACTL_DT="6/15/2021" PE_SPENT_AMT="96285.04" CNSTR_SPENT_AMT="86195.19" CE_SPENT_AMT="375.35" TOT_SPENT_AMT="182855.58" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1451266.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006507070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 69" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="JEFFERSON COUNTY LINE, SOUTH" LIMITS_TO_DSCR="TRAM ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/27/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="814526" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="8/9/2022" PSE_30_ACTL_DT="8/9/2022" PSE_60_TRGT_DT="9/8/2022" PSE_60_ACTL_DT="9/8/2022" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="11/4/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.531 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/26/2023" CNSTR_WKBG_DT="5/29/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.03" DSGN_START_TRGT_DT="7/11/2022" DSGN_START_ACTL_DT="7/11/2022" ENVCLR_TRGT_DT="10/12/2022" ENVCLR_ACTL_DT="10/12/2022" UTIL_TRGT_DT="10/23/2022" UTIL_ACTL_DT="10/23/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/4/2022" RTL_ACTL_DT="11/4/2022" CNSTR_SPENT_AMT="964966.44" CE_SPENT_AMT="10703.38" TOT_SPENT_AMT="975669.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="625000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006507071" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006508166" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 380" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT CALDER AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="225716" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="21195.12" CNSTR_SPENT_AMT="387758.05" CE_SPENT_AMT="35211.26" TOT_SPENT_AMT="444164.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="189271.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006508167" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 380" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="AT WASHINGTON BLVD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="161103" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/29/2020" PSE_30_ACTL_DT="11/29/2020" PSE_60_TRGT_DT="12/29/2020" PSE_60_ACTL_DT="12/29/2020" PSE_100_TRGT_DT="3/2/2021" PSE_100_ACTL_DT="3/2/2021" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="6/22/2021" CNSTR_WKBG_DT="10/18/2021" CNSTR_PCT_TIME_USED="88.49" CNSTR_PCT_COMPLETE="109.44" DSGN_START_TRGT_DT="10/31/2020" DSGN_START_ACTL_DT="10/31/2020" ENVCLR_TRGT_DT="2/12/2021" ENVCLR_ACTL_DT="2/12/2021" UTIL_TRGT_DT="2/12/2021" UTIL_ACTL_DT="2/12/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2021" RTL_ACTL_DT="3/2/2021" PE_SPENT_AMT="17925.10" CNSTR_SPENT_AMT="191739.65" CE_SPENT_AMT="24068.92" TOT_SPENT_AMT="233733.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="138285.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006508169" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 380" CNTY_NM="Jefferson" LIMITS_FROM_DSCR="JIM GILLIGAN WAY, SOUTH" LIMITS_TO_DSCR="500' SOUTH OF SULPHUR PLANT ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/2/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1948712" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/4/2022" PSE_30_ACTL_DT="1/4/2022" PSE_60_TRGT_DT="2/3/2022" PSE_60_ACTL_DT="2/3/2022" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="4/1/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.760 (mi)" TXDOT_CNTCT_NM="David Collins, P.E." TXDOT_CNTCT_PH_NBR="(409)924-6521" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="7/17/2023" CNSTR_PCT_TIME_USED="142.86" CNSTR_PCT_COMPLETE="100.19" DSGN_START_TRGT_DT="12/6/2021" DSGN_START_ACTL_DT="12/6/2021" ENVCLR_TRGT_DT="3/9/2022" ENVCLR_ACTL_DT="3/9/2022" UTIL_TRGT_DT="3/20/2022" UTIL_ACTL_DT="3/20/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="4/1/2022" CNSTR_SPENT_AMT="1848168.58" CE_SPENT_AMT="27582.94" TOT_SPENT_AMT="1875751.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1631552.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006508172" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006508173" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006514029" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 96-F" CNTY_NM="Hardin" LIMITS_FROM_DSCR="0.706 MILES SOUTH OF FM 418, SOUTH" LIMITS_TO_DSCR="BNSF RAILROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/23/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27600" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/30/2022" PSE_30_ACTL_DT="3/30/2022" PSE_60_TRGT_DT="4/29/2022" PSE_60_ACTL_DT="5/9/2022" PSE_100_TRGT_DT="7/1/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.160 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="5/2/2023" CNSTR_PCT_TIME_USED="77.33" CNSTR_PCT_COMPLETE="95.35" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/12/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="7/5/2022" CNSTR_SPENT_AMT="22622.85" CE_SPENT_AMT="406.62" TOT_SPENT_AMT="23029.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="19389.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006514030" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 96-F" CNTY_NM="Hardin" LIMITS_FROM_DSCR="US 96, WEST" LIMITS_TO_DSCR="FM 92" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="190072" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/20/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/26/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.977 (mi)" TXDOT_CNTCT_NM="Lisa Collins, P.E." TXDOT_CNTCT_PH_NBR="409-898-5816" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/30/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/26/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/15/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="197675.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006515006" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3513" CNTY_NM="Hardin" LIMITS_FROM_DSCR="EAST CHANCE CUT OFF, SOUTH" LIMITS_TO_DSCR="MITCHELL ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="263164" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/28/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Beaumont" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.238 (mi)" TXDOT_CNTCT_NM="Bryce Broussard, P.E." TXDOT_CNTCT_PH_NBR="(409)883-3476" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="4/30/2025" CNSTR_PCT_TIME_USED="31.67" CNSTR_PCT_COMPLETE="75.91" DSGN_START_TRGT_DT="3/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="715.15" TOT_SPENT_AMT="715.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="384396.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006601022" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Dallam" LIMITS_FROM_DSCR="OKLAHOMA STATE LINE" LIMITS_TO_DSCR="SHERMAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="604196" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="676700.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006602036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Sherman" LIMITS_FROM_DSCR="DALLAM COUNTY LINE" LIMITS_TO_DSCR=".6 MI N OF US 54 IN STRATFORD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="659957" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.209 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="739152.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006603045" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Sherman" LIMITS_FROM_DSCR=".01 MI S OF US 54 IN STRATFORD" LIMITS_TO_DSCR="MOORE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2979960" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Legacy" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="19.564 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3337555.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="MCCLARY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12902616" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/2/2018" PSE_30_ACTL_DT="5/2/2018" PSE_60_TRGT_DT="8/1/2018" PSE_60_ACTL_DT="8/1/2018" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/1/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.968 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/6/2021" CNSTR_PCT_TIME_USED="83.89" CNSTR_PCT_COMPLETE="98.75" DSGN_START_TRGT_DT="1/9/2017" DSGN_START_ACTL_DT="1/9/2017" ENVCLR_TRGT_DT="1/9/2017" ENVCLR_ACTL_DT="1/9/2017" UTIL_TRGT_DT="1/11/2021" UTIL_ACTL_DT="2/5/2021" ROW_TRGT_DT="8/3/2020" ROW_ACTL_DT="8/3/2020" RTL_TRGT_DT="1/11/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="1017254.16" CNSTR_SPENT_AMT="14321622.23" CE_SPENT_AMT="95084.23" TOT_SPENT_AMT="15433960.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="886498.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT2_AMT="108270.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT3_AMT="12400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="2 MILES NORTH OF FM 119" LIMITS_TO_DSCR="1.2 MILES NORTH OF FM 119" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5883268" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/2/2018" PSE_30_ACTL_DT="5/2/2018" PSE_60_TRGT_DT="8/1/2018" PSE_60_ACTL_DT="8/1/2018" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/1/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.785 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/6/2021" CNSTR_PCT_TIME_USED="83.89" CNSTR_PCT_COMPLETE="98.75" DSGN_START_TRGT_DT="1/9/2017" DSGN_START_ACTL_DT="1/9/2017" ENVCLR_TRGT_DT="1/9/2017" ENVCLR_ACTL_DT="1/9/2017" UTIL_TRGT_DT="1/11/2021" UTIL_ACTL_DT="2/5/2021" ROW_TRGT_DT="8/3/2020" ROW_ACTL_DT="8/3/2020" RTL_TRGT_DT="1/11/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="2706.76" CNSTR_SPENT_AMT="6154179.53" CE_SPENT_AMT="40859.00" TOT_SPENT_AMT="6197745.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="SOUTH OF FM 281" LIMITS_TO_DSCR="DUMAS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4229617" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/18/2020" PSE_30_ACTL_DT="12/18/2020" PSE_60_TRGT_DT="2/4/2021" PSE_60_ACTL_DT="2/5/2021" PSE_100_TRGT_DT="4/7/2021" PSE_100_ACTL_DT="4/6/2021" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.906 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="VECTOR UTILITIES LLC" CNSTR_NTPD_DT="8/25/2021" CNSTR_WKBG_DT="3/30/2022" CNSTR_PCT_TIME_USED="361.31" CNSTR_PCT_COMPLETE="46.25" DSGN_START_TRGT_DT="10/26/2020" DSGN_START_ACTL_DT="10/26/2020" ENVCLR_TRGT_DT="4/7/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="4/7/2021" UTIL_ACTL_DT="2/19/2021" ROW_TRGT_DT="3/18/2021" ROW_ACTL_DT="3/17/2021" RTL_TRGT_DT="5/6/2021" RTL_ACTL_DT="5/13/2021" PE_SPENT_AMT="33253.58" CNSTR_SPENT_AMT="2379552.25" CE_SPENT_AMT="99080.25" TOT_SPENT_AMT="2511886.08" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="4050000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="AT FM 281 &amp; RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1420000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.089 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="TI-ZACK CONCRETE, LLC" CNSTR_NTPD_DT="5/27/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="459361.53" TOT_SPENT_AMT="459361.53" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1420000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604082" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="AT FM 281 &amp; RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1450000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.089 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="TI-ZACK CONCRETE, LLC" CNSTR_NTPD_DT="5/27/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1450000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="FM 281" LIMITS_TO_DSCR="SHERMAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2231728" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.301 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="L A FULLER &amp; SONS CONSTRUCTION, LTD." CNSTR_NTPD_DT="6/6/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="101.96" CNSTR_PCT_COMPLETE="98.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="100392.50" CNSTR_SPENT_AMT="2217780.81" CE_SPENT_AMT="106621.87" TOT_SPENT_AMT="2424795.18" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006604084" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Moore" LIMITS_FROM_DSCR="SOUTH OF FM 281" LIMITS_TO_DSCR="DUMAS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5971613" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.906 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.65" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="47630.72" CNSTR_SPENT_AMT="35990.00" CE_SPENT_AMT="483.03" TOT_SPENT_AMT="84103.75" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="4229617.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="SOUTH CITY LIMITS OF DUMAS" LIMITS_TO_DSCR="SH 152" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17687174" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/2/2018" PSE_30_ACTL_DT="5/2/2018" PSE_60_TRGT_DT="8/1/2018" PSE_60_ACTL_DT="8/1/2018" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/1/2020" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.810 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/6/2021" CNSTR_PCT_TIME_USED="83.89" CNSTR_PCT_COMPLETE="98.75" DSGN_START_TRGT_DT="1/9/2017" DSGN_START_ACTL_DT="1/9/2017" ENVCLR_TRGT_DT="1/9/2017" ENVCLR_ACTL_DT="1/9/2017" UTIL_TRGT_DT="1/11/2021" UTIL_ACTL_DT="2/5/2021" ROW_TRGT_DT="8/3/2020" ROW_ACTL_DT="8/3/2020" RTL_TRGT_DT="1/11/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="2211901.61" CNSTR_SPENT_AMT="19495767.95" CE_SPENT_AMT="117209.38" TOT_SPENT_AMT="21824878.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="1824990.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT2_AMT="13700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="AT SH 152" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327316" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="5/2/2018" PSE_30_ACTL_DT="5/2/2018" PSE_60_TRGT_DT="8/1/2018" PSE_60_ACTL_DT="8/1/2018" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/1/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="SEMA CONSTRUCTION, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/6/2021" CNSTR_PCT_TIME_USED="83.89" CNSTR_PCT_COMPLETE="98.75" DSGN_START_TRGT_DT="1/9/2017" DSGN_START_ACTL_DT="1/9/2017" ENVCLR_TRGT_DT="1/9/2017" ENVCLR_ACTL_DT="1/9/2017" UTIL_TRGT_DT="1/11/2021" UTIL_ACTL_DT="2/5/2021" ROW_TRGT_DT="8/3/2020" ROW_ACTL_DT="8/3/2020" RTL_TRGT_DT="1/11/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="1424.39" CNSTR_SPENT_AMT="739720.95" CE_SPENT_AMT="3334.56" TOT_SPENT_AMT="744479.90" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="149069.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605071" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="6.7 MI N OF SH 354" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5700000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/6/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/12/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/12/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.108 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/12/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/12/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/10/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31410.46" TOT_SPENT_AMT="31410.46" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="5700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605072" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="6.7 MI N OF SH 354" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5800000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/6/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/12/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/12/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.108 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/12/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/12/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/10/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3634.15" TOT_SPENT_AMT="3634.15" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="5800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605073" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="5.24 MI NORTH OF SH 354" LIMITS_TO_DSCR="1.52 MI SOUTH OF SH 354" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1115126" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.767 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1115126.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605074" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="3.5 MI N OF SH 354" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.114 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="70016.14" TOT_SPENT_AMT="70016.14" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605075" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="3.5 MI N OF SH 354" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.114 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="7.0 MI N OF SH 354" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/6/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/12/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/12/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.093 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/12/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/12/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/10/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10290.08" TOT_SPENT_AMT="10290.08" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="7.0 MI N OF SH 354" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/6/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/12/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/12/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.093 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/12/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/12/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/10/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="79590.78" TOT_SPENT_AMT="79590.78" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605078" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="AT SAND CREEK (NB)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605079" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="AT SAND CREEK (SB)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6500000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605080" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006605081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Moore" LIMITS_FROM_DSCR="SOUTH DUMAS CITY LIMITS" LIMITS_TO_DSCR="POTTER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2346958" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Zachary Mayer, P. E." TXDOT_CNTCT_PH_NBR="(806)665-2374" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="2/13/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="9.17" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7869.14" CE_SPENT_AMT="10.53" TOT_SPENT_AMT="7879.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2356000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006701084" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Randall" LIMITS_FROM_DSCR="RUSSELL LONG BLVD" LIMITS_TO_DSCR="SOUTH CANYON CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2488877" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="5/4/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="7/25/2024" CNSTR_PCT_TIME_USED="91.95" CNSTR_PCT_COMPLETE="97.98" DSGN_START_TRGT_DT="12/9/2022" DSGN_START_ACTL_DT="12/9/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/21/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/6/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="319505.06" CNSTR_SPENT_AMT="2747550.59" CE_SPENT_AMT="121494.14" TOT_SPENT_AMT="3188549.79" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2410CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="2235044.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006701087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Randall" LIMITS_FROM_DSCR="RUSSELL LONG BLVD" LIMITS_TO_DSCR="4 LANE DIVIDED" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2363664" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/4/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="7/25/2024" CNSTR_PCT_TIME_USED="91.95" CNSTR_PCT_COMPLETE="97.98" DSGN_START_TRGT_DT="12/9/2022" DSGN_START_ACTL_DT="12/9/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/21/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/6/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="72863.91" CNSTR_SPENT_AMT="2147601.38" CE_SPENT_AMT="83980.76" TOT_SPENT_AMT="2304446.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2101693.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006701088" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Randall" LIMITS_FROM_DSCR="US 87/US 60 CONN BRG" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1620000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.052 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1620000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006701089" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006702069" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="SH 86" LIMITS_TO_DSCR="RANDALL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="937500" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.795 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/2/2018" DSGN_START_ACTL_DT="7/2/2018" ENVCLR_TRGT_DT="6/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23263.87" CE_SPENT_AMT="14486.83" TOT_SPENT_AMT="37750.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="975000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006702071" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="ON FM 1881" LIMITS_TO_DSCR="AT ATSF RAILROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/4/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2387019" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/11/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Heath C. Bozeman, P.E." TXDOT_CNTCT_PH_NBR="(806)429-6023" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="9/1/2021" CNSTR_WKBG_DT="9/13/2021" CNSTR_PCT_TIME_USED="116.67" CNSTR_PCT_COMPLETE="107.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/4/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/26/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/11/2021" PE_SPENT_AMT="132487.32" CNSTR_SPENT_AMT="2353247.11" CE_SPENT_AMT="198876.47" TOT_SPENT_AMT="2684610.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="277308.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT2_PID="BMN" FUND_CAT2_AMT="1127593.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006702072" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="ON CR 113" LIMITS_TO_DSCR="AT ATSF RAILROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/4/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1355446" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/11/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Heath C. Bozeman, P.E." TXDOT_CNTCT_PH_NBR="(806)429-6023" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="9/1/2021" CNSTR_WKBG_DT="9/13/2021" CNSTR_PCT_TIME_USED="116.67" CNSTR_PCT_COMPLETE="107.50" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/4/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/26/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/11/2021" PE_SPENT_AMT="89995.32" CNSTR_SPENT_AMT="1917887.42" CE_SPENT_AMT="158103.13" TOT_SPENT_AMT="2165985.87" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="562335.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006702074" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="CR 128 (FM 1181 OVERPASS)" LIMITS_TO_DSCR="RANDALL COUNTY LINE (WEST SERVICE ROAD)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="939522" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="10/19/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="6/27/2022" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="107.34" DSGN_START_TRGT_DT="9/8/2020" DSGN_START_ACTL_DT="9/8/2020" ENVCLR_TRGT_DT="6/22/2021" ENVCLR_ACTL_DT="6/22/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2021" RTL_ACTL_DT="10/19/2021" PE_SPENT_AMT="10677.81" CNSTR_SPENT_AMT="99565.19" CE_SPENT_AMT="1430.56" TOT_SPENT_AMT="111673.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="63130.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006702075" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="FM 2698 ACCESS" LIMITS_TO_DSCR="RANDALL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="330923" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/10/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/6/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/7/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/10/2020" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="344160.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="9/4/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006702076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006703049" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="HALE COUNTY LINE" LIMITS_TO_DSCR="SH 86" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="937500" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.609 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/2/2018" DSGN_START_ACTL_DT="7/2/2018" ENVCLR_TRGT_DT="6/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="975000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006703054" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Swisher" LIMITS_FROM_DSCR="HALE COUNTY LINE (WEST IH27 SERVICE RDS)" LIMITS_TO_DSCR="SH 86" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="609838" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="10/19/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="6/27/2022" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="107.34" DSGN_START_TRGT_DT="9/8/2020" DSGN_START_ACTL_DT="9/8/2020" ENVCLR_TRGT_DT="6/22/2021" ENVCLR_ACTL_DT="6/22/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2021" RTL_ACTL_DT="10/19/2021" PE_SPENT_AMT="350.61" CNSTR_SPENT_AMT="688373.23" CE_SPENT_AMT="9889.73" TOT_SPENT_AMT="698613.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="573625.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006703055" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006704045" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="SH 194" LIMITS_TO_DSCR="NORTH I-27 BUSINESS LOOP" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="294056" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="349.57" CNSTR_SPENT_AMT="305500.03" CE_SPENT_AMT="3991.68" TOT_SPENT_AMT="309841.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="286502.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006704050" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="US 70 IN PLAINVIEW" LIMITS_TO_DSCR="SWISHER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="937500" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.500 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/2/2018" DSGN_START_ACTL_DT="7/2/2018" ENVCLR_TRGT_DT="6/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="975000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006704056" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="SH 194" LIMITS_TO_DSCR="SWISHER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/8/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1478054" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.550 (mi)" TXDOT_CNTCT_NM="Heath C. Bozeman, P.E." TXDOT_CNTCT_PH_NBR="(806)429-6023" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="1/10/2022" CNSTR_PCT_TIME_USED="79.49" CNSTR_PCT_COMPLETE="95.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12174.61" CNSTR_SPENT_AMT="1438733.83" CE_SPENT_AMT="34284.77" TOT_SPENT_AMT="1485193.21" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1445823.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006704057" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="0.7 MILE SOUTH OF US 70" LIMITS_TO_DSCR="REFERENCE MARKER 54" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="258385" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="349.99" CNSTR_SPENT_AMT="260155.85" CE_SPENT_AMT="3363.29" TOT_SPENT_AMT="263869.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="255600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006705047" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="EAST 1ST ST IN HALE CENTER" LIMITS_TO_DSCR="FM 3466" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="552841" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10597.51" TOT_SPENT_AMT="10597.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="574955.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006705048" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="NORTH HALE CENTER CITY LIMITS" LIMITS_TO_DSCR="SOUTH PLAINVIEW CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="937500" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.000 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/2/2018" DSGN_START_ACTL_DT="7/2/2018" ENVCLR_TRGT_DT="6/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="975000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006705052" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="SOUTH FM 1914" LIMITS_TO_DSCR="0.672 MI NORTH OF SOUTH FM 1914" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="125300" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.204 (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" PE_SPENT_AMT="2771.71" CNSTR_SPENT_AMT="116100.00" CE_SPENT_AMT="1912.03" TOT_SPENT_AMT="120783.74" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="152040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006705053" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="PLAINVIEW CITY LIMITS (SOUTH END)" LIMITS_TO_DSCR="0.17 MILE SOUTH OF US 70" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="368904" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="112.97" CNSTR_PCT_COMPLETE="98.72" DSGN_START_TRGT_DT="5/4/2021" DSGN_START_ACTL_DT="5/4/2021" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="7/1/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" PE_SPENT_AMT="18904.96" CNSTR_SPENT_AMT="16927.40" CE_SPENT_AMT="651.33" TOT_SPENT_AMT="36483.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="225000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006706061" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="REFERENCE MARKER 27" LIMITS_TO_DSCR="HALE CENTER CITY LIMITS (SOUTH)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="529745" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="471.73" CNSTR_SPENT_AMT="534764.78" CE_SPENT_AMT="6913.38" TOT_SPENT_AMT="542149.89" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="524717.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006706064" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 27" CNTY_NM="Hale" LIMITS_FROM_DSCR="LUBBOCK COUNTY LINE" LIMITS_TO_DSCR="E 1ST ST. IN HALE CENTER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="797714" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="829623.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707094" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MILES SOUTH OF YUCCA LANE" LIMITS_TO_DSCR="0.5 MILES NORTH OF YUCCA LANE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/18/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12783073" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="11/29/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="3/12/2023" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="2/5/2024" CNSTR_PCT_TIME_USED="45.51" CNSTR_PCT_COMPLETE="69.68" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/6/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/3/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="899292.51" CNSTR_SPENT_AMT="11647657.44" CE_SPENT_AMT="639385.05" TOT_SPENT_AMT="13186335.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="9500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707099" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 326" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="INTERSECTION OF SS0326" LIMITS_TO_DSCR="AND ERSKINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="389441" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.017 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/5/2021" DSGN_START_ACTL_DT="10/5/2021" ENVCLR_TRGT_DT="4/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/8/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18362.01" TOT_SPENT_AMT="18362.01" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="436174.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707100" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MILE SOUTH OF FM 1294" LIMITS_TO_DSCR="0.5 MIL NORTH OF FM 1294" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1475120" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/2/2023" CNSTR_WKBG_DT="5/12/2023" CNSTR_PCT_TIME_USED="99.64" CNSTR_PCT_COMPLETE="99.51" DSGN_START_TRGT_DT="12/4/2020" DSGN_START_ACTL_DT="12/4/2020" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="9/20/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" PE_SPENT_AMT="26191.01" CNSTR_SPENT_AMT="2647772.46" CE_SPENT_AMT="127072.32" TOT_SPENT_AMT="2801035.79" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="175000.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT2_PID="BMN" FUND_CAT2_AMT="1231000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707101" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 SOUTH OF FM 1294" LIMITS_TO_DSCR="0.5 MILE NORTH OF FM 1294" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="636350" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/2/2023" CNSTR_WKBG_DT="5/12/2023" CNSTR_PCT_TIME_USED="99.64" CNSTR_PCT_COMPLETE="99.51" DSGN_START_TRGT_DT="12/4/2020" DSGN_START_ACTL_DT="12/4/2020" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="9/20/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" CNSTR_SPENT_AMT="1420487.10" CE_SPENT_AMT="68998.00" TOT_SPENT_AMT="1489485.10" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707102" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="HALE COUNTY LINE" LIMITS_TO_DSCR="SPUR 326" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="512464" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="112.97" CNSTR_PCT_COMPLETE="98.72" DSGN_START_TRGT_DT="5/4/2021" DSGN_START_ACTL_DT="5/4/2021" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="7/1/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" CNSTR_SPENT_AMT="587789.60" CE_SPENT_AMT="22614.48" TOT_SPENT_AMT="610404.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="637078.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707103" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MI NORTH OF SL 289" LIMITS_TO_DSCR="CLEMSON STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/18/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5683705" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="11/29/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="3/12/2023" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="2/5/2024" CNSTR_PCT_TIME_USED="45.51" CNSTR_PCT_COMPLETE="69.68" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/6/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/3/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2422141.53" CE_SPENT_AMT="359319.35" TOT_SPENT_AMT="2781460.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="235075.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="3581500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707104" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MI NORTH OF LP 289" LIMITS_TO_DSCR="CLEMSON STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/18/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5863324" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="11/29/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="3/12/2023" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="2/5/2024" CNSTR_PCT_TIME_USED="45.51" CNSTR_PCT_COMPLETE="69.68" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/6/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/3/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="3442407.41" CE_SPENT_AMT="370795.92" TOT_SPENT_AMT="3813203.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="909925.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="3151500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707106" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="BLUEFIELD STREET -FR NORTH &amp; SOUTH BOUND" LIMITS_TO_DSCR="FM 1729 - FR NORTH AND SOUTH BOUND" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="640640" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="666266.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006707107" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006708012" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1318" CNTY_NM="Swisher" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="FM 146" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="105692" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="109920.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006709033" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 27-U" CNTY_NM="Hale" LIMITS_FROM_DSCR="FM 3466" LIMITS_TO_DSCR="W 3RD STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7507438" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="3/28/2023" PSE_100_TRGT_DT="5/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Heath C. Bozeman, P.E." TXDOT_CNTCT_PH_NBR="(806)429-6023" CNSTR_CMPNY_NM="COPPELL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="5/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="3/4/2022" DSGN_START_ACTL_DT="3/4/2022" ENVCLR_TRGT_DT="4/5/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/8/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="637419.36" TOT_SPENT_AMT="637419.36" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="7607438.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006711046" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MILE SOUTH OF BRIDGE" LIMITS_TO_DSCR="0.5 MILE NORTH OF BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="175460" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/2/2023" CNSTR_WKBG_DT="5/12/2023" CNSTR_PCT_TIME_USED="99.64" CNSTR_PCT_COMPLETE="99.51" DSGN_START_TRGT_DT="12/4/2020" DSGN_START_ACTL_DT="12/4/2020" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="9/20/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" CNSTR_SPENT_AMT="204727.61" CE_SPENT_AMT="18272.17" TOT_SPENT_AMT="222999.78" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="280000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006711051" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="SPUR 326" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1081882" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="112.97" CNSTR_PCT_COMPLETE="98.72" DSGN_START_TRGT_DT="5/4/2021" DSGN_START_ACTL_DT="5/4/2021" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="7/1/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" CNSTR_SPENT_AMT="1241537.69" CE_SPENT_AMT="47766.11" TOT_SPENT_AMT="1289303.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1082500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006711052" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="FM 835 (50TH ST.)" LIMITS_TO_DSCR="13TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="81416" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="294.60" CNSTR_SPENT_AMT="80524.42" CE_SPENT_AMT="1041.01" TOT_SPENT_AMT="81860.03" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="81539.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006711053" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="FM 835 (50TH ST.)" LIMITS_TO_DSCR="13TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92543" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="513.31" CNSTR_SPENT_AMT="92912.81" CE_SPENT_AMT="1201.26" TOT_SPENT_AMT="94627.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="92605.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006711054" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006712006" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 292" CNTY_NM="Swisher" LIMITS_FROM_DSCR="25 FT SOUTH OF FM 145-EDGE OF CONCRETE" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65203" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="63454.69" CE_SPENT_AMT="224.00" TOT_SPENT_AMT="63678.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="65800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006715004" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 461" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="N IH 27" LIMITS_TO_DSCR="S IH 27" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135910" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1614.93" TOT_SPENT_AMT="1614.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="142856.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717029" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="0.478 MILES SE OF US 60" LIMITS_TO_DSCR="0.914 MILES N OF US 60" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="41220" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/9/2019" PSE_30_ACTL_DT="11/5/2019" PSE_60_TRGT_DT="8/12/2019" PSE_60_ACTL_DT="12/11/2019" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/1/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.910 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="5/4/2021" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="100.00" DSGN_START_TRGT_DT="1/22/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2020" ENVCLR_ACTL_DT="4/1/2020" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="5/29/2020" ROW_TRGT_DT="9/10/2019" ROW_ACTL_DT="1/22/2019" RTL_TRGT_DT="7/3/2020" RTL_ACTL_DT="7/24/2020" CNSTR_SPENT_AMT="82390.69" CE_SPENT_AMT="-1327.67" TOT_SPENT_AMT="81063.02" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="53314.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717030" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="0.478 MILES SE OF US 60" LIMITS_TO_DSCR="0.914 MILES N OF US 60" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52504" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/9/2019" PSE_30_ACTL_DT="11/5/2019" PSE_60_TRGT_DT="8/12/2019" PSE_60_ACTL_DT="12/11/2019" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/1/2020" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.914 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="5/4/2021" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="100.00" DSGN_START_TRGT_DT="1/22/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2020" ENVCLR_ACTL_DT="4/1/2020" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="5/29/2020" ROW_TRGT_DT="9/10/2019" ROW_ACTL_DT="1/22/2019" RTL_TRGT_DT="7/3/2020" RTL_ACTL_DT="7/24/2020" CNSTR_SPENT_AMT="114766.68" CE_SPENT_AMT="852.74" TOT_SPENT_AMT="115619.42" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="37504.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717032" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="NORTH OF US 60/US 87 INTERCHANGE" LIMITS_TO_DSCR="SOUTH OF US 60/US 87 INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="46112275" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="4/27/2022" PSE_30_ACTL_DT="4/27/2022" PSE_60_TRGT_DT="12/8/2022" PSE_60_ACTL_DT="1/19/2023" PSE_100_TRGT_DT="10/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.794 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="7/15/2024" CNSTR_PCT_TIME_USED="19.13" CNSTR_PCT_COMPLETE="32.19" DSGN_START_TRGT_DT="11/15/2021" DSGN_START_ACTL_DT="9/19/2022" ENVCLR_TRGT_DT="4/13/2022" ENVCLR_ACTL_DT="4/13/2022" UTIL_TRGT_DT="3/28/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/19/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/29/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="561366.46" CNSTR_SPENT_AMT="16656719.39" CE_SPENT_AMT="136487.08" TOT_SPENT_AMT="17354572.93" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="32006179.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="7342513.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717033" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="NORTH OF US 60/US 87 INTERCHANGE" LIMITS_TO_DSCR="SOUTH OF US 60/US 87 INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9260000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.794 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="302776.04" TOT_SPENT_AMT="302776.04" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717037" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="AT P.D.T. FORK RED RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2047646" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.158 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="5.80" CNSTR_PCT_COMPLETE="2.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="20020.00" CE_SPENT_AMT="3826.59" TOT_SPENT_AMT="23846.59" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1715000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717038" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="AT P.D.T. FORK RED RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2011524" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.158 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="5.80" CNSTR_PCT_COMPLETE="2.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="20020.00" CE_SPENT_AMT="3741.11" TOT_SPENT_AMT="23761.11" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1710000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717039" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="IH 27 NB/SH 217 BRG" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1250000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.084 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006717040" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 27" CNTY_NM="Randall" LIMITS_FROM_DSCR="IH 27 SB/SH 217 BRG" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1250000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.084 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801073" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="114TH STREET" LIMITS_TO_DSCR="146TH STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="133586489" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="3/12/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/7/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="1/4/2022" DIST_NM="Lubbock" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/3/2013" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/28/2018" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="21332493.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2709)" FUND_CAT2_PID="TM" FUND_CAT2_AMT="3502746.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="73826536.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT4_AMT="17455699.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MI NORTH OF FM 41" LIMITS_TO_DSCR="0.5 MI SOUTH OF FM 41" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21657409" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="6/23/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="ALLEN BUTLER CONSTRUCTION, INC." CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="10/11/2021" CNSTR_PCT_TIME_USED="118.12" CNSTR_PCT_COMPLETE="60.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/3/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/3/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="7/23/2021" PE_SPENT_AMT="452489.72" CNSTR_SPENT_AMT="14105269.63" CE_SPENT_AMT="773694.52" TOT_SPENT_AMT="15331453.87" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="8000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="8000000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT3_AMT="2500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="82ND STREET" LIMITS_TO_DSCR="LOOP 493" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="678258" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="328.26" CNSTR_SPENT_AMT="707865.91" CE_SPENT_AMT="9248.93" TOT_SPENT_AMT="717443.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="655079.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801079" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 27" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="82ND STREET" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="81067" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="12/6/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="112.97" CNSTR_PCT_COMPLETE="98.72" DSGN_START_TRGT_DT="5/4/2021" DSGN_START_ACTL_DT="5/4/2021" ENVCLR_TRGT_DT="11/7/2022" ENVCLR_ACTL_DT="7/1/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2022" RTL_ACTL_DT="12/6/2022" PE_SPENT_AMT="9379.52" CNSTR_SPENT_AMT="93003.47" CE_SPENT_AMT="3578.32" TOT_SPENT_AMT="105961.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="125000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801080" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="82ND STREET FRONTAGE ROAD (SOUTHBOUND)" LIMITS_TO_DSCR="114TH STREET FRONTAGE ROAD (SOUTHBOUND)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86345" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="265.38" CNSTR_SPENT_AMT="86718.62" CE_SPENT_AMT="1121.13" TOT_SPENT_AMT="88105.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="85940.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="82ND STREET FRONTAGE ROAD NORTHBOUND" LIMITS_TO_DSCR="114TH STREET FRONTAGE ROAD NORTHBOUND" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78679" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="305.57" CNSTR_SPENT_AMT="78459.71" CE_SPENT_AMT="1014.37" TOT_SPENT_AMT="79779.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="77800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801082" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="82ND STREET" LIMITS_TO_DSCR="LYNN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2402925" DIST_LET_DATE="2/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/4/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/4/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/7/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/4/2025" DSGN_START_ACTL_DT="4/4/2023" ENVCLR_TRGT_DT="12/5/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/7/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801083" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="82ND STREET" LIMITS_TO_DSCR="LYNN COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29275.78" TOT_SPENT_AMT="29275.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006801086" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="0.5 MI NORTH OF FM 41" LIMITS_TO_DSCR="0.5 MI SOUTH OF FM 41" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20000000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="53938.45" TOT_SPENT_AMT="53938.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="TCD" FUND_CAT1_AMT="20000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006802049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lynn" LIMITS_FROM_DSCR="NORTH OF SL 472" LIMITS_TO_DSCR="SOUTH OF SL 472" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="441903" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.730 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7399.14" CNSTR_SPENT_AMT="35123.00" CE_SPENT_AMT="4676.11" TOT_SPENT_AMT="47198.25" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="390120.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006802050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Lynn" LIMITS_FROM_DSCR="LUBBOCK COUNTY LINE" LIMITS_TO_DSCR="FM 211 NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1371262" DIST_LET_DATE="2/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/20/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/5/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/2/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/10/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/10/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/2/2028" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006802051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Lynn" LIMITS_FROM_DSCR="LUBBOCK COUNTY LINE" LIMITS_TO_DSCR="TAHOKA CITY LIMITS" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34149.65" TOT_SPENT_AMT="34149.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006802052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006803034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lynn" LIMITS_FROM_DSCR="SOUTH SL 472" LIMITS_TO_DSCR="SOUTH SL 76" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3355925" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="GRATIOT CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/16/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="28.29" CNSTR_PCT_COMPLETE="40.39" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6293.14" CNSTR_SPENT_AMT="160886.00" CE_SPENT_AMT="36087.62" TOT_SPENT_AMT="203266.76" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3600589.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006803035" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lynn" LIMITS_FROM_DSCR="US 87 SOUTHBOUND FRONTAGE ROAD" LIMITS_TO_DSCR="TO END OF ROADWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22013" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="771.88" CNSTR_SPENT_AMT="20647.31" CE_SPENT_AMT="267.05" TOT_SPENT_AMT="21686.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="21704.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006803036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Lynn" LIMITS_FROM_DSCR="US 87 NORTHBOUND FRONTAGE" LIMITS_TO_DSCR="TO THE ON RAMP OF US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7171" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="570.69" CNSTR_SPENT_AMT="6194.19" CE_SPENT_AMT="80.21" TOT_SPENT_AMT="6845.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="7071.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006803037" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006804040" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-K" CNTY_NM="Dawson" LIMITS_FROM_DSCR="N 13TH STREET" LIMITS_TO_DSCR="N 1ST STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="133688" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="10/19/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.669 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="6/27/2022" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="107.34" DSGN_START_TRGT_DT="9/8/2020" DSGN_START_ACTL_DT="9/8/2020" ENVCLR_TRGT_DT="6/22/2021" ENVCLR_ACTL_DT="6/22/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2021" RTL_ACTL_DT="10/19/2021" PE_SPENT_AMT="185.81" CNSTR_SPENT_AMT="149347.79" CE_SPENT_AMT="2145.74" TOT_SPENT_AMT="151679.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="44282.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006804041" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Dawson" LIMITS_FROM_DSCR="LYNN COUNTY LINE" LIMITS_TO_DSCR="FM1210" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1774772" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2023" PSE_100_ACTL_DT="1/25/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.344 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="98.81" CNSTR_PCT_COMPLETE="91.44" DSGN_START_TRGT_DT="1/4/2023" DSGN_START_ACTL_DT="10/4/2021" ENVCLR_TRGT_DT="1/5/2023" ENVCLR_ACTL_DT="9/23/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/7/2023" RTL_ACTL_DT="1/25/2023" PE_SPENT_AMT="24499.16" CNSTR_SPENT_AMT="1553090.50" CE_SPENT_AMT="64266.65" TOT_SPENT_AMT="1641856.31" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2091490.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006804042" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006805037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Dawson" LIMITS_FROM_DSCR="0.5 MILE SOUTH OF US 180" LIMITS_TO_DSCR="MARTIN COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2017703" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1481.81" TOT_SPENT_AMT="1481.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2232983.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006805038" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-K" CNTY_NM="Dawson" LIMITS_FROM_DSCR="N 1ST. STREET" LIMITS_TO_DSCR="SE 15TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="253219" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="10/19/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.945 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="6/27/2022" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="107.34" DSGN_START_TRGT_DT="9/8/2020" DSGN_START_ACTL_DT="9/8/2020" ENVCLR_TRGT_DT="6/22/2021" ENVCLR_ACTL_DT="6/22/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2021" RTL_ACTL_DT="10/19/2021" PE_SPENT_AMT="505.30" CNSTR_SPENT_AMT="284962.49" CE_SPENT_AMT="4094.19" TOT_SPENT_AMT="289561.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="55368.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006805039" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Dawson" LIMITS_FROM_DSCR="CR0336" LIMITS_TO_DSCR="MARTIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2941876" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.697 (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="4/4/2022" ENVCLR_TRGT_DT="6/5/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/8/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_AMT="3385274.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006805040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Dawson" LIMITS_FROM_DSCR="CR 1026" LIMITS_TO_DSCR="US 180" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10020228" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="11/4/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/18/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/15/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="9.75" CNSTR_PCT_COMPLETE="12.62" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="11/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/23/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/23/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/15/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="194136.13" CNSTR_SPENT_AMT="1177732.22" CE_SPENT_AMT="166606.59" TOT_SPENT_AMT="1538474.94" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="7000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006805042" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006806017" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Martin" LIMITS_FROM_DSCR="DAWSON COUNTY LINE" LIMITS_TO_DSCR="HOWARD COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1559541" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="2/9/2022" PSE_30_ACTL_DT="2/9/2022" PSE_60_TRGT_DT="2/22/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="3/31/2022" PSE_100_ACTL_DT="4/21/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="3/6/2023" CNSTR_PCT_TIME_USED="79.71" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/9/2022" DSGN_START_ACTL_DT="12/8/2021" ENVCLR_TRGT_DT="3/31/2022" ENVCLR_ACTL_DT="3/17/2022" UTIL_TRGT_DT="3/31/2022" UTIL_ACTL_DT="4/21/2022" ROW_TRGT_DT="3/31/2022" ROW_ACTL_DT="4/21/2022" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="4/21/2022" CNSTR_SPENT_AMT="1757511.40" CE_SPENT_AMT="10869.00" TOT_SPENT_AMT="1768380.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1399981.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006807033" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="MARTIN/HOWARD CO LINE" LIMITS_TO_DSCR=".797MI NORTH OF CO RD 50" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="347975" DIST_LET_DATE="12/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.928 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="389732.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006807051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="MARTIN CL" LIMITS_TO_DSCR="4 MILES N FM 846" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5897202" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2022" PSE_30_ACTL_DT="2/9/2022" PSE_60_TRGT_DT="2/22/2022" PSE_60_ACTL_DT="3/15/2022" PSE_100_TRGT_DT="3/31/2022" PSE_100_ACTL_DT="4/21/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.915 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="3/6/2023" CNSTR_PCT_TIME_USED="79.71" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/9/2022" DSGN_START_ACTL_DT="12/8/2021" ENVCLR_TRGT_DT="3/31/2022" ENVCLR_ACTL_DT="3/17/2022" UTIL_TRGT_DT="3/31/2022" UTIL_ACTL_DT="4/21/2022" ROW_TRGT_DT="3/31/2022" ROW_ACTL_DT="4/21/2022" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="4/21/2022" PE_SPENT_AMT="49493.39" CNSTR_SPENT_AMT="6046713.27" CE_SPENT_AMT="37394.75" TOT_SPENT_AMT="6133601.41" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="5468235.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006808063" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-M" CNTY_NM="Howard" LIMITS_FROM_DSCR="IH 20 NFR" LIMITS_TO_DSCR="BI 20-G" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1397793" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/3/2022" PSE_30_ACTL_DT="2/3/2022" PSE_60_TRGT_DT="3/2/2022" PSE_60_ACTL_DT="3/22/2022" PSE_100_TRGT_DT="6/6/2022" PSE_100_ACTL_DT="9/29/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.174 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="8/15/2023" CNSTR_PCT_TIME_USED="77.78" CNSTR_PCT_COMPLETE="99.81" DSGN_START_TRGT_DT="11/2/2021" DSGN_START_ACTL_DT="11/2/2021" ENVCLR_TRGT_DT="3/24/2022" ENVCLR_ACTL_DT="4/13/2022" UTIL_TRGT_DT="3/24/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="3/24/2022" ROW_ACTL_DT="10/21/2022" RTL_TRGT_DT="6/6/2022" RTL_ACTL_DT="9/29/2022" PE_SPENT_AMT="52995.06" CNSTR_SPENT_AMT="796878.47" CE_SPENT_AMT="10325.37" TOT_SPENT_AMT="860198.90" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1311854.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006808066" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR=".793MI NORTH OF CO RD 50" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1182534" DIST_LET_DATE="12/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="17.335 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1182534.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006808067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="1750 FEET NORTH OF US 87 RELIEF ROUTE" LIMITS_TO_DSCR="CR 36" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/13/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6899250" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="11/1/2021" CNSTR_PCT_TIME_USED="92.42" CNSTR_PCT_COMPLETE="97.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="922390.49" CNSTR_SPENT_AMT="7198988.18" CE_SPENT_AMT="97119.73" TOT_SPENT_AMT="8218498.40" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="10400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006808070" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="4 MILES N OF FM 846" LIMITS_TO_DSCR="0.6 MILES N OF FM 2230" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7656689" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="1/30/2025" CNSTR_PCT_TIME_USED="39.09" CNSTR_PCT_COMPLETE="102.35" DSGN_START_TRGT_DT="2/6/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26961.17" CNSTR_SPENT_AMT="8290320.61" CE_SPENT_AMT="95092.80" TOT_SPENT_AMT="8412374.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9755543.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006808071" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-M" CNTY_NM="Howard" LIMITS_FROM_DSCR="NEAR FM 700" LIMITS_TO_DSCR=" I-20 NFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3210294" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="2/3/2022" PSE_30_ACTL_DT="2/3/2022" PSE_60_TRGT_DT="3/2/2022" PSE_60_ACTL_DT="3/22/2022" PSE_100_TRGT_DT="6/6/2022" PSE_100_ACTL_DT="9/29/2022" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="8/15/2023" CNSTR_PCT_TIME_USED="77.78" CNSTR_PCT_COMPLETE="99.81" DSGN_START_TRGT_DT="11/2/2021" DSGN_START_ACTL_DT="11/2/2021" ENVCLR_TRGT_DT="3/24/2022" ENVCLR_ACTL_DT="4/13/2022" UTIL_TRGT_DT="3/24/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="3/24/2022" ROW_ACTL_DT="10/21/2022" RTL_TRGT_DT="6/6/2022" RTL_ACTL_DT="9/29/2022" PE_SPENT_AMT="26279.47" CNSTR_SPENT_AMT="3792086.78" CE_SPENT_AMT="49134.82" TOT_SPENT_AMT="3867501.07" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2903811.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006809012" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 76" CNTY_NM="Lynn" LIMITS_FROM_DSCR="FM 2053" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4336853" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2019" PSE_100_ACTL_DT="4/17/2020" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.701 (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="ALLEN BUTLER CONSTRUCTION, INC." CNSTR_NTPD_DT="7/7/2020" CNSTR_WKBG_DT="8/17/2020" CNSTR_PCT_TIME_USED="107.51" CNSTR_PCT_COMPLETE="97.56" DSGN_START_TRGT_DT="10/6/2017" DSGN_START_ACTL_DT="10/6/2017" ENVCLR_TRGT_DT="7/8/2019" ENVCLR_ACTL_DT="12/23/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/8/2019" RTL_ACTL_DT="4/17/2020" PE_SPENT_AMT="236261.51" CNSTR_SPENT_AMT="2076562.13" CE_SPENT_AMT="173188.92" TOT_SPENT_AMT="2486012.56" FUND_CAT1_DSCR="Category 8 - Systemic Widening Program (2008SW)" FUND_CAT1_PID="SSW" FUND_CAT1_AMT="280400.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT2_AMT="219600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006810008" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2212" CNTY_NM="Dawson" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="MARTIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="56187" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="351.10" CNSTR_SPENT_AMT="57746.97" CE_SPENT_AMT="754.60" TOT_SPENT_AMT="58852.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="55214.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006812011" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Dawson" LIMITS_FROM_DSCR="NORTH 10TH STREET" LIMITS_TO_DSCR="SE 13TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="131426" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="10/19/2021" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.631 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/20/2022" CNSTR_WKBG_DT="6/27/2022" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="107.34" DSGN_START_TRGT_DT="9/8/2020" DSGN_START_ACTL_DT="9/8/2020" ENVCLR_TRGT_DT="6/22/2021" ENVCLR_ACTL_DT="6/22/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2021" RTL_ACTL_DT="10/19/2021" PE_SPENT_AMT="203.18" CNSTR_SPENT_AMT="147631.18" CE_SPENT_AMT="2121.07" TOT_SPENT_AMT="149955.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="102176.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006812012" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Dawson" LIMITS_FROM_DSCR="N 5TH STREET" LIMITS_TO_DSCR="N 3RD STREET IN LAMESA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3060214" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="11/4/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/18/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/15/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Severiano Sisneros, P.E." TXDOT_CNTCT_PH_NBR="(806)637-4501" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="9.75" CNSTR_PCT_COMPLETE="12.62" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="11/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/23/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/23/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/15/2026" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="466975.89" CE_SPENT_AMT="66060.32" TOT_SPENT_AMT="533036.21" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006812013" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006814002" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 493" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59646" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="58894.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006901054" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-M" CNTY_NM="Howard" LIMITS_FROM_DSCR="BI 20-G" LIMITS_TO_DSCR="FM 700 NFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="862159" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="2/3/2022" PSE_30_ACTL_DT="2/3/2022" PSE_60_TRGT_DT="3/2/2022" PSE_60_ACTL_DT="3/22/2022" PSE_100_TRGT_DT="6/6/2022" PSE_100_ACTL_DT="9/29/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ryan Sayles, P.E." TXDOT_CNTCT_PH_NBR="(432)263-4768" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="8/15/2023" CNSTR_PCT_TIME_USED="77.78" CNSTR_PCT_COMPLETE="99.81" DSGN_START_TRGT_DT="11/2/2021" DSGN_START_ACTL_DT="11/2/2021" ENVCLR_TRGT_DT="3/24/2022" ENVCLR_ACTL_DT="4/13/2022" UTIL_TRGT_DT="3/24/2022" UTIL_ACTL_DT="6/13/2022" ROW_TRGT_DT="3/24/2022" ROW_ACTL_DT="10/21/2022" RTL_TRGT_DT="6/6/2022" RTL_ACTL_DT="9/29/2022" PE_SPENT_AMT="2794.77" CNSTR_SPENT_AMT="1017483.25" CE_SPENT_AMT="13183.75" TOT_SPENT_AMT="1033461.77" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="787885.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006901060" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-M" CNTY_NM="Howard" LIMITS_FROM_DSCR="BI 20 - G" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="299785" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.160 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/24/2020" CNSTR_WKBG_DT="6/24/2020" CNSTR_PCT_TIME_USED="59.22" CNSTR_PCT_COMPLETE="97.67" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="388.36" CNSTR_SPENT_AMT="445466.78" CE_SPENT_AMT="2746.29" TOT_SPENT_AMT="448601.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="355362.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006901061" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="2 MILES NORTH OF GLASSCOCK CO" LIMITS_TO_DSCR="GLASSCOCK CO" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15037037" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="11/18/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/17/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.045 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="1/4/2022" ENVCLR_TRGT_DT="12/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/23/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/23/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/17/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1708669.83" TOT_SPENT_AMT="1708669.83" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="16240000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006901062" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="NEAR RM 33" LIMITS_TO_DSCR="NEAR FM 461" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="12/17/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/31/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/21/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/21/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/21/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42711.75" TOT_SPENT_AMT="42711.75" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="3120000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006901064" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 87-M" CNTY_NM="Howard" LIMITS_FROM_DSCR="BIG SPRING CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="84540" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/12/2021" PSE_30_ACTL_DT="11/12/2021" PSE_60_TRGT_DT="11/26/2021" PSE_60_ACTL_DT="11/26/2021" PSE_100_TRGT_DT="5/16/2022" PSE_100_ACTL_DT="4/24/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCOTT TUCKER CONSTRUCTION COMPANY, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="11/15/2022" CNSTR_PCT_TIME_USED="127.68" CNSTR_PCT_COMPLETE="90.71" DSGN_START_TRGT_DT="9/1/2021" DSGN_START_ACTL_DT="9/1/2021" ENVCLR_TRGT_DT="1/10/2022" ENVCLR_ACTL_DT="1/10/2022" UTIL_TRGT_DT="1/7/2022" UTIL_ACTL_DT="1/7/2022" ROW_TRGT_DT="1/7/2022" ROW_ACTL_DT="1/7/2022" RTL_TRGT_DT="5/16/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="66535.45" CE_SPENT_AMT="5225.43" TOT_SPENT_AMT="71760.88" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006901065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="RM 33" LIMITS_TO_DSCR="FM 461" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/4/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="836953" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/21/2022" PSE_30_ACTL_DT="9/22/2022" PSE_60_TRGT_DT="12/6/2022" PSE_60_ACTL_DT="1/2/2023" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCR CIVIL CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="11/3/2023" CNSTR_PCT_TIME_USED="89.75" CNSTR_PCT_COMPLETE="102.13" DSGN_START_TRGT_DT="8/8/2022" DSGN_START_ACTL_DT="8/8/2022" ENVCLR_TRGT_DT="1/17/2023" ENVCLR_ACTL_DT="12/6/2022" UTIL_TRGT_DT="1/17/2023" UTIL_ACTL_DT="9/22/2022" ROW_TRGT_DT="1/17/2023" ROW_ACTL_DT="9/22/2022" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/1/2023" CNSTR_SPENT_AMT="852761.98" CE_SPENT_AMT="7496.67" TOT_SPENT_AMT="860258.65" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1093670.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902029" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="HOWARD COUNTY LINE" LIMITS_TO_DSCR="STERLING COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6059478" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.166 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="83.76" TOT_SPENT_AMT="83.76" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="6059478.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="5/15/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902030" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="HOWARD COUNTY LINE" LIMITS_TO_DSCR="0.45 MILES S OF HOWARD COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3318519" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="11/18/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/17/2025" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="1/4/2022" ENVCLR_TRGT_DT="12/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/23/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/23/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/17/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="540458.76" TOT_SPENT_AMT="540458.76" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="3584000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="HOWARD COUNTY LINE" LIMITS_TO_DSCR="STERLING COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2288897" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="25.93" CNSTR_PCT_COMPLETE="23.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1996309.58" CE_SPENT_AMT="1975.73" TOT_SPENT_AMT="1998285.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2652306.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902032" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902035" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="AT CANNIBAL DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="237984" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="237984.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="AT CANNIBAL DRAW RELIEF" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="121272" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="121272.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902037" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="AT CANNIBAL DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="288934" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="288934.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006902038" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Glasscock" LIMITS_FROM_DSCR="AT CANNIBAL DRAW RELIEF" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250164" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="250164.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006903058" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Sterling" LIMITS_FROM_DSCR="GLASSCOCK COUNTY LINE" LIMITS_TO_DSCR="SH 163 IN STERLING CITY" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11796492" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="19.791 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="11796492.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006903061" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Sterling" LIMITS_FROM_DSCR="GLASSCOCK COUNTY LINE" LIMITS_TO_DSCR="0.242 MI N OF SH 163" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3486859" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="25.93" CNSTR_PCT_COMPLETE="23.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="3841.70" TOT_SPENT_AMT="3841.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3708441.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006903062" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006903063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Sterling" LIMITS_FROM_DSCR="0.242 MI N OF SH 163" LIMITS_TO_DSCR="SH 163" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="325459" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="REECE ALBERT, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="27.78" CNSTR_PCT_COMPLETE="55.27" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="1385.71" TOT_SPENT_AMT="1385.71" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2362493.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006904043" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Sterling" LIMITS_FROM_DSCR="SH 163 IN STERLING CITY" LIMITS_TO_DSCR="COKE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17169976" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.070 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8310.03" TOT_SPENT_AMT="8310.03" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="17169976.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006904046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Sterling" LIMITS_FROM_DSCR="SH 163" LIMITS_TO_DSCR="SH 158" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1272487" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="REECE ALBERT, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="27.78" CNSTR_PCT_COMPLETE="55.27" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="4342.50" CE_SPENT_AMT="5517.67" TOT_SPENT_AMT="9860.17" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1166902.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006904047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Sterling" LIMITS_FROM_DSCR="SH 158" LIMITS_TO_DSCR="COKE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4607096" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="REECE ALBERT, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="27.78" CNSTR_PCT_COMPLETE="55.27" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="5492213.46" CE_SPENT_AMT="22649.99" TOT_SPENT_AMT="5514863.45" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="4194518.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006904048" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006905029" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Coke" LIMITS_FROM_DSCR="STERLING COUNTY LINE" LIMITS_TO_DSCR="TOM GREEN COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5531958" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.576 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="5531958.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006905032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Coke" LIMITS_FROM_DSCR="STERLING COUNTY LINE" LIMITS_TO_DSCR="TOM GREEN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="690000" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="451839.89" TOT_SPENT_AMT="451839.89" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="690000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006905033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006906035" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="COKE COUNTY LINE" LIMITS_TO_DSCR="9.8 MILES SOUTH OF COKE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5812116" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.751 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="5812116.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006906036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="COKE COUNTY LINE" LIMITS_TO_DSCR="IRWIN BLVD IN CARLSBAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1490000" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="1043111.69" TOT_SPENT_AMT="1043111.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1490000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006906037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="COKE COUNTY LINE" LIMITS_TO_DSCR="BEAUMONT ST. IN CARLSBAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22828703" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="REECE ALBERT, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="27.78" CNSTR_PCT_COMPLETE="55.27" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="7883907.03" CE_SPENT_AMT="107443.74" TOT_SPENT_AMT="7991350.77" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="23382713.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006906038" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006906039" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907107" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="9.8 MILES SOUTH OF COKE COUNTY LINE" LIMITS_TO_DSCR="33RD STREET IN SAN ANGELO" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8570651" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.379 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="8570651.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907114" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="9.75 MILES SOUTH OF COKE COUNTY LINE" LIMITS_TO_DSCR="33RD STREET IN SAN ANGELO" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2624443" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="25.93" CNSTR_PCT_COMPLETE="23.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="2890.00" TOT_SPENT_AMT="2890.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2794664.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907116" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT 23RD ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="671024" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="39.19" CNSTR_PCT_COMPLETE="62.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="71654.46" CNSTR_SPENT_AMT="597929.38" CE_SPENT_AMT="2712.84" TOT_SPENT_AMT="672296.68" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907117" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT W HARRIS AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="858922" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="39.19" CNSTR_PCT_COMPLETE="62.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="48958.82" CNSTR_SPENT_AMT="456454.70" CE_SPENT_AMT="5644.13" TOT_SPENT_AMT="511057.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907118" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT W CONCHO AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="325432" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="39.19" CNSTR_PCT_COMPLETE="62.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="60605.17" CNSTR_SPENT_AMT="50230.50" CE_SPENT_AMT="2040.64" TOT_SPENT_AMT="112876.31" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907120" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907123" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006907124" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="006910002" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Howard" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="BU 87" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1080000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007001056" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1223" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="FM 388" LIMITS_TO_DSCR="SL 306" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="524000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="565920.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007002091" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="SL 570 NORTH OF WALL" LIMITS_TO_DSCR="CONCHO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/16/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9737926" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="REECE ALBERT, INC." CNSTR_NTPD_DT="2/15/2022" CNSTR_WKBG_DT="3/16/2022" CNSTR_PCT_TIME_USED="102.70" CNSTR_PCT_COMPLETE="87.84" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17714.31" CNSTR_SPENT_AMT="9999354.85" CE_SPENT_AMT="532930.57" TOT_SPENT_AMT="10549999.73" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="9900000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007002092" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="US 277" LIMITS_TO_DSCR="SL 306 AND FM 1223" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27500000" DIST_LET_DATE="7/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.913 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3918.12" TOT_SPENT_AMT="3918.12" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="30199999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007002097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="BEN FICKLIN ROAD" LIMITS_TO_DSCR="END OF FRONTAGE ROADS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1252462" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/12/2022" CNSTR_WKBG_DT="7/26/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.66" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1650751.46" CE_SPENT_AMT="738.89" TOT_SPENT_AMT="1651490.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="155331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007002099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="SOUTH CONCHO RIVER" LIMITS_TO_DSCR="CONCHO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4084306" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="SCOUT 5 CONSTRUCTION LLC" CNSTR_NTPD_DT="2/5/2024" CNSTR_WKBG_DT="4/15/2024" CNSTR_PCT_TIME_USED="73.18" CNSTR_PCT_COMPLETE="99.32" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="648.06" CNSTR_SPENT_AMT="4110472.82" CE_SPENT_AMT="80375.82" TOT_SPENT_AMT="4191496.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3599951.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007002100" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT JACKSON ST" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="592480" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="39.19" CNSTR_PCT_COMPLETE="62.11" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="59443.80" CNSTR_SPENT_AMT="481065.60" CE_SPENT_AMT="4335.53" TOT_SPENT_AMT="544844.93" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007002101" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007003059" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007003060" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Concho" LIMITS_FROM_DSCR="TOM GREEN COUNTY LINE" LIMITS_TO_DSCR="16.946 MI E OF TOM GREEN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1210000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1355200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007003061" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007003062" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007004033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Concho" LIMITS_FROM_DSCR="CONCHO STREET IN EDEN" LIMITS_TO_DSCR="SANTA FE STREET IN EDEN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2630486" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/28/2012" PSE_30_ACTL_DT="12/28/2012" PSE_60_TRGT_DT="9/30/2016" PSE_60_ACTL_DT="9/30/2016" PSE_100_TRGT_DT="12/8/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.103 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="1/27/2025" CNSTR_PCT_TIME_USED="23.20" CNSTR_PCT_COMPLETE="34.93" DSGN_START_TRGT_DT="6/20/2011" DSGN_START_ACTL_DT="6/20/2011" ENVCLR_TRGT_DT="1/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/8/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/28/2017" ROW_ACTL_DT="2/28/2017" RTL_TRGT_DT="1/12/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32560.79" CNSTR_SPENT_AMT="425259.09" CE_SPENT_AMT="12615.29" TOT_SPENT_AMT="470435.17" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="2630485.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007004040" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007004041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007006053" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="CONCHO C/L" LIMITS_TO_DSCR="0.44 MI W. OF US 283" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="263697" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="295341.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007006054" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="BRADY CREEK BRIDGE" LIMITS_TO_DSCR="UNO STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="800000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.323 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007006056" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="CONCHO C/L" LIMITS_TO_DSCR="0.44 MI W. OF US 283" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1400000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.160 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007009003" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 570" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="US 87 IN WALL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="105830" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="112654.52" CE_SPENT_AMT="965.58" TOT_SPENT_AMT="113620.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="127145.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007101054" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="S. CHURCH ST" LIMITS_TO_DSCR="S. BRIDGE ST." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="649231" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/10/2018" PSE_100_ACTL_DT="9/13/2018" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.045 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/28/2018" DSGN_START_ACTL_DT="5/8/2018" ENVCLR_TRGT_DT="7/5/2018" ENVCLR_ACTL_DT="12/16/2016" UTIL_TRGT_DT="5/7/2018" UTIL_ACTL_DT="9/13/2018" ROW_TRGT_DT="5/1/2018" ROW_ACTL_DT="9/13/2018" RTL_TRGT_DT="9/17/2018" RTL_ACTL_DT="9/13/2018" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1080000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007101057" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007101059" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="BRADY CREEK BRIDGE" LIMITS_TO_DSCR="0.45  MI S OF SH 71" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="236279" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.221 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="264632.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007101060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR=".5 MI S OF SH 71" LIMITS_TO_DSCR="1 MI. N OF SAN SABA RIVER" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="864048" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.000 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="32.08" CNSTR_PCT_COMPLETE="45.42" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="400914.45" CE_SPENT_AMT="17.75" TOT_SPENT_AMT="400932.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="774082.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007101062" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007101063" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007102033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="1 MI N OF SAN SABA RIVER" LIMITS_TO_DSCR="MASON C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="801571" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.709 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="32.08" CNSTR_PCT_COMPLETE="45.42" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="372524.67" CE_SPENT_AMT="16.49" TOT_SPENT_AMT="372541.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="381469.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007103043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Mason" LIMITS_FROM_DSCR="KRAUSE RD" LIMITS_TO_DSCR="US 377" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1660742" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="33.33" CNSTR_PCT_COMPLETE="84.77" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/7/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/7/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/7/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="26757.84" CNSTR_SPENT_AMT="1520443.31" CE_SPENT_AMT="10547.80" TOT_SPENT_AMT="1557748.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1980045.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007104056" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Mason" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="MEYERS ST" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1215852" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/10/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="6/6/2024" CNSTR_PCT_TIME_USED="50.76" CNSTR_PCT_COMPLETE="104.72" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="12/27/2022" ENVCLR_TRGT_DT="7/10/2023" ENVCLR_ACTL_DT="2/2/2023" UTIL_TRGT_DT="7/10/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/10/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/10/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1309249.20" CE_SPENT_AMT="78066.49" TOT_SPENT_AMT="1387315.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1394528.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007104057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Mason" LIMITS_FROM_DSCR="RM 1723" LIMITS_TO_DSCR="DIVIDED SECTION" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3031735" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="3/7/2024" CNSTR_PCT_TIME_USED="97.56" CNSTR_PCT_COMPLETE="77.10" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12045.44" CNSTR_SPENT_AMT="2012723.12" CE_SPENT_AMT="46200.79" TOT_SPENT_AMT="2070969.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3873676.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007104058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007105030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Mason" LIMITS_FROM_DSCR="0.415 MI E OF RM 152" LIMITS_TO_DSCR="RM 2242" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4942754" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/24/2023" PSE_100_ACTL_DT="3/17/2023" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.181 (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="5/13/2024" CNSTR_PCT_TIME_USED="92.96" CNSTR_PCT_COMPLETE="90.09" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="6/20/2022" ENVCLR_ACTL_DT="6/20/2022" UTIL_TRGT_DT="2/24/2023" UTIL_ACTL_DT="3/3/2023" ROW_TRGT_DT="2/24/2023" ROW_ACTL_DT="3/3/2023" RTL_TRGT_DT="2/24/2023" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="15175.67" CNSTR_SPENT_AMT="4555660.12" CE_SPENT_AMT="149631.30" TOT_SPENT_AMT="4720467.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2850000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007106061" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="RM 648" LIMITS_TO_DSCR="BARONS CREEK" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3393331" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="3393331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007106062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 87" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="WEST US 290" LIMITS_TO_DSCR="EAST US 290" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2169194" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/10/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="6/6/2024" CNSTR_PCT_TIME_USED="50.76" CNSTR_PCT_COMPLETE="104.72" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="12/27/2022" ENVCLR_TRGT_DT="7/10/2023" ENVCLR_ACTL_DT="2/2/2023" UTIL_TRGT_DT="7/10/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/10/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/10/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22746.11" CNSTR_SPENT_AMT="2029117.70" CE_SPENT_AMT="120989.85" TOT_SPENT_AMT="2172853.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2569803.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007106063" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="BARONS CREEK" LIMITS_TO_DSCR="OLD MASON ROAD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2682852" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20699.21" TOT_SPENT_AMT="20699.21" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2682852.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007106064" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="OLD MASON ROAD" LIMITS_TO_DSCR="US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2991071" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/16/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2991071.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007201055" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="0.26 MI N OF RIVER RD" LIMITS_TO_DSCR="0.26 MI S OF RIVER RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="834755" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3592.35" TOT_SPENT_AMT="3592.35" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="934924.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007202021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Kendall" LIMITS_FROM_DSCR="GILLESPIE/KENDALL CL" LIMITS_TO_DSCR="KENDALL/KERR CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="185275" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.691 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="207508.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007203017" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Kerr" LIMITS_FROM_DSCR="KENDALL/KERR CL" LIMITS_TO_DSCR="KERR/KENDALL CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="171601" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="192194.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007203018" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Kerr" LIMITS_FROM_DSCR="KERR/KENDALL COUNTY LINE" LIMITS_TO_DSCR="KERR/KENDALL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65727" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.461 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="65727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007204036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Kendall" LIMITS_FROM_DSCR="KERR/KENDALL CL" LIMITS_TO_DSCR="IH 10 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="580872" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.194 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="650577.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205089" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="FM 473" LIMITS_TO_DSCR="CIBOLO CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26085495" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/2/2022" PSE_30_ACTL_DT="9/8/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="12/7/2022" PSE_100_TRGT_DT="11/1/2022" PSE_100_ACTL_DT="2/1/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.129 (mi)" TXDOT_CNTCT_NM="Andres Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="(830)257-8444" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="10/25/2023" CNSTR_WKBG_DT="11/27/2023" CNSTR_PCT_TIME_USED="87.90" CNSTR_PCT_COMPLETE="103.37" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="12/1/2023" ENVCLR_ACTL_DT="12/15/2022" UTIL_TRGT_DT="11/1/2022" UTIL_ACTL_DT="2/1/2023" ROW_TRGT_DT="11/1/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2023" RTL_ACTL_DT="2/1/2023" PE_SPENT_AMT="1912741.23" CNSTR_SPENT_AMT="27471178.04" CE_SPENT_AMT="1320678.32" TOT_SPENT_AMT="30704597.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="17239.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="290124.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT3_PID="PM" FUND_CAT3_AMT="52040.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT4_PID="PM" FUND_CAT4_AMT="65041.00" FUND_CAT5_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT5_PID="PM" FUND_CAT5_AMT="370269.00" FUND_CAT6_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT6_PID="PM" FUND_CAT6_AMT="98597.00" FUND_CAT7_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT7_PID="PM" FUND_CAT7_AMT="3427.00" FUND_CAT8_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT8_PID="PM" FUND_CAT8_AMT="148568.00" FUND_CAT9_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT9_PID="PM" FUND_CAT9_AMT="4073411.00" FUND_CAT10_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT10_PID="PM" FUND_CAT10_AMT="24953089.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205090" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="US 87B" LIMITS_TO_DSCR="IH 10 WBML" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="540940" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.253 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="5/2/2022" CNSTR_PCT_TIME_USED="97.12" CNSTR_PCT_COMPLETE="89.37" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/3/2021" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/3/2021" PE_SPENT_AMT="56611.05" CNSTR_SPENT_AMT="19872.61" CE_SPENT_AMT="353.62" TOT_SPENT_AMT="76837.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="14681.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205091" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="FM 289" LIMITS_TO_DSCR="US 87 B" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104001" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.100 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="5/2/2022" CNSTR_PCT_TIME_USED="97.12" CNSTR_PCT_COMPLETE="89.37" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/3/2021" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/3/2021" CNSTR_SPENT_AMT="125650.62" CE_SPENT_AMT="2356.48" TOT_SPENT_AMT="128007.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="203372.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205092" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="S OF GUADALUPE RIVER" LIMITS_TO_DSCR="JOSHUA RANCH ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74535" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.457 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="5/2/2022" CNSTR_PCT_TIME_USED="97.12" CNSTR_PCT_COMPLETE="89.37" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/3/2021" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/3/2021" CNSTR_SPENT_AMT="90468.48" CE_SPENT_AMT="1696.68" TOT_SPENT_AMT="92165.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="117878.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205093" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="S OR GUADALUPE RIVER" LIMITS_TO_DSCR="US 87 (COMFORT)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10984" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.545 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="5/2/2022" CNSTR_PCT_TIME_USED="97.12" CNSTR_PCT_COMPLETE="89.37" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/3/2021" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/3/2021" CNSTR_SPENT_AMT="13193.33" CE_SPENT_AMT="247.48" TOT_SPENT_AMT="13440.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="11011.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205094" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="US 87 (COMFORT)" LIMITS_TO_DSCR="FM 289" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="61365" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.110 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="5/2/2022" CNSTR_PCT_TIME_USED="97.12" CNSTR_PCT_COMPLETE="89.37" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/3/2021" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/3/2021" CNSTR_SPENT_AMT="74133.89" CE_SPENT_AMT="1390.36" TOT_SPENT_AMT="75524.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="75131.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205096" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="1.6 MI. WEST OF US 87" LIMITS_TO_DSCR="0.3 MI. EAST OF US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="321790" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="8/1/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="10/13/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/17/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.858 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="106.42" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="2/10/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="3/17/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="3/17/2023" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="3/17/2023" PE_SPENT_AMT="39605.61" CNSTR_SPENT_AMT="374092.82" CE_SPENT_AMT="40199.74" TOT_SPENT_AMT="453898.17" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="405852.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205099" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="0.25 MI. NORTH OF FM 289" LIMITS_TO_DSCR="CIBOLO CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="149863" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.819 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="167847.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007205101" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="1.8 MI. NORTH OF BLASCHKE RD." LIMITS_TO_DSCR="FM 473" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7000000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.627 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="7840000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007206082" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="SH 46" LIMITS_TO_DSCR="0.25 MI W. OF BEXAR/KENDALL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="110000000" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.128 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1835497.41" TOT_SPENT_AMT="1835497.41" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007206089" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="0.25 MI W. OF BEXAR/KENDALL COUNTY LINE" LIMITS_TO_DSCR="KENDALL/BEXAR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="980000" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.248 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007206091" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="FREDERICK CREEK BRIDGE" LIMITS_TO_DSCR="SCENIC LOOP RD." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="386320" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="8/1/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="10/13/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/17/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.002 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="106.42" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="2/10/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="3/17/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="3/17/2023" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="3/17/2023" CNSTR_SPENT_AMT="476378.02" CE_SPENT_AMT="44105.46" TOT_SPENT_AMT="520483.48" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="573375.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007206092" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="CIBOLO CREEK" LIMITS_TO_DSCR="IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="44563" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="49911.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007206093" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Kendall" LIMITS_FROM_DSCR="AT JOHNS RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="676000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="676000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007207075" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="KENDALL/BEXAR COUNTY LINE" LIMITS_TO_DSCR="FM 3351" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="129020000" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.324 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="164865.20" CE_SPENT_AMT="1767.31" TOT_SPENT_AMT="166632.51" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007207077" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT FM 3351 (RALPH FAIR ROAD)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3572000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.312 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="161723.58" TOT_SPENT_AMT="161723.58" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT1_AMT="3572000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT2_AMT="428640.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007208142" PT_PHASE="Feasibility Studies" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SL 1604" LIMITS_TO_DSCR="SL 345" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="750000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TBD" PROJ_LENGTH="2.978 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2722516.32" TOT_SPENT_AMT="2722516.32" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007208144" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT LP 1604 NORTH" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/13/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="407303740" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="12/1/2020" PSE_30_ACTL_DT="1/4/2021" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="5/3/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="11/1/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.802 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="6/29/2022" CNSTR_WKBG_DT="7/13/2022" CNSTR_PCT_TIME_USED="60.52" CNSTR_PCT_COMPLETE="62.76" DSGN_START_TRGT_DT="2/3/2020" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="8/3/2021" ENVCLR_ACTL_DT="2/4/2021" UTIL_TRGT_DT="6/1/2021" UTIL_ACTL_DT="11/1/2021" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="11/1/2021" RTL_TRGT_DT="8/3/2021" RTL_ACTL_DT="11/1/2021" PE_SPENT_AMT="18533417.08" CNSTR_SPENT_AMT="256394909.32" CE_SPENT_AMT="11120906.54" TOT_SPENT_AMT="286049232.94" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="17000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="108084940.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007208148" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 345" CNTY_NM="Bexar" LIMITS_FROM_DSCR="DATAPOINT DR." LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="948661" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.601 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_AMT="1062500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007212191" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.1 MI EAST OF HILDERBRAND" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18155195" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="5/3/2021" PSE_30_ACTL_DT="5/3/2021" PSE_60_TRGT_DT="9/1/2021" PSE_60_ACTL_DT="9/1/2021" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="4/29/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.004 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="11/9/2022" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="58.55" CNSTR_PCT_COMPLETE="52.01" DSGN_START_TRGT_DT="9/1/2020" DSGN_START_ACTL_DT="9/1/2020" ENVCLR_TRGT_DT="4/11/2022" ENVCLR_ACTL_DT="4/11/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" PE_SPENT_AMT="840118.62" CNSTR_SPENT_AMT="7002785.31" CE_SPENT_AMT="1273583.41" TOT_SPENT_AMT="9116487.34" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="5762678.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="10246078.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="2014667.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007212199" PT_PHASE="Feasibility Studies" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 345" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2750000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Feasibility Study To Determine Future Transportation Envelope And Operational Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TBD" PROJ_LENGTH="11.109 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="460.79" TOT_SPENT_AMT="460.79" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="2750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007212201" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="CROSSROADS" LIMITS_TO_DSCR="SP 421 (CULEBRA RD.)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8079917" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.067 (mi)" TXDOT_CNTCT_NM="Carlos Arcila, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5809" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.23" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="293762.01" CNSTR_SPENT_AMT="15769.60" CE_SPENT_AMT="12792.35" TOT_SPENT_AMT="322323.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8062931.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007212202" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT FRESNO STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="361440" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.155 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="361440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302080" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="FM 1937" LIMITS_TO_DSCR="2.6 MI SOUTH OF FM 1937" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4316413" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/1/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="2/1/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/15/2021" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.600 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="SALINAS CONSTRUCTION TECHNOLOGIES, LTD." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="11/15/2021" CNSTR_PCT_TIME_USED="117.37" CNSTR_PCT_COMPLETE="88.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="3/3/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/2/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/15/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/15/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="4/2/2021" PE_SPENT_AMT="50225.07" CNSTR_SPENT_AMT="5225105.27" CE_SPENT_AMT="404777.97" TOT_SPENT_AMT="5680108.31" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302082" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="SAVA ST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1961005" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.650 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="ELECNOR BELCO ELECTRIC, INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="82.40" CNSTR_PCT_COMPLETE="50.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="49357.97" CNSTR_SPENT_AMT="1169220.12" CE_SPENT_AMT="169810.74" TOT_SPENT_AMT="1388388.83" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3498795.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302083" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.1 MI NORTH OF SOCORRO" LIMITS_TO_DSCR="0.1 MI SOUTH OF SOCORRO" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="419952" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="ELECNOR BELCO ELECTRIC, INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="82.40" CNSTR_PCT_COMPLETE="50.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="22950.00" CE_SPENT_AMT="38678.14" TOT_SPENT_AMT="61628.14" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="496514.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302084" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.3 MI NORTH OF JANET GALE" LIMITS_TO_DSCR="0.15 SOUTH OF JANET GALE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1732940" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/7/2022" PSE_30_ACTL_DT="12/7/2022" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.450 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="LCR TOTAL TRANSPORT LLC" CNSTR_NTPD_DT="10/31/2024" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="56.12" CNSTR_PCT_COMPLETE="38.30" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="663684.48" CE_SPENT_AMT="24411.23" TOT_SPENT_AMT="688095.71" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1327812.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="MARTHA RD." LIMITS_TO_DSCR="BEXAR/ATASCOSA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="241699" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.523 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="ROADWAY SPECIALTIES, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="3/14/2025" CNSTR_PCT_TIME_USED="39.18" CNSTR_PCT_COMPLETE="88.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5975.26" CNSTR_SPENT_AMT="213139.79" CE_SPENT_AMT="972.93" TOT_SPENT_AMT="220087.98" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="85131.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302090" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="FM 2537" LIMITS_TO_DSCR="JANET GALE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="841018" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.706 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="841018.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="FM 1937" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9200000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="10304000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007302092" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2068.37" TOT_SPENT_AMT="2068.37" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007303065" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="300' SOUTH OF SH 97 EAST" LIMITS_TO_DSCR="900' SOUTH OF SH 97 EAST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="70000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2408RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="70000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007303069" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="BEXAR/ATASCOSA CL" LIMITS_TO_DSCR="SP 242" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1070830" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.810 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1199330.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007303070" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="180 FT. SOUTH OF SANCHEZ AVE." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="316564" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.005 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="6401.11" TOT_SPENT_AMT="6401.11" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2308RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007303071" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="SH 97" LIMITS_TO_DSCR="FM 1334" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1491158" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.069 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3433.88" TOT_SPENT_AMT="3433.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1670096.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007303072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="BEXAR/ATASCOSA COUNTY LINE" LIMITS_TO_DSCR="FM 3006" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="876706" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.059 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="ROADWAY SPECIALTIES, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="3/14/2025" CNSTR_PCT_TIME_USED="39.18" CNSTR_PCT_COMPLETE="88.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="330.72" CNSTR_SPENT_AMT="775784.67" CE_SPENT_AMT="10792.15" TOT_SPENT_AMT="786907.54" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1333974.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007304050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="FM 1334" LIMITS_TO_DSCR="IH 37" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="217870" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.607 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="226332.69" CE_SPENT_AMT="1704.01" TOT_SPENT_AMT="228036.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="259008.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007304051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="SOUTH OF EUROSTAR DR." LIMITS_TO_DSCR="IH 37" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="353757" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.139 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="ROADWAY SPECIALTIES, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="3/14/2025" CNSTR_PCT_TIME_USED="39.18" CNSTR_PCT_COMPLETE="88.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="297.23" CNSTR_SPENT_AMT="310291.40" CE_SPENT_AMT="4587.51" TOT_SPENT_AMT="315176.14" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="681913.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007305074" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="0.8 MI. N OF FM 791" LIMITS_TO_DSCR="0.6 MI. N OF PULLIN RD." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="207724" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.293 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="207724.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007306049" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="LIVE OAK COUNTY LINE" LIMITS_TO_DSCR="0.8 MI. N OF FM 791" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135211" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.387 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="135211.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007307002" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="AT INTERSECTION OF IH37/FM2049" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="593371" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.050 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="630335.59" CE_SPENT_AMT="22969.29" TOT_SPENT_AMT="653304.88" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="455000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007307065" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="US 281 INTERS." LIMITS_TO_DSCR="ATASCOSA COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="55000000" DIST_LET_DATE="5/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Additional Travel Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TBD" PROJ_LENGTH="11.100 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="55000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007307068" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="ON IH37 AT NB &amp; SB RESTAREAS" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/13/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1030452" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SRA" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/6/2022" PSE_100_ACTL_DT="4/28/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.468 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="SALINAS CONSTRUCTION TECHNOLOGIES, LTD." CNSTR_NTPD_DT="8/11/2022" CNSTR_WKBG_DT="9/20/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="114.84" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="5/11/2022" ENVCLR_ACTL_DT="4/11/2022" UTIL_TRGT_DT="5/11/2022" UTIL_ACTL_DT="4/28/2022" ROW_TRGT_DT="5/11/2022" ROW_ACTL_DT="4/28/2022" RTL_TRGT_DT="5/11/2022" RTL_ACTL_DT="4/28/2022" PE_SPENT_AMT="3356.99" CNSTR_SPENT_AMT="1314043.00" CE_SPENT_AMT="151183.81" TOT_SPENT_AMT="1468583.80" FUND_CAT1_DSCR="Category 9 - Transportation Alternative Program (TAP), STP-Flex (2209FX)" FUND_CAT1_PID="SW" FUND_CAT1_AMT="600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007307071" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="ATASCOSA COUNTY LINE" LIMITS_TO_DSCR="3.9 MILES NORTH OF SH 72" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6063315" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="7/9/2024" CNSTR_PCT_TIME_USED="77.63" CNSTR_PCT_COMPLETE="39.25" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35389.76" CNSTR_SPENT_AMT="2603919.92" CE_SPENT_AMT="74740.05" TOT_SPENT_AMT="2714049.73" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="9000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308183" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="LP 13" LIMITS_TO_DSCR="IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20700000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.161 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="564680.04" TOT_SPENT_AMT="564680.04" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="2175000.00" FUND_CAT2_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2605)" FUND_CAT2_AMT="18525000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT3_AMT="828000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308198" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT BASSE RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8300000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.707 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308199" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT JONES MALTSBERGER SOUTH" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.588 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308200" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.25 MILES S OF S NEW BRAUNFELS AVE" LIMITS_TO_DSCR="  S NEW BRAUNFELS AVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="164889" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="4/9/2020" PSE_30_ACTL_DT="4/9/2020" PSE_60_TRGT_DT="4/15/2020" PSE_60_ACTL_DT="4/15/2020" PSE_100_TRGT_DT="5/8/2020" PSE_100_ACTL_DT="5/8/2020" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.249 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="10/21/2020" CNSTR_WKBG_DT="11/16/2020" CNSTR_PCT_TIME_USED="65.71" CNSTR_PCT_COMPLETE="100.15" DSGN_START_TRGT_DT="2/14/2020" DSGN_START_ACTL_DT="2/14/2020" ENVCLR_TRGT_DT="7/1/2020" ENVCLR_ACTL_DT="6/24/2020" UTIL_TRGT_DT="5/8/2020" UTIL_ACTL_DT="5/8/2020" ROW_TRGT_DT="5/8/2020" ROW_ACTL_DT="5/8/2020" RTL_TRGT_DT="7/1/2020" RTL_ACTL_DT="6/24/2020" PE_SPENT_AMT="8087.04" CNSTR_SPENT_AMT="164404.92" CE_SPENT_AMT="26436.54" TOT_SPENT_AMT="198928.50" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308201" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="LP 13" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="506855" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="2/1/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="4/1/2022" PSE_100_TRGT_DT="6/1/2022" PSE_100_ACTL_DT="6/10/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.287 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="D&amp;G ENERGY CORPORATION" CNSTR_NTPD_DT="4/25/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="65.63" CNSTR_PCT_COMPLETE="100.17" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="10/28/2022" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="6/10/2022" ROW_TRGT_DT="6/1/2022" ROW_ACTL_DT="6/10/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="11/1/2022" PE_SPENT_AMT="50.73" CNSTR_SPENT_AMT="507415.00" CE_SPENT_AMT="3085.50" TOT_SPENT_AMT="510551.23" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="719775.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308202" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="E OLMOS DR" LIMITS_TO_DSCR="PEARL PKWY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="239268" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.460 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="91.29" CNSTR_PCT_COMPLETE="105.02" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="552479.27" CE_SPENT_AMT="2700.77" TOT_SPENT_AMT="555180.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="393876.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308203" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.38 MILES NORTH OF IH 410" LIMITS_TO_DSCR="0.5 MILES SOUTH OF IH 410" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="880181" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="1/31/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="4/1/2022" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="4/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.100 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="10/20/2022" CNSTR_PCT_TIME_USED="34.71" CNSTR_PCT_COMPLETE="91.16" DSGN_START_TRGT_DT="12/15/2021" DSGN_START_ACTL_DT="12/15/2021" ENVCLR_TRGT_DT="7/1/2022" ENVCLR_ACTL_DT="6/10/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="4/4/2022" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="4/4/2022" RTL_TRGT_DT="7/1/2022" RTL_ACTL_DT="6/10/2022" PE_SPENT_AMT="9441.37" CNSTR_SPENT_AMT="821069.77" CE_SPENT_AMT="89248.22" TOT_SPENT_AMT="919759.36" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="981927.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308205" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="IH 410" LIMITS_TO_DSCR="0.54 MI N. OF SOUTHTON RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="280950" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/10/2022" PSE_30_ACTL_DT="11/10/2022" PSE_60_TRGT_DT="11/11/2022" PSE_60_ACTL_DT="11/11/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="1/12/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.103 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="ELECNOR BELCO ELECTRIC, INC." CNSTR_NTPD_DT="8/11/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="81.58" CNSTR_PCT_COMPLETE="101.12" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="4/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2023" UTIL_ACTL_DT="1/12/2023" ROW_TRGT_DT="2/1/2023" ROW_ACTL_DT="1/12/2023" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4210.66" CNSTR_SPENT_AMT="837345.00" CE_SPENT_AMT="1780.88" TOT_SPENT_AMT="843336.54" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="447393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308206" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT IH 10" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="725295" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="1/12/2023" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="1/12/2023" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="2/27/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.644 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="APEX LANDSCAPE &amp; IRRIGATION, LLC" CNSTR_NTPD_DT="6/21/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="81.07" CNSTR_PCT_COMPLETE="85.16" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/24/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/27/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/27/2023" RTL_TRGT_DT="TBD" RTL_ACTL_DT="3/24/2023" PE_SPENT_AMT="434.74" CNSTR_SPENT_AMT="590046.54" CE_SPENT_AMT="62752.30" TOT_SPENT_AMT="653233.58" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="856533.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308210" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 281" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT JONES MALTSBERGER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3876.73" TOT_SPENT_AMT="3876.73" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="11200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007308212" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309035" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="S FLORES ROAD" LIMITS_TO_DSCR="SAN ANTONIO RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53226" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.522 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="52932.53" CE_SPENT_AMT="858.93" TOT_SPENT_AMT="53791.46" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="42585.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309036" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SAN ANTONIO RIVER" LIMITS_TO_DSCR="SOUTHTON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75260" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.291 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="75253.50" CE_SPENT_AMT="1221.16" TOT_SPENT_AMT="76474.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="108486.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309037" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR=".82 MI S OF LP 1604" LIMITS_TO_DSCR="SAN ANTONIO RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65844" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.457 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="65687.39" CE_SPENT_AMT="1065.84" TOT_SPENT_AMT="66753.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="62825.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309038" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="SAN ANTONIO RIVER" LIMITS_TO_DSCR="DONUP ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="22212" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.626 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="21683.22" CE_SPENT_AMT="351.94" TOT_SPENT_AMT="22035.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="33032.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309039" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="DONUP ROAD" LIMITS_TO_DSCR="SOUTHTON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="31423" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="4/1/2021" PSE_30_ACTL_DT="4/1/2021" PSE_60_TRGT_DT="4/2/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/3/2021" PSE_100_ACTL_DT="6/1/2021" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.115 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="7/21/2022" CNSTR_PCT_TIME_USED="86.02" CNSTR_PCT_COMPLETE="91.01" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="8/6/2021" ENVCLR_ACTL_DT="8/2/2021" UTIL_TRGT_DT="6/3/2021" UTIL_ACTL_DT="6/1/2021" ROW_TRGT_DT="6/3/2021" ROW_ACTL_DT="6/1/2021" RTL_TRGT_DT="8/6/2021" RTL_ACTL_DT="8/2/2021" CNSTR_SPENT_AMT="31249.34" CE_SPENT_AMT="507.17" TOT_SPENT_AMT="31756.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="47281.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309040" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.3 MILES S OF HARDY ROAD" LIMITS_TO_DSCR="0.2 MILES N OF HARDY ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="292836" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="7/1/2020" PSE_30_ACTL_DT="7/1/2020" PSE_60_TRGT_DT="8/3/2020" PSE_60_ACTL_DT="8/3/2020" PSE_100_TRGT_DT="9/4/2020" PSE_100_ACTL_DT="9/4/2020" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.500 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="3/5/2021" CNSTR_WKBG_DT="4/19/2021" CNSTR_PCT_TIME_USED="75.93" CNSTR_PCT_COMPLETE="100.00" DSGN_START_TRGT_DT="5/1/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="11/2/2020" ENVCLR_ACTL_DT="10/26/2020" UTIL_TRGT_DT="9/4/2020" UTIL_ACTL_DT="9/4/2020" ROW_TRGT_DT="9/4/2020" ROW_ACTL_DT="9/4/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="10/26/2020" PE_SPENT_AMT="22039.95" CNSTR_SPENT_AMT="293376.82" CE_SPENT_AMT="56050.32" TOT_SPENT_AMT="371467.09" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="330000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309041" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="0.54 MI N. OF SOUTHTON RD" LIMITS_TO_DSCR="SOUTHTON RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="177900" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/10/2022" PSE_30_ACTL_DT="11/10/2022" PSE_60_TRGT_DT="11/11/2022" PSE_60_ACTL_DT="11/11/2022" PSE_100_TRGT_DT="2/1/2023" PSE_100_ACTL_DT="1/12/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.546 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="ELECNOR BELCO ELECTRIC, INC." CNSTR_NTPD_DT="8/11/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="81.58" CNSTR_PCT_COMPLETE="101.12" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="4/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2023" UTIL_ACTL_DT="1/12/2023" ROW_TRGT_DT="2/1/2023" ROW_ACTL_DT="1/12/2023" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="148.72" CNSTR_SPENT_AMT="-318450.00" CE_SPENT_AMT="50.83" TOT_SPENT_AMT="-318250.45" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="115000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309043" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT FM 536" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007309044" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Bexar" LIMITS_FROM_DSCR="AT HARDY RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007310053" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="US 281" LIMITS_TO_DSCR="BEXAR/ ATASCOSA COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26832600" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.906 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="787246.08" TOT_SPENT_AMT="787246.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="27905904.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007310060" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="0.3 MI. NORTH OF US 281" LIMITS_TO_DSCR="0.15 MI. NORTH OF SH 97" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="815382" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="8/1/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="10/13/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/17/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.769 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="106.42" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="2/10/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="3/17/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="3/17/2023" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="3/17/2023" PE_SPENT_AMT="133.68" CNSTR_SPENT_AMT="814203.65" CE_SPENT_AMT="95202.14" TOT_SPENT_AMT="909539.47" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1265485.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007310061" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="0.55 MI. SOUTH OF FM 3006" LIMITS_TO_DSCR="ATASCOSA/BEXAR COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="880693" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2022" PSE_30_ACTL_DT="8/1/2022" PSE_60_TRGT_DT="1/2/2023" PSE_60_ACTL_DT="10/13/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/17/2023" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.289 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="106.42" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="2/10/2023" UTIL_TRGT_DT="3/1/2023" UTIL_ACTL_DT="3/17/2023" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="3/17/2023" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="3/17/2023" PE_SPENT_AMT="721.75" CNSTR_SPENT_AMT="893855.25" CE_SPENT_AMT="104265.25" TOT_SPENT_AMT="998842.25" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1154950.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007310066" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="0.6 MI. N OF PULLIN RD." LIMITS_TO_DSCR="0.5 MI S OF COUGHRAN RD." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58715" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.438 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9126.71" TOT_SPENT_AMT="9126.71" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="58715.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007310067" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="AT FM 536" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007310068" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="CRANE RD." LIMITS_TO_DSCR="FM 3006" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6084759" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="175230.28" TOT_SPENT_AMT="175230.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="6084759.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007313012" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="AT ATASCOSA RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4880363" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.168 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="1/21/2025" CNSTR_PCT_TIME_USED="21.65" CNSTR_PCT_COMPLETE="22.53" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="889110.14" CNSTR_SPENT_AMT="1100533.22" CE_SPENT_AMT="54499.40" TOT_SPENT_AMT="2044142.76" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="5195540.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007313014" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="AT LIPAN CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.121 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007313015" PT_PHASE="Construction begins within 4 years" HWY_NBR="UA 281" CNTY_NM="Atascosa" LIMITS_FROM_DSCR="IH 37" LIMITS_TO_DSCR="LIVE OAK C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="593223" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.606 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="664410.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007314008" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 281" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="ON UA281 .5 MI N OF FM99" LIMITS_TO_DSCR=".5 MI S OF FM99" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/17/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="71944" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/15/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="10/17/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/31/2023" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.966 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="MALDONADO-BURKETT, LLP" CNSTR_NTPD_DT="7/20/2023" CNSTR_WKBG_DT="3/4/2024" CNSTR_PCT_TIME_USED="71.74" CNSTR_PCT_COMPLETE="97.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="3/10/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/10/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/31/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/31/2023" RTL_TRGT_DT="TBD" RTL_ACTL_DT="3/31/2023" PE_SPENT_AMT="30072.62" CNSTR_SPENT_AMT="69095.61" CE_SPENT_AMT="11055.13" TOT_SPENT_AMT="110223.36" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="110049.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007314009" PT_PHASE="Construction underway or begins soon" HWY_NBR="UA 281" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="IH 37" LIMITS_TO_DSCR="ATASCOSA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="728539" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/3/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.050 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="3/6/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="107.32" CNSTR_PCT_COMPLETE="93.56" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="6/2/2021" ENVCLR_TRGT_DT="8/8/2022" ENVCLR_ACTL_DT="6/18/2021" UTIL_TRGT_DT="8/8/2022" UTIL_ACTL_DT="8/5/2022" ROW_TRGT_DT="8/8/2022" ROW_ACTL_DT="8/5/2022" RTL_TRGT_DT="8/8/2022" RTL_ACTL_DT="8/5/2022" PE_SPENT_AMT="9074.13" CNSTR_SPENT_AMT="711500.73" CE_SPENT_AMT="5260.86" TOT_SPENT_AMT="725835.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="725326.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401002" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="AT INTERSECTION OF IH37/CR 207" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="223361" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="192590.16" CE_SPENT_AMT="8232.43" TOT_SPENT_AMT="200822.59" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="260000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401054" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="NORTH OF US59 INTERS." LIMITS_TO_DSCR="US 281 INTERS." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82000000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Additional Travel Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="15.400 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="82000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401056" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="US 281" LIMITS_TO_DSCR="SH 72" PRJ_TIER="" ENERGY="" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1600000" DIST_LET_DATE="5/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.604 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401059" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="FM 799" LIMITS_TO_DSCR="SH 72" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="588245" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/3/2022" PSE_100_ACTL_DT="8/12/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.404 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="143.24" CNSTR_PCT_COMPLETE="91.60" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="5/2/2022" ENVCLR_TRGT_DT="8/8/2022" ENVCLR_ACTL_DT="7/21/2022" UTIL_TRGT_DT="8/8/2022" UTIL_ACTL_DT="7/21/2022" ROW_TRGT_DT="8/8/2022" ROW_ACTL_DT="7/21/2022" RTL_TRGT_DT="8/8/2022" RTL_ACTL_DT="7/21/2022" PE_SPENT_AMT="230.13" CNSTR_SPENT_AMT="564013.59" CE_SPENT_AMT="12960.97" TOT_SPENT_AMT="577204.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="759200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401060" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="SH 72" LIMITS_TO_DSCR="US 281" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="366010" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.546 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="82.61" CNSTR_PCT_COMPLETE="100.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="27988.08" CE_SPENT_AMT="2385.40" TOT_SPENT_AMT="30373.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="482021.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401061" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="FM 1358" LIMITS_TO_DSCR="US 281 (CONTROL BREAK)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="672998" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.523 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="327577.74" CE_SPENT_AMT="3154.62" TOT_SPENT_AMT="330732.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="634400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007401062" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="3.9 MILES NORTH OF SH 72" LIMITS_TO_DSCR="0.5 MILES NORTH OF US 59" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14385828" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="12/2/2024" CNSTR_PCT_TIME_USED="29.18" CNSTR_PCT_COMPLETE="17.41" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="76368.50" CNSTR_SPENT_AMT="2504880.03" CE_SPENT_AMT="38692.16" TOT_SPENT_AMT="2619940.69" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="17195455.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402001" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="AT INTERSECTION OF IH37/CR 356" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="237182" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.065 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="196035.08" CE_SPENT_AMT="8860.03" TOT_SPENT_AMT="204895.11" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="265000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402002" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="AT INTERSECTION OF IH37/CR 350" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="430880" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.067 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="204785.53" CE_SPENT_AMT="16993.29" TOT_SPENT_AMT="221778.82" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="370000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402078" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="SAN PATRICIO COUNTY LINE" LIMITS_TO_DSCR="NORTH OF US59/IH37 INTERS." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92000000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Additional Travel Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="17.785 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="92000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402082" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="0.5 MILES NORTH OF US 59" LIMITS_TO_DSCR="SAN PATRICIO COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13060729" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="6/26/2024" CNSTR_WKBG_DT="8/6/2024" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="52.22" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13475.52" CNSTR_SPENT_AMT="6886814.75" CE_SPENT_AMT="114640.08" TOT_SPENT_AMT="7014930.35" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="15704346.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402083" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="FM799SOUTH" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4604111" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4788275.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402084" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="FM 534" LIMITS_TO_DSCR="CR 356" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="267512" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="299613.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007402085" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="EXIT @ FM 3024" LIMITS_TO_DSCR="FM 799 SOUTH" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="266178" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="298119.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007403001" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="AT INTERSECTION OF IH37/FM3377" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="275700" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.070 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="218449.61" CE_SPENT_AMT="11058.71" TOT_SPENT_AMT="229508.32" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007403044" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="NORTH OF SH188 (CONTROL BREAK)" LIMITS_TO_DSCR="LIVE OAK COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29000000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Additional Travel Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.470 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="29000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007403047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR=".4 MI S OF SS459" LIMITS_TO_DSCR=".45 MI N OF SS 459" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="530617" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="1/24/2020" PSE_30_ACTL_DT="1/24/2020" PSE_60_TRGT_DT="3/13/2020" PSE_60_ACTL_DT="3/13/2020" PSE_100_TRGT_DT="5/15/2020" PSE_100_ACTL_DT="5/15/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.826 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/8/2020" CNSTR_WKBG_DT="1/29/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.34" DSGN_START_TRGT_DT="11/1/2019" DSGN_START_ACTL_DT="11/1/2019" ENVCLR_TRGT_DT="4/29/2020" ENVCLR_ACTL_DT="4/29/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/15/2020" RTL_ACTL_DT="5/15/2020" PE_SPENT_AMT="64087.24" CNSTR_SPENT_AMT="568384.97" CE_SPENT_AMT="30976.46" TOT_SPENT_AMT="663448.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="266369.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007403049" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SS 459" LIMITS_TO_DSCR="0.45 MI SOUTH OF SS 459" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="700000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="46285.15" TOT_SPENT_AMT="46285.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007404043" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SOUTH OF SH188 (CONTROL BREAK)" LIMITS_TO_DSCR="NORTH OF SH188 (CONTROL BREAK)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25000000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Additional Travel Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.480 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="25000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007404045" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR=".5 MI S OF SS 459" LIMITS_TO_DSCR=".4 MI S OF SS 459 CONTROL BREAK" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19184" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="1/24/2020" PSE_30_ACTL_DT="1/24/2020" PSE_60_TRGT_DT="3/13/2020" PSE_60_ACTL_DT="3/13/2020" PSE_100_TRGT_DT="5/15/2020" PSE_100_ACTL_DT="5/15/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.056 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="9/8/2020" CNSTR_WKBG_DT="1/29/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.34" DSGN_START_TRGT_DT="11/1/2019" DSGN_START_ACTL_DT="11/1/2019" ENVCLR_TRGT_DT="4/29/2020" ENVCLR_ACTL_DT="4/29/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/15/2020" RTL_ACTL_DT="5/15/2020" CNSTR_SPENT_AMT="23778.13" CE_SPENT_AMT="1207.25" TOT_SPENT_AMT="24985.38" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="17002.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007404047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 188" LIMITS_TO_DSCR="0.47 MI SOUTH OF SH 188 (CONTROL BREAK)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="493249" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/18/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/12/2023" CNSTR_WKBG_DT="10/31/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.52" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/20/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="452670.53" CE_SPENT_AMT="5221.94" TOT_SPENT_AMT="457892.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="731977.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007404048" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 188" LIMITS_TO_DSCR="0.45 MI SOUTH OF SS 459" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="80137.44" TOT_SPENT_AMT="80137.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007405098" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="NUECES RIVER (CB)" LIMITS_TO_DSCR="IH37/US 77 INTERCHANGE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/23/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21739733" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="6/18/2019" PSE_30_ACTL_DT="6/18/2019" PSE_60_TRGT_DT="12/12/2019" PSE_60_ACTL_DT="12/12/2019" PSE_100_TRGT_DT="6/19/2020" PSE_100_ACTL_DT="6/19/2020" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.520 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="7/14/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="64.68" CNSTR_PCT_COMPLETE="87.18" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="3/20/2020" UTIL_TRGT_DT="5/15/2020" UTIL_ACTL_DT="5/15/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/12/2021" RTL_ACTL_DT="3/12/2021" PE_SPENT_AMT="7870182.40" CNSTR_SPENT_AMT="24194368.77" CE_SPENT_AMT="2406630.02" TOT_SPENT_AMT="34471181.19" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="16773509.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="5226491.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007405099" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="IH37/US77 INTERCHANGE" LIMITS_TO_DSCR="SOUTH OF SH188 (CONTROL BREAK)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="71000000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Additional Travel Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="13.802 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="71000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007405102" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="0.47 MI SOUTH OF SH 188 (CONTROL BREAK)" LIMITS_TO_DSCR="CR 40" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5538173" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/18/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.925 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="10/12/2023" CNSTR_WKBG_DT="10/31/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.52" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/20/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="193630.13" CNSTR_SPENT_AMT="5477400.11" CE_SPENT_AMT="81342.27" TOT_SPENT_AMT="5752372.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="7923600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007405103" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 234" LIMITS_TO_DSCR="FM 630" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4250000" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="143455.39" TOT_SPENT_AMT="143455.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007405104" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 234" LIMITS_TO_DSCR="COOPER RD (CR54)" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3400000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="273814.93" TOT_SPENT_AMT="273814.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="3536000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406001" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. OF IH37/CALLICOTE RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="247373" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.115 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="239594.85" CE_SPENT_AMT="10127.90" TOT_SPENT_AMT="249722.75" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="265000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406002" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. OF IH37/VIOLET RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="233910" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.149 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="282100.78" CE_SPENT_AMT="9841.43" TOT_SPENT_AMT="291942.21" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="235000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406003" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. OF IH37/CARBON PLANT RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="277052" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.208 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="282065.19" CE_SPENT_AMT="11398.10" TOT_SPENT_AMT="293463.29" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406005" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. OF IH37/SUNTIDE RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="274344" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.127 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="244781.13" CE_SPENT_AMT="11116.56" TOT_SPENT_AMT="255897.69" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="305000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406006" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. OF IH37/ CLARKWOOD RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="476761" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.161 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" CNSTR_SPENT_AMT="424190.11" CE_SPENT_AMT="19507.50" TOT_SPENT_AMT="443697.61" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="510000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406007" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. IH37/SOUTHERN MINERALS" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="476473" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/10/2020" PSE_100_ACTL_DT="11/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.128 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="LUCANIA CONSTRUCTION LLC" CNSTR_NTPD_DT="3/1/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="84.86" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="12/2/2020" ENVCLR_ACTL_DT="7/29/2020" UTIL_TRGT_DT="11/16/2020" UTIL_ACTL_DT="11/10/2020" ROW_TRGT_DT="11/16/2020" ROW_ACTL_DT="11/10/2020" RTL_TRGT_DT="12/2/2020" RTL_ACTL_DT="11/10/2020" PE_SPENT_AMT="1803.53" CNSTR_SPENT_AMT="404709.63" CE_SPENT_AMT="19193.60" TOT_SPENT_AMT="425706.76" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_AMT="530000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406230" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="FM 1694_(CALLICOATE RD)" LIMITS_TO_DSCR="RED BIRD LANE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/15/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4906044" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="8/28/2018" PSE_30_ACTL_DT="8/28/2018" PSE_60_TRGT_DT="10/15/2018" PSE_60_ACTL_DT="10/15/2018" PSE_100_TRGT_DT="12/8/2020" PSE_100_ACTL_DT="9/27/2019" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.247 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="1/14/2020" CNSTR_WKBG_DT="3/23/2020" CNSTR_PCT_TIME_USED="105.49" CNSTR_PCT_COMPLETE="101.00" DSGN_START_TRGT_DT="1/2/2018" DSGN_START_ACTL_DT="1/2/2018" ENVCLR_TRGT_DT="2/16/2021" ENVCLR_ACTL_DT="9/18/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/16/2021" RTL_ACTL_DT="9/27/2019" PE_SPENT_AMT="236807.39" CNSTR_SPENT_AMT="5045335.29" CE_SPENT_AMT="175762.84" TOT_SPENT_AMT="5457905.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="6500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406241" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="REDBIRD LN. (OVERPASS)" LIMITS_TO_DSCR="NUECES RIVER_(CB)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59711872" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="6/18/2019" PSE_30_ACTL_DT="6/18/2019" PSE_60_TRGT_DT="12/12/2019" PSE_60_ACTL_DT="12/12/2019" PSE_100_TRGT_DT="6/19/2020" PSE_100_ACTL_DT="6/19/2020" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.769 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="7/14/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="64.68" CNSTR_PCT_COMPLETE="87.18" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="3/20/2020" UTIL_TRGT_DT="5/15/2020" UTIL_ACTL_DT="5/15/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/12/2021" RTL_ACTL_DT="3/12/2021" PE_SPENT_AMT="5563531.89" CNSTR_SPENT_AMT="54551771.19" CE_SPENT_AMT="7125216.59" TOT_SPENT_AMT="67240519.67" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="33000000.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_PID="017" FUND_CAT2_AMT="15000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406242" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT IH37/I69E INTERCHANGE" LIMITS_TO_DSCR="ON EXIT 14A" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/15/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1936043" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/28/2018" PSE_30_ACTL_DT="8/28/2018" PSE_60_TRGT_DT="10/15/2018" PSE_60_ACTL_DT="10/15/2018" PSE_100_TRGT_DT="12/8/2020" PSE_100_ACTL_DT="9/27/2019" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.351 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="1/14/2020" CNSTR_WKBG_DT="3/23/2020" CNSTR_PCT_TIME_USED="105.49" CNSTR_PCT_COMPLETE="101.00" DSGN_START_TRGT_DT="1/2/2018" DSGN_START_ACTL_DT="1/2/2018" ENVCLR_TRGT_DT="2/16/2021" ENVCLR_ACTL_DT="9/18/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/16/2021" RTL_ACTL_DT="9/27/2019" PE_SPENT_AMT="618831.88" CNSTR_SPENT_AMT="2510876.45" CE_SPENT_AMT="60367.24" TOT_SPENT_AMT="3190075.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="1200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406247" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT INTERS. IH37/SH 286" LIMITS_TO_DSCR="1.7 MI S OF SH358/IH37 INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2200000" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="10/24/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/17/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.908 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="9/3/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/3/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/3/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/3/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2288000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406249" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="RED BIRD LANE" LIMITS_TO_DSCR="NUECES RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/23/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2539142" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="6/18/2019" PSE_30_ACTL_DT="6/18/2019" PSE_60_TRGT_DT="12/12/2019" PSE_60_ACTL_DT="12/12/2019" PSE_100_TRGT_DT="6/19/2020" PSE_100_ACTL_DT="6/19/2020" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.772 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="7/14/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="64.68" CNSTR_PCT_COMPLETE="87.18" DSGN_START_TRGT_DT="2/1/2018" DSGN_START_ACTL_DT="2/1/2018" ENVCLR_TRGT_DT="3/20/2020" ENVCLR_ACTL_DT="3/20/2020" UTIL_TRGT_DT="5/15/2020" UTIL_ACTL_DT="5/15/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/12/2021" RTL_ACTL_DT="3/12/2021" PE_SPENT_AMT="8459.36" CNSTR_SPENT_AMT="639774.37" CE_SPENT_AMT="292416.75" TOT_SPENT_AMT="940650.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406252" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="AT IH 37/SH 358 INTERCHANGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="107000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406253" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Nueces" LIMITS_FROM_DSCR="TANCHAHUA ST." LIMITS_TO_DSCR="BREWSTER ST." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="269165" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Advanced Traffic Management System Connection" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/15/2021" PSE_100_ACTL_DT="2/9/2021" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.717 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="HIGHWAY BARRICADES AND SERVICES, LLC" CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="4/5/2022" CNSTR_PCT_TIME_USED="86.96" CNSTR_PCT_COMPLETE="96.61" DSGN_START_TRGT_DT="11/2/2020" DSGN_START_ACTL_DT="11/2/2020" ENVCLR_TRGT_DT="3/11/2021" ENVCLR_ACTL_DT="1/20/2021" UTIL_TRGT_DT="2/18/2021" UTIL_ACTL_DT="2/9/2021" ROW_TRGT_DT="2/18/2021" ROW_ACTL_DT="2/9/2021" RTL_TRGT_DT="3/11/2021" RTL_ACTL_DT="2/9/2021" PE_SPENT_AMT="11000.38" CNSTR_SPENT_AMT="305653.35" CE_SPENT_AMT="49791.77" TOT_SPENT_AMT="366445.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="260900.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406254" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="SH 358" LIMITS_TO_DSCR="FM 2292" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="420462" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.407 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="6/1/2023" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="110.62" CNSTR_PCT_COMPLETE="91.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4686.58" CNSTR_SPENT_AMT="394871.11" CE_SPENT_AMT="21627.86" TOT_SPENT_AMT="421185.55" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="359880.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406255" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="MP 14.357" LIMITS_TO_DSCR="MP 14.395" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99144" DIST_LET_DATE="7/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - State Railroad Grade Crossing (2210RX)" FUND_CAT1_PID="RGC" FUND_CAT1_AMT="99144.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406256" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 37" CNTY_NM="Nueces" LIMITS_FROM_DSCR="1.20 MI W OF SH 358" LIMITS_TO_DSCR="@ OLD UPRR OVERPASS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Removal And/or Replacement And/or Disposal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="1560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007406257" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007409016" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 407" CNTY_NM="Nueces" LIMITS_FROM_DSCR="VILLA DR." LIMITS_TO_DSCR="UP RIVER RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="739859" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="182498.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007410008" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3024" CNTY_NM="Live Oak" LIMITS_FROM_DSCR="1000 FT N OF FM 534" LIMITS_TO_DSCR="1000 S OF FM 534" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="121594" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.378 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/8/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="76576.11" TOT_SPENT_AMT="76576.11" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="121594.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/4/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007411008" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3024" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="600 FT NORTH OF FM 3377" LIMITS_TO_DSCR="600 FT SOUTH OF FM 3377" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="184459" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/8/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="184459.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/4/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007411009" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3024" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="LIVE OAK COUNTY LINE" LIMITS_TO_DSCR="SH 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="227215" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="230534.12" CE_SPENT_AMT="1098.66" TOT_SPENT_AMT="231632.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="260000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007412006" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 459" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 359" LIMITS_TO_DSCR="IH 37" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="115828" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="129727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007501023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="US 67/90" LIMITS_TO_DSCR="BREWSTER/PECOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1359030" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="109.29" CNSTR_SPENT_AMT="950079.74" CE_SPENT_AMT="23326.28" TOT_SPENT_AMT="973515.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="902382.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007501024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="US 67 / US 90 JCT" LIMITS_TO_DSCR="PECOS / BREWSTER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="261733" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/3/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/11/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Rene Romero, P.E." TXDOT_CNTCT_PH_NBR="(915)849-5550" CNSTR_CMPNY_NM="CENTERLINE TECHNOLOGIES, LLC" CNSTR_NTPD_DT="3/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="2/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/24/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22.52" TOT_SPENT_AMT="22.52" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="429130.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007501025" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="INTERSECTION OF US 67/US 90" LIMITS_TO_DSCR="1.54 MI NE OF US 90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2705338" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/3/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/4/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/11/2026" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/23/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/20/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/26/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/5/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="384590.49" TOT_SPENT_AMT="384590.49" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2921765.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007501026" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Brewster" LIMITS_FROM_DSCR="BREWSTER/PECOS COUNTY LINE" LIMITS_TO_DSCR="19.617 MI W OF BREWSTER/PECOS CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1751518" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007502026" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Pecos" LIMITS_FROM_DSCR="16.8 MI SOUTH OF IH 10" LIMITS_TO_DSCR="BREWSTER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17261851" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="5/27/2020" PSE_30_ACTL_DT="5/27/2020" PSE_60_TRGT_DT="11/3/2020" PSE_60_ACTL_DT="11/3/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.663 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="11/1/2021" CNSTR_PCT_TIME_USED="107.06" CNSTR_PCT_COMPLETE="101.59" DSGN_START_TRGT_DT="1/27/2020" DSGN_START_ACTL_DT="1/27/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/9/2021" UTIL_ACTL_DT="3/9/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2021" RTL_ACTL_DT="6/28/2021" PE_SPENT_AMT="1085703.43" CNSTR_SPENT_AMT="19614844.67" CE_SPENT_AMT="1326394.63" TOT_SPENT_AMT="22026942.73" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="13995600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007503022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Pecos" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="16.8 MI SOUTH OF IH 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18492619" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="5/27/2020" PSE_30_ACTL_DT="5/27/2020" PSE_60_TRGT_DT="11/3/2020" PSE_60_ACTL_DT="11/3/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.831 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="11/1/2021" CNSTR_PCT_TIME_USED="107.06" CNSTR_PCT_COMPLETE="101.59" DSGN_START_TRGT_DT="1/27/2020" DSGN_START_ACTL_DT="1/27/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/9/2021" UTIL_ACTL_DT="3/9/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/28/2021" RTL_ACTL_DT="6/28/2021" PE_SPENT_AMT="725585.83" CNSTR_SPENT_AMT="24421005.92" CE_SPENT_AMT="1681984.81" TOT_SPENT_AMT="26828576.56" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="18997200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007606037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Upton" LIMITS_FROM_DSCR="WEST OF US 385" LIMITS_TO_DSCR="0.7 MI W OF CR 450" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/25/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26727485" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/29/2019" PSE_30_ACTL_DT="3/29/2019" PSE_60_TRGT_DT="5/17/2019" PSE_60_ACTL_DT="5/17/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="9/21/2023" CNSTR_PCT_TIME_USED="74.54" CNSTR_PCT_COMPLETE="32.56" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="7/7/2022" ENVCLR_ACTL_DT="7/7/2022" UTIL_TRGT_DT="2/2/2021" UTIL_ACTL_DT="2/2/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2021" RTL_ACTL_DT="11/1/2021" PE_SPENT_AMT="750597.03" CNSTR_SPENT_AMT="8891873.27" CE_SPENT_AMT="1662528.28" TOT_SPENT_AMT="11304998.58" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="19065000.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="1470566.00" FUND_CAT3_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT3_PID="PES" FUND_CAT3_AMT="1123264.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007606038" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Upton" LIMITS_FROM_DSCR="0.7 MI W OF CR 450" LIMITS_TO_DSCR="W OF SH 329" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35357143" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/29/2019" PSE_30_ACTL_DT="3/29/2019" PSE_60_TRGT_DT="5/17/2019" PSE_60_ACTL_DT="5/17/2019" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="6/30/2021" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="7/7/2022" ENVCLR_ACTL_DT="7/7/2022" UTIL_TRGT_DT="2/2/2021" UTIL_ACTL_DT="2/2/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="3/31/2022" PE_SPENT_AMT="3930.62" TOT_SPENT_AMT="3930.62" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="BSP" FUND_CAT1_AMT="2217138.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="20481000.00" FUND_CAT3_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT3_PID="PES" FUND_CAT3_AMT="16901862.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007607037" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Upton" LIMITS_FROM_DSCR="EAST OF CR 225" LIMITS_TO_DSCR="SH 329" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="37800000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="2/20/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/12/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.007 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/14/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/24/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2532803.49" TOT_SPENT_AMT="2532803.49" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="37800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007607038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Upton" LIMITS_FROM_DSCR="0.2 MILES WEST OF SH 329" LIMITS_TO_DSCR="REAGAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1581276" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/3/2022" PSE_30_ACTL_DT="3/3/2022" PSE_60_TRGT_DT="4/5/2022" PSE_60_ACTL_DT="4/5/2022" PSE_100_TRGT_DT="7/20/2022" PSE_100_ACTL_DT="7/20/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="5/30/2023" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="95.97" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="6/21/2022" ENVCLR_ACTL_DT="6/21/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/20/2022" RTL_ACTL_DT="7/20/2022" CNSTR_SPENT_AMT="989160.50" CE_SPENT_AMT="14032.05" TOT_SPENT_AMT="1003192.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1849317.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007607040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Upton" LIMITS_FROM_DSCR="REAGAN COUNTY LINE" LIMITS_TO_DSCR="EAST OF CR 225" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20376775" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.716 (mi)" TXDOT_CNTCT_NM="Jennifer Chavarria, P.E." TXDOT_CNTCT_PH_NBR="(432)694-2195" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.52" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35135.68" CNSTR_SPENT_AMT="73750.00" TOT_SPENT_AMT="108885.68" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="20720716.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007608027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Reagan" LIMITS_FROM_DSCR="SH 137" LIMITS_TO_DSCR="UPTON COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/13/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23698271" DIST_LET_DATE="3/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/24/2018" PSE_30_ACTL_DT="8/24/2018" PSE_60_TRGT_DT="3/8/2019" PSE_60_ACTL_DT="3/8/2019" PSE_100_TRGT_DT="1/3/2020" PSE_100_ACTL_DT="1/3/2020" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.516 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="REECE ALBERT, INC." CNSTR_NTPD_DT="4/21/2020" CNSTR_WKBG_DT="8/19/2020" CNSTR_PCT_TIME_USED="101.01" CNSTR_PCT_COMPLETE="99.54" DSGN_START_TRGT_DT="5/1/2018" DSGN_START_ACTL_DT="5/1/2018" ENVCLR_TRGT_DT="1/3/2020" ENVCLR_ACTL_DT="1/3/2020" UTIL_TRGT_DT="1/3/2020" UTIL_ACTL_DT="1/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/3/2020" RTL_ACTL_DT="1/3/2020" PE_SPENT_AMT="561484.52" CNSTR_SPENT_AMT="24366152.83" CE_SPENT_AMT="1703241.74" TOT_SPENT_AMT="26630879.09" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="25500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007701031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Reagan" LIMITS_FROM_DSCR="IRION COUNTY LINE" LIMITS_TO_DSCR="SH 137" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="698571" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="6/10/2004" CNSTR_PCT_TIME_USED="77.55" CNSTR_PCT_COMPLETE="103.59" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/9/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="717880.25" CE_SPENT_AMT="7264.69" TOT_SPENT_AMT="725144.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="708893.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007701033" PT_PHASE="Construction underway or begins soon" CNTY_NM="Reagan" LIMITS_FROM_DSCR="SH 137" LIMITS_TO_DSCR="2.03 MI E OF SH 137" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1867825" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="2017251.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/21/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007702033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Irion" LIMITS_FROM_DSCR="30.8 MILES SOUTH OF TOM GREEN CO LINE" LIMITS_TO_DSCR="REAGAN CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14270216" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="11/8/2019" PSE_30_ACTL_DT="11/8/2019" PSE_60_TRGT_DT="2/12/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="7/3/2020" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.982 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="14.73" CNSTR_PCT_COMPLETE="6.10" DSGN_START_TRGT_DT="8/15/2019" DSGN_START_ACTL_DT="8/15/2019" ENVCLR_TRGT_DT="8/7/2020" ENVCLR_ACTL_DT="6/17/2020" UTIL_TRGT_DT="7/3/2020" UTIL_ACTL_DT="7/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17726.72" CNSTR_SPENT_AMT="538729.38" CE_SPENT_AMT="47643.83" TOT_SPENT_AMT="604099.93" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="15270715.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007703031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Irion" LIMITS_FROM_DSCR="20.6 MILES SOUTH OF TOM GREEN CO LINE" LIMITS_TO_DSCR="30.8 MILES SOUTH OF TOM GREEN CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11678954" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="11/8/2019" PSE_30_ACTL_DT="11/8/2019" PSE_60_TRGT_DT="2/12/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="7/3/2020" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.240 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="14.73" CNSTR_PCT_COMPLETE="6.10" DSGN_START_TRGT_DT="8/15/2019" DSGN_START_ACTL_DT="8/15/2019" ENVCLR_TRGT_DT="8/7/2020" ENVCLR_ACTL_DT="6/17/2020" UTIL_TRGT_DT="7/3/2020" UTIL_ACTL_DT="7/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16550.38" CNSTR_SPENT_AMT="957576.93" CE_SPENT_AMT="41403.84" TOT_SPENT_AMT="1015531.15" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="12481225.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007703033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Irion" LIMITS_FROM_DSCR="AT DRY DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="573019" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/8/2019" PSE_30_ACTL_DT="11/8/2019" PSE_60_TRGT_DT="2/12/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="7/3/2020" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="14.73" CNSTR_PCT_COMPLETE="6.10" DSGN_START_TRGT_DT="8/15/2019" DSGN_START_ACTL_DT="8/15/2019" ENVCLR_TRGT_DT="8/7/2020" ENVCLR_ACTL_DT="6/17/2020" UTIL_TRGT_DT="7/3/2020" UTIL_ACTL_DT="7/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="200494.95" CE_SPENT_AMT="1918.99" TOT_SPENT_AMT="202413.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="514800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007704032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Irion" LIMITS_FROM_DSCR="10.2 MILES SOUTH OF TOM GREEN CO LINE" LIMITS_TO_DSCR="20.6 MILES SOUTH OF TOM GREEN CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8775094" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="11/8/2019" PSE_30_ACTL_DT="11/8/2019" PSE_60_TRGT_DT="2/12/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="7/3/2020" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.331 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="14.73" CNSTR_PCT_COMPLETE="6.10" DSGN_START_TRGT_DT="8/15/2019" DSGN_START_ACTL_DT="8/15/2019" ENVCLR_TRGT_DT="8/7/2020" ENVCLR_ACTL_DT="6/17/2020" UTIL_TRGT_DT="7/3/2020" UTIL_ACTL_DT="7/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17607.08" CE_SPENT_AMT="29532.81" TOT_SPENT_AMT="47139.89" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="9454779.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007705031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Irion" LIMITS_FROM_DSCR="TOM GREEN CO LINE" LIMITS_TO_DSCR="10.2 MILES SOUTH OF TOM GREEN CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16271220" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="11/8/2019" PSE_30_ACTL_DT="11/8/2019" PSE_60_TRGT_DT="2/12/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="7/3/2020" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.219 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="14.73" CNSTR_PCT_COMPLETE="6.10" DSGN_START_TRGT_DT="8/15/2019" DSGN_START_ACTL_DT="8/15/2019" ENVCLR_TRGT_DT="8/7/2020" ENVCLR_ACTL_DT="6/17/2020" UTIL_TRGT_DT="7/3/2020" UTIL_ACTL_DT="7/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1731407.95" CNSTR_SPENT_AMT="1632206.91" CE_SPENT_AMT="43063.26" TOT_SPENT_AMT="3406678.12" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="18314574.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007705033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Irion" LIMITS_FROM_DSCR="AT DRY DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="663437" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/8/2019" PSE_30_ACTL_DT="11/8/2019" PSE_60_TRGT_DT="2/12/2020" PSE_60_ACTL_DT="2/12/2020" PSE_100_TRGT_DT="7/3/2020" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="14.73" CNSTR_PCT_COMPLETE="6.10" DSGN_START_TRGT_DT="8/15/2019" DSGN_START_ACTL_DT="8/15/2019" ENVCLR_TRGT_DT="8/7/2020" ENVCLR_ACTL_DT="6/17/2020" UTIL_TRGT_DT="7/3/2020" UTIL_ACTL_DT="7/3/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/7/2020" RTL_ACTL_DT="TBD" CE_SPENT_AMT="2228.00" TOT_SPENT_AMT="2228.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="572000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="@ US 87" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1130458" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="7/29/2019" PSE_30_ACTL_DT="7/29/2019" PSE_60_TRGT_DT="1/2/2020" PSE_60_ACTL_DT="1/2/2020" PSE_100_TRGT_DT="4/3/2020" PSE_100_ACTL_DT="4/3/2020" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="8/26/2020" CNSTR_WKBG_DT="1/7/2021" CNSTR_PCT_TIME_USED="262.80" CNSTR_PCT_COMPLETE="99.24" DSGN_START_TRGT_DT="3/15/2019" DSGN_START_ACTL_DT="3/15/2019" ENVCLR_TRGT_DT="2/6/2020" ENVCLR_ACTL_DT="2/6/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/3/2020" RTL_ACTL_DT="4/3/2020" PE_SPENT_AMT="187673.40" CNSTR_SPENT_AMT="1318938.57" CE_SPENT_AMT="136936.22" TOT_SPENT_AMT="1643548.19" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="917908.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706102" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="CHADBOURNE STREET" LIMITS_TO_DSCR="SL 306 WEST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="605569" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CE_SPENT_AMT="2936.99" TOT_SPENT_AMT="2936.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="729442.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706103" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="CHAPEL HILL DRIVE" LIMITS_TO_DSCR="IRION COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="766546" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/21/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/4/2024" CNSTR_WKBG_DT="6/10/2004" CNSTR_PCT_TIME_USED="77.55" CNSTR_PCT_COMPLETE="103.59" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/9/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="796231.17" CE_SPENT_AMT="8003.60" TOT_SPENT_AMT="804234.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="776567.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706104" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="US 67 AT SHERWOOD WAY" LIMITS_TO_DSCR="ARDEN ROAD EXIT" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="409662.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="CHADBOURNE ST" LIMITS_TO_DSCR="START OF RIGID PAVEMENT AT RED ARROYO BR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="238000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="247520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706106" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="CHADBOURNE STREET" LIMITS_TO_DSCR="BU 67-H" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="280000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="302400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007706107" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="CHADBOURNE ST" LIMITS_TO_DSCR="SL 306" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7359247" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="118545.60" TOT_SPENT_AMT="118545.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="7653617.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 306" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="300 FEET E OF RAILROAD TRACKS" LIMITS_TO_DSCR="CONCHO RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="88525" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.257 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/24/2020" CNSTR_WKBG_DT="7/22/2020" CNSTR_PCT_TIME_USED="96.59" CNSTR_PCT_COMPLETE="96.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="75458.97" CE_SPENT_AMT="554.60" TOT_SPENT_AMT="76013.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="118000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708044" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 306" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="BEN FICKLIN ROAD" LIMITS_TO_DSCR="US 87 FRONTAGE ROADS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28882" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/12/2022" CNSTR_WKBG_DT="7/26/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.66" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="34728.21" CE_SPENT_AMT="285.28" TOT_SPENT_AMT="35013.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="29665.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708045" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 306" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="BU 67H" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="556008" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CE_SPENT_AMT="2697.86" TOT_SPENT_AMT="2697.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="670805.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708046" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 306" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1967622" DIST_LET_DATE="6/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Remove/replace Bridge Rail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1967622.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708047" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 306" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6461502" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="6719962.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708048" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007708049" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007709010" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 67-H" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="SL 306" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="169122" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/1/2021" PSE_30_ACTL_DT="10/1/2021" PSE_60_TRGT_DT="12/3/2021" PSE_60_ACTL_DT="12/3/2021" PSE_100_TRGT_DT="2/25/2022" PSE_100_ACTL_DT="2/25/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.292 (mi)" TXDOT_CNTCT_NM="Mitchell Gatlin, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="6/16/2022" CNSTR_WKBG_DT="8/15/2020" CNSTR_PCT_TIME_USED="42.20" CNSTR_PCT_COMPLETE="98.58" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="8/10/2021" ENVCLR_TRGT_DT="3/4/2022" ENVCLR_ACTL_DT="2/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/4/2022" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="23810.23" CNSTR_SPENT_AMT="280533.83" CE_SPENT_AMT="6751.07" TOT_SPENT_AMT="311095.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="634400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007709011" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 67-H" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT ARDEN ROAD" LIMITS_TO_DSCR="-" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="525028" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="11/18/2022" PSE_30_ACTL_DT="11/18/2022" PSE_60_TRGT_DT="12/9/2022" PSE_60_ACTL_DT="12/9/2022" PSE_100_TRGT_DT="2/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="9/6/2023" CNSTR_WKBG_DT="5/7/2024" CNSTR_PCT_TIME_USED="108.62" CNSTR_PCT_COMPLETE="103.96" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="1/30/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/3/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="542729.69" CE_SPENT_AMT="26488.67" TOT_SPENT_AMT="569218.36" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="483465.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007709013" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 67-H" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT OXFORD DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="700000" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="William McLane, P.E." TXDOT_CNTCT_PH_NBR="(325)947-9211" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="4/17/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="40995.09" TOT_SPENT_AMT="40995.09" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007709014" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 67-H" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT NORTH CONCHO RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007709015" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 67-H" CNTY_NM="Tom Green" LIMITS_FROM_DSCR="AT NORTH CONCHO RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007801039" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Runnels" LIMITS_FROM_DSCR="COLEMAN COUNTY LINE" LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16790200" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="13.986 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="8395100.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007802022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="RUNNELS C/L" LIMITS_TO_DSCR="CR 368" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="271400" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.353 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="32071.98" CE_SPENT_AMT="12.55" TOT_SPENT_AMT="32084.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="389252.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007802023" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007803059" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR=".8 MI E OF FM 503" LIMITS_TO_DSCR="SH 206" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99150" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.799 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="107082.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007803060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="2.25 MI. W SH 206" LIMITS_TO_DSCR="SH 206" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="167510" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.379 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="79.31" CNSTR_PCT_COMPLETE="61.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="84472.50" CE_SPENT_AMT="1178.85" TOT_SPENT_AMT="85651.35" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007803061" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007803062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="CR 368" LIMITS_TO_DSCR=".8 MI E OF FM 503" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="390527" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.711 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="46281.07" CE_SPENT_AMT="18.11" TOT_SPENT_AMT="46299.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="299150.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007804131" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 568" CNTY_NM="Coleman" LIMITS_FROM_DSCR="SH 206" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="63517" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.469 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="68598.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007805025" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="US 84" LIMITS_TO_DSCR="SH 206" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="348521" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.781 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="79.31" CNSTR_PCT_COMPLETE="61.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="216850.00" CE_SPENT_AMT="2543.00" TOT_SPENT_AMT="219393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007805027" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007805028" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Coleman" LIMITS_FROM_DSCR="SH 206" LIMITS_TO_DSCR="US 84 (SANTA ANNA)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/12/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5382266" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.173 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="4/5/2024" CNSTR_WKBG_DT="8/12/2024" CNSTR_PCT_TIME_USED="134.78" CNSTR_PCT_COMPLETE="49.26" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="47006.20" CNSTR_SPENT_AMT="2861524.25" CE_SPENT_AMT="55829.02" TOT_SPENT_AMT="2964359.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007901046" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007901047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Brown" LIMITS_FROM_DSCR="US 84 S" LIMITS_TO_DSCR="1 MI W OF FM 3100" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2519239" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.814 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="2/8/2024" CNSTR_WKBG_DT="10/1/2024" CNSTR_PCT_TIME_USED="107.92" CNSTR_PCT_COMPLETE="62.09" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1276828.01" CE_SPENT_AMT="3357.55" TOT_SPENT_AMT="1280185.56" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007902055" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007902056" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007902057" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007902058" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Comanche" LIMITS_FROM_DSCR="SH 36" LIMITS_TO_DSCR="BROWN C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1133298" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1269294.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007903044" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Comanche" LIMITS_FROM_DSCR=".68 MI E OF SH 36" LIMITS_TO_DSCR="FM 1476" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82142857" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.383 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="150580.58" TOT_SPENT_AMT="150580.58" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007903050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Comanche" LIMITS_FROM_DSCR="0.74 MI E OF SHE 36" LIMITS_TO_DSCR="LEON RIVER BRIDGE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="803484" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.915 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="899902.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007903053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Comanche" LIMITS_FROM_DSCR="LEON RIVER" LIMITS_TO_DSCR="ERATH COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4166970" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.882 (mi)" TXDOT_CNTCT_NM="Natnael Asfaw, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0358" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="2/8/2024" CNSTR_WKBG_DT="10/1/2024" CNSTR_PCT_TIME_USED="107.92" CNSTR_PCT_COMPLETE="62.09" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2002976.80" CE_SPENT_AMT="5267.05" TOT_SPENT_AMT="2008243.85" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007903054" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007904049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Erath" LIMITS_FROM_DSCR="FORT WORTH AND WESTERN RAILROAD" LIMITS_TO_DSCR="FM 219" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14378775" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="9/17/2018" PSE_30_ACTL_DT="3/24/2022" PSE_60_TRGT_DT="2/5/2021" PSE_60_ACTL_DT="7/14/2022" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.916 (mi)" TXDOT_CNTCT_NM="Sarah Horner, P.E." TXDOT_CNTCT_PH_NBR="(254)965-3511" CNSTR_CMPNY_NM="JAY MILLS CONTRACTING, INCORPORATED" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="4/7/2025" CNSTR_PCT_TIME_USED="9.64" CNSTR_PCT_COMPLETE="15.20" DSGN_START_TRGT_DT="4/23/2018" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="9/3/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/24/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/10/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1255260.83" CNSTR_SPENT_AMT="2248319.48" CE_SPENT_AMT="50644.97" TOT_SPENT_AMT="3554225.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9772188.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007904052" PT_PHASE="Planning, 10+ years" HWY_NBR="US 67" CNTY_NM="Erath" LIMITS_FROM_DSCR="COMANCHE COUNTY LINE" LIMITS_TO_DSCR="DUBLIN RELIEF ROUTE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct 4 Lane Divided Highway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.235 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="9000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007904056" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007905060" PT_PHASE="Planning, 10+ years" HWY_NBR="US 67" CNTY_NM="Erath" LIMITS_FROM_DSCR="BUS 67K" LIMITS_TO_DSCR="FM 988" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32670206" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="36590630.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007905064" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Erath" LIMITS_FROM_DSCR="N PATRICK ST" LIMITS_TO_DSCR="GLEN ROSE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="40420" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Theresa Poer, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6619" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="1.10" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="736.45" TOT_SPENT_AMT="736.45" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="157152.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007905068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Erath" LIMITS_FROM_DSCR="US 67/US 377" LIMITS_TO_DSCR="END OF BRIDGE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1372346" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="240.200 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="51489.81" TOT_SPENT_AMT="51489.81" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="1537030.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007905069" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 67-K" CNTY_NM="Erath" LIMITS_FROM_DSCR="BEGIN BRIDE COLVERT" LIMITS_TO_DSCR="END BRIDGE CULVERT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="88516" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="30.800 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25816.47" TOT_SPENT_AMT="25816.47" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="99140.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007907019" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="007908006" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Erath" LIMITS_FROM_DSCR="S PATRICK ST" LIMITS_TO_DSCR="N PATRICK ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="201343" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Theresa Poer, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6619" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="1.10" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2653.18" CNSTR_SPENT_AMT="4875.00" CE_SPENT_AMT="1345.18" TOT_SPENT_AMT="8873.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="158880.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008001054" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Erath" LIMITS_FROM_DSCR="BU 377J" LIMITS_TO_DSCR="N OF BU 377J" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3975000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen 2 To 4 Divided" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.293 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="30000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008001056" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Erath" LIMITS_FROM_DSCR="US 281" LIMITS_TO_DSCR="EAST OF CR 513" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4697141" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.503 (mi)" TXDOT_CNTCT_NM="Sarah Horner, P.E." TXDOT_CNTCT_PH_NBR="(254)965-3511" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="9/17/2024" CNSTR_PCT_TIME_USED="83.72" CNSTR_PCT_COMPLETE="100.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13258.44" CNSTR_SPENT_AMT="6065234.22" CE_SPENT_AMT="167197.61" TOT_SPENT_AMT="6245690.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="4981452.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008002060" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Erath" LIMITS_FROM_DSCR="N OF BU 377J" LIMITS_TO_DSCR="HOOD COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="50000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen 2 To 4 Divided" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.234 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="50000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008002063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Erath" LIMITS_FROM_DSCR="EAST OF CR 513" LIMITS_TO_DSCR="HOOD CO LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2678118" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.060 (mi)" TXDOT_CNTCT_NM="Sarah Horner, P.E." TXDOT_CNTCT_PH_NBR="(254)965-3511" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="9/17/2024" CNSTR_PCT_TIME_USED="83.72" CNSTR_PCT_COMPLETE="100.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2766692.43" CE_SPENT_AMT="124033.26" TOT_SPENT_AMT="2890725.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3931965.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008002064" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Erath" LIMITS_FROM_DSCR="GLENN ST" LIMITS_TO_DSCR="PALUXY RIVER" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="136600" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.013 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Federal Railway-Highway Crossing Program (2408RX)" FUND_CAT1_PID="FRS" FUND_CAT1_AMT="136600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008003049" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="OVERSTREET BLVD" LIMITS_TO_DSCR="PIRATE DR" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="117543033" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/10/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.100 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/9/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/4/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/4/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5006606.09" TOT_SPENT_AMT="5006606.09" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="29704197.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="52000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008003058" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="ERATH COUNTY LINE" LIMITS_TO_DSCR="BU 377" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60000000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen 2 To 4 Divided" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.900 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="60000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008003060" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="PIRATE DR" LIMITS_TO_DSCR="HOLMES DRIVE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43451105" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24706.63" TOT_SPENT_AMT="24706.63" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008003061" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="S INTERSECTION OF US 377" LIMITS_TO_DSCR="BU 377" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="314046" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Sarah Horner, P.E." TXDOT_CNTCT_PH_NBR="(254)965-3511" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="2/15/2024" CNSTR_WKBG_DT="6/26/2024" CNSTR_PCT_TIME_USED="102.33" CNSTR_PCT_COMPLETE="79.74" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="255602.03" CE_SPENT_AMT="3081.66" TOT_SPENT_AMT="258683.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="210079.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008003063" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="EAST OF COKE COURT" LIMITS_TO_DSCR="WEST OF KNOX ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1673266" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1673226.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008003064" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008004081" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="FM 4" LIMITS_TO_DSCR="OVERSTREET BOULEVARD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="148695000" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/10/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/9/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/4/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/4/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6079874.01" CE_SPENT_AMT="448.86" TOT_SPENT_AMT="6080322.87" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008004094" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Hood" LIMITS_FROM_DSCR="NORTH OF FM 167 (FALL CREEK HWY)" LIMITS_TO_DSCR="FM 4" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="133928571" DIST_LET_DATE="9/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/10/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.266 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/9/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/4/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/4/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2966784.16" TOT_SPENT_AMT="2966784.16" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008007099" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WINSCOTT ROAD" LIMITS_TO_DSCR="SOUTH OF STEVENS DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42716631" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1286998.54" TOT_SPENT_AMT="1286998.54" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="42842298.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008008028" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 167" CNTY_NM="Hood" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="FM 4" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="137159" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.960 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="153618.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008010019" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 377H" CNTY_NM="Hood" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="WEST US 377" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/24/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6993916" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Sarah Horner, P.E." TXDOT_CNTCT_PH_NBR="(254)965-3511" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="11/6/2024" CNSTR_PCT_TIME_USED="26.04" CNSTR_PCT_COMPLETE="73.16" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="139372.52" CNSTR_SPENT_AMT="5489372.71" CE_SPENT_AMT="84024.49" TOT_SPENT_AMT="5712769.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="6856962.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008101050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="E. BELKNAP AT TRINITY RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/2/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2055473" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.177 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="11/13/2024" CNSTR_WKBG_DT="1/14/2025" CNSTR_PCT_TIME_USED="49.48" CNSTR_PCT_COMPLETE="79.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="12/20/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="358103.03" CNSTR_SPENT_AMT="1700610.88" CE_SPENT_AMT="111369.46" TOT_SPENT_AMT="2170083.37" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="3849120.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008101052" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 347" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="GILVIN ST." LIMITS_TO_DSCR="IH 35W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/29/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2211573" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/3/2021" PSE_30_ACTL_DT="6/18/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="1/21/2022" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="1/12/2023" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="91.08" CNSTR_PCT_COMPLETE="91.81" DSGN_START_TRGT_DT="2/10/2021" DSGN_START_ACTL_DT="2/10/2021" ENVCLR_TRGT_DT="9/29/2022" ENVCLR_ACTL_DT="7/14/2022" UTIL_TRGT_DT="12/17/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/10/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/18/2022" RTL_ACTL_DT="9/1/2022" PE_SPENT_AMT="423574.81" CNSTR_SPENT_AMT="1741551.53" CE_SPENT_AMT="215688.31" TOT_SPENT_AMT="2380814.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2612620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008102075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="PECAN ST" LIMITS_TO_DSCR="TAYLOR ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="255000" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="455.79" CNSTR_SPENT_AMT="255855.77" TOT_SPENT_AMT="256311.56" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="255000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008102076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="NORTH PARK DRIVE" LIMITS_TO_DSCR="STARNES ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="470872" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="APEX LANDSCAPE &amp; IRRIGATION, LLC" CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="2/27/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="94.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="6/19/2022" CNSTR_SPENT_AMT="472147.25" CE_SPENT_AMT="113236.44" TOT_SPENT_AMT="585383.69" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="439012.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008102077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="SH 183" LIMITS_TO_DSCR="STARLIGHT DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7770211" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.699 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="9/18/2024" CNSTR_PCT_TIME_USED="52.55" CNSTR_PCT_COMPLETE="89.90" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="484228.52" CNSTR_SPENT_AMT="7624252.70" CE_SPENT_AMT="424449.08" TOT_SPENT_AMT="8532930.30" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="12860363.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="BS-114K" LIMITS_TO_DSCR="IN ROANOKE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3793305" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/29/2014" PSE_30_ACTL_DT="8/29/2014" PSE_60_TRGT_DT="11/17/2014" PSE_60_ACTL_DT="11/17/2014" PSE_100_TRGT_DT="8/31/2018" PSE_100_ACTL_DT="5/1/2019" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Amanda Miller, P.E." TXDOT_CNTCT_PH_NBR="(940)387-1414" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="3/26/2020" CNSTR_WKBG_DT="6/10/2020" CNSTR_PCT_TIME_USED="99.91" CNSTR_PCT_COMPLETE="98.17" DSGN_START_TRGT_DT="11/1/2013" DSGN_START_ACTL_DT="11/1/2013" ENVCLR_TRGT_DT="8/6/2015" ENVCLR_ACTL_DT="8/6/2015" UTIL_TRGT_DT="6/1/2019" UTIL_ACTL_DT="11/1/2019" ROW_TRGT_DT="8/6/2018" ROW_ACTL_DT="4/15/2017" RTL_TRGT_DT="6/1/2019" RTL_ACTL_DT="11/1/2019" PE_SPENT_AMT="326108.14" CNSTR_SPENT_AMT="4029899.56" CE_SPENT_AMT="221296.02" TOT_SPENT_AMT="4577303.72" FUND_CAT1_DSCR="Category 6 - Bridge Program (2006)" FUND_CAT1_AMT="2091744.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103047" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="SOUTH OF FM 1171" LIMITS_TO_DSCR="CRAWFORD ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="157638975" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/2/2018" PSE_30_ACTL_DT="11/1/2019" PSE_60_TRGT_DT="8/2/2018" PSE_60_ACTL_DT="2/1/2020" PSE_100_TRGT_DT="3/1/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2018" DSGN_START_ACTL_DT="7/1/2019" ENVCLR_TRGT_DT="12/1/2018" ENVCLR_ACTL_DT="3/13/2019" UTIL_TRGT_DT="9/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2020" ROW_ACTL_DT="3/31/2021" RTL_TRGT_DT="9/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2441130.56" CNSTR_SPENT_AMT="87249.66" CE_SPENT_AMT="876.10" TOT_SPENT_AMT="2529256.32" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="92888434.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="HENRIETTA CREEK RD" LIMITS_TO_DSCR="NORTH OF BS-114K" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18803011" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/29/2014" PSE_30_ACTL_DT="8/29/2014" PSE_60_TRGT_DT="11/17/2014" PSE_60_ACTL_DT="11/17/2014" PSE_100_TRGT_DT="8/31/2018" PSE_100_ACTL_DT="5/1/2019" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Amanda Miller, P.E." TXDOT_CNTCT_PH_NBR="(940)387-1414" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="3/26/2020" CNSTR_WKBG_DT="6/10/2020" CNSTR_PCT_TIME_USED="99.91" CNSTR_PCT_COMPLETE="98.17" DSGN_START_TRGT_DT="11/1/2013" DSGN_START_ACTL_DT="11/1/2013" ENVCLR_TRGT_DT="8/6/2015" ENVCLR_ACTL_DT="8/6/2015" UTIL_TRGT_DT="6/1/2019" UTIL_ACTL_DT="11/1/2019" ROW_TRGT_DT="8/6/2018" ROW_ACTL_DT="4/15/2017" RTL_TRGT_DT="6/1/2019" RTL_ACTL_DT="11/1/2019" PE_SPENT_AMT="2472367.88" CNSTR_SPENT_AMT="20471760.32" CE_SPENT_AMT="994318.19" TOT_SPENT_AMT="23938446.39" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="339826.00" FUND_CAT2_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT2_AMT="13444113.00" FUND_CAT3_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2005)" FUND_CAT3_AMT="1922275.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103049" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="SH 114" LIMITS_TO_DSCR="SOUTH OF FM 1171" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="94881194" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.747 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="241523.78" TOT_SPENT_AMT="241523.78" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103054" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="CRAWFORD RD" LIMITS_TO_DSCR="NORTH OF HICKORY CREEK (C-S BREAK)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53069969" DIST_LET_DATE="4/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct And Widen 2 Lane Rural Highway As 6 Lane Divided" PSE_30_TRGT_DT="3/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.384 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="65250.37" TOT_SPENT_AMT="65250.37" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="53069969.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103064" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="DENTON STREET" LIMITS_TO_DSCR="PARISH LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="271896" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.741 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="226.18" TOT_SPENT_AMT="226.18" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="367500.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="41044.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103065" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="HICKORY CREEK" LIMITS_TO_DSCR="MARSHALL CREEK ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4223805" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.433 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4990.00" TOT_SPENT_AMT="4990.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4730662.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103067" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="HICKORY CREEK RELIEF" LIMITS_TO_DSCR="HICKORY CREEK RELIEF" PRJ_TIER="" ENERGY="" FREIGHT="" TRUNK_SYS_FLAG="" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="300000" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.026 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19121.82" TOT_SPENT_AMT="19121.82" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT DENTON CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11890590" DIST_LET_DATE="3/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="569492.08" TOT_SPENT_AMT="569492.08" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008103069" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008104038" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="NORTH OF HICKORY CREEK" LIMITS_TO_DSCR="FM 1830" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25368095" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="3/1/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.781 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008104042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT FORT WORTH DRIVE" LIMITS_TO_DSCR="IN THE CITY OF DENTON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="509665" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.320 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2219.75" TOT_SPENT_AMT="2219.75" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="570825.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008104045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="ROSELAWN DR" LIMITS_TO_DSCR="COUNTRY CLUB RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="405284" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.078 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="19905.29" TOT_SPENT_AMT="19905.29" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="420000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008104046" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008105049" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 428" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT GREENBELT" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78854062" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="NNF" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="13886249.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="10/29/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008105051" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3524" CNTY_NM="Denton" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="FM 428" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="121608" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.796 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11189.35" CNSTR_SPENT_AMT="148338.13" CE_SPENT_AMT="1221.57" TOT_SPENT_AMT="160749.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="115694.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008105052" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 428" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT KINGS ROW" LIMITS_TO_DSCR="IN THE CITY OF DENTON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="307546" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="319848.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008105053" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 428" CNTY_NM="Denton" LIMITS_FROM_DSCR="N OF SL 288" LIMITS_TO_DSCR="FM 3524" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4201507" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.634 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="40.83" CNSTR_PCT_COMPLETE="30.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22614.10" CNSTR_SPENT_AMT="284645.58" CE_SPENT_AMT="670.87" TOT_SPENT_AMT="307930.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3428230.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008105055" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 428" CNTY_NM="Denton" LIMITS_FROM_DSCR="DENTON" LIMITS_TO_DSCR="AUBREY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80640" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.915 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="316.60" TOT_SPENT_AMT="316.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="90317.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008105056" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008106042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="GRAYSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7494391" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="11/1/2019" PSE_30_ACTL_DT="6/1/2019" PSE_60_TRGT_DT="11/1/2019" PSE_60_ACTL_DT="7/10/2019" PSE_100_TRGT_DT="11/1/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Amanda Miller, P.E." TXDOT_CNTCT_PH_NBR="(940)387-1414" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="9/8/2023" CNSTR_WKBG_DT="10/30/2023" CNSTR_PCT_TIME_USED="86.47" CNSTR_PCT_COMPLETE="86.91" DSGN_START_TRGT_DT="11/1/2019" DSGN_START_ACTL_DT="6/1/2019" ENVCLR_TRGT_DT="5/1/2020" ENVCLR_ACTL_DT="7/1/2019" UTIL_TRGT_DT="5/1/2020" UTIL_ACTL_DT="6/1/2019" ROW_TRGT_DT="5/1/2020" ROW_ACTL_DT="6/1/2019" RTL_TRGT_DT="5/1/2020" RTL_ACTL_DT="10/9/2019" PE_SPENT_AMT="137960.62" CNSTR_SPENT_AMT="7714376.88" CE_SPENT_AMT="176856.22" TOT_SPENT_AMT="8029193.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="7978675.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008106044" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="FM 455" LIMITS_TO_DSCR="GRAYSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150778" DIST_LET_DATE="10/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.495 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="168871.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008107026" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 56" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="84077" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="100549.36" CE_SPENT_AMT="960.43" TOT_SPENT_AMT="101509.79" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="79232.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008107028" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR=".300 MI S OF FM 922" LIMITS_TO_DSCR=".3 MI N OF MCKNIGHT RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/19/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2109717" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="6/2/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="229672.91" CE_SPENT_AMT="132.76" TOT_SPENT_AMT="229805.67" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2362883.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="9/6/2024" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008107029" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008107030" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008107031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR="HINTON ST" LIMITS_TO_DSCR="SHAWNEE DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/19/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="6/2/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="221334.78" CE_SPENT_AMT="97.56" TOT_SPENT_AMT="221432.34" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008107033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR="DENTON COUNTY LINE" LIMITS_TO_DSCR="FM 902" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9292000" DIST_LET_DATE="4/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="10407040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008108011" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 377B" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 377 N" LIMITS_TO_DSCR="US 377 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1709162" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/9/2019" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="5/19/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="1/25/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.799 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="6/16/2022" CNSTR_WKBG_DT="7/15/2022" CNSTR_PCT_TIME_USED="152.69" CNSTR_PCT_COMPLETE="84.94" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/3/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/19/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="8/10/2018" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/5/2018" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/18/2021" PE_SPENT_AMT="29777.43" CNSTR_SPENT_AMT="1637898.46" CE_SPENT_AMT="20743.72" TOT_SPENT_AMT="1688419.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="725000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008110048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 901 E" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/8/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1740801" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.190 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="9/16/2020" CNSTR_WKBG_DT="11/3/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="62674.44" CNSTR_SPENT_AMT="1733858.95" CE_SPENT_AMT="82288.52" TOT_SPENT_AMT="1878821.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1555038.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008110050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="SH 56" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9150" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="7446.51" CE_SPENT_AMT="100.63" TOT_SPENT_AMT="7547.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8639.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008110052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Grayson" LIMITS_FROM_DSCR="OKLAHOMA STATE LINE" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5667809" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.380 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="OVERLAND CORPORATION" CNSTR_NTPD_DT="5/8/2024" CNSTR_WKBG_DT="8/9/2024" CNSTR_PCT_TIME_USED="143.75" CNSTR_PCT_COMPLETE="98.98" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="37532.57" CNSTR_SPENT_AMT="6556264.55" CE_SPENT_AMT="117902.48" TOT_SPENT_AMT="6711699.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="10010000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008110053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008110054" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008112041" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 35W" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="US 81/287 SPLIT" LIMITS_TO_DSCR="DENTON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="270380540" DIST_LET_DATE="6/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.201 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17758277.48" CE_SPENT_AMT="55674.38" TOT_SPENT_AMT="17813951.86" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113050" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="SH 114" LIMITS_TO_DSCR="IH 35W/IH35E INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="798479436" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="7/7/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="11/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.582 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/2/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2919628.56" TOT_SPENT_AMT="2919628.56" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113058" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="TARRANT COUNTY LINE" LIMITS_TO_DSCR="SH 114" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="399913734" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="7/7/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="11/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.945 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/2/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="706529.24" TOT_SPENT_AMT="706529.24" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113059" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="SH 114" LIMITS_TO_DSCR="IH 35/IH35E INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="338830141" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="8/1/2045" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/1/2045" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2045" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.889 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2045" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/1/2045" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2045" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2045" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2045" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113060" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="TARRANT COUNTY LINE" LIMITS_TO_DSCR="SH 114" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="189565966" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="8/1/2045" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/1/2045" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/1/2045" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.880 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2045" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/1/2045" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2045" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2045" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2045" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113065" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="DALE EARNHARDT WAY" LIMITS_TO_DSCR="FM 407" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="190200000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="10/9/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/9/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.292 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/1/2020" DSGN_START_ACTL_DT="3/1/2023" ENVCLR_TRGT_DT="7/1/2020" ENVCLR_ACTL_DT="6/30/2020" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18607297.44" TOT_SPENT_AMT="18607297.44" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="188486753.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113069" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT FM 2449" LIMITS_TO_DSCR="IN THE CITY OF DENTON" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="437111" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.751 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC" CNSTR_NTPD_DT="5/25/2023" CNSTR_WKBG_DT="6/21/2024" CNSTR_PCT_TIME_USED="190.00" CNSTR_PCT_COMPLETE="73.16" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="24220.02" CNSTR_SPENT_AMT="339061.42" CE_SPENT_AMT="6324.73" TOT_SPENT_AMT="369606.17" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="356228.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113070" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="NORTH OF SH 114" LIMITS_TO_DSCR="FM 1515" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="316075" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.844 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="386016.22" CE_SPENT_AMT="3178.84" TOT_SPENT_AMT="389195.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="64584.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113071" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="SOUTH OF FM 407" LIMITS_TO_DSCR="FM 2449" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="187450000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="6/1/2022" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="11/1/2022" PSE_60_ACTL_DT="3/30/2023" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="6/30/2020" ENVCLR_ACTL_DT="6/30/2020" UTIL_TRGT_DT="6/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1552656.41" TOT_SPENT_AMT="1552656.41" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="188486753.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113072" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008113073" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 35W" CNTY_NM="Denton" LIMITS_FROM_DSCR="EAGLE PARKWAY" LIMITS_TO_DSCR="DALE EARNHARDT BOULEVARD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64668750" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="846618.32" TOT_SPENT_AMT="846618.32" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008114009" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 377E" CNTY_NM="Denton" LIMITS_FROM_DSCR="US 377N" LIMITS_TO_DSCR="US 377S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135945" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.021 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="152258.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008116004" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008117002" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 129" CNTY_NM="Grayson" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="SH 56" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28188" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="29316.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008201018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 50" CNTY_NM="Fannin" LIMITS_FROM_DSCR="SH 34 (LADONIA)" LIMITS_TO_DSCR="HUNT COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="131676" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.376 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="90.28" TOT_SPENT_AMT="90.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="156119.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008202021" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 50" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FANNIN COUNTY LINE" LIMITS_TO_DSCR="SH 24" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65894" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="68197.46" CE_SPENT_AMT="745.62" TOT_SPENT_AMT="68943.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="65393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008202022" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008301055" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Hunt" LIMITS_FROM_DSCR="BU 11H" LIMITS_TO_DSCR="HOPKINS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1139000" DIST_LET_DATE="3/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1275680.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008302058" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 11" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="HUNT COUNTY LINE" LIMITS_TO_DSCR="0.83 MI E OF FM 2653 N" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="424131" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="430879.39" CE_SPENT_AMT="5452.55" TOT_SPENT_AMT="436331.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="467140.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008302059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 11" CNTY_NM="Hopkins" LIMITS_FROM_DSCR=".83 MI E OF FM 2653N" LIMITS_TO_DSCR="6.19 MI. E OF FM 2653S (CR 4700)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="495379" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.320 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="340.46" TOT_SPENT_AMT="340.46" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="635524.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008302060" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="0.05 MI W OF FM 275" LIMITS_TO_DSCR="0.05 MI E OF FM 275" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92448" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="99844.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008303057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 11" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="SH 154" LIMITS_TO_DSCR="0.7 MI E OF FM 69 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="576156" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="591086.33" CE_SPENT_AMT="7330.31" TOT_SPENT_AMT="598416.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="463949.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008304033" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 11" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="0.7 MI E OF FM 69 S" LIMITS_TO_DSCR=".3 MI W OF FM 3019" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="586142" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="525957.84" CE_SPENT_AMT="7143.13" TOT_SPENT_AMT="533100.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="471644.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008307048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 11" CNTY_NM="Camp" LIMITS_FROM_DSCR="FM 1519" LIMITS_TO_DSCR="SL 179" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="321663" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.977 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="88.68" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="5/3/2023" ENVCLR_ACTL_DT="2/27/2023" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="4/10/2023" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="4/10/2023" RTL_TRGT_DT="7/28/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="314902.93" CE_SPENT_AMT="3235.63" TOT_SPENT_AMT="318138.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="307976.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008307049" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008308055" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Camp" LIMITS_FROM_DSCR="SOUTH RR CROSSING" LIMITS_TO_DSCR="US 271" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1800000" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="10/22/2018" PSE_30_ACTL_DT="10/22/2018" PSE_60_TRGT_DT="1/28/2019" PSE_60_ACTL_DT="1/28/2019" PSE_100_TRGT_DT="10/5/2034" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.669 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/3/2018" DSGN_START_ACTL_DT="9/3/2018" ENVCLR_TRGT_DT="2/20/2019" ENVCLR_ACTL_DT="2/20/2019" UTIL_TRGT_DT="10/5/2034" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/4/2018" ROW_ACTL_DT="9/4/2018" RTL_TRGT_DT="11/9/2034" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34218.39" TOT_SPENT_AMT="34218.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="2016000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008308057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 11" CNTY_NM="Camp" LIMITS_FROM_DSCR="FM 557" LIMITS_TO_DSCR="E. PITTSBURG CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80253" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.450 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="93755.74" CE_SPENT_AMT="1628.70" TOT_SPENT_AMT="95384.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="76004.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008308059" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008308060" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008308061" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Camp" LIMITS_FROM_DSCR="0.04 MI E OF US 271" LIMITS_TO_DSCR="TITUS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="354528" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.736 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="397071.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008309038" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Titus" LIMITS_FROM_DSCR="CAMP C/L" LIMITS_TO_DSCR="MORRIS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="352224" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.381 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="394491.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008310044" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Morris" LIMITS_FROM_DSCR="DAINGERFIELD WEST CITY LIMITS" LIMITS_TO_DSCR="US 259" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="142200" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.975 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="153576.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008310045" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Morris" LIMITS_FROM_DSCR="AT BOGGY CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2367699" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.108 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="2367699.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008311026" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 11" CNTY_NM="Hunt" LIMITS_FROM_DSCR="250' WEST OF SH 24" LIMITS_TO_DSCR="MONROE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600000" DIST_LET_DATE="8/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="4/4/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/6/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/16/2021" DSGN_START_ACTL_DT="8/16/2021" ENVCLR_TRGT_DT="9/6/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/28/2020" UTIL_ACTL_DT="9/28/2020" ROW_TRGT_DT="3/23/2020" ROW_ACTL_DT="3/23/2020" RTL_TRGT_DT="3/16/2023" RTL_ACTL_DT="3/16/2023" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="48000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008311027" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Hunt" LIMITS_FROM_DSCR="MONROE ST" LIMITS_TO_DSCR="BU 11 H" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="670000" DIST_LET_DATE="3/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="750400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008312004" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 11" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="SH 19" LIMITS_TO_DSCR="SH 154" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2669802" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="49419.57" TOT_SPENT_AMT="49419.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="2669802.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008401093" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Morris" LIMITS_FROM_DSCR="FM 338" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="335149" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.078 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="393919.47" CE_SPENT_AMT="6842.87" TOT_SPENT_AMT="400762.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="311149.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008401095" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Morris" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="SH 338" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="591498" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.163 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="662478.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008401096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Morris" LIMITS_FROM_DSCR="SH 338" LIMITS_TO_DSCR="SH 49" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="417812" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.091 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="111090.42" CE_SPENT_AMT="405.74" TOT_SPENT_AMT="111496.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="580481.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008501052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Morris" LIMITS_FROM_DSCR="BOWIE C/L" LIMITS_TO_DSCR="US 67" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="904946" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.982 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1013540.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008502053" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="2.3 MI S OF FM 561" LIMITS_TO_DSCR="MORRIS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6983425" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/10/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/6/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/12/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.318 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/4/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/4/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/12/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="213.28" TOT_SPENT_AMT="213.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="7821436.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008502054" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="2.3 MI S OF FM 561" LIMITS_TO_DSCR="FM 561" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6010666" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.375 (mi)" TXDOT_CNTCT_NM="Wendy Starkes, P.E." TXDOT_CNTCT_PH_NBR="(903)572-8511" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="3/6/2024" CNSTR_WKBG_DT="4/15/2024" CNSTR_PCT_TIME_USED="75.32" CNSTR_PCT_COMPLETE="99.13" DSGN_START_TRGT_DT="4/3/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/24/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="44931.66" CNSTR_SPENT_AMT="6798518.65" CE_SPENT_AMT="53335.53" TOT_SPENT_AMT="6896785.84" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="5863970.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008502055" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 561" LIMITS_TO_DSCR="0.03 MI S OF CR 4243" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5477267" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.434 (mi)" TXDOT_CNTCT_NM="Wendy Starkes, P.E." TXDOT_CNTCT_PH_NBR="(903)572-8511" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="3/6/2024" CNSTR_WKBG_DT="4/15/2024" CNSTR_PCT_TIME_USED="75.32" CNSTR_PCT_COMPLETE="99.13" DSGN_START_TRGT_DT="4/3/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/24/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22404.26" CNSTR_SPENT_AMT="5276233.73" CE_SPENT_AMT="67976.89" TOT_SPENT_AMT="5366614.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="5726325.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008502056" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="WARD CREEK" LIMITS_TO_DSCR="0.1 MI S OF CR 4243" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9488012" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="6/23/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.421 (mi)" TXDOT_CNTCT_NM="Wendy Starkes, P.E." TXDOT_CNTCT_PH_NBR="(903)572-8511" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="3/6/2024" CNSTR_WKBG_DT="4/15/2024" CNSTR_PCT_TIME_USED="75.32" CNSTR_PCT_COMPLETE="99.13" DSGN_START_TRGT_DT="4/3/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/24/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21356.31" CNSTR_SPENT_AMT="9374190.64" CE_SPENT_AMT="99301.31" TOT_SPENT_AMT="9494848.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="8800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008502057" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008502058" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008503017" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2735" CNTY_NM="Bowie" LIMITS_FROM_DSCR="8.3 MI. N. OF US 82" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="262444" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/2/2021" PSE_100_ACTL_DT="3/22/2021" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.233 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="HX FARMS, INC." CNSTR_NTPD_DT="7/28/2021" CNSTR_WKBG_DT="11/16/2021" CNSTR_PCT_TIME_USED="99.72" CNSTR_PCT_COMPLETE="87.87" DSGN_START_TRGT_DT="8/3/2020" DSGN_START_ACTL_DT="8/3/2020" ENVCLR_TRGT_DT="1/5/2021" ENVCLR_ACTL_DT="11/6/2020" UTIL_TRGT_DT="8/4/2020" UTIL_ACTL_DT="8/4/2020" ROW_TRGT_DT="8/4/2020" ROW_ACTL_DT="8/4/2020" RTL_TRGT_DT="4/2/2021" RTL_ACTL_DT="3/31/2021" PE_SPENT_AMT="54819.29" CNSTR_SPENT_AMT="300269.87" CE_SPENT_AMT="28037.38" TOT_SPENT_AMT="383126.54" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="292782.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008503019" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2735" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 2735N" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="391193" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.233 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="379.39" TOT_SPENT_AMT="379.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="433817.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008503020" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2735" CNTY_NM="Bowie" LIMITS_FROM_DSCR="FM 2735N" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="274452" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.229 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HRR" FUND_CAT1_AMT="274452.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008504049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="0.5 MI N OF FM 44" LIMITS_TO_DSCR="0.5 MI S OF FM 44" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96995" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/4/2022" PSE_100_ACTL_DT="10/13/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="12/4/2023" CNSTR_PCT_TIME_USED="108.14" CNSTR_PCT_COMPLETE="99.98" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="2/2/2022" ENVCLR_TRGT_DT="3/2/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="3/1/2022" UTIL_ACTL_DT="11/4/2022" ROW_TRGT_DT="3/1/2022" ROW_ACTL_DT="11/4/2022" RTL_TRGT_DT="11/4/2022" RTL_ACTL_DT="11/1/2022" CNSTR_SPENT_AMT="98733.51" CE_SPENT_AMT="360.76" TOT_SPENT_AMT="99094.27" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="141084.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008504050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT FM 1701" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="140135" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/3/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="TEXAS TRAFFIC CONTROL SYSTEMS, INC." CNSTR_NTPD_DT="7/19/2022" CNSTR_WKBG_DT="11/30/2022" CNSTR_PCT_TIME_USED="83.59" CNSTR_PCT_COMPLETE="99.52" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="1/10/2022" ENVCLR_ACTL_DT="1/10/2022" UTIL_TRGT_DT="11/2/2021" UTIL_ACTL_DT="11/2/2021" ROW_TRGT_DT="11/2/2021" ROW_ACTL_DT="11/2/2021" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="3/30/2022" PE_SPENT_AMT="14429.62" CNSTR_SPENT_AMT="88156.40" CE_SPENT_AMT="3551.14" TOT_SPENT_AMT="106137.16" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="175000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008504051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="AT FM 992" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="121385" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.817 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1498.65" TOT_SPENT_AMT="1498.65" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="135951.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008504052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Bowie" LIMITS_FROM_DSCR="OKLAHOMA S/L" LIMITS_TO_DSCR="0.3 MI S OF FM 44" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="908838" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.142 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1017899.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008505006" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 144" CNTY_NM="Morris" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="US 259 N" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="179934" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2022" PSE_100_ACTL_DT="7/14/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.960 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/26/2023" CNSTR_WKBG_DT="5/25/2023" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="90.17" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="2/18/2022" ENVCLR_TRGT_DT="5/4/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="1/3/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/3/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2022" RTL_ACTL_DT="8/5/2022" CNSTR_SPENT_AMT="195236.78" CE_SPENT_AMT="2355.52" TOT_SPENT_AMT="197592.30" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="21725.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="31911.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_PID="PM" FUND_CAT3_AMT="30173.00" FUND_CAT4_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT4_PID="PM" FUND_CAT4_AMT="68882.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601073" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="4.06 MILES E OF SL 20" LIMITS_TO_DSCR="8.935 MILES E OF SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="40853482" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/8/2021" PSE_30_ACTL_DT="11/8/2021" PSE_60_TRGT_DT="3/21/2022" PSE_60_ACTL_DT="3/21/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="4/6/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.899 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="9/6/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="60.69" CNSTR_PCT_COMPLETE="51.63" DSGN_START_TRGT_DT="9/1/2021" DSGN_START_ACTL_DT="9/1/2021" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="7/29/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/15/2022" ROW_ACTL_DT="10/20/2022" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3228542.37" CNSTR_SPENT_AMT="21240370.69" CE_SPENT_AMT="1526393.84" TOT_SPENT_AMT="25995306.90" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="37983100.00" FUND_CAT2_DSCR="Category 11 - Rider (16B11)" FUND_CAT2_PID="R11" FUND_CAT2_AMT="5500000.00" FUND_CAT3_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT3_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601093" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="SL 20" LIMITS_TO_DSCR="RR 6086L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="176551" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.450 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="VECTOR UTILITIES LLC" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="112.31" CNSTR_PCT_COMPLETE="98.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8455.03" CNSTR_SPENT_AMT="165006.24" CE_SPENT_AMT="9092.60" TOT_SPENT_AMT="182553.87" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1353740.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601094" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="945237" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.406 (mi)" TXDOT_CNTCT_NM="Hyung Jun Ahn, P.E." TXDOT_CNTCT_PH_NBR="(830)703-1422" CNSTR_CMPNY_NM="VECTOR UTILITIES LLC" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="1/26/2021" CNSTR_PCT_TIME_USED="112.31" CNSTR_PCT_COMPLETE="98.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9268.88" CNSTR_SPENT_AMT="856029.72" CE_SPENT_AMT="48590.83" TOT_SPENT_AMT="913889.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="688677.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601098" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="SL 20 INTERSECTION" LIMITS_TO_DSCR="E.G. RANCH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104897" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="2/22/2022" PSE_30_ACTL_DT="3/14/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="3/25/2022" PSE_100_TRGT_DT="5/31/2022" PSE_100_ACTL_DT="6/14/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.298 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="B &amp; MS CONSTRUCTION, INC." CNSTR_NTPD_DT="9/28/2022" CNSTR_WKBG_DT="11/30/2022" CNSTR_PCT_TIME_USED="220.37" CNSTR_PCT_COMPLETE="100.24" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="2/28/2022" ENVCLR_TRGT_DT="6/21/2022" ENVCLR_ACTL_DT="6/20/2022" UTIL_TRGT_DT="6/21/2022" UTIL_ACTL_DT="6/14/2022" ROW_TRGT_DT="6/21/2022" ROW_ACTL_DT="6/14/2022" RTL_TRGT_DT="6/21/2022" RTL_ACTL_DT="6/20/2022" CNSTR_SPENT_AMT="95374.50" CE_SPENT_AMT="364.28" TOT_SPENT_AMT="95738.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="241171.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601099" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="SL 20" LIMITS_TO_DSCR="CONCORD HILLS BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="818296" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="2/22/2022" PSE_30_ACTL_DT="3/14/2022" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="3/25/2022" PSE_100_TRGT_DT="5/31/2022" PSE_100_ACTL_DT="6/14/2022" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.641 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="B &amp; MS CONSTRUCTION, INC." CNSTR_NTPD_DT="9/28/2022" CNSTR_WKBG_DT="11/30/2022" CNSTR_PCT_TIME_USED="220.37" CNSTR_PCT_COMPLETE="100.24" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="2/28/2022" ENVCLR_TRGT_DT="6/21/2022" ENVCLR_ACTL_DT="6/20/2022" UTIL_TRGT_DT="6/21/2022" UTIL_ACTL_DT="6/14/2022" ROW_TRGT_DT="6/21/2022" ROW_ACTL_DT="6/14/2022" RTL_TRGT_DT="6/21/2022" RTL_ACTL_DT="6/20/2022" PE_SPENT_AMT="45403.24" CNSTR_SPENT_AMT="785403.40" CE_SPENT_AMT="104388.49" TOT_SPENT_AMT="935195.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1132257.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601100" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="571139" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="12/7/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="47.27" CNSTR_PCT_COMPLETE="71.51" DSGN_START_TRGT_DT="12/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/23/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/23/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/23/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/23/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="224733.94" CNSTR_SPENT_AMT="580005.15" CE_SPENT_AMT="6306.68" TOT_SPENT_AMT="811045.77" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="7/12/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601101" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="CONCORD HILLS" LIMITS_TO_DSCR="LAS MISSIONES BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="467576" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="5/20/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.447 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/26/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008601102" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 83" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.05 MILES WEST OF MCPHERSON DR" LIMITS_TO_DSCR="0.13 MILES EAST OF MCPHERSON DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="425464" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="5/20/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/30/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/8/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.179 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/26/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008602023" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="8.935 MILES E OF LP 20" LIMITS_TO_DSCR="9.830 MILES E OF LP 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6833304" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="11/8/2021" PSE_30_ACTL_DT="11/8/2021" PSE_60_TRGT_DT="3/21/2022" PSE_60_ACTL_DT="3/21/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="4/6/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.849 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="9/6/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="60.69" CNSTR_PCT_COMPLETE="51.63" DSGN_START_TRGT_DT="9/1/2021" DSGN_START_ACTL_DT="9/1/2021" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="7/29/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/15/2022" ROW_ACTL_DT="10/20/2022" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="624709.11" CNSTR_SPENT_AMT="3885795.28" CE_SPENT_AMT="290719.45" TOT_SPENT_AMT="4801223.84" FUND_CAT1_DSCR="Category 11 - Rider (16B11)" FUND_CAT1_PID="R11" FUND_CAT1_AMT="5769231.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="1080844.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008602030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="17.16 MILES EAST OF SL 20" LIMITS_TO_DSCR="18.9 MILES EAST OF SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1606357" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="1/4/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.600 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.21" CNSTR_PCT_COMPLETE="103.21" DSGN_START_TRGT_DT="11/9/2020" DSGN_START_ACTL_DT="12/18/2020" ENVCLR_TRGT_DT="3/1/2021" ENVCLR_ACTL_DT="4/1/2021" UTIL_TRGT_DT="4/15/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2021" RTL_ACTL_DT="4/15/2021" PE_SPENT_AMT="216475.60" CNSTR_SPENT_AMT="1427080.28" CE_SPENT_AMT="83769.30" TOT_SPENT_AMT="1727325.18" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="2774044.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008603035" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.515 MILE WEST OF FM 2895" LIMITS_TO_DSCR="1.518 MILE EAST OF FM 469" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="528204" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/29/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/28/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.208 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.91" CNSTR_PCT_COMPLETE="21.92" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/16/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/27/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="638.08" TOT_SPENT_AMT="638.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="593087.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008604026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="40.2 MILES EAST OF SL 20" LIMITS_TO_DSCR="42.2 MILES EAST OF SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1588016" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="1/4/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.21" CNSTR_PCT_COMPLETE="103.21" DSGN_START_TRGT_DT="11/9/2020" DSGN_START_ACTL_DT="12/18/2020" ENVCLR_TRGT_DT="3/1/2021" ENVCLR_ACTL_DT="4/1/2021" UTIL_TRGT_DT="4/15/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2021" RTL_ACTL_DT="4/15/2021" PE_SPENT_AMT="69019.12" CNSTR_SPENT_AMT="1878330.94" CE_SPENT_AMT="110367.67" TOT_SPENT_AMT="2057717.73" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="2792136.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008604027" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Webb" LIMITS_FROM_DSCR="1.518 MI EAST OF FM649" LIMITS_TO_DSCR="DUVAL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="785568" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/29/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/28/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.454 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.91" CNSTR_PCT_COMPLETE="21.92" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/16/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/27/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="949.47" TOT_SPENT_AMT="949.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="890854.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008605021" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="44.2 MILES EAST OF SL 20" LIMITS_TO_DSCR="46.2 MILES EAST OF SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1668887" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="1/4/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.21" CNSTR_PCT_COMPLETE="103.21" DSGN_START_TRGT_DT="11/9/2020" DSGN_START_ACTL_DT="12/18/2020" ENVCLR_TRGT_DT="3/1/2021" ENVCLR_ACTL_DT="4/1/2021" UTIL_TRGT_DT="4/15/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2021" RTL_ACTL_DT="4/15/2021" PE_SPENT_AMT="79525.23" CNSTR_SPENT_AMT="1974785.65" CE_SPENT_AMT="115918.84" TOT_SPENT_AMT="2170229.72" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="2709137.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008605022" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="42.5 MILES EAST OF SL 20" LIMITS_TO_DSCR="44.2 MILES EAST OF SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="304824" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="1/4/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/12/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.700 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.21" CNSTR_PCT_COMPLETE="103.21" DSGN_START_TRGT_DT="11/9/2020" DSGN_START_ACTL_DT="12/18/2020" ENVCLR_TRGT_DT="3/1/2021" ENVCLR_ACTL_DT="4/1/2021" UTIL_TRGT_DT="4/15/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2021" RTL_ACTL_DT="4/15/2021" CNSTR_SPENT_AMT="360436.51" CE_SPENT_AMT="21157.69" TOT_SPENT_AMT="381594.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008605023" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="WEBB/DUVAL COUNTY LINE" LIMITS_TO_DSCR="DUVAL/JIM HOGG COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="238975" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.870 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="248534.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="4/22/2024" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008606031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="SIGRID AVE." LIMITS_TO_DSCR="JIM HOGG/DUVAL CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="224680" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.566 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="10/10/2019" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="97.32" CNSTR_PCT_COMPLETE="96.23" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="219146.25" CE_SPENT_AMT="1951.33" TOT_SPENT_AMT="221097.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="79834.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008606033" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="0.200 MI W OF SIGRID AVE." LIMITS_TO_DSCR="0.090 MI W OF SIGRID AVE." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="68955" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Replace Guardrail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/5/2020" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.110 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="3/8/2021" CNSTR_PCT_TIME_USED="215.23" CNSTR_PCT_COMPLETE="105.38" DSGN_START_TRGT_DT="4/13/2020" DSGN_START_ACTL_DT="4/13/2020" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="6/3/2020" UTIL_TRGT_DT="6/23/2020" UTIL_ACTL_DT="6/5/2020" ROW_TRGT_DT="6/23/2020" ROW_ACTL_DT="6/5/2020" RTL_TRGT_DT="6/23/2020" RTL_ACTL_DT="6/5/2020" CNSTR_SPENT_AMT="75806.44" CE_SPENT_AMT="8215.22" TOT_SPENT_AMT="84021.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="69699.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008606034" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008606035" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="SIGRID AVE." LIMITS_TO_DSCR="SH 16" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="75686" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/19/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="3/31/2025" CNSTR_PCT_TIME_USED="37.50" CNSTR_PCT_COMPLETE="43.98" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="36991.08" CE_SPENT_AMT="321.99" TOT_SPENT_AMT="37313.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="95573.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008607037" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="0.88 MI N OF LUCILLE ST." LIMITS_TO_DSCR="0.98 MI N OF LUCILLE ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="62471" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Replace Guardrail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/5/2020" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="3/8/2021" CNSTR_PCT_TIME_USED="215.23" CNSTR_PCT_COMPLETE="105.38" DSGN_START_TRGT_DT="4/13/2020" DSGN_START_ACTL_DT="4/13/2020" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="6/3/2020" UTIL_TRGT_DT="6/23/2020" UTIL_ACTL_DT="6/5/2020" ROW_TRGT_DT="6/23/2020" ROW_ACTL_DT="6/5/2020" RTL_TRGT_DT="6/23/2020" RTL_ACTL_DT="6/5/2020" CNSTR_SPENT_AMT="76651.63" CE_SPENT_AMT="7487.33" TOT_SPENT_AMT="84138.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="63851.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008607038" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 359" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="GALBRAITH ST." LIMITS_TO_DSCR="JIM HOGG/DUVAL COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="225118" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="382.99" TOT_SPENT_AMT="382.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="243127.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008607039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="SH 16" LIMITS_TO_DSCR="OLD CEMETERY RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="48035" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/31/2025" CNSTR_PCT_TIME_USED="49.00" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2728.74" CNSTR_SPENT_AMT="56719.02" CE_SPENT_AMT="550.13" TOT_SPENT_AMT="59997.89" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="53789.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008607040" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 16" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="0.1 MI. N. OF SH 359 (GALBRAITH ST.)" LIMITS_TO_DSCR="0.1 MI. S. OF SH 359 (GALBRAITH ST.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="267603" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="86.10" TOT_SPENT_AMT="86.10" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008607041" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 16" CNTY_NM="Jim Hogg" LIMITS_FROM_DSCR="0.1 MI. N. OF SH 359 (VIGGIE ST.)" LIMITS_TO_DSCR="0.1 MI. S. OF SH 359 (VIGGIE ST.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="267603" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39.08" TOT_SPENT_AMT="39.08" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008608028" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="JIM HOGG/DUVAL COUNTY LINE" LIMITS_TO_DSCR="0.6 MI NORTH OF FM 716" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="942540" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/29/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/28/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/24/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.943 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.91" CNSTR_PCT_COMPLETE="21.92" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/16/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/16/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/16/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/27/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34419.83" CNSTR_SPENT_AMT="1361027.66" CE_SPENT_AMT="770.48" TOT_SPENT_AMT="1396217.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1605040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008609042" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="CR 307" LIMITS_TO_DSCR="TEXAS BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="201408" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.930 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRP INFRASTRUCTURE SERVICES, LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="1/16/2025" CNSTR_PCT_TIME_USED="56.25" CNSTR_PCT_COMPLETE="72.94" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11701.61" CNSTR_SPENT_AMT="94967.45" CE_SPENT_AMT="17282.65" TOT_SPENT_AMT="123951.71" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="295834.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008609043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 339" CNTY_NM="Duval" LIMITS_FROM_DSCR="SH 339" LIMITS_TO_DSCR="FM 3196" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="309024" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.385 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="309025.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008609044" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="FM 3196" LIMITS_TO_DSCR="FM 2295" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="273200" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.352 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="273201.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008610053" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="SH 44" LIMITS_TO_DSCR="SAN DIEGO CREEK BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3426634" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="5/9/2017" PSE_30_ACTL_DT="5/9/2017" PSE_60_TRGT_DT="8/17/2017" PSE_60_ACTL_DT="8/17/2017" PSE_100_TRGT_DT="4/19/2021" PSE_100_ACTL_DT="4/19/2021" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.341 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="MAKO CONTRACTING, LLC" CNSTR_NTPD_DT="8/9/2023" CNSTR_WKBG_DT="9/8/2023" CNSTR_PCT_TIME_USED="97.61" CNSTR_PCT_COMPLETE="77.92" DSGN_START_TRGT_DT="1/30/2017" DSGN_START_ACTL_DT="1/30/2017" ENVCLR_TRGT_DT="3/23/2021" ENVCLR_ACTL_DT="3/23/2021" UTIL_TRGT_DT="6/5/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/5/2023" RTL_ACTL_DT="5/2/2023" PE_SPENT_AMT="905896.76" CNSTR_SPENT_AMT="3062851.61" CE_SPENT_AMT="193513.49" TOT_SPENT_AMT="4162261.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="3114727.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008610054" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="0.079 MI E OF FM 2295" LIMITS_TO_DSCR="SH 44" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="76810" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.231 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="72743.30" CE_SPENT_AMT="4164.68" TOT_SPENT_AMT="76907.98" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="370848.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008610057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 44" CNTY_NM="Duval" LIMITS_FROM_DSCR="SH 359" LIMITS_TO_DSCR="JIM WELLS CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="615389" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.282 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1631.19" TOT_SPENT_AMT="1631.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="615389.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008610058" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Duval" LIMITS_FROM_DSCR="FM 2295 EAST INTERSECTION" LIMITS_TO_DSCR="2.107 MILES EAST OF FM 2295" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1604925" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/30/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.107 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/4/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2263.74" TOT_SPENT_AMT="2263.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1604926.00" TXDOT_CNTCT_LAST_UPDATE_DT="2/6/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008611050" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 44" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="FM 1554" LIMITS_TO_DSCR="VENTURA ST." PRJ_TIER="" ENERGY="" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="3/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/8/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.488 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/1/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/8/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/13/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/13/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/13/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="11200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008611054" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 44" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="US 281" LIMITS_TO_DSCR="SAN DIEGO (EOM)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4520397" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4882029.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.54 MILES SOUTH OF DEL MAR BLVD" LIMITS_TO_DSCR="0.67 MILES NORTH OF DEL MAR BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="76501827" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.208 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2837629.87" CNSTR_SPENT_AMT="12560493.61" CE_SPENT_AMT="427569.59" TOT_SPENT_AMT="15825693.07" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="2647149.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="754006.00" FUND_CAT3_DSCR="Category 10 - Coordinated Border Infrastructure (1010CB)" FUND_CAT3_PID="CBI" FUND_CAT3_AMT="16927107.00" FUND_CAT4_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT4_AMT="7934240.00" FUND_CAT5_DSCR="Category 11 - Rider (16B11)" FUND_CAT5_PID="R11" FUND_CAT5_AMT="24594324.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614076" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.51 MILES SOUTH OF SHILOH DRIVE" LIMITS_TO_DSCR="0.49 MILES NORTH OF SHILOH DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42854875" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1546585.09" CNSTR_SPENT_AMT="12660298.69" CE_SPENT_AMT="517400.67" TOT_SPENT_AMT="14724284.45" FUND_CAT1_DSCR="Category 10 - Coordinated Border Infrastructure (1010CB)" FUND_CAT1_PID="CBI" FUND_CAT1_AMT="10232266.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="5733203.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="630707.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614077" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.50 MI SOUTH OF E. CORRIDOR RD(AIRPORT)" LIMITS_TO_DSCR="0.50 MI NORTH OF E. CORRIDOR RD(AIRPORT)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33330081" DIST_LET_DATE="7/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="4/14/2021" PSE_30_ACTL_DT="4/14/2021" PSE_60_TRGT_DT="10/22/2021" PSE_60_ACTL_DT="10/22/2021" PSE_100_TRGT_DT="6/27/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="6/10/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/14/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/10/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/16/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="727250.14" CE_SPENT_AMT="120.42" TOT_SPENT_AMT="727370.56" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="37319692.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.50 MI S OF JACAMAN RD" LIMITS_TO_DSCR="0.50 MI N OF JACAMAN RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49285317" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2026524.04" CNSTR_SPENT_AMT="14567655.34" CE_SPENT_AMT="496861.07" TOT_SPENT_AMT="17091040.45" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="28003889.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="14777127.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.36 MILES SOUTH OF UNIVERSITY BOULEVARD" LIMITS_TO_DSCR="0.26 MILES NORTH OF UNIVERSITY BOULEVARD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27615154" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.064 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1215608.39" CNSTR_SPENT_AMT="8154387.27" CE_SPENT_AMT="278084.44" TOT_SPENT_AMT="9648080.10" FUND_CAT1_DSCR="Category 10 - Coordinated Border Infrastructure (1010CB)" FUND_CAT1_PID="CBI" FUND_CAT1_AMT="2823593.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="4052143.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_AMT="651785.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614086" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="BUSINESS 59" LIMITS_TO_DSCR="0.28 MILES SOUTH OF JACAMAN RD." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="71102563" DIST_LET_DATE="7/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="4/14/2021" PSE_30_ACTL_DT="4/14/2021" PSE_60_TRGT_DT="10/22/2021" PSE_60_ACTL_DT="10/22/2021" PSE_100_TRGT_DT="6/27/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.040 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="6/10/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/14/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/10/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/16/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4698511.59" CE_SPENT_AMT="1349.82" TOT_SPENT_AMT="4699861.41" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="79634871.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.12 MI S. OF E. CORRIDOR RD.(AIRPORT)" LIMITS_TO_DSCR="0.36 MI SOUTH OF UNIVERSITY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26636821" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.130 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3114168.55" CNSTR_SPENT_AMT="7856909.62" CE_SPENT_AMT="268985.12" TOT_SPENT_AMT="11240063.29" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="24338678.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="2298143.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.93 MI SOUTH OF UNIVERSITY BLVD" LIMITS_TO_DSCR="0.51 MI SOUTH OF SHILOH DR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="54907180" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.415 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4631322.49" CNSTR_SPENT_AMT="16195032.98" CE_SPENT_AMT="805579.95" TOT_SPENT_AMT="21631935.42" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="1317588.00" FUND_CAT2_DSCR="Category 10 - Coordinated Border Infrastructure (1010CB)" FUND_CAT2_PID="CBI" FUND_CAT2_AMT="24066285.00" FUND_CAT3_DSCR="Category 11 - Rider (16B11)" FUND_CAT3_PID="R11" FUND_CAT3_AMT="8144510.00" FUND_CAT4_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT4_AMT="9878796.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.51 MI SOUTH OF SHILOH" LIMITS_TO_DSCR="INTERNATIONAL BLVD." PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/21/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52695081" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="12/14/2020" PSE_30_ACTL_DT="12/14/2020" PSE_60_TRGT_DT="7/21/2021" PSE_60_ACTL_DT="7/21/2021" PSE_100_TRGT_DT="2/16/2023" PSE_100_ACTL_DT="1/5/2023" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.944 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="8/23/2023" CNSTR_WKBG_DT="2/19/2024" CNSTR_PCT_TIME_USED="22.17" CNSTR_PCT_COMPLETE="27.99" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="8/31/2021" ENVCLR_ACTL_DT="8/31/2021" UTIL_TRGT_DT="1/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/28/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2846495.42" CNSTR_SPENT_AMT="15521333.69" CE_SPENT_AMT="653363.02" TOT_SPENT_AMT="19021192.13" FUND_CAT1_DSCR="Category 10 - Coordinated Border Infrastructure (1010CB)" FUND_CAT1_PID="CBI" FUND_CAT1_AMT="1437549.00" FUND_CAT2_DSCR="Category 11 - Rider (16B11)" FUND_CAT2_PID="R11" FUND_CAT2_AMT="6190275.00" FUND_CAT3_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT3_AMT="10500090.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614099" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.3 MI WEST OF IH 35 (NB&amp;SB)" LIMITS_TO_DSCR="0.3 MI E OF MCPHERSON RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1616712" DIST_LET_DATE="2/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.735 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1810717.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614101" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 260" CNTY_NM="Webb" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SH 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="225650" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="11/21/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/31/2023" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="TRIPLE H FIELD SERVICES, LLC" CNSTR_NTPD_DT="9/13/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="101.34" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="3/22/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/22/2023" UTIL_ACTL_DT="5/3/2023" ROW_TRGT_DT="3/22/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/22/2023" RTL_ACTL_DT="5/3/2023" PE_SPENT_AMT="187111.73" CNSTR_SPENT_AMT="248705.40" CE_SPENT_AMT="24592.38" TOT_SPENT_AMT="460409.51" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="326981.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="GRAND CENTRAL BLVD" LIMITS_TO_DSCR="INTERNATIONAL BLVD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4800000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.519 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="30430.04" TOT_SPENT_AMT="30430.04" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="5184000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614104" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.03 MI S OF US 59 (NBSB) (ML)" LIMITS_TO_DSCR="SH 359/SL 20 INT" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4493789" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.152 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="5033044.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.5 MI WEST OF IH 35 (NBSB)(ML)" LIMITS_TO_DSCR="0.3 MI E OF MCPHERSON RD" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1812355" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.470 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="2029837.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008614106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 69W" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.10 MILES NORTH OF RIVERBANK DR" LIMITS_TO_DSCR="0.10 MILES SOUTH OF RIVERBANK DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="397415" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="THE LEVY COMPANY, LLC" CNSTR_NTPD_DT="4/17/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616008" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.580 MILES SOUTH OF LOMAS DEL SUR BLVD" LIMITS_TO_DSCR="0.721 MILES NORTH OF LOMAS DEL SUR BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45239785" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.300 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.17" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2874894.25" CNSTR_SPENT_AMT="74485.57" CE_SPENT_AMT="56611.06" TOT_SPENT_AMT="3005990.88" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2507)" FUND_CAT1_AMT="7030287.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616009" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.1 MILES SOUTH OF CIELITO LINDO BLVD" LIMITS_TO_DSCR="0.1 MILES NORTH OF CIELITO LINDO BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="37500000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1643485.47" TOT_SPENT_AMT="1643485.47" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="38000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616010" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.1 MILES SOUTH OF SIERRA VISTA BLVD" LIMITS_TO_DSCR="0.1 MILES NORTH OF SIERRA VISTA BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="40000000" DIST_LET_DATE="8/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1477700.42" TOT_SPENT_AMT="1477700.42" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="27300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616013" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="SH 359" LIMITS_TO_DSCR="MANGANA HEIN RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8314716" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.051 (mi)" TXDOT_CNTCT_NM="Jorge Millan, P.E." TXDOT_CNTCT_PH_NBR="(830)876-1000" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/25/2024" CNSTR_WKBG_DT="5/27/2024" CNSTR_PCT_TIME_USED="96.12" CNSTR_PCT_COMPLETE="97.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="97.00" CNSTR_SPENT_AMT="8207525.67" CE_SPENT_AMT="173938.27" TOT_SPENT_AMT="8381560.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="8577461.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.721 MILES NORTH OF LOMAS DEL SUR BLVD" LIMITS_TO_DSCR="0.54 MILES SOUTH OF SH 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4347122" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.323 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.17" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="539563.28" CNSTR_SPENT_AMT="7864.43" CE_SPENT_AMT="5977.17" TOT_SPENT_AMT="553404.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="4320687.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616019" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="0.4 MILES SOUTH OF SIERRA VISTA BLVD" LIMITS_TO_DSCR="MANGANA-HEIN RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1909646" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.886 (mi)" TXDOT_CNTCT_NM="Jose Vargas, P.E." TXDOT_CNTCT_PH_NBR="(956)712-7701" CNSTR_CMPNY_NM="THE LEVY COMPANY, LLC" CNSTR_NTPD_DT="4/17/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8900.26" TOT_SPENT_AMT="8900.26" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008616020" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 20" CNTY_NM="Webb" LIMITS_FROM_DSCR="SH 359/SL 20 INT (NBSB)(ML)" LIMITS_TO_DSCR="0.4 MI SOUTH OF SH 359/SL 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="454549" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Laredo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.400 (mi)" TXDOT_CNTCT_NM="Robert Rodriguez III, P.E." TXDOT_CNTCT_PH_NBR="956-712-7735" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="509095.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008619033" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 665" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="FM 1931" LIMITS_TO_DSCR="NUECES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28000000" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.551 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="737715.29" TOT_SPENT_AMT="737715.29" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="31360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008619036" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 665" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="FM 1352" LIMITS_TO_DSCR="NUECES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="601734" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/3/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.294 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="3/6/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="107.32" CNSTR_PCT_COMPLETE="93.56" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="6/2/2021" ENVCLR_TRGT_DT="8/8/2022" ENVCLR_ACTL_DT="6/18/2021" UTIL_TRGT_DT="8/8/2022" UTIL_ACTL_DT="8/5/2022" ROW_TRGT_DT="8/8/2022" ROW_ACTL_DT="8/5/2022" RTL_TRGT_DT="8/8/2022" RTL_ACTL_DT="8/5/2022" CNSTR_SPENT_AMT="612320.00" CE_SPENT_AMT="7212.04" TOT_SPENT_AMT="619532.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="576560.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008620021" PT_PHASE="Planning, 10+ years" HWY_NBR="FM 665" CNTY_NM="Nueces" LIMITS_FROM_DSCR="JIM WELLS COUNTY LINE" LIMITS_TO_DSCR="FM 666 INTERSECTION (CONTROL BREAK)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28000000" DIST_LET_DATE="5/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.600 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1317.54" TOT_SPENT_AMT="1317.54" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008620023" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 665" CNTY_NM="Nueces" LIMITS_FROM_DSCR="CR 107" LIMITS_TO_DSCR="FM 666" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2247833" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="3/11/2021" PSE_30_ACTL_DT="2/12/2021" PSE_60_TRGT_DT="4/27/2021" PSE_60_ACTL_DT="4/2/2021" PSE_100_TRGT_DT="6/15/2021" PSE_100_ACTL_DT="6/18/2021" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.556 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="12/30/2021" CNSTR_WKBG_DT="1/17/2022" CNSTR_PCT_TIME_USED="111.27" CNSTR_PCT_COMPLETE="99.19" DSGN_START_TRGT_DT="1/25/2021" DSGN_START_ACTL_DT="9/1/2020" ENVCLR_TRGT_DT="7/20/2021" ENVCLR_ACTL_DT="10/22/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/20/2021" RTL_ACTL_DT="6/18/2021" PE_SPENT_AMT="69212.24" CNSTR_SPENT_AMT="2372457.82" CE_SPENT_AMT="127060.79" TOT_SPENT_AMT="2568730.85" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1312996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008701107" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="SH 44" LIMITS_TO_DSCR=".3 MI N OF CR325 (CONTROL BREAK)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25000000" DIST_LET_DATE="5/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.167 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008701109" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 44" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="FM 1931" LIMITS_TO_DSCR="SH 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="426669" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/3/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.283 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="3/6/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="107.32" CNSTR_PCT_COMPLETE="93.56" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="6/2/2021" ENVCLR_TRGT_DT="8/8/2022" ENVCLR_ACTL_DT="6/18/2021" UTIL_TRGT_DT="8/8/2022" UTIL_ACTL_DT="8/5/2022" ROW_TRGT_DT="8/8/2022" ROW_ACTL_DT="8/5/2022" RTL_TRGT_DT="8/8/2022" RTL_ACTL_DT="8/5/2022" CNSTR_SPENT_AMT="452490.90" CE_SPENT_AMT="5206.59" TOT_SPENT_AMT="457697.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="368854.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008701110" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="ON SH359 FROM .5 MI N OF FM2044" LIMITS_TO_DSCR=".5 MI S OF FM 2044" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/17/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="76213" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="7/15/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="10/17/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/31/2023" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.067 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="MALDONADO-BURKETT, LLP" CNSTR_NTPD_DT="7/20/2023" CNSTR_WKBG_DT="3/4/2024" CNSTR_PCT_TIME_USED="71.74" CNSTR_PCT_COMPLETE="97.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="3/10/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/10/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/31/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/31/2023" RTL_TRGT_DT="TBD" RTL_ACTL_DT="3/31/2023" CNSTR_SPENT_AMT="76929.24" CE_SPENT_AMT="13691.90" TOT_SPENT_AMT="90621.14" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="214444.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008701111" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="1000 FT N OF FM 2044" LIMITS_TO_DSCR="1000 FT S OF FM 2044" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="240403" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.379 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/8/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="240403.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/4/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008701112" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="SH 44" LIMITS_TO_DSCR="END OF CONTROL SECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="376120" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.090 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="82.61" CNSTR_PCT_COMPLETE="100.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="400244.40" CE_SPENT_AMT="3910.86" TOT_SPENT_AMT="404155.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="435977.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702051" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="SOYARS ST IN ORANGE GROVE" LIMITS_TO_DSCR="SAN PATRICIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3300000" DIST_LET_DATE="6/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Spot Base Repair And Overlay" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.915 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="3300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702052" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR=".3 MI N OF CR325 (CONTROL BREAK)" LIMITS_TO_DSCR="FM 624" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32000000" DIST_LET_DATE="5/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.308 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702053" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="CR 308" LIMITS_TO_DSCR="FM 70" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18000000" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="10/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1696232.01" TOT_SPENT_AMT="1696232.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="18720000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="800 FT S OF FM 534" LIMITS_TO_DSCR="800 FT N OF FM 534" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="156536" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="4/17/2023" PSE_30_ACTL_DT="12/2/2022" PSE_60_TRGT_DT="4/17/2023" PSE_60_ACTL_DT="2/24/2023" PSE_100_TRGT_DT="4/17/2023" PSE_100_ACTL_DT="4/27/2023" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.379 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="D&amp;G ENERGY CORPORATION" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/9/2024" CNSTR_PCT_TIME_USED="186.89" CNSTR_PCT_COMPLETE="97.42" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="1/4/2021" ENVCLR_TRGT_DT="4/17/2023" ENVCLR_ACTL_DT="3/13/2023" UTIL_TRGT_DT="4/17/2023" UTIL_ACTL_DT="4/27/2023" ROW_TRGT_DT="4/17/2023" ROW_ACTL_DT="4/27/2023" RTL_TRGT_DT="4/17/2023" RTL_ACTL_DT="4/27/2023" PE_SPENT_AMT="15676.07" CNSTR_SPENT_AMT="149160.94" CE_SPENT_AMT="23153.45" TOT_SPENT_AMT="187990.46" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="136462.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="BEGINNING OF CONTROL SECTION" LIMITS_TO_DSCR="CR 308" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="261783" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.353 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="82.61" CNSTR_PCT_COMPLETE="100.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="278146.98" CE_SPENT_AMT="2723.09" TOT_SPENT_AMT="280870.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="304689.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702058" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="0.5 MI. S OF FM 70" LIMITS_TO_DSCR="SAN PATRICIO COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="149045" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.383 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="157240.02" CE_SPENT_AMT="706.59" TOT_SPENT_AMT="157946.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="223600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 359" CNTY_NM="Jim Wells" LIMITS_FROM_DSCR="1,000 FEET WEST OF WENDT ST" LIMITS_TO_DSCR="600 FEET EAST OF W MENDOZA AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/28/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="351435" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="MAKO CONTRACTING, LLC" CNSTR_NTPD_DT="10/10/2024" CNSTR_WKBG_DT="12/2/2024" CNSTR_PCT_TIME_USED="45.10" CNSTR_PCT_COMPLETE="35.02" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31018.45" CNSTR_SPENT_AMT="61094.00" CE_SPENT_AMT="7666.24" TOT_SPENT_AMT="99778.69" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008702060" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008703031" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 359" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="JIM WELLS COUNTY LINE" LIMITS_TO_DSCR="MONTANA ST. (MATHIS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Spot Base Repair, Shldr Levelup And Overlay" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.921 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008704042" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008704043" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 359" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SS 459" LIMITS_TO_DSCR="EAST OF IH 37" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="197663" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="221383.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008705030" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 359" CNTY_NM="Bee" LIMITS_FROM_DSCR="SAN PATRICIO COUNTY LINE" LIMITS_TO_DSCR="US 181" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8250000" DIST_LET_DATE="12/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.294 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008705032" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008705033" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 359" CNTY_NM="Bee" LIMITS_FROM_DSCR="SAN PATRICIO COUNTY LINE" LIMITS_TO_DSCR="US 181" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="790635" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="885511.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008706031" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 359B" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="ON E. SAN PATRICIO AVE @ N.  BEE ST" LIMITS_TO_DSCR="SH 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1078557" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="MAKO CONTRACTING, LLC" CNSTR_NTPD_DT="3/16/2023" CNSTR_WKBG_DT="4/27/2023" CNSTR_PCT_TIME_USED="180.80" CNSTR_PCT_COMPLETE="108.97" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="170377.85" CNSTR_SPENT_AMT="1158777.64" CE_SPENT_AMT="52270.58" TOT_SPENT_AMT="1381426.07" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2310CR)" FUND_CAT1_PID="MAS" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008801047" PT_PHASE="Planning, 10+ years" HWY_NBR="US 59" CNTY_NM="Bee" LIMITS_FROM_DSCR="2.3 MI NE OF US 181" LIMITS_TO_DSCR="GOLIAD COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45000000" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Additional 2 Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.914 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="222480.67" TOT_SPENT_AMT="222480.67" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="PH1" FUND_CAT1_AMT="22500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008801048" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 59" CNTY_NM="Bee" LIMITS_FROM_DSCR="2 MILES SW OF FM 351" LIMITS_TO_DSCR="2 MILES NE OF US 181" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="350000000" DIST_LET_DATE="12/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Environmental Study &amp; Documentation" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.000 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8209.04" TOT_SPENT_AMT="8209.04" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="1200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="5/29/2024" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008802050" PT_PHASE="Planning, 10+ years" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="BEE COUNTY LINE" LIMITS_TO_DSCR="SH 239" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="80000000" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Additional 2 Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.048 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="426804.88" TOT_SPENT_AMT="426804.88" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="PH1" FUND_CAT1_AMT="45000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008802051" PT_PHASE="Planning, 10+ years" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="SH 239" LIMITS_TO_DSCR="GOLIAD WEST CITY LIMIT" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Additional 2 Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="158464.44" TOT_SPENT_AMT="158464.44" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="PH1" FUND_CAT1_AMT="4000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008802062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="ON US59 AT SAN ANTONIO RIVER STR.9" LIMITS_TO_DSCR="3.0 MI. SW OF US 183" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/6/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="31574353" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/9/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.244 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="4/21/2025" CNSTR_PCT_TIME_USED="4.32" CNSTR_PCT_COMPLETE="22.50" DSGN_START_TRGT_DT="3/29/2022" DSGN_START_ACTL_DT="9/27/2022" ENVCLR_TRGT_DT="2/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/8/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/8/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2127426.86" CNSTR_SPENT_AMT="7116433.34" CE_SPENT_AMT="57576.03" TOT_SPENT_AMT="9301436.23" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2510)" FUND_CAT1_PID="BIG" FUND_CAT1_AMT="17547359.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT2_PID="BSP" FUND_CAT2_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008802063" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="330 FT. E OF FORT ST" LIMITS_TO_DSCR="SH 239" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3500000" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.080 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28178.36" TOT_SPENT_AMT="28178.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="3780000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008802070" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="US 183" LIMITS_TO_DSCR="FORT ST." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="590.56" TOT_SPENT_AMT="590.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1040000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008803047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="VICTORIA COUNTY LINE" LIMITS_TO_DSCR="CONTROL BREAK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/21/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2405250" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/3/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.152 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="3/6/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="107.32" CNSTR_PCT_COMPLETE="93.56" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="6/2/2021" ENVCLR_TRGT_DT="8/8/2022" ENVCLR_ACTL_DT="6/18/2021" UTIL_TRGT_DT="8/8/2022" UTIL_ACTL_DT="8/5/2022" ROW_TRGT_DT="8/8/2022" ROW_ACTL_DT="8/5/2022" RTL_TRGT_DT="8/8/2022" RTL_ACTL_DT="8/5/2022" CNSTR_SPENT_AMT="2257547.10" CE_SPENT_AMT="28184.64" TOT_SPENT_AMT="2285731.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1560520.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008803048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="VICTORIA COUNTY LINE" LIMITS_TO_DSCR="WRIGHT ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/25/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10014542" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="12/9/2022" PSE_30_ACTL_DT="12/9/2022" PSE_60_TRGT_DT="1/20/2023" PSE_60_ACTL_DT="1/20/2023" PSE_100_TRGT_DT="4/3/2023" PSE_100_ACTL_DT="3/31/2023" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.755 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/9/2023" CNSTR_WKBG_DT="11/14/2023" CNSTR_PCT_TIME_USED="96.32" CNSTR_PCT_COMPLETE="100.22" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="4/3/2023" ENVCLR_ACTL_DT="3/14/2023" UTIL_TRGT_DT="4/4/2023" UTIL_ACTL_DT="3/31/2023" ROW_TRGT_DT="4/4/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/31/2023" PE_SPENT_AMT="44780.64" CNSTR_SPENT_AMT="10880688.60" CE_SPENT_AMT="282873.68" TOT_SPENT_AMT="11208342.92" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="11521610.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008803049" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008803050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Goliad" LIMITS_FROM_DSCR="WRIGHT ST." LIMITS_TO_DSCR="330 FT E OF FORT ST." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="540000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008804071" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="0.7 MI. SOUTH OF BU 59T" LIMITS_TO_DSCR="BU 59T" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32527531" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="2/22/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/19/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/4/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.700 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/29/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/4/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/3/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1225266.90" CNSTR_SPENT_AMT="19626.90" TOT_SPENT_AMT="1244893.80" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="BU 59-T" LIMITS_TO_DSCR="BU 77S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7439303" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/31/2021" PSE_30_ACTL_DT="1/7/2022" PSE_60_TRGT_DT="1/11/2022" PSE_60_ACTL_DT="5/17/2022" PSE_100_TRGT_DT="7/12/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.487 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="9/19/2023" CNSTR_WKBG_DT="11/20/2023" CNSTR_PCT_TIME_USED="83.71" CNSTR_PCT_COMPLETE="80.24" DSGN_START_TRGT_DT="9/26/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/9/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/31/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/30/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/9/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1426557.36" CNSTR_SPENT_AMT="5869285.83" CE_SPENT_AMT="60118.37" TOT_SPENT_AMT="7355961.56" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805098" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="SH 185" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13531313" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/5/2021" PSE_100_ACTL_DT="6/3/2021" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.136 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="4/7/2022" CNSTR_PCT_TIME_USED="96.30" CNSTR_PCT_COMPLETE="103.34" DSGN_START_TRGT_DT="12/21/2017" DSGN_START_ACTL_DT="12/21/2017" ENVCLR_TRGT_DT="6/4/2021" ENVCLR_ACTL_DT="6/4/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/4/2021" RTL_ACTL_DT="6/4/2021" PE_SPENT_AMT="469450.83" CNSTR_SPENT_AMT="14408406.33" CE_SPENT_AMT="454473.87" TOT_SPENT_AMT="15332331.03" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="3500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="BU 59T NB AT SKYTOP ST. STR#0088-05-194" LIMITS_TO_DSCR="BU 59T NB AT SKYTOP ST. STR#0088-05-195" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16696429" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/6/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/6/2020" DSGN_START_ACTL_DT="4/6/2020" ENVCLR_TRGT_DT="12/5/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/5/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/5/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/5/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1150153.16" TOT_SPENT_AMT="1150153.16" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BSP" FUND_CAT1_AMT="18700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805104" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="0.450 MILES SOUTH OF SH 185" LIMITS_TO_DSCR="0.391 MILES NORTH OF FM 1686" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/4/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5347549" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2020" PSE_100_ACTL_DT="5/5/2020" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.988 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="1/12/2021" CNSTR_PCT_TIME_USED="107.06" CNSTR_PCT_COMPLETE="104.83" DSGN_START_TRGT_DT="8/2/2019" DSGN_START_ACTL_DT="8/2/2019" ENVCLR_TRGT_DT="5/8/2020" ENVCLR_ACTL_DT="5/8/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/8/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="40629.34" CNSTR_SPENT_AMT="6029849.28" CE_SPENT_AMT="173462.43" TOT_SPENT_AMT="6243941.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="5829218.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805105" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR=".146 MI N OF FM 1686" LIMITS_TO_DSCR="0.75 MI S OF FM 1686" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="2/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="10/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/4/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.653 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/3/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/3/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="288101.35" TOT_SPENT_AMT="288101.35" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="16599856.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/26/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805109" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="BU 59T" LIMITS_TO_DSCR="0.7 MI. NORTH OF BU 59T" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="14969708" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="2/22/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/19/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/4/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.700 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/29/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/4/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/3/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1177715.42" TOT_SPENT_AMT="1177715.42" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805111" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="SL 463" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327520" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/2/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="5/21/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.01" DSGN_START_TRGT_DT="2/17/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/17/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1166.97" CNSTR_SPENT_AMT="370562.62" CE_SPENT_AMT="3841.73" TOT_SPENT_AMT="375571.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="385117.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805112" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="US 59 NEAR SPUR 91" LIMITS_TO_DSCR="US 59 NEAR SPUR 91" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="132441" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="148334.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805113" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="US 59 FRONTAGE NEAR BUS 59T" LIMITS_TO_DSCR="US 59 FRONTAGE NEAR BUS 59T" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="54941" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="41.77" TOT_SPENT_AMT="41.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="61534.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008805114" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="LP 463" LIMITS_TO_DSCR="BU 59T" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3250000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.400 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29135.50" TOT_SPENT_AMT="29135.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3510000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008901092" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="0.391 MILES NORTH OF FM 1686" LIMITS_TO_DSCR="1.337 MILES NORTH OF FM 1686" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/4/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1531040" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2020" PSE_100_ACTL_DT="5/5/2020" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.945 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="1/12/2021" CNSTR_PCT_TIME_USED="107.06" CNSTR_PCT_COMPLETE="104.83" DSGN_START_TRGT_DT="8/2/2019" DSGN_START_ACTL_DT="8/2/2019" ENVCLR_TRGT_DT="5/8/2020" ENVCLR_ACTL_DT="5/8/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/8/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="115308.50" CNSTR_SPENT_AMT="1429557.01" CE_SPENT_AMT="60769.42" TOT_SPENT_AMT="1605634.93" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="769584.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008901093" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="0.80 MI N OF FM 444" LIMITS_TO_DSCR="1.323 MI N OF FM 1686" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="260000000" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="10/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/4/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.660 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/3/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/3/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1623012.51" TOT_SPENT_AMT="1623012.51" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008901094" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="1.323 MI N OF FM 1686" LIMITS_TO_DSCR=".146 MI N OF FM 1686" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="2/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="10/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/4/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.180 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/5/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/3/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/3/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="328024.16" TOT_SPENT_AMT="328024.16" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="37809330.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/26/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008901097" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="1.030 MI E FM 444-S" LIMITS_TO_DSCR="TREASURE OAKS RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="305654" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="538.28" TOT_SPENT_AMT="538.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="330106.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008901098" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Victoria" LIMITS_FROM_DSCR="BU 59T" LIMITS_TO_DSCR="JACKSON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13650000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.215 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10368.32" TOT_SPENT_AMT="10368.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="14742000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008903096" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="0.30 MI N OF VICTORIA C/L" LIMITS_TO_DSCR="0.40 MI N OF LAVACA RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="391095" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="BEAR CREEK CONTRACTING, LLC" CNSTR_NTPD_DT="3/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="60533.02" TOT_SPENT_AMT="60533.02" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008903099" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="VICTORIA C/L" LIMITS_TO_DSCR="LAVACA RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9900000" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.143 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14649.68" TOT_SPENT_AMT="14649.68" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008903100" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="2350 FT EAST OF FM 234 S(FRONTAGE RD)" LIMITS_TO_DSCR="2700 FT WEST OF CR 317 (FRONTAGE RDS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="261163" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.603 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="282056.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008903101" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008903102" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008903103" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008904082" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="0.020 MI N OF FM 710" LIMITS_TO_DSCR="2.470 MI S OF FM 710" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="515003" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.493 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="4/29/2025" CNSTR_PCT_TIME_USED="17.14" CNSTR_PCT_COMPLETE="36.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13779.70" CNSTR_SPENT_AMT="77498.94" CE_SPENT_AMT="573.06" TOT_SPENT_AMT="91851.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="622124.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008904085" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="SL 521" LIMITS_TO_DSCR="FM 710" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="394401150" DIST_LET_DATE="12/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.491 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3797.93" TOT_SPENT_AMT="3797.93" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008904086" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008904087" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008905047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="WHARTON C/L" LIMITS_TO_DSCR="FM 710" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.750 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/24/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/5/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23446.74" TOT_SPENT_AMT="23446.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="4680000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008905049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="0.020 MI N OF FM 710" LIMITS_TO_DSCR="1.445 MI N OF FM 710" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250988" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.502 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="4/29/2025" CNSTR_PCT_TIME_USED="17.14" CNSTR_PCT_COMPLETE="36.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7089.50" TOT_SPENT_AMT="7089.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="381301.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008905050" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 59" CNTY_NM="Jackson" LIMITS_FROM_DSCR="FM 710" LIMITS_TO_DSCR="WHARTON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="248929200" DIST_LET_DATE="12/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.728 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3803.74" TOT_SPENT_AMT="3803.74" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008906080" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="BU 59 SOUTH OF EL CAMPO" LIMITS_TO_DSCR="0.50 MI S OF CR 352" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="200000000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="4/4/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/8/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/5/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.788 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/6/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2029" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9462325.91" TOT_SPENT_AMT="9462325.91" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="231839999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008906091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="JACKSON C/L" LIMITS_TO_DSCR="FM 647" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1250000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.220 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/24/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/5/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15592.59" TOT_SPENT_AMT="15592.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008906092" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FM 1163" LIMITS_TO_DSCR="900 FT N OF CR 355" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3220561" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="8/19/2022" PSE_30_ACTL_DT="8/19/2022" PSE_60_TRGT_DT="11/25/2022" PSE_60_ACTL_DT="11/25/2022" PSE_100_TRGT_DT="4/5/2023" PSE_100_ACTL_DT="3/24/2023" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.462 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="62.67" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="5/5/2023" ENVCLR_ACTL_DT="3/3/2023" UTIL_TRGT_DT="4/5/2023" UTIL_ACTL_DT="4/28/2023" ROW_TRGT_DT="4/5/2023" ROW_ACTL_DT="4/28/2023" RTL_TRGT_DT="5/5/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="26054.09" CNSTR_SPENT_AMT="2855773.02" CE_SPENT_AMT="72735.58" TOT_SPENT_AMT="2954562.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2908451.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008906094" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="0.50 MI S OF CR 352" LIMITS_TO_DSCR="JACKSON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29200000" DIST_LET_DATE="9/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.768 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2415578.72" TOT_SPENT_AMT="2415578.72" FUND_CAT1_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT1_AMT="33000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008906097" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FM 647 (NB)" LIMITS_TO_DSCR="BU 59S SOUTH OF EL CAMPO (NB)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8800000" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.170 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12144.42" TOT_SPENT_AMT="12144.42" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008906100" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008907145" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FM 961" LIMITS_TO_DSCR="BU 59 NORTH OF EL CAMPO" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="447307211" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="9/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.025 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/30/2020" DSGN_START_ACTL_DT="6/30/2020" ENVCLR_TRGT_DT="7/2/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/2/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11724223.65" CNSTR_SPENT_AMT="6861.50" TOT_SPENT_AMT="11731085.15" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="124308974.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="375691025.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008907154" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="0.26 MI. NORTH OF FM 102" LIMITS_TO_DSCR="1 MI SOUTH OF FM 961" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/18/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="239072875" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="11/22/2021" PSE_30_ACTL_DT="11/22/2021" PSE_60_TRGT_DT="7/13/2022" PSE_60_ACTL_DT="7/13/2022" PSE_100_TRGT_DT="4/13/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.567 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="12/27/2023" CNSTR_WKBG_DT="1/18/2024" CNSTR_PCT_TIME_USED="20.77" CNSTR_PCT_COMPLETE="29.98" DSGN_START_TRGT_DT="3/1/2017" DSGN_START_ACTL_DT="3/1/2017" ENVCLR_TRGT_DT="10/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/13/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/13/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11232741.35" CNSTR_SPENT_AMT="69083977.34" CE_SPENT_AMT="2335461.61" TOT_SPENT_AMT="82652180.30" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="247201881.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008907159" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="0.74 MI NORTH OF FM 960" LIMITS_TO_DSCR="0.20 MI SOUTH OF FM 961" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8528161" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/20/2021" PSE_100_ACTL_DT="8/20/2021" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.660 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="5/4/2022" CNSTR_PCT_TIME_USED="162.22" CNSTR_PCT_COMPLETE="92.47" DSGN_START_TRGT_DT="3/12/2021" DSGN_START_ACTL_DT="3/24/2021" ENVCLR_TRGT_DT="8/30/2021" ENVCLR_ACTL_DT="5/4/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/10/2021" RTL_ACTL_DT="9/3/2021" PE_SPENT_AMT="61973.68" CNSTR_SPENT_AMT="8384191.05" CE_SPENT_AMT="151910.05" TOT_SPENT_AMT="8598074.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="6500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008907164" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FM 960" LIMITS_TO_DSCR="FM 1163" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2938497" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="8/19/2022" PSE_30_ACTL_DT="8/19/2022" PSE_60_TRGT_DT="11/25/2022" PSE_60_ACTL_DT="11/25/2022" PSE_100_TRGT_DT="4/5/2023" PSE_100_ACTL_DT="3/24/2023" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.464 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="48.15" CNSTR_PCT_COMPLETE="62.67" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="5/5/2023" ENVCLR_ACTL_DT="3/3/2023" UTIL_TRGT_DT="4/5/2023" UTIL_ACTL_DT="4/28/2023" ROW_TRGT_DT="4/5/2023" ROW_ACTL_DT="4/28/2023" RTL_TRGT_DT="5/5/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="17963.48" CNSTR_SPENT_AMT="534104.85" CE_SPENT_AMT="1252.07" TOT_SPENT_AMT="553320.40" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3517236.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008908098" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FORT BEND C/L" LIMITS_TO_DSCR="0.83 MILES SOUTH OF SH 60" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="168669295" DIST_LET_DATE="1/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="5/21/2018" PSE_30_ACTL_DT="6/15/2018" PSE_60_TRGT_DT="9/17/2018" PSE_60_ACTL_DT="10/3/2018" PSE_100_TRGT_DT="5/10/2019" PSE_100_ACTL_DT="8/26/2019" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="2/21/2020" CNSTR_WKBG_DT="3/11/2020" CNSTR_PCT_TIME_USED="83.06" CNSTR_PCT_COMPLETE="84.53" DSGN_START_TRGT_DT="1/13/2017" DSGN_START_ACTL_DT="1/13/2017" ENVCLR_TRGT_DT="5/16/2017" ENVCLR_ACTL_DT="11/13/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/15/2019" RTL_ACTL_DT="11/13/2019" PE_SPENT_AMT="9236828.85" CNSTR_SPENT_AMT="154807361.49" CE_SPENT_AMT="7833536.08" TOT_SPENT_AMT="171877726.42" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="017" FUND_CAT1_AMT="100000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_PID="017" FUND_CAT2_AMT="77000000.00" FUND_CAT3_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT3_AMT="31000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008908100" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Wharton" LIMITS_FROM_DSCR="SH 60" LIMITS_TO_DSCR="0.26 MI. N. OF FM 102" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/18/2030" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="103634660" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="11/22/2021" PSE_30_ACTL_DT="11/22/2021" PSE_60_TRGT_DT="7/13/2022" PSE_60_ACTL_DT="7/13/2022" PSE_100_TRGT_DT="4/13/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.212 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="WILLIAMS BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="12/27/2023" CNSTR_WKBG_DT="1/18/2024" CNSTR_PCT_TIME_USED="20.77" CNSTR_PCT_COMPLETE="29.98" DSGN_START_TRGT_DT="3/1/2017" DSGN_START_ACTL_DT="3/1/2017" ENVCLR_TRGT_DT="10/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/13/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/13/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42447.80" CNSTR_SPENT_AMT="35162894.82" CE_SPENT_AMT="1196694.58" TOT_SPENT_AMT="36402037.20" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="107141029.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008909088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="EAST OF SS 529" LIMITS_TO_DSCR="WHARTON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1508722" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.052 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="11/1/2023" CNSTR_PCT_TIME_USED="75.78" CNSTR_PCT_COMPLETE="74.82" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="86010.80" CNSTR_SPENT_AMT="1635864.60" CE_SPENT_AMT="12200.24" TOT_SPENT_AMT="1734075.64" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008909089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 59" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="0.2 MILES SOUTH OF FM 2919" LIMITS_TO_DSCR="0.2 MILES NORTH OF ISLEIB ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/20/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9515" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2021" PSE_100_ACTL_DT="1/12/2024" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.679 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="101.03" DSGN_START_TRGT_DT="8/7/2020" DSGN_START_ACTL_DT="8/7/2020" ENVCLR_TRGT_DT="2/5/2021" ENVCLR_ACTL_DT="7/27/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2020" ROW_ACTL_DT="9/5/2023" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="1001.82" CNSTR_SPENT_AMT="13701.08" CE_SPENT_AMT="443.20" TOT_SPENT_AMT="15146.10" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="5429.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008909090" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="WHARTON COUNTY LINE" LIMITS_TO_DSCR="EAST OF SS 529" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1361501" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.836 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="15409.77" TOT_SPENT_AMT="15409.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1415961.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008909091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 59" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="SS 529" LIMITS_TO_DSCR="SS 10 (HARTLEDGE RD)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="280788" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="518.02" TOT_SPENT_AMT="518.02" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008910026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 60" CNTY_NM="Wharton" LIMITS_FROM_DSCR="US 59" LIMITS_TO_DSCR="FM 1301" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="849080" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/6/2022" PSE_100_ACTL_DT="5/6/2022" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.997 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="11/9/2022" CNSTR_WKBG_DT="12/6/2023" CNSTR_PCT_TIME_USED="481.67" CNSTR_PCT_COMPLETE="88.86" DSGN_START_TRGT_DT="3/8/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/8/2022" ENVCLR_ACTL_DT="4/26/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/5/2022" RTL_ACTL_DT="8/4/2022" PE_SPENT_AMT="61694.20" CNSTR_SPENT_AMT="552208.48" CE_SPENT_AMT="31510.73" TOT_SPENT_AMT="645413.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1057170.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008910031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 60" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FM 1301" LIMITS_TO_DSCR="ALABAMA RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="666689" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="6/27/2024" PSE_30_ACTL_DT="1/4/2023" PSE_60_TRGT_DT="7/31/2024" PSE_60_ACTL_DT="3/6/2023" PSE_100_TRGT_DT="10/4/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="1/4/2024" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="124.19" DSGN_START_TRGT_DT="2/27/2024" DSGN_START_ACTL_DT="4/19/2022" ENVCLR_TRGT_DT="1/3/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/26/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/4/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="139976.24" CNSTR_SPENT_AMT="788293.13" CE_SPENT_AMT="20798.92" TOT_SPENT_AMT="949068.29" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2310CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="734622.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008910032" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 59-R" CNTY_NM="Wharton" LIMITS_FROM_DSCR="SH 60" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="197347" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.019 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="617.38" TOT_SPENT_AMT="617.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="213135.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008910033" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 60" CNTY_NM="Wharton" LIMITS_FROM_DSCR="BU 59R" LIMITS_TO_DSCR="FM 1301" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2970000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.306 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20110.62" TOT_SPENT_AMT="20110.62" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="3207600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008910034" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 60" CNTY_NM="Wharton" LIMITS_FROM_DSCR="BU 59R" LIMITS_TO_DSCR="FM 1301" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="419834" DIST_LET_DATE="11/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.277 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008910035" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008911007" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 521" CNTY_NM="Jackson" LIMITS_FROM_DSCR=".091 MI EAST OF FM 1822" LIMITS_TO_DSCR="0.067 MI EAST OF SH 111" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="371788" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/2/2022" PSE_100_ACTL_DT="1/19/2023" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.586 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="6/7/2023" CNSTR_WKBG_DT="9/18/2023" CNSTR_PCT_TIME_USED="99.44" CNSTR_PCT_COMPLETE="105.10" DSGN_START_TRGT_DT="9/30/2021" DSGN_START_ACTL_DT="9/30/2021" ENVCLR_TRGT_DT="4/7/2023" ENVCLR_ACTL_DT="3/14/2023" UTIL_TRGT_DT="6/29/2023" UTIL_ACTL_DT="1/19/2023" ROW_TRGT_DT="12/2/2022" ROW_ACTL_DT="1/19/2023" RTL_TRGT_DT="4/7/2023" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="144338.51" CNSTR_SPENT_AMT="247953.40" CE_SPENT_AMT="14303.72" TOT_SPENT_AMT="406595.63" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2310CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="469167.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008911008" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 521" CNTY_NM="Jackson" LIMITS_FROM_DSCR="END OF STATE MAINTENANCE" LIMITS_TO_DSCR="N. KLEAS ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="95019" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.472 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="106421.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008912006" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 522" CNTY_NM="Jackson" LIMITS_FROM_DSCR="5TH STREET" LIMITS_TO_DSCR="FM 710 (SOUTH SIDE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60242" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/2/2022" PSE_100_ACTL_DT="1/19/2023" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.130 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="ENCINO LANDSCAPE, INC." CNSTR_NTPD_DT="6/7/2023" CNSTR_WKBG_DT="9/18/2023" CNSTR_PCT_TIME_USED="99.44" CNSTR_PCT_COMPLETE="105.10" DSGN_START_TRGT_DT="9/30/2021" DSGN_START_ACTL_DT="9/30/2021" ENVCLR_TRGT_DT="4/7/2023" ENVCLR_ACTL_DT="3/14/2023" UTIL_TRGT_DT="6/29/2023" UTIL_ACTL_DT="1/19/2023" ROW_TRGT_DT="12/2/2022" ROW_ACTL_DT="1/19/2023" RTL_TRGT_DT="4/7/2023" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="42709.42" CNSTR_SPENT_AMT="63236.43" CE_SPENT_AMT="3647.88" TOT_SPENT_AMT="109593.73" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2310CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="76004.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008915018" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 59-S" CNTY_NM="Wharton" LIMITS_FROM_DSCR="US 59 EL CAMPO" LIMITS_TO_DSCR="1.19 MI SOUTHWEST OF US 59" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4493532" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.198 (mi)" TXDOT_CNTCT_NM="Ryan Simper, P.E." TXDOT_CNTCT_PH_NBR="(979)532-3141" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="3/8/2021" DSGN_START_ACTL_DT="6/29/2020" ENVCLR_TRGT_DT="10/4/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="59617.38" TOT_SPENT_AMT="59617.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4524432.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008915019" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 59-S" CNTY_NM="Wharton" LIMITS_FROM_DSCR="FM 2765" LIMITS_TO_DSCR="SH 71" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="861000" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.270 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="189753.48" TOT_SPENT_AMT="189753.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="929880.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008916006" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008919017" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 87" CNTY_NM="Victoria" LIMITS_FROM_DSCR="BU 77S (NAVARRO ST)" LIMITS_TO_DSCR="US 87 (MAIN ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="390000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.251 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="106140.56" TOT_SPENT_AMT="106140.56" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2610CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="405600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="008919018" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 59-T" CNTY_NM="Victoria" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="WATER ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1300000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.017 (mi)" TXDOT_CNTCT_NM="Jeffery Vinklarek, P.E." TXDOT_CNTCT_PH_NBR="361-293-4363" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="164224.62" TOT_SPENT_AMT="164224.62" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2610CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="1352000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009002055" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 40" CNTY_NM="Oldham" LIMITS_FROM_DSCR="6.2 MI E OF NEW MEXICO (MM 6)" LIMITS_TO_DSCR="11.2 MI E OF NEW MEXICO (MM 12)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8887327" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="6/17/2022" PSE_30_ACTL_DT="6/17/2022" PSE_60_TRGT_DT="6/21/2022" PSE_60_ACTL_DT="6/21/2022" PSE_100_TRGT_DT="10/3/2022" PSE_100_ACTL_DT="4/14/2023" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.019 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="KIEWIT INFRASTRUCTURE SOUTH CO." CNSTR_NTPD_DT="7/24/2024" CNSTR_WKBG_DT="4/8/2025" CNSTR_PCT_TIME_USED="25.00" CNSTR_PCT_COMPLETE="22.69" DSGN_START_TRGT_DT="5/16/2022" DSGN_START_ACTL_DT="5/16/2022" ENVCLR_TRGT_DT="10/3/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/3/2022" UTIL_ACTL_DT="12/1/2022" ROW_TRGT_DT="8/4/2022" ROW_ACTL_DT="11/3/2022" RTL_TRGT_DT="10/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28420.55" CNSTR_SPENT_AMT="2027009.94" CE_SPENT_AMT="12833.47" TOT_SPENT_AMT="2068263.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="9846029.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009002056" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 40" CNTY_NM="Oldham" LIMITS_FROM_DSCR="IH 40 EB/IVY RD BRG" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="525000" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.044 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="525000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009002057" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009003065" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 40" CNTY_NM="Oldham" LIMITS_FROM_DSCR="0.2 MI W OF FM 2858 (MM16)" LIMITS_TO_DSCR="0.2 MI E OF SH 214 (MM 23)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8400000" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="6/17/2022" PSE_30_ACTL_DT="6/17/2022" PSE_60_TRGT_DT="6/21/2022" PSE_60_ACTL_DT="6/21/2022" PSE_100_TRGT_DT="10/3/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.664 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/16/2022" DSGN_START_ACTL_DT="5/16/2022" ENVCLR_TRGT_DT="10/3/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/3/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/4/2022" ROW_ACTL_DT="11/3/2022" RTL_TRGT_DT="10/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7918.86" TOT_SPENT_AMT="7918.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9408000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009003066" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009004069" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 40" CNTY_NM="Oldham" LIMITS_FROM_DSCR="IH 40 EB NEAR MM 40" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20000000" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.216 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="819672.06" TOT_SPENT_AMT="819672.06" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009004071" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 40" CNTY_NM="Oldham" LIMITS_FROM_DSCR="AT US 385" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="480061" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.054 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="5.80" CNSTR_PCT_COMPLETE="2.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="1020.05" TOT_SPENT_AMT="1020.05" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="491000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009004072" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 40" CNTY_NM="Oldham" LIMITS_FROM_DSCR="AT US 385" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="755422" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.054 (mi)" TXDOT_CNTCT_NM="Clint Harms, P.E." TXDOT_CNTCT_PH_NBR="(806)934-1122" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="5.80" CNSTR_PCT_COMPLETE="2.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="1656.86" TOT_SPENT_AMT="1656.86" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="513000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005103" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 40" CNTY_NM="Potter" LIMITS_FROM_DSCR="MM 57" LIMITS_TO_DSCR="MM 63" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16448000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.551 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="83446.51" TOT_SPENT_AMT="83446.51" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005105" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="BI-40D INTERSECTION AT HAGY BLVD/PORT LN" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="221050" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="221050.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 40" CNTY_NM="Potter" LIMITS_FROM_DSCR="AT RM 2381" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/16/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="176972" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="4/29/2021" PSE_30_ACTL_DT="4/29/2021" PSE_60_TRGT_DT="6/24/2021" PSE_60_ACTL_DT="9/15/2021" PSE_100_TRGT_DT="11/1/2021" PSE_100_ACTL_DT="12/6/2021" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.039 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="4/19/2022" CNSTR_WKBG_DT="3/27/2023" CNSTR_PCT_TIME_USED="91.13" CNSTR_PCT_COMPLETE="104.30" DSGN_START_TRGT_DT="4/1/2021" DSGN_START_ACTL_DT="4/1/2021" ENVCLR_TRGT_DT="11/1/2021" ENVCLR_ACTL_DT="11/22/2021" UTIL_TRGT_DT="11/1/2021" UTIL_ACTL_DT="9/16/2021" ROW_TRGT_DT="7/29/2021" ROW_ACTL_DT="7/29/2021" RTL_TRGT_DT="12/1/2021" RTL_ACTL_DT="12/22/2021" PE_SPENT_AMT="481.91" CNSTR_SPENT_AMT="184362.42" CE_SPENT_AMT="3592.61" TOT_SPENT_AMT="188436.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="310000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005109" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="IH 40" LIMITS_TO_DSCR="SL 279" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8119862" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/15/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/14/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.397 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="12/4/2024" CNSTR_WKBG_DT="1/20/2025" CNSTR_PCT_TIME_USED="23.91" CNSTR_PCT_COMPLETE="13.33" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="12/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1466009.07" CNSTR_SPENT_AMT="1919685.06" CE_SPENT_AMT="10540.43" TOT_SPENT_AMT="3396234.56" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3377643.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="1945532.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005110" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="IH 40" LIMITS_TO_DSCR="SL 279" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2201889" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/15/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/14/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.397 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="12/4/2024" CNSTR_WKBG_DT="1/20/2025" CNSTR_PCT_TIME_USED="23.91" CNSTR_PCT_COMPLETE="13.33" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="12/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="116650.00" CE_SPENT_AMT="3614.21" TOT_SPENT_AMT="120264.21" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1407974.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="1343426.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005111" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 40" CNTY_NM="Potter" LIMITS_FROM_DSCR="0.715 MI WEST OF BI-40D" LIMITS_TO_DSCR="BI-40D" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="804518" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="11/7/2022" PSE_30_ACTL_DT="11/7/2022" PSE_60_TRGT_DT="11/11/2022" PSE_60_ACTL_DT="11/11/2022" PSE_100_TRGT_DT="3/1/2023" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.774 (mi)" TXDOT_CNTCT_NM="Bernardo Ferrel, P.E." TXDOT_CNTCT_PH_NBR="(806)356-3620" CNSTR_CMPNY_NM="MICA CORPORATION" CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="9/14/2023" CNSTR_PCT_TIME_USED="93.46" CNSTR_PCT_COMPLETE="99.09" DSGN_START_TRGT_DT="9/19/2022" DSGN_START_ACTL_DT="9/19/2022" ENVCLR_TRGT_DT="1/2/2023" ENVCLR_ACTL_DT="1/2/2023" UTIL_TRGT_DT="1/13/2023" UTIL_ACTL_DT="1/13/2023" ROW_TRGT_DT="12/12/2022" ROW_ACTL_DT="12/12/2022" RTL_TRGT_DT="3/29/2023" RTL_ACTL_DT="3/22/2023" PE_SPENT_AMT="59777.27" CNSTR_SPENT_AMT="819736.84" CE_SPENT_AMT="4521.28" TOT_SPENT_AMT="884035.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="556735.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005112" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="IH 40 WEST" LIMITS_TO_DSCR="SL 279" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9198576" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="5/15/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/14/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="12/4/2024" CNSTR_WKBG_DT="1/20/2025" CNSTR_PCT_TIME_USED="23.91" CNSTR_PCT_COMPLETE="13.33" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="12/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38650.17" CNSTR_SPENT_AMT="310559.80" CE_SPENT_AMT="15555.27" TOT_SPENT_AMT="364765.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="7832471.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005113" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="WEST SL 335" LIMITS_TO_DSCR="SL 279 (SW 9TH AVE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11461726" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="5/15/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/14/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="GILVIN-TERRILL, LTD." CNSTR_NTPD_DT="12/4/2024" CNSTR_WKBG_DT="1/20/2025" CNSTR_PCT_TIME_USED="23.91" CNSTR_PCT_COMPLETE="13.33" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="12/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/27/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/29/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="628.70" CNSTR_SPENT_AMT="1783905.50" CE_SPENT_AMT="20824.79" TOT_SPENT_AMT="1805358.99" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="2191688.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005117" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009005118" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006044" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="ON BI 40-D EB" LIMITS_TO_DSCR="AT BNSF RR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2915941" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/2/2018" PSE_30_ACTL_DT="11/2/2018" PSE_60_TRGT_DT="12/31/2018" PSE_60_ACTL_DT="12/31/2018" PSE_100_TRGT_DT="4/10/2019" PSE_100_ACTL_DT="4/10/2019" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.248 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="UNITED FIRE &amp; CASUALTY COMPANY" CNSTR_NTPD_DT="3/12/2021" CNSTR_WKBG_DT="5/3/2021" CNSTR_PCT_TIME_USED="246.95" CNSTR_PCT_COMPLETE="96.47" DSGN_START_TRGT_DT="11/30/2017" DSGN_START_ACTL_DT="11/30/2017" ENVCLR_TRGT_DT="6/27/2019" ENVCLR_ACTL_DT="6/27/2019" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="6/1/2020" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="6/1/2020" RTL_TRGT_DT="8/3/2020" RTL_ACTL_DT="8/3/2020" PE_SPENT_AMT="313825.07" CNSTR_SPENT_AMT="2547563.00" CE_SPENT_AMT="174811.38" TOT_SPENT_AMT="3036199.45" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2512000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006045" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="ON BI 40-D WB" LIMITS_TO_DSCR="AT BNSF RR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2291336" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/2/2018" PSE_30_ACTL_DT="11/2/2018" PSE_60_TRGT_DT="12/31/2018" PSE_60_ACTL_DT="12/31/2018" PSE_100_TRGT_DT="4/10/2019" PSE_100_ACTL_DT="4/10/2019" DIST_NM="Amarillo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.248 (mi)" TXDOT_CNTCT_NM="Joe Chappell, P.E." TXDOT_CNTCT_PH_NBR="(806)378-0071" CNSTR_CMPNY_NM="UNITED FIRE &amp; CASUALTY COMPANY" CNSTR_NTPD_DT="3/12/2021" CNSTR_WKBG_DT="5/3/2021" CNSTR_PCT_TIME_USED="246.95" CNSTR_PCT_COMPLETE="96.47" DSGN_START_TRGT_DT="11/30/2017" DSGN_START_ACTL_DT="11/30/2017" ENVCLR_TRGT_DT="6/27/2019" ENVCLR_ACTL_DT="6/27/2019" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="6/1/2020" ROW_TRGT_DT="6/1/2020" ROW_ACTL_DT="6/1/2020" RTL_TRGT_DT="8/3/2020" RTL_ACTL_DT="8/3/2020" PE_SPENT_AMT="250435.55" CNSTR_SPENT_AMT="2185566.17" CE_SPENT_AMT="200699.81" TOT_SPENT_AMT="2636701.53" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006048" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="SL 279 (SW 9TH AVE)" LIMITS_TO_DSCR="FM 1719 (WESTERN ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9500000" DIST_LET_DATE="7/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="2250000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="8010000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006049" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="SL 279 (SW 9TH AVE)" LIMITS_TO_DSCR="FM 1719 (WESTERN ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6135924" DIST_LET_DATE="7/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="6626798.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006050" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="N HUGHES ST" LIMITS_TO_DSCR="BUCHANAN ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2826918" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.916 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2807)" FUND_CAT1_AMT="3166148.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006051" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="BI 40-D" CNTY_NM="Potter" LIMITS_FROM_DSCR="AT N HUGHES INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="722470" DIST_LET_DATE="7/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Amarillo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.161 (mi)" TXDOT_CNTCT_NM="Kit Black, P.E." TXDOT_CNTCT_PH_NBR="806-356-3383" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2607)" FUND_CAT1_AMT="780268.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009006054" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101050" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="CR 60 / CR 107 (GRAYSON C/L)" LIMITS_TO_DSCR="NORTH CR 60 / CR 107" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3413073" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="10/1/2017" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="11/1/2018" PSE_100_TRGT_DT="6/12/2019" PSE_100_ACTL_DT="10/1/2020" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.310 (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2017" DSGN_START_ACTL_DT="10/1/2017" ENVCLR_TRGT_DT="12/1/2018" ENVCLR_ACTL_DT="12/19/2018" UTIL_TRGT_DT="4/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="4/1/2020" RTL_TRGT_DT="4/1/2021" RTL_ACTL_DT="9/1/2022" PE_SPENT_AMT="10583.18" TOT_SPENT_AMT="10583.18" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="4173698.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101053" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SS 316" LIMITS_TO_DSCR="FM 120" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12744" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.818 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="2/19/2020" CNSTR_WKBG_DT="5/18/2020" CNSTR_PCT_TIME_USED="73.13" CNSTR_PCT_COMPLETE="94.04" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2635.67" CE_SPENT_AMT="105.02" TOT_SPENT_AMT="2740.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="12573.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 56" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="599677" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.809 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="608339.09" CE_SPENT_AMT="8724.20" TOT_SPENT_AMT="617063.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="165834.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101056" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 56" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/10/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82752" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/9/2020" PSE_30_ACTL_DT="10/9/2020" PSE_60_TRGT_DT="3/18/2021" PSE_60_ACTL_DT="3/18/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="4/6/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.01" DSGN_START_TRGT_DT="5/6/2020" DSGN_START_ACTL_DT="5/6/2020" ENVCLR_TRGT_DT="3/18/2021" ENVCLR_ACTL_DT="3/18/2021" UTIL_TRGT_DT="6/11/2019" UTIL_ACTL_DT="6/11/2019" ROW_TRGT_DT="12/3/2018" ROW_ACTL_DT="12/3/2018" RTL_TRGT_DT="12/3/2021" RTL_ACTL_DT="12/3/2021" CNSTR_SPENT_AMT="77902.20" CE_SPENT_AMT="1383.41" TOT_SPENT_AMT="79285.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="110663.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 120" LIMITS_TO_DSCR="SH 56" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="862628" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="947475.92" CE_SPENT_AMT="11218.39" TOT_SPENT_AMT="958694.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="693360.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR=".100 MI N OF FM 902" LIMITS_TO_DSCR=".05 MI S OF FM 902" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1171373" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.335 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="2/20/2025" CNSTR_PCT_TIME_USED="75.00" CNSTR_PCT_COMPLETE="87.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="102657.19" CNSTR_SPENT_AMT="1057920.87" CE_SPENT_AMT="11847.44" TOT_SPENT_AMT="1172425.50" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1348840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101060" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="AT FALLON ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="587246" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="587246.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009101061" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 289" CNTY_NM="Grayson" LIMITS_FROM_DSCR="SH 56" LIMITS_TO_DSCR="COLLIN C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1629957" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1825552.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009103022" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="N BUS 289C, NORTH OF CELINA" LIMITS_TO_DSCR="N CR 60/CR 107 (GRAYSON C/L)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34291677" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="10/1/2017" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="11/1/2018" PSE_100_TRGT_DT="6/12/2019" PSE_100_ACTL_DT="10/1/2020" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.253 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2017" DSGN_START_ACTL_DT="10/1/2017" ENVCLR_TRGT_DT="12/1/2018" ENVCLR_ACTL_DT="12/19/2018" UTIL_TRGT_DT="4/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2020" ROW_ACTL_DT="4/1/2020" RTL_TRGT_DT="4/1/2021" RTL_ACTL_DT="9/1/2022" PE_SPENT_AMT="2094999.08" CNSTR_SPENT_AMT="1976.97" TOT_SPENT_AMT="2096976.05" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="37331924.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009103030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="ROUNDTREE COURT" LIMITS_TO_DSCR="FM 455" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="329042" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.402 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="330000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009103031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT CR 99 / CR 100" LIMITS_TO_DSCR="IN THE CITY OF CELINA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="393752" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.300 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/19/2023" CNSTR_WKBG_DT="6/13/2024" CNSTR_PCT_TIME_USED="102.73" CNSTR_PCT_COMPLETE="518.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="59307.28" CNSTR_SPENT_AMT="407499.28" CE_SPENT_AMT="5015.30" TOT_SPENT_AMT="471821.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="419835.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009103032" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 289 AT LEGACY DR" LIMITS_TO_DSCR="IN THE CITY OF CELINA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="404317" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="YUNEX LLC" CNSTR_NTPD_DT="6/12/2024" CNSTR_WKBG_DT="9/10/2024" CNSTR_PCT_TIME_USED="83.13" CNSTR_PCT_COMPLETE="94.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1891.79" CNSTR_SPENT_AMT="394328.84" CE_SPENT_AMT="11006.38" TOT_SPENT_AMT="407227.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="462393.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009103033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009104067" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="E BROADWAY ST" LIMITS_TO_DSCR="FM 455 IN COLLIN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1647786" DIST_LET_DATE="8/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="4/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.291 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="82042.64" TOT_SPENT_AMT="82042.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2175127.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009104068" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="FM 455" LIMITS_TO_DSCR=" FRONTIER PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="300000" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.291 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009104069" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="PANTHER CREEK RELIEF" LIMITS_TO_DSCR="PANTHER CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3848917" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="3/1/2023" PSE_30_ACTL_DT="3/1/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.308 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="ED BELL CONSTRUCTION COMPANY" CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="112.86" CNSTR_PCT_COMPLETE="77.55" DSGN_START_TRGT_DT="11/22/2022" DSGN_START_ACTL_DT="11/22/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="290056.46" CNSTR_SPENT_AMT="3182793.42" CE_SPENT_AMT="326032.89" TOT_SPENT_AMT="3798882.77" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="447864.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="3245953.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009105080" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 289" CNTY_NM="Collin" LIMITS_FROM_DSCR="PGBT" LIMITS_TO_DSCR="SH 121" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1200000" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.032 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1296000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009106059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 289" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT CAMPBELL RD" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="240536" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="(INACTIVE)HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="3/23/2021" CNSTR_PCT_TIME_USED="81.00" CNSTR_PCT_COMPLETE="101.02" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10929.17" CNSTR_SPENT_AMT="264496.60" CE_SPENT_AMT="5457.07" TOT_SPENT_AMT="280882.84" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="302665.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009106061" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 289" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="SL 12" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6496056" DIST_LET_DATE="7/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.118 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="7015740.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009106062" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 289" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SL 12" LIMITS_TO_DSCR="SH 190" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="317821" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.070 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="325446.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT2_AMT="5088.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009109016" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 289C" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 289N" LIMITS_TO_DSCR="SH 289S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="211940" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.482 (mi)" TXDOT_CNTCT_NM="David Morren, P.E." TXDOT_CNTCT_PH_NBR="(214)319-3574" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="2/7/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="193694.29" TOT_SPENT_AMT="193694.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="197352.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009109017" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 289C" CNTY_NM="Collin" LIMITS_FROM_DSCR="BEECH STREET" LIMITS_TO_DSCR="SH 289S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2843505" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.475 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="12/2/2024" CNSTR_PCT_TIME_USED="48.54" CNSTR_PCT_COMPLETE="83.51" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/1/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="133857.10" CNSTR_SPENT_AMT="2490844.28" CE_SPENT_AMT="78227.51" TOT_SPENT_AMT="2702928.89" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2420995.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009109018" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 289C" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 289N" LIMITS_TO_DSCR="E. ASH. ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="248499" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.545 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="229703.38" CE_SPENT_AMT="848.80" TOT_SPENT_AMT="230552.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="236822.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009109019" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 289C" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 289 (NORTH)" LIMITS_TO_DSCR="BEECH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7755867" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.482 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="144464.52" TOT_SPENT_AMT="144464.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8686570.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009110002" PT_PHASE="Construction underway or begins soon" HWY_NBR="FS 121" CNTY_NM="Grayson" LIMITS_FROM_DSCR="FM 121" LIMITS_TO_DSCR="COUNTY LINE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/7/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9300300" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="NNF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="7/6/2020" PSE_30_ACTL_DT="7/6/2020" PSE_60_TRGT_DT="12/10/2020" PSE_60_ACTL_DT="12/10/2020" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="8/11/2021" DIST_NM="Paris" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.476 (mi)" TXDOT_CNTCT_NM="Aaron Bloom, P.E." TXDOT_CNTCT_PH_NBR="(903)868-9251" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="11/29/2021" CNSTR_PCT_TIME_USED="106.10" CNSTR_PCT_COMPLETE="96.04" DSGN_START_TRGT_DT="1/29/2020" DSGN_START_ACTL_DT="1/29/2020" ENVCLR_TRGT_DT="12/10/2020" ENVCLR_ACTL_DT="12/10/2020" UTIL_TRGT_DT="3/14/2019" UTIL_ACTL_DT="3/14/2019" ROW_TRGT_DT="9/4/2018" ROW_ACTL_DT="9/4/2018" RTL_TRGT_DT="9/8/2021" RTL_ACTL_DT="9/8/2021" PE_SPENT_AMT="172272.12" CNSTR_SPENT_AMT="9478236.59" CE_SPENT_AMT="197113.28" TOT_SPENT_AMT="9847621.99" FUND_CAT1_DSCR="Category 11 - District Discretionary (2211)" FUND_CAT1_AMT="4000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009201052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 175" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SOUTH OF BUDD ST" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34944136" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="10/8/2019" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="6/1/2018" PSE_100_TRGT_DT="4/1/2019" PSE_100_ACTL_DT="3/1/2019" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.247 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY" CNSTR_NTPD_DT="1/15/2020" CNSTR_WKBG_DT="7/6/2020" CNSTR_PCT_TIME_USED="164.36" CNSTR_PCT_COMPLETE="83.87" DSGN_START_TRGT_DT="4/1/2017" DSGN_START_ACTL_DT="4/1/2017" ENVCLR_TRGT_DT="9/13/2013" ENVCLR_ACTL_DT="9/13/2013" UTIL_TRGT_DT="6/1/2019" UTIL_ACTL_DT="12/1/2019" ROW_TRGT_DT="8/6/2018" ROW_ACTL_DT="10/8/2019" RTL_TRGT_DT="6/1/2019" RTL_ACTL_DT="12/1/2019" PE_SPENT_AMT="7192693.91" CNSTR_SPENT_AMT="26206935.18" CE_SPENT_AMT="2817185.10" TOT_SPENT_AMT="36216814.19" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="41688000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009201057" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 310" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT LAMAR ST AND UNION PACIFIC RR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13814473" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/14/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/14/2019" PSE_60_ACTL_DT="4/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.567 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="5/27/2021" CNSTR_WKBG_DT="7/20/2021" CNSTR_PCT_TIME_USED="102.84" CNSTR_PCT_COMPLETE="100.20" DSGN_START_TRGT_DT="3/1/2018" DSGN_START_ACTL_DT="3/1/2018" ENVCLR_TRGT_DT="4/29/2019" ENVCLR_ACTL_DT="4/29/2019" UTIL_TRGT_DT="12/1/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/14/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2019" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2383765.30" CNSTR_SPENT_AMT="17187459.09" CE_SPENT_AMT="864206.09" TOT_SPENT_AMT="20435430.48" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6408.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="16210336.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009201059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 310" CNTY_NM="Dallas" LIMITS_FROM_DSCR="PENNSYLVANIA AVENUE" LIMITS_TO_DSCR="NORTH OF AL LIPSCOMB WAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11916518" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="10/8/2019" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="6/1/2018" PSE_100_TRGT_DT="4/1/2019" PSE_100_ACTL_DT="3/1/2019" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.521 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY" CNSTR_NTPD_DT="1/15/2020" CNSTR_WKBG_DT="7/6/2020" CNSTR_PCT_TIME_USED="164.36" CNSTR_PCT_COMPLETE="83.87" DSGN_START_TRGT_DT="4/1/2017" DSGN_START_ACTL_DT="4/1/2017" ENVCLR_TRGT_DT="9/13/2013" ENVCLR_ACTL_DT="9/13/2013" UTIL_TRGT_DT="6/1/2019" UTIL_ACTL_DT="12/1/2019" ROW_TRGT_DT="8/6/2018" ROW_ACTL_DT="10/8/2019" RTL_TRGT_DT="6/1/2019" RTL_ACTL_DT="12/1/2019" PE_SPENT_AMT="1494492.59" CNSTR_SPENT_AMT="11353559.09" CE_SPENT_AMT="1222444.47" TOT_SPENT_AMT="14070496.15" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="10100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202125" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT DOWDY FERRY RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3359266" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="3/1/2020" PSE_30_ACTL_DT="5/1/2020" PSE_60_TRGT_DT="3/1/2020" PSE_60_ACTL_DT="10/1/2020" PSE_100_TRGT_DT="3/1/2020" PSE_100_ACTL_DT="6/17/2021" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.734 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="ED BELL CONSTRUCTION COMPANY" CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="1/11/2022" CNSTR_PCT_TIME_USED="99.39" CNSTR_PCT_COMPLETE="98.66" DSGN_START_TRGT_DT="3/1/2020" DSGN_START_ACTL_DT="5/1/2020" ENVCLR_TRGT_DT="3/1/2020" ENVCLR_ACTL_DT="1/28/2021" UTIL_TRGT_DT="3/1/2020" UTIL_ACTL_DT="5/1/2020" ROW_TRGT_DT="3/1/2020" ROW_ACTL_DT="5/1/2020" RTL_TRGT_DT="3/1/2021" RTL_ACTL_DT="1/28/2021" PE_SPENT_AMT="794893.32" CNSTR_SPENT_AMT="3627193.70" CE_SPENT_AMT="205174.80" TOT_SPENT_AMT="4627261.82" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2205)" FUND_CAT1_AMT="3700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202130" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT SL 9" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4228798" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="10/29/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/29/2018" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="3/1/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.124 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="96.29" CNSTR_PCT_COMPLETE="99.56" DSGN_START_TRGT_DT="12/1/2016" DSGN_START_ACTL_DT="12/1/2016" ENVCLR_TRGT_DT="11/16/2017" ENVCLR_ACTL_DT="11/16/2017" UTIL_TRGT_DT="3/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="134130.39" CNSTR_SPENT_AMT="4182046.06" CE_SPENT_AMT="172435.15" TOT_SPENT_AMT="4488611.60" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="3833334.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202135" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SOUTH OF MALLOY BRIDGE RD" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7294651" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="1/3/2023" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.907 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="2/8/2024" CNSTR_WKBG_DT="6/12/2024" CNSTR_PCT_TIME_USED="97.35" CNSTR_PCT_COMPLETE="91.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="401088.26" CNSTR_SPENT_AMT="7264541.44" CE_SPENT_AMT="222943.84" TOT_SPENT_AMT="7888573.54" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="7880945.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202137" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="ELLIS COUNTY LINE" LIMITS_TO_DSCR="SOUTH OF IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3818133" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/15/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="11/15/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.590 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="2/13/2024" CNSTR_PCT_TIME_USED="74.69" CNSTR_PCT_COMPLETE="77.36" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/23/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="122745.12" CNSTR_SPENT_AMT="3311498.81" CE_SPENT_AMT="97397.58" TOT_SPENT_AMT="3531641.51" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2305)" FUND_CAT1_AMT="4155701.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202138" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 310" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT SIMPSON STUART RD" LIMITS_TO_DSCR="IN CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2894529" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="SELECT MAINTENANCE, L.L.C." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="34.91" CNSTR_PCT_COMPLETE="44.78" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="545640.00" CNSTR_SPENT_AMT="1343343.57" CE_SPENT_AMT="4555.27" TOT_SPENT_AMT="1893538.84" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="898163.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="1987630.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202139" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="FULGHUM ROAD" LIMITS_TO_DSCR="MALLOY BRIDGE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1304170" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.612 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12.56" CNSTR_SPENT_AMT="1187595.93" TOT_SPENT_AMT="1187608.49" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1307500.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202144" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="ELLIS COUNTY LINE" LIMITS_TO_DSCR="SH 310" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17642552" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1252283.20" TOT_SPENT_AMT="1252283.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="18348254.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202145" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202146" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SOUTH OF FERRIS" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="313600" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.096 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1101.28" TOT_SPENT_AMT="1101.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="351232.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009202149" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="WEST OF PALESTINE STREET" LIMITS_TO_DSCR="EAST OF DOWDY FERRY RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="266007" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.107 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="266007.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203053" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="AT FM 664" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="73475987" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="10/8/2019" PSE_30_ACTL_DT="1/31/2019" PSE_60_TRGT_DT="3/1/2020" PSE_60_ACTL_DT="3/1/2020" PSE_100_TRGT_DT="10/30/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.258 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/31/2019" DSGN_START_ACTL_DT="1/31/2019" ENVCLR_TRGT_DT="1/1/2020" ENVCLR_ACTL_DT="3/26/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2021" ROW_ACTL_DT="9/1/2022" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3036039.11" CNSTR_SPENT_AMT="10873.08" CE_SPENT_AMT="91.77" TOT_SPENT_AMT="3047003.96" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="34000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="12117201.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203056" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SOUTH OF RISINGER RD" LIMITS_TO_DSCR="DALLAS CL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/1/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327094" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.701 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="2/1/2022" CNSTR_PCT_TIME_USED="95.52" CNSTR_PCT_COMPLETE="94.62" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="358080.98" CE_SPENT_AMT="4125.94" TOT_SPENT_AMT="362206.92" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="156218.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203063" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="BI 45J" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2192848" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="7/1/2022" PSE_30_ACTL_DT="7/1/2022" PSE_60_TRGT_DT="8/1/2022" PSE_60_ACTL_DT="9/13/2022" PSE_100_TRGT_DT="12/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.248 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="97.81" CNSTR_PCT_COMPLETE="98.86" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="12/1/2022" ENVCLR_ACTL_DT="10/5/2022" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="11/9/2022" PE_SPENT_AMT="65485.76" CNSTR_SPENT_AMT="2267958.56" CE_SPENT_AMT="64053.95" TOT_SPENT_AMT="2397498.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="2433313.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203064" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SOUTH OF RISINGER RD" LIMITS_TO_DSCR="DALLAS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3290000" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.709 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203065" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="NB MAINLANE AT SL 561 CROSSOVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2474265" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Embankment Stabilization" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.218 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="FNH CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="3/17/2025" CNSTR_PCT_TIME_USED="33.60" CNSTR_PCT_COMPLETE="16.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28939.18" CNSTR_SPENT_AMT="505014.90" CE_SPENT_AMT="5396.25" TOT_SPENT_AMT="539350.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2097049.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203066" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009203067" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204077" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="AT SH 34 (ENNIS AVENUE)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8112437" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="3/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.290 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="GREY SKY CONSTRUCTION LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="3/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="496295.20" TOT_SPENT_AMT="496295.20" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="8272437.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204078" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SH 34" LIMITS_TO_DSCR="NORTH OF SH 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58309947" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="10/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.395 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="60494.85" TOT_SPENT_AMT="60494.85" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204079" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SOUTH OF HAMPER RD" LIMITS_TO_DSCR="SOUTH OF RISINGER RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/1/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="148336" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.275 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="2/1/2022" CNSTR_PCT_TIME_USED="95.52" CNSTR_PCT_COMPLETE="94.62" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="161713.99" CE_SPENT_AMT="1863.32" TOT_SPENT_AMT="163577.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="75600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204084" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SH 34" LIMITS_TO_DSCR="SOUTH OF HAMPEL RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="379620" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.682 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="425174.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204085" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SH 34" LIMITS_TO_DSCR="SOUTH OF RISINGER RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7500000" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.683 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204086" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009204087" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009205053" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SH 34" LIMITS_TO_DSCR="FM 85" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="102441733" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="10/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.986 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1740688.42" TOT_SPENT_AMT="1740688.42" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009205058" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="NAVARRO COUNTY LINE" LIMITS_TO_DSCR="SH 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="362025" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="405468.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009205060" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 45" CNTY_NM="Ellis" LIMITS_FROM_DSCR="NAVARRO COUNTY LINE" LIMITS_TO_DSCR="SH 34" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="362025" DIST_LET_DATE="8/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="98885.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009205061" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009206105" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="CHAMBERS CREEK" LIMITS_TO_DSCR="ELLIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6333012" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="2/1/2020" PSE_30_ACTL_DT="2/1/2020" PSE_60_TRGT_DT="2/1/2020" PSE_60_ACTL_DT="12/11/2020" PSE_100_TRGT_DT="2/1/2020" PSE_100_ACTL_DT="2/27/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.350 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="A. K. GILLIS &amp; SONS, LLC" CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="7/18/2022" CNSTR_PCT_TIME_USED="99.58" CNSTR_PCT_COMPLETE="97.83" DSGN_START_TRGT_DT="2/1/2020" DSGN_START_ACTL_DT="2/1/2020" ENVCLR_TRGT_DT="2/1/2021" ENVCLR_ACTL_DT="1/28/2021" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="3/1/2021" ROW_TRGT_DT="2/1/2021" ROW_ACTL_DT="3/1/2021" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="3/1/2021" PE_SPENT_AMT="795790.47" CNSTR_SPENT_AMT="7856117.24" CE_SPENT_AMT="63908.54" TOT_SPENT_AMT="8715816.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="9762896.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009206110" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="AT SH 31D INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15954" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.010 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="17366.16" TOT_SPENT_AMT="17366.16" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="18000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009206111" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="E OF US 287" LIMITS_TO_DSCR="ELLIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2135476" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2391733.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009206112" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="N OF CR 4742" LIMITS_TO_DSCR="S OF CR 4744" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1577940" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.301 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1580000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009206113" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009206114" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009207061" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 356" CNTY_NM="Dallas" LIMITS_FROM_DSCR="WEST OF JAMESTOWN DRIVE" LIMITS_TO_DSCR="N STORY ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="284296" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.730 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="CENTRAL NORTH CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="12/1/2023" CNSTR_PCT_TIME_USED="88.33" CNSTR_PCT_COMPLETE="95.33" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7834.93" CNSTR_SPENT_AMT="287897.35" CE_SPENT_AMT="12991.51" TOT_SPENT_AMT="308723.79" FUND_CAT1_DSCR="Category 10 - Landscape Incentive Awards (GCAA) (1810LI)" FUND_CAT1_PID="LIA" FUND_CAT1_AMT="310000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009207062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 356" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SH 183" LIMITS_TO_DSCR="ELM FORK TRINITY RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7572476" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.040 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="23.40" CNSTR_PCT_COMPLETE="27.32" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="303596.81" CNSTR_SPENT_AMT="2441731.71" CE_SPENT_AMT="17658.29" TOT_SPENT_AMT="2762986.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="7338630.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009208021" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 45-G" CNTY_NM="Ellis" LIMITS_FROM_DSCR="SP 469" LIMITS_TO_DSCR="SH 34" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2489261" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2489261.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009209008" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 45-J" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT TEN MILE CREEK" LIMITS_TO_DSCR="AND AT TEN MILE CREEK RELIEF" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4898974" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="10/29/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/29/2018" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="3/1/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="1/4/2022" CNSTR_PCT_TIME_USED="96.29" CNSTR_PCT_COMPLETE="99.56" DSGN_START_TRGT_DT="12/1/2016" DSGN_START_ACTL_DT="12/1/2016" ENVCLR_TRGT_DT="11/16/2017" ENVCLR_ACTL_DT="11/16/2017" UTIL_TRGT_DT="3/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2021" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="4782897.43" TOT_SPENT_AMT="4782897.43" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT1_AMT="1171.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT2_AMT="1610929.00" FUND_CAT3_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT3_AMT="2080799.00" FUND_CAT4_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2307)" FUND_CAT4_AMT="2226280.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009210009" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 45-J" CNTY_NM="Ellis" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="IH 45 SOUTH (S OF S MAIN ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="110736" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.232 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="134852.84" CE_SPENT_AMT="1110.55" TOT_SPENT_AMT="135963.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="104354.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009211005" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 561" CNTY_NM="Ellis" LIMITS_FROM_DSCR="NORTH OF IH 45" LIMITS_TO_DSCR="NEWTON RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="45888" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.037 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="55626.80" CE_SPENT_AMT="458.16" TOT_SPENT_AMT="56084.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="43715.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009212006" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 45-H" CNTY_NM="Ellis" LIMITS_FROM_DSCR="IH 45 SBFR NORTH" LIMITS_TO_DSCR="IH 45 SBFR SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="142424" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.232 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="40.83" CNSTR_PCT_COMPLETE="30.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="52815.03" CE_SPENT_AMT="125.45" TOT_SPENT_AMT="52940.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="138049.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009213030" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 45-F" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="11TH AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="139597" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.918 (mi)" TXDOT_CNTCT_NM="David Morren, P.E." TXDOT_CNTCT_PH_NBR="(214)319-3574" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="2/7/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="137638.82" CE_SPENT_AMT="730.11" TOT_SPENT_AMT="138368.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="58730.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009213031" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 45-F" CNTY_NM="Navarro" LIMITS_FROM_DSCR="AT POST OAK CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4143565" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="7/1/2022" PSE_30_ACTL_DT="3/17/2023" PSE_60_TRGT_DT="12/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.085 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2023" ROW_ACTL_DT="12/1/2022" RTL_TRGT_DT="5/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="641015.61" TOT_SPENT_AMT="641015.61" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="4875000.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009213033" PT_PHASE="Construction underway or begins soon" HWY_NBR="BI 45-F" CNTY_NM="Navarro" LIMITS_FROM_DSCR="HARTY ROAD" LIMITS_TO_DSCR="IH 45 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4119673" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="8/8/2024" CNSTR_PCT_TIME_USED="84.91" CNSTR_PCT_COMPLETE="94.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="86717.93" CNSTR_SPENT_AMT="4140400.42" CE_SPENT_AMT="103293.05" TOT_SPENT_AMT="4330411.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4675544.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009213034" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 45-F" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45N" LIMITS_TO_DSCR="HARDY AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="222203" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="248867.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009213035" PT_PHASE="Construction begins within 4 years" HWY_NBR="BI 45-F" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="SH 287" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="165358" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="185201.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214086" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 345" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 30 INTERCHANGE" LIMITS_TO_DSCR="SPUR 366 INTERCHANGE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21883783" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="10/1/2019" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="7/1/2020" PSE_100_TRGT_DT="3/1/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.400 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="5/13/2024" CNSTR_PCT_TIME_USED="80.16" CNSTR_PCT_COMPLETE="58.26" DSGN_START_TRGT_DT="11/1/2017" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="3/1/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2019" UTIL_ACTL_DT="1/1/2020" ROW_TRGT_DT="3/2/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2019" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3700226.17" CNSTR_SPENT_AMT="15439904.68" CE_SPENT_AMT="276167.01" TOT_SPENT_AMT="19416297.86" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="13095000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="4711546.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214088" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="LENWAY ST." LIMITS_TO_DSCR="GOOD LATIMER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30136042" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="10/8/2019" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="6/1/2018" PSE_100_TRGT_DT="4/1/2019" PSE_100_ACTL_DT="3/1/2019" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.004 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY" CNSTR_NTPD_DT="1/15/2020" CNSTR_WKBG_DT="7/6/2020" CNSTR_PCT_TIME_USED="164.36" CNSTR_PCT_COMPLETE="83.87" DSGN_START_TRGT_DT="4/1/2017" DSGN_START_ACTL_DT="4/1/2017" ENVCLR_TRGT_DT="9/13/2013" ENVCLR_ACTL_DT="9/13/2013" UTIL_TRGT_DT="6/1/2019" UTIL_ACTL_DT="12/1/2019" ROW_TRGT_DT="8/6/2018" ROW_ACTL_DT="10/8/2019" RTL_TRGT_DT="6/1/2019" RTL_ACTL_DT="12/1/2019" PE_SPENT_AMT="2824395.45" CNSTR_SPENT_AMT="31401046.60" CE_SPENT_AMT="3092483.76" TOT_SPENT_AMT="37317925.81" FUND_CAT1_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT1_AMT="26327302.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214094" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 345" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="SPUR 366" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1379840809" DIST_LET_DATE="8/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20423385.83" TOT_SPENT_AMT="20423385.83" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214098" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="PENNSYLVANIA AVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5125905" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="10/1/2021" PSE_30_ACTL_DT="10/1/2021" PSE_60_TRGT_DT="1/1/2022" PSE_60_ACTL_DT="1/21/2022" PSE_100_TRGT_DT="3/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.346 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="5/19/2023" CNSTR_PCT_TIME_USED="93.59" CNSTR_PCT_COMPLETE="65.28" DSGN_START_TRGT_DT="10/1/2021" DSGN_START_ACTL_DT="10/1/2021" ENVCLR_TRGT_DT="10/1/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="294089.61" CNSTR_SPENT_AMT="4375512.56" CE_SPENT_AMT="121933.87" TOT_SPENT_AMT="4791536.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6845618.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214101" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SOUTH OF IH 20" LIMITS_TO_DSCR="NORTH OF IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="298845" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Install/rehabilitate Its" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="6/15/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="11/15/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="2/13/2024" CNSTR_PCT_TIME_USED="74.69" CNSTR_PCT_COMPLETE="77.36" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/23/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="128.12" CNSTR_SPENT_AMT="197858.65" CE_SPENT_AMT="5571.77" TOT_SPENT_AMT="203558.54" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2305)" FUND_CAT1_AMT="409438.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214102" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT PENNSYLVANIA" LIMITS_TO_DSCR="IN THE CITY OF DALLAS" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="816531" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.378 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6533.13" TOT_SPENT_AMT="6533.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="685040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214103" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="PENNSYLVANIA AVE" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7188412" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/1/2023" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="5/1/2023" PSE_60_ACTL_DT="1/21/2022" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.346 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="7/20/2024" CNSTR_PCT_TIME_USED="93.15" CNSTR_PCT_COMPLETE="82.43" DSGN_START_TRGT_DT="1/1/2023" DSGN_START_ACTL_DT="9/1/2021" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="125607.70" CNSTR_SPENT_AMT="6439396.91" CE_SPENT_AMT="73133.24" TOT_SPENT_AMT="6638137.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="9079210.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214104" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="OVERTON RD" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3534464" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/1/2022" PSE_30_ACTL_DT="11/1/2022" PSE_60_TRGT_DT="2/1/2023" PSE_60_ACTL_DT="12/21/2022" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.853 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="ED BELL CONSTRUCTION COMPANY" CNSTR_NTPD_DT="9/6/2023" CNSTR_WKBG_DT="11/28/2023" CNSTR_PCT_TIME_USED="153.85" CNSTR_PCT_COMPLETE="83.15" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="47497.46" CNSTR_SPENT_AMT="3541957.94" CE_SPENT_AMT="131978.33" TOT_SPENT_AMT="3721433.73" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214107" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 345" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="SS 366" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="235200" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.419 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="756.96" TOT_SPENT_AMT="756.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="263424.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214108" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT NEWTON CREEK" LIMITS_TO_DSCR="AND FIVE MILE CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3175651" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.284 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="BECK-REIT &amp; SONS, LTD." CNSTR_NTPD_DT="2/5/2024" CNSTR_WKBG_DT="5/13/2024" CNSTR_PCT_TIME_USED="43.89" CNSTR_PCT_COMPLETE="98.92" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="101524.72" CNSTR_SPENT_AMT="3615002.84" CE_SPENT_AMT="11686.10" TOT_SPENT_AMT="3728213.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3608160.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009214109" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SL 12" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5729757" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6188138.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009215003" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 469" CNTY_NM="Ellis" LIMITS_FROM_DSCR="BI 45G IN ENNIS" LIMITS_TO_DSCR="FM 879" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="119465" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.929 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="40.83" CNSTR_PCT_COMPLETE="30.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="44203.88" CE_SPENT_AMT="104.99" TOT_SPENT_AMT="44308.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="118474.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301104" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="AT US 287" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13617" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="9094.79" TOT_SPENT_AMT="9094.79" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="18000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301105" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="RICHLAND CREEK" LIMITS_TO_DSCR="BI 45F" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="799185" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="977683.03" CE_SPENT_AMT="8051.17" TOT_SPENT_AMT="985734.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="775996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301106" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45 EAST OF 287" LIMITS_TO_DSCR="IH 45 EAST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5304066" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Embankment Stabilization" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.170 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="FNH CONSTRUCTION, LLC" CNSTR_NTPD_DT="11/7/2024" CNSTR_WKBG_DT="3/17/2025" CNSTR_PCT_TIME_USED="33.60" CNSTR_PCT_COMPLETE="16.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="95532.10" CNSTR_SPENT_AMT="827475.20" CE_SPENT_AMT="11473.02" TOT_SPENT_AMT="934480.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3906549.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301107" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="SH 14" LIMITS_TO_DSCR="RICHLAND CRK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="88643" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.141 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="99280.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301108" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Navarro" LIMITS_FROM_DSCR="SH 14" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1830921" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2050632.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301109" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009301110" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009302022" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 14" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="FREESTONE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="593997" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="726519.65" CE_SPENT_AMT="5982.83" TOT_SPENT_AMT="732502.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="548079.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009303025" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 14" CNTY_NM="Freestone" LIMITS_FROM_DSCR="WEST MAIN AVENUE" LIMITS_TO_DSCR="WEST COLORADO AVENUE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18330" DIST_LET_DATE="10/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Flashing Beacon" PSE_30_TRGT_DT="1/7/2020" PSE_30_ACTL_DT="4/20/2020" PSE_60_TRGT_DT="3/20/2020" PSE_60_ACTL_DT="6/15/2020" PSE_100_TRGT_DT="7/15/2020" PSE_100_ACTL_DT="7/31/2020" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC." CNSTR_NTPD_DT="11/19/2020" CNSTR_WKBG_DT="4/20/2021" CNSTR_PCT_TIME_USED="106.33" CNSTR_PCT_COMPLETE="99.94" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="7/29/2020" ENVCLR_ACTL_DT="7/21/2020" UTIL_TRGT_DT="10/1/2019" UTIL_ACTL_DT="7/31/2020" ROW_TRGT_DT="10/1/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/29/2020" RTL_ACTL_DT="7/31/2020" CNSTR_SPENT_AMT="21606.90" CE_SPENT_AMT="90.39" TOT_SPENT_AMT="21697.29" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="30876.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009303026" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 14" CNTY_NM="Freestone" LIMITS_FROM_DSCR="NAVARRO COUNTY LINE" LIMITS_TO_DSCR="LIMESTONE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="367057" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="411104.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009304052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009305052" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009305053" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 14" CNTY_NM="Limestone" LIMITS_FROM_DSCR="CLR 412" LIMITS_TO_DSCR="FM 3401" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/29/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="133646" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/23/2022" PSE_30_ACTL_DT="2/23/2022" PSE_60_TRGT_DT="4/6/2022" PSE_60_ACTL_DT="4/6/2022" PSE_100_TRGT_DT="6/8/2022" PSE_100_ACTL_DT="6/8/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chris Pruitt, P.E." TXDOT_CNTCT_PH_NBR="(254)867-2800" CNSTR_CMPNY_NM="ROAD SOLUTIONS L.L.C." CNSTR_NTPD_DT="9/28/2022" CNSTR_WKBG_DT="5/4/2023" CNSTR_PCT_TIME_USED="130.00" CNSTR_PCT_COMPLETE="98.27" DSGN_START_TRGT_DT="1/10/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/4/2022" ENVCLR_ACTL_DT="4/25/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/15/2022" RTL_ACTL_DT="6/15/2022" PE_SPENT_AMT="3675.49" CNSTR_SPENT_AMT="126761.00" CE_SPENT_AMT="5693.31" TOT_SPENT_AMT="136129.80" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="125693.00" TXDOT_CNTCT_LAST_UPDATE_DT="1/28/2025" LAST_CNSTR_UPDATE_DT="1/28/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009305054" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 14" CNTY_NM="Limestone" LIMITS_FROM_DSCR="SH 164" LIMITS_TO_DSCR="S THORNTON CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="830000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="8.416 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="863200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009306023" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 14" CNTY_NM="Limestone" LIMITS_FROM_DSCR="SH 7" LIMITS_TO_DSCR="FALLS CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="615000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/6/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/13/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/15/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/15/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="688800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009306025" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 14" CNTY_NM="Limestone" LIMITS_FROM_DSCR="S THORNTON CITY LIMITS" LIMITS_TO_DSCR="SH 7" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1050000" DIST_LET_DATE="11/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TBD" PROJ_LENGTH="7.565 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1176000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009306026" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009307021" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 14" CNTY_NM="Falls" LIMITS_FROM_DSCR="LIMESTONE CO LINE" LIMITS_TO_DSCR="ROBERTSON CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2374395" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="4/6/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/13/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/15/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.895 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/15/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3047.06" TOT_SPENT_AMT="3047.06" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="2659322.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009307023" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009308021" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009401032" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AT UPRR RAILROAD &amp; UPRR SPUR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/4/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26588577" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="8/21/2020" PSE_30_ACTL_DT="8/21/2020" PSE_60_TRGT_DT="4/15/2021" PSE_60_ACTL_DT="12/10/2021" PSE_100_TRGT_DT="9/2/2021" PSE_100_ACTL_DT="1/26/2023" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.099 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="10/31/2023" CNSTR_PCT_TIME_USED="58.01" CNSTR_PCT_COMPLETE="47.12" DSGN_START_TRGT_DT="12/18/2018" DSGN_START_ACTL_DT="12/18/2018" ENVCLR_TRGT_DT="7/28/2021" ENVCLR_ACTL_DT="12/21/2022" UTIL_TRGT_DT="4/28/2022" UTIL_ACTL_DT="12/19/2022" ROW_TRGT_DT="12/7/2021" ROW_ACTL_DT="6/3/2022" RTL_TRGT_DT="5/5/2022" RTL_ACTL_DT="12/19/2022" PE_SPENT_AMT="5289476.57" CNSTR_SPENT_AMT="13891199.13" CE_SPENT_AMT="1226942.56" TOT_SPENT_AMT="20407618.26" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="12000000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="14050.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402135" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 10" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WESTPARK WAY" LIMITS_TO_DSCR="TEXAS STAR PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="122036" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="3/2/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/4/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.446 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="10/17/2022" CNSTR_PCT_TIME_USED="98.00" CNSTR_PCT_COMPLETE="97.20" DSGN_START_TRGT_DT="6/30/2021" DSGN_START_ACTL_DT="6/30/2021" ENVCLR_TRGT_DT="1/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/25/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38032.40" CNSTR_SPENT_AMT="147533.92" CE_SPENT_AMT="17368.07" TOT_SPENT_AMT="202934.39" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="59278.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402136" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="BEAR CREEK BLVD" LIMITS_TO_DSCR="DALLAS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="353000000" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2154787.15" TOT_SPENT_AMT="2154787.15" FUND_CAT1_DSCR="Category 3 - Toll Revenue (TOLREV)" FUND_CAT1_AMT="390065000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402137" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AMERICAN BLVD" LIMITS_TO_DSCR="DALLAS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6540578" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="7/18/2024" CNSTR_WKBG_DT="3/17/2025" CNSTR_PCT_TIME_USED="32.67" CNSTR_PCT_COMPLETE="67.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="173885.28" CNSTR_SPENT_AMT="4941571.21" CE_SPENT_AMT="31952.25" TOT_SPENT_AMT="5147408.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="11995752.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402138" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WEST OF BIG FOSSIL CREEK" LIMITS_TO_DSCR="RUFE SNOW DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1089939" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="JAGOE-PUBLIC COMPANY" CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="2.94" CNSTR_PCT_COMPLETE="9.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1464.37" CNSTR_SPENT_AMT="54874.55" CE_SPENT_AMT="563.28" TOT_SPENT_AMT="56902.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1005348.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402140" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 10" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="FANNING DR" LIMITS_TO_DSCR="DICKEY DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/25/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="309363" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="3/2/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/4/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.600 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="O. TREVINO CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="10/17/2022" CNSTR_PCT_TIME_USED="98.00" CNSTR_PCT_COMPLETE="97.20" DSGN_START_TRGT_DT="6/30/2021" DSGN_START_ACTL_DT="6/30/2021" ENVCLR_TRGT_DT="1/12/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/25/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13103.40" CNSTR_SPENT_AMT="303419.55" CE_SPENT_AMT="35651.03" TOT_SPENT_AMT="352173.98" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="196353.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402141" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="RUFE SNOW" LIMITS_TO_DSCR="BOOTHE CALLAWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="11/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Signal Improvements,leds &amp; Gps Clocks" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402142" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 10" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="LAKE CREST LANE" LIMITS_TO_DSCR="BLUEBONNET DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="300000" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="983.51" CNSTR_SPENT_AMT="287063.03" TOT_SPENT_AMT="288046.54" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402146" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WEHRING" LIMITS_TO_DSCR="HANDLEY EDERVILLE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/24/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="323183" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Daniel Poole, P.E." TXDOT_CNTCT_PH_NBR="(817)399-4300" CNSTR_CMPNY_NM="CENTRAL NORTH CONSTRUCTION, LLC" CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="12/6/2023" CNSTR_PCT_TIME_USED="73.26" CNSTR_PCT_COMPLETE="93.73" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8713.10" CNSTR_SPENT_AMT="306665.25" CE_SPENT_AMT="69185.40" TOT_SPENT_AMT="384563.75" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2410GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="400000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="116786.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402147" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 10" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="WEST PARK DRIVE" LIMITS_TO_DSCR="SH 183" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4582149" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4863.41" TOT_SPENT_AMT="4863.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4948721.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009402148" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403060" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 482" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT SH 114 &amp; SH 183" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91202288" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="1/1/2013" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="6/1/2018" PSE_100_TRGT_DT="1/1/2019" PSE_100_ACTL_DT="2/1/2020" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Brenan Honey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6517" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="7/13/2020" CNSTR_WKBG_DT="8/3/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="93.41" DSGN_START_TRGT_DT="11/19/2012" DSGN_START_ACTL_DT="11/19/2012" ENVCLR_TRGT_DT="4/1/2014" ENVCLR_ACTL_DT="4/1/2014" UTIL_TRGT_DT="7/1/2019" UTIL_ACTL_DT="5/1/2020" ROW_TRGT_DT="8/6/2018" ROW_ACTL_DT="4/1/2018" RTL_TRGT_DT="7/1/2019" RTL_ACTL_DT="5/1/2020" PE_SPENT_AMT="6875562.96" CNSTR_SPENT_AMT="90243992.69" CE_SPENT_AMT="4981738.02" TOT_SPENT_AMT="102101293.67" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="210000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403120" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 183" CNTY_NM="Dallas" LIMITS_FROM_DSCR="WEST OF SH 161" LIMITS_TO_DSCR="0.66 MILE WEST OF LOOP 12" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="857645176" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.699 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403121" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 183" CNTY_NM="Dallas" LIMITS_FROM_DSCR="WEST OF LP 12" LIMITS_TO_DSCR="EAST OF LP 12" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="382338850" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.600 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403123" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 482" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 35E" LIMITS_TO_DSCR="LOOP 12" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25386" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="12/18/2019" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="4/14/2020" PSE_60_ACTL_DT="10/14/2019" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.771 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="MICA CORPORATION" CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="91.88" CNSTR_PCT_COMPLETE="110.63" DSGN_START_TRGT_DT="5/7/2019" DSGN_START_ACTL_DT="5/7/2019" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="11/17/2021" UTIL_TRGT_DT="9/22/2020" UTIL_ACTL_DT="8/19/2020" ROW_TRGT_DT="9/22/2020" ROW_ACTL_DT="8/19/2020" RTL_TRGT_DT="10/21/2020" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="4643.11" CNSTR_SPENT_AMT="25324.35" CE_SPENT_AMT="1308.28" TOT_SPENT_AMT="31275.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="122431.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403124" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 183" CNTY_NM="Dallas" LIMITS_FROM_DSCR="WEST OF SL 12" LIMITS_TO_DSCR="EAST OF SL 12" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16211819" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403125" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 183" CNTY_NM="Dallas" LIMITS_FROM_DSCR="W OF SH 161" LIMITS_TO_DSCR="WEST OF SL 12" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="56643706" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403127" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009403128" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009405067" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="SH 199" LIMITS_TO_DSCR="IH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="216143488" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="7/19/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/25/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.888 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/28/2019" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/31/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/16/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/16/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3135458.02" TOT_SPENT_AMT="3135458.02" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009405068" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="TRAFFIC CIRCLE" LIMITS_TO_DSCR="MALL CIRCLE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3983176" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="9/27/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/11/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.559 (mi)" TXDOT_CNTCT_NM="Justin Thomey, P.E." TXDOT_CNTCT_PH_NBR="(817)370-6640" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="4/22/2025" CNSTR_PCT_TIME_USED="16.81" CNSTR_PCT_COMPLETE="62.04" DSGN_START_TRGT_DT="11/29/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/5/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/18/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="186129.32" CNSTR_SPENT_AMT="2377131.96" CE_SPENT_AMT="12113.51" TOT_SPENT_AMT="2575374.79" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4337365.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009405070" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 183" CNTY_NM="Tarrant" LIMITS_FROM_DSCR="AT PUMPHREY DR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18749969" DIST_LET_DATE="3/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="7/19/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/25/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/28/2019" DSGN_START_ACTL_DT="10/28/2019" ENVCLR_TRGT_DT="3/31/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/16/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/16/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3355.35" TOT_SPENT_AMT="3355.35" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009407046" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 183" CNTY_NM="Dallas" LIMITS_FROM_DSCR="REGAL ROW" LIMITS_TO_DSCR="IH 35E" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="207544402" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2345120.45" TOT_SPENT_AMT="2345120.45" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009502096" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Dallas" LIMITS_FROM_DSCR="EAST OF BELT LINE RD" LIMITS_TO_DSCR="LAWSON RD (DALLAS/KAUFMAN C/L)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="322288828" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/8/2019" PSE_30_ACTL_DT="2/14/2022" PSE_60_TRGT_DT="11/1/2020" PSE_60_ACTL_DT="5/2/2022" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.114 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/8/2019" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="3/1/2020" ENVCLR_ACTL_DT="4/13/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="3/6/2023" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13447021.78" TOT_SPENT_AMT="13447021.78" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="1588225.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT2_AMT="241928203.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="62066566.00" FUND_CAT4_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT4_AMT="60980494.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009502107" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Dallas" LIMITS_FROM_DSCR="EAST OF TOWN EAST BLVD" LIMITS_TO_DSCR="EAST OF BELT LINE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="342164864" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/31/2020" PSE_30_ACTL_DT="10/8/2019" PSE_60_TRGT_DT="1/1/2021" PSE_60_ACTL_DT="3/5/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="4/14/2023" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="AUSTIN BRIDGE &amp; ROAD SERVICES, LP" CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="2/24/2025" CNSTR_PCT_TIME_USED="6.42" CNSTR_PCT_COMPLETE="13.22" DSGN_START_TRGT_DT="10/8/2019" DSGN_START_ACTL_DT="10/8/2019" ENVCLR_TRGT_DT="4/13/2020" ENVCLR_ACTL_DT="4/13/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="1/27/2023" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11716315.56" CNSTR_SPENT_AMT="46092565.20" CE_SPENT_AMT="368238.90" TOT_SPENT_AMT="58177119.66" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="75843420.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="228404680.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009502117" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Dallas" LIMITS_FROM_DSCR="EAST OF PRESIDENTIAL ROW" LIMITS_TO_DSCR="EAST OF NORTH GALLOWAY AVENUE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="493923" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="11/4/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/13/2020" PSE_60_ACTL_DT="7/13/2020" PSE_100_TRGT_DT="9/2/2020" PSE_100_ACTL_DT="9/2/2020" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.396 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="5/3/2022" CNSTR_PCT_TIME_USED="154.90" CNSTR_PCT_COMPLETE="84.67" DSGN_START_TRGT_DT="5/5/2016" DSGN_START_ACTL_DT="5/5/2016" ENVCLR_TRGT_DT="10/16/2020" ENVCLR_ACTL_DT="7/16/2020" UTIL_TRGT_DT="11/12/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/12/2020" ROW_ACTL_DT="9/2/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="73910.03" CNSTR_SPENT_AMT="476728.54" CE_SPENT_AMT="30448.17" TOT_SPENT_AMT="581086.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1002894.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009502125" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Dallas" LIMITS_FROM_DSCR="EAST OF TOWN EAST BLVD" LIMITS_TO_DSCR="EAST OF GUS THOMASSON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64127964" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="10/9/2019" PSE_30_ACTL_DT="11/1/2020" PSE_60_TRGT_DT="10/9/2019" PSE_60_ACTL_DT="10/1/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.072 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/9/2019" DSGN_START_ACTL_DT="11/1/2020" ENVCLR_TRGT_DT="3/1/2020" ENVCLR_ACTL_DT="4/13/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="8/1/2022" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2501472.47" TOT_SPENT_AMT="2501472.47" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="33062577.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="38760742.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503080" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="LAWSON RD (DALLAS / KAUFMAN C/L)" LIMITS_TO_DSCR="FM 460" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/29/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="112819452" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="10/8/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2020" PSE_60_ACTL_DT="12/1/2020" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.984 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="63.36" CNSTR_PCT_COMPLETE="70.72" DSGN_START_TRGT_DT="3/1/2019" DSGN_START_ACTL_DT="3/1/2019" ENVCLR_TRGT_DT="3/1/2020" ENVCLR_ACTL_DT="4/13/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="6/1/2022" PE_SPENT_AMT="3081135.24" CNSTR_SPENT_AMT="82740543.65" CE_SPENT_AMT="2359597.96" TOT_SPENT_AMT="88181276.85" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="35979803.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="86020198.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503085" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="AT FM 460" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/29/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6723349" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="10/8/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2020" PSE_60_ACTL_DT="12/1/2020" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.210 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="63.36" CNSTR_PCT_COMPLETE="70.72" DSGN_START_TRGT_DT="3/1/2019" DSGN_START_ACTL_DT="3/1/2019" ENVCLR_TRGT_DT="3/1/2020" ENVCLR_ACTL_DT="4/13/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="6/1/2022" PE_SPENT_AMT="267473.11" CNSTR_SPENT_AMT="5681699.98" CE_SPENT_AMT="161266.96" TOT_SPENT_AMT="6110440.05" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT1_PID="INF" FUND_CAT1_AMT="3944904.00" FUND_CAT2_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT2_AMT="6443588.00" FUND_CAT3_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT3_PID="BMN" FUND_CAT3_AMT="1882263.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="FM 460" LIMITS_TO_DSCR="EAST OF FM 548" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74197" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="12/18/2019" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="4/14/2020" PSE_60_ACTL_DT="10/14/2019" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.329 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="MICA CORPORATION" CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="91.88" CNSTR_PCT_COMPLETE="110.63" DSGN_START_TRGT_DT="5/7/2019" DSGN_START_ACTL_DT="5/7/2019" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="11/17/2021" UTIL_TRGT_DT="9/22/2020" UTIL_ACTL_DT="8/19/2020" ROW_TRGT_DT="9/22/2020" ROW_ACTL_DT="8/19/2020" RTL_TRGT_DT="10/21/2020" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="82.10" CNSTR_SPENT_AMT="75167.59" CE_SPENT_AMT="2979.81" TOT_SPENT_AMT="78229.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="137758.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503098" PT_PHASE="Construction begins within 4 years" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="SOUTH FRONTAGE ROAD" LIMITS_TO_DSCR="AT BUFFALO CREEK" PRJ_TIER="" ENERGY="" FREIGHT="" TRUNK_SYS_FLAG="" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7495824" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="477853.91" TOT_SPENT_AMT="477853.91" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="4832824.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="3000000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT3_AMT="626626.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503099" PT_PHASE="Construction begins within 4 years" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="SOUTH FRONTAGE ROAD" LIMITS_TO_DSCR="AT BUFFALO CREEK RELIEF" PRJ_TIER="" ENERGY="" FREIGHT="" TRUNK_SYS_FLAG="" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11783326" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="379702.18" TOT_SPENT_AMT="379702.18" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="5119326.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="7000000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT3_AMT="969546.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503100" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="WESTBOUND AT BUFFALO CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9579411" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="470924.24" TOT_SPENT_AMT="470924.24" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="5417033.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="4700000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT3_AMT="809363.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503101" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EASTBOUND AT BUFFALO CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8688436" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="377880.10" TOT_SPENT_AMT="377880.10" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="5520233.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="3600000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT3_AMT="729619.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503102" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="WESTBOUND AT BUFFALO CREEK RELIEF" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16131790" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="378421.59" TOT_SPENT_AMT="378421.59" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="7154409.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="9800000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT3_AMT="1356353.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EASTBOUND AT BUFFALO CREEK RELIEF" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13454743" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="378036.86" TOT_SPENT_AMT="378036.86" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="6735782.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="7300000.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT3_AMT="1122863.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503106" PT_PHASE="Planning, 10+ years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="FM 460" LIMITS_TO_DSCR="EAST OF FM 548" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2644427" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.028 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2767184.92" TOT_SPENT_AMT="2767184.92" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503107" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="FM 460" LIMITS_TO_DSCR="EAST OF FM 548" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4452973" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.494 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.79" CNSTR_PCT_COMPLETE="93.95" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="952814.00" CE_SPENT_AMT="6175.43" TOT_SPENT_AMT="958989.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="722409.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503108" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="AT BUFFALO CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8454897" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="378907.25" TOT_SPENT_AMT="378907.25" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="8454897.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_AMT="676392.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503109" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="AT BUFFALO CREEK RELIEF" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16688562" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="2/24/2023" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="7/21/2022" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="6/1/2022" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="380064.02" TOT_SPENT_AMT="380064.02" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="16688562.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_AMT="1335085.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009503110" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="BUFFALO CREEK RELIEF" LIMITS_TO_DSCR="FM 548" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/22/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3495000" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.159 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="ED BELL CONSTRUCTION COMPANY" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="4/7/2025" CNSTR_PCT_TIME_USED="13.56" CNSTR_PCT_COMPLETE="9.44" DSGN_START_TRGT_DT="1/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="68404.32" CNSTR_SPENT_AMT="319564.40" CE_SPENT_AMT="8156.43" TOT_SPENT_AMT="396125.15" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009504069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="AT SH 205/FM 148" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13807277" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="1/26/2018" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="5/1/2018" PSE_100_TRGT_DT="11/1/2019" PSE_100_ACTL_DT="12/13/2021" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.491 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="STERLING DELAWARE HOLDING COMPANY" CNSTR_NTPD_DT="6/30/2022" CNSTR_WKBG_DT="10/25/2022" CNSTR_PCT_TIME_USED="124.60" CNSTR_PCT_COMPLETE="87.57" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="5/1/2017" ENVCLR_TRGT_DT="8/31/2018" ENVCLR_ACTL_DT="8/23/2018" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="1/1/2022" ROW_TRGT_DT="8/1/2019" ROW_ACTL_DT="4/1/2020" RTL_TRGT_DT="6/1/2020" RTL_ACTL_DT="1/1/2022" PE_SPENT_AMT="694555.59" CNSTR_SPENT_AMT="14587396.91" CE_SPENT_AMT="877372.23" TOT_SPENT_AMT="16159324.73" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2205)" FUND_CAT1_AMT="9349949.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009504072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EAST OF FM 548" LIMITS_TO_DSCR="SP 557" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="136341" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="12/18/2019" PSE_30_ACTL_DT="9/30/2019" PSE_60_TRGT_DT="4/14/2020" PSE_60_ACTL_DT="10/14/2019" PSE_100_TRGT_DT="9/22/2020" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.098 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="MICA CORPORATION" CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="10/10/2022" CNSTR_PCT_TIME_USED="91.88" CNSTR_PCT_COMPLETE="110.63" DSGN_START_TRGT_DT="5/7/2019" DSGN_START_ACTL_DT="5/7/2019" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="11/17/2021" UTIL_TRGT_DT="9/22/2020" UTIL_ACTL_DT="8/19/2020" ROW_TRGT_DT="9/22/2020" ROW_ACTL_DT="8/19/2020" RTL_TRGT_DT="10/21/2020" RTL_ACTL_DT="3/4/2022" PE_SPENT_AMT="42266.40" CNSTR_SPENT_AMT="160698.44" CE_SPENT_AMT="1706.43" TOT_SPENT_AMT="204671.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="138614.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009504073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="US 80 EB" LIMITS_TO_DSCR="AT BACHELOR CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2032085" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="1/26/2018" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="5/1/2018" PSE_100_TRGT_DT="11/1/2019" PSE_100_ACTL_DT="12/13/2021" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.173 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="STERLING DELAWARE HOLDING COMPANY" CNSTR_NTPD_DT="6/30/2022" CNSTR_WKBG_DT="10/25/2022" CNSTR_PCT_TIME_USED="124.60" CNSTR_PCT_COMPLETE="87.57" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="5/1/2017" ENVCLR_TRGT_DT="8/31/2018" ENVCLR_ACTL_DT="8/23/2018" UTIL_TRGT_DT="6/1/2020" UTIL_ACTL_DT="1/1/2022" ROW_TRGT_DT="8/1/2019" ROW_ACTL_DT="4/1/2020" RTL_TRGT_DT="6/1/2020" RTL_ACTL_DT="1/1/2022" PE_SPENT_AMT="534871.43" CNSTR_SPENT_AMT="2058178.92" CE_SPENT_AMT="144123.51" TOT_SPENT_AMT="2737173.86" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1582142.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009504076" PT_PHASE="Planning, 10+ years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EAST  OF FM 548" LIMITS_TO_DSCR="SPUR 557" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="440832306" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.806 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2711979.16" TOT_SPENT_AMT="2711979.16" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009504077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EAST OF FM 548" LIMITS_TO_DSCR="SPUR 557" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="718827" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.009 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.79" CNSTR_PCT_COMPLETE="93.95" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="908620.42" CE_SPENT_AMT="5889.02" TOT_SPENT_AMT="914509.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="705828.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009505060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="WEST OF BRADSHAW" LIMITS_TO_DSCR="FM 986" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/7/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="425286" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="10/1/2022" PSE_30_ACTL_DT="8/1/2022" PSE_60_TRGT_DT="10/1/2022" PSE_60_ACTL_DT="10/14/2022" PSE_100_TRGT_DT="10/1/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.473 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="7/28/2023" CNSTR_PCT_TIME_USED="91.78" CNSTR_PCT_COMPLETE="93.04" DSGN_START_TRGT_DT="10/1/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="10/1/2023" ENVCLR_ACTL_DT="11/28/2022" UTIL_TRGT_DT="10/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10413.83" CNSTR_SPENT_AMT="415835.18" CE_SPENT_AMT="9447.04" TOT_SPENT_AMT="435696.05" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="903536.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009505061" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="KINGS CREEK" LIMITS_TO_DSCR="VAN ZANDT COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19765417" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.089 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33079.61" TOT_SPENT_AMT="33079.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="21346650.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009505062" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="ON MOORE AVE (US 80) W FROM BROOKSHIR DR" LIMITS_TO_DSCR="BRADSHAW STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1200000" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.480 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009505063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="US 80 AT FM 2728 (WEST)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="257051" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="1/11/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="2/14/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.245 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="DURABLE SPECIALTIES, INC." CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="2/27/2023" CNSTR_PCT_TIME_USED="131.70" CNSTR_PCT_COMPLETE="105.44" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/18/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="5/11/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/23/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/23/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="37287.92" CNSTR_SPENT_AMT="306448.58" CE_SPENT_AMT="1702.06" TOT_SPENT_AMT="345438.56" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009505064" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EAST OF CR 354" LIMITS_TO_DSCR="WEST OF FM 2728" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/2/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1089056" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/16/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/19/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.023 (mi)" TXDOT_CNTCT_NM="LANE SELMAN, P.E." TXDOT_CNTCT_PH_NBR="(972)962-3617" CNSTR_CMPNY_NM="BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="10/16/2023" CNSTR_PCT_TIME_USED="42.72" CNSTR_PCT_COMPLETE="88.80" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/19/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/19/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/19/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/19/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23583.47" CNSTR_SPENT_AMT="1058866.20" CE_SPENT_AMT="32662.71" TOT_SPENT_AMT="1115112.38" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="882969.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009506075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="EDGEWOOD W C/L" LIMITS_TO_DSCR="SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="438800" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="473213.91" CE_SPENT_AMT="7222.48" TOT_SPENT_AMT="480436.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="533000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009507061" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="FM 857" LIMITS_TO_DSCR="SMITH CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="671814" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="770275.08" CE_SPENT_AMT="13541.18" TOT_SPENT_AMT="783816.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="738173.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009507062" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="GS W CITY LIMITS" LIMITS_TO_DSCR="FM 857" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="647295" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="724971.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009508021" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Smith" LIMITS_FROM_DSCR="VAN ZANDT C/L" LIMITS_TO_DSCR="SMITH C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2886984" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="83891.55" CNSTR_SPENT_AMT="198070.74" CE_SPENT_AMT="3482.05" TOT_SPENT_AMT="285444.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2072946.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009509040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Wood" LIMITS_FROM_DSCR="SMITH C/L" LIMITS_TO_DSCR="US 69 IN LINDALE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="634639" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="727831.36" CE_SPENT_AMT="12795.11" TOT_SPENT_AMT="740626.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="561307.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009510033" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="EAST OF TOWN EAST BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="111501947" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="10/9/2019" PSE_30_ACTL_DT="11/1/2020" PSE_60_TRGT_DT="10/9/2019" PSE_60_ACTL_DT="10/1/2021" PSE_100_TRGT_DT="6/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/9/2019" DSGN_START_ACTL_DT="11/1/2020" ENVCLR_TRGT_DT="3/1/2020" ENVCLR_ACTL_DT="4/13/2020" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2021" ROW_ACTL_DT="8/1/2022" RTL_TRGT_DT="6/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5150808.06" TOT_SPENT_AMT="5150808.06" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT1_AMT="25753185.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="102149697.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009510057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 30" LIMITS_TO_DSCR="E OF PRESIDENTIAL ROW" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="529532" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="11/4/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/13/2020" PSE_60_ACTL_DT="7/13/2020" PSE_100_TRGT_DT="9/2/2020" PSE_100_ACTL_DT="9/2/2020" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.439 (mi)" TXDOT_CNTCT_NM="Nathan Petter, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6240" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="5/3/2022" CNSTR_PCT_TIME_USED="154.90" CNSTR_PCT_COMPLETE="84.67" DSGN_START_TRGT_DT="5/5/2016" DSGN_START_ACTL_DT="5/5/2016" ENVCLR_TRGT_DT="10/16/2020" ENVCLR_ACTL_DT="7/16/2020" UTIL_TRGT_DT="11/12/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/12/2020" ROW_ACTL_DT="9/2/2020" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="28434.68" CNSTR_SPENT_AMT="511578.24" CE_SPENT_AMT="32673.98" TOT_SPENT_AMT="572686.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1017492.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009511011" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009512003" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 87" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="EOM (BRIN STREET)" LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11700" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="13104.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009513044" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="KAUFMAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="187520" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.415 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="CROSS PLUS CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/21/2023" CNSTR_WKBG_DT="1/3/2024" CNSTR_PCT_TIME_USED="55.50" CNSTR_PCT_COMPLETE="100.57" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/16/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13728.47" CNSTR_SPENT_AMT="195048.33" CE_SPENT_AMT="6041.58" TOT_SPENT_AMT="214818.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="143502.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009513045" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 20" CNTY_NM="Dallas" LIMITS_FROM_DSCR="AT IH 635 DIRECT CONNECTOR" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35757094" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2729.01" TOT_SPENT_AMT="2729.01" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009513049" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Dallas" LIMITS_FROM_DSCR="IH 635" LIMITS_TO_DSCR="KAUFMAN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5000000" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="5200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009513050" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 20" CNTY_NM="Dallas" LIMITS_FROM_DSCR="SEAGOVILLE ROAD" LIMITS_TO_DSCR="BELTLINE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1524810" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.783 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2610GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1524810.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="121985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009514033" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="DALLAS COUNTY LINE" LIMITS_TO_DSCR="SP 557" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="358084" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.509 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="CROSS PLUS CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/21/2023" CNSTR_WKBG_DT="1/3/2024" CNSTR_PCT_TIME_USED="55.50" CNSTR_PCT_COMPLETE="100.57" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/16/2019" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="40281.32" CNSTR_SPENT_AMT="249601.25" CE_SPENT_AMT="7731.28" TOT_SPENT_AMT="297613.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="132018.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009514034" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 20" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="WEST OF FM 148" LIMITS_TO_DSCR="WEST OF SS 557" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1055603" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="12/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/1/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.815 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="29244.65" TOT_SPENT_AMT="29244.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1055603.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/4/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009514035" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 20" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="WEST OF CR 305" LIMITS_TO_DSCR="SP 557" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="233868832" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.467 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/1/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/10/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4971606.84" TOT_SPENT_AMT="4971606.84" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009514036" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 20" CNTY_NM="Kaufman" LIMITS_FROM_DSCR="WEST OF FM 741" LIMITS_TO_DSCR="BIG BRUSH CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7589286" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="2/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.936 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="4/10/2020" ENVCLR_ACTL_DT="4/10/2020" UTIL_TRGT_DT="4/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8027140.83" TOT_SPENT_AMT="8027140.83" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="8500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009514037" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009601047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Wood" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="600 FT E OF SL 564" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="132616" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="150911.04" CE_SPENT_AMT="2653.03" TOT_SPENT_AMT="153564.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="380089.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009602052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Wood" LIMITS_FROM_DSCR="FM 778" LIMITS_TO_DSCR="UPSHUR CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1232610" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="3/11/2025" CNSTR_PCT_TIME_USED="37.06" CNSTR_PCT_COMPLETE="41.44" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/25/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="663192.50" CE_SPENT_AMT="1815.10" TOT_SPENT_AMT="665007.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1362849.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009603075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Upshur" LIMITS_FROM_DSCR="WOOD C/L" LIMITS_TO_DSCR="0.3 MI E OF SH 155N" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6277174" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="1/25/2022" PSE_30_ACTL_DT="1/25/2022" PSE_60_TRGT_DT="4/26/2022" PSE_60_ACTL_DT="4/26/2022" PSE_100_TRGT_DT="5/3/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.926 (mi)" TXDOT_CNTCT_NM="Wendy Starkes, P.E." TXDOT_CNTCT_PH_NBR="(903)572-8511" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="3/23/2023" CNSTR_PCT_TIME_USED="119.88" CNSTR_PCT_COMPLETE="100.11" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="10/17/2022" ENVCLR_ACTL_DT="5/20/2022" UTIL_TRGT_DT="11/2/2021" UTIL_ACTL_DT="11/2/2021" ROW_TRGT_DT="11/2/2021" ROW_ACTL_DT="11/2/2021" RTL_TRGT_DT="9/19/2022" RTL_ACTL_DT="7/8/2022" PE_SPENT_AMT="75913.97" CNSTR_SPENT_AMT="6922715.19" CE_SPENT_AMT="164577.62" TOT_SPENT_AMT="7163206.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="8459685.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009603077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Upshur" LIMITS_FROM_DSCR="LITTLE WHITE OAK CREEK" LIMITS_TO_DSCR="GREGG C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="285256" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.352 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="88.68" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="5/3/2023" ENVCLR_ACTL_DT="2/27/2023" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="4/10/2023" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="4/10/2023" RTL_TRGT_DT="7/28/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="279349.37" CE_SPENT_AMT="2870.34" TOT_SPENT_AMT="282219.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="314315.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009603078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Upshur" LIMITS_FROM_DSCR="0.5 MI E OF N RODEO DRIVE" LIMITS_TO_DSCR="0.5 MI W OF N RODEO DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="40776" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/3/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/10/2024" CNSTR_WKBG_DT="1/23/2025" CNSTR_PCT_TIME_USED="55.33" CNSTR_PCT_COMPLETE="63.52" DSGN_START_TRGT_DT="12/8/2022" DSGN_START_ACTL_DT="12/8/2022" ENVCLR_TRGT_DT="3/8/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/9/2022" UTIL_ACTL_DT="12/9/2022" ROW_TRGT_DT="12/9/2022" ROW_ACTL_DT="12/9/2022" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1646.10" CNSTR_SPENT_AMT="3061.00" CE_SPENT_AMT="221.72" TOT_SPENT_AMT="4928.82" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="54039.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009603079" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009603080" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Upshur" LIMITS_FROM_DSCR="0.3 MI E OF SH 155" LIMITS_TO_DSCR="LITTLE WHITE OAK CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="148200" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.448 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="160056.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009603081" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009604069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="LOCKERPLANT RD, 1.1 MI E OF SL 485" LIMITS_TO_DSCR="EAST LAKE DEVERNIA RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/28/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2654545" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="8/1/2022" PSE_30_ACTL_DT="9/16/2022" PSE_60_TRGT_DT="8/31/2022" PSE_60_ACTL_DT="10/14/2022" PSE_100_TRGT_DT="11/17/2022" PSE_100_ACTL_DT="11/17/2022" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="EAST TEXAS BRIDGE, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="4/25/2023" CNSTR_PCT_TIME_USED="160.71" CNSTR_PCT_COMPLETE="94.27" DSGN_START_TRGT_DT="6/13/2022" DSGN_START_ACTL_DT="6/13/2022" ENVCLR_TRGT_DT="12/27/2022" ENVCLR_ACTL_DT="10/21/2022" UTIL_TRGT_DT="10/14/2022" UTIL_ACTL_DT="1/19/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/17/2022" RTL_ACTL_DT="11/17/2022" PE_SPENT_AMT="78442.79" CNSTR_SPENT_AMT="2562490.49" CE_SPENT_AMT="10450.87" TOT_SPENT_AMT="2651384.15" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="550000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="2071998.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009604070" PT_PHASE="Planning, 10+ years" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="UPSHUR C/L, E" LIMITS_TO_DSCR="US 271 (MAIN ST)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17857143" DIST_LET_DATE="8/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/22/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/22/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/24/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/21/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/11/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/15/2030" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/15/2030" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/15/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="147098.61" TOT_SPENT_AMT="147098.61" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009604071" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="UPSHUR CL, SE" LIMITS_TO_DSCR="SL 485" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3878620" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/25/2022" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="8/31/2022" PSE_60_ACTL_DT="12/1/2022" PSE_100_TRGT_DT="12/22/2022" PSE_100_ACTL_DT="12/22/2022" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="4/19/2023" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="184.81" CNSTR_PCT_COMPLETE="86.88" DSGN_START_TRGT_DT="6/13/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="2/1/2023" ENVCLR_ACTL_DT="10/21/2022" UTIL_TRGT_DT="11/9/2022" UTIL_ACTL_DT="11/9/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/22/2022" RTL_ACTL_DT="12/22/2022" PE_SPENT_AMT="28138.50" CNSTR_SPENT_AMT="3628480.38" CE_SPENT_AMT="71186.20" TOT_SPENT_AMT="3727805.08" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="4000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009604072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="FM 3272" LIMITS_TO_DSCR="FM 1845" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/28/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8001676" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="8/1/2022" PSE_30_ACTL_DT="9/16/2022" PSE_60_TRGT_DT="8/31/2022" PSE_60_ACTL_DT="10/14/2022" PSE_100_TRGT_DT="11/17/2022" PSE_100_ACTL_DT="11/17/2022" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="EAST TEXAS BRIDGE, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="4/25/2023" CNSTR_PCT_TIME_USED="160.71" CNSTR_PCT_COMPLETE="94.27" DSGN_START_TRGT_DT="6/13/2022" DSGN_START_ACTL_DT="6/13/2022" ENVCLR_TRGT_DT="12/27/2022" ENVCLR_ACTL_DT="10/21/2022" UTIL_TRGT_DT="10/14/2022" UTIL_ACTL_DT="1/19/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/17/2022" RTL_ACTL_DT="11/17/2022" PE_SPENT_AMT="4704.05" CNSTR_SPENT_AMT="7917386.81" CE_SPENT_AMT="97388.62" TOT_SPENT_AMT="8019479.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="7250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009604073" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="SL 485" LIMITS_TO_DSCR="LOCKERPOINT RD." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="245864" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="275368.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009604074" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="LAKE DEVERNIA ROAD" LIMITS_TO_DSCR="FM 3272" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="LONGVIEW BRIDGE AND ROAD, LTD." CNSTR_NTPD_DT="5/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42006.60" TOT_SPENT_AMT="42006.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009605008" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1801" CNTY_NM="Wood" LIMITS_FROM_DSCR="SL 564" LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="87197" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="83477.53" CE_SPENT_AMT="325.07" TOT_SPENT_AMT="83802.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="89265.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009606075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Gregg" LIMITS_FROM_DSCR="FM 1845" LIMITS_TO_DSCR="SH 300" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/28/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1913189" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="8/1/2022" PSE_30_ACTL_DT="9/16/2022" PSE_60_TRGT_DT="8/31/2022" PSE_60_ACTL_DT="10/14/2022" PSE_100_TRGT_DT="11/17/2022" PSE_100_ACTL_DT="11/17/2022" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="EAST TEXAS BRIDGE, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="4/25/2023" CNSTR_PCT_TIME_USED="160.71" CNSTR_PCT_COMPLETE="94.27" DSGN_START_TRGT_DT="6/13/2022" DSGN_START_ACTL_DT="6/13/2022" ENVCLR_TRGT_DT="12/27/2022" ENVCLR_ACTL_DT="10/21/2022" UTIL_TRGT_DT="10/14/2022" UTIL_ACTL_DT="1/19/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/17/2022" RTL_ACTL_DT="11/17/2022" PE_SPENT_AMT="34401.17" CNSTR_SPENT_AMT="1665506.94" CE_SPENT_AMT="20486.84" TOT_SPENT_AMT="1720394.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1978482.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009607052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="SL 281" LIMITS_TO_DSCR="TOM BROWN PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1144740" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2022" PSE_100_ACTL_DT="7/5/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.505 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="10/13/2022" CNSTR_WKBG_DT="2/15/2023" CNSTR_PCT_TIME_USED="30.77" CNSTR_PCT_COMPLETE="92.19" DSGN_START_TRGT_DT="10/1/2021" DSGN_START_ACTL_DT="10/1/2021" ENVCLR_TRGT_DT="11/2/2021" ENVCLR_ACTL_DT="9/10/2021" UTIL_TRGT_DT="10/1/2021" UTIL_ACTL_DT="10/1/2021" ROW_TRGT_DT="10/1/2021" ROW_ACTL_DT="10/1/2021" RTL_TRGT_DT="6/7/2022" RTL_ACTL_DT="7/8/2022" PE_SPENT_AMT="22514.16" CNSTR_SPENT_AMT="1108377.17" CE_SPENT_AMT="13856.49" TOT_SPENT_AMT="1144747.82" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1239030.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009607053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="AT TOM BROWN PKWY." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="65054" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/3/2022" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="TEXAS TRAFFIC CONTROL SYSTEMS, INC." CNSTR_NTPD_DT="7/19/2022" CNSTR_WKBG_DT="11/30/2022" CNSTR_PCT_TIME_USED="83.59" CNSTR_PCT_COMPLETE="99.52" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="1/10/2022" ENVCLR_ACTL_DT="1/10/2022" UTIL_TRGT_DT="11/2/2021" UTIL_ACTL_DT="11/2/2021" ROW_TRGT_DT="11/2/2021" ROW_ACTL_DT="11/2/2021" RTL_TRGT_DT="4/1/2022" RTL_ACTL_DT="3/30/2022" CNSTR_SPENT_AMT="73967.78" CE_SPENT_AMT="2942.64" TOT_SPENT_AMT="76910.42" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="110000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009607054" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="GREGG C/L" LIMITS_TO_DSCR="0.1 MI. W. OF TOM BROWN PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6333887" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="9/23/2022" PSE_30_ACTL_DT="9/27/2022" PSE_60_TRGT_DT="11/18/2022" PSE_60_ACTL_DT="10/25/2022" PSE_100_TRGT_DT="6/13/2023" PSE_100_ACTL_DT="4/24/2023" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.742 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="12/7/2023" CNSTR_PCT_TIME_USED="146.09" CNSTR_PCT_COMPLETE="97.89" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="7/8/2022" ENVCLR_TRGT_DT="12/16/2022" ENVCLR_ACTL_DT="10/25/2022" UTIL_TRGT_DT="8/1/2022" UTIL_ACTL_DT="12/16/2022" ROW_TRGT_DT="8/1/2022" ROW_ACTL_DT="12/16/2022" RTL_TRGT_DT="6/13/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="80942.54" CNSTR_SPENT_AMT="6398382.09" CE_SPENT_AMT="172777.93" TOT_SPENT_AMT="6652102.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="7593020.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009607056" PT_PHASE="Planning, 10+ years" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="AT INDUSTRIAL BOULEVARD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1940000" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="114528.24" TOT_SPENT_AMT="114528.24" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009608056" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="0.7 MI W OF FM 450" LIMITS_TO_DSCR="FM 968" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4316515" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.762 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009608058" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="FM 968" LIMITS_TO_DSCR="FM 450" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="193142859" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="9/21/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/23/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/26/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.973 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/3/2029" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/1/2031" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2031" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009608059" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="FM 968" LIMITS_TO_DSCR=".4 MI E OF FM 450" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/26/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="354302" DIST_LET_DATE="10/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.602 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/17/2021" CNSTR_WKBG_DT="7/19/2022" CNSTR_PCT_TIME_USED="79.69" CNSTR_PCT_COMPLETE="90.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="416449.92" CE_SPENT_AMT="7234.31" TOT_SPENT_AMT="423684.23" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="329149.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009608060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="0.5 MI W OF FM 968" LIMITS_TO_DSCR="0.5 MI E OF FM 968" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="84323" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="11/5/2024" CNSTR_PCT_TIME_USED="61.18" CNSTR_PCT_COMPLETE="96.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="392.00" CNSTR_SPENT_AMT="83501.80" CE_SPENT_AMT="3002.44" TOT_SPENT_AMT="86896.24" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="153931.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009609082" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="AT FM 2199 INTERSECTION" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3314429" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="1/28/2020" PSE_30_ACTL_DT="1/28/2020" PSE_60_TRGT_DT="11/17/2020" PSE_60_ACTL_DT="11/17/2020" PSE_100_TRGT_DT="9/22/2021" PSE_100_ACTL_DT="12/3/2021" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.284 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/6/2019" DSGN_START_ACTL_DT="9/6/2019" ENVCLR_TRGT_DT="6/18/2020" ENVCLR_ACTL_DT="6/18/2020" UTIL_TRGT_DT="9/22/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/24/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/25/2024" RTL_ACTL_DT="12/7/2021" PE_SPENT_AMT="277065.98" TOT_SPENT_AMT="277065.98" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="3996000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="10/23/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009609090" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="0.2 MI E OF SL 390" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="635508" DIST_LET_DATE="10/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.787 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009610027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="0.5 MI W OF FM 9S" LIMITS_TO_DSCR="0.5 MI E OF FM 9S" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="82564" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Christina Y. Trowler, P.E." TXDOT_CNTCT_PH_NBR="(903)799-1480" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="11/5/2024" CNSTR_PCT_TIME_USED="61.18" CNSTR_PCT_COMPLETE="96.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="226.29" CNSTR_SPENT_AMT="81143.60" CE_SPENT_AMT="2938.91" TOT_SPENT_AMT="84308.80" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="123418.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009610028" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 80" CNTY_NM="Harrison" LIMITS_FROM_DSCR="0.3 MI. E. OF FM 134" LIMITS_TO_DSCR="LOUISIANA S/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3801386" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.397 (mi)" TXDOT_CNTCT_NM="Jacob Vise, P.E." TXDOT_CNTCT_PH_NBR="(903)935-2809" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="9/18/2024" CNSTR_PCT_TIME_USED="112.77" CNSTR_PCT_COMPLETE="99.02" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="38021.06" CNSTR_SPENT_AMT="3706366.86" CE_SPENT_AMT="46681.05" TOT_SPENT_AMT="3791068.97" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="4196642.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009702041" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="RED RIVER BRIDGE, SOUTH" LIMITS_TO_DSCR="RANDOLPH ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="518003" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="580163.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009801041" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Hardeman" LIMITS_FROM_DSCR="4.983 MILES SOUTH OF QUANAH CL, SOUTH" LIMITS_TO_DSCR="FOARD C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="643661" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="11/28/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/28/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/28/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/20/2024" CNSTR_PCT_TIME_USED="61.40" CNSTR_PCT_COMPLETE="109.22" DSGN_START_TRGT_DT="11/28/2022" DSGN_START_ACTL_DT="11/28/2022" ENVCLR_TRGT_DT="11/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/28/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/28/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/28/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32.26" CNSTR_SPENT_AMT="740413.98" CE_SPENT_AMT="8919.82" TOT_SPENT_AMT="749366.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="598287.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009803037" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Foard" LIMITS_FROM_DSCR="US 70, SOUTH" LIMITS_TO_DSCR="KNOX C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6320000" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="11/24/2015" PSE_30_ACTL_DT="1/4/2016" PSE_60_TRGT_DT="12/3/2015" PSE_60_ACTL_DT="8/1/2016" PSE_100_TRGT_DT="12/10/2015" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.396 (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/18/2015" DSGN_START_ACTL_DT="11/18/2015" ENVCLR_TRGT_DT="11/30/2015" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/3/2015" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/18/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2015" RTL_ACTL_DT="TBD" PE_SPENT_AMT="121054.44" TOT_SPENT_AMT="121054.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="6572800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009803040" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Foard" LIMITS_FROM_DSCR="US 70, SOUTH" LIMITS_TO_DSCR="431' SOUTH OF NORTH WICHITA RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="247613" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/24/2015" PSE_30_ACTL_DT="1/4/2016" PSE_60_TRGT_DT="12/3/2015" PSE_60_ACTL_DT="8/1/2016" PSE_100_TRGT_DT="12/10/2015" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/18/2015" DSGN_START_ACTL_DT="11/18/2015" ENVCLR_TRGT_DT="11/30/2015" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/3/2015" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/18/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2015" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2940.33" TOT_SPENT_AMT="2940.33" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="282149.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009804039" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Knox" LIMITS_FROM_DSCR="431' SOUTH OF NORTH WICHITA RIVER, SOUTH" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="354596" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/24/2015" PSE_30_ACTL_DT="1/4/2016" PSE_60_TRGT_DT="12/3/2015" PSE_60_ACTL_DT="8/1/2016" PSE_100_TRGT_DT="12/10/2015" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/18/2015" DSGN_START_ACTL_DT="11/18/2015" ENVCLR_TRGT_DT="11/30/2015" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/3/2015" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/18/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2015" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2251.72" TOT_SPENT_AMT="2251.72" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="404056.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009804040" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 6" CNTY_NM="Knox" LIMITS_FROM_DSCR="FM 1756, SOUTH" LIMITS_TO_DSCR="SOUTH WICHITA RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="580923" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="650634.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009805034" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Knox" LIMITS_FROM_DSCR="US 82, SOUTH" LIMITS_TO_DSCR="FM 2534" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4247604" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/21/2022" PSE_30_ACTL_DT="1/21/2022" PSE_60_TRGT_DT="2/18/2022" PSE_60_ACTL_DT="2/25/2022" PSE_100_TRGT_DT="3/18/2022" PSE_100_ACTL_DT="9/20/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="2/28/2023" CNSTR_PCT_TIME_USED="111.11" CNSTR_PCT_COMPLETE="102.65" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="9/23/2022" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="5/31/2022" UTIL_TRGT_DT="1/3/2022" UTIL_ACTL_DT="5/26/2022" ROW_TRGT_DT="1/3/2022" ROW_ACTL_DT="5/26/2022" RTL_TRGT_DT="3/25/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="76423.02" CNSTR_SPENT_AMT="4377144.12" CE_SPENT_AMT="120031.74" TOT_SPENT_AMT="4573598.88" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="2400000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="2401779.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009805036" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Knox" LIMITS_FROM_DSCR="FM 2534, SOUTH" LIMITS_TO_DSCR="ONE BLOCK NORTH OF SH 222" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/3/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4539971" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/30/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/30/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/9/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="5/1/2025" CNSTR_PCT_TIME_USED="22.22" CNSTR_PCT_COMPLETE="70.41" DSGN_START_TRGT_DT="11/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/26/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/9/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="94386.58" CNSTR_SPENT_AMT="2396594.07" CE_SPENT_AMT="913.27" TOT_SPENT_AMT="2491893.92" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009806066" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Haskell" LIMITS_FROM_DSCR="SOUTH O'BRIEN CITY LIMIT" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/24/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="962724" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/22/2022" PSE_30_ACTL_DT="3/22/2022" PSE_60_TRGT_DT="5/23/2022" PSE_60_ACTL_DT="5/23/2022" PSE_100_TRGT_DT="9/1/2022" PSE_100_ACTL_DT="9/1/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.444 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="6/12/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.63" DSGN_START_TRGT_DT="2/9/2022" DSGN_START_ACTL_DT="2/9/2022" ENVCLR_TRGT_DT="6/15/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="10/12/2022" UTIL_ACTL_DT="10/12/2022" ROW_TRGT_DT="10/12/2022" ROW_ACTL_DT="10/12/2022" RTL_TRGT_DT="10/12/2022" RTL_ACTL_DT="10/12/2022" PE_SPENT_AMT="1220.12" CNSTR_SPENT_AMT="1066552.16" CE_SPENT_AMT="14253.80" TOT_SPENT_AMT="1082026.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1020785.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009901037" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 283" CNTY_NM="Coleman" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="FM 2633" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="242829" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.108 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="271968.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009903024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 283" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="COLEMAN C/L" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1053634" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.696 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="125243.08" CE_SPENT_AMT="49.01" TOT_SPENT_AMT="125292.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1163230.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="009903026" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010003086" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="0.4 MI WEST OF CR150" LIMITS_TO_DSCR="STANDISH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2646819" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/2/2022" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.030 (mi)" TXDOT_CNTCT_NM="Christen Longoria, P.E." TXDOT_CNTCT_PH_NBR="(210)633-1401" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="1/12/2023" CNSTR_WKBG_DT="4/5/2023" CNSTR_PCT_TIME_USED="45.31" CNSTR_PCT_COMPLETE="92.74" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="7/1/2022" ENVCLR_ACTL_DT="3/18/2022" UTIL_TRGT_DT="5/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/3/2023" RTL_ACTL_DT="5/23/2022" PE_SPENT_AMT="354549.92" CNSTR_SPENT_AMT="2457402.02" CE_SPENT_AMT="65594.28" TOT_SPENT_AMT="2877546.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1974471.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010003087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="FM 537" LIMITS_TO_DSCR="CR 223" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33541" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.300 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="34820.42" CE_SPENT_AMT="262.16" TOT_SPENT_AMT="35082.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="49213.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010003089" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="BEXAR/WILSON CL" LIMITS_TO_DSCR="FM 537" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1538954" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.842 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1600512.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010003094" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="AT SHANNON RIDGE DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="522587" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.195 (mi)" TXDOT_CNTCT_NM="Richard De La Cruz, P.E." TXDOT_CNTCT_PH_NBR="210-615-6434" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="74958.62" TOT_SPENT_AMT="74958.62" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="522587.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010004042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="0.1 MI NORTH OF CR 244" LIMITS_TO_DSCR="0.1 MI SOUTH OF CR 244" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="81118" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2021" PSE_30_ACTL_DT="9/1/2021" PSE_60_TRGT_DT="12/1/2021" PSE_60_ACTL_DT="12/1/2021" PSE_100_TRGT_DT="4/1/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dale L. Picha, P.E." TXDOT_CNTCT_PH_NBR="(210)615-5810" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="11/14/2022" CNSTR_PCT_TIME_USED="91.29" CNSTR_PCT_COMPLETE="105.02" DSGN_START_TRGT_DT="7/1/2021" DSGN_START_ACTL_DT="7/1/2021" ENVCLR_TRGT_DT="5/2/2022" ENVCLR_ACTL_DT="4/29/2022" UTIL_TRGT_DT="4/1/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="4/1/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="5/2/2022" RTL_ACTL_DT="4/29/2022" CNSTR_SPENT_AMT="84562.25" CE_SPENT_AMT="496.18" TOT_SPENT_AMT="85058.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="74232.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010004043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="CR 223" LIMITS_TO_DSCR="WILSON/KARNES CL" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="692243" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.960 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="718170.99" CE_SPENT_AMT="5406.95" TOT_SPENT_AMT="723577.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="965420.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010005001" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="AT SAN ANTONIO RIVER BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="786452" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2022" PSE_100_ACTL_DT="4/8/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.178 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="1/23/2023" CNSTR_PCT_TIME_USED="149.21" CNSTR_PCT_COMPLETE="94.58" DSGN_START_TRGT_DT="9/1/2021" DSGN_START_ACTL_DT="9/1/2021" ENVCLR_TRGT_DT="2/10/2022" ENVCLR_ACTL_DT="4/25/2022" UTIL_TRGT_DT="2/10/2022" UTIL_ACTL_DT="4/8/2022" ROW_TRGT_DT="2/10/2022" ROW_ACTL_DT="4/8/2022" RTL_TRGT_DT="2/10/2022" RTL_ACTL_DT="4/25/2022" PE_SPENT_AMT="3701.48" CNSTR_SPENT_AMT="954559.46" CE_SPENT_AMT="55013.70" TOT_SPENT_AMT="1013274.64" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="394860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010005065" PT_PHASE="Planning, 10+ years" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="THE WILSON COUNTY LINE" LIMITS_TO_DSCR="0.270 KM (0.17 MI)NORTH OF FM 1144" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60000000" DIST_LET_DATE="4/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct An Additional 2 Lanes To Provide For A 4 Lane Divided Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TBD" PROJ_LENGTH="10.699 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="60000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010005187" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="ON US181 FROM .5 MI N OF FM81" LIMITS_TO_DSCR=".5 MI S OF FM81" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="257824" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/2/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.830 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="MALDONADO-BURKETT, LLP" CNSTR_NTPD_DT="6/15/2022" CNSTR_WKBG_DT="11/16/2022" CNSTR_PCT_TIME_USED="71.59" CNSTR_PCT_COMPLETE="107.05" DSGN_START_TRGT_DT="10/1/2021" DSGN_START_ACTL_DT="10/1/2021" ENVCLR_TRGT_DT="3/7/2022" ENVCLR_ACTL_DT="3/15/2022" UTIL_TRGT_DT="3/7/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="3/7/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="3/7/2022" RTL_ACTL_DT="3/15/2022" PE_SPENT_AMT="15859.44" CNSTR_SPENT_AMT="303013.75" CE_SPENT_AMT="16312.03" TOT_SPENT_AMT="335185.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="239041.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010005188" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="ON US181 FROM .5 MI N OF FM1144" LIMITS_TO_DSCR=".5 MI S OF FM 1144" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="226984" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/2/2022" PSE_100_ACTL_DT="3/4/2022" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.994 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="MALDONADO-BURKETT, LLP" CNSTR_NTPD_DT="6/15/2022" CNSTR_WKBG_DT="11/16/2022" CNSTR_PCT_TIME_USED="71.59" CNSTR_PCT_COMPLETE="107.05" DSGN_START_TRGT_DT="10/1/2021" DSGN_START_ACTL_DT="10/1/2021" ENVCLR_TRGT_DT="3/7/2022" ENVCLR_ACTL_DT="3/15/2022" UTIL_TRGT_DT="3/7/2022" UTIL_ACTL_DT="3/4/2022" ROW_TRGT_DT="3/7/2022" ROW_ACTL_DT="3/4/2022" RTL_TRGT_DT="3/7/2022" RTL_ACTL_DT="3/15/2022" PE_SPENT_AMT="12393.53" CNSTR_SPENT_AMT="246498.68" CE_SPENT_AMT="15893.45" TOT_SPENT_AMT="274785.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="216035.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010005189" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="BU 181D/FM1144" LIMITS_TO_DSCR="0.53 MI S  OF CR 394(CONTROL BREAK)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="445342" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.502 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="451204.80" CE_SPENT_AMT="2138.05" TOT_SPENT_AMT="453342.85" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="592800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010006043" PT_PHASE="Planning, 10+ years" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="SH 72 IN KENEDY" LIMITS_TO_DSCR="BEE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60000000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Additional 2 Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.532 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="9500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010006067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Karnes" LIMITS_FROM_DSCR="0.53 MI S  OF CR 394(CONTROL BREAK)" LIMITS_TO_DSCR="SH 72" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="304717" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.414 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="295077.01" CE_SPENT_AMT="1449.66" TOT_SPENT_AMT="296526.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="416000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010007037" PT_PHASE="Planning, 10+ years" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="KARNES C/L" LIMITS_TO_DSCR="0.8 MI S OF FM 1465" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="47000000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Additional 2 Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.400 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="12600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010007053" PT_PHASE="Planning, 10+ years" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="SAN PATRICIO COUNTY LINE" LIMITS_TO_DSCR="CONTROL BREAK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4000000" DIST_LET_DATE="8/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008056" PT_PHASE="Planning, 10+ years" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="0.8 MI S OF FM 1465 N OF NORMANNA" LIMITS_TO_DSCR="0.3 MI N OF BU 181-J" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28000000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Additional 2 Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.970 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="87478.72" TOT_SPENT_AMT="87478.72" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_PID="CNN" FUND_CAT1_AMT="8539871.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008095" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR=".3 MI N. OF BU 1810J" LIMITS_TO_DSCR="BU 181-J INTERSECTION_(SOUTH Y)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7771037" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/18/2019" PSE_30_ACTL_DT="11/18/2019" PSE_60_TRGT_DT="1/10/2020" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="5/11/2020" PSE_100_ACTL_DT="5/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.616 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="2/22/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.58" DSGN_START_TRGT_DT="10/1/2019" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="4/17/2020" ENVCLR_ACTL_DT="4/29/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/11/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="36278.24" CNSTR_SPENT_AMT="8437854.39" CE_SPENT_AMT="288961.34" TOT_SPENT_AMT="8763093.97" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="9500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="BU 181J" LIMITS_TO_DSCR=".1 MI S OF RIDGEWAY LN. (CB)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1001107" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/18/2019" PSE_30_ACTL_DT="11/18/2019" PSE_60_TRGT_DT="1/10/2020" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="5/11/2020" PSE_100_ACTL_DT="5/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.508 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="2/22/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.58" DSGN_START_TRGT_DT="10/1/2019" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="4/17/2020" ENVCLR_ACTL_DT="4/29/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/11/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="9140.90" CNSTR_SPENT_AMT="1011956.91" CE_SPENT_AMT="45164.48" TOT_SPENT_AMT="1066262.29" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="390000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008102" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="ON US181 FROM 1.188 MI N OF FM3355" LIMITS_TO_DSCR="1.085 S OF FM 3355" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/22/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="460100" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/29/2022" PSE_100_ACTL_DT="7/7/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.359 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="10/13/2022" CNSTR_WKBG_DT="12/15/2022" CNSTR_PCT_TIME_USED="40.00" CNSTR_PCT_COMPLETE="96.67" DSGN_START_TRGT_DT="2/1/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="7/5/2022" ENVCLR_ACTL_DT="7/11/2022" UTIL_TRGT_DT="7/5/2022" UTIL_ACTL_DT="7/7/2022" ROW_TRGT_DT="7/5/2022" ROW_ACTL_DT="7/7/2022" RTL_TRGT_DT="7/5/2022" RTL_ACTL_DT="7/7/2022" PE_SPENT_AMT="5447.84" CNSTR_SPENT_AMT="446876.00" CE_SPENT_AMT="9985.37" TOT_SPENT_AMT="462309.21" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="732735.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008103" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008104" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="NORMANNA - 1.3 MI N OF CR 104/COLONY RD" LIMITS_TO_DSCR="1500 FT N OF BU 181-J" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="42000000" DIST_LET_DATE="3/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="748884.90" TOT_SPENT_AMT="748884.90" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="33800000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="13240000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010008106" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="FM 351" LIMITS_TO_DSCR="0.6 MILES S OF BU 181J" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1272029" DIST_LET_DATE="3/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1424673.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010009023" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 181" CNTY_NM="Wilson" LIMITS_FROM_DSCR="US 181 N" LIMITS_TO_DSCR="US 181 S" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="261192" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="2/9/2023" PSE_60_TRGT_DT="4/13/2023" PSE_60_ACTL_DT="4/13/2023" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.715 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="96.73" CNSTR_PCT_COMPLETE="87.36" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="271309.04" CE_SPENT_AMT="2042.60" TOT_SPENT_AMT="273351.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="309541.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010011014" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010011015" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 181G" CNTY_NM="Karnes" LIMITS_FROM_DSCR="SH 72" LIMITS_TO_DSCR="BU 72 B" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="38242" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.518 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="82.61" CNSTR_PCT_COMPLETE="100.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="29907.84" CE_SPENT_AMT="354.57" TOT_SPENT_AMT="30262.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="43034.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010011016" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 181G" CNTY_NM="Karnes" LIMITS_FROM_DSCR="FM 1145" LIMITS_TO_DSCR="BU 181" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92207" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.464 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="82.61" CNSTR_PCT_COMPLETE="100.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="92445.29" CE_SPENT_AMT="945.82" TOT_SPENT_AMT="93391.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="104309.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010011017" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010013027" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 181J" CNTY_NM="Bee" LIMITS_FROM_DSCR=".1 MI N OF HUNTINGTON ST." LIMITS_TO_DSCR=".48 MI N OF US 59" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="563120" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="11/18/2020" PSE_30_ACTL_DT="12/1/2020" PSE_60_TRGT_DT="1/11/2021" PSE_60_ACTL_DT="2/1/2021" PSE_100_TRGT_DT="3/12/2021" PSE_100_ACTL_DT="3/11/2021" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="3/1/2022" CNSTR_PCT_TIME_USED="83.59" CNSTR_PCT_COMPLETE="87.62" DSGN_START_TRGT_DT="10/1/2020" DSGN_START_ACTL_DT="10/1/2020" ENVCLR_TRGT_DT="4/14/2021" ENVCLR_ACTL_DT="10/9/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/14/2021" RTL_ACTL_DT="3/11/2021" PE_SPENT_AMT="43030.09" CNSTR_SPENT_AMT="520474.58" CE_SPENT_AMT="9622.61" TOT_SPENT_AMT="573127.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="594000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010101067" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="0.1 MI S OF RIDGEWAY LN. (CB)" LIMITS_TO_DSCR="SH 359" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5967594" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="11/18/2019" PSE_30_ACTL_DT="11/18/2019" PSE_60_TRGT_DT="1/10/2020" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="5/11/2020" PSE_100_ACTL_DT="5/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.866 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="8/20/2020" CNSTR_WKBG_DT="2/22/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.58" DSGN_START_TRGT_DT="10/1/2019" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="4/17/2020" ENVCLR_ACTL_DT="4/29/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/11/2020" RTL_ACTL_DT="5/8/2020" PE_SPENT_AMT="8794.13" CNSTR_SPENT_AMT="5809136.74" CE_SPENT_AMT="271309.18" TOT_SPENT_AMT="6089240.05" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="6110000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010101070" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="0.22 MILES SOUTH OF SH 359" LIMITS_TO_DSCR="0.9 MILES SOUTH OF SH 359" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="326866" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="366090.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010102039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Bee" LIMITS_FROM_DSCR="SAN PATRICIO COUNTY LINE" LIMITS_TO_DSCR="CR 519" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9794886" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/8/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.495 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="9/21/2022" CNSTR_WKBG_DT="1/3/2023" CNSTR_PCT_TIME_USED="97.56" CNSTR_PCT_COMPLETE="94.71" DSGN_START_TRGT_DT="8/1/2021" DSGN_START_ACTL_DT="8/1/2021" ENVCLR_TRGT_DT="3/18/2022" ENVCLR_ACTL_DT="5/19/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/3/2022" ROW_TRGT_DT="6/13/2022" ROW_ACTL_DT="6/3/2022" RTL_TRGT_DT="6/13/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="31874.40" CNSTR_SPENT_AMT="11558804.84" CE_SPENT_AMT="307051.27" TOT_SPENT_AMT="11897730.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="4000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010102040" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103119" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="INTERS. WITH BU77T" LIMITS_TO_DSCR="PIRATE BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="6/6/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/6/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.605 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/6/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/3/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16869.71" TOT_SPENT_AMT="16869.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="3360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103120" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="ON US181 FROM 400 FT N OF SH 188" LIMITS_TO_DSCR=".5 MI E OF PIRATE BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1469794" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="4/10/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/10/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/10/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.034 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="9.50" CNSTR_PCT_COMPLETE="28.59" DSGN_START_TRGT_DT="4/10/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/12/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/12/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="180395.74" CNSTR_SPENT_AMT="563980.66" CE_SPENT_AMT="2798.78" TOT_SPENT_AMT="747175.18" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="862363.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103121" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="PIRATE BLVD" LIMITS_TO_DSCR="SH 89" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9000000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct Curb And Gutter" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.909 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="273434.27" TOT_SPENT_AMT="273434.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="9720000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103122" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103123" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 188" LIMITS_TO_DSCR=".06 MI SE OF CR 65" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="688746" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2022" PSE_30_ACTL_DT="10/7/2022" PSE_60_TRGT_DT="1/13/2023" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="3/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.212 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="6/10/2024" CNSTR_PCT_TIME_USED="51.96" CNSTR_PCT_COMPLETE="101.26" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="3/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/15/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="720316.85" CE_SPENT_AMT="6348.85" TOT_SPENT_AMT="726665.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="685752.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103124" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="FM 3089" LIMITS_TO_DSCR="SH 89" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="654353" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2022" PSE_30_ACTL_DT="10/7/2022" PSE_60_TRGT_DT="1/13/2023" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="3/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.299 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="6/10/2024" CNSTR_PCT_TIME_USED="51.96" CNSTR_PCT_COMPLETE="101.26" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="3/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/15/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="658192.61" CE_SPENT_AMT="9115.67" TOT_SPENT_AMT="667308.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="808077.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103125" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="BEE COUNTY LINE" LIMITS_TO_DSCR="SH 89" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="648067" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.643 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="699912.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010103127" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="BEE CO. LINE" LIMITS_TO_DSCR="FM 3089" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="818461" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12580.96" TOT_SPENT_AMT="12580.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="818461.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104114" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="FM 3239 (BUDDY GANEM DR.)" LIMITS_TO_DSCR="FM 2986 (WILDCAT DR.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1022754" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="4/30/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="6/30/2020" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="9/8/2020" PSE_100_ACTL_DT="9/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="2/2/2022" CNSTR_PCT_TIME_USED="98.77" CNSTR_PCT_COMPLETE="102.28" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="9/22/2020" UTIL_TRGT_DT="9/8/2020" UTIL_ACTL_DT="9/8/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/22/2020" RTL_ACTL_DT="9/22/2020" PE_SPENT_AMT="1917504.88" CNSTR_SPENT_AMT="3902797.99" CE_SPENT_AMT="22863.04" TOT_SPENT_AMT="5843165.91" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104117" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="WILDCAT RD" LIMITS_TO_DSCR="CONTROL BREAK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1287448" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="4/30/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="6/30/2020" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="9/8/2020" PSE_100_ACTL_DT="9/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="2/2/2022" CNSTR_PCT_TIME_USED="98.77" CNSTR_PCT_COMPLETE="102.28" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="9/22/2020" UTIL_TRGT_DT="9/8/2020" UTIL_ACTL_DT="9/8/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/22/2020" RTL_ACTL_DT="9/22/2020" PE_SPENT_AMT="15399.66" CNSTR_SPENT_AMT="228836.43" CE_SPENT_AMT="31007.82" TOT_SPENT_AMT="275243.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="770000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104120" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="FM3239 (BUDDY GANEM DR.)" LIMITS_TO_DSCR="FM2986 (WILDCAT DR.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20495891" DIST_LET_DATE="11/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/30/2020" PSE_30_ACTL_DT="4/30/2020" PSE_60_TRGT_DT="6/30/2020" PSE_60_ACTL_DT="6/30/2020" PSE_100_TRGT_DT="9/8/2020" PSE_100_ACTL_DT="9/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.340 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="12/15/2020" CNSTR_WKBG_DT="2/2/2022" CNSTR_PCT_TIME_USED="98.77" CNSTR_PCT_COMPLETE="102.28" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="9/22/2020" ENVCLR_ACTL_DT="9/22/2020" UTIL_TRGT_DT="9/8/2020" UTIL_ACTL_DT="9/8/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/22/2020" RTL_ACTL_DT="9/22/2020" PE_SPENT_AMT="23396.21" CNSTR_SPENT_AMT="20153201.77" CE_SPENT_AMT="627907.40" TOT_SPENT_AMT="20804505.38" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="13200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104127" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SH 35" LIMITS_TO_DSCR="S OF FM 893" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86796" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/20/2020" PSE_30_ACTL_DT="4/24/2020" PSE_60_TRGT_DT="4/8/2020" PSE_60_ACTL_DT="6/19/2020" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="7/13/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.014 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="10/7/2020" CNSTR_WKBG_DT="7/19/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.48" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="7/6/2020" ENVCLR_ACTL_DT="6/30/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2020" RTL_ACTL_DT="7/13/2020" PE_SPENT_AMT="7431.77" CNSTR_SPENT_AMT="127668.17" CE_SPENT_AMT="1404.95" TOT_SPENT_AMT="136504.89" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="143261.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104130" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="0.6 MI S OF CR 1206" LIMITS_TO_DSCR="0.9 MI S OF CR 1206" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1300000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="415067.84" TOT_SPENT_AMT="415067.84" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1495000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104131" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="SS 202" LIMITS_TO_DSCR="0.12 MI W OF FM 631" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12996391" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="11/11/2022" PSE_30_ACTL_DT="11/11/2022" PSE_60_TRGT_DT="3/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.075 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="3/18/2024" CNSTR_PCT_TIME_USED="108.85" CNSTR_PCT_COMPLETE="94.56" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="3/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/4/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/4/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/4/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="111251.34" CNSTR_SPENT_AMT="12441408.57" CE_SPENT_AMT="206769.36" TOT_SPENT_AMT="12759429.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="15575359.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104132" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010104133" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="0.06 MILES SOUTH EAST OF CR 65" LIMITS_TO_DSCR="1.38 MILES NORTH WEST OF FM 631N" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="668418" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2022" PSE_30_ACTL_DT="10/7/2022" PSE_60_TRGT_DT="1/13/2023" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="3/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.106 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="6/10/2024" CNSTR_PCT_TIME_USED="51.96" CNSTR_PCT_COMPLETE="101.26" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="3/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/15/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="672732.44" CE_SPENT_AMT="9371.90" TOT_SPENT_AMT="682104.34" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="754414.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010105036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="CONTROL BREAK" LIMITS_TO_DSCR="NUECES COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/9/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2555979" DIST_LET_DATE="2/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="5/12/2020" CNSTR_WKBG_DT="7/13/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.20" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="51046.39" CNSTR_SPENT_AMT="2641435.23" CE_SPENT_AMT="122964.42" TOT_SPENT_AMT="2815446.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="2730000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010105038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="S FM 893" LIMITS_TO_DSCR="NUECES COUNTY LINE CONTROL BREAK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="161050" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/20/2020" PSE_30_ACTL_DT="4/24/2020" PSE_60_TRGT_DT="4/8/2020" PSE_60_ACTL_DT="6/19/2020" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="7/13/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.487 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="10/7/2020" CNSTR_WKBG_DT="7/19/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.48" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="7/6/2020" ENVCLR_ACTL_DT="6/30/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2020" RTL_ACTL_DT="7/13/2020" CNSTR_SPENT_AMT="156646.80" CE_SPENT_AMT="3676.86" TOT_SPENT_AMT="160323.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="114609.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010106115" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 181" CNTY_NM="Nueces" LIMITS_FROM_DSCR="SAN PATRICIO CO LINE CONTROL BREAK" LIMITS_TO_DSCR=".32 MI S OF BURLESON ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="152610" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/20/2020" PSE_30_ACTL_DT="4/24/2020" PSE_60_TRGT_DT="4/8/2020" PSE_60_ACTL_DT="6/19/2020" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="7/13/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.164 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="10/7/2020" CNSTR_WKBG_DT="7/19/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.48" DSGN_START_TRGT_DT="1/2/2020" DSGN_START_ACTL_DT="1/2/2020" ENVCLR_TRGT_DT="7/6/2020" ENVCLR_ACTL_DT="6/30/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2020" RTL_ACTL_DT="7/13/2020" CNSTR_SPENT_AMT="151703.10" CE_SPENT_AMT="3495.53" TOT_SPENT_AMT="155198.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="151448.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010106118" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010107024" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 181J" CNTY_NM="Bee" LIMITS_FROM_DSCR=".48 MI N OF US 59" LIMITS_TO_DSCR=".1 MI S OF SH 202" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="192517" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="11/18/2020" PSE_30_ACTL_DT="12/1/2020" PSE_60_TRGT_DT="1/11/2021" PSE_60_ACTL_DT="2/1/2021" PSE_100_TRGT_DT="3/12/2021" PSE_100_ACTL_DT="3/11/2021" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC." CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="3/1/2022" CNSTR_PCT_TIME_USED="83.59" CNSTR_PCT_COMPLETE="87.62" DSGN_START_TRGT_DT="10/1/2020" DSGN_START_ACTL_DT="10/1/2020" ENVCLR_TRGT_DT="4/14/2021" ENVCLR_ACTL_DT="10/9/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/14/2021" RTL_ACTL_DT="3/11/2021" CNSTR_SPENT_AMT="168649.45" CE_SPENT_AMT="3989.39" TOT_SPENT_AMT="172638.84" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="1206000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010107025" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 181J" CNTY_NM="Bee" LIMITS_FROM_DSCR="W. CARTER ST." LIMITS_TO_DSCR="SH 202" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="780331" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/7/2021" PSE_100_ACTL_DT="6/11/2021" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.042 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="11/30/2021" CNSTR_PCT_TIME_USED="97.56" CNSTR_PCT_COMPLETE="100.17" DSGN_START_TRGT_DT="12/1/2020" DSGN_START_ACTL_DT="12/1/2020" ENVCLR_TRGT_DT="6/10/2021" ENVCLR_ACTL_DT="5/27/2021" UTIL_TRGT_DT="6/10/2021" UTIL_ACTL_DT="6/11/2021" ROW_TRGT_DT="6/10/2021" ROW_ACTL_DT="6/11/2021" RTL_TRGT_DT="6/10/2021" RTL_ACTL_DT="6/11/2021" PE_SPENT_AMT="3220.94" CNSTR_SPENT_AMT="793241.61" CE_SPENT_AMT="96266.29" TOT_SPENT_AMT="892728.84" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="870000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010108005" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 89" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="US 181" LIMITS_TO_DSCR="SH 188" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Overlay Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.399 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010108006" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 89" CNTY_NM="San Patricio" LIMITS_FROM_DSCR="US 181" LIMITS_TO_DSCR=" SH 188" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="564090" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2022" PSE_30_ACTL_DT="10/7/2022" PSE_60_TRGT_DT="1/13/2023" PSE_60_ACTL_DT="1/13/2023" PSE_100_TRGT_DT="3/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.790 (mi)" TXDOT_CNTCT_NM="Fidencio Lopez, Jr., P.E." TXDOT_CNTCT_PH_NBR="(361)364-6402" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="6/10/2024" CNSTR_PCT_TIME_USED="51.96" CNSTR_PCT_COMPLETE="101.26" DSGN_START_TRGT_DT="7/1/2022" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="3/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/15/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="561713.30" CE_SPENT_AMT="7863.88" TOT_SPENT_AMT="569577.18" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="628763.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010201122" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 44-D" CNTY_NM="Nueces" LIMITS_FROM_DSCR="ON BS44D FROM .25 MI W FM2292" LIMITS_TO_DSCR=".25 MI E FM2292" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86143" DIST_LET_DATE="5/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="1/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/5/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.501 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="30.26" DSGN_START_TRGT_DT="1/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="41339.52" CNSTR_SPENT_AMT="181414.00" CE_SPENT_AMT="8.57" TOT_SPENT_AMT="222762.09" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="122422.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010201123" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 44" CNTY_NM="Nueces" LIMITS_FROM_DSCR="1000 FEET W. OF HEINSOHN RD" LIMITS_TO_DSCR="1000 FEET E. OF HEINSOHN RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="209195" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/8/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.700 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/2/2023" CNSTR_PCT_TIME_USED="75.00" CNSTR_PCT_COMPLETE="96.63" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/3/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/3/2022" ROW_TRGT_DT="6/13/2022" ROW_ACTL_DT="6/3/2022" RTL_TRGT_DT="6/13/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="22350.11" CNSTR_SPENT_AMT="208019.60" CE_SPENT_AMT="41395.54" TOT_SPENT_AMT="271765.25" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="240950.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010201124" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010201125" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 44" CNTY_NM="Nueces" LIMITS_FROM_DSCR="FY 2025 DISTRICT WIDE SEAL COAT" LIMITS_TO_DSCR="AT VARIOUS LOCATIONS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="384543" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.887 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="29455.89" CE_SPENT_AMT="1832.61" TOT_SPENT_AMT="31288.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="375000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="131492.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010201126" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 44" CNTY_NM="Nueces" LIMITS_FROM_DSCR="SH 358" LIMITS_TO_DSCR="0.5 MI WEST OF INTERNATIONAL DR" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="202992" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/5/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/5/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/5/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/4/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28250.53" TOT_SPENT_AMT="28250.53" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="219232.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/2/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010201127" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010202105" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 44" CNTY_NM="Nueces" LIMITS_FROM_DSCR="FM 1694" LIMITS_TO_DSCR="I-69E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5053955" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.183 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="8/2/2024" CNSTR_WKBG_DT="5/28/2025" CNSTR_PCT_TIME_USED="1.11" CNSTR_PCT_COMPLETE="0.60" DSGN_START_TRGT_DT="1/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="52904.00" CE_SPENT_AMT="5399.57" TOT_SPENT_AMT="58303.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010203083" PT_PHASE="Planning, 10+ years" HWY_NBR="US 77" CNTY_NM="Nueces" LIMITS_FROM_DSCR="S OF CR28" LIMITS_TO_DSCR="CR 16" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1" DIST_LET_DATE="7/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct Relief Route Around Driscoll" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.132 (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1818364.36" CE_SPENT_AMT="3088.97" TOT_SPENT_AMT="1821453.33" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010203087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 77" CNTY_NM="Nueces" LIMITS_FROM_DSCR="CR4" LIMITS_TO_DSCR="FM 70" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/3/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7712829" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="1/31/2020" PSE_30_ACTL_DT="1/31/2020" PSE_60_TRGT_DT="3/31/2020" PSE_60_ACTL_DT="3/31/2020" PSE_100_TRGT_DT="10/8/2020" PSE_100_ACTL_DT="10/8/2020" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="1/8/2021" CNSTR_WKBG_DT="3/8/2021" CNSTR_PCT_TIME_USED="99.48" CNSTR_PCT_COMPLETE="97.91" DSGN_START_TRGT_DT="10/1/2017" DSGN_START_ACTL_DT="10/1/2017" ENVCLR_TRGT_DT="7/17/2020" ENVCLR_ACTL_DT="7/17/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/8/2020" RTL_ACTL_DT="10/8/2020" PE_SPENT_AMT="569799.63" CNSTR_SPENT_AMT="8345423.25" CE_SPENT_AMT="432816.65" TOT_SPENT_AMT="9348039.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="9000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010203092" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 77" CNTY_NM="Nueces" LIMITS_FROM_DSCR="CR 10" LIMITS_TO_DSCR="CR 4" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="487669" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="546189.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010203093" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 77" CNTY_NM="Nueces" LIMITS_FROM_DSCR="FM 70" LIMITS_TO_DSCR="CR 4" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="374704" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="419668.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010204097" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 77" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="CR 2130" LIMITS_TO_DSCR="1.5 MI. N. OF SH 285" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/30/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="176703809" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/31/2020" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="8/1/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="1/6/2022" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="8.648 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="ANDERSON COLUMBIA CO., INC." CNSTR_NTPD_DT="4/19/2022" CNSTR_WKBG_DT="10/3/2022" CNSTR_PCT_TIME_USED="38.97" CNSTR_PCT_COMPLETE="48.99" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="2/4/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="1/6/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="1/6/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/4/2022" PE_SPENT_AMT="10675829.56" CNSTR_SPENT_AMT="91187053.30" CE_SPENT_AMT="3555520.13" TOT_SPENT_AMT="105418402.99" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="176700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010204099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 77" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="FM 1356" LIMITS_TO_DSCR="CR 2130" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="55237175" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="2/2/2018" PSE_30_ACTL_DT="2/2/2018" PSE_60_TRGT_DT="6/14/2019" PSE_60_ACTL_DT="11/22/2019" PSE_100_TRGT_DT="11/18/2019" PSE_100_ACTL_DT="4/10/2020" DIST_NM="Corpus Christi" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.390 (mi)" TXDOT_CNTCT_NM="Eric Martinez,  P.E." TXDOT_CNTCT_PH_NBR="(361)661-7050" CNSTR_CMPNY_NM="BAY LTD." CNSTR_NTPD_DT="7/27/2020" CNSTR_WKBG_DT="1/6/2021" CNSTR_PCT_TIME_USED="97.12" CNSTR_PCT_COMPLETE="101.37" DSGN_START_TRGT_DT="3/27/2017" DSGN_START_ACTL_DT="3/27/2017" ENVCLR_TRGT_DT="2/20/2020" ENVCLR_ACTL_DT="1/7/2020" UTIL_TRGT_DT="2/20/2020" UTIL_ACTL_DT="4/10/2020" ROW_TRGT_DT="2/20/2020" ROW_ACTL_DT="4/10/2020" RTL_TRGT_DT="2/20/2020" RTL_ACTL_DT="4/10/2020" PE_SPENT_AMT="4453193.60" CNSTR_SPENT_AMT="58655675.02" CE_SPENT_AMT="5273510.67" TOT_SPENT_AMT="68382379.29" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="55000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010204108" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 77" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="FM 1898" LIMITS_TO_DSCR="FM 1356" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="388819" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.796 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="82.61" CNSTR_PCT_COMPLETE="100.06" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="371177.07" CE_SPENT_AMT="19819.68" TOT_SPENT_AMT="390996.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="438206.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010206033" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 285" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="US 77" LIMITS_TO_DSCR="S. BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="196274" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Highway/railroad Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - State Railroad Grade Crossing (2210RX)" FUND_CAT1_PID="RGC" FUND_CAT1_AMT="196274.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010206034" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 285" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="4.3 MILES W OF US 77" LIMITS_TO_DSCR="3.1 MILES W OF US 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="205150" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="HIGHWAY BARRICADES AND SERVICES, LLC" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/13/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/13/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/13/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/13/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1289.26" TOT_SPENT_AMT="1289.26" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="148930.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010206035" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 285" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="BROOKS COUNTY LINE" LIMITS_TO_DSCR="US 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1158956" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1251672.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010207046" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 285" CNTY_NM="Brooks" LIMITS_FROM_DSCR="FM 2191" LIMITS_TO_DSCR="BROOKS/KLEBERG CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4520000" DIST_LET_DATE="5/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/2/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/24/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/9/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.900 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/16/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/15/2024" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010207048" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 285" CNTY_NM="Brooks" LIMITS_FROM_DSCR="FM 1418" LIMITS_TO_DSCR="FM 2191" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17092792" DIST_LET_DATE="4/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="8/3/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/9/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/9/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/2/2026" DSGN_START_ACTL_DT="5/1/2022" ENVCLR_TRGT_DT="5/16/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2030" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2030" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1010684.59" TOT_SPENT_AMT="1010684.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="19143927.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010207049" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 285" CNTY_NM="Brooks" LIMITS_FROM_DSCR="FM 2191" LIMITS_TO_DSCR="1.30 MI E OF FM 2191" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/7/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="295222" DIST_LET_DATE="5/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="8/26/2019" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/15/2019" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2020" PSE_100_ACTL_DT="3/3/2020" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.291 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="7/20/2020" CNSTR_WKBG_DT="9/2/2020" CNSTR_PCT_TIME_USED="98.81" CNSTR_PCT_COMPLETE="94.02" DSGN_START_TRGT_DT="1/28/2019" DSGN_START_ACTL_DT="1/28/2019" ENVCLR_TRGT_DT="3/10/2020" ENVCLR_ACTL_DT="2/11/2020" UTIL_TRGT_DT="3/24/2020" UTIL_ACTL_DT="3/3/2020" ROW_TRGT_DT="3/24/2020" ROW_ACTL_DT="3/3/2020" RTL_TRGT_DT="5/7/2020" RTL_ACTL_DT="3/3/2020" PE_SPENT_AMT="47.85" CNSTR_SPENT_AMT="287820.32" CE_SPENT_AMT="47256.18" TOT_SPENT_AMT="335124.35" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="413158.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010207050" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 285" CNTY_NM="Brooks" LIMITS_FROM_DSCR="0.17 MI W OF COUNTY RD. 229" LIMITS_TO_DSCR="0.08 MI W OF COUNTY RD. 229" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57053" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Replace Guardrail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2020" PSE_100_ACTL_DT="6/5/2020" DIST_NM="Pharr" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.090 (mi)" TXDOT_CNTCT_NM="Daniel Flores, P.E." TXDOT_CNTCT_PH_NBR="(956)848-5006" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="9/18/2020" CNSTR_WKBG_DT="3/8/2021" CNSTR_PCT_TIME_USED="215.23" CNSTR_PCT_COMPLETE="105.38" DSGN_START_TRGT_DT="4/13/2020" DSGN_START_ACTL_DT="4/13/2020" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="6/3/2020" UTIL_TRGT_DT="6/23/2020" UTIL_ACTL_DT="6/5/2020" ROW_TRGT_DT="6/23/2020" ROW_ACTL_DT="6/5/2020" RTL_TRGT_DT="6/23/2020" RTL_ACTL_DT="6/5/2020" CNSTR_SPENT_AMT="82265.07" CE_SPENT_AMT="6857.08" TOT_SPENT_AMT="89122.15" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="50974.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010207051" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 285" CNTY_NM="Brooks" LIMITS_FROM_DSCR="FM 2191" LIMITS_TO_DSCR="BROOKS/KLEBERG COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="443512" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/3/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/1/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/2/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Pharr" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Norma Garza, P.E." TXDOT_CNTCT_PH_NBR="956-702-6180" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/9/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/16/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23117.87" TOT_SPENT_AMT="23117.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="461252.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010211016" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-V" CNTY_NM="Nueces" LIMITS_FROM_DSCR="1000 FEET S. OF US 77" LIMITS_TO_DSCR="US 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="70786" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/8/2022" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.189 (mi)" TXDOT_CNTCT_NM="Ernest Longoria, P.E." TXDOT_CNTCT_PH_NBR="(361)808-2261" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/2/2023" CNSTR_PCT_TIME_USED="75.00" CNSTR_PCT_COMPLETE="96.63" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="6/13/2022" ENVCLR_ACTL_DT="6/3/2022" UTIL_TRGT_DT="6/13/2022" UTIL_ACTL_DT="6/3/2022" ROW_TRGT_DT="6/13/2022" ROW_ACTL_DT="6/3/2022" RTL_TRGT_DT="6/13/2022" RTL_ACTL_DT="6/3/2022" PE_SPENT_AMT="98.42" CNSTR_SPENT_AMT="67153.25" CE_SPENT_AMT="15721.33" TOT_SPENT_AMT="82973.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="64050.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010211017" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-V" CNTY_NM="Nueces" LIMITS_FROM_DSCR="US 77" LIMITS_TO_DSCR="KLEBERG COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="275402" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="308450.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010212034" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 77-V" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="FM1717(14TH ST)" LIMITS_TO_DSCR="US 77(SOUTH)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="267097" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.227 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="31.25" CNSTR_PCT_COMPLETE="88.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="262061.97" CE_SPENT_AMT="1281.00" TOT_SPENT_AMT="263342.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="364000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010212035" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 77-V" CNTY_NM="Kleberg" LIMITS_FROM_DSCR="NUECES COUNTY LINE" LIMITS_TO_DSCR="FM 1898" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="275402" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Paula Sales-Evans, P.E." TXDOT_CNTCT_PH_NBR="361-808-2222" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="308450.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010214107" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 544" CNTY_NM="Nueces" LIMITS_FROM_DSCR="SH 44" LIMITS_TO_DSCR="SH 358" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/28/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106600" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/3/2022" PSE_100_ACTL_DT="8/12/2022" DIST_NM="Corpus Christi" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.136 (mi)" TXDOT_CNTCT_NM="Nicholas K. Novosad, P.E." TXDOT_CNTCT_PH_NBR="(830)780-3132" CNSTR_CMPNY_NM="CK NEWBERRY, LLC" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="5/1/2023" CNSTR_PCT_TIME_USED="143.24" CNSTR_PCT_COMPLETE="91.60" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="5/2/2022" ENVCLR_TRGT_DT="8/8/2022" ENVCLR_ACTL_DT="7/21/2022" UTIL_TRGT_DT="8/8/2022" UTIL_ACTL_DT="7/21/2022" ROW_TRGT_DT="8/8/2022" ROW_ACTL_DT="7/21/2022" RTL_TRGT_DT="8/8/2022" RTL_ACTL_DT="7/21/2022" CNSTR_SPENT_AMT="87523.65" CE_SPENT_AMT="2805.46" TOT_SPENT_AMT="90329.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="88400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010301043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 17" CNTY_NM="Reeves" LIMITS_FROM_DSCR="BI 20" LIMITS_TO_DSCR="1 MI S FM 869" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/17/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="859921" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="7/18/2022" CNSTR_PCT_TIME_USED="63.79" CNSTR_PCT_COMPLETE="78.61" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="851943.00" CE_SPENT_AMT="20864.43" TOT_SPENT_AMT="872807.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1160501.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010301044" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 17" CNTY_NM="Reeves" LIMITS_FROM_DSCR="N OF COTTON ST" LIMITS_TO_DSCR="3/4 MI S OF CR 206" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6972496" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/8/2023" PSE_30_ACTL_DT="11/17/2022" PSE_60_TRGT_DT="1/5/2024" PSE_60_ACTL_DT="1/25/2023" PSE_100_TRGT_DT="3/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="9/13/2023" CNSTR_WKBG_DT="11/6/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="102.62" DSGN_START_TRGT_DT="11/13/2023" DSGN_START_ACTL_DT="8/19/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/28/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="458113.82" CNSTR_SPENT_AMT="7397640.93" CE_SPENT_AMT="659065.94" TOT_SPENT_AMT="8514820.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2975890.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010301046" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT COUNTY ROAD 131" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1839115" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="6/3/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/1/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/14/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/6/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/14/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/28/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/14/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7193.53" TOT_SPENT_AMT="7193.53" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010301047" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT STAFFORD BLVD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="11/2/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/30/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/11/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/5/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/11/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/28/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/11/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3686.24" TOT_SPENT_AMT="3686.24" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010301049" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Reeves" LIMITS_FROM_DSCR="0.75 MI S OF CR 206" LIMITS_TO_DSCR="FM 869" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="931299" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1043055.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010302034" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 17" CNTY_NM="Reeves" LIMITS_FROM_DSCR="IH 10 SFR" LIMITS_TO_DSCR="0.6 MI SOUTH OF FM 869" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="917182" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2022" PSE_30_ACTL_DT="3/3/2022" PSE_60_TRGT_DT="5/3/2022" PSE_60_ACTL_DT="4/5/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="7/20/2022" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="6/2/2023" CNSTR_PCT_TIME_USED="87.04" CNSTR_PCT_COMPLETE="101.25" DSGN_START_TRGT_DT="3/9/2022" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="7/6/2022" ENVCLR_ACTL_DT="6/21/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2022" RTL_ACTL_DT="7/20/2022" CNSTR_SPENT_AMT="932305.80" CE_SPENT_AMT="3971.47" TOT_SPENT_AMT="936277.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="726137.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010402031" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="REEVES COUNTY LINE" LIMITS_TO_DSCR="7.77 MI E OF SH 118" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1694296" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1897611.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010403043" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="7.77 MI E OF SH 118" LIMITS_TO_DSCR="0.48 MI S OF SH 118" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="812981" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="910539.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010404015" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Jeff Davis" LIMITS_FROM_DSCR="0.48 MI S OF SH 118" LIMITS_TO_DSCR="8.24 MI N OF FM 1112" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1074795" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1203770.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010405025" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 17" CNTY_NM="Presidio" LIMITS_FROM_DSCR="NORTH CITY LIMIT OF MARFA" LIMITS_TO_DSCR="JCT OF US 67/90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/5/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1293211" DIST_LET_DATE="2/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="6/23/2021" CNSTR_WKBG_DT="9/7/2021" CNSTR_PCT_TIME_USED="80.30" CNSTR_PCT_COMPLETE="103.74" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="25146.96" CNSTR_SPENT_AMT="1448612.14" CE_SPENT_AMT="78894.51" TOT_SPENT_AMT="1552653.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010405028" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 17" CNTY_NM="Presidio" LIMITS_FROM_DSCR="8.24 MI N OF FM 1112" LIMITS_TO_DSCR="0.87 MI N OF FM 1112" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="664796" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="744572.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010406024" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="THE JUNCTION OF US 67/90" LIMITS_TO_DSCR="0.371 MI SOUTH OF JUNCTION US 67/90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="900000" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="7/8/2031" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/28/2031" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/2/2032" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.371 (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2030" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/4/2031" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/25/2031" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/12/2031" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/27/2032" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3458313.27" TOT_SPENT_AMT="3458313.27" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010406027" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="WACO STREET" LIMITS_TO_DSCR="1900 FT S OF WACO STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/1/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="369918" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Hike And/or Bike" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.360 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="7/7/2020" CNSTR_PCT_TIME_USED="78.53" CNSTR_PCT_COMPLETE="97.57" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="40715.72" CNSTR_SPENT_AMT="389691.05" CE_SPENT_AMT="14775.02" TOT_SPENT_AMT="445181.79" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2009TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="306603.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010406030" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="JCT OF US 67/90" LIMITS_TO_DSCR="15.3 MI S OF JCT US 67/90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1288998" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="487.76" TOT_SPENT_AMT="487.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1392118.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010406031" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="US 67/S HIGHLAND AVE" LIMITS_TO_DSCR="16.299 MI S OF US 67/S HIGHLAND AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="48936" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="12/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20.58" TOT_SPENT_AMT="20.58" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="48936.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010407027" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="15.3 MI S OF JCT US 67/90" LIMITS_TO_DSCR="33.6 MI S OF JCT US 67/90" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1541776" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="424.21" TOT_SPENT_AMT="424.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1665118.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010407028" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="16.299 MI S OF US 67/S HIGHLAND AVE" LIMITS_TO_DSCR="33.597 MI S OF MARFA" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="58531" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="12/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42.04" TOT_SPENT_AMT="42.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="58531.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010408024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="32.19 MI S OF MARFA" LIMITS_TO_DSCR="5.209 MI S OF SHAFTER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="717625" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="34.33" CNSTR_SPENT_AMT="878522.50" CE_SPENT_AMT="14010.75" TOT_SPENT_AMT="892567.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="600208.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010408027" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="32.19 MI S OF MARFA" LIMITS_TO_DSCR="5.209 MI S OF SHAFTER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1165000" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010408028" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="26.54 MI N OF TEXAS/MEXICO LINE" LIMITS_TO_DSCR="13.336 MI N OF TEXAS/MEXICO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="154233" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="12/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42.05" TOT_SPENT_AMT="42.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="154233.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010409031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="5.209 MI S OF SHAFTER" LIMITS_TO_DSCR="INTERNATIONAL BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="736043" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/30/2021" PSE_30_ACTL_DT="4/5/2021" PSE_60_TRGT_DT="5/27/2021" PSE_60_ACTL_DT="5/4/2021" PSE_100_TRGT_DT="9/10/2021" PSE_100_ACTL_DT="9/8/2021" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Armando Ramirez, P.E." TXDOT_CNTCT_PH_NBR="(432)837-7800" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="1/10/2022" CNSTR_WKBG_DT="4/4/2022" CNSTR_PCT_TIME_USED="97.50" CNSTR_PCT_COMPLETE="99.17" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="2/1/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/7/2021" UTIL_TRGT_DT="1/28/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/24/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/6/2021" RTL_ACTL_DT="10/5/2021" PE_SPENT_AMT="34.33" CNSTR_SPENT_AMT="805533.63" CE_SPENT_AMT="13916.90" TOT_SPENT_AMT="819484.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="672658.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010409033" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="36.419 MI S OF JCT US 90" LIMITS_TO_DSCR="INTERSECTION OF FM 170" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9566326" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="10714285.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010409034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="AT FM 170" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2283830" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/6/2022" PSE_30_ACTL_DT="9/29/2022" PSE_60_TRGT_DT="12/7/2022" PSE_60_ACTL_DT="12/28/2022" PSE_100_TRGT_DT="4/10/2023" PSE_100_ACTL_DT="4/27/2023" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="9/22/2022" ENVCLR_TRGT_DT="2/16/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/6/2023" UTIL_ACTL_DT="2/22/2023" ROW_TRGT_DT="4/6/2023" ROW_ACTL_DT="1/1/2023" RTL_TRGT_DT="5/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="521011.57" TOT_SPENT_AMT="521011.57" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="683830.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010409035" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="5.209 MI S OF SHAFTER" LIMITS_TO_DSCR="INTERNATIONAL BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1305625" DIST_LET_DATE="12/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010409036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 67" CNTY_NM="Presidio" LIMITS_FROM_DSCR="13.336 MI N OF TEXAS/MEXICO LINE" LIMITS_TO_DSCR="TEXAS/MEXICO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="159506" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Advanced Traffic Management System" PSE_30_TRGT_DT="12/5/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/6/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2024" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/12/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42.05" TOT_SPENT_AMT="42.05" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="159506.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010411009" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 67-A" CNTY_NM="Presidio" LIMITS_FROM_DSCR="IGNACIO ST" LIMITS_TO_DSCR="CHURCH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="41913" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/5/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/6/2025" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jonathan J. Concha, P.E." TXDOT_CNTCT_PH_NBR="(915)757-5901" CNSTR_CMPNY_NM="MARTINEZ BROS. CONTRACTORS, LLC" CNSTR_NTPD_DT="7/10/2024" CNSTR_WKBG_DT="9/9/2024" CNSTR_PCT_TIME_USED="111.76" CNSTR_PCT_COMPLETE="111.73" DSGN_START_TRGT_DT="5/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/2/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/21/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/9/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/2/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="55.89" CNSTR_SPENT_AMT="44504.05" CE_SPENT_AMT="157.10" TOT_SPENT_AMT="44717.04" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010502023" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 86" CNTY_NM="Hall" LIMITS_FROM_DSCR="INTERSECTION OF SH 70, NORTH" LIMITS_TO_DSCR="FM 657" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6392223" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/9/2020" PSE_30_ACTL_DT="1/9/2020" PSE_60_TRGT_DT="3/12/2020" PSE_60_ACTL_DT="2/28/2022" PSE_100_TRGT_DT="7/31/2020" PSE_100_ACTL_DT="6/27/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.270 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="3/18/2024" CNSTR_PCT_TIME_USED="97.85" CNSTR_PCT_COMPLETE="101.90" DSGN_START_TRGT_DT="10/30/2019" DSGN_START_ACTL_DT="10/30/2019" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="3/10/2022" UTIL_TRGT_DT="10/30/2019" UTIL_ACTL_DT="2/10/2022" ROW_TRGT_DT="10/30/2019" ROW_ACTL_DT="3/10/2022" RTL_TRGT_DT="7/31/2020" RTL_ACTL_DT="6/27/2022" PE_SPENT_AMT="143019.05" CNSTR_SPENT_AMT="6816200.56" CE_SPENT_AMT="67924.91" TOT_SPENT_AMT="7027144.52" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="250000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT2_AMT="5681366.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010502026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 70" CNTY_NM="Hall" LIMITS_FROM_DSCR="TURKEY NCL, NORTH" LIMITS_TO_DSCR="INTERSECTION OF SH 86" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="247567" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/9/2020" PSE_30_ACTL_DT="1/9/2020" PSE_60_TRGT_DT="3/12/2020" PSE_60_ACTL_DT="2/28/2022" PSE_100_TRGT_DT="7/31/2020" PSE_100_ACTL_DT="6/27/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="J. LEE MILLIGAN, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="3/18/2024" CNSTR_PCT_TIME_USED="97.85" CNSTR_PCT_COMPLETE="101.90" DSGN_START_TRGT_DT="10/30/2019" DSGN_START_ACTL_DT="10/30/2019" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="3/10/2022" UTIL_TRGT_DT="10/30/2019" UTIL_ACTL_DT="2/10/2022" ROW_TRGT_DT="10/30/2019" ROW_ACTL_DT="3/10/2022" RTL_TRGT_DT="7/31/2020" RTL_ACTL_DT="6/27/2022" PE_SPENT_AMT="7553.69" CNSTR_SPENT_AMT="233394.89" CE_SPENT_AMT="3854.80" TOT_SPENT_AMT="244803.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="217985.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010504044" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 70" CNTY_NM="Motley" LIMITS_FROM_DSCR="FM 2009, SOUTH" LIMITS_TO_DSCR="US 62/70" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.510 (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/5/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/5/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28855.72" TOT_SPENT_AMT="28855.72" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010505036" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 70" CNTY_NM="Motley" LIMITS_FROM_DSCR="US 62/70, SOUTH" LIMITS_TO_DSCR="DICKENS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/18/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="294584" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matthew Herbstritt , P.E." TXDOT_CNTCT_PH_NBR="(940)937-7283" CNSTR_CMPNY_NM="STRIPE LINES, INC." CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="6/2/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18919.56" TOT_SPENT_AMT="18919.56" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="286048.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010506023" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 70" CNTY_NM="Dickens" LIMITS_FROM_DSCR="8 MILES NORTH OF US 82, SOUTH" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5364188" DIST_LET_DATE="11/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/12/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/16/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/28/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/9/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="78017.55" TOT_SPENT_AMT="78017.55" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010506025" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 70" CNTY_NM="Dickens" LIMITS_FROM_DSCR="MOTLEY C/L, SOUTH" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/18/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="284486" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matthew Herbstritt , P.E." TXDOT_CNTCT_PH_NBR="(940)937-7283" CNSTR_CMPNY_NM="STRIPE LINES, INC." CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="6/2/2025" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="956.31" TOT_SPENT_AMT="956.31" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="335045.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010506026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 70" CNTY_NM="Dickens" LIMITS_FROM_DSCR="MOTLEY C/L, S" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1280702" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="11/21/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="13.54" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="367.46" CNSTR_SPENT_AMT="181357.74" CE_SPENT_AMT="566.34" TOT_SPENT_AMT="182291.54" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1190346.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010603038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Kent" LIMITS_FROM_DSCR="SH 70" LIMITS_TO_DSCR="STONEWALL CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="231171" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="120490.66" CE_SPENT_AMT="150.44" TOT_SPENT_AMT="120641.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="213620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010603039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 70" CNTY_NM="Kent" LIMITS_FROM_DSCR="DICKENS CO LINE" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="980112" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/8/2023" PSE_30_ACTL_DT="3/8/2023" PSE_60_TRGT_DT="5/15/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.12" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="985538.92" CE_SPENT_AMT="12623.72" TOT_SPENT_AMT="998162.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1151687.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010604036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="SALT FORK BRAZOS RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8952032" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="5/28/2020" PSE_30_ACTL_DT="7/3/2020" PSE_60_TRGT_DT="9/8/2020" PSE_60_ACTL_DT="9/3/2021" PSE_100_TRGT_DT="11/3/2020" PSE_100_ACTL_DT="5/10/2022" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="EARTH BUILDERS, L.P." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="1/23/2023" CNSTR_PCT_TIME_USED="97.04" CNSTR_PCT_COMPLETE="98.49" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="11/3/2020" ENVCLR_ACTL_DT="6/10/2022" UTIL_TRGT_DT="11/3/2020" UTIL_ACTL_DT="3/1/2022" ROW_TRGT_DT="11/3/2020" ROW_ACTL_DT="3/1/2022" RTL_TRGT_DT="11/3/2020" RTL_ACTL_DT="5/10/2022" PE_SPENT_AMT="992500.25" CNSTR_SPENT_AMT="8825809.55" CE_SPENT_AMT="114052.87" TOT_SPENT_AMT="9932362.67" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="15189040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010604037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="KENT CO LINE" LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1133910" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="590698.09" CE_SPENT_AMT="737.54" TOT_SPENT_AMT="591435.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1073791.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010604038" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="KENT CO. LINE" LIMITS_TO_DSCR="US 83 N OF ASPERMONT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="492161" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="492161.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010605030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="NORTH OF ASPERMONT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1167787" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/8/2013" PSE_30_ACTL_DT="8/8/2013" PSE_60_TRGT_DT="10/31/2013" PSE_60_ACTL_DT="10/31/2013" PSE_100_TRGT_DT="1/17/2014" PSE_100_ACTL_DT="1/17/2014" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.027 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="DELHUR INDUSTRIES, INC." CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="4/14/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/20/2013" DSGN_START_ACTL_DT="3/20/2013" ENVCLR_TRGT_DT="2/6/2014" ENVCLR_ACTL_DT="2/6/2014" UTIL_TRGT_DT="3/16/2021" UTIL_ACTL_DT="3/16/2021" ROW_TRGT_DT="1/17/2014" ROW_ACTL_DT="1/17/2014" RTL_TRGT_DT="11/5/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="147922.29" CNSTR_SPENT_AMT="1120269.31" CE_SPENT_AMT="50817.56" TOT_SPENT_AMT="1319009.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010605039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 83" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/27/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="341607" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="9/9/2020" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/25/2021" PSE_100_ACTL_DT="2/25/2021" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="6/10/2021" CNSTR_WKBG_DT="8/9/2021" CNSTR_PCT_TIME_USED="95.49" CNSTR_PCT_COMPLETE="101.27" DSGN_START_TRGT_DT="6/15/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/25/2021" ENVCLR_ACTL_DT="12/31/2020" UTIL_TRGT_DT="2/25/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/25/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/25/2021" RTL_ACTL_DT="3/4/2021" CNSTR_SPENT_AMT="385146.51" CE_SPENT_AMT="17470.69" TOT_SPENT_AMT="402617.20" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="465000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010606037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Stonewall" LIMITS_FROM_DSCR="US 83" LIMITS_TO_DSCR="SH 283" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="718089" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/8/2023" PSE_30_ACTL_DT="3/8/2023" PSE_60_TRGT_DT="5/15/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="5/6/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.12" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="2/1/2023" ENVCLR_TRGT_DT="8/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="721693.86" CE_SPENT_AMT="9244.12" TOT_SPENT_AMT="730937.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="716677.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010607028" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 283" CNTY_NM="Haskell" LIMITS_FROM_DSCR="STONEWALL CO LINE" LIMITS_TO_DSCR="SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="360120" DIST_LET_DATE="12/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="403334.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010607029" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 6" CNTY_NM="Haskell" LIMITS_FROM_DSCR="US 283" LIMITS_TO_DSCR="US 277" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="281125" DIST_LET_DATE="12/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="314860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010607030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Haskell" LIMITS_FROM_DSCR="RED PAINT CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="723088" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="11/12/2021" PSE_30_ACTL_DT="11/12/2021" PSE_60_TRGT_DT="11/26/2021" PSE_60_ACTL_DT="11/26/2021" PSE_100_TRGT_DT="5/16/2022" PSE_100_ACTL_DT="4/24/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="SCOTT TUCKER CONSTRUCTION COMPANY, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="11/15/2022" CNSTR_PCT_TIME_USED="127.68" CNSTR_PCT_COMPLETE="90.71" DSGN_START_TRGT_DT="9/1/2021" DSGN_START_ACTL_DT="9/1/2021" ENVCLR_TRGT_DT="1/10/2022" ENVCLR_ACTL_DT="1/10/2022" UTIL_TRGT_DT="1/7/2022" UTIL_ACTL_DT="1/7/2022" ROW_TRGT_DT="1/7/2022" ROW_ACTL_DT="1/7/2022" RTL_TRGT_DT="5/16/2022" RTL_ACTL_DT="4/29/2022" PE_SPENT_AMT="15103.01" CNSTR_SPENT_AMT="974034.13" CE_SPENT_AMT="26987.89" TOT_SPENT_AMT="1016125.03" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="770000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010701038" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Jones" LIMITS_FROM_DSCR="OAK ST" LIMITS_TO_DSCR="SHACKELFORD CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1047141" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="545146.74" CE_SPENT_AMT="680.65" TOT_SPENT_AMT="545827.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="985499.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010701039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Jones" LIMITS_FROM_DSCR="BU 277G" LIMITS_TO_DSCR="OAK ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/13/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1426357" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="12/17/2021" PSE_30_ACTL_DT="12/17/2021" PSE_60_TRGT_DT="2/7/2022" PSE_60_ACTL_DT="2/7/2022" PSE_100_TRGT_DT="3/18/2022" PSE_100_ACTL_DT="4/14/2022" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Bryce Turentine, P.E." TXDOT_CNTCT_PH_NBR="(325)690-9821" CNSTR_CMPNY_NM="FOUTSCO PAVING COMPANY, LLC" CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="1/3/2023" CNSTR_PCT_TIME_USED="91.23" CNSTR_PCT_COMPLETE="101.48" DSGN_START_TRGT_DT="10/11/2021" DSGN_START_ACTL_DT="10/11/2021" ENVCLR_TRGT_DT="2/23/2022" ENVCLR_ACTL_DT="3/22/2022" UTIL_TRGT_DT="2/23/2022" UTIL_ACTL_DT="3/22/2022" ROW_TRGT_DT="2/23/2022" ROW_ACTL_DT="3/22/2022" RTL_TRGT_DT="3/18/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="318.59" CNSTR_SPENT_AMT="1644948.83" CE_SPENT_AMT="17172.92" TOT_SPENT_AMT="1662440.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1181713.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010702041" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 180" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="SH 351" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="593609" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="664842.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010702042" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="JONES CO LINE" LIMITS_TO_DSCR="US 180" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="214970" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Anthony Boucher, P.E." TXDOT_CNTCT_PH_NBR="(325)573-0143" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="4/25/2025" CNSTR_PCT_TIME_USED="24.27" CNSTR_PCT_COMPLETE="49.48" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="111674.27" CE_SPENT_AMT="139.43" TOT_SPENT_AMT="111813.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="188136.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010703017" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 601" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 576" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="298915" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.672 (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="310872.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010703018" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 601" CNTY_NM="Shackelford" LIMITS_FROM_DSCR="FM 601" LIMITS_TO_DSCR="AT HUBBARD CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3683000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="3683000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010801030" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="US 80, S" LIMITS_TO_DSCR="IH 20, IN CANTON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27500000" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="12/6/2019" PSE_30_ACTL_DT="6/16/2020" PSE_60_TRGT_DT="4/24/2020" PSE_60_ACTL_DT="4/13/2021" PSE_100_TRGT_DT="11/6/2020" PSE_100_ACTL_DT="12/20/2021" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.555 (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/3/2019" DSGN_START_ACTL_DT="10/3/2019" ENVCLR_TRGT_DT="9/1/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/21/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/23/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1310639.27" TOT_SPENT_AMT="1310639.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="29700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010801031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="US 80" LIMITS_TO_DSCR="IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="519676" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="595784.19" CE_SPENT_AMT="10473.75" TOT_SPENT_AMT="606257.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="829161.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010801032" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="SH 64" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="198911" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="222780.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010802033" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="0.3 MI S OF SH 234(DEBBIE)IN CANTON,S" LIMITS_TO_DSCR="0.3 MI S OF FM 1861 (HENDERSON C/L)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12108566" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/31/2019" PSE_30_ACTL_DT="6/16/2020" PSE_60_TRGT_DT="8/30/2019" PSE_60_ACTL_DT="1/26/2021" PSE_100_TRGT_DT="12/31/2019" PSE_100_ACTL_DT="4/14/2021" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.718 (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="11/22/2021" CNSTR_PCT_TIME_USED="76.48" CNSTR_PCT_COMPLETE="101.74" DSGN_START_TRGT_DT="12/6/2018" DSGN_START_ACTL_DT="12/6/2018" ENVCLR_TRGT_DT="7/15/2021" ENVCLR_ACTL_DT="7/16/2021" UTIL_TRGT_DT="11/15/2019" UTIL_ACTL_DT="4/9/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/21/2021" RTL_ACTL_DT="5/11/2021" PE_SPENT_AMT="265611.18" CNSTR_SPENT_AMT="12285584.12" CE_SPENT_AMT="286623.60" TOT_SPENT_AMT="12837818.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="16530000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010802036" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="SH 243 IN CANTON, S" LIMITS_TO_DSCR="HENDERSON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="794760" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="881838.19" CE_SPENT_AMT="13455.77" TOT_SPENT_AMT="895293.96" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="840000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010803041" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Henderson" LIMITS_FROM_DSCR="0.3 MI S OF FM1861(VAN ZANDT C/L),S" LIMITS_TO_DSCR="0.1 MI N OF SL 7 IN ATHENS (WATSON)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13887918" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/14/2020" PSE_30_ACTL_DT="5/14/2020" PSE_60_TRGT_DT="1/26/2021" PSE_60_ACTL_DT="1/26/2021" PSE_100_TRGT_DT="11/9/2021" PSE_100_ACTL_DT="11/9/2021" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Danny Henderson, P.E." TXDOT_CNTCT_PH_NBR="(903)675-4196" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="1/7/2025" CNSTR_PCT_TIME_USED="15.67" CNSTR_PCT_COMPLETE="21.67" DSGN_START_TRGT_DT="12/6/2018" DSGN_START_ACTL_DT="12/6/2018" ENVCLR_TRGT_DT="8/6/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/20/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/9/2021" RTL_ACTL_DT="10/27/2022" PE_SPENT_AMT="692206.77" CNSTR_SPENT_AMT="3121351.82" CE_SPENT_AMT="93670.18" TOT_SPENT_AMT="3907228.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="19760000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010803043" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 19-J" CNTY_NM="Henderson" LIMITS_FROM_DSCR="N SL7/US175 IN ATHENS, S" LIMITS_TO_DSCR="TYLER ST, 0.1 MI N OF BU 175 (C-S BREAK)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="126090" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.500 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="135768.91" CE_SPENT_AMT="2072.28" TOT_SPENT_AMT="137841.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="166000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010803044" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Henderson" LIMITS_FROM_DSCR="0.2 MI N OF CR 3907" LIMITS_TO_DSCR="0.2 MI S OF GRAND VIEW DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="178439" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Danny Henderson, P.E." TXDOT_CNTCT_PH_NBR="(903)675-4196" CNSTR_CMPNY_NM="REYNOLDS &amp; KAY, LTD." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/25/2024" CNSTR_PCT_TIME_USED="106.67" CNSTR_PCT_COMPLETE="99.23" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8783.49" CNSTR_SPENT_AMT="181650.70" CE_SPENT_AMT="9095.47" TOT_SPENT_AMT="199529.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="78268.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010804038" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 19-J" CNTY_NM="Henderson" LIMITS_FROM_DSCR=".1 MI N OF BU 175 (TYLER ST), S" LIMITS_TO_DSCR="SL 7 IN ATHENS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="223476" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="241220.46" CE_SPENT_AMT="3681.70" TOT_SPENT_AMT="244902.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="270000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010804039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Henderson" LIMITS_FROM_DSCR="SL 7 (S) IN ATHENS, S" LIMITS_TO_DSCR="FM 1615" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="64082" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="68543.54" CE_SPENT_AMT="1046.20" TOT_SPENT_AMT="69589.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="76000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010804040" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 19-J" CNTY_NM="Henderson" LIMITS_FROM_DSCR="COLLEGE ST" LIMITS_TO_DSCR="BEN BELT DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1938061" DIST_LET_DATE="6/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="5/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/30/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/29/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/2/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="4/30/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/22/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="206212.13" TOT_SPENT_AMT="206212.13" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2509TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="1191322.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2509TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="48100.00" FUND_CAT3_DSCR="Category 10 - Curb Ramp Program (2510CR)" FUND_CAT3_PID="MAS" FUND_CAT3_AMT="702639.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/5/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010804041" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 19-J" CNTY_NM="Henderson" LIMITS_FROM_DSCR="BEN BELT DR" LIMITS_TO_DSCR="SL 7 RAMPS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2607922" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Danny Henderson, P.E." TXDOT_CNTCT_PH_NBR="(903)675-4196" CNSTR_CMPNY_NM="3LW CIVIL LLC" CNSTR_NTPD_DT="7/17/2024" CNSTR_WKBG_DT="11/4/2024" CNSTR_PCT_TIME_USED="44.50" CNSTR_PCT_COMPLETE="50.28" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="62617.03" CNSTR_SPENT_AMT="1313429.76" CE_SPENT_AMT="61051.05" TOT_SPENT_AMT="1437097.84" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2410CR)" FUND_CAT1_PID="MAS" FUND_CAT1_AMT="2844124.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010804042" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Henderson" LIMITS_FROM_DSCR="FM 1615" LIMITS_TO_DSCR="0.08 MI N. OF CR 4612 (COON CREEK)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="246476" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="282958.20" CE_SPENT_AMT="4974.40" TOT_SPENT_AMT="287932.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="418084.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010805020" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Henderson" LIMITS_FROM_DSCR="COON CREEK (0.08 MI. N. OF CR 4612)" LIMITS_TO_DSCR="BEAR CREEK (0.62 MI. N. OF ANDERSON CL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="602584" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="674894.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010807040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Anderson" LIMITS_FROM_DSCR="LP 256N" LIMITS_TO_DSCR="US 84" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="183972" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="191331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010809052" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Hopkins" LIMITS_FROM_DSCR="SH 11" LIMITS_TO_DSCR="RAINS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16786586" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.159 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="1/10/2024" CNSTR_PCT_TIME_USED="60.99" CNSTR_PCT_COMPLETE="43.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="121448.57" CNSTR_SPENT_AMT="7986886.41" CE_SPENT_AMT="123843.62" TOT_SPENT_AMT="8232178.60" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="14780000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="1205281.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010810026" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Rains" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="HOPKINS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9009000" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="10090080.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010811022" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Rains" LIMITS_FROM_DSCR="VAN ZANDT COUNTY LINE" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19510400" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="21851648.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010812018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Van Zandt" LIMITS_FROM_DSCR="1.5 MI N OF FM 859 (RAINS C/L)," LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8769309" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/12/2022" PSE_100_ACTL_DT="1/12/2022" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="5/12/2022" CNSTR_WKBG_DT="6/21/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="104.20" DSGN_START_TRGT_DT="12/6/2018" DSGN_START_ACTL_DT="12/6/2018" ENVCLR_TRGT_DT="3/2/2022" ENVCLR_ACTL_DT="2/17/2022" UTIL_TRGT_DT="8/24/2020" UTIL_ACTL_DT="12/10/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/12/2022" RTL_ACTL_DT="1/12/2022" PE_SPENT_AMT="168909.29" CNSTR_SPENT_AMT="9910362.40" CE_SPENT_AMT="244621.83" TOT_SPENT_AMT="10323893.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="11600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010901065" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Anderson" LIMITS_FROM_DSCR="US 287" LIMITS_TO_DSCR="E. PARK AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="153184" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="171567.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010901066" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Anderson" LIMITS_FROM_DSCR="SH 294" LIMITS_TO_DSCR="1.7 MI N OF SH 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3800000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4256000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010902027" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Anderson" LIMITS_FROM_DSCR="1.7 MI N OF SH 294" LIMITS_TO_DSCR="0.2 MI S OF SH 294 E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3250000" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="69746.93" TOT_SPENT_AMT="69746.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="3640000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010903036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="ANDERSON COUNTY LINE" LIMITS_TO_DSCR="2.117 MI NORTH OF 2663" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/19/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1162833" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Replace Guardrail" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/16/2020" PSE_60_ACTL_DT="11/4/2020" PSE_100_TRGT_DT="3/12/2021" PSE_100_ACTL_DT="3/15/2021" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.106 (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="ODUM SERVICES, LLC" CNSTR_NTPD_DT="7/20/2021" CNSTR_WKBG_DT="8/9/2021" CNSTR_PCT_TIME_USED="75.80" CNSTR_PCT_COMPLETE="99.75" DSGN_START_TRGT_DT="5/30/2019" DSGN_START_ACTL_DT="5/30/2019" ENVCLR_TRGT_DT="9/14/2020" ENVCLR_ACTL_DT="3/29/2021" UTIL_TRGT_DT="3/12/2021" UTIL_ACTL_DT="4/2/2021" ROW_TRGT_DT="3/12/2021" ROW_ACTL_DT="4/2/2021" RTL_TRGT_DT="4/2/2021" RTL_ACTL_DT="4/2/2021" PE_SPENT_AMT="16586.99" CNSTR_SPENT_AMT="1140819.17" CE_SPENT_AMT="58728.49" TOT_SPENT_AMT="1216134.65" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1899954.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010903038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="BU 287" LIMITS_TO_DSCR="2.193 MI N OF FM 2663" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="304214" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.060 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="264786.95" CE_SPENT_AMT="2955.95" TOT_SPENT_AMT="267742.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="285824.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010903039" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="ANDERSON COUNTY LINE" LIMITS_TO_DSCR="GRAPELAND (SOUTH CITY LIMITS)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="757976" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="6/10/2022" CNSTR_PCT_TIME_USED="91.80" CNSTR_PCT_COMPLETE="89.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="497.83" CNSTR_SPENT_AMT="669711.95" CE_SPENT_AMT="8655.65" TOT_SPENT_AMT="678865.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="457527.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010903041" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="BU 287V NORTH" LIMITS_TO_DSCR="BU 287V SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="229244" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="5/24/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy King, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4472" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="4/18/2024" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="58.02" CNSTR_PCT_COMPLETE="95.03" DSGN_START_TRGT_DT="8/7/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8847.10" CNSTR_SPENT_AMT="222233.93" CE_SPENT_AMT="7381.67" TOT_SPENT_AMT="238462.70" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="157747.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010903042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="ANDERSON COUNTY LINE" LIMITS_TO_DSCR="3.27 MI SOUTH OF ANDERSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="207379" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="203021.80" CE_SPENT_AMT="2773.69" TOT_SPENT_AMT="205795.49" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="137824.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010903044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="ANDERSON COUNTY LINE" LIMITS_TO_DSCR="2.198 MI N OF FM 2663" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8517762" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/3/2024" CNSTR_WKBG_DT="9/27/2024" CNSTR_PCT_TIME_USED="79.29" CNSTR_PCT_COMPLETE="93.45" DSGN_START_TRGT_DT="5/8/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/6/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34285.62" CNSTR_SPENT_AMT="8188384.90" CE_SPENT_AMT="99296.35" TOT_SPENT_AMT="8321966.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="12193331.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010904030" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="SL 304 (N)" LIMITS_TO_DSCR="CROCKETT TOWN SQUARE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1006019" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/10/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.369 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/13/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/6/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1126741.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010904032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="2.193 MI N OF FM 2663" LIMITS_TO_DSCR="SL 304" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="441177" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.315 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="384104.54" CE_SPENT_AMT="4227.32" TOT_SPENT_AMT="388331.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="444576.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010904034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Houston" LIMITS_FROM_DSCR="2.198 MI N OF FM 2663" LIMITS_TO_DSCR="0.35 MI N OF FM 2160" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2706605" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="5/3/2024" CNSTR_WKBG_DT="9/27/2024" CNSTR_PCT_TIME_USED="79.29" CNSTR_PCT_COMPLETE="93.45" DSGN_START_TRGT_DT="5/8/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/6/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2522386.71" CE_SPENT_AMT="30587.70" TOT_SPENT_AMT="2552974.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4124290.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010905043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Houston" LIMITS_FROM_DSCR="SL 304" LIMITS_TO_DSCR="5.5 MILES SOUTH OF SL 304" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3019866" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="2/7/2025" CNSTR_WKBG_DT="2/24/2025" CNSTR_PCT_TIME_USED="21.48" CNSTR_PCT_COMPLETE="34.95" DSGN_START_TRGT_DT="10/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/7/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/6/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="209.10" CNSTR_SPENT_AMT="3411565.23" CE_SPENT_AMT="24742.31" TOT_SPENT_AMT="3436516.64" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="3567196.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010905045" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Houston" LIMITS_FROM_DSCR="CROCKETT TOWN SQUARE" LIMITS_TO_DSCR="SL 304" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1100000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="6/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/10/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/13/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/6/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1232000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010906043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Houston" LIMITS_FROM_DSCR="LOVELADY CITY LIMITS SOUTH" LIMITS_TO_DSCR="TRINITY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="218614" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.975 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="189600.55" CE_SPENT_AMT="2866.48" TOT_SPENT_AMT="192467.03" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="249327.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010906045" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Houston" LIMITS_FROM_DSCR="1.665 MI N OF FM 231" LIMITS_TO_DSCR="LOVELADY CITY LIMITS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="884327" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="990447.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010906046" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Houston" LIMITS_FROM_DSCR="SOUTH LOVELADY CITY LIMITS" LIMITS_TO_DSCR="TRINITY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="463917" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="519587.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010907054" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Trinity" LIMITS_FROM_DSCR="ELIZABETH ST" LIMITS_TO_DSCR="MADISON ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="21210" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy King, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4472" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.33" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="27796.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010907056" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Trinity" LIMITS_FROM_DSCR="HOUSTON COUNTY LINE" LIMITS_TO_DSCR="0.126 MI S OF FM 1617" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1310324" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/14/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/7/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/10/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/9/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/7/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/7/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/4/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1467562.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010908048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Trinity" LIMITS_FROM_DSCR="0.128 MILES S FM 1617" LIMITS_TO_DSCR="TRINITY RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="381818" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="331800.97" CE_SPENT_AMT="3535.58" TOT_SPENT_AMT="335336.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="589600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010908050" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Trinity" LIMITS_FROM_DSCR="FM 1617" LIMITS_TO_DSCR="WALKER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="599426" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/25/2023" PSE_60_ACTL_DT="1/25/2023" PSE_100_TRGT_DT="4/7/2023" PSE_100_ACTL_DT="4/7/2023" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="SCOUT 5 CONSTRUCTION LLC" CNSTR_NTPD_DT="7/20/2023" CNSTR_WKBG_DT="9/27/2023" CNSTR_PCT_TIME_USED="61.64" CNSTR_PCT_COMPLETE="101.63" DSGN_START_TRGT_DT="9/15/2022" DSGN_START_ACTL_DT="9/15/2022" ENVCLR_TRGT_DT="12/21/2022" ENVCLR_ACTL_DT="12/21/2022" UTIL_TRGT_DT="2/22/2023" UTIL_ACTL_DT="2/22/2023" ROW_TRGT_DT="3/8/2023" ROW_ACTL_DT="3/8/2023" RTL_TRGT_DT="4/28/2023" RTL_ACTL_DT="4/28/2023" PE_SPENT_AMT="24999.87" CNSTR_SPENT_AMT="635216.54" CE_SPENT_AMT="33086.91" TOT_SPENT_AMT="693303.32" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="719366.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010908052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010909067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Walker" LIMITS_FROM_DSCR="TRINITY COUNTY LINE" LIMITS_TO_DSCR="0.4 MI N OF SH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1232058" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1294327.17" CE_SPENT_AMT="15239.05" TOT_SPENT_AMT="1309566.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1660996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010909068" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Walker" LIMITS_FROM_DSCR="0.4 MI N OF SH 30" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="354090" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/22/2022" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="12/2/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="9/14/2023" CNSTR_WKBG_DT="1/9/2024" CNSTR_PCT_TIME_USED="58.00" CNSTR_PCT_COMPLETE="104.40" DSGN_START_TRGT_DT="7/14/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/14/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/13/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32080.13" CNSTR_SPENT_AMT="225632.06" CE_SPENT_AMT="1976.96" TOT_SPENT_AMT="259689.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="290714.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010909069" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Walker" LIMITS_FROM_DSCR="0.9 MI S OF FM 405" LIMITS_TO_DSCR="2.3 MI N OF SH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3500000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010909070" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Walker" LIMITS_FROM_DSCR="TRINITY COUNTY LINE" LIMITS_TO_DSCR="0.4 MI N OF SH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="132692" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="143848.59" CE_SPENT_AMT="1991.61" TOT_SPENT_AMT="145840.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="160530.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010909071" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT SH 75" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2100000" DIST_LET_DATE="6/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010912009" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 190" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT UNIVERSITY AVENUE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="446500" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010912010" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 190" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT SH 75" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="447000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="2/7/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/27/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/19/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/28/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1377.62" TOT_SPENT_AMT="1377.62" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010912012" PT_PHASE="Planning, 10+ years" HWY_NBR="US 190" CNTY_NM="Walker" LIMITS_FROM_DSCR="SH 75 S" LIMITS_TO_DSCR="SH 30" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="69854" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="78237.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="010912013" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 30" CNTY_NM="Walker" LIMITS_FROM_DSCR="US 190" LIMITS_TO_DSCR="SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28681" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/22/2022" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="12/2/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="9/14/2023" CNSTR_WKBG_DT="1/9/2024" CNSTR_PCT_TIME_USED="58.00" CNSTR_PCT_COMPLETE="104.40" DSGN_START_TRGT_DT="7/14/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/14/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/13/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="27808.01" CE_SPENT_AMT="243.69" TOT_SPENT_AMT="28051.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="35107.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001045" PT_PHASE="Feasibility Studies" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="FM 2793" LIMITS_TO_DSCR="MONTGOMERY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="400000" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.671 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="401439.81" TOT_SPENT_AMT="401439.81" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001047" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT THE INTERSECTION OF LAKE ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15065" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Donation" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.010 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_PID="CC" FUND_CAT1_AMT="14770.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_PID="CC" FUND_CAT2_AMT="295.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT SOUTHWOOD DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="665233" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/8/2020" PSE_30_ACTL_DT="7/11/2020" PSE_60_TRGT_DT="12/22/2020" PSE_60_ACTL_DT="9/16/2020" PSE_100_TRGT_DT="4/16/2021" PSE_100_ACTL_DT="4/1/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.400 (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="7/22/2021" CNSTR_WKBG_DT="12/8/2021" CNSTR_PCT_TIME_USED="116.67" CNSTR_PCT_COMPLETE="96.12" DSGN_START_TRGT_DT="7/29/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="5/14/2021" ENVCLR_ACTL_DT="4/5/2021" UTIL_TRGT_DT="1/2/2020" UTIL_ACTL_DT="4/1/2021" ROW_TRGT_DT="1/2/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2021" RTL_ACTL_DT="4/5/2021" PE_SPENT_AMT="1316.62" CNSTR_SPENT_AMT="729863.59" CE_SPENT_AMT="119812.01" TOT_SPENT_AMT="850992.22" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="538731.00" FUND_CAT2_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT2_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001049" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT 2793" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="761277" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="4/3/2020" PSE_30_ACTL_DT="10/31/2020" PSE_60_TRGT_DT="6/16/2020" PSE_60_ACTL_DT="12/4/2020" PSE_100_TRGT_DT="10/9/2020" PSE_100_ACTL_DT="4/30/2021" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="12/16/2021" CNSTR_PCT_TIME_USED="117.65" CNSTR_PCT_COMPLETE="103.93" DSGN_START_TRGT_DT="1/8/2020" DSGN_START_ACTL_DT="9/14/2020" ENVCLR_TRGT_DT="10/23/2020" ENVCLR_ACTL_DT="5/14/2021" UTIL_TRGT_DT="1/2/2020" UTIL_ACTL_DT="4/30/2021" ROW_TRGT_DT="1/2/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/23/2020" RTL_ACTL_DT="5/14/2021" PE_SPENT_AMT="168455.08" CNSTR_SPENT_AMT="1009963.75" CE_SPENT_AMT="137602.41" TOT_SPENT_AMT="1316021.24" FUND_CAT1_DSCR="Category 11 - District Discretionary (2111)" FUND_CAT1_AMT="540000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001050" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT 22ND STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="465000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="2/7/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/27/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/30/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/25/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="520000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001051" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="AT LAKE ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="447000" DIST_LET_DATE="9/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="2/7/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/27/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/19/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/27/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/28/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (8DA)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001052" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="0.5 MILES NORTH OF FM 2296" LIMITS_TO_DSCR="0.5 MILES SOUTH OF FM 2296" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="671396" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="51212.78" TOT_SPENT_AMT="51212.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="698252.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001053" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="US 190" LIMITS_TO_DSCR="MONTGOMERY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="721030" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="778713.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011001056" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Walker" LIMITS_FROM_DSCR="0.25 MI E OF FM 1374" LIMITS_TO_DSCR="0.25 MI W OF FM 1374" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="800000" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="59084.18" TOT_SPENT_AMT="59084.18" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011003078" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="SOUTH OF FM 3083" LIMITS_TO_DSCR="LEAGUE LINE ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11687617" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/8/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/11/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/14/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/7/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/11/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2121556.74" TOT_SPENT_AMT="2121556.74" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2805)" FUND_CAT1_AMT="849948.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011003079" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="LEAGUE LINE ROAD" LIMITS_TO_DSCR="FM 830" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17910102" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/8/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/11/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/14/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.800 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/7/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/11/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2317185.76" TOT_SPENT_AMT="2317185.76" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2805)" FUND_CAT1_AMT="1555721.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011003080" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 75" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="FM 830" LIMITS_TO_DSCR="FM 2432" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20676481" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/8/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/11/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/14/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/7/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/11/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/2/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2323318.19" CNSTR_SPENT_AMT="1950.05" TOT_SPENT_AMT="2325268.24" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2805)" FUND_CAT1_AMT="1779767.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011003084" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 75" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="SL 336N" LIMITS_TO_DSCR="SH 105" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3091391" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/22/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.698 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/9/2017" ENVCLR_ACTL_DT="1/7/2020" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/31/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="149936.37" TOT_SPENT_AMT="149936.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3123782.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004202" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="S OF SHENANDOAH PARK DR" LIMITS_TO_DSCR="SH 242" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/19/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25562343" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="3/2/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/21/2022" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.123 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="10.10" CNSTR_PCT_COMPLETE="6.75" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="10/19/2022" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="10/19/2022" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1744326.30" CNSTR_SPENT_AMT="1823062.30" CE_SPENT_AMT="33814.85" TOT_SPENT_AMT="3601203.45" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="269405.00" FUND_CAT2_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT2_AMT="19068785.00" FUND_CAT3_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2407)" FUND_CAT3_AMT="7603686.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004203" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 75" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="SH 105" LIMITS_TO_DSCR="GLADSTELL ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1135842" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/22/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.223 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/9/2017" ENVCLR_ACTL_DT="1/7/2020" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/31/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4600.55" TOT_SPENT_AMT="4600.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1135842.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004204" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004205" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="AT SH 242" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/19/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17068408" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Direct Connectors" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="3/2/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/21/2022" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.019 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="10/2/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="10.10" CNSTR_PCT_COMPLETE="6.75" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="10/19/2022" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="10/19/2022" RTL_TRGT_DT="9/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="240423.37" CNSTR_SPENT_AMT="1126515.81" CE_SPENT_AMT="22505.82" TOT_SPENT_AMT="1389445.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="19150273.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004208" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="HARRIS COUNTY LINE" LIMITS_TO_DSCR="SL 336 (SOUTH)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/15/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1993103" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.820 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="2/26/2025" CNSTR_PCT_TIME_USED="5.30" CNSTR_PCT_COMPLETE="4.20" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2020" ENVCLR_ACTL_DT="10/2/2020" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="52751.06" CNSTR_SPENT_AMT="53962.89" CE_SPENT_AMT="16808.17" TOT_SPENT_AMT="123522.12" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004209" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="NORTH OF FM 1488" LIMITS_TO_DSCR="SL 336 (SOUTH)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1297847" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/5/2021" PSE_30_ACTL_DT="8/5/2021" PSE_60_TRGT_DT="12/21/2022" PSE_60_ACTL_DT="12/21/2022" PSE_100_TRGT_DT="6/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.216 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="MC2 CIVIL, LLC" CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="3.85" CNSTR_PCT_COMPLETE="19.12" DSGN_START_TRGT_DT="8/2/2021" DSGN_START_ACTL_DT="8/2/2021" ENVCLR_TRGT_DT="9/6/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/25/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/25/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="268550.05" CNSTR_SPENT_AMT="258041.74" CE_SPENT_AMT="30702.13" TOT_SPENT_AMT="557293.92" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="2647115.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004212" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="HARRIS COUNTY LINE" LIMITS_TO_DSCR="FM 1488" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2201364" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/10/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/12/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="155484.33" TOT_SPENT_AMT="155484.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2289419.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004213" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="FM 1488" LIMITS_TO_DSCR="SL 336(S)" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="807840" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/10/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/12/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="840154.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004219" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="SL 336 SOUTH" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/29/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="266518" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="5/10/2022" PSE_60_TRGT_DT="5/10/2022" PSE_60_ACTL_DT="5/10/2022" PSE_100_TRGT_DT="5/12/2022" PSE_100_ACTL_DT="5/12/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.820 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.14" DSGN_START_TRGT_DT="4/5/2022" DSGN_START_ACTL_DT="4/5/2022" ENVCLR_TRGT_DT="6/15/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="5/10/2022" UTIL_ACTL_DT="5/10/2022" ROW_TRGT_DT="5/10/2022" ROW_ACTL_DT="5/10/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="93244.85" CNSTR_SPENT_AMT="290053.32" CE_SPENT_AMT="12787.44" TOT_SPENT_AMT="396085.61" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004224" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="AT SPRING CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/9/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1242084" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="5/27/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39271.48" TOT_SPENT_AMT="39271.48" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1242084.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004225" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="AT RESEARCH FOREST DR. / TAMINA RD." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9304.61" TOT_SPENT_AMT="9304.61" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004226" PT_PHASE="Planning, 10+ years" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="NORTH OF HARDY TOLL ROAD" LIMITS_TO_DSCR="WOODLANDS PARKWAY" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Ramps" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8558.13" TOT_SPENT_AMT="8558.13" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004227" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Montgomery" LIMITS_FROM_DSCR="HARRIS COUNTY LINE" LIMITS_TO_DSCR="SL 336 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="760500" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011004228" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005126" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="CYPRESS STA. DRIVE" LIMITS_TO_DSCR="CYPRESS OAK DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/20/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6683534" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/10/2020" PSE_30_ACTL_DT="1/10/2020" PSE_60_TRGT_DT="3/12/2020" PSE_60_ACTL_DT="3/12/2020" PSE_100_TRGT_DT="6/3/2020" PSE_100_ACTL_DT="6/3/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.556 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="ARANDA BROTHERS CONSTRUCTION CO., INC." CNSTR_NTPD_DT="2/23/2022" CNSTR_WKBG_DT="3/25/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.78" DSGN_START_TRGT_DT="11/5/2019" DSGN_START_ACTL_DT="11/5/2019" ENVCLR_TRGT_DT="6/3/2020" ENVCLR_ACTL_DT="10/11/2021" UTIL_TRGT_DT="6/3/2020" UTIL_ACTL_DT="6/3/2020" ROW_TRGT_DT="6/3/2020" ROW_ACTL_DT="6/3/2020" RTL_TRGT_DT="4/2/2021" RTL_ACTL_DT="4/2/2021" PE_SPENT_AMT="1058007.43" CNSTR_SPENT_AMT="11889600.33" CE_SPENT_AMT="545672.53" TOT_SPENT_AMT="13493280.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="2300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005127" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT CYPRESSWOOD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/10/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="750384" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="(INACTIVE)MAIN LANE INDUSTRIES LTD." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="5/31/2022" CNSTR_PCT_TIME_USED="68.89" CNSTR_PCT_COMPLETE="109.66" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="398709.41" CNSTR_SPENT_AMT="849376.73" CE_SPENT_AMT="68785.06" TOT_SPENT_AMT="1316871.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="971266.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005130" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT FM 1960" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="474659" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/2/2019" PSE_30_ACTL_DT="10/2/2019" PSE_60_TRGT_DT="12/2/2019" PSE_60_ACTL_DT="12/2/2019" PSE_100_TRGT_DT="3/4/2020" PSE_100_ACTL_DT="3/4/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="3/5/2021" CNSTR_WKBG_DT="6/30/2023" CNSTR_PCT_TIME_USED="92.47" CNSTR_PCT_COMPLETE="104.11" DSGN_START_TRGT_DT="10/1/2019" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="10/3/2019" ENVCLR_ACTL_DT="5/10/2019" UTIL_TRGT_DT="1/3/2020" UTIL_ACTL_DT="1/3/2020" ROW_TRGT_DT="1/3/2020" ROW_ACTL_DT="1/3/2020" RTL_TRGT_DT="10/30/2020" RTL_ACTL_DT="10/16/2020" PE_SPENT_AMT="326136.88" CNSTR_SPENT_AMT="753503.79" CE_SPENT_AMT="239575.43" TOT_SPENT_AMT="1319216.10" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="706732.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005133" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="WEST RICHEY RD FROMKUYKENDAHL ROAD" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7029040" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="PE" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.580 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="6764546.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005134" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH OF KUYKENDAHL RD." LIMITS_TO_DSCR="MONTGOMERY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/15/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1170562" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.540 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="2/26/2025" CNSTR_PCT_TIME_USED="5.30" CNSTR_PCT_COMPLETE="4.20" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2020" ENVCLR_ACTL_DT="10/2/2020" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="32755.19" CNSTR_SPENT_AMT="53659.29" CE_SPENT_AMT="16713.63" TOT_SPENT_AMT="103128.11" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005136" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="SH 99 SB EXIT" LIMITS_TO_DSCR="SPRING CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1402000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/10/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/12/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1458080.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005137" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="KUYKENDAHL ROAD" LIMITS_TO_DSCR="FM 1960" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="812240" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.337 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TRP INFRASTRUCTURE SERVICES, LLC" CNSTR_NTPD_DT="3/20/2025" CNSTR_WKBG_DT="5/19/2025" CNSTR_PCT_TIME_USED="10.00" CNSTR_PCT_COMPLETE="11.74" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/17/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="83224.47" CNSTR_SPENT_AMT="70483.81" CE_SPENT_AMT="95.58" TOT_SPENT_AMT="153803.86" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="812240.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005138" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="FM 1960" LIMITS_TO_DSCR="MONTGOMERY C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1215572" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.119 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TRP INFRASTRUCTURE SERVICES, LLC" CNSTR_NTPD_DT="3/20/2025" CNSTR_WKBG_DT="5/19/2025" CNSTR_PCT_TIME_USED="10.00" CNSTR_PCT_COMPLETE="11.74" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/17/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="148983.85" CNSTR_SPENT_AMT="152391.88" CE_SPENT_AMT="204.67" TOT_SPENT_AMT="301580.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1215572.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005140" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="KUYKENDAHL" LIMITS_TO_DSCR="FM 1960" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="324032" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/10/2022" PSE_100_ACTL_DT="1/10/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.612 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="PROFESSIONAL TRAFFIC CONTROL LLC" CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="4/27/2023" CNSTR_PCT_TIME_USED="68.12" CNSTR_PCT_COMPLETE="90.42" DSGN_START_TRGT_DT="1/7/2022" DSGN_START_ACTL_DT="1/7/2022" ENVCLR_TRGT_DT="2/11/2022" ENVCLR_ACTL_DT="2/11/2022" UTIL_TRGT_DT="1/4/2022" UTIL_ACTL_DT="1/4/2022" ROW_TRGT_DT="1/4/2022" ROW_ACTL_DT="1/4/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="64936.97" CNSTR_SPENT_AMT="348643.82" CE_SPENT_AMT="30294.85" TOT_SPENT_AMT="443875.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="529929.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005141" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="MONTGOMERY COUNTY LINE" LIMITS_TO_DSCR="KUYKENDAHL ROAD/GREENS ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/29/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="311648" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="5/10/2022" PSE_60_TRGT_DT="5/10/2022" PSE_60_ACTL_DT="5/10/2022" PSE_100_TRGT_DT="5/12/2022" PSE_100_ACTL_DT="5/12/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.537 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.14" DSGN_START_TRGT_DT="4/5/2022" DSGN_START_ACTL_DT="4/5/2022" ENVCLR_TRGT_DT="6/15/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="5/10/2022" UTIL_ACTL_DT="5/10/2022" ROW_TRGT_DT="5/10/2022" ROW_ACTL_DT="5/10/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="478.85" CNSTR_SPENT_AMT="342200.90" CE_SPENT_AMT="15086.45" TOT_SPENT_AMT="357766.20" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005142" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005143" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011005144" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006132" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH OF WEST ROAD" LIMITS_TO_DSCR="SL 8" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="312589286" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="8/10/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/11/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/16/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.987 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/11/2021" ENVCLR_ACTL_DT="2/3/2021" UTIL_TRGT_DT="8/3/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2035" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1704674.72" CE_SPENT_AMT="754.47" TOT_SPENT_AMT="1705429.19" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006139" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH OF SHEPHERD DRIVE" LIMITS_TO_DSCR="SOUTH OF WEST ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="474017857" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/9/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/13/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/16/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.512 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/8/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/13/2022" ENVCLR_ACTL_DT="2/3/2021" UTIL_TRGT_DT="9/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/1/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/26/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1794234.77" CE_SPENT_AMT="651.61" TOT_SPENT_AMT="1794886.38" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006143" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT WEST ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="485208" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/2/2018" PSE_30_ACTL_DT="11/2/2018" PSE_60_TRGT_DT="1/7/2019" PSE_60_ACTL_DT="1/7/2019" PSE_100_TRGT_DT="4/3/2019" PSE_100_ACTL_DT="4/3/2019" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="12/19/2019" CNSTR_WKBG_DT="4/17/2020" CNSTR_PCT_TIME_USED="94.92" CNSTR_PCT_COMPLETE="111.62" DSGN_START_TRGT_DT="11/1/2018" DSGN_START_ACTL_DT="11/1/2018" ENVCLR_TRGT_DT="11/5/2018" ENVCLR_ACTL_DT="2/13/2019" UTIL_TRGT_DT="2/5/2019" UTIL_ACTL_DT="2/5/2019" ROW_TRGT_DT="2/5/2019" ROW_ACTL_DT="2/5/2019" RTL_TRGT_DT="4/3/2019" RTL_ACTL_DT="6/11/2019" PE_SPENT_AMT="50533.26" CNSTR_SPENT_AMT="749256.03" CE_SPENT_AMT="49156.96" TOT_SPENT_AMT="848946.25" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="804653.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006144" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT GREENS ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="632695" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/2/2019" PSE_30_ACTL_DT="10/2/2019" PSE_60_TRGT_DT="12/2/2019" PSE_60_ACTL_DT="12/2/2019" PSE_100_TRGT_DT="3/4/2020" PSE_100_ACTL_DT="3/4/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="8/16/2022" CNSTR_PCT_TIME_USED="94.07" CNSTR_PCT_COMPLETE="113.68" DSGN_START_TRGT_DT="10/1/2019" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="10/3/2019" ENVCLR_ACTL_DT="5/10/2019" UTIL_TRGT_DT="1/3/2020" UTIL_ACTL_DT="1/3/2020" ROW_TRGT_DT="1/3/2020" ROW_ACTL_DT="1/3/2020" RTL_TRGT_DT="3/4/2020" RTL_ACTL_DT="9/29/2020" PE_SPENT_AMT="48207.24" CNSTR_SPENT_AMT="1200457.26" CE_SPENT_AMT="94308.32" TOT_SPENT_AMT="1342972.82" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="804653.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006145" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT SL 8" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/1/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="483195" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/2/2019" PSE_30_ACTL_DT="10/2/2019" PSE_60_TRGT_DT="12/2/2019" PSE_60_ACTL_DT="12/2/2019" PSE_100_TRGT_DT="3/4/2020" PSE_100_ACTL_DT="3/4/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="8/16/2022" CNSTR_PCT_TIME_USED="94.07" CNSTR_PCT_COMPLETE="113.68" DSGN_START_TRGT_DT="10/1/2019" DSGN_START_ACTL_DT="10/1/2019" ENVCLR_TRGT_DT="10/3/2019" ENVCLR_ACTL_DT="5/10/2019" UTIL_TRGT_DT="1/3/2020" UTIL_ACTL_DT="1/3/2020" ROW_TRGT_DT="1/3/2020" ROW_ACTL_DT="1/3/2020" RTL_TRGT_DT="3/4/2020" RTL_ACTL_DT="9/29/2020" PE_SPENT_AMT="49606.60" CNSTR_SPENT_AMT="955923.68" CE_SPENT_AMT="75097.98" TOT_SPENT_AMT="1080628.26" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="804653.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006150" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR=" RITTENHOUSE ROAD" LIMITS_TO_DSCR="WEST LITTLE YORK ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/20/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1730" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2021" PSE_100_ACTL_DT="1/12/2024" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.344 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="5/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="96.67" CNSTR_PCT_COMPLETE="101.03" DSGN_START_TRGT_DT="8/7/2020" DSGN_START_ACTL_DT="8/7/2020" ENVCLR_TRGT_DT="2/5/2021" ENVCLR_ACTL_DT="7/27/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/6/2020" ROW_ACTL_DT="9/5/2023" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="512.14" CNSTR_SPENT_AMT="2029.81" CE_SPENT_AMT="65.72" TOT_SPENT_AMT="2607.67" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2110GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="987.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006151" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR=" WEST CROSSTIMBERS ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="874432" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/10/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/12/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="944387.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006152" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="N OF VETERANS MEMORIAL DRIVE" LIMITS_TO_DSCR="SL 8" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="670432" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.336 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TRP INFRASTRUCTURE SERVICES, LLC" CNSTR_NTPD_DT="3/20/2025" CNSTR_WKBG_DT="5/19/2025" CNSTR_PCT_TIME_USED="10.00" CNSTR_PCT_COMPLETE="11.74" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/17/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="70771.78" CNSTR_SPENT_AMT="88735.27" CE_SPENT_AMT="120.31" TOT_SPENT_AMT="159627.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="670432.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006153" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8" LIMITS_TO_DSCR="KUYKENDAHL ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/16/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="230759" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.225 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="TRP INFRASTRUCTURE SERVICES, LLC" CNSTR_NTPD_DT="3/20/2025" CNSTR_WKBG_DT="5/19/2025" CNSTR_PCT_TIME_USED="10.00" CNSTR_PCT_COMPLETE="11.74" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/17/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31898.92" CNSTR_SPENT_AMT="21636.27" CE_SPENT_AMT="29.34" TOT_SPENT_AMT="53564.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="230759.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006154" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.1 MILES NORTH OF W. TIDWELL RD." LIMITS_TO_DSCR="0.1 MILES SOUTH OF W. TIDWELL RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/20/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="507603" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/23/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="2/21/2023" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="4/2/2024" CNSTR_PCT_TIME_USED="64.44" CNSTR_PCT_COMPLETE="68.21" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="8/29/2022" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16171.11" CNSTR_SPENT_AMT="805967.95" CE_SPENT_AMT="62999.73" TOT_SPENT_AMT="885138.79" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="345457.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006155" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.1 MILES NORTH OF W. RITTENHOUSE RD." LIMITS_TO_DSCR="0.1 MILES SOUTH OF W. RITTENHOUSE RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/2/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="584108" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="9/23/2024" CNSTR_PCT_TIME_USED="57.72" CNSTR_PCT_COMPLETE="53.66" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="80816.90" CNSTR_SPENT_AMT="319881.17" CE_SPENT_AMT="19109.56" TOT_SPENT_AMT="419807.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="607994.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006156" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="SL 8 NORTH" LIMITS_TO_DSCR="KUYKENDAHL" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/6/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99503" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/10/2022" PSE_100_ACTL_DT="1/10/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.065 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="PROFESSIONAL TRAFFIC CONTROL LLC" CNSTR_NTPD_DT="2/27/2023" CNSTR_WKBG_DT="4/27/2023" CNSTR_PCT_TIME_USED="68.12" CNSTR_PCT_COMPLETE="90.42" DSGN_START_TRGT_DT="1/7/2022" DSGN_START_ACTL_DT="1/7/2022" ENVCLR_TRGT_DT="2/11/2022" ENVCLR_ACTL_DT="2/11/2022" UTIL_TRGT_DT="1/4/2022" UTIL_ACTL_DT="1/4/2022" ROW_TRGT_DT="1/4/2022" ROW_ACTL_DT="1/4/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="18827.22" CNSTR_SPENT_AMT="107040.18" CE_SPENT_AMT="9301.13" TOT_SPENT_AMT="135168.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="149971.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006157" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006158" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="KUYKENDAHL ROAD/GREENS ROAD" LIMITS_TO_DSCR="SS 261" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/29/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="213809" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="5/10/2022" PSE_60_TRGT_DT="5/10/2022" PSE_60_ACTL_DT="5/10/2022" PSE_100_TRGT_DT="5/12/2022" PSE_100_ACTL_DT="5/12/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.602 (mi)" TXDOT_CNTCT_NM="Phil Garlin, P.E." TXDOT_CNTCT_PH_NBR="(281)319-6400" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="4/24/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.14" DSGN_START_TRGT_DT="4/5/2022" DSGN_START_ACTL_DT="4/5/2022" ENVCLR_TRGT_DT="6/15/2022" ENVCLR_ACTL_DT="6/15/2022" UTIL_TRGT_DT="5/10/2022" UTIL_ACTL_DT="5/10/2022" ROW_TRGT_DT="5/10/2022" ROW_ACTL_DT="5/10/2022" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="349.96" CNSTR_SPENT_AMT="229167.48" CE_SPENT_AMT="10103.29" TOT_SPENT_AMT="239620.73" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="50000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006160" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006161" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="IH 45 SB" LIMITS_TO_DSCR="SL 8 EB" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="203204" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="227588.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006162" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 45" CNTY_NM="Harris" LIMITS_FROM_DSCR="WEST CANINO ROAD" LIMITS_TO_DSCR="SOUTH OF KUYKENDAHL ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/15/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2412266" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/18/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.610 (mi)" TXDOT_CNTCT_NM="Abraham Guzman, P.E. " TXDOT_CNTCT_PH_NBR="(936)538-3300" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="8/22/2024" CNSTR_WKBG_DT="2/26/2025" CNSTR_PCT_TIME_USED="5.30" CNSTR_PCT_COMPLETE="4.20" DSGN_START_TRGT_DT="8/17/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2020" ENVCLR_ACTL_DT="10/2/2020" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="71726.06" CNSTR_SPENT_AMT="111568.85" CE_SPENT_AMT="40527.54" TOT_SPENT_AMT="223822.45" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011006163" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR="NORTHEW STREET" LIMITS_TO_DSCR="WEST LITTLE YORK ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2028" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="47706" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.254 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="11.85" CNSTR_PCT_COMPLETE="8.86" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="3069.28" CE_SPENT_AMT="56.95" TOT_SPENT_AMT="3126.23" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="47707.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011007022" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR="WEST CROSSTIMBERS ST" LIMITS_TO_DSCR="IH 610" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="276136" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/11/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/10/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/5/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/5/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/12/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="298227.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011007023" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 261" CNTY_NM="Harris" LIMITS_FROM_DSCR="0.1 MILES NORTH OF W. 34TH ST." LIMITS_TO_DSCR="0.1 MILES SOUTH OF W. 34TH ST." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/2/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="413976" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="9/23/2024" CNSTR_PCT_TIME_USED="57.72" CNSTR_PCT_COMPLETE="53.66" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/26/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/31/2021" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="240625.52" CE_SPENT_AMT="14374.94" TOT_SPENT_AMT="255000.46" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="356662.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011101096" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 521" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT FUQUA STREET" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="226988" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/2/2018" PSE_30_ACTL_DT="10/2/2018" PSE_60_TRGT_DT="11/29/2018" PSE_60_ACTL_DT="11/29/2018" PSE_100_TRGT_DT="3/1/2019" PSE_100_ACTL_DT="3/1/2019" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="STATEWIDE TRAFFIC SIGNAL COMPANY" CNSTR_NTPD_DT="3/12/2020" CNSTR_WKBG_DT="11/2/2020" CNSTR_PCT_TIME_USED="77.42" CNSTR_PCT_COMPLETE="117.01" DSGN_START_TRGT_DT="10/1/2018" DSGN_START_ACTL_DT="10/1/2018" ENVCLR_TRGT_DT="10/3/2018" ENVCLR_ACTL_DT="2/13/2019" UTIL_TRGT_DT="1/2/2019" UTIL_ACTL_DT="1/2/2019" ROW_TRGT_DT="1/2/2019" ROW_ACTL_DT="1/2/2019" RTL_TRGT_DT="3/1/2019" RTL_ACTL_DT="5/20/2019" PE_SPENT_AMT="34063.15" CNSTR_SPENT_AMT="393029.51" CE_SPENT_AMT="24352.54" TOT_SPENT_AMT="451445.20" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="322114.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011101097" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 521" CNTY_NM="Harris" LIMITS_FROM_DSCR="FORT BEND C/L" LIMITS_TO_DSCR="ANDERSON RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/12/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="329769" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.648 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.64" CNSTR_PCT_COMPLETE="5.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20241.58" CNSTR_SPENT_AMT="14186.00" TOT_SPENT_AMT="34427.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="329769.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011101098" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 521" CNTY_NM="Harris" LIMITS_FROM_DSCR="HOLLY HALL ST" LIMITS_TO_DSCR="US 90A (OLD SPANISH TRAIL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1000000" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.962 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35481.16" TOT_SPENT_AMT="35481.16" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011101100" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 521" CNTY_NM="Harris" LIMITS_FROM_DSCR="BLUEBONNET DRIVE" LIMITS_TO_DSCR="IH 610" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17809436" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="8/19/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/20/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/25/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/18/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/20/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/12/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/12/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/30/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2536318.60" TOT_SPENT_AMT="2536318.60" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_AMT="9589483.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011101103" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011101105" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 521" CNTY_NM="Harris" LIMITS_FROM_DSCR="SOUTH OF BROADSTREET ROAD" LIMITS_TO_DSCR="IH 610" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6149010" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="94508.02" TOT_SPENT_AMT="94508.02" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6640931.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011103059" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 521" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 2234" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99699465" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="3/9/2017" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="3/13/2017" PSE_100_TRGT_DT="2/24/2023" PSE_100_ACTL_DT="2/24/2023" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.312 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="GRANITE CONSTRUCTION COMPANY" CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="11/6/2023" CNSTR_PCT_TIME_USED="58.68" CNSTR_PCT_COMPLETE="42.97" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="3/8/2017" ENVCLR_TRGT_DT="1/5/2023" ENVCLR_ACTL_DT="1/5/2023" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="3/1/2017" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="3/1/2017" RTL_TRGT_DT="4/3/2023" RTL_ACTL_DT="4/3/2023" PE_SPENT_AMT="1400693.68" CNSTR_SPENT_AMT="44268345.85" CE_SPENT_AMT="1912247.45" TOT_SPENT_AMT="47581286.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6346986.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011103064" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 521" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="CR 56" LIMITS_TO_DSCR="SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="93057882" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/28/2019" PSE_30_ACTL_DT="12/27/2022" PSE_60_TRGT_DT="4/1/2019" PSE_60_ACTL_DT="12/27/2022" PSE_100_TRGT_DT="4/4/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.800 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/27/2019" DSGN_START_ACTL_DT="3/27/2019" ENVCLR_TRGT_DT="4/1/2019" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/21/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/21/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/30/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="376037.45" CNSTR_SPENT_AMT="3549.84" TOT_SPENT_AMT="379587.29" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2705)" FUND_CAT1_AMT="2442822.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011103065" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 521" CNTY_NM="Fort Bend" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="HARRIS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/12/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="834658" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.567 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.64" CNSTR_PCT_COMPLETE="5.37" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="62067.94" CNSTR_SPENT_AMT="71929.63" TOT_SPENT_AMT="133997.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="846829.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011103068" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011104035" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 521" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="BS 288B" LIMITS_TO_DSCR="FM 1462" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1947783" DIST_LET_DATE="4/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.879 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="5/14/2020" CNSTR_WKBG_DT="9/8/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.16" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="53160.89" CNSTR_SPENT_AMT="1975118.98" CE_SPENT_AMT="46235.10" TOT_SPENT_AMT="2074514.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011104037" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 521" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="FM 1462" LIMITS_TO_DSCR="CR 56" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="57900000" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/5/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/6/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TBD" PROJ_LENGTH="6.500 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/6/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/2/2032" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/2/2032" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2032" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1322980.19" TOT_SPENT_AMT="1322980.19" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011105019" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 521" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="BS 288-B" LIMITS_TO_DSCR="CR 44" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4969827" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/10/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/9/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/4/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/11/2021" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="5367413.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011107049" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="SH 35" LIMITS_TO_DSCR="CEMETERY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="458582" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2021" PSE_100_ACTL_DT="6/21/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.948 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/17/2022" CNSTR_PCT_TIME_USED="97.28" CNSTR_PCT_COMPLETE="109.40" DSGN_START_TRGT_DT="1/5/2021" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="2/22/2022" ENVCLR_ACTL_DT="2/22/2022" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="1/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="1/4/2021" RTL_TRGT_DT="6/15/2022" RTL_ACTL_DT="6/15/2022" PE_SPENT_AMT="50755.15" CNSTR_SPENT_AMT="521888.04" CE_SPENT_AMT="18338.88" TOT_SPENT_AMT="590982.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="630000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011107052" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="SH 35" LIMITS_TO_DSCR="ORANGE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="678396" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2609TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="807292.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2609TP)" FUND_CAT2_AMT="52560.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108100" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 36" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="0.5 MI S OF THE BRAZOS RIVER" LIMITS_TO_DSCR="FM 1495 (SEG. 15)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8923165" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/13/2018" PSE_100_ACTL_DT="3/5/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.246 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="COPASA INC" CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="11/15/2021" CNSTR_PCT_TIME_USED="70.62" CNSTR_PCT_COMPLETE="97.69" DSGN_START_TRGT_DT="10/3/2016" DSGN_START_ACTL_DT="4/8/2021" ENVCLR_TRGT_DT="7/6/2017" ENVCLR_ACTL_DT="7/5/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/4/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="364630.17" CNSTR_SPENT_AMT="12161072.48" CE_SPENT_AMT="564447.71" TOT_SPENT_AMT="13090150.36" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108124" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 288" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="2ND STREET" LIMITS_TO_DSCR="SH 36" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2068826" DIST_LET_DATE="2/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="5/6/2021" PSE_30_ACTL_DT="5/6/2021" PSE_60_TRGT_DT="5/10/2021" PSE_60_ACTL_DT="5/10/2021" PSE_100_TRGT_DT="5/12/2021" PSE_100_ACTL_DT="5/12/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.410 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="(INACTIVE)MAIN LANE INDUSTRIES LTD." CNSTR_NTPD_DT="3/15/2023" CNSTR_WKBG_DT="6/5/2023" CNSTR_PCT_TIME_USED="94.59" CNSTR_PCT_COMPLETE="100.03" DSGN_START_TRGT_DT="5/5/2021" DSGN_START_ACTL_DT="5/5/2021" ENVCLR_TRGT_DT="9/14/2022" ENVCLR_ACTL_DT="11/30/2022" UTIL_TRGT_DT="4/29/2021" UTIL_ACTL_DT="4/29/2021" ROW_TRGT_DT="4/29/2021" ROW_ACTL_DT="4/29/2021" RTL_TRGT_DT="2/1/2023" RTL_ACTL_DT="2/1/2023" PE_SPENT_AMT="85136.97" CNSTR_SPENT_AMT="4436110.25" CE_SPENT_AMT="169808.99" TOT_SPENT_AMT="4691056.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1572000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108125" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 288" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="SH 36" LIMITS_TO_DSCR="DOW DRAINAGE CANAL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/10/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10708612" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/10/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.940 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="4/9/2025" CNSTR_PCT_TIME_USED="37.78" CNSTR_PCT_COMPLETE="17.23" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/9/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/4/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/11/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="266904.52" CNSTR_SPENT_AMT="1450713.85" CE_SPENT_AMT="10904.91" TOT_SPENT_AMT="1728523.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="13256299.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108126" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="FM 2004" LIMITS_TO_DSCR="JOHNSON COOK ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/2/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="894065" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/30/2021" PSE_100_ACTL_DT="8/30/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.900 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="4/12/2023" CNSTR_WKBG_DT="7/25/2023" CNSTR_PCT_TIME_USED="85.37" CNSTR_PCT_COMPLETE="96.87" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="8/26/2021" ENVCLR_TRGT_DT="10/5/2022" ENVCLR_ACTL_DT="10/5/2022" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="8/23/2021" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="8/23/2021" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="62526.69" CNSTR_SPENT_AMT="871330.06" CE_SPENT_AMT="6641.01" TOT_SPENT_AMT="940497.76" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="397796.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108127" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="AT KYLE ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="291221" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="2/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="TRAF-TEX, INC." CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.76" DSGN_START_TRGT_DT="2/6/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/6/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39273.02" CNSTR_SPENT_AMT="2780.75" TOT_SPENT_AMT="42053.77" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="284194.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108128" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 288" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="2ND STREET" LIMITS_TO_DSCR="SOUTH OF 4TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="266972" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77387.88" TOT_SPENT_AMT="77387.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="299009.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108129" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="AT FLAG LAKE CANAL" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="592730" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BWR" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="28679.13" TOT_SPENT_AMT="28679.13" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108130" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 288" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="AT FLAG LAKE DRAINAGE CANAL - SOUTHBOUND" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="351493" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.028 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="222441.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011108131" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 288" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="AT FLAG LAKE DRAINAGE CANAL - NORTHBOUND" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="333818" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.021 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="208365.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011109042" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="FM 523" LIMITS_TO_DSCR="FM 521" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10948342" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/28/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.795 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="6/19/2023" CNSTR_PCT_TIME_USED="94.83" CNSTR_PCT_COMPLETE="93.99" DSGN_START_TRGT_DT="9/27/2022" DSGN_START_ACTL_DT="9/27/2022" ENVCLR_TRGT_DT="12/2/2019" ENVCLR_ACTL_DT="12/2/2019" UTIL_TRGT_DT="10/1/2021" UTIL_ACTL_DT="10/1/2021" ROW_TRGT_DT="10/1/2021" ROW_ACTL_DT="10/1/2021" RTL_TRGT_DT="10/21/2022" RTL_ACTL_DT="10/21/2022" PE_SPENT_AMT="802909.08" CNSTR_SPENT_AMT="10266573.82" CE_SPENT_AMT="251190.54" TOT_SPENT_AMT="11320673.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="11444786.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011109044" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="SH 35" LIMITS_TO_DSCR="FM 523" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1993120" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2021" PSE_100_ACTL_DT="6/21/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.661 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/17/2022" CNSTR_PCT_TIME_USED="97.28" CNSTR_PCT_COMPLETE="109.40" DSGN_START_TRGT_DT="1/5/2021" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="2/22/2022" ENVCLR_ACTL_DT="2/22/2022" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="1/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="1/4/2021" RTL_TRGT_DT="6/15/2022" RTL_ACTL_DT="6/15/2022" PE_SPENT_AMT="101488.68" CNSTR_SPENT_AMT="2306295.21" CE_SPENT_AMT="80946.42" TOT_SPENT_AMT="2488730.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1523000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011109045" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="AT CR 45" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/14/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="166957" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/29/2022" PSE_100_ACTL_DT="3/29/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="ALLSTATE SIGNAL &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="8/8/2024" CNSTR_PCT_TIME_USED="81.67" CNSTR_PCT_COMPLETE="87.41" DSGN_START_TRGT_DT="8/26/2021" DSGN_START_ACTL_DT="8/26/2021" ENVCLR_TRGT_DT="3/1/2022" ENVCLR_ACTL_DT="3/1/2022" UTIL_TRGT_DT="8/23/2021" UTIL_ACTL_DT="8/23/2021" ROW_TRGT_DT="8/23/2021" ROW_ACTL_DT="8/23/2021" RTL_TRGT_DT="3/30/2022" RTL_ACTL_DT="3/30/2022" PE_SPENT_AMT="960.09" CNSTR_SPENT_AMT="167143.50" CE_SPENT_AMT="2894.04" TOT_SPENT_AMT="170997.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="182306.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011109046" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR=" CANNAN DRIVE" LIMITS_TO_DSCR="LORRAINE STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="67649" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="5/19/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="5/19/2022" PSE_100_TRGT_DT="5/25/2022" PSE_100_ACTL_DT="2/8/2023" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.458 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/30/2024" CNSTR_PCT_TIME_USED="95.41" CNSTR_PCT_COMPLETE="81.89" DSGN_START_TRGT_DT="5/24/2022" DSGN_START_ACTL_DT="5/24/2022" ENVCLR_TRGT_DT="5/24/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="5/19/2022" UTIL_ACTL_DT="5/19/2022" ROW_TRGT_DT="5/19/2022" ROW_ACTL_DT="5/19/2022" RTL_TRGT_DT="5/26/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="630.76" CNSTR_SPENT_AMT="59979.85" CE_SPENT_AMT="6276.02" TOT_SPENT_AMT="66886.63" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="50000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011109048" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 288B" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="CEDAR STREET" LIMITS_TO_DSCR="SH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3090475" DIST_LET_DATE="6/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2609TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="3677664.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2609TP)" FUND_CAT2_PID="TP" FUND_CAT2_AMT="239440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011113003" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 274" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="BS 288B NORTH" LIMITS_TO_DSCR="BS 288B SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1482100" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/21/2021" PSE_100_ACTL_DT="6/21/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.284 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="DURWOOD GREENE CONSTRUCTION CO." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/17/2022" CNSTR_PCT_TIME_USED="97.28" CNSTR_PCT_COMPLETE="109.40" DSGN_START_TRGT_DT="1/5/2021" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="2/22/2022" ENVCLR_ACTL_DT="2/22/2022" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="1/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="1/4/2021" RTL_TRGT_DT="6/15/2022" RTL_ACTL_DT="6/15/2022" PE_SPENT_AMT="5587.71" CNSTR_SPENT_AMT="1732485.95" CE_SPENT_AMT="60878.35" TOT_SPENT_AMT="1798952.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1275000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011113004" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 274" CNTY_NM="Brazoria" LIMITS_FROM_DSCR="BS 288B SOUTH" LIMITS_TO_DSCR="BS 288B NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="145306" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="5/19/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="5/19/2022" PSE_100_TRGT_DT="5/25/2022" PSE_100_ACTL_DT="2/8/2023" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.284 (mi)" TXDOT_CNTCT_NM="Maria Aponte, P.E." TXDOT_CNTCT_PH_NBR="(979)864-8500" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="7/26/2023" CNSTR_WKBG_DT="1/30/2024" CNSTR_PCT_TIME_USED="95.41" CNSTR_PCT_COMPLETE="81.89" DSGN_START_TRGT_DT="5/24/2022" DSGN_START_ACTL_DT="5/24/2022" ENVCLR_TRGT_DT="5/24/2022" ENVCLR_ACTL_DT="8/10/2022" UTIL_TRGT_DT="5/19/2022" UTIL_ACTL_DT="5/19/2022" ROW_TRGT_DT="5/19/2022" ROW_ACTL_DT="5/19/2022" RTL_TRGT_DT="5/26/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="177.00" CNSTR_SPENT_AMT="129143.18" CE_SPENT_AMT="13512.79" TOT_SPENT_AMT="142832.97" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2310GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011201019" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Kimble" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="GILLESPIE CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="584304" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/23/2019" PSE_30_ACTL_DT="10/7/2019" PSE_60_TRGT_DT="11/12/2019" PSE_60_ACTL_DT="11/15/2019" PSE_100_TRGT_DT="3/23/2020" PSE_100_ACTL_DT="3/23/2020" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="14.499 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/27/2020" CNSTR_WKBG_DT="12/1/2020" CNSTR_PCT_TIME_USED="100.72" CNSTR_PCT_COMPLETE="100.53" DSGN_START_TRGT_DT="8/1/2019" DSGN_START_ACTL_DT="8/1/2019" ENVCLR_TRGT_DT="4/3/2020" ENVCLR_ACTL_DT="4/9/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/3/2020" RTL_ACTL_DT="4/9/2020" PE_SPENT_AMT="237638.70" CNSTR_SPENT_AMT="716662.97" CE_SPENT_AMT="31815.33" TOT_SPENT_AMT="986117.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="510440.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011201020" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Kimble" LIMITS_FROM_DSCR="IH 10" LIMITS_TO_DSCR="GILLESPIE CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34708162" DIST_LET_DATE="4/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="14.499 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="38873141.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011201021" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Kimble" LIMITS_FROM_DSCR="IH-10" LIMITS_TO_DSCR="GILLESPIE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1079000" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1122160.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011202035" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="WEST OF CORNEHL" LIMITS_TO_DSCR="EAST OF REAH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1603332" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/6/2023" PSE_100_ACTL_DT="3/3/2023" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.300 (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="8/7/2023" CNSTR_PCT_TIME_USED="62.50" CNSTR_PCT_COMPLETE="97.09" DSGN_START_TRGT_DT="8/1/2022" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="9/30/2022" ENVCLR_ACTL_DT="9/12/2022" UTIL_TRGT_DT="3/6/2023" UTIL_ACTL_DT="3/3/2023" ROW_TRGT_DT="3/6/2023" ROW_ACTL_DT="3/3/2023" RTL_TRGT_DT="3/6/2023" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="251.73" CNSTR_SPENT_AMT="1454458.54" CE_SPENT_AMT="7875.23" TOT_SPENT_AMT="1462585.50" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1458868.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011202036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="KIMBLE C/L" LIMITS_TO_DSCR="W OF FLAG CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1938373" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="2/7/2024" CNSTR_PCT_TIME_USED="63.29" CNSTR_PCT_COMPLETE="110.53" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="13599.83" CNSTR_SPENT_AMT="1868501.61" CE_SPENT_AMT="15449.23" TOT_SPENT_AMT="1897550.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2457940.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011203036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="E. OF REEH RD" LIMITS_TO_DSCR="US 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3070930" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/26/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="ALLEN KELLER COMPANY" CNSTR_NTPD_DT="10/12/2023" CNSTR_WKBG_DT="1/8/2024" CNSTR_PCT_TIME_USED="92.98" CNSTR_PCT_COMPLETE="96.87" DSGN_START_TRGT_DT="12/28/2022" DSGN_START_ACTL_DT="12/28/2022" ENVCLR_TRGT_DT="5/1/2023" ENVCLR_ACTL_DT="4/7/2023" UTIL_TRGT_DT="5/26/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/26/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/26/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11132.14" CNSTR_SPENT_AMT="3033451.36" CE_SPENT_AMT="54319.84" TOT_SPENT_AMT="3098903.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3598410.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011301043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="N WASHINGTON ST" LIMITS_TO_DSCR="CRISTOL DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1506296" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/23/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/10/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="6/6/2024" CNSTR_PCT_TIME_USED="50.76" CNSTR_PCT_COMPLETE="104.72" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="12/27/2022" ENVCLR_TRGT_DT="7/10/2023" ENVCLR_ACTL_DT="2/2/2023" UTIL_TRGT_DT="7/10/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/10/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/10/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1623294.18" CE_SPENT_AMT="96791.99" TOT_SPENT_AMT="1720086.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1570466.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011302062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="EAST OF OLD SAN ANTONIO RD" LIMITS_TO_DSCR="RM 1376" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7275163" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="11/24/2020" PSE_30_ACTL_DT="3/12/2021" PSE_60_TRGT_DT="5/7/2021" PSE_60_ACTL_DT="11/3/2021" PSE_100_TRGT_DT="10/1/2021" PSE_100_ACTL_DT="1/14/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.505 (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="MPB, INC." CNSTR_NTPD_DT="5/12/2022" CNSTR_WKBG_DT="8/15/2022" CNSTR_PCT_TIME_USED="81.27" CNSTR_PCT_COMPLETE="98.84" DSGN_START_TRGT_DT="7/20/2020" DSGN_START_ACTL_DT="1/28/2021" ENVCLR_TRGT_DT="6/24/2021" ENVCLR_ACTL_DT="6/17/2021" UTIL_TRGT_DT="12/7/2021" UTIL_ACTL_DT="12/6/2021" ROW_TRGT_DT="7/20/2020" ROW_ACTL_DT="12/6/2021" RTL_TRGT_DT="12/7/2021" RTL_ACTL_DT="12/6/2021" PE_SPENT_AMT="1045973.73" CNSTR_SPENT_AMT="8683574.22" CE_SPENT_AMT="70117.26" TOT_SPENT_AMT="9799665.21" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="12500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011302063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="JENSCHKE LANE" LIMITS_TO_DSCR="CEMETERY RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12041546" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="10/13/2021" PSE_30_ACTL_DT="10/13/2021" PSE_60_TRGT_DT="4/12/2022" PSE_60_ACTL_DT="4/12/2022" PSE_100_TRGT_DT="12/29/2022" PSE_100_ACTL_DT="12/8/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.900 (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="7/19/2023" CNSTR_WKBG_DT="10/30/2023" CNSTR_PCT_TIME_USED="91.76" CNSTR_PCT_COMPLETE="80.15" DSGN_START_TRGT_DT="5/25/2021" DSGN_START_ACTL_DT="5/25/2021" ENVCLR_TRGT_DT="6/7/2022" ENVCLR_ACTL_DT="10/10/2022" UTIL_TRGT_DT="1/26/2023" UTIL_ACTL_DT="2/1/2023" ROW_TRGT_DT="1/26/2023" ROW_ACTL_DT="2/1/2023" RTL_TRGT_DT="1/26/2023" RTL_ACTL_DT="2/1/2023" PE_SPENT_AMT="1391248.01" CNSTR_SPENT_AMT="11575214.33" CE_SPENT_AMT="258449.77" TOT_SPENT_AMT="13224912.11" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="11440000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="761546.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011302068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="RM 1376" LIMITS_TO_DSCR="1.913 MILES EAST OF RM 1376" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4977417" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/24/2020" PSE_30_ACTL_DT="3/12/2021" PSE_60_TRGT_DT="5/7/2021" PSE_60_ACTL_DT="11/3/2021" PSE_100_TRGT_DT="10/1/2021" PSE_100_ACTL_DT="1/14/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.913 (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="MPB, INC." CNSTR_NTPD_DT="5/12/2022" CNSTR_WKBG_DT="8/15/2022" CNSTR_PCT_TIME_USED="81.27" CNSTR_PCT_COMPLETE="98.84" DSGN_START_TRGT_DT="7/20/2020" DSGN_START_ACTL_DT="1/28/2021" ENVCLR_TRGT_DT="6/24/2021" ENVCLR_ACTL_DT="6/17/2021" UTIL_TRGT_DT="12/7/2021" UTIL_ACTL_DT="12/6/2021" ROW_TRGT_DT="7/20/2020" ROW_ACTL_DT="12/6/2021" RTL_TRGT_DT="12/7/2021" RTL_ACTL_DT="12/6/2021" PE_SPENT_AMT="310674.26" CNSTR_SPENT_AMT="6323455.40" CE_SPENT_AMT="87120.25" TOT_SPENT_AMT="6721249.91" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="169201.00" FUND_CAT2_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT2_PID="HES" FUND_CAT2_AMT="3611953.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011302070" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Gillespie" LIMITS_FROM_DSCR="0.73 MI E. OF GOEHMANN LN" LIMITS_TO_DSCR="0.40 MI W. OF ELGIN BEHRENDS RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2850688" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="3192771.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011305050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 281" CNTY_NM="Blanco" LIMITS_FROM_DSCR="SOUTH OF JOHNSON CITY" LIMITS_TO_DSCR="SOUTH OF US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2171859" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/21/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Joe Muck, P.E." TXDOT_CNTCT_PH_NBR="(512)756-2316" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="6/5/2024" CNSTR_PCT_TIME_USED="77.03" CNSTR_PCT_COMPLETE="93.72" DSGN_START_TRGT_DT="3/22/2023" DSGN_START_ACTL_DT="3/22/2023" ENVCLR_TRGT_DT="7/3/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/21/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/21/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/21/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="113.95" CNSTR_SPENT_AMT="2206888.28" CE_SPENT_AMT="63166.52" TOT_SPENT_AMT="2270168.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2474390.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011305051" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 281" CNTY_NM="Blanco" LIMITS_FROM_DSCR="STANTON RD" LIMITS_TO_DSCR="US 290E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="951570" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="6234.65" TOT_SPENT_AMT="6234.65" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011305052" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011307070" PT_PHASE="Planning, 10+ years" HWY_NBR="US 290" CNTY_NM="Hays" LIMITS_FROM_DSCR="RM 12" LIMITS_TO_DSCR="TRAVIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="486000000" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.135 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3504564.54" TOT_SPENT_AMT="3504564.54" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011307071" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Hays" LIMITS_FROM_DSCR="BLANCO/HAYS COUNTY LINE" LIMITS_TO_DSCR="0.177 MI EAST OF RM 165" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/20/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="714500" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="6/14/2022" PSE_30_ACTL_DT="6/14/2022" PSE_60_TRGT_DT="6/29/2022" PSE_60_ACTL_DT="7/11/2022" PSE_100_TRGT_DT="7/27/2022" PSE_100_ACTL_DT="10/3/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.498 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="8/14/2023" CNSTR_PCT_TIME_USED="32.26" CNSTR_PCT_COMPLETE="97.80" DSGN_START_TRGT_DT="6/6/2022" DSGN_START_ACTL_DT="6/6/2022" ENVCLR_TRGT_DT="5/26/2021" ENVCLR_ACTL_DT="5/26/2021" UTIL_TRGT_DT="7/27/2022" UTIL_ACTL_DT="8/3/2022" ROW_TRGT_DT="7/27/2022" ROW_ACTL_DT="8/3/2022" RTL_TRGT_DT="7/27/2022" RTL_ACTL_DT="8/3/2022" PE_SPENT_AMT="6596.12" CNSTR_SPENT_AMT="708724.74" CE_SPENT_AMT="33582.93" TOT_SPENT_AMT="748903.79" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="817795.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011307072" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Hays" LIMITS_FROM_DSCR="AT TRAUTWEIN ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1960789" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="7/25/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/19/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/6/2025" PSE_100_ACTL_DT="2/3/2023" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.189 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="E-Z BEL CONSTRUCTION, LLC" CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="2/12/2024" CNSTR_PCT_TIME_USED="86.52" CNSTR_PCT_COMPLETE="103.01" DSGN_START_TRGT_DT="6/2/2025" DSGN_START_ACTL_DT="11/5/2020" ENVCLR_TRGT_DT="10/28/2021" ENVCLR_ACTL_DT="10/28/2021" UTIL_TRGT_DT="11/6/2025" UTIL_ACTL_DT="3/3/2023" ROW_TRGT_DT="11/6/2025" ROW_ACTL_DT="3/3/2023" RTL_TRGT_DT="11/6/2025" RTL_ACTL_DT="3/3/2023" PE_SPENT_AMT="27120.47" CNSTR_SPENT_AMT="2195536.22" CE_SPENT_AMT="127220.68" TOT_SPENT_AMT="2349877.37" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="310608.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011307075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Hays" LIMITS_FROM_DSCR="AT MARTIN ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/8/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1353925" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="5/28/2020" PSE_30_ACTL_DT="5/28/2020" PSE_60_TRGT_DT="8/4/2020" PSE_60_ACTL_DT="8/4/2020" PSE_100_TRGT_DT="10/1/2020" PSE_100_ACTL_DT="10/1/2020" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.171 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="8/25/2021" CNSTR_WKBG_DT="11/30/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="103.03" DSGN_START_TRGT_DT="4/1/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="10/1/2020" ENVCLR_ACTL_DT="5/13/2021" UTIL_TRGT_DT="10/1/2020" UTIL_ACTL_DT="10/5/2020" ROW_TRGT_DT="10/1/2020" ROW_ACTL_DT="10/5/2020" RTL_TRGT_DT="10/1/2020" RTL_ACTL_DT="10/5/2020" PE_SPENT_AMT="36403.72" CNSTR_SPENT_AMT="1519002.08" CE_SPENT_AMT="79704.43" TOT_SPENT_AMT="1635110.23" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="1230000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011307079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Hays" LIMITS_FROM_DSCR="0.1 MI WEST OF TIGER LANE" LIMITS_TO_DSCR="0.1 MI EAST OF TIGER LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="225000" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="225000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011307080" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Hays" LIMITS_FROM_DSCR="ROGER HANKS PKWY" LIMITS_TO_DSCR="EAST OF ROB SHELTON DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18500000" DIST_LET_DATE="8/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="1/4/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/4/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/4/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/4/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/4/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/4/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/4/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/4/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="365721.69" TOT_SPENT_AMT="365721.69" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="10057600.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_PID="SW2" FUND_CAT2_AMT="10662400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011308060" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="WEST OF RM 1826" LIMITS_TO_DSCR="SL 1" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="542005569" DIST_LET_DATE="8/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="COLORADO RIVER CONSTRUCTORS, OHP" CNSTR_NTPD_DT="8/10/2020" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="77.20" CNSTR_PCT_COMPLETE="82.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="40346496.89" CNSTR_SPENT_AMT="904159.79" CE_SPENT_AMT="6002177.34" TOT_SPENT_AMT="47252834.02" FUND_CAT1_DSCR="Category 4 - Congestion Connectivity (1904U)" FUND_CAT1_AMT="74399664.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (2012)" FUND_CAT2_AMT="205100000.00" FUND_CAT3_DSCR="Category 12 - Strategic Priority (12CL)" FUND_CAT3_AMT="60000000.00" FUND_CAT4_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT4_AMT="15823770.00" FUND_CAT5_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT5_AMT="78137.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011308087" PT_PHASE="Planning, 10+ years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="HAYS COUNTY LINE" LIMITS_TO_DSCR="RM 1826" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="381857143" DIST_LET_DATE="9/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.398 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3252754.51" CE_SPENT_AMT="11184.92" TOT_SPENT_AMT="3263939.43" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011308091" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT LEDGESTONE TERRACE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="478253" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="AARON CONCRETE CONTRACTORS, LLC" CNSTR_NTPD_DT="10/16/2024" CNSTR_WKBG_DT="5/15/2025" CNSTR_PCT_TIME_USED="30.43" CNSTR_PCT_COMPLETE="20.78" DSGN_START_TRGT_DT="5/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31901.75" CNSTR_SPENT_AMT="109472.00" CE_SPENT_AMT="7098.94" TOT_SPENT_AMT="148472.69" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="60000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT2_AMT="5791.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011309073" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="SL 1" LIMITS_TO_DSCR="W OF WESTGATE BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1494645" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/27/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/22/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="7/25/2024" CNSTR_PCT_TIME_USED="37.50" CNSTR_PCT_COMPLETE="98.20" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/9/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/9/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/9/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1414523.93" CE_SPENT_AMT="61997.39" TOT_SPENT_AMT="1476521.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1583306.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011309074" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="0.689 MI. EAST OF MONTERREY OAKS DR" LIMITS_TO_DSCR="0.864 MI. EAST OF BRODIE LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="446429" DIST_LET_DATE="3/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="11/3/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/3/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/3/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5740.16" TOT_SPENT_AMT="5740.16" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011309076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011309077" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="0.246 MILES WEST OF SL 1" LIMITS_TO_DSCR="WEST GATE BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/6/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="406603" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="11/12/2024" CNSTR_PCT_TIME_USED="55.26" CNSTR_PCT_COMPLETE="94.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10600.42" CNSTR_SPENT_AMT="392832.27" CE_SPENT_AMT="23031.64" TOT_SPENT_AMT="426464.33" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="575978.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011309078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="LP 1 SB" LIMITS_TO_DSCR="STR# 14-227-0-0113-09-023." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20720" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="GIBSON &amp; ASSOCIATES, INC." CNSTR_NTPD_DT="3/12/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9396.72" TOT_SPENT_AMT="9396.72" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="127524.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011309079" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 343" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290" LIMITS_TO_DSCR="S OF COLLIER ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2619781" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2829363.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011310003" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 343" CNTY_NM="Travis" LIMITS_FROM_DSCR="S OF COLLIER ST" LIMITS_TO_DSCR="BARTON SPRINGS RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="867971" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="937409.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011312002" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 343" CNTY_NM="Travis" LIMITS_FROM_DSCR="BARTON SPRINGS ROAD" LIMITS_TO_DSCR="WEST RIVERSIDE DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1989000" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.262 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20719.32" TOT_SPENT_AMT="20719.32" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="1989000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011312003" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 343" CNTY_NM="Travis" LIMITS_FROM_DSCR="BARTON SPRINGS RD" LIMITS_TO_DSCR="COLORADO BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="30767" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="33228.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011312004" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 343" CNTY_NM="Travis" LIMITS_FROM_DSCR="SL 343 BRIDGE" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1443096" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1558544.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313162" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="BULL CREEK" LIMITS_TO_DSCR="0.02 MI N OF RM 2222" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="915000" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/17/2020" PSE_30_ACTL_DT="1/17/2020" PSE_60_TRGT_DT="6/18/2020" PSE_60_ACTL_DT="6/18/2020" PSE_100_TRGT_DT="10/19/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.556 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2018" DSGN_START_ACTL_DT="8/10/2018" ENVCLR_TRGT_DT="9/16/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/22/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/22/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9639.84" TOT_SPENT_AMT="9639.84" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313163" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 71" CNTY_NM="Travis" LIMITS_FROM_DSCR="EAST OF RIVERSIDE" LIMITS_TO_DSCR="US 183" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9003371" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="FOI" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="7/19/2018" PSE_30_ACTL_DT="6/28/2018" PSE_60_TRGT_DT="12/3/2018" PSE_60_ACTL_DT="12/12/2018" PSE_100_TRGT_DT="4/29/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.574 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2017" DSGN_START_ACTL_DT="5/1/2017" ENVCLR_TRGT_DT="11/12/2018" ENVCLR_ACTL_DT="11/9/2021" UTIL_TRGT_DT="6/16/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/20/2019" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/16/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="807629.23" TOT_SPENT_AMT="807629.23" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_PID="SW4" FUND_CAT1_AMT="10083775.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313166" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT WESTLAKE DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/26/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59242344" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="5/24/2019" PSE_30_ACTL_DT="5/24/2019" PSE_60_TRGT_DT="10/21/2019" PSE_60_ACTL_DT="10/21/2019" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="9/1/2021" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.054 (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="COPASA INC" CNSTR_NTPD_DT="2/15/2022" CNSTR_WKBG_DT="7/5/2022" CNSTR_PCT_TIME_USED="79.80" CNSTR_PCT_COMPLETE="70.82" DSGN_START_TRGT_DT="3/7/2019" DSGN_START_ACTL_DT="3/7/2019" ENVCLR_TRGT_DT="3/26/2020" ENVCLR_ACTL_DT="3/26/2020" UTIL_TRGT_DT="1/31/2022" UTIL_ACTL_DT="8/5/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/31/2022" RTL_ACTL_DT="8/5/2021" PE_SPENT_AMT="4321939.82" CNSTR_SPENT_AMT="40859475.01" CE_SPENT_AMT="4126913.34" TOT_SPENT_AMT="49308328.17" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="14000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313167" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT SPICEWOOD SPRINGS ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="62000000" DIST_LET_DATE="6/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="8/16/2019" PSE_30_ACTL_DT="8/16/2019" PSE_60_TRGT_DT="6/18/2020" PSE_60_ACTL_DT="6/18/2020" PSE_100_TRGT_DT="10/12/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.806 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/8/2018" DSGN_START_ACTL_DT="1/8/2018" ENVCLR_TRGT_DT="9/3/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/16/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2993985.35" CE_SPENT_AMT="2522.53" TOT_SPENT_AMT="2996507.88" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="43151360.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="21288639.00" FUND_CAT3_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT3_AMT="5000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313168" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT COURTYARD DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59722222" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="3/27/2020" PSE_30_ACTL_DT="3/27/2020" PSE_60_TRGT_DT="9/22/2020" PSE_60_ACTL_DT="9/22/2020" PSE_100_TRGT_DT="9/30/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/16/2018" DSGN_START_ACTL_DT="4/16/2018" ENVCLR_TRGT_DT="1/4/2021" ENVCLR_ACTL_DT="3/16/2021" UTIL_TRGT_DT="8/5/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/5/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3532370.52" CE_SPENT_AMT="2083.46" TOT_SPENT_AMT="3534453.98" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="11000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313169" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT LAKEWOOD DRIVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="60600000" DIST_LET_DATE="8/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="1/17/2020" PSE_30_ACTL_DT="1/17/2020" PSE_60_TRGT_DT="6/18/2020" PSE_60_ACTL_DT="6/18/2020" PSE_100_TRGT_DT="10/19/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.942 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/10/2018" DSGN_START_ACTL_DT="8/10/2018" ENVCLR_TRGT_DT="9/16/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/22/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/22/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3371077.23" TOT_SPENT_AMT="3371077.23" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="9000000.00" FUND_CAT2_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT2_AMT="37914560.00" FUND_CAT3_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT3_AMT="20957439.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313184" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="SH 343" LIMITS_TO_DSCR="SL 360" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/2/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="532177" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/27/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/22/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="7/25/2024" CNSTR_PCT_TIME_USED="37.50" CNSTR_PCT_COMPLETE="98.20" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/9/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/9/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/9/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5279.27" CNSTR_SPENT_AMT="559940.71" CE_SPENT_AMT="13042.71" TOT_SPENT_AMT="578262.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="673918.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313189" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="LP 1" LIMITS_TO_DSCR="US 290" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1201837" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="5/11/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/3/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Willie Semora Jr., P.E." TXDOT_CNTCT_PH_NBR="(512)292-2401" CNSTR_CMPNY_NM="HUNTER INDUSTRIES, LTD." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="5/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/1/2022" ENVCLR_ACTL_DT="3/1/2022" UTIL_TRGT_DT="6/3/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/3/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/3/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5629.95" CE_SPENT_AMT="1674.27" TOT_SPENT_AMT="7304.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1472736.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313190" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313192" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313193" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="RM 2244" LIMITS_TO_DSCR="SL 1" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7894282" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="8841596.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313194" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 71" CNTY_NM="Travis" LIMITS_FROM_DSCR="TODD LANE" LIMITS_TO_DSCR="BURLESON ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="324074" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Multimodal Facility" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1704.72" TOT_SPENT_AMT="1704.72" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="350000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011313195" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 360" CNTY_NM="Travis" LIMITS_FROM_DSCR="COURTYARD DR" LIMITS_TO_DSCR="RM 2222" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8653846" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Embankment Stabilization" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19472.62" TOT_SPENT_AMT="19472.62" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="8653846.00" TXDOT_CNTCT_LAST_UPDATE_DT="5/1/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011401068" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT IH 35" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="768495" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="AAD CONTRACTING INC." CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="4/16/2025" CNSTR_PCT_TIME_USED="37.50" CNSTR_PCT_COMPLETE="33.93" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="81061.49" CNSTR_SPENT_AMT="268720.00" CE_SPENT_AMT="5259.76" TOT_SPENT_AMT="355041.25" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="NC" FUND_CAT1_AMT="739777.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT2_PID="BMN" FUND_CAT2_AMT="210223.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011401070" PT_PHASE="Construction begins within 4 years" HWY_NBR="SS 69" CNTY_NM="Travis" LIMITS_FROM_DSCR="CAPMETRO RAILROAD" LIMITS_TO_DSCR="IH 35" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1428571" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2689.59" TOT_SPENT_AMT="2689.59" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="1600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011401071" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="IH 35" LIMITS_TO_DSCR="US 183" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5714286" DIST_LET_DATE="5/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5171.13" TOT_SPENT_AMT="5171.13" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="6400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011401072" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402109" PT_PHASE="Planning, 10+ years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="WEST OF SH 130 SBFR" LIMITS_TO_DSCR="EAST OF SH 130 NBFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1250000" DIST_LET_DATE="7/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="BIK" PROJ_DSCR="Bicycle And Pedestrian Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.136 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="1250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="12/5/2024" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402111" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="SHADOW GLEN BLVD" LIMITS_TO_DSCR="0.189 MI EAST OF SHADOW GLEN BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1323559" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.189 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10596.88" TOT_SPENT_AMT="10596.88" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1482386.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402112" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="0.275 MI W OF FM 973" LIMITS_TO_DSCR="0.189 MI E OF FM 973" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1312988" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.464 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="104463.68" TOT_SPENT_AMT="104463.68" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1470547.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402113" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="0.115 MI W OF GEORGE BUSH ST" LIMITS_TO_DSCR="CEDER ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="738482" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.284 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="1/14/2025" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="99.16" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="195234.98" CNSTR_SPENT_AMT="783015.61" CE_SPENT_AMT="1785.40" TOT_SPENT_AMT="980035.99" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="808899.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402114" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT LEXINGTON" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="387821" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="1/14/2025" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="99.16" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="60268.94" CNSTR_SPENT_AMT="464301.93" CE_SPENT_AMT="993.41" TOT_SPENT_AMT="525564.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="329726.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402115" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT FM 973" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="488254" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="63.55" TOT_SPENT_AMT="63.55" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="546845.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402116" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="GREGG MANOR  RD" LIMITS_TO_DSCR="FM 973" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3569654" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="47447.58" TOT_SPENT_AMT="47447.58" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="25403.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT2_AMT="3687037.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402117" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="0.202 MI  EAST OF LEXINGTON ST" LIMITS_TO_DSCR="0.203 MI EAST OF LEXINGTON ST" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="93118" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="9/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="1/14/2025" CNSTR_PCT_TIME_USED="90.91" CNSTR_PCT_COMPLETE="99.16" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/1/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="105314.32" CE_SPENT_AMT="43.05" TOT_SPENT_AMT="105357.37" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="94976.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402120" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT FM 973" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2752226" DIST_LET_DATE="8/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="108653.31" TOT_SPENT_AMT="108653.31" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2862315.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011402123" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011403107" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="EAST OF OLD KIMBRO ROAD" LIMITS_TO_DSCR="WEST OF FM 1100" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/24/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="505422" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Donation" PSE_30_TRGT_DT="10/12/2023" PSE_30_ACTL_DT="6/30/2022" PSE_60_TRGT_DT="1/9/2024" PSE_60_ACTL_DT="6/30/2022" PSE_100_TRGT_DT="5/3/2024" PSE_100_ACTL_DT="9/15/2022" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="6/12/2023" CNSTR_PCT_TIME_USED="70.45" CNSTR_PCT_COMPLETE="96.46" DSGN_START_TRGT_DT="9/1/2023" DSGN_START_ACTL_DT="6/1/2022" ENVCLR_TRGT_DT="4/16/2024" ENVCLR_ACTL_DT="10/17/2022" UTIL_TRGT_DT="5/3/2024" UTIL_ACTL_DT="12/7/2022" ROW_TRGT_DT="5/3/2024" ROW_ACTL_DT="12/7/2022" RTL_TRGT_DT="5/3/2024" RTL_ACTL_DT="12/7/2022" PE_SPENT_AMT="84452.71" CNSTR_SPENT_AMT="513046.69" CE_SPENT_AMT="3617.03" TOT_SPENT_AMT="601116.43" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="364075.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011403108" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="EB AT COTTONWOOD &amp; BIG DRY CREEKS" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1631221" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="BK FIELD OPERATIONS LLC" CNSTR_NTPD_DT="3/19/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="36716.02" TOT_SPENT_AMT="36716.02" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011403110" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Travis" LIMITS_FROM_DSCR="AT COUNTY LINE RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="222388" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="249074.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011403111" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011404078" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Bastrop" LIMITS_FROM_DSCR=" 0.094 MI E OF SH 95" LIMITS_TO_DSCR="0.132 MI W OF FM 696" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/14/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4582834" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/7/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Diana Schulze, P.E." TXDOT_CNTCT_PH_NBR="(512)321-2195" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/7/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/7/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/7/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="47663.22" TOT_SPENT_AMT="47663.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="4701334.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011404079" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Bastrop" LIMITS_FROM_DSCR="SH 95N" LIMITS_TO_DSCR="0.643 MI E OF FM 696" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1763363" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1904432.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011404080" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Bastrop" LIMITS_FROM_DSCR="AT UPRR AND CENTRAL AVE" LIMITS_TO_DSCR="#14-011-0-0114-04-502" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="585905" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="174.23" TOT_SPENT_AMT="174.23" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="656214.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011404081" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Bastrop" LIMITS_FROM_DSCR="US 290EB AT UPRR &amp; CENTRAL AVENUE" LIMITS_TO_DSCR="#14-011-0-0114-04-503." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="615620" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="689494.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011404083" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011405046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Bastrop" LIMITS_FROM_DSCR="0.132 MI W OF FM 696" LIMITS_TO_DSCR="BIG SANDY CREEK BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/14/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="913111" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/7/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Diana Schulze, P.E." TXDOT_CNTCT_PH_NBR="(512)321-2195" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="9/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/18/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/7/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/7/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/7/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1142566.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011407086" PT_PHASE="Planning, 10+ years" HWY_NBR="US 290" CNTY_NM="Lee" LIMITS_FROM_DSCR="US 77" LIMITS_TO_DSCR="0.379 MILES WEST OF US 77" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="8/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Construct Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.379 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011407087" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Lee" LIMITS_FROM_DSCR="NAVARRO" LIMITS_TO_DSCR="CR 226" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2209194" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Diana Schulze, P.E." TXDOT_CNTCT_PH_NBR="(512)321-2195" CNSTR_CMPNY_NM="LONE STAR PAVING COMPANY" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="68.75" CNSTR_PCT_COMPLETE="81.03" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="36473.25" CNSTR_SPENT_AMT="1815225.58" CE_SPENT_AMT="8007.05" TOT_SPENT_AMT="1859705.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2413738.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011407088" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Lee" LIMITS_FROM_DSCR="SOUTH BURLESON ST" LIMITS_TO_DSCR="HEMPSTEAD ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1533630" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 9 - Transportation Alternatives Program (2709TP)" FUND_CAT1_PID="TP" FUND_CAT1_AMT="105000.00" FUND_CAT2_DSCR="Category 9 - Transportation Alternatives Program (2709TP)" FUND_CAT2_AMT="1707716.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011407089" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Lee" LIMITS_FROM_DSCR="AT DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2030955" DIST_LET_DATE="2/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11057.34" TOT_SPENT_AMT="11057.34" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2274670.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011408037" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409088" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 290F" CNTY_NM="Washington" LIMITS_FROM_DSCR="BS 36-J" LIMITS_TO_DSCR="MARKET STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2220400" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="12/8/2020" PSE_30_ACTL_DT="8/29/2022" PSE_60_TRGT_DT="2/19/2021" PSE_60_ACTL_DT="1/24/2023" PSE_100_TRGT_DT="6/11/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.240 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/25/2020" DSGN_START_ACTL_DT="10/18/2022" ENVCLR_TRGT_DT="7/9/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/3/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/3/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/3/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1279350.06" CNSTR_SPENT_AMT="7215.21" TOT_SPENT_AMT="1286565.27" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2710CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="2398032.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409089" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="0.1 MI W OF FM 390" LIMITS_TO_DSCR="0.1 MI E OF FM 2679" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="239547" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Flashing Beacon" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="2/2/2021" PSE_60_TRGT_DT="9/13/2022" PSE_60_ACTL_DT="4/1/2021" PSE_100_TRGT_DT="3/28/2023" PSE_100_ACTL_DT="6/4/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="CITYLYNX, INC." CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="4/26/2022" CNSTR_PCT_TIME_USED="98.77" CNSTR_PCT_COMPLETE="98.38" DSGN_START_TRGT_DT="12/8/2021" DSGN_START_ACTL_DT="1/1/2021" ENVCLR_TRGT_DT="9/13/2022" ENVCLR_ACTL_DT="5/28/2021" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="6/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/12/2023" RTL_ACTL_DT="6/4/2021" PE_SPENT_AMT="13697.39" CNSTR_SPENT_AMT="254807.42" CE_SPENT_AMT="19047.80" TOT_SPENT_AMT="287552.61" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="229187.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409090" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="0.1 MI W OF FM 1948" LIMITS_TO_DSCR="0.1 MI E OF FM 1948" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="106919" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/1/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="11/1/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/1/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="6/15/2023" CNSTR_PCT_TIME_USED="94.92" CNSTR_PCT_COMPLETE="96.47" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/18/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/18/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/1/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/1/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/2/2022" PE_SPENT_AMT="6241.27" CNSTR_SPENT_AMT="117340.54" CE_SPENT_AMT="2950.62" TOT_SPENT_AMT="126532.43" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="94667.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409091" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="1.2 MI E OF FM 2679" LIMITS_TO_DSCR="SH 36" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="84028143" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="2/27/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/11/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/13/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/11/2023" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="10/11/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/19/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/19/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/7/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1518096.96" TOT_SPENT_AMT="1518096.96" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="94153534.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_AMT="10.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409093" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="0.3 MI W OF RANCHO DE PANCHO LN" LIMITS_TO_DSCR="0.3 MILES EAST OF RANCHO DE PANCHO LN" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20842" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Flashing Beacon" PSE_30_TRGT_DT="7/7/2022" PSE_30_ACTL_DT="2/15/2022" PSE_60_TRGT_DT="9/16/2022" PSE_60_ACTL_DT="5/11/2022" PSE_100_TRGT_DT="1/9/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="ALLSTATE SIGNAL &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="5/11/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="98.67" CNSTR_PCT_COMPLETE="93.52" DSGN_START_TRGT_DT="4/13/2022" DSGN_START_ACTL_DT="1/1/2022" ENVCLR_TRGT_DT="12/28/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/13/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="16095.09" CNSTR_SPENT_AMT="19642.00" CE_SPENT_AMT="1190.83" TOT_SPENT_AMT="36927.92" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="19705.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409094" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290F" CNTY_NM="Washington" LIMITS_FROM_DSCR="US 290 N" LIMITS_TO_DSCR="BS 36J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="118454" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="122903.46" CE_SPENT_AMT="1447.05" TOT_SPENT_AMT="124350.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="119379.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409095" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="FAYETTE COUNTY LINE" LIMITS_TO_DSCR="SH 36" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2180389" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="2442035.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409098" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="0.5 MI W OF FM 2679" LIMITS_TO_DSCR="0.5 MI E OF BERLIN RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="85012191" DIST_LET_DATE="9/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="709556.46" TOT_SPENT_AMT="709556.46" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="99498269.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409099" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="0.10 MI E OF WINDY ACRES" LIMITS_TO_DSCR="0.25 MI W OF FM 2679" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1750000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="6/5/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="984275.09" TOT_SPENT_AMT="984275.09" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409100" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290F" CNTY_NM="Washington" LIMITS_FROM_DSCR="US 290 N" LIMITS_TO_DSCR="BS 36J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8963" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="9573.55" CE_SPENT_AMT="132.56" TOT_SPENT_AMT="9706.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="11596.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011409101" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410097" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="FM 1371" LIMITS_TO_DSCR="WALLER COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78158714" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.704 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1167378.13" TOT_SPENT_AMT="1167378.13" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410099" PT_PHASE="Feasibility Studies" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="1 MI W OF FM 2447" LIMITS_TO_DSCR="2.1 MI E OF FM 1155" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Feasibility Study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TBD" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1258778.43" TOT_SPENT_AMT="1258778.43" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="1500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410100" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="0.1 MI W OF WONDER HILL ROAD" LIMITS_TO_DSCR="0.1 MI E OF WONDER HILL ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/1/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49336" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="8/1/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="11/1/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="5/1/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="6/15/2023" CNSTR_PCT_TIME_USED="94.92" CNSTR_PCT_COMPLETE="96.47" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="5/18/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="4/18/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="3/1/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="3/1/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/2/2022" PE_SPENT_AMT="5589.02" CNSTR_SPENT_AMT="47859.24" CE_SPENT_AMT="2470.36" TOT_SPENT_AMT="55918.62" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="65229.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410101" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="1.5 MI E OF FM 1155" LIMITS_TO_DSCR="1 MI W OF FM 1155" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4792166" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="8/24/2022" PSE_30_ACTL_DT="9/15/2022" PSE_60_TRGT_DT="11/3/2022" PSE_60_ACTL_DT="2/15/2023" PSE_100_TRGT_DT="2/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="8/3/2023" CNSTR_WKBG_DT="1/5/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.07" DSGN_START_TRGT_DT="6/1/2022" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="2/15/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/14/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="354632.76" CNSTR_SPENT_AMT="4729590.60" CE_SPENT_AMT="748946.12" TOT_SPENT_AMT="5833169.48" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="2260553.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410102" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="WALLER COUNTY LINE" LIMITS_TO_DSCR="FM 1155" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5600000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/28/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/9/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/30/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/3/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/13/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="232296.07" TOT_SPENT_AMT="232296.07" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="6272000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410103" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290F" CNTY_NM="Washington" LIMITS_FROM_DSCR="SH 105" LIMITS_TO_DSCR="US 290 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="198255" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="2/9/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="11/16/2023" CNSTR_WKBG_DT="4/22/2024" CNSTR_PCT_TIME_USED="74.81" CNSTR_PCT_COMPLETE="90.14" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="1/31/2023" ENVCLR_TRGT_DT="4/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/29/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="207399.60" CE_SPENT_AMT="2441.93" TOT_SPENT_AMT="209841.53" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="198717.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410104" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="AT FM 577" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2162427" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="8/17/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/26/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="(INACTIVE)MAIN LANE INDUSTRIES LTD." CNSTR_NTPD_DT="10/23/2023" CNSTR_WKBG_DT="1/17/2024" CNSTR_PCT_TIME_USED="89.77" CNSTR_PCT_COMPLETE="95.08" DSGN_START_TRGT_DT="3/15/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/30/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3349.29" CNSTR_SPENT_AMT="3090337.03" CE_SPENT_AMT="128797.00" TOT_SPENT_AMT="3222483.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3187835.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410106" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 290F" CNTY_NM="Washington" LIMITS_FROM_DSCR="SH 105" LIMITS_TO_DSCR="US 290 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28186" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="10/22/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="69.00" CNSTR_PCT_COMPLETE="101.71" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="30438.95" CE_SPENT_AMT="421.44" TOT_SPENT_AMT="30860.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="31472.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011410108" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Washington" LIMITS_FROM_DSCR="FM 1371" LIMITS_TO_DSCR="FM 577" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5500000" DIST_LET_DATE="5/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="6/5/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4637.97" TOT_SPENT_AMT="4637.97" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411077" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74285714" DIST_LET_DATE="3/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="3/7/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/8/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/13/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.800 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/6/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/8/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/25/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/25/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/18/2033" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2553936.40" TOT_SPENT_AMT="2553936.40" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="33200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411079" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="AT BRAZOS RIVER TURNAROUND" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/3/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1147340" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Rehabilitate Bridge" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/9/2021" PSE_100_ACTL_DT="9/9/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="EARTH BUILDERS, L.P." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="5/30/2023" CNSTR_PCT_TIME_USED="92.16" CNSTR_PCT_COMPLETE="104.64" DSGN_START_TRGT_DT="9/8/2021" DSGN_START_ACTL_DT="9/8/2021" ENVCLR_TRGT_DT="2/15/2022" ENVCLR_ACTL_DT="2/15/2022" UTIL_TRGT_DT="9/2/2021" UTIL_ACTL_DT="9/2/2021" ROW_TRGT_DT="9/2/2021" ROW_ACTL_DT="9/2/2021" RTL_TRGT_DT="9/10/2021" RTL_ACTL_DT="9/10/2021" PE_SPENT_AMT="477642.58" CNSTR_SPENT_AMT="1265302.72" CE_SPENT_AMT="79484.85" TOT_SPENT_AMT="1822430.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411081" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="0.1 MI WEST OF FM 362" LIMITS_TO_DSCR="0.1 MI EAST OF FM 362" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/30/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="305852" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="10/7/2019" PSE_30_ACTL_DT="10/7/2019" PSE_60_TRGT_DT="2/21/2020" PSE_60_ACTL_DT="12/18/2020" PSE_100_TRGT_DT="2/21/2020" PSE_100_ACTL_DT="12/18/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.200 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="10/21/2020" CNSTR_WKBG_DT="1/21/2021" CNSTR_PCT_TIME_USED="202.08" CNSTR_PCT_COMPLETE="99.15" DSGN_START_TRGT_DT="3/11/2019" DSGN_START_ACTL_DT="3/11/2019" ENVCLR_TRGT_DT="2/21/2020" ENVCLR_ACTL_DT="3/5/2019" UTIL_TRGT_DT="3/4/2019" UTIL_ACTL_DT="3/4/2019" ROW_TRGT_DT="3/4/2019" ROW_ACTL_DT="3/4/2019" RTL_TRGT_DT="4/16/2020" RTL_ACTL_DT="4/16/2020" PE_SPENT_AMT="19464.59" CNSTR_SPENT_AMT="458263.59" CE_SPENT_AMT="80349.02" TOT_SPENT_AMT="558077.20" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="45578.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT2_AMT="414000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411082" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="EAST OF  FM 362" LIMITS_TO_DSCR="WEST OF FM 362." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/30/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4285292" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="10/7/2019" PSE_30_ACTL_DT="10/7/2019" PSE_60_TRGT_DT="2/21/2020" PSE_60_ACTL_DT="12/18/2020" PSE_100_TRGT_DT="2/21/2020" PSE_100_ACTL_DT="12/18/2020" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="10/21/2020" CNSTR_WKBG_DT="1/21/2021" CNSTR_PCT_TIME_USED="202.08" CNSTR_PCT_COMPLETE="99.15" DSGN_START_TRGT_DT="3/11/2019" DSGN_START_ACTL_DT="3/11/2019" ENVCLR_TRGT_DT="2/21/2020" ENVCLR_ACTL_DT="3/5/2019" UTIL_TRGT_DT="3/4/2019" UTIL_ACTL_DT="3/4/2019" ROW_TRGT_DT="3/4/2019" ROW_ACTL_DT="3/4/2019" RTL_TRGT_DT="4/16/2020" RTL_ACTL_DT="4/16/2020" PE_SPENT_AMT="1057872.72" CNSTR_SPENT_AMT="8422813.72" CE_SPENT_AMT="1476796.51" TOT_SPENT_AMT="10957482.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="4400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411083" PT_PHASE="Planning, 10+ years" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="WASHINGTON COUNTY LINE" LIMITS_TO_DSCR="SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="100714285" DIST_LET_DATE="3/1/2038" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/5/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/6/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.900 (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/4/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/6/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2030" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2030" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/2/2030" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1865635.31" TOT_SPENT_AMT="1865635.31" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="112800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411086" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="JAMES MUSE PARKWAY" LIMITS_TO_DSCR="NORTH OF FM 362" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10942905" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="NNF" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="6/18/2021" PSE_30_ACTL_DT="6/18/2021" PSE_60_TRGT_DT="1/3/2022" PSE_60_ACTL_DT="1/3/2022" PSE_100_TRGT_DT="6/2/2022" PSE_100_ACTL_DT="6/2/2022" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="ISI CONTRACTING, INC." CNSTR_NTPD_DT="4/12/2023" CNSTR_WKBG_DT="10/12/2023" CNSTR_PCT_TIME_USED="93.75" CNSTR_PCT_COMPLETE="72.69" DSGN_START_TRGT_DT="8/6/2021" DSGN_START_ACTL_DT="8/6/2021" ENVCLR_TRGT_DT="6/23/2022" ENVCLR_ACTL_DT="6/23/2022" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="8/9/2021" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="8/9/2021" RTL_TRGT_DT="6/10/2022" RTL_ACTL_DT="9/27/2022" PE_SPENT_AMT="1596998.42" CNSTR_SPENT_AMT="8198529.81" CE_SPENT_AMT="821379.46" TOT_SPENT_AMT="10616907.69" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="5305185.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="5637720.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411088" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="BLASINGAME/OLD HOWTH RD (W OF SH 6)" LIMITS_TO_DSCR="WALLER/HARRIS COUNTY  LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1035931" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2021" PSE_100_ACTL_DT="8/2/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.241 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="82.99" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="1/4/2021" ENVCLR_TRGT_DT="6/1/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="8/11/2021" ROW_TRGT_DT="8/2/2021" ROW_ACTL_DT="8/2/2021" RTL_TRGT_DT="8/2/2021" RTL_ACTL_DT="8/2/2021" PE_SPENT_AMT="37929.44" CNSTR_SPENT_AMT="860515.21" CE_SPENT_AMT="61273.84" TOT_SPENT_AMT="959718.49" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411090" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="WASHINGTON COUNTY LINE" LIMITS_TO_DSCR="HARRIS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10835282" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="220116.10" TOT_SPENT_AMT="220116.10" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2505)" FUND_CAT1_AMT="10835282.00" TXDOT_CNTCT_LAST_UPDATE_DT="4/4/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411092" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="AT PONDS CREEK TRIBUTARY (WB MAINLANES)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="242068" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/24/2021" PSE_100_ACTL_DT="8/24/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="(INACTIVE)MB WESTERN INDUSTRIAL CONTRACTING COMPANY" CNSTR_NTPD_DT="2/23/2023" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="141.18" CNSTR_PCT_COMPLETE="101.16" DSGN_START_TRGT_DT="8/23/2021" DSGN_START_ACTL_DT="8/23/2021" ENVCLR_TRGT_DT="8/23/2021" ENVCLR_ACTL_DT="11/28/2022" UTIL_TRGT_DT="8/18/2021" UTIL_ACTL_DT="8/18/2021" ROW_TRGT_DT="8/18/2021" ROW_ACTL_DT="8/18/2021" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="30846.36" CNSTR_SPENT_AMT="210696.31" CE_SPENT_AMT="897.57" TOT_SPENT_AMT="242440.24" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411093" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="AT PONDS CREEK TRIBUTARY (EB MAINLANES)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="146724" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/24/2021" PSE_100_ACTL_DT="8/24/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="(INACTIVE)MB WESTERN INDUSTRIAL CONTRACTING COMPANY" CNSTR_NTPD_DT="2/23/2023" CNSTR_WKBG_DT="3/13/2023" CNSTR_PCT_TIME_USED="141.18" CNSTR_PCT_COMPLETE="101.16" DSGN_START_TRGT_DT="8/23/2021" DSGN_START_ACTL_DT="8/23/2021" ENVCLR_TRGT_DT="8/23/2021" ENVCLR_ACTL_DT="11/28/2022" UTIL_TRGT_DT="8/18/2021" UTIL_ACTL_DT="8/18/2021" ROW_TRGT_DT="8/18/2021" ROW_ACTL_DT="8/18/2021" RTL_TRGT_DT="1/2/2023" RTL_ACTL_DT="1/2/2023" PE_SPENT_AMT="20647.47" CNSTR_SPENT_AMT="144854.61" CE_SPENT_AMT="2436.25" TOT_SPENT_AMT="167938.33" FUND_CAT1_DSCR="Category 6 - Bridge Program (2306)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411094" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="WASHINGTON C/L" LIMITS_TO_DSCR="HARRIS C/L" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/27/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1936236" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/24/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.772 (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="20.11" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="8/23/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/23/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/18/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/18/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/25/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="103291.14" CNSTR_SPENT_AMT="1896224.66" CE_SPENT_AMT="34510.98" TOT_SPENT_AMT="2034026.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3861722.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011411096" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Waller" LIMITS_FROM_DSCR="AT FM 1098" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2032000" DIST_LET_DATE="2/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/7/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="2/4/2028" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/4/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/8/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="349406.64" TOT_SPENT_AMT="349406.64" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="2275840.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412012" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="WALLER COUNTY LINE" LIMITS_TO_DSCR="EAST OF HEGAR ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/25/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3991011" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="7/7/2022" PSE_30_ACTL_DT="7/7/2022" PSE_60_TRGT_DT="7/7/2022" PSE_60_ACTL_DT="7/7/2022" PSE_100_TRGT_DT="2/22/2023" PSE_100_ACTL_DT="2/22/2023" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.534 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="5/5/2023" CNSTR_WKBG_DT="6/19/2023" CNSTR_PCT_TIME_USED="228.57" CNSTR_PCT_COMPLETE="99.23" DSGN_START_TRGT_DT="7/7/2022" DSGN_START_ACTL_DT="7/7/2022" ENVCLR_TRGT_DT="6/16/2022" ENVCLR_ACTL_DT="6/16/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/7/2022" ROW_ACTL_DT="7/7/2022" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="4/4/2023" PE_SPENT_AMT="79659.16" CNSTR_SPENT_AMT="4861256.19" CE_SPENT_AMT="236920.62" TOT_SPENT_AMT="5177835.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="5254764.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412013" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="WALLER / HARRIS C/L" LIMITS_TO_DSCR="BADTKE  ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="616384" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/2/2021" PSE_100_ACTL_DT="8/2/2021" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.502 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="YELLOWSTONE LANDSCAPE - CENTRAL, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="4/3/2023" CNSTR_PCT_TIME_USED="90.00" CNSTR_PCT_COMPLETE="82.99" DSGN_START_TRGT_DT="1/4/2021" DSGN_START_ACTL_DT="1/4/2021" ENVCLR_TRGT_DT="6/1/2021" ENVCLR_ACTL_DT="6/1/2021" UTIL_TRGT_DT="8/11/2021" UTIL_ACTL_DT="8/11/2021" ROW_TRGT_DT="8/2/2021" ROW_ACTL_DT="8/2/2021" RTL_TRGT_DT="8/2/2021" RTL_ACTL_DT="8/2/2021" PE_SPENT_AMT="14331.98" CNSTR_SPENT_AMT="659416.52" CE_SPENT_AMT="46954.39" TOT_SPENT_AMT="720702.89" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2210GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412014" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="WALLER COUNTY LINE" LIMITS_TO_DSCR="WEST OF BADTKE RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/1/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="935785" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="CTM" PROJ_DSCR="Advanced Traffic Management System" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dock Gee, P.E." TXDOT_CNTCT_PH_NBR="(713)802-5405" CNSTR_CMPNY_NM="ALLSTATE SIGNAL &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="9/30/2024" CNSTR_PCT_TIME_USED="57.04" CNSTR_PCT_COMPLETE="91.43" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="88501.30" CNSTR_SPENT_AMT="859089.71" CE_SPENT_AMT="80248.51" TOT_SPENT_AMT="1027839.52" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412015" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT HEGAR ROAD AND FIELD STORE ROAD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/11/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="425418" DIST_LET_DATE="3/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="CSD" PROJ_DSCR="Drainage Improvements" PSE_30_TRGT_DT="7/19/2022" PSE_30_ACTL_DT="7/19/2022" PSE_60_TRGT_DT="7/19/2022" PSE_60_ACTL_DT="7/19/2022" PSE_100_TRGT_DT="2/27/2023" PSE_100_ACTL_DT="2/27/2023" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.379 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="FORDE CONSTRUCTION COMPANY, INC." CNSTR_NTPD_DT="4/12/2023" CNSTR_WKBG_DT="5/22/2023" CNSTR_PCT_TIME_USED="85.00" CNSTR_PCT_COMPLETE="92.29" DSGN_START_TRGT_DT="9/27/2022" DSGN_START_ACTL_DT="9/27/2022" ENVCLR_TRGT_DT="10/5/2022" ENVCLR_ACTL_DT="10/5/2022" UTIL_TRGT_DT="7/19/2022" UTIL_ACTL_DT="7/19/2022" ROW_TRGT_DT="7/19/2022" ROW_ACTL_DT="7/19/2022" RTL_TRGT_DT="3/1/2023" RTL_ACTL_DT="3/1/2023" PE_SPENT_AMT="82632.58" CNSTR_SPENT_AMT="480069.77" CE_SPENT_AMT="94123.21" TOT_SPENT_AMT="656825.56" FUND_CAT1_DSCR="Category 11 - District Discretionary (2311)" FUND_CAT1_AMT="517932.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412016" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="WALLER C/L" LIMITS_TO_DSCR="FIELDS STORE RD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/27/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="34359" DIST_LET_DATE="4/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/24/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Carlos M. Zepeda, Jr., P.E." TXDOT_CNTCT_PH_NBR="(281)238-7900" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="5/22/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="20.11" CNSTR_PCT_COMPLETE="96.83" DSGN_START_TRGT_DT="8/23/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/23/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/18/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/18/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/25/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2144.34" CNSTR_SPENT_AMT="31911.36" CE_SPENT_AMT="112.65" TOT_SPENT_AMT="34168.35" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="73677.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412017" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="AT FM 2920" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/28/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1523998" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="TNR" PROJ_DSCR="Transportation NoN-Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.097 (mi)" TXDOT_CNTCT_NM="Hamoon Bahrami, P.E." TXDOT_CNTCT_PH_NBR="(713)934-5900" CNSTR_CMPNY_NM="FORDE CONSTRUCTION COMPANY, INC." CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="2/6/2025" CNSTR_PCT_TIME_USED="80.00" CNSTR_PCT_COMPLETE="80.74" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="214715.26" CNSTR_SPENT_AMT="1227365.40" CE_SPENT_AMT="102432.02" TOT_SPENT_AMT="1544512.68" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011412018" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 290" CNTY_NM="Harris" LIMITS_FROM_DSCR="WALLER COUNTY LINE" LIMITS_TO_DSCR="BADTKE RD" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1140300" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Houston" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Grady Mapes, P.E." TXDOT_CNTCT_PH_NBR="713-866-7040" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="483426.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011413005" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 458" CNTY_NM="Fayette" LIMITS_FROM_DSCR="US 290" LIMITS_TO_DSCR="SH 237" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="110253" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/28/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/21/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/2/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Yoakum" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.392 (mi)" TXDOT_CNTCT_NM="James Janak, P.E." TXDOT_CNTCT_PH_NBR="(361)572-5214" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/6/2023" CNSTR_WKBG_DT="5/21/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.01" DSGN_START_TRGT_DT="2/17/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/17/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/17/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="205.43" CNSTR_SPENT_AMT="123520.88" CE_SPENT_AMT="1280.56" TOT_SPENT_AMT="125006.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="125105.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011417011" PT_PHASE="Construction begins within 4 years" HWY_NBR="SL 109" CNTY_NM="Bastrop" LIMITS_FROM_DSCR="SOUTH OF DEPOT STREET" LIMITS_TO_DSCR="N OF CENTRAL AVE. AT DOT #765606G" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="144000" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Highway/railroad Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - State Railroad Grade Crossing (2310RX)" FUND_CAT1_PID="RGC" FUND_CAT1_AMT="144000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011420014" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 212" CNTY_NM="Travis" LIMITS_FROM_DSCR="US 290" LIMITS_TO_DSCR="WILBARGER CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/10/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="799754" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Fleischman, P.E." TXDOT_CNTCT_PH_NBR="(512)997-2201" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/21/2024" CNSTR_WKBG_DT="7/9/2024" CNSTR_PCT_TIME_USED="87.50" CNSTR_PCT_COMPLETE="101.22" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22707.92" CNSTR_SPENT_AMT="830885.08" CE_SPENT_AMT="58156.68" TOT_SPENT_AMT="911749.68" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011501015" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 20" CNTY_NM="Guadalupe" LIMITS_FROM_DSCR="FM 621" LIMITS_TO_DSCR="GUADALUPE/CALDWELL CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74258" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Antonio" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.535 (mi)" TXDOT_CNTCT_NM="Frances Merecka, P.E." TXDOT_CNTCT_PH_NBR="(830)741-8024" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/14/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="25.76" CNSTR_PCT_COMPLETE="80.19" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="74109.59" CE_SPENT_AMT="280.23" TOT_SPENT_AMT="74389.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="84195.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011502019" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 20" CNTY_NM="Caldwell" LIMITS_FROM_DSCR="GUADALUPE COUNTY LINE" LIMITS_TO_DSCR="PR 10" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/14/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2629208" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="1/26/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/22/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/9/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.608 (mi)" TXDOT_CNTCT_NM="Diana Schulze, P.E." TXDOT_CNTCT_PH_NBR="(512)321-2195" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="4/14/2025" CNSTR_PCT_TIME_USED="41.82" CNSTR_PCT_COMPLETE="70.69" DSGN_START_TRGT_DT="12/4/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/9/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/9/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/9/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/9/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50264.65" CNSTR_SPENT_AMT="1964853.19" CE_SPENT_AMT="6578.92" TOT_SPENT_AMT="2021696.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="3220299.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011503028" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 20" CNTY_NM="Caldwell" LIMITS_FROM_DSCR="US 183" LIMITS_TO_DSCR="TRINITY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="655246" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="113430.01" TOT_SPENT_AMT="113430.01" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="113475.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011504055" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 20" CNTY_NM="Bastrop" LIMITS_FROM_DSCR="3.1 MILES SOUTH OF SH 71" LIMITS_TO_DSCR="STR# 14-011-0-0115-04-017" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/1/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2547556" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="11/18/2020" PSE_30_ACTL_DT="11/18/2020" PSE_60_TRGT_DT="8/6/2021" PSE_60_ACTL_DT="5/19/2021" PSE_100_TRGT_DT="12/10/2021" PSE_100_ACTL_DT="12/16/2021" DIST_NM="Austin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.081 (mi)" TXDOT_CNTCT_NM="Diana Schulze, P.E." TXDOT_CNTCT_PH_NBR="(512)321-2195" CNSTR_CMPNY_NM="CAPITAL EXCAVATION COMPANY" CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="11/28/2022" CNSTR_PCT_TIME_USED="94.77" CNSTR_PCT_COMPLETE="101.67" DSGN_START_TRGT_DT="10/26/2020" DSGN_START_ACTL_DT="10/26/2020" ENVCLR_TRGT_DT="12/16/2021" ENVCLR_ACTL_DT="10/11/2021" UTIL_TRGT_DT="3/7/2022" UTIL_ACTL_DT="2/3/2022" ROW_TRGT_DT="3/7/2022" ROW_ACTL_DT="2/3/2022" RTL_TRGT_DT="3/7/2022" RTL_ACTL_DT="2/3/2022" PE_SPENT_AMT="567087.98" CNSTR_SPENT_AMT="2786081.86" CE_SPENT_AMT="32463.27" TOT_SPENT_AMT="3385633.11" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="283866.00" FUND_CAT2_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT2_PID="ON" FUND_CAT2_AMT="1800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011504057" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011601040" PT_PHASE="Feasibility Studies" HWY_NBR="SH 21" CNTY_NM="Lee" LIMITS_FROM_DSCR="US 77 INTERSECTION" LIMITS_TO_DSCR="BURLESON/LEE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1062000" DIST_LET_DATE="9/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Austin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.930 (mi)" TXDOT_CNTCT_NM="Heather Ashley-Nguyen, P.E." TXDOT_CNTCT_PH_NBR="512-832-7216" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="105736.03" TOT_SPENT_AMT="105736.03" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="1062000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011601041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011602048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="LEE COUNTY LINE" LIMITS_TO_DSCR="0.5 MI W OF FM 975" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="114884" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/22/2022" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="12/2/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="9/14/2023" CNSTR_WKBG_DT="1/9/2024" CNSTR_PCT_TIME_USED="58.00" CNSTR_PCT_COMPLETE="104.40" DSGN_START_TRGT_DT="7/14/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/14/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/13/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="111232.02" CE_SPENT_AMT="974.62" TOT_SPENT_AMT="112206.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="92009.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603066" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="AT FM 2000" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="678390" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="2/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="3/9/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="2/22/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="7/8/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/1/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/7/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/22/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="1/10/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/22/2022" PE_SPENT_AMT="141311.46" CNSTR_SPENT_AMT="436338.69" CE_SPENT_AMT="25747.67" TOT_SPENT_AMT="603397.82" FUND_CAT1_DSCR="Category 11 - District Discretionary (2211)" FUND_CAT1_AMT="600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="FM 1362 S" LIMITS_TO_DSCR="0.12 MI E OF CR 213" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="12/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1821881" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/26/2023" PSE_30_ACTL_DT="9/2/2022" PSE_60_TRGT_DT="3/8/2024" PSE_60_ACTL_DT="11/19/2022" PSE_100_TRGT_DT="7/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/6/2023" CNSTR_WKBG_DT="1/18/2024" CNSTR_PCT_TIME_USED="99.52" CNSTR_PCT_COMPLETE="99.96" DSGN_START_TRGT_DT="10/2/2023" DSGN_START_ACTL_DT="8/1/2022" ENVCLR_TRGT_DT="6/19/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/2/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/16/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="427621.66" CNSTR_SPENT_AMT="1888056.54" CE_SPENT_AMT="187566.58" TOT_SPENT_AMT="2503244.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="847296.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603070" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="0.3 MI W OF FM 50 S" LIMITS_TO_DSCR="BRAZOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1064375" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="26.51" CNSTR_PCT_COMPLETE="31.69" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="53045.27" CNSTR_SPENT_AMT="369129.55" CE_SPENT_AMT="24786.70" TOT_SPENT_AMT="446961.52" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603071" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="0.113 MI E OF CR 213" LIMITS_TO_DSCR="BRAZOS RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1020603" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/30/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="1/18/2024" CNSTR_PCT_TIME_USED="41.43" CNSTR_PCT_COMPLETE="86.48" DSGN_START_TRGT_DT="9/1/2022" DSGN_START_ACTL_DT="9/1/2022" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/6/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1596.08" CNSTR_SPENT_AMT="927635.66" CE_SPENT_AMT="18784.81" TOT_SPENT_AMT="948016.55" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1213860.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603072" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="FM 975" LIMITS_TO_DSCR="BRAZOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1560780" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/9/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/9/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="11.94" CNSTR_PCT_COMPLETE="35.60" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/23/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/23/2022" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="228385.56" CE_SPENT_AMT="27.88" TOT_SPENT_AMT="228413.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="1722117.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603073" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="FM 975" LIMITS_TO_DSCR="BRAZOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="124537" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="134500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011603074" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Burleson" LIMITS_FROM_DSCR="FM 975" LIMITS_TO_DSCR="SH 36" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1500000" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2297.85" TOT_SPENT_AMT="2297.85" FUND_CAT1_DSCR="Category 10 - Curb Ramp Program (2610CR)" FUND_CAT1_PID="ADA" FUND_CAT1_AMT="1560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604108" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="0.1 MI W OF SH OSR" LIMITS_TO_DSCR="0.1 MI E OF SH OSR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="78279" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Flashing Beacon" PSE_30_TRGT_DT="5/10/2022" PSE_30_ACTL_DT="2/2/2021" PSE_60_TRGT_DT="9/13/2022" PSE_60_ACTL_DT="4/1/2021" PSE_100_TRGT_DT="3/28/2023" PSE_100_ACTL_DT="6/4/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="CITYLYNX, INC." CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="4/26/2022" CNSTR_PCT_TIME_USED="98.77" CNSTR_PCT_COMPLETE="98.38" DSGN_START_TRGT_DT="12/8/2021" DSGN_START_ACTL_DT="1/1/2021" ENVCLR_TRGT_DT="9/13/2022" ENVCLR_ACTL_DT="5/28/2021" UTIL_TRGT_DT="1/4/2021" UTIL_ACTL_DT="6/4/2021" ROW_TRGT_DT="1/4/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/12/2023" RTL_ACTL_DT="6/4/2021" CNSTR_SPENT_AMT="70958.63" CE_SPENT_AMT="10564.55" TOT_SPENT_AMT="81523.18" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="144133.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604109" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="0.2 MI W OF FM 2818" LIMITS_TO_DSCR="0.2 MI E OF FM 2818" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="611488" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="1/7/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="5/11/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="6/3/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="1/19/2023" CNSTR_PCT_TIME_USED="99.53" CNSTR_PCT_COMPLETE="106.62" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="6/1/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/20/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="9/15/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="2/4/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="5/1/2022" PE_SPENT_AMT="21095.71" CNSTR_SPENT_AMT="600361.52" CE_SPENT_AMT="22828.42" TOT_SPENT_AMT="644285.65" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="40900.00" FUND_CAT2_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT2_PID="HES" FUND_CAT2_AMT="511255.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604111" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BURLESON COUNTY LINE" LIMITS_TO_DSCR="1.5 MI E OF OSR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5905142" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="6/24/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/4/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/26/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="1/6/2025" CNSTR_PCT_TIME_USED="26.51" CNSTR_PCT_COMPLETE="31.69" DSGN_START_TRGT_DT="4/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/16/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/16/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="90701.77" CNSTR_SPENT_AMT="1869908.83" CE_SPENT_AMT="120875.80" TOT_SPENT_AMT="2081486.40" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="5/27/2024" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604112" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="FM 2818" LIMITS_TO_DSCR="FM 158" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="16002" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/22/2022" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="12/2/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="9/14/2023" CNSTR_WKBG_DT="1/9/2024" CNSTR_PCT_TIME_USED="58.00" CNSTR_PCT_COMPLETE="104.40" DSGN_START_TRGT_DT="7/14/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/14/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/13/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="15488.01" CE_SPENT_AMT="135.79" TOT_SPENT_AMT="15623.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="15618.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604113" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BRAZOS RIVER" LIMITS_TO_DSCR="FM 2818" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1214668" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1360428.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604114" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="3.6 MI W OF FM 2818" LIMITS_TO_DSCR="1.7 MI W OF FM 2818" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="327236" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="MASSANA CONSTRUCTION INC." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="3/3/2025" CNSTR_PCT_TIME_USED="63.64" CNSTR_PCT_COMPLETE="93.90" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="63820.07" CNSTR_SPENT_AMT="349288.93" CE_SPENT_AMT="7699.97" TOT_SPENT_AMT="420808.97" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1143056.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604115" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="SH 21 WB AT THE BRAZOS RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="650000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3761.58" TOT_SPENT_AMT="3761.58" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="650000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011604116" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="SH 21 EB AT BRAZOS RIVER" LIMITS_TO_DSCR="BRAZOS RIVER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="88.24" TOT_SPENT_AMT="88.24" FUND_CAT1_DSCR="Category 6 - Bridge Program (2606)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011605022" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 158" CNTY_NM="Brazos" LIMITS_FROM_DSCR="0.1 MI W OF N BRYAN AVE" LIMITS_TO_DSCR="0.1 MI E OF N BRYAN AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29551" DIST_LET_DATE="6/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="10/8/2020" PSE_30_ACTL_DT="7/11/2020" PSE_60_TRGT_DT="12/22/2020" PSE_60_ACTL_DT="9/16/2020" PSE_100_TRGT_DT="4/16/2021" PSE_100_ACTL_DT="4/1/2021" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="KNIFE RIVER CORPORATION - SOUTH" CNSTR_NTPD_DT="7/22/2021" CNSTR_WKBG_DT="12/8/2021" CNSTR_PCT_TIME_USED="116.67" CNSTR_PCT_COMPLETE="96.12" DSGN_START_TRGT_DT="7/29/2020" DSGN_START_ACTL_DT="4/1/2020" ENVCLR_TRGT_DT="5/14/2021" ENVCLR_ACTL_DT="4/5/2021" UTIL_TRGT_DT="1/2/2020" UTIL_ACTL_DT="4/1/2021" ROW_TRGT_DT="1/2/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/9/2021" RTL_ACTL_DT="4/5/2021" CNSTR_SPENT_AMT="24540.40" CE_SPENT_AMT="5255.09" TOT_SPENT_AMT="29795.49" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="45446.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011606011" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011701051" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 21" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS 6-R" LIMITS_TO_DSCR="SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7652250" DIST_LET_DATE="7/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/24/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/4/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/23/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.869 (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/13/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/27/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="490836.82" TOT_SPENT_AMT="490836.82" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="8429720.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011701058" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 2038" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1029188" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1152691.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011701059" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 21-H" CNTY_NM="Brazos" LIMITS_FROM_DSCR="US 190 W" LIMITS_TO_DSCR="US 190 E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="56504" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="63284.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011702038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="AT FM 974" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49940" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="9/27/2023" PSE_60_ACTL_DT="1/31/2023" PSE_100_TRGT_DT="12/15/2023" PSE_100_ACTL_DT="2/24/2023" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="8/7/2023" CNSTR_WKBG_DT="2/1/2024" CNSTR_PCT_TIME_USED="99.19" CNSTR_PCT_COMPLETE="99.78" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="9/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/29/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="44815.00" CE_SPENT_AMT="12957.86" TOT_SPENT_AMT="57772.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="71812.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011702040" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011702041" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS 21 EAST" LIMITS_TO_DSCR="MADISON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="885488" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="991747.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011703024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Madison" LIMITS_FROM_DSCR="BRAZOS COUNTY LINE" LIMITS_TO_DSCR="1 MI EAST OF FM 39" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="35279005" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="7/18/2019" PSE_30_ACTL_DT="7/18/2019" PSE_60_TRGT_DT="12/18/2019" PSE_60_ACTL_DT="12/18/2019" PSE_100_TRGT_DT="5/1/2021" PSE_100_ACTL_DT="5/1/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.81" DSGN_START_TRGT_DT="12/1/2018" DSGN_START_ACTL_DT="12/1/2018" ENVCLR_TRGT_DT="9/16/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/16/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/16/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/17/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4230027.43" CNSTR_SPENT_AMT="292331.58" CE_SPENT_AMT="11297.59" TOT_SPENT_AMT="4533656.60" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="56757353.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="10000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011703036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Madison" LIMITS_FROM_DSCR="2 MI W OF FM 39" LIMITS_TO_DSCR="FM 39" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="17040" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="11869.66" TOT_SPENT_AMT="11869.66" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="17040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011704031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Madison" LIMITS_FROM_DSCR="1 MI EAST OF FM 39" LIMITS_TO_DSCR="MARTIN L KING BLVD." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="83277444" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="7/18/2019" PSE_30_ACTL_DT="7/18/2019" PSE_60_TRGT_DT="12/18/2019" PSE_60_ACTL_DT="12/18/2019" PSE_100_TRGT_DT="5/1/2021" PSE_100_ACTL_DT="5/1/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.192 (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.81" DSGN_START_TRGT_DT="12/1/2018" DSGN_START_ACTL_DT="12/1/2018" ENVCLR_TRGT_DT="9/16/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/16/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/16/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/17/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3702311.56" CNSTR_SPENT_AMT="703744.57" CE_SPENT_AMT="27197.02" TOT_SPENT_AMT="4433253.15" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="138071352.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT2_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011704047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Madison" LIMITS_FROM_DSCR="MADISONVILL WEST CITY LIMIT" LIMITS_TO_DSCR="SS 174" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96421" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="107992.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="AT FM 2346" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/5/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1118978" DIST_LET_DATE="5/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="2/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="3/9/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="2/22/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="CORNERSTONE PAVING AND CONSTRUCTION, L.L.C." CNSTR_NTPD_DT="6/9/2022" CNSTR_WKBG_DT="7/8/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/1/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="3/7/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="2/22/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="1/10/2022" RTL_TRGT_DT="TBD" RTL_ACTL_DT="2/22/2022" PE_SPENT_AMT="99163.52" CNSTR_SPENT_AMT="1230346.45" CE_SPENT_AMT="72600.71" TOT_SPENT_AMT="1402110.68" FUND_CAT1_DSCR="Category 11 - District Discretionary (2211)" FUND_CAT1_AMT="630000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705058" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="0.2 MI W OF OSR" LIMITS_TO_DSCR="0.2 MI E OF OF OSR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43790" DIST_LET_DATE="6/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="9/7/2023" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="9/27/2023" PSE_60_ACTL_DT="1/31/2023" PSE_100_TRGT_DT="12/15/2023" PSE_100_ACTL_DT="2/24/2023" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Robbins, P.E." TXDOT_CNTCT_PH_NBR="(979)778-6233" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="8/7/2023" CNSTR_WKBG_DT="2/1/2024" CNSTR_PCT_TIME_USED="99.19" CNSTR_PCT_COMPLETE="99.78" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="9/27/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/29/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="39640.00" CE_SPENT_AMT="11369.20" TOT_SPENT_AMT="51009.20" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="43340.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705059" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="0.1 MI W OF OSR" LIMITS_TO_DSCR="FM 2548" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/11/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="717145" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="12/26/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="LARRY YOUNG PAVING, INC." CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="11/11/2024" CNSTR_PCT_TIME_USED="60.98" CNSTR_PCT_COMPLETE="105.83" DSGN_START_TRGT_DT="10/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/22/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/1/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/16/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="93161.24" CNSTR_SPENT_AMT="794428.64" CE_SPENT_AMT="40946.16" TOT_SPENT_AMT="928536.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="626284.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705061" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="FM 247" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="800850" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/9/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/9/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Charlie Reed, P.E." TXDOT_CNTCT_PH_NBR="(979)778-9650" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="11.94" CNSTR_PCT_COMPLETE="35.60" DSGN_START_TRGT_DT="8/9/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/23/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/9/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/9/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/23/2022" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="117241.62" CE_SPENT_AMT="14.31" TOT_SPENT_AMT="117255.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="409553.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="FM 247" LIMITS_TO_DSCR="HOUSTON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/24/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43656" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="9/22/2022" PSE_30_ACTL_DT="11/8/2022" PSE_60_TRGT_DT="12/2/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/30/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="James Kreamer, P.E." TXDOT_CNTCT_PH_NBR="(979)836-9359" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="9/14/2023" CNSTR_WKBG_DT="1/9/2024" CNSTR_PCT_TIME_USED="58.00" CNSTR_PCT_COMPLETE="104.40" DSGN_START_TRGT_DT="7/14/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/2/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/14/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/13/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="42240.02" CE_SPENT_AMT="370.17" TOT_SPENT_AMT="42610.19" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="43895.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705063" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="0.14 MI E OF IH 45" LIMITS_TO_DSCR="1.17 MI E OF IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2001327" DIST_LET_DATE="4/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="177529.91" TOT_SPENT_AMT="177529.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2322995.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705065" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Madison" LIMITS_FROM_DSCR="SS 174" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="200826" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="224925.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705066" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Madison" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="FM 247" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="89150" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="96282.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011705068" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011706047" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="SH 21 AT TRINITY RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27844040" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/16/2017" PSE_30_ACTL_DT="8/16/2017" PSE_60_TRGT_DT="1/27/2021" PSE_60_ACTL_DT="1/27/2021" PSE_100_TRGT_DT="12/31/2021" PSE_100_ACTL_DT="1/2/2022" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.100 (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="5/10/2022" CNSTR_WKBG_DT="8/8/2022" CNSTR_PCT_TIME_USED="96.88" CNSTR_PCT_COMPLETE="92.69" DSGN_START_TRGT_DT="3/9/2016" DSGN_START_ACTL_DT="3/9/2016" ENVCLR_TRGT_DT="2/1/2022" ENVCLR_ACTL_DT="1/13/2022" UTIL_TRGT_DT="2/4/2022" UTIL_ACTL_DT="2/4/2022" ROW_TRGT_DT="11/16/2021" ROW_ACTL_DT="1/3/2022" RTL_TRGT_DT="2/4/2022" RTL_ACTL_DT="2/4/2022" PE_SPENT_AMT="1290051.54" CNSTR_SPENT_AMT="26188041.29" CE_SPENT_AMT="1816742.21" TOT_SPENT_AMT="29294835.04" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="26800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011706052" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="FM 1280" LIMITS_TO_DSCR="2.48 MILES EAST OF FM 2967" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="830776" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="930469.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011706053" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="MADISON COUNTY LINE" LIMITS_TO_DSCR="FM 1280 W" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1488474" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="1/14/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/8/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/7/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/10/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/9/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/7/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/7/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/4/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1667091.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011707042" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="2.48 MILES EAST OF FM 2967" LIMITS_TO_DSCR="SH 7 EAST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="791863" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="113.58" TOT_SPENT_AMT="113.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="678792.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011707044" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="2.1 MI SW OF SH 7" LIMITS_TO_DSCR="0.6 MI SW OF SH 7" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/31/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="335809" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/5/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="2/7/2025" CNSTR_WKBG_DT="2/24/2025" CNSTR_PCT_TIME_USED="21.48" CNSTR_PCT_COMPLETE="34.95" DSGN_START_TRGT_DT="10/2/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/7/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/6/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/5/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="339600.20" CE_SPENT_AMT="3062.85" TOT_SPENT_AMT="342663.05" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="349164.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011709005" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Brazos" LIMITS_FROM_DSCR="BS 21H W" LIMITS_TO_DSCR="BS 21H E" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="173106" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Doug Marino, P.E." TXDOT_CNTCT_PH_NBR="979-778-9635" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="186954.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011710001" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 190" CNTY_NM="Madison" LIMITS_FROM_DSCR="1.71 MI WEST OF FM 39" LIMITS_TO_DSCR="1.77 MI EAST OF FM 39" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="56736903" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="NNF" PROJ_DSCR="Construct New Road" PSE_30_TRGT_DT="7/18/2019" PSE_30_ACTL_DT="7/18/2019" PSE_60_TRGT_DT="12/18/2019" PSE_60_ACTL_DT="12/18/2019" PSE_100_TRGT_DT="5/1/2021" PSE_100_ACTL_DT="5/1/2021" DIST_NM="Bryan" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="JAMES CONSTRUCTION GROUP, LLC" CNSTR_NTPD_DT="2/26/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.81" DSGN_START_TRGT_DT="12/1/2018" DSGN_START_ACTL_DT="12/1/2018" ENVCLR_TRGT_DT="9/16/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="9/16/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/16/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/17/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2021598.53" CNSTR_SPENT_AMT="496172.78" CE_SPENT_AMT="19175.28" TOT_SPENT_AMT="2536946.59" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="78356306.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011801021" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="CROCKETT TOWN SQUARE" LIMITS_TO_DSCR="SL 304" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1020741" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/10/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/13/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/20/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/2/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/6/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1143230.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011801022" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="FM 3187" LIMITS_TO_DSCR="2.56 MILES WEST OF FM 1733" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6960752" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Adding Shoulders With No Added Capacity" PSE_30_TRGT_DT="3/15/2023" PSE_30_ACTL_DT="3/15/2023" PSE_60_TRGT_DT="6/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/10/2024" CNSTR_PCT_TIME_USED="63.06" CNSTR_PCT_COMPLETE="40.27" DSGN_START_TRGT_DT="12/19/2022" DSGN_START_ACTL_DT="12/19/2022" ENVCLR_TRGT_DT="6/22/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="3/15/2023" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="41016.76" CNSTR_SPENT_AMT="2928010.24" CE_SPENT_AMT="51073.12" TOT_SPENT_AMT="3020100.12" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="6590893.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011801023" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="SL 304" LIMITS_TO_DSCR="2.564 MILES SOUTH OF FM 1733" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="576603" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="561987.87" CE_SPENT_AMT="9367.48" TOT_SPENT_AMT="571355.35" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="387691.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011801024" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="SL 304" LIMITS_TO_DSCR="FM 3187" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2147452" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/15/2023" PSE_30_ACTL_DT="3/15/2023" PSE_60_TRGT_DT="6/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/10/2024" CNSTR_PCT_TIME_USED="63.06" CNSTR_PCT_COMPLETE="40.27" DSGN_START_TRGT_DT="12/19/2022" DSGN_START_ACTL_DT="12/19/2022" ENVCLR_TRGT_DT="6/22/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="3/15/2023" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="371.92" CNSTR_SPENT_AMT="900654.54" CE_SPENT_AMT="15710.15" TOT_SPENT_AMT="916736.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2031624.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011802035" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="FM 1733" LIMITS_TO_DSCR="FM 227 NORTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="278621" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.232 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="243538.61" CE_SPENT_AMT="2595.04" TOT_SPENT_AMT="246133.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="324666.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011802036" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="2.56 MILES WEST OF FM 1733" LIMITS_TO_DSCR="CHEROKEE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5219248" DIST_LET_DATE="1/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Adding Shoulders With No Added Capacity" PSE_30_TRGT_DT="3/15/2023" PSE_30_ACTL_DT="3/15/2023" PSE_60_TRGT_DT="6/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="5/10/2024" CNSTR_PCT_TIME_USED="63.06" CNSTR_PCT_COMPLETE="40.27" DSGN_START_TRGT_DT="12/19/2022" DSGN_START_ACTL_DT="12/19/2022" ENVCLR_TRGT_DT="6/22/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/18/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/15/2023" ROW_ACTL_DT="3/15/2023" RTL_TRGT_DT="11/3/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="43439.32" CNSTR_SPENT_AMT="2057966.18" CE_SPENT_AMT="35897.15" TOT_SPENT_AMT="2137302.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="5135858.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011802037" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="2.564 MILES SOUTH OF FM 1733" LIMITS_TO_DSCR="FM 1733" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="165299" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="157415.48" CE_SPENT_AMT="3171.77" TOT_SPENT_AMT="160587.25" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="112542.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011802040" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Houston" LIMITS_FROM_DSCR="3.3 MILES SOUTH OF COUNTY LINE" LIMITS_TO_DSCR="1.3 MILES SOUTH OF COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="812208" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="673460.22" TOT_SPENT_AMT="673460.22" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="812208.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011803005" PT_PHASE="Construction underway or begins soon" HWY_NBR="PR 44" CNTY_NM="Houston" LIMITS_FROM_DSCR="SH 21" LIMITS_TO_DSCR="END OF PAVEMENT INSIDE PARK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="513982" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="9/7/2022" PSE_30_ACTL_DT="9/7/2022" PSE_60_TRGT_DT="11/30/2022" PSE_60_ACTL_DT="11/30/2022" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="DREWERY CONSTRUCTION COMPANY, INCORPORATED" CNSTR_NTPD_DT="9/18/2024" CNSTR_WKBG_DT="1/13/2025" CNSTR_PCT_TIME_USED="59.38" CNSTR_PCT_COMPLETE="34.61" DSGN_START_TRGT_DT="5/23/2022" DSGN_START_ACTL_DT="5/23/2022" ENVCLR_TRGT_DT="10/17/2022" ENVCLR_ACTL_DT="10/17/2022" UTIL_TRGT_DT="2/2/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/2/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/1/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="71298.00" CE_SPENT_AMT="9529.66" TOT_SPENT_AMT="80827.66" FUND_CAT1_DSCR="Category 10 - Texas Parks &amp; Wildlife Roads (2410PR)" FUND_CAT1_PID="TPW" FUND_CAT1_AMT="201753.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011804032" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="HOUSTON C/L, E" LIMITS_TO_DSCR="US 69 IN ALTO" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/18/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5923689" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="12/6/2019" PSE_30_ACTL_DT="12/6/2019" PSE_60_TRGT_DT="3/4/2020" PSE_60_ACTL_DT="3/4/2020" PSE_100_TRGT_DT="5/29/2020" PSE_100_ACTL_DT="4/15/2021" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.442 (mi)" TXDOT_CNTCT_NM="Paul Schneider, P.E. " TXDOT_CNTCT_PH_NBR="(903)509-9066" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="9/16/2021" CNSTR_WKBG_DT="1/10/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="104.33" DSGN_START_TRGT_DT="9/25/2019" DSGN_START_ACTL_DT="9/25/2019" ENVCLR_TRGT_DT="6/29/2021" ENVCLR_ACTL_DT="10/1/2020" UTIL_TRGT_DT="5/8/2020" UTIL_ACTL_DT="4/9/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/21/2021" RTL_ACTL_DT="4/15/2021" PE_SPENT_AMT="216458.53" CNSTR_SPENT_AMT="7251190.27" CE_SPENT_AMT="385787.99" TOT_SPENT_AMT="7853436.79" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="7500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011804033" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="NECHES RIVER" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7408412" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="ER" PROJ_DSCR="Emergency Relief" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="7011500.38" TOT_SPENT_AMT="7011500.38" FUND_CAT1_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT1_PID="ER" FUND_CAT1_AMT="3532187.00" FUND_CAT2_DSCR="Category 10 - Miscellaneous Transportation Projects (2210)" FUND_CAT2_PID="ER" FUND_CAT2_AMT="3876225.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011804034" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011804037" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="ANDERSON CL" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="525522" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="588584.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011805025" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="0.07 MILES EAST OF MULBERRY STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="472562" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="529269.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011806074" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 225" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="632752" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="565532.31" CE_SPENT_AMT="10053.09" TOT_SPENT_AMT="575585.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="738505.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011806077" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 21-P" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="US 59" LIMITS_TO_DSCR="0.338 MI W OF FM 225" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1387953" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="19.13" CNSTR_PCT_COMPLETE="35.35" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/27/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/8/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="33290.69" CNSTR_SPENT_AMT="480867.77" CE_SPENT_AMT="2251.74" TOT_SPENT_AMT="516410.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1249194.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011806078" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="CHEROKEE C/L" LIMITS_TO_DSCR="FM 225 S" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="603825" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="652132.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011806080" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 225 S" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1485578" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1663848.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808075" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="SH 21 AT CARRIZO CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2490125" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/30/2018" PSE_30_ACTL_DT="1/30/2018" PSE_60_TRGT_DT="8/1/2018" PSE_60_ACTL_DT="8/1/2018" PSE_100_TRGT_DT="9/13/2019" PSE_100_ACTL_DT="9/13/2019" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.385 (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="DREWERY CONSTRUCTION COMPANY, INCORPORATED" CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="3/10/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="101.23" DSGN_START_TRGT_DT="8/9/2017" DSGN_START_ACTL_DT="8/9/2017" ENVCLR_TRGT_DT="7/21/2021" ENVCLR_ACTL_DT="7/21/2021" UTIL_TRGT_DT="7/29/2021" UTIL_ACTL_DT="11/4/2021" ROW_TRGT_DT="7/27/2021" ROW_ACTL_DT="11/2/2021" RTL_TRGT_DT="11/5/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="838675.92" CNSTR_SPENT_AMT="2538037.24" CE_SPENT_AMT="144051.12" TOT_SPENT_AMT="3520764.28" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1664300.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808076" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="SH 21 AT ATASCOSO CREEK" LIMITS_TO_DSCR="SH 21 AT ATASCOSO CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/15/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5478921" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="1/30/2018" PSE_30_ACTL_DT="1/30/2018" PSE_60_TRGT_DT="8/1/2018" PSE_60_ACTL_DT="8/1/2018" PSE_100_TRGT_DT="9/30/2020" PSE_100_ACTL_DT="9/30/2020" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.028 (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="6/17/2021" CNSTR_WKBG_DT="9/17/2021" CNSTR_PCT_TIME_USED="121.87" CNSTR_PCT_COMPLETE="100.27" DSGN_START_TRGT_DT="8/9/2017" DSGN_START_ACTL_DT="8/9/2017" ENVCLR_TRGT_DT="12/1/2020" ENVCLR_ACTL_DT="12/1/2020" UTIL_TRGT_DT="12/4/2020" UTIL_ACTL_DT="3/5/2021" ROW_TRGT_DT="12/2/2020" ROW_ACTL_DT="3/5/2021" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="27806.32" CNSTR_SPENT_AMT="5557093.13" CE_SPENT_AMT="280591.42" TOT_SPENT_AMT="5865490.87" FUND_CAT1_DSCR="Category 6 - Bridge Program (2106)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="5691237.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808081" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 3276" LIMITS_TO_DSCR="FM 95" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20198000" DIST_LET_DATE="1/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.010 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808082" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 95" LIMITS_TO_DSCR="SAN AUGUSTINE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7088600" DIST_LET_DATE="5/1/2034" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="7/6/2033" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="10/12/2033" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/3/2034" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.023 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/13/2030" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/21/2034" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/13/2034" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/10/2034" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/2/2035" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808085" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 7-N" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="AT LA NANA CREEK" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3200000" DIST_LET_DATE="8/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="8/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/3/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.030 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/4/2020" DSGN_START_ACTL_DT="5/4/2020" ENVCLR_TRGT_DT="10/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/2/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/5/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="597144.64" TOT_SPENT_AMT="597144.64" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3584000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808086" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 95" LIMITS_TO_DSCR="SAN AUGUSTINE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="202514" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="198608.30" CE_SPENT_AMT="2294.39" TOT_SPENT_AMT="200902.69" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="180783.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808087" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="0.4 MI W OF FM 226" LIMITS_TO_DSCR="FM 3276" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="445630" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/29/2023" PSE_30_ACTL_DT="3/29/2023" PSE_60_TRGT_DT="5/31/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/4/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="96.23" CNSTR_PCT_COMPLETE="90.23" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="11/1/2022" ENVCLR_TRGT_DT="6/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/1/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="415.29" CNSTR_SPENT_AMT="421519.67" CE_SPENT_AMT="3806.81" TOT_SPENT_AMT="425741.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="415759.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808089" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 3276" LIMITS_TO_DSCR="FM 95" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="870872" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="13712.80" CE_SPENT_AMT="123.10" TOT_SPENT_AMT="13835.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="829942.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808090" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 21-P" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 225" LIMITS_TO_DSCR="BU 59F" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32125" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/2/2022" PSE_100_ACTL_DT="8/31/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy King, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4472" CNSTR_CMPNY_NM="ECONOLITE SYSTEMS, INC." CNSTR_NTPD_DT="1/26/2023" CNSTR_WKBG_DT="6/24/2024" CNSTR_PCT_TIME_USED="82.50" CNSTR_PCT_COMPLETE="95.10" DSGN_START_TRGT_DT="6/8/2022" DSGN_START_ACTL_DT="6/8/2022" ENVCLR_TRGT_DT="7/14/2022" ENVCLR_ACTL_DT="7/11/2022" UTIL_TRGT_DT="9/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="38168.30" CE_SPENT_AMT="339.33" TOT_SPENT_AMT="38507.63" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="14589.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808091" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 7-N" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="BU 59F" LIMITS_TO_DSCR="BS 21P" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6942" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/2/2022" PSE_100_ACTL_DT="8/31/2022" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy King, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4472" CNSTR_CMPNY_NM="ECONOLITE SYSTEMS, INC." CNSTR_NTPD_DT="1/26/2023" CNSTR_WKBG_DT="6/24/2024" CNSTR_PCT_TIME_USED="82.50" CNSTR_PCT_COMPLETE="95.10" DSGN_START_TRGT_DT="6/8/2022" DSGN_START_ACTL_DT="6/8/2022" ENVCLR_TRGT_DT="7/14/2022" ENVCLR_ACTL_DT="7/11/2022" UTIL_TRGT_DT="9/2/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="9/2/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="6942.43" CE_SPENT_AMT="344.12" TOT_SPENT_AMT="7286.55" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="13916.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808092" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 21-P" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="0.338 MI W OF FM 225" LIMITS_TO_DSCR="BU 59F" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="704611" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="19.13" CNSTR_PCT_COMPLETE="35.35" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/27/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/8/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="234825.02" CE_SPENT_AMT="1101.98" TOT_SPENT_AMT="235927.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="633643.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808093" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 7-N" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="MOUND ST" LIMITS_TO_DSCR="BS 21P" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="961107" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="19.13" CNSTR_PCT_COMPLETE="35.35" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/27/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/8/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="337536.45" CE_SPENT_AMT="1583.98" TOT_SPENT_AMT="339120.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="846366.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808095" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 21-P" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="SH 21/BS 7N" LIMITS_TO_DSCR="SL 224" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/31/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="891474" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="7/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/20/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/8/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="1/13/2025" CNSTR_WKBG_DT="2/3/2025" CNSTR_PCT_TIME_USED="19.13" CNSTR_PCT_COMPLETE="35.35" DSGN_START_TRGT_DT="5/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/20/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/27/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/8/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="309702.44" CE_SPENT_AMT="1453.36" TOT_SPENT_AMT="311155.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="808583.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011808096" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 21" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="SL 224" LIMITS_TO_DSCR="0.4 MI W OF FM 226" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="461026" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="497908.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011809009" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 547" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 21" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99211" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="85328.02" CE_SPENT_AMT="985.75" TOT_SPENT_AMT="86313.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="79997.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011810068" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="NACOGDOCHES COUNTY LINE" LIMITS_TO_DSCR="SH 147 N" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="691532" DIST_LET_DATE="11/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/16/2021" CNSTR_WKBG_DT="6/10/2022" CNSTR_PCT_TIME_USED="91.80" CNSTR_PCT_COMPLETE="89.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="262.08" CNSTR_SPENT_AMT="611334.96" CE_SPENT_AMT="7425.28" TOT_SPENT_AMT="619022.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="531502.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011810069" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="NACOGDOCHES COUNTY LINE" LIMITS_TO_DSCR="SH 147 N" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2098372" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2022" PSE_100_ACTL_DT="7/7/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="5/8/2023" CNSTR_PCT_TIME_USED="86.47" CNSTR_PCT_COMPLETE="96.30" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="4/1/2022" ENVCLR_TRGT_DT="6/28/2022" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="9/30/2022" UTIL_ACTL_DT="9/30/2022" ROW_TRGT_DT="9/28/2022" ROW_ACTL_DT="9/28/2022" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="2106043.45" CE_SPENT_AMT="35714.18" TOT_SPENT_AMT="2141757.63" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1945559.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011810070" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="US 96" LIMITS_TO_DSCR="SH 147" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="12/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="33820" DIST_LET_DATE="1/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy King, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4472" CNSTR_CMPNY_NM="THIRD COAST SERVICES LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="8.33" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="42233.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011811009" PT_PHASE="Construction underway or begins soon" HWY_NBR="SL 34" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="FM 95" LIMITS_TO_DSCR="SH 21" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="47003" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" PE_SPENT_AMT="350.24" CNSTR_SPENT_AMT="27952.28" CE_SPENT_AMT="323.00" TOT_SPENT_AMT="28625.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="35106.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011812015" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 353" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 147" LIMITS_TO_DSCR="SHELBY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4496429" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="3/8/2034" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/14/2034" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/6/2034" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.890 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/9/2034" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/14/2034" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="12/6/2034" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/6/2034" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/3/2034" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="5036000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011812021" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 353" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="SH 147" LIMITS_TO_DSCR="SHELBY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="317246" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="300119.19" CE_SPENT_AMT="4686.78" TOT_SPENT_AMT="304805.97" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="266560.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011813014" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 353" CNTY_NM="Shelby" LIMITS_FROM_DSCR="SAN AUGUSTINE COUNTY LINE" LIMITS_TO_DSCR="SH 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1696429" DIST_LET_DATE="1/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="1900000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011813015" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 353" CNTY_NM="Shelby" LIMITS_FROM_DSCR="SAN AUGUSTINE COUNTY LINE" LIMITS_TO_DSCR="SH 87" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="132407" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/20/2022" PSE_60_ACTL_DT="5/20/2022" PSE_100_TRGT_DT="8/5/2022" PSE_100_ACTL_DT="8/5/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/14/2022" CNSTR_WKBG_DT="7/19/2023" CNSTR_PCT_TIME_USED="126.40" CNSTR_PCT_COMPLETE="92.32" DSGN_START_TRGT_DT="3/1/2022" DSGN_START_ACTL_DT="3/1/2022" ENVCLR_TRGT_DT="8/3/2022" ENVCLR_ACTL_DT="8/3/2022" UTIL_TRGT_DT="9/6/2022" UTIL_ACTL_DT="9/6/2022" ROW_TRGT_DT="9/6/2022" ROW_ACTL_DT="9/6/2022" RTL_TRGT_DT="9/2/2022" RTL_ACTL_DT="9/2/2022" CNSTR_SPENT_AMT="120636.14" CE_SPENT_AMT="2248.61" TOT_SPENT_AMT="122884.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="112210.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011901018" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="FM 1" LIMITS_TO_DSCR="SABINE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="947191" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/8/2033" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/14/2033" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/6/2034" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.355 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/6/2031" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/9/2033" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/23/2034" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/6/2034" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/2/2035" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011901019" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="San Augustine" LIMITS_FROM_DSCR="FM 1" LIMITS_TO_DSCR="SABINE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="108201" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="5300.12" CE_SPENT_AMT="15.27" TOT_SPENT_AMT="5315.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="105826.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011902017" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 21" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SAN AUGUSTINE COUNTY LINE" LIMITS_TO_DSCR="FM 330" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3163000" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="6/8/2033" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="9/14/2033" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/6/2034" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.364 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/6/2031" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/9/2033" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/23/2034" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/6/2034" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/2/2035" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011902022" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SAN AUGUSTINE COUNTY LINE" LIMITS_TO_DSCR="FM 330" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="351907" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="14733.40" CE_SPENT_AMT="49.80" TOT_SPENT_AMT="14783.20" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="343307.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011903030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Sabine" LIMITS_FROM_DSCR="FM 330" LIMITS_TO_DSCR="SH 87" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="579310" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="3/24/2025" CNSTR_PCT_TIME_USED="37.16" CNSTR_PCT_COMPLETE="20.08" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="23680.10" CE_SPENT_AMT="81.55" TOT_SPENT_AMT="23761.65" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="507404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011904035" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Sabine" LIMITS_FROM_DSCR="SH 87" LIMITS_TO_DSCR="1.9 MI NE OF FM 3121" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1393108" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2022" PSE_100_ACTL_DT="7/7/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.000 (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="5/8/2023" CNSTR_PCT_TIME_USED="86.47" CNSTR_PCT_COMPLETE="96.30" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="4/1/2022" ENVCLR_TRGT_DT="6/28/2022" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="9/30/2022" UTIL_ACTL_DT="9/30/2022" ROW_TRGT_DT="9/28/2022" ROW_ACTL_DT="9/28/2022" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="1364376.91" CE_SPENT_AMT="17899.85" TOT_SPENT_AMT="1382276.76" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1278302.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011905003" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Sabine" LIMITS_FROM_DSCR="1.9 MI NE OF FM 3121" LIMITS_TO_DSCR="SABINE RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="263829" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2022" PSE_100_ACTL_DT="7/7/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="5/8/2023" CNSTR_PCT_TIME_USED="86.47" CNSTR_PCT_COMPLETE="96.30" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="4/1/2022" ENVCLR_TRGT_DT="6/28/2022" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="9/30/2022" UTIL_ACTL_DT="9/30/2022" ROW_TRGT_DT="9/28/2022" ROW_ACTL_DT="9/28/2022" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="183089.25" CE_SPENT_AMT="2402.03" TOT_SPENT_AMT="185491.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="266332.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="011905004" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 21" CNTY_NM="Sabine" LIMITS_FROM_DSCR="0.65 MI W OF SABINE RIVER BRIDGE" LIMITS_TO_DSCR="0.35 MI W OF SABINE RIVER BRIDGE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1987987" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="8/30/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="11/29/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/1/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Sisco, P.E." TXDOT_CNTCT_PH_NBR="(936)633-4331" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="8/1/2024" CNSTR_WKBG_DT="1/7/2025" CNSTR_PCT_TIME_USED="43.93" CNSTR_PCT_COMPLETE="45.65" DSGN_START_TRGT_DT="9/15/2022" DSGN_START_ACTL_DT="9/15/2022" ENVCLR_TRGT_DT="2/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/5/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/6/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/5/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="11316.30" CNSTR_SPENT_AMT="953782.99" CE_SPENT_AMT="29203.10" TOT_SPENT_AMT="994302.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1706779.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012001020" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 22" CNTY_NM="Hamilton" LIMITS_FROM_DSCR="SH 36" LIMITS_TO_DSCR="FM 1602" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4590000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Construct Frontage Roads" PSE_30_TRGT_DT="2/12/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/18/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/10/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.142 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/18/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/25/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/14/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="5140800.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012001021" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 22" CNTY_NM="Hamilton" LIMITS_FROM_DSCR="SH 36" LIMITS_TO_DSCR="FM 1602" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10253020" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="3/4/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/17/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/21/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.077 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/12/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/13/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/11/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="11483382.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012002016" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 22" CNTY_NM="Hamilton" LIMITS_FROM_DSCR="FM 1602" LIMITS_TO_DSCR="BOSQUE CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7124980" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="3/4/2026" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/17/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/21/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.141 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/12/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/13/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/11/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="7124980.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012003031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 22" CNTY_NM="Bosque" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="FM 2136" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9797443" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/8/2020" PSE_30_ACTL_DT="4/8/2020" PSE_60_TRGT_DT="6/17/2020" PSE_60_ACTL_DT="6/17/2020" PSE_100_TRGT_DT="10/7/2020" PSE_100_ACTL_DT="10/7/2020" DIST_NM="Waco" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="9/20/2021" CNSTR_WKBG_DT="12/6/2021" CNSTR_PCT_TIME_USED="110.00" CNSTR_PCT_COMPLETE="100.70" DSGN_START_TRGT_DT="11/13/2019" DSGN_START_ACTL_DT="11/13/2019" ENVCLR_TRGT_DT="7/23/2020" ENVCLR_ACTL_DT="7/23/2020" UTIL_TRGT_DT="10/12/2015" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/12/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/2/2020" RTL_ACTL_DT="11/2/2020" PE_SPENT_AMT="762719.20" CNSTR_SPENT_AMT="11941853.76" CE_SPENT_AMT="483174.78" TOT_SPENT_AMT="13187747.74" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="13750000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012003032" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 22" CNTY_NM="Bosque" LIMITS_FROM_DSCR="HAMILTON CL" LIMITS_TO_DSCR="FM 2136" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10070000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/18/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/18/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/11/2020" ENVCLR_ACTL_DT="8/11/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="11278400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012003033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012003034" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012004012" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 218" CNTY_NM="Mills" LIMITS_FROM_DSCR="SH 16" LIMITS_TO_DSCR="HAMILTON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="97734" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.137 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="109462.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012005027" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 218" CNTY_NM="Hamilton" LIMITS_FROM_DSCR="MILLS CL" LIMITS_TO_DSCR="FM 2486" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1037647" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/20/2022" PSE_60_ACTL_DT="4/20/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="8/22/2023" CNSTR_PCT_TIME_USED="88.33" CNSTR_PCT_COMPLETE="102.03" DSGN_START_TRGT_DT="2/2/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/8/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/8/2022" RTL_ACTL_DT="7/8/2022" CNSTR_SPENT_AMT="807943.19" CE_SPENT_AMT="7219.71" TOT_SPENT_AMT="815162.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1352466.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012005028" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 218" CNTY_NM="Hamilton" LIMITS_FROM_DSCR="@ FM 1702" LIMITS_TO_DSCR="@ FM 1702" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="228264" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="RHINO EQUITY, LLC" CNSTR_NTPD_DT="4/9/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="77183.40" CE_SPENT_AMT="63.36" TOT_SPENT_AMT="77246.76" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="228264.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012101050" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 22" CNTY_NM="Bosque" LIMITS_FROM_DSCR="FM 219" LIMITS_TO_DSCR="HILL C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7280000" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="2/21/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/29/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/6/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/13/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/3/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/13/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="802461.01" TOT_SPENT_AMT="802461.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="7862400.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012101052" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 22" CNTY_NM="Bosque" LIMITS_FROM_DSCR="FM 1991" LIMITS_TO_DSCR="FM 219" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15500000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="4/18/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/18/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/18/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/18/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/11/2020" ENVCLR_ACTL_DT="8/11/2020" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="17360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012101053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012102059" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 22" CNTY_NM="Hill" LIMITS_FROM_DSCR="SH 171" LIMITS_TO_DSCR="SH 81" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="8/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/2/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.310 (mi)" TXDOT_CNTCT_NM="Victor Goebel, P.E." TXDOT_CNTCT_PH_NBR="254-867-2873" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/1/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="629703.53" TOT_SPENT_AMT="629703.53" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="2600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012102062" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 22" CNTY_NM="Hill" LIMITS_FROM_DSCR="AT SH 171/HOUSTON ST" LIMITS_TO_DSCR="AT SH 171/HOUSTON ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15520" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="12/15/2021" PSE_30_ACTL_DT="12/15/2021" PSE_60_TRGT_DT="2/2/2022" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="4/20/2022" PSE_100_ACTL_DT="4/20/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chris Pruitt, P.E." TXDOT_CNTCT_PH_NBR="(254)867-2800" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="3/11/2024" CNSTR_PCT_TIME_USED="53.33" CNSTR_PCT_COMPLETE="86.51" DSGN_START_TRGT_DT="10/18/2021" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/9/2022" ENVCLR_ACTL_DT="5/10/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/18/2022" RTL_ACTL_DT="6/2/2022" PE_SPENT_AMT="80.57" CNSTR_SPENT_AMT="8443.81" CE_SPENT_AMT="141.13" TOT_SPENT_AMT="8665.51" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="35594.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012102063" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 22" CNTY_NM="Hill" LIMITS_FROM_DSCR="FM 933" LIMITS_TO_DSCR="HILLSBORO CITY LIMIT" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="1/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1091162" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/20/2022" PSE_60_ACTL_DT="4/20/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="7/6/2022" DIST_NM="Waco" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeff Jackson, P.E." TXDOT_CNTCT_PH_NBR="(254)865-7115" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="8/22/2023" CNSTR_PCT_TIME_USED="88.33" CNSTR_PCT_COMPLETE="102.03" DSGN_START_TRGT_DT="2/2/2022" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/8/2022" ENVCLR_ACTL_DT="6/8/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/8/2022" RTL_ACTL_DT="7/8/2022" CNSTR_SPENT_AMT="1148708.37" CE_SPENT_AMT="10264.73" TOT_SPENT_AMT="1158973.10" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="894455.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012102065" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012103067" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012104029" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 22" CNTY_NM="Navarro" LIMITS_FROM_DSCR="HILL COUNTY LINE" LIMITS_TO_DSCR="FM 667" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="364714" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.915 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.79" CNSTR_PCT_COMPLETE="93.95" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="459613.43" CE_SPENT_AMT="2978.86" TOT_SPENT_AMT="462592.29" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="365609.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012104030" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012105052" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 22" CNTY_NM="Navarro" LIMITS_FROM_DSCR="NW CR 1190" LIMITS_TO_DSCR="W OF 37TH ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="487251" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.239 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="40.83" CNSTR_PCT_COMPLETE="30.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="180834.06" CE_SPENT_AMT="429.51" TOT_SPENT_AMT="181263.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="469582.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012105053" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 22" CNTY_NM="Navarro" LIMITS_FROM_DSCR="37TH STREET" LIMITS_TO_DSCR="BS SH 31D" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1812324" DIST_LET_DATE="8/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2029803.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012108021" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 55" CNTY_NM="Navarro" LIMITS_FROM_DSCR="3RD ST BLOOMING GROVE (NEAR SH 22)" LIMITS_TO_DSCR="SH 31" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="713537" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="12/1/2022" PSE_30_ACTL_DT="12/1/2022" PSE_60_TRGT_DT="3/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.991 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="1/29/2024" CNSTR_PCT_TIME_USED="88.89" CNSTR_PCT_COMPLETE="99.85" DSGN_START_TRGT_DT="12/1/2022" DSGN_START_ACTL_DT="12/1/2022" ENVCLR_TRGT_DT="7/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="873172.11" CE_SPENT_AMT="7190.47" TOT_SPENT_AMT="880362.58" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="640131.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012201042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="W OF GRANDVIEW DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="714723" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.951 (mi)" TXDOT_CNTCT_NM="David Morren, P.E." TXDOT_CNTCT_PH_NBR="(214)319-3574" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="2/7/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="705672.08" CE_SPENT_AMT="3743.10" TOT_SPENT_AMT="709415.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="865130.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012201043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="IH 45" LIMITS_TO_DSCR="FM 637" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1374655" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.920 (mi)" TXDOT_CNTCT_NM="Juan Paredes, P.E." TXDOT_CNTCT_PH_NBR="(903)874-4351" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="12/16/2019" CNSTR_WKBG_DT="3/26/2020" CNSTR_PCT_TIME_USED="91.40" CNSTR_PCT_COMPLETE="87.12" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="98408.74" CNSTR_SPENT_AMT="1443718.26" CE_SPENT_AMT="11865.27" TOT_SPENT_AMT="1553992.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="2393676.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012201046" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 287T" CNTY_NM="Navarro" LIMITS_FROM_DSCR="BI 45F" LIMITS_TO_DSCR="IH 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53934" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.805 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.79" CNSTR_PCT_COMPLETE="93.95" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="67174.29" CE_SPENT_AMT="435.37" TOT_SPENT_AMT="67609.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="53066.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012201047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="LAKE HALBERT RD" LIMITS_TO_DSCR="W OF SS 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="529155" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.759 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="592654.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012201048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="FM 739" LIMITS_TO_DSCR="W OF CR 4901 (END OF JUG)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72542" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.841 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="40.83" CNSTR_PCT_COMPLETE="30.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="26407.52" CE_SPENT_AMT="62.72" TOT_SPENT_AMT="26470.24" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="70810.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012201049" PT_PHASE="Planning, 10+ years" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="AT LAKE HALBERT BRIDGE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12248447" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.357 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="415063.97" TOT_SPENT_AMT="415063.97" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012202031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="GRANDVIEW ST" LIMITS_TO_DSCR="SS 294" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="72756" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.571 (mi)" TXDOT_CNTCT_NM="David Morren, P.E." TXDOT_CNTCT_PH_NBR="(214)319-3574" CNSTR_CMPNY_NM="BRANNAN PAVING CO., LTD." CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="2/7/2020" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="89.80" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="71004.16" CE_SPENT_AMT="376.64" TOT_SPENT_AMT="71380.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="636703.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012202032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Navarro" LIMITS_FROM_DSCR="1.0 MI W OF SS 294" LIMITS_TO_DSCR="FREESTONE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="840140" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.750 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="2/17/2025" CNSTR_PCT_TIME_USED="40.83" CNSTR_PCT_COMPLETE="30.29" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="311723.47" CE_SPENT_AMT="740.41" TOT_SPENT_AMT="312463.88" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="809130.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012203033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 287" CNTY_NM="Freestone" LIMITS_FROM_DSCR="0.1 MI W OF FM 488" LIMITS_TO_DSCR="0.1 MI E OF FM 488" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="839267" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Intersection Improvements With Right And/or Left Turn Lanes" PSE_30_TRGT_DT="11/8/2021" PSE_30_ACTL_DT="11/8/2021" PSE_60_TRGT_DT="1/1/2022" PSE_60_ACTL_DT="1/1/2022" PSE_100_TRGT_DT="5/9/2022" PSE_100_ACTL_DT="5/9/2022" DIST_NM="Bryan" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Delmy Reyes, P.E." TXDOT_CNTCT_PH_NBR="(936)295-3462" CNSTR_CMPNY_NM="BIG CREEK CONSTRUCTION, LTD." CNSTR_NTPD_DT="9/20/2022" CNSTR_WKBG_DT="1/9/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="114.93" DSGN_START_TRGT_DT="9/8/2021" DSGN_START_ACTL_DT="9/8/2021" ENVCLR_TRGT_DT="5/29/2022" ENVCLR_ACTL_DT="5/29/2022" UTIL_TRGT_DT="5/9/2022" UTIL_ACTL_DT="5/9/2022" ROW_TRGT_DT="5/9/2022" ROW_ACTL_DT="5/9/2022" RTL_TRGT_DT="5/9/2022" RTL_ACTL_DT="5/9/2022" PE_SPENT_AMT="71977.35" CNSTR_SPENT_AMT="1119296.02" CE_SPENT_AMT="60664.66" TOT_SPENT_AMT="1251938.03" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="156722.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012203035" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012204040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 287" CNTY_NM="Anderson" LIMITS_FROM_DSCR="FM 321" LIMITS_TO_DSCR="FREESTONE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1245959" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1395474.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012207003" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 294" CNTY_NM="Navarro" LIMITS_FROM_DSCR="SH 287" LIMITS_TO_DSCR="END OF MAINTENANCE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="90971" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.241 (mi)" TXDOT_CNTCT_NM="Jeffrey A. Bush, P.E." TXDOT_CNTCT_PH_NBR="(214)320-6199" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="98.79" CNSTR_PCT_COMPLETE="93.95" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="114903.37" CE_SPENT_AMT="744.76" TOT_SPENT_AMT="115648.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="88994.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012301038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Anderson" LIMITS_FROM_DSCR="SL 256 IN PALESTINE, E" LIMITS_TO_DSCR="3 MI  E OF FM 3266 E OF CR391" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="415546" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="448169.18" CE_SPENT_AMT="6840.21" TOT_SPENT_AMT="455009.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="427000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012301040" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Anderson" LIMITS_FROM_DSCR="SL 256" LIMITS_TO_DSCR="CHEROKEE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1267347" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="1419428.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012301041" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Anderson" LIMITS_FROM_DSCR="US 287" LIMITS_TO_DSCR="LP256 S" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79269" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="88781.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012301042" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Anderson" LIMITS_FROM_DSCR="CO RD 399" LIMITS_TO_DSCR=".18 MI W. CHEROKEE CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6090200" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1118.97" TOT_SPENT_AMT="1118.97" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6090200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012302046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="ANDERSON C/L, E" LIMITS_TO_DSCR="FM 343 IN RUSK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="765681" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="826476.68" CE_SPENT_AMT="12614.26" TOT_SPENT_AMT="839090.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="840000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012302048" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Cherokee" LIMITS_FROM_DSCR=".18 MI W. CHEROKEE CL" LIMITS_TO_DSCR="1.5 MI WEST OF FM 747" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6090200" DIST_LET_DATE="1/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="920.54" TOT_SPENT_AMT="920.54" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="6090200.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012303022" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="0.5 MI E OF SH 110, IN RUSK, NE" LIMITS_TO_DSCR="RUSK C/L IN REKLAW" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/29/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7859265" DIST_LET_DATE="1/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="7/14/2017" PSE_30_ACTL_DT="8/10/2017" PSE_60_TRGT_DT="9/15/2017" PSE_60_ACTL_DT="10/30/2017" PSE_100_TRGT_DT="2/1/2018" PSE_100_ACTL_DT="9/30/2018" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.330 (mi)" TXDOT_CNTCT_NM="Paul Schneider, P.E. " TXDOT_CNTCT_PH_NBR="(903)509-9066" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="3/5/2021" CNSTR_WKBG_DT="4/5/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.03" DSGN_START_TRGT_DT="4/3/2017" DSGN_START_ACTL_DT="4/3/2017" ENVCLR_TRGT_DT="12/31/2020" ENVCLR_ACTL_DT="10/21/2020" UTIL_TRGT_DT="6/13/2018" UTIL_ACTL_DT="9/4/2020" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/19/2020" RTL_ACTL_DT="11/6/2020" PE_SPENT_AMT="304273.38" CNSTR_SPENT_AMT="7908835.86" CE_SPENT_AMT="351652.12" TOT_SPENT_AMT="8564761.36" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="9800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012303023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="LP 62" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="85048" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="3/11/2025" CNSTR_PCT_TIME_USED="37.06" CNSTR_PCT_COMPLETE="41.44" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/25/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="44590.32" CE_SPENT_AMT="122.07" TOT_SPENT_AMT="44712.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="99062.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012303024" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Cherokee" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="SH 110" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="173786" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/16/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/6/2025" CNSTR_WKBG_DT="3/11/2025" CNSTR_PCT_TIME_USED="37.06" CNSTR_PCT_COMPLETE="41.44" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/25/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/16/2024" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="91304.00" CE_SPENT_AMT="249.91" TOT_SPENT_AMT="91553.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="201846.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012304023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Rusk" LIMITS_FROM_DSCR="FM 2753, E" LIMITS_TO_DSCR="FM 225" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2429719" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="5/27/2020" PSE_30_ACTL_DT="12/1/2020" PSE_60_TRGT_DT="8/20/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/28/2020" PSE_100_ACTL_DT="11/15/2021" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.083 (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="84.39" CNSTR_PCT_COMPLETE="98.76" DSGN_START_TRGT_DT="2/3/2020" DSGN_START_ACTL_DT="2/3/2020" ENVCLR_TRGT_DT="3/1/2023" ENVCLR_ACTL_DT="9/17/2021" UTIL_TRGT_DT="11/30/2020" UTIL_ACTL_DT="10/3/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/20/2023" RTL_ACTL_DT="10/13/2022" PE_SPENT_AMT="151685.90" CNSTR_SPENT_AMT="3701462.05" CE_SPENT_AMT="91791.22" TOT_SPENT_AMT="3944939.17" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="3077701.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012305015" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Rusk" LIMITS_FROM_DSCR="FM 225, E" LIMITS_TO_DSCR="CR 3155" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/23/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12866630" DIST_LET_DATE="1/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="8/10/2017" PSE_30_ACTL_DT="8/10/2017" PSE_60_TRGT_DT="10/30/2017" PSE_60_ACTL_DT="10/30/2017" PSE_100_TRGT_DT="9/30/2018" PSE_100_ACTL_DT="9/30/2018" DIST_NM="Tyler" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="DREWERY CONSTRUCTION COMPANY, INCORPORATED" CNSTR_NTPD_DT="2/14/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="144.86" CNSTR_PCT_COMPLETE="54.81" DSGN_START_TRGT_DT="4/3/2017" DSGN_START_ACTL_DT="1/2/2017" ENVCLR_TRGT_DT="4/6/2023" ENVCLR_ACTL_DT="10/21/2022" UTIL_TRGT_DT="4/14/2022" UTIL_ACTL_DT="4/14/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/6/2022" RTL_ACTL_DT="7/8/2022" PE_SPENT_AMT="231642.08" CNSTR_SPENT_AMT="7046208.01" CE_SPENT_AMT="135020.19" TOT_SPENT_AMT="7412870.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="11734694.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012305016" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Rusk" LIMITS_FROM_DSCR="W OF US 259 IN MT. ENTERPRISE, W" LIMITS_TO_DSCR="CR 3155" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99208" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="106769.71" CE_SPENT_AMT="1629.63" TOT_SPENT_AMT="108399.34" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="139000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012306031" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 84" CNTY_NM="Rusk" LIMITS_FROM_DSCR="SHELBY CL" LIMITS_TO_DSCR="2ND STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="669538" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="749882.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012307023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 84" CNTY_NM="Shelby" LIMITS_FROM_DSCR="RUSK COUNTY LINE" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1078347" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/7/2022" PSE_100_ACTL_DT="7/7/2022" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Randal Cooper, P.E." TXDOT_CNTCT_PH_NBR="(936)564-7782" CNSTR_CMPNY_NM="TEXAS MATERIALS GROUP, INC." CNSTR_NTPD_DT="3/23/2023" CNSTR_WKBG_DT="5/8/2023" CNSTR_PCT_TIME_USED="86.47" CNSTR_PCT_COMPLETE="96.30" DSGN_START_TRGT_DT="4/1/2022" DSGN_START_ACTL_DT="4/1/2022" ENVCLR_TRGT_DT="6/28/2022" ENVCLR_ACTL_DT="6/28/2022" UTIL_TRGT_DT="9/30/2022" UTIL_ACTL_DT="9/30/2022" ROW_TRGT_DT="9/28/2022" ROW_ACTL_DT="9/28/2022" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="1034402.50" CE_SPENT_AMT="14160.91" TOT_SPENT_AMT="1048563.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="990830.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012308014" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 415" CNTY_NM="Shelby" LIMITS_FROM_DSCR="SH 87" LIMITS_TO_DSCR="FM 138" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/31/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="333072" DIST_LET_DATE="11/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.848 (mi)" TXDOT_CNTCT_NM="Clint Jones, P.E." TXDOT_CNTCT_PH_NBR="(936)327-8981" CNSTR_CMPNY_NM="D. I. J. CONSTRUCTION, INC." CNSTR_NTPD_DT="12/10/2019" CNSTR_WKBG_DT="3/31/2020" CNSTR_PCT_TIME_USED="46.22" CNSTR_PCT_COMPLETE="94.55" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="290938.76" CE_SPENT_AMT="4761.04" TOT_SPENT_AMT="295699.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="280844.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012402035" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 283" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="FM 925" LIMITS_TO_DSCR="FM 924" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5113470" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="OVERLAND CORPORATION" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="2/25/2025" CNSTR_PCT_TIME_USED="74.79" CNSTR_PCT_COMPLETE="91.69" DSGN_START_TRGT_DT="2/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="20887.07" CNSTR_SPENT_AMT="4080510.40" CE_SPENT_AMT="55552.95" TOT_SPENT_AMT="4156950.42" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="5560620.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012403065" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 283" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="PEASE RIVER" LIMITS_TO_DSCR="0.4 MILES N OF US 70 NBFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="27026" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1808.88" CE_SPENT_AMT="0.51" TOT_SPENT_AMT="1809.39" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="31738.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012403066" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 283" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="PEASE RIVER" LIMITS_TO_DSCR="FM 925" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="530194" DIST_LET_DATE="7/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="OVERLAND CORPORATION" CNSTR_NTPD_DT="8/14/2024" CNSTR_WKBG_DT="2/25/2025" CNSTR_PCT_TIME_USED="74.79" CNSTR_PCT_COMPLETE="91.69" DSGN_START_TRGT_DT="2/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="74.04" CNSTR_SPENT_AMT="489187.50" CE_SPENT_AMT="7287.60" TOT_SPENT_AMT="496549.14" FUND_CAT1_DSCR="Category 11 - District Discretionary (2411)" FUND_CAT1_AMT="581040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012404042" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 183" CNTY_NM="Wilbarger" LIMITS_FROM_DSCR="NEAR FM 2585" LIMITS_TO_DSCR="NEAR FM 1763" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="439317" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="492035.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012405031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 183" CNTY_NM="Baylor" LIMITS_FROM_DSCR="WICHITA RIVER" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="260745" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="4.95" TOT_SPENT_AMT="4.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="278181.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012405032" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012501034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 183" CNTY_NM="Baylor" LIMITS_FROM_DSCR="US 277" LIMITS_TO_DSCR="THROCKMORTON CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7724537" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Adding Shoulders With No Added Capacity" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/7/2022" PSE_60_ACTL_DT="6/7/2022" PSE_100_TRGT_DT="6/2/2022" PSE_100_ACTL_DT="6/16/2022" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Zachary Husen, P.E." TXDOT_CNTCT_PH_NBR="(940)549-0676" CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="4/17/2023" CNSTR_PCT_TIME_USED="102.38" CNSTR_PCT_COMPLETE="104.80" DSGN_START_TRGT_DT="11/1/2021" DSGN_START_ACTL_DT="11/1/2021" ENVCLR_TRGT_DT="9/23/2022" ENVCLR_ACTL_DT="7/25/2022" UTIL_TRGT_DT="6/2/2022" UTIL_ACTL_DT="6/2/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/23/2022" RTL_ACTL_DT="7/22/2022" PE_SPENT_AMT="436221.17" CNSTR_SPENT_AMT="8103689.86" CE_SPENT_AMT="150782.33" TOT_SPENT_AMT="8690693.36" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6901652.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012502036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 183" CNTY_NM="Throckmorton" LIMITS_FROM_DSCR="BAYLOR COUNTY LINE" LIMITS_TO_DSCR="COLLEGE ST" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="840494" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="488.14" TOT_SPENT_AMT="488.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="907734.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012503054" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 183" CNTY_NM="Throckmorton" LIMITS_FROM_DSCR="COLLEGE ST" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15662" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="488.14" TOT_SPENT_AMT="488.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="16915.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012503055" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 283" CNTY_NM="Throckmorton" LIMITS_FROM_DSCR="US 183 SPLIT" LIMITS_TO_DSCR="FM 209" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="363428" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.87" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="865.06" CNSTR_SPENT_AMT="303571.98" CE_SPENT_AMT="2741.02" TOT_SPENT_AMT="307178.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="413580.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012503056" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 283" CNTY_NM="Throckmorton" LIMITS_FROM_DSCR="US 183" LIMITS_TO_DSCR="SHACKLEFORD COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7800000" DIST_LET_DATE="5/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="10/2/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/7/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/23/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="10/2/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/7/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/25/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/25/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/27/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4504.78" TOT_SPENT_AMT="4504.78" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="8112000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012503057" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 183" CNTY_NM="Throckmorton" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="US 283" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="380494" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/10/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/19/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="426153.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012601041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012602021" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 6" CNTY_NM="Callahan" LIMITS_FROM_DSCR="SHACKELFORD CO LINE" LIMITS_TO_DSCR="EASTLAND CO LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92516" DIST_LET_DATE="12/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Abilene" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Michael Haithcock, P.E." TXDOT_CNTCT_PH_NBR="325-676-6810" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="92516.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012603034" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 6" CNTY_NM="Eastland" LIMITS_FROM_DSCR="FM 2807" LIMITS_TO_DSCR="UNION PACIFIC RAILROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3035807" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.079 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="37504.82" TOT_SPENT_AMT="37504.82" FUND_CAT1_DSCR="Category PA - Plan Authority (PLAN)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012603039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 6" CNTY_NM="Eastland" LIMITS_FROM_DSCR="FM 1853" LIMITS_TO_DSCR="US 183 N." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="630320" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.138 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="74699.28" CE_SPENT_AMT="29.23" TOT_SPENT_AMT="74728.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="425852.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012603040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 183" CNTY_NM="Eastland" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="SH 206" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15235" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.000 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1623.91" CE_SPENT_AMT="0.64" TOT_SPENT_AMT="1624.55" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="23683.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012603042" PT_PHASE="Planning, 10+ years" HWY_NBR="SH 6" CNTY_NM="Eastland" LIMITS_FROM_DSCR="FM 1853" LIMITS_TO_DSCR="FM 2807" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="11000000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.824 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="12320000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012701036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 183" CNTY_NM="Eastland" LIMITS_FROM_DSCR="SH 6" LIMITS_TO_DSCR="0.1 MI S OF IH 20 SFR" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="86025" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.322 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="10149.36" CE_SPENT_AMT="3.97" TOT_SPENT_AMT="10153.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="81450.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012701038" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012702144" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 183" CNTY_NM="Eastland" LIMITS_FROM_DSCR="5 MI. N OF RISING STAR NCL" LIMITS_TO_DSCR="N CITY LIMIT OF RISING STAR" PRJ_TIER="" ENERGY="" FREIGHT="" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="341973" DIST_LET_DATE="11/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.036 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012702145" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 183" CNTY_NM="Eastland" LIMITS_FROM_DSCR="RISING STAR S CITY LIMITS" LIMITS_TO_DSCR="BROWN C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="62814" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.686 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="7307.54" CE_SPENT_AMT="2.86" TOT_SPENT_AMT="7310.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="37916.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012702150" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 183" CNTY_NM="Eastland" LIMITS_FROM_DSCR="CR 173 (CS)" LIMITS_TO_DSCR="RISING STAR S.C.L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="101848" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.290 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="109996.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012702151" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 183" CNTY_NM="Eastland" LIMITS_FROM_DSCR="RISING STAR N.C.L." LIMITS_TO_DSCR="RISING STAR S.C.L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="101848" DIST_LET_DATE="11/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.258 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012703035" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 183" CNTY_NM="Brown" LIMITS_FROM_DSCR="EASTLAND C/L" LIMITS_TO_DSCR="FM 1467" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1449528" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="14.685 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="179237.62" CE_SPENT_AMT="70.09" TOT_SPENT_AMT="179307.71" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="734156.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012703036" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012704038" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012801104" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Brown" LIMITS_FROM_DSCR="BAKER STREET" LIMITS_TO_DSCR="FM 2524" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="1/1/2036" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen 4 Lane Undivided To 4 Lane Divided With Flush Median" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.346 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="92222.70" TOT_SPENT_AMT="92222.70" FUND_CAT1_DSCR="Category PA - Develop Authority (CANDPA)" FUND_CAT1_AMT="3000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012801109" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Brown" LIMITS_FROM_DSCR="FM 45" LIMITS_TO_DSCR="MCCULLOCH C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="125000000" DIST_LET_DATE="1/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="16.399 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="51936.11" TOT_SPENT_AMT="51936.11" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="6000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012801115" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 377" CNTY_NM="Brown" LIMITS_FROM_DSCR="18TH ST." LIMITS_TO_DSCR="NEAR FM 3064" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000001" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="88700.59" TOT_SPENT_AMT="88700.59" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012801117" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Brown" LIMITS_FROM_DSCR="FM 45" LIMITS_TO_DSCR="MCCULLOCH C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1854434" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="16.642 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/12/2024" CNSTR_WKBG_DT="4/28/2025" CNSTR_PCT_TIME_USED="32.08" CNSTR_PCT_COMPLETE="45.42" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="852966.83" CE_SPENT_AMT="37.76" TOT_SPENT_AMT="853004.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1027127.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012801120" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Brown" LIMITS_FROM_DSCR="US 67" LIMITS_TO_DSCR="FM 45" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="51633" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.792 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="55764.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012801121" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012802021" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2376" CNTY_NM="Brown" LIMITS_FROM_DSCR="END OF STATE MAINTENANCE" LIMITS_TO_DSCR="FM 45" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="167763" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.248 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="19689.76" CE_SPENT_AMT="7.71" TOT_SPENT_AMT="19697.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="128266.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012802022" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3064" CNTY_NM="Brown" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="FM 2376" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="111808" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.256 (mi)" TXDOT_CNTCT_NM="Casey L. McGee, P.E." TXDOT_CNTCT_PH_NBR="(325)643-0417" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="3/18/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="12.37" CNSTR_PCT_COMPLETE="11.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="12991.18" CE_SPENT_AMT="5.09" TOT_SPENT_AMT="12996.27" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="90165.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012802023" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="FM 2376" CNTY_NM="Brown" LIMITS_FROM_DSCR="STEPHEN F AUSTIN" LIMITS_TO_DSCR="FM 3064" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="250000" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Roadway Rehabilitation/reconstruction With No Added Capacity" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="260000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012803036" PT_PHASE="Planning, 10+ years" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="BROWN COUNTY LINE" LIMITS_TO_DSCR="1.2 MI S OF FM 1028" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="95000000" DIST_LET_DATE="1/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012804037" PT_PHASE="Planning, 10+ years" HWY_NBR="US 377" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="1.2 MI S OF FM 1028" LIMITS_TO_DSCR="US 190" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="95000000" DIST_LET_DATE="1/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="73.71" TOT_SPENT_AMT="73.71" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012804038" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="US 87" LIMITS_TO_DSCR="WEST MAIN STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1006906" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/10/2018" PSE_100_ACTL_DT="9/13/2018" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/28/2018" DSGN_START_ACTL_DT="5/8/2018" ENVCLR_TRGT_DT="7/5/2018" ENVCLR_ACTL_DT="12/16/2016" UTIL_TRGT_DT="5/7/2018" UTIL_ACTL_DT="9/13/2018" ROW_TRGT_DT="5/1/2018" ROW_ACTL_DT="9/13/2018" RTL_TRGT_DT="9/17/2018" RTL_ACTL_DT="9/13/2018" PE_SPENT_AMT="122885.66" TOT_SPENT_AMT="122885.66" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="2160000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012804043" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 190" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="MAIN STREET" LIMITS_TO_DSCR="US 377" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="49358" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.880 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="55281.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012901037" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 1311" CNTY_NM="Mcculloch" LIMITS_FROM_DSCR="US 190" LIMITS_TO_DSCR="MENARD C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="167309" DIST_LET_DATE="11/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Brownwood" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.141 (mi)" TXDOT_CNTCT_NM="Jason Scantling, P.E." TXDOT_CNTCT_PH_NBR="325-643-0415" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="187386.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012902006" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 1311" CNTY_NM="Menard" LIMITS_FROM_DSCR="MCCULLOCH COUNTY LINE" LIMITS_TO_DSCR="SH 29" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="102234" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.943 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/24/2020" CNSTR_WKBG_DT="7/22/2020" CNSTR_PCT_TIME_USED="96.59" CNSTR_PCT_COMPLETE="96.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="137477.93" CE_SPENT_AMT="634.64" TOT_SPENT_AMT="138112.57" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="133000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012903010" PT_PHASE="Construction underway or begins soon" HWY_NBR="RM 1221" CNTY_NM="Menard" LIMITS_FROM_DSCR="SH 29" LIMITS_TO_DSCR="KIMBLE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="368031" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="428313.51" CE_SPENT_AMT="3525.10" TOT_SPENT_AMT="431838.61" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="447753.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="012904008" PT_PHASE="Construction underway or begins soon" HWY_NBR="RM 1221" CNTY_NM="Kimble" LIMITS_FROM_DSCR="MENARD COUNTY LINE" LIMITS_TO_DSCR="US 377" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="52849" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="6/3/2022" PSE_30_ACTL_DT="6/3/2022" PSE_60_TRGT_DT="7/29/2022" PSE_60_ACTL_DT="7/29/2022" PSE_100_TRGT_DT="9/30/2022" PSE_100_ACTL_DT="9/30/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/20/2023" CNSTR_WKBG_DT="7/10/2023" CNSTR_PCT_TIME_USED="94.44" CNSTR_PCT_COMPLETE="102.06" DSGN_START_TRGT_DT="5/9/2022" DSGN_START_ACTL_DT="5/9/2022" ENVCLR_TRGT_DT="9/9/2022" ENVCLR_ACTL_DT="9/9/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/30/2022" RTL_ACTL_DT="9/30/2022" CNSTR_SPENT_AMT="59540.64" CE_SPENT_AMT="495.88" TOT_SPENT_AMT="60036.52" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="63353.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013001022" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013002026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Cochran" LIMITS_FROM_DSCR="EAST MORTON CITY LIMITS" LIMITS_TO_DSCR="HOCKLEY COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="783490" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="462.78" CNSTR_SPENT_AMT="790791.18" CE_SPENT_AMT="10223.20" TOT_SPENT_AMT="801477.16" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="774046.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013003030" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="COCHRAN COUNTY LINE" LIMITS_TO_DSCR="FM 303 SOUTH" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="394987" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/20/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="24.24" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1066.67" TOT_SPENT_AMT="1066.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="443358.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013004035" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="US 385" LIMITS_TO_DSCR="LUBBOCK COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="5/15/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="840659" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/8/2022" PSE_100_ACTL_DT="7/11/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="16.605 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="DIGG COMMERCIAL, LLC" CNSTR_NTPD_DT="9/28/2022" CNSTR_WKBG_DT="11/28/2022" CNSTR_PCT_TIME_USED="153.33" CNSTR_PCT_COMPLETE="93.69" DSGN_START_TRGT_DT="6/6/2022" DSGN_START_ACTL_DT="10/6/2020" ENVCLR_TRGT_DT="6/7/2022" ENVCLR_ACTL_DT="4/25/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/8/2022" RTL_ACTL_DT="7/12/2022" PE_SPENT_AMT="77052.09" CNSTR_SPENT_AMT="740073.80" CE_SPENT_AMT="96275.26" TOT_SPENT_AMT="913401.15" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="724033.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013004038" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="NORTH FM 168" LIMITS_TO_DSCR="KENNEDY STREET IN SMYER" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="212450" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" CNSTR_SPENT_AMT="207198.00" CE_SPENT_AMT="3282.85" TOT_SPENT_AMT="210480.85" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="236064.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013004039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="FM2646" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104650" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" PE_SPENT_AMT="131.70" CNSTR_SPENT_AMT="104752.00" CE_SPENT_AMT="1627.65" TOT_SPENT_AMT="106511.35" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="120280.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013004040" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="S FM168" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="107650" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" CNSTR_SPENT_AMT="108996.00" CE_SPENT_AMT="1678.83" TOT_SPENT_AMT="110674.83" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="113446.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013004041" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="FM2130" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/31/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="104800" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/4/2023" PSE_100_ACTL_DT="3/9/2023" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jeremy Dearing, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4411" CNSTR_CMPNY_NM="WILLIS ELECTRIC CO., LP" CNSTR_NTPD_DT="6/28/2023" CNSTR_WKBG_DT="10/9/2023" CNSTR_PCT_TIME_USED="88.43" CNSTR_PCT_COMPLETE="96.48" DSGN_START_TRGT_DT="12/1/2021" DSGN_START_ACTL_DT="12/1/2021" ENVCLR_TRGT_DT="3/2/2023" ENVCLR_ACTL_DT="2/14/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/4/2023" RTL_ACTL_DT="3/9/2023" CNSTR_SPENT_AMT="92394.00" CE_SPENT_AMT="1579.14" TOT_SPENT_AMT="93973.14" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="117295.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013004042" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Hockley" LIMITS_FROM_DSCR="FM 2646" LIMITS_TO_DSCR="LUBBOCK COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1306607" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1358871.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013005085" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 62" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="MEMPHIS AVE" LIMITS_TO_DSCR="IH-27" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/24/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25690813" DIST_LET_DATE="2/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="1/17/2022" DIST_NM="Lubbock" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.100 (mi)" TXDOT_CNTCT_NM="Joe Villalobos, P.E" TXDOT_CNTCT_PH_NBR="(806)748-4466" CNSTR_CMPNY_NM="SACYR CONSTRUCTION USA LLC" CNSTR_NTPD_DT="3/16/2022" CNSTR_WKBG_DT="6/23/2022" CNSTR_PCT_TIME_USED="91.39" CNSTR_PCT_COMPLETE="75.83" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="10/22/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="6/2/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="1/31/2022" PE_SPENT_AMT="2022643.55" CNSTR_SPENT_AMT="21169162.40" CE_SPENT_AMT="924242.43" TOT_SPENT_AMT="24116048.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="23850438.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="1149563.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013005090" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="SPUR 309 (RESEARCH BLVD)" LIMITS_TO_DSCR="IOLA AVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="475749" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="448.55" CNSTR_SPENT_AMT="495506.14" CE_SPENT_AMT="6474.21" TOT_SPENT_AMT="502428.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="461665.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013005092" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="FM 2378" LIMITS_TO_DSCR="FM 179" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="519493" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="540273.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013005093" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="AVE G-EAST AND WEST BOUND" LIMITS_TO_DSCR="EAST BROADWAY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="98841" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="102795.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013007031" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 385" CNTY_NM="Hockley" LIMITS_FROM_DSCR="SH 114" LIMITS_TO_DSCR="BS 114 B (HOUSTON ST.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="4/29/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1758826" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="10/28/2019" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.441 (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY" CNSTR_NTPD_DT="2/24/2020" CNSTR_WKBG_DT="3/28/2020" CNSTR_PCT_TIME_USED="249.39" CNSTR_PCT_COMPLETE="85.85" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="2/2/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="9/18/2019" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/12/2019" PE_SPENT_AMT="61.19" CNSTR_SPENT_AMT="1192290.12" CE_SPENT_AMT="282988.91" TOT_SPENT_AMT="1475340.22" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="1712500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013007032" PT_PHASE="Construction underway or begins soon" HWY_NBR="BS 114B" CNTY_NM="Hockley" LIMITS_FROM_DSCR="SH 114" LIMITS_TO_DSCR="US 385" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="202835" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="12/1/2022" CNSTR_WKBG_DT="7/21/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.88" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="285.12" CNSTR_SPENT_AMT="241837.67" CE_SPENT_AMT="3535.87" TOT_SPENT_AMT="245658.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="174009.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013007033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 385" CNTY_NM="Hockley" LIMITS_FROM_DSCR="SH 114" LIMITS_TO_DSCR="BS 114B (HOUSTON ST.)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="7/25/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3994252" DIST_LET_DATE="3/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Neil Welch, P.E." TXDOT_CNTCT_PH_NBR="432-263-4768 " CNSTR_CMPNY_NM="DUININCK, INC." CNSTR_NTPD_DT="5/3/2024" CNSTR_WKBG_DT="7/2/2024" CNSTR_PCT_TIME_USED="76.47" CNSTR_PCT_COMPLETE="63.62" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="39152.54" CNSTR_SPENT_AMT="1344310.18" CE_SPENT_AMT="48640.56" TOT_SPENT_AMT="1432103.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2285000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013101062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 62" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="LUBBOCK CITY LIMITS" LIMITS_TO_DSCR="CHESTNUT ST. IN IDALOU" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="699877" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="217.40" CNSTR_SPENT_AMT="730219.60" CE_SPENT_AMT="9540.98" TOT_SPENT_AMT="739977.98" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="680957.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013101063" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="E BROADWAY" LIMITS_TO_DSCR="3RD STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="98840" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="102794.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013102043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 62" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="FM 400" LIMITS_TO_DSCR="FM 789" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="548025" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/24/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="6/11/2024" CNSTR_PCT_TIME_USED="90.63" CNSTR_PCT_COMPLETE="94.37" DSGN_START_TRGT_DT="1/11/2021" DSGN_START_ACTL_DT="1/11/2023" ENVCLR_TRGT_DT="9/21/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/24/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="409.86" CNSTR_SPENT_AMT="553347.35" CE_SPENT_AMT="7153.63" TOT_SPENT_AMT="560910.84" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="441293.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013102044" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="FM400" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="875376" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1016821.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013103032" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 62" CNTY_NM="Crosby" LIMITS_FROM_DSCR="INTERSECTION OF" LIMITS_TO_DSCR="US82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="198356" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="HES" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kylan Francis, P.E." TXDOT_CNTCT_PH_NBR="806-293-5484" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="216384.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013104043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Crosby" LIMITS_FROM_DSCR="COUNTY ROAD 179" LIMITS_TO_DSCR="FM 2591" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="771087" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="321.30" CNSTR_SPENT_AMT="804731.79" CE_SPENT_AMT="10514.55" TOT_SPENT_AMT="815567.64" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="754810.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013105040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Crosby" LIMITS_FROM_DSCR="FM 2591" LIMITS_TO_DSCR="DICKENS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="892967" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="322.00" CNSTR_SPENT_AMT="931402.53" CE_SPENT_AMT="12169.62" TOT_SPENT_AMT="943894.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="870288.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013106056" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="CROSBY C/L, EAST" LIMITS_TO_DSCR="DICKENS WCL (WBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4700000" DIST_LET_DATE="2/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/7/2020" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/8/2020" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/22/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/8/2020" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/22/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="6/22/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/8/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="66707.20" TOT_SPENT_AMT="66707.20" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013106057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="CROSBY C/L, EAST" LIMITS_TO_DSCR="CROW STREET (WBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="527928" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="7/13/2020" CNSTR_PCT_TIME_USED="31.37" CNSTR_PCT_COMPLETE="101.15" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1002.23" CNSTR_SPENT_AMT="625296.27" CE_SPENT_AMT="3292.56" TOT_SPENT_AMT="629591.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="692296.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013106058" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="CROSBY C/L, E" LIMITS_TO_DSCR="CROW STREET IN DICKENS" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="877466" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3964.09" TOT_SPENT_AMT="3964.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="947663.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013108023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Lubbock" LIMITS_FROM_DSCR="ASH AVE" LIMITS_TO_DSCR="US 62" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="204040" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="8/12/2021" PSE_30_ACTL_DT="8/12/2021" PSE_60_TRGT_DT="1/28/2022" PSE_60_ACTL_DT="1/28/2022" PSE_100_TRGT_DT="11/22/2022" PSE_100_ACTL_DT="9/28/2022" DIST_NM="Lubbock" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Edward Goebel, P.E." TXDOT_CNTCT_PH_NBR="(806)745-4463" CNSTR_CMPNY_NM="LIPHAM ASPHALT AND PAVING COMPANY, LLC" CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="5/15/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.53" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="1/3/2022" ENVCLR_TRGT_DT="8/5/2022" ENVCLR_ACTL_DT="8/5/2022" UTIL_TRGT_DT="11/8/2022" UTIL_ACTL_DT="3/8/2022" ROW_TRGT_DT="11/8/2022" ROW_ACTL_DT="6/8/2022" RTL_TRGT_DT="11/22/2022" RTL_ACTL_DT="9/28/2022" PE_SPENT_AMT="315.03" CNSTR_SPENT_AMT="212359.77" CE_SPENT_AMT="2774.79" TOT_SPENT_AMT="215449.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="209847.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013201054" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="CROW STREET, EAST" LIMITS_TO_DSCR="DICKENS ECL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="51546" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="7/13/2020" CNSTR_PCT_TIME_USED="31.37" CNSTR_PCT_COMPLETE="101.15" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="914.90" CNSTR_SPENT_AMT="60618.25" CE_SPENT_AMT="540.72" TOT_SPENT_AMT="62073.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="35145.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013201055" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="1186' EAST OF DICKENS ECL, EAST" LIMITS_TO_DSCR="8.23 MILES (WBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6142334" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/2/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/23/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="102.02" CNSTR_PCT_COMPLETE="100.27" DSGN_START_TRGT_DT="11/18/2020" DSGN_START_ACTL_DT="4/10/2023" ENVCLR_TRGT_DT="3/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/18/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/18/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/23/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="42069.60" CNSTR_SPENT_AMT="5472480.11" CE_SPENT_AMT="72661.20" TOT_SPENT_AMT="5587210.91" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="5689242.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013201056" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="DICKENS ECL, EAST" LIMITS_TO_DSCR="8.438 MILES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="521106" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/11/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2022" PSE_60_ACTL_DT="5/25/2022" PSE_100_TRGT_DT="3/11/2022" PSE_100_ACTL_DT="8/2/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="6/15/2023" CNSTR_PCT_TIME_USED="32.76" CNSTR_PCT_COMPLETE="106.83" DSGN_START_TRGT_DT="3/11/2022" DSGN_START_ACTL_DT="3/11/2022" ENVCLR_TRGT_DT="3/11/2022" ENVCLR_ACTL_DT="7/8/2022" UTIL_TRGT_DT="3/11/2022" UTIL_ACTL_DT="7/8/2022" ROW_TRGT_DT="3/11/2022" ROW_ACTL_DT="7/8/2022" RTL_TRGT_DT="3/11/2022" RTL_ACTL_DT="8/2/2022" PE_SPENT_AMT="423.85" CNSTR_SPENT_AMT="623747.73" CE_SPENT_AMT="6081.82" TOT_SPENT_AMT="630253.40" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="18975.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="351238.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_PID="PM" FUND_CAT3_AMT="107776.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013201057" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013202037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="8.23 MILES W OF KING C/L, EAST" LIMITS_TO_DSCR="KING C/L (WBL)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5176684" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/2/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/23/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="8/5/2024" CNSTR_PCT_TIME_USED="102.02" CNSTR_PCT_COMPLETE="100.27" DSGN_START_TRGT_DT="11/18/2020" DSGN_START_ACTL_DT="4/10/2023" ENVCLR_TRGT_DT="3/2/2021" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/18/2020" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/18/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/23/2021" RTL_ACTL_DT="TBD" PE_SPENT_AMT="535.74" CNSTR_SPENT_AMT="5755423.25" CE_SPENT_AMT="76417.96" TOT_SPENT_AMT="5832376.95" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="4529631.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013202038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Dickens" LIMITS_FROM_DSCR="8.438 MILES EAST OF DICKENS ECL, EAST" LIMITS_TO_DSCR="KING C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="582637" DIST_LET_DATE="10/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/11/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/11/2022" PSE_60_ACTL_DT="5/25/2022" PSE_100_TRGT_DT="3/11/2022" PSE_100_ACTL_DT="8/2/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/16/2022" CNSTR_WKBG_DT="6/15/2023" CNSTR_PCT_TIME_USED="32.76" CNSTR_PCT_COMPLETE="106.83" DSGN_START_TRGT_DT="3/11/2022" DSGN_START_ACTL_DT="3/11/2022" ENVCLR_TRGT_DT="3/11/2022" ENVCLR_ACTL_DT="7/8/2022" UTIL_TRGT_DT="3/11/2022" UTIL_ACTL_DT="7/8/2022" ROW_TRGT_DT="3/11/2022" ROW_ACTL_DT="7/8/2022" RTL_TRGT_DT="3/11/2022" RTL_ACTL_DT="8/2/2022" PE_SPENT_AMT="423.85" CNSTR_SPENT_AMT="697487.98" CE_SPENT_AMT="5951.99" TOT_SPENT_AMT="703863.82" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="47521.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="351238.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT3_PID="PM" FUND_CAT3_AMT="133900.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013202039" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013203036" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="King" LIMITS_FROM_DSCR="0.422 MILES EAST OF GUTHRIE AIRPORT, E" LIMITS_TO_DSCR="0.109 MILES EAST OF US 83" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2500000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="75999.26" TOT_SPENT_AMT="75999.26" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="2800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013301049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="King" LIMITS_FROM_DSCR="0.5 MILES WEST OF SH 222, EAST" LIMITS_TO_DSCR="KNOX C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/3/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5768976" DIST_LET_DATE="1/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/25/2021" PSE_30_ACTL_DT="6/8/2021" PSE_60_TRGT_DT="6/23/2021" PSE_60_ACTL_DT="8/20/2021" PSE_100_TRGT_DT="8/2/2021" PSE_100_ACTL_DT="10/1/2021" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="2/16/2022" CNSTR_WKBG_DT="9/30/2022" CNSTR_PCT_TIME_USED="127.78" CNSTR_PCT_COMPLETE="109.11" DSGN_START_TRGT_DT="4/30/2021" DSGN_START_ACTL_DT="4/30/2021" ENVCLR_TRGT_DT="8/19/2021" ENVCLR_ACTL_DT="9/16/2021" UTIL_TRGT_DT="4/30/2021" UTIL_ACTL_DT="9/16/2021" ROW_TRGT_DT="4/30/2021" ROW_ACTL_DT="9/16/2021" RTL_TRGT_DT="8/19/2021" RTL_ACTL_DT="11/5/2021" PE_SPENT_AMT="48739.25" CNSTR_SPENT_AMT="6483366.90" CE_SPENT_AMT="252130.60" TOT_SPENT_AMT="6784236.75" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="3700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013301054" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="King" LIMITS_FROM_DSCR="DIVIDED SECTION, EAST" LIMITS_TO_DSCR="13.164 MILES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="686517" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Louis McDow, P.E." TXDOT_CNTCT_PH_NBR="(940)937-7196" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="11/20/2019" CNSTR_WKBG_DT="7/13/2020" CNSTR_PCT_TIME_USED="31.37" CNSTR_PCT_COMPLETE="101.15" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="186.13" CNSTR_SPENT_AMT="817526.97" CE_SPENT_AMT="4556.16" TOT_SPENT_AMT="822269.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_AMT="675000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013301055" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="King" LIMITS_FROM_DSCR="0.109 MILES EAST OF US 83, EAST" LIMITS_TO_DSCR="0.5 MILES W OF SH 222" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7800000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="281464.92" TOT_SPENT_AMT="281464.92" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="8736000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013303038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Knox" LIMITS_FROM_DSCR="758' WEST OF FM 267 (N INT), EAST" LIMITS_TO_DSCR="BAYLOR C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="7/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12684228" DIST_LET_DATE="7/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/26/2017" PSE_30_ACTL_DT="10/16/2017" PSE_60_TRGT_DT="4/7/2017" PSE_60_ACTL_DT="3/30/2018" PSE_100_TRGT_DT="5/31/2017" PSE_100_ACTL_DT="1/24/2020" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.941 (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="8/14/2020" CNSTR_WKBG_DT="11/4/2020" CNSTR_PCT_TIME_USED="142.90" CNSTR_PCT_COMPLETE="103.30" DSGN_START_TRGT_DT="8/26/2016" DSGN_START_ACTL_DT="8/26/2016" ENVCLR_TRGT_DT="5/23/2017" ENVCLR_ACTL_DT="7/12/2018" UTIL_TRGT_DT="8/26/2016" UTIL_ACTL_DT="1/24/2020" ROW_TRGT_DT="8/26/2016" ROW_ACTL_DT="2/12/2018" RTL_TRGT_DT="6/2/2017" RTL_ACTL_DT="1/24/2020" PE_SPENT_AMT="486541.41" CNSTR_SPENT_AMT="12986549.37" CE_SPENT_AMT="370447.87" TOT_SPENT_AMT="13843538.65" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_PID="017" FUND_CAT1_AMT="9000000.00" FUND_CAT2_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT2_PID="PES" FUND_CAT2_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013303049" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Knox" LIMITS_FROM_DSCR="430' EAST OF SH 6, EAST" LIMITS_TO_DSCR="930' EAST OF SH 6" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="23345" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="1/21/2022" PSE_30_ACTL_DT="1/21/2022" PSE_60_TRGT_DT="2/18/2022" PSE_60_ACTL_DT="2/25/2022" PSE_100_TRGT_DT="3/18/2022" PSE_100_ACTL_DT="9/20/2022" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jared Groves, P.E." TXDOT_CNTCT_PH_NBR="940-937-7251 " CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="1/4/2023" CNSTR_WKBG_DT="2/28/2023" CNSTR_PCT_TIME_USED="111.11" CNSTR_PCT_COMPLETE="102.65" DSGN_START_TRGT_DT="1/3/2022" DSGN_START_ACTL_DT="9/23/2022" ENVCLR_TRGT_DT="3/25/2022" ENVCLR_ACTL_DT="5/31/2022" UTIL_TRGT_DT="1/3/2022" UTIL_ACTL_DT="5/26/2022" ROW_TRGT_DT="1/3/2022" ROW_ACTL_DT="5/26/2022" RTL_TRGT_DT="3/25/2022" RTL_ACTL_DT="6/3/2022" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="23345.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013303050" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 82" CNTY_NM="Knox" LIMITS_FROM_DSCR="3.20 MILES EAST OF THE BENJAMIN C/L" LIMITS_TO_DSCR="1.40 MILES" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="280620" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Childress" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Chuck Steed, P.E." TXDOT_CNTCT_PH_NBR="940-937-7191" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2049.07" TOT_SPENT_AMT="2049.07" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="325494.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013303051" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013304042" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 82" CNTY_NM="Baylor" LIMITS_FROM_DSCR="KNOX COUNTY LINE" LIMITS_TO_DSCR="BU 183B" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15938381" DIST_LET_DATE="12/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/16/2022" PSE_100_ACTL_DT="10/1/2021" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="12.579 (mi)" TXDOT_CNTCT_NM="Zachary Husen, P.E." TXDOT_CNTCT_PH_NBR="(940)549-0676" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="1/5/2022" CNSTR_WKBG_DT="3/21/2022" CNSTR_PCT_TIME_USED="94.12" CNSTR_PCT_COMPLETE="99.01" DSGN_START_TRGT_DT="7/6/2022" DSGN_START_ACTL_DT="8/1/2019" ENVCLR_TRGT_DT="7/6/2022" ENVCLR_ACTL_DT="9/22/2021" UTIL_TRGT_DT="7/1/2022" UTIL_ACTL_DT="9/13/2021" ROW_TRGT_DT="7/1/2022" ROW_ACTL_DT="9/22/2021" RTL_TRGT_DT="12/1/2022" RTL_ACTL_DT="10/1/2021" PE_SPENT_AMT="952289.11" CNSTR_SPENT_AMT="16496766.57" CE_SPENT_AMT="387693.73" TOT_SPENT_AMT="17836749.41" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="18380319.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013305029" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 114" CNTY_NM="Baylor" LIMITS_FROM_DSCR="NEAR SEYMOUR" LIMITS_TO_DSCR="NEAR FM 1285" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13000000" DIST_LET_DATE="1/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="12/9/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/10/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/13/2028" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.055 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/6/2027" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/10/2027" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/2/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/2/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2028" RTL_ACTL_DT="11/7/2030" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="14560000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013305031" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 114" CNTY_NM="Baylor" LIMITS_FROM_DSCR="US 277" LIMITS_TO_DSCR="NEAR FM 1285" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="713324" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="904.48" CE_SPENT_AMT="13.55" TOT_SPENT_AMT="918.03" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="727973.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013306032" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Baylor" LIMITS_FROM_DSCR="NEAR FM 1285" LIMITS_TO_DSCR="ARCHER COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12350000" DIST_LET_DATE="1/1/2030" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="1/8/2027" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/11/2027" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/16/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.514 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="8/7/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="8/11/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/3/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/30/2027" RTL_ACTL_DT="11/1/2029" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="13832000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT2_AMT="380077.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013306033" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Baylor" LIMITS_FROM_DSCR="NEAR FM 1285" LIMITS_TO_DSCR="ARCHER COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="729773" DIST_LET_DATE="11/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="488.14" TOT_SPENT_AMT="488.14" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="788155.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013307030" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Archer" LIMITS_FROM_DSCR="BAYLOR COUNTY LINE" LIMITS_TO_DSCR="YOUNG COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10000000" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/17/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/18/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.690 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/7/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/11/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2025" RTL_ACTL_DT="11/2/2028" PE_SPENT_AMT="1457352.31" TOT_SPENT_AMT="1457352.31" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="11200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013307031" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013308037" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Young" LIMITS_FROM_DSCR="ARCHER COUNTY LINE" LIMITS_TO_DSCR="FM 2178 N" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6000000" DIST_LET_DATE="1/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="2/18/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/17/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/18/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.055 (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/7/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/11/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/1/2025" RTL_ACTL_DT="11/2/2028" PE_SPENT_AMT="5229.08" TOT_SPENT_AMT="5229.08" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="6720000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013308038" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 114" CNTY_NM="Young" LIMITS_FROM_DSCR="FM 2178N" LIMITS_TO_DSCR="AVENUE C" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/30/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="3/4/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/4/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/15/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="19929.28" TOT_SPENT_AMT="19929.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="2160000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013308039" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013401027" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 251" CNTY_NM="Young" LIMITS_FROM_DSCR="SH 79" LIMITS_TO_DSCR="FM 926 (NEWCASTLE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4490410" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Surfacing/roadway Restoration" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/15/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Zachary Husen, P.E." TXDOT_CNTCT_PH_NBR="(940)549-0676" CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="9/6/2024" CNSTR_WKBG_DT="5/15/2025" CNSTR_PCT_TIME_USED="10.53" CNSTR_PCT_COMPLETE="19.59" DSGN_START_TRGT_DT="2/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/16/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/15/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/15/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/26/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="17457.25" CNSTR_SPENT_AMT="881116.62" TOT_SPENT_AMT="898573.87" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="4752282.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013402063" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 926" CNTY_NM="Young" LIMITS_FROM_DSCR="SH 251" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="150000" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - District Discretionary (2711)" FUND_CAT1_AMT="168000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013402064" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013403034" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Young" LIMITS_FROM_DSCR="FM 2179" LIMITS_TO_DSCR="JACK COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="602861" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1791.15" CE_SPENT_AMT="11.45" TOT_SPENT_AMT="1802.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="614385.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013403035" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Young" LIMITS_FROM_DSCR="SH 16" LIMITS_TO_DSCR="FM 2179" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2000000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/17/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_CMPNY_NM="ZACK BURKETT CO." CNSTR_NTPD_DT="5/8/2025" CNSTR_WKBG_DT="5/20/2025" CNSTR_PCT_TIME_USED="6.86" CNSTR_PCT_COMPLETE="18.60" DSGN_START_TRGT_DT="4/4/2023" DSGN_START_ACTL_DT="4/4/2023" ENVCLR_TRGT_DT="4/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/3/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31149.06" CNSTR_SPENT_AMT="376791.00" TOT_SPENT_AMT="407940.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="2000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013404038" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Jack" LIMITS_FROM_DSCR="YOUNG COUNTY LINE" LIMITS_TO_DSCR="9TH STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28502682" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="7/14/2021" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/2/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/23/2022" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="15.569 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/20/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/23/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/23/2022" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/21/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1974061.78" CE_SPENT_AMT="101.52" TOT_SPENT_AMT="1974163.30" FUND_CAT1_DSCR="Category 11 - District Discretionary (2611)" FUND_CAT1_AMT="6000000.00" FUND_CAT2_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT2_PID="PES" FUND_CAT2_AMT="25000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013405040" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 59" CNTY_NM="Jack" LIMITS_FROM_DSCR="FM 1810" LIMITS_TO_DSCR="PARK RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="516075" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.386 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="578004.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013405041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013406055" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013407075" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Wise" LIMITS_FROM_DSCR=".300 MI EAST OF SH 101" LIMITS_TO_DSCR="BU 380F" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000073" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/1/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.660 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="4/11/2024" CNSTR_PCT_TIME_USED="86.26" CNSTR_PCT_COMPLETE="88.36" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="3/1/2023" PE_SPENT_AMT="124590.73" CNSTR_SPENT_AMT="2677362.13" CE_SPENT_AMT="82743.83" TOT_SPENT_AMT="2884696.69" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1339690.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="1830536.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013407076" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013408043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Wise" LIMITS_FROM_DSCR="BU 380F" LIMITS_TO_DSCR="DENTON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2011493" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/1/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.500 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="4/11/2024" CNSTR_PCT_TIME_USED="86.26" CNSTR_PCT_COMPLETE="88.36" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="3/1/2023" PE_SPENT_AMT="10619.80" CNSTR_SPENT_AMT="1763205.54" CE_SPENT_AMT="79204.32" TOT_SPENT_AMT="1853029.66" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1239690.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="1210823.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013409068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT THOMAS J EGAN RD" LIMITS_TO_DSCR="IN THE CITY OF DENTON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="503115" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="588422.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013409069" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="WISE COUNTY LINE" LIMITS_TO_DSCR="FM 156" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="12731474" DIST_LET_DATE="7/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.227 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="209419.24" TOT_SPENT_AMT="209419.24" FUND_CAT1_DSCR="Category 11 - District Discretionary (2511)" FUND_CAT1_AMT="14056895.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013410020" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Jack" LIMITS_FROM_DSCR="FM 1156" LIMITS_TO_DSCR="WISE COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/13/2026" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5207991" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="12/8/2021" PSE_30_ACTL_DT="12/8/2021" PSE_60_TRGT_DT="7/6/2022" PSE_60_ACTL_DT="7/6/2022" PSE_100_TRGT_DT="5/2/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="6.971 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="3/14/2024" CNSTR_WKBG_DT="7/22/2024" CNSTR_PCT_TIME_USED="49.75" CNSTR_PCT_COMPLETE="22.42" DSGN_START_TRGT_DT="9/2/2020" DSGN_START_ACTL_DT="9/2/2020" ENVCLR_TRGT_DT="12/23/2022" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/2/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/2/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/31/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="274220.25" CNSTR_SPENT_AMT="1074287.00" CE_SPENT_AMT="35104.31" TOT_SPENT_AMT="1383611.56" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="5391399.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013411026" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 380" CNTY_NM="Wise" LIMITS_FROM_DSCR="AT UNION PACIFIC/MISSOURI PACIFIC R" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8000000" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="RL" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.435 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1025349.23" CNSTR_SPENT_AMT="15257.76" TOT_SPENT_AMT="1040606.99" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013411034" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Wise" LIMITS_FROM_DSCR="JACK COUNTY LINE" LIMITS_TO_DSCR="SH 101" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10708141" DIST_LET_DATE="2/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.050 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="327543.56" TOT_SPENT_AMT="327543.56" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="10708141.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013411036" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 380" CNTY_NM="Wise" LIMITS_FROM_DSCR="SH 101" LIMITS_TO_DSCR="JACK COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="157077862" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.085 (mi)" TXDOT_CNTCT_NM="Ricardo Gonzalez, P.E." TXDOT_CNTCT_PH_NBR="817-370-6541" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2853888.92" TOT_SPENT_AMT="2853888.92" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013411038" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Wise" LIMITS_FROM_DSCR="SH 101" LIMITS_TO_DSCR=".300 MI EAST OF SH 101" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/21/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="53390" DIST_LET_DATE="8/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/1/2022" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="12/1/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="3/1/2023" DIST_NM="Fort Worth" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.300 (mi)" TXDOT_CNTCT_NM="Alfred Luera, P.E." TXDOT_CNTCT_PH_NBR="(940)626-3400" CNSTR_CMPNY_NM="SILVER CREEK CONSTRUCTION, INC." CNSTR_NTPD_DT="9/7/2023" CNSTR_WKBG_DT="4/11/2024" CNSTR_PCT_TIME_USED="86.26" CNSTR_PCT_COMPLETE="88.36" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="7/1/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="3/1/2023" PE_SPENT_AMT="7868.92" CNSTR_SPENT_AMT="49326.26" CE_SPENT_AMT="2123.91" TOT_SPENT_AMT="59319.09" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502059" PT_PHASE="Feasibility Studies" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 289" LIMITS_TO_DSCR="SH 5" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1402091" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="11.007 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="462542.69" TOT_SPENT_AMT="462542.69" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="1402091.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502062" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="0.104 MI W OF BOIS D'ARC RD" LIMITS_TO_DSCR="0.100 MI W OF US 75 SBFR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="566611" DIST_LET_DATE="3/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.591 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="FLORIDA TRAFFIC CONTROL DEVICES, INC." CNSTR_NTPD_DT="4/28/2020" CNSTR_WKBG_DT="9/14/2020" CNSTR_PCT_TIME_USED="95.83" CNSTR_PCT_COMPLETE="93.62" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8375.52" CNSTR_SPENT_AMT="625523.07" CE_SPENT_AMT="31293.54" TOT_SPENT_AMT="665192.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2008)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="621954.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="N STONEBRIDGE DR TO W OF SH 5" LIMITS_TO_DSCR="IN THE CITY OF MCKINNEY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="167750" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="1/17/2019" PSE_30_ACTL_DT="1/17/2019" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/2/2020" PSE_100_TRGT_DT="3/5/2021" PSE_100_ACTL_DT="3/5/2021" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="5.958 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="DURABLE SPECIALTIES, INC." CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="2/15/2022" CNSTR_PCT_TIME_USED="96.88" CNSTR_PCT_COMPLETE="96.95" DSGN_START_TRGT_DT="12/11/2018" DSGN_START_ACTL_DT="12/11/2018" ENVCLR_TRGT_DT="10/23/2020" ENVCLR_ACTL_DT="10/23/2020" UTIL_TRGT_DT="12/10/2020" UTIL_ACTL_DT="12/10/2020" ROW_TRGT_DT="12/10/2020" ROW_ACTL_DT="12/10/2020" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="3026.20" CNSTR_SPENT_AMT="656610.71" CE_SPENT_AMT="6937.91" TOT_SPENT_AMT="666574.82" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="968763.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502065" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="COIT ROAD" LIMITS_TO_DSCR="JCT US 380/UNIVERSITY DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="337632053" DIST_LET_DATE="9/1/2044" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="1/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.266 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="12/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="6/1/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/1/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="22423809.13" TOT_SPENT_AMT="22423809.13" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502067" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="WEST UNIVERSITY DRIVE AT COMMUNITY AVE" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2928198" DIST_LET_DATE="8/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Intersection Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21018.60" TOT_SPENT_AMT="21018.60" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2405)" FUND_CAT1_AMT="1176000.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="3043078.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502068" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="WEST OF BNSF RAILROAD" LIMITS_TO_DSCR="WEST OF LAKEWOOD DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="196370238" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="6/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.896 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2077795.34" TOT_SPENT_AMT="2077795.34" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="47768001.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/15/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502069" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 289" LIMITS_TO_DSCR="LOVERS LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="278725" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="4/11/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.432 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC" CNSTR_NTPD_DT="12/15/2022" CNSTR_WKBG_DT="2/14/2024" CNSTR_PCT_TIME_USED="96.43" CNSTR_PCT_COMPLETE="92.98" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="248467.66" CE_SPENT_AMT="2142.65" TOT_SPENT_AMT="250610.31" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="147706.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502070" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="WEST OF SH 289" LIMITS_TO_DSCR="SOUTH OF LOVERS LANE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="454938" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.432 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="627105.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502071" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="STONEBRIDGE DR" LIMITS_TO_DSCR="WEST OF BOIS D'' ARC RD IN MCKINNEY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2644427" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.150 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_CMPNY_NM="SICE, INC." CNSTR_NTPD_DT="4/17/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="560.28" TOT_SPENT_AMT="560.28" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1519015.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="1125412.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502073" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="FM 2478 (CUSTER RD)" LIMITS_TO_DSCR="STONEBRIDGE DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="301759" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/upgrade Roadway Lighting" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_CMPNY_NM="SICE, INC." CNSTR_NTPD_DT="4/17/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="325899.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502075" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="BAYLOR SCOTT AND WHITE DRIVE" LIMITS_TO_DSCR="CUSTER ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="9183635" DIST_LET_DATE="12/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.161 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="9550980.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013502076" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="US 75" LIMITS_TO_DSCR="SH 5" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="500000" DIST_LET_DATE="6/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RES" PROJ_DSCR="Repair Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.359 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="540000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013503046" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="WEST OF BRIDGE FARMER RD" LIMITS_TO_DSCR="4TH STREET" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79752498" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/1/2019" PSE_30_ACTL_DT="8/1/2020" PSE_60_TRGT_DT="9/1/2019" PSE_60_ACTL_DT="4/19/2022" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="9/1/2019" DSGN_START_ACTL_DT="1/13/2020" ENVCLR_TRGT_DT="9/1/2019" ENVCLR_ACTL_DT="1/29/2020" UTIL_TRGT_DT="1/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7100875.64" TOT_SPENT_AMT="7100875.64" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="11000000.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="45123408.00" FUND_CAT3_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT3_AMT="2139189.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013503048" PT_PHASE="Feasibility Studies" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 5" LIMITS_TO_DSCR="FM 75" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="922823" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.245 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="35920.56" TOT_SPENT_AMT="35920.56" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="922823.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013503051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="W OF SH 5 TO AIRPORT DR" LIMITS_TO_DSCR="IN THE CITY OF MCKINNEY" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="32710" DIST_LET_DATE="5/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="1/17/2019" PSE_30_ACTL_DT="1/17/2019" PSE_60_TRGT_DT="10/2/2020" PSE_60_ACTL_DT="10/2/2020" PSE_100_TRGT_DT="3/5/2021" PSE_100_ACTL_DT="3/5/2021" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="1.389 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="DURABLE SPECIALTIES, INC." CNSTR_NTPD_DT="9/29/2021" CNSTR_WKBG_DT="2/15/2022" CNSTR_PCT_TIME_USED="96.88" CNSTR_PCT_COMPLETE="96.95" DSGN_START_TRGT_DT="12/11/2018" DSGN_START_ACTL_DT="12/11/2018" ENVCLR_TRGT_DT="10/23/2020" ENVCLR_ACTL_DT="10/23/2020" UTIL_TRGT_DT="12/10/2020" UTIL_ACTL_DT="12/10/2020" ROW_TRGT_DT="12/10/2020" ROW_ACTL_DT="12/10/2020" RTL_TRGT_DT="3/5/2021" RTL_ACTL_DT="3/5/2021" PE_SPENT_AMT="1223.56" CNSTR_SPENT_AMT="119545.29" CE_SPENT_AMT="1481.46" TOT_SPENT_AMT="122250.31" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="181643.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013503056" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="FM 1827" LIMITS_TO_DSCR="JCT US 380/WEST PRINCETON DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="116108142" DIST_LET_DATE="4/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="6/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/4/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/4/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3222638.72" TOT_SPENT_AMT="3222638.72" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013503057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="AIRPORT DRIVE" LIMITS_TO_DSCR="WEST OF BRIDGE FARMER RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="62384289" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="9/1/2019" PSE_30_ACTL_DT="8/1/2020" PSE_60_TRGT_DT="9/1/2019" PSE_60_ACTL_DT="4/19/2022" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="3.600 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="9/1/2019" DSGN_START_ACTL_DT="1/13/2020" ENVCLR_TRGT_DT="9/1/2019" ENVCLR_ACTL_DT="1/29/2020" UTIL_TRGT_DT="1/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="48047.87" TOT_SPENT_AMT="48047.87" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504032" PT_PHASE="Feasibility Studies" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="FM 75" LIMITS_TO_DSCR="EAST OF SH 78" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="972635" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="7.636 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="34251.65" TOT_SPENT_AMT="34251.65" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="972635.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="4TH STREET" LIMITS_TO_DSCR="CR 458" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="13208687" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="9/1/2019" PSE_30_ACTL_DT="8/1/2020" PSE_60_TRGT_DT="9/1/2019" PSE_60_ACTL_DT="4/19/2022" PSE_100_TRGT_DT="9/1/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.621 (mi)" TXDOT_CNTCT_NM="Jennifer Vorster, P.E." TXDOT_CNTCT_PH_NBR="(972)542-2345" CNSTR_CMPNY_NM="WEBBER, LLC" CNSTR_NTPD_DT="4/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="9/1/2019" DSGN_START_ACTL_DT="1/13/2020" ENVCLR_TRGT_DT="9/1/2019" ENVCLR_ACTL_DT="1/29/2020" UTIL_TRGT_DT="1/1/2022" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/1/2021" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/1/2022" RTL_ACTL_DT="TBD" PE_SPENT_AMT="737795.02" TOT_SPENT_AMT="737795.02" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="855230.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504036" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="JCT US 380/ EAST PRINCETON DRIVE" LIMITS_TO_DSCR="CR 560" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="558002157" DIST_LET_DATE="3/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="6/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.399 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/4/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/4/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="7581311.85" TOT_SPENT_AMT="7581311.85" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="624962416.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504038" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="CR 560" LIMITS_TO_DSCR="JCT US 380/AUDIE MURPHY W/O FARMERSVILLE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79275348" DIST_LET_DATE="10/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="4/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/2/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="18.322 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1060702.51" TOT_SPENT_AMT="1060702.51" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504041" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504042" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013504043" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013505026" PT_PHASE="Feasibility Studies" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="EAST OF SH 78" LIMITS_TO_DSCR="HUNT C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="517064" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="4.060 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18701.94" TOT_SPENT_AMT="18701.94" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="517064.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013505028" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="WEST OF CR 698 (HUNT C/L)" LIMITS_TO_DSCR="CR 698/CR 699 (COLLIN/HUNT COUNTY LINE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="26387186" DIST_LET_DATE="10/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="4/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/2/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4151279.25" TOT_SPENT_AMT="4151279.25" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013505030" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="AT FM 547" LIMITS_TO_DSCR="IN THE CITY OF FARMERSVILLE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="290550" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="TCD" PROJ_DSCR="Install Traffic Signal" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="WG ENGINEERING &amp; CONSTRUCTION, LLC" CNSTR_NTPD_DT="6/19/2023" CNSTR_WKBG_DT="6/13/2024" CNSTR_PCT_TIME_USED="102.73" CNSTR_PCT_COMPLETE="518.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50965.07" CNSTR_SPENT_AMT="280453.78" CE_SPENT_AMT="8091.30" TOT_SPENT_AMT="339510.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="TCD" FUND_CAT1_AMT="250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506032" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="EB FM 903" LIMITS_TO_DSCR="0.417 MI E. OF FM 903" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4326" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="377.31" CNSTR_SPENT_AMT="4854.50" CE_SPENT_AMT="60.09" TOT_SPENT_AMT="5291.90" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4303.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506033" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="WB FM 903" LIMITS_TO_DSCR="0.417 MI E OF FM 903" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4336" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="4375.95" CE_SPENT_AMT="60.13" TOT_SPENT_AMT="4436.08" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4313.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506035" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 380J" CNTY_NM="Hunt" LIMITS_FROM_DSCR="US 380" LIMITS_TO_DSCR="US 380" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="112993" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="114638.83" CE_SPENT_AMT="1441.49" TOT_SPENT_AMT="116080.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="122237.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506036" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="COLLIN COUNTY LINE" LIMITS_TO_DSCR="BU 380J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="306414" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="234886.01" CE_SPENT_AMT="3646.66" TOT_SPENT_AMT="238532.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="325094.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506037" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="BU 380J" LIMITS_TO_DSCR="FM 903" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="138421" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="133936.03" CE_SPENT_AMT="1733.18" TOT_SPENT_AMT="135669.21" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="145330.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506041" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506042" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506044" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506045" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013506046" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013507043" PT_PHASE="Construction underway or begins soon" HWY_NBR="SS 302" CNTY_NM="Hunt" LIMITS_FROM_DSCR="US 69" LIMITS_TO_DSCR="SH 34" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/18/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1456448" DIST_LET_DATE="4/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="9/20/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="9/29/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="11/1/2021" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.530 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="9/1/2022" CNSTR_WKBG_DT="11/21/2022" CNSTR_PCT_TIME_USED="93.50" CNSTR_PCT_COMPLETE="94.64" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="9/7/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/13/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/5/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="11/5/2021" RTL_TRGT_DT="TBD" RTL_ACTL_DT="12/13/2021" PE_SPENT_AMT="6000.03" CNSTR_SPENT_AMT="1099186.14" CE_SPENT_AMT="40476.63" TOT_SPENT_AMT="1145662.80" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="540500.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013507047" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="EB 0.417 MI E OF FM 903" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25953" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="26009.78" CE_SPENT_AMT="361.21" TOT_SPENT_AMT="26370.99" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="25355.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013507048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="WB 0.417 MI E OF FM 903" LIMITS_TO_DSCR="US 69" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/17/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25392" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="9/25/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/22/2018" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/9/2018" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS, LLC" CNSTR_NTPD_DT="3/19/2021" CNSTR_WKBG_DT="4/21/2021" CNSTR_PCT_TIME_USED="132.08" CNSTR_PCT_COMPLETE="95.14" DSGN_START_TRGT_DT="6/5/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/22/2018" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="2/16/2016" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/3/2015" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/8/2020" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="22978.68" CE_SPENT_AMT="362.26" TOT_SPENT_AMT="23340.94" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="24761.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013507049" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013507050" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510050" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="US 377" LIMITS_TO_DSCR="WEST OF CR 26 (COUNTY LINE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="132896767" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="1/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="6/1/2021" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.450 (mi)" TXDOT_CNTCT_NM="Amanda Miller, P.E." TXDOT_CNTCT_PH_NBR="(940)387-1414" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="1/20/2022" CNSTR_PCT_TIME_USED="78.53" CNSTR_PCT_COMPLETE="76.47" DSGN_START_TRGT_DT="12/1/2017" DSGN_START_ACTL_DT="12/1/2017" ENVCLR_TRGT_DT="6/29/2018" ENVCLR_ACTL_DT="6/29/2018" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="8/1/2021" PE_SPENT_AMT="12889488.52" CNSTR_SPENT_AMT="114823279.82" CE_SPENT_AMT="3782425.68" TOT_SPENT_AMT="131495194.02" FUND_CAT1_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT1_AMT="7258.00" FUND_CAT2_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT2_AMT="7258.00" FUND_CAT3_DSCR="Category 3 - Local Contribution/Participation (LOCAL)" FUND_CAT3_AMT="282522.00" FUND_CAT4_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2105)" FUND_CAT4_AMT="56200000.00" FUND_CAT5_DSCR="Category 7 - Metropolitan Mobility/Rehabilitation (2107)" FUND_CAT5_AMT="22277120.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510057" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="SL 288" LIMITS_TO_DSCR="US 377 / US 380 INTERSECTION" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/30/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20616737" DIST_LET_DATE="6/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Install Raised Median" PSE_30_TRGT_DT="4/16/2019" PSE_30_ACTL_DT="1/1/2016" PSE_60_TRGT_DT="4/16/2019" PSE_60_ACTL_DT="1/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="12/1/2019" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.476 (mi)" TXDOT_CNTCT_NM="Amanda Miller, P.E." TXDOT_CNTCT_PH_NBR="(940)387-1414" CNSTR_CMPNY_NM="RAGLE CONSTRUCTION, INC." CNSTR_NTPD_DT="10/28/2020" CNSTR_WKBG_DT="1/15/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="92.64" DSGN_START_TRGT_DT="5/11/2014" DSGN_START_ACTL_DT="5/11/2014" ENVCLR_TRGT_DT="4/16/2019" ENVCLR_ACTL_DT="6/29/2018" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="6/1/2020" ROW_TRGT_DT="2/1/2020" ROW_ACTL_DT="2/1/2020" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="6/1/2020" PE_SPENT_AMT="2175584.58" CNSTR_SPENT_AMT="21367353.37" CE_SPENT_AMT="1492073.13" TOT_SPENT_AMT="25035011.08" FUND_CAT1_DSCR="Category 5 - Congestion Mitigation &amp; Air Quality Improvement (2005)" FUND_CAT1_AMT="665000.00" FUND_CAT2_DSCR="Category 2M - Metropolitan Area Corridor  (1902M)" FUND_CAT2_AMT="17839014.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510063" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="US 377N" LIMITS_TO_DSCR="CR 26 (COLLIN COUNTY)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2976626" DIST_LET_DATE="8/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="8/6/2018" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/6/2018" PSE_60_ACTL_DT="1/1/2019" PSE_100_TRGT_DT="12/1/2019" PSE_100_ACTL_DT="6/1/2021" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="10.450 (mi)" TXDOT_CNTCT_NM="Amanda Miller, P.E." TXDOT_CNTCT_PH_NBR="(940)387-1414" CNSTR_CMPNY_NM="ZACHRY CONSTRUCTION CORPORATION" CNSTR_NTPD_DT="9/21/2021" CNSTR_WKBG_DT="1/20/2022" CNSTR_PCT_TIME_USED="78.53" CNSTR_PCT_COMPLETE="76.47" DSGN_START_TRGT_DT="12/1/2017" DSGN_START_ACTL_DT="12/1/2017" ENVCLR_TRGT_DT="6/29/2018" ENVCLR_ACTL_DT="6/29/2018" UTIL_TRGT_DT="2/1/2021" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="2/1/2020" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/1/2021" RTL_ACTL_DT="8/1/2021" CNSTR_SPENT_AMT="622450.62" CE_SPENT_AMT="92584.16" TOT_SPENT_AMT="715034.78" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="3478445.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510065" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="TEEL PKWY/CHAMPIONSHIP DRIVE" LIMITS_TO_DSCR="DENTON/COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="95587220" DIST_LET_DATE="9/1/2044" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="1/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="4/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1642333.24" TOT_SPENT_AMT="1642333.24" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="107057686.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="12/6/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510066" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="GEESLING RD" LIMITS_TO_DSCR="EAST OF NORTH TRINITY ROAD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="180204113" DIST_LET_DATE="7/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Convert NoN-Freeway" PSE_30_TRGT_DT="1/1/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="1/2/2026" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/2/2027" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.079 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/1/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2028" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="1/2/2027" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9803.66" TOT_SPENT_AMT="9803.66" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510068" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Denton" LIMITS_FROM_DSCR="FISHTRAP RD" LIMITS_TO_DSCR="COLLIN COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="107520" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="8.571 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="316.59" TOT_SPENT_AMT="316.59" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="120422.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013510069" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 377" CNTY_NM="Denton" LIMITS_FROM_DSCR="AT N. BELL AVE" LIMITS_TO_DSCR="IN THE CITY OF DENTON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="665231" DIST_LET_DATE="4/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="TS" PROJ_DSCR="Traffic Signal Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2708)" FUND_CAT1_PID="VRU" FUND_CAT1_AMT="745059.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013511022" PT_PHASE="Feasibility Studies" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="DENTON C/L" LIMITS_TO_DSCR="SH 289" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="280997" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="FS" PROJ_DSCR="Engineering Design/study" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="2.207 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3761772.77" TOT_SPENT_AMT="3761772.77" FUND_CAT1_DSCR="Category FS - Feasibility Study (FEAS)" FUND_CAT1_AMT="280997.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013511024" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="DENTON/COLLIN CL" LIMITS_TO_DSCR="EAST OF SH 289" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="576555680" DIST_LET_DATE="8/1/2045" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Reconstruct Existing Roadway" PSE_30_TRGT_DT="6/1/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.148 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="12/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="8497801.01" TOT_SPENT_AMT="8497801.01" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="90160000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="11/15/2024" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013511025" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="DENTON COUNTY LINE" LIMITS_TO_DSCR="SH 289" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1721275" DIST_LET_DATE="11/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install Illumination" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="12/14/2021" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="4/11/2022" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.116 (mi)" TXDOT_CNTCT_NM="Christopher Blain, P.E" TXDOT_CNTCT_PH_NBR="(214)320-6680" CNSTR_CMPNY_NM="HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC" CNSTR_NTPD_DT="12/15/2022" CNSTR_WKBG_DT="2/14/2024" CNSTR_PCT_TIME_USED="96.43" CNSTR_PCT_COMPLETE="92.98" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="1/5/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1623972.70" CE_SPENT_AMT="26302.61" TOT_SPENT_AMT="1650275.31" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1411460.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013511026" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="MAHARD PKWY" LIMITS_TO_DSCR="EAST OF SH 289" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="454938" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="LSE" PROJ_DSCR="Landscape Development" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.178 (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 10 - Green Ribbon Landscape Improvement (2510GR)" FUND_CAT1_PID="GR" FUND_CAT1_AMT="1250000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013511028" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="DENTON C/L" LIMITS_TO_DSCR="PRINCETON" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="161280" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Install/replace Signs" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1609.13" TOT_SPENT_AMT="1609.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2608)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="180634.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013514002" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 380" CNTY_NM="Hunt" LIMITS_FROM_DSCR="BU 380J" LIMITS_TO_DSCR="BU 380J" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="10/8/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="169356" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="5/28/2024" CNSTR_WKBG_DT="6/8/2024" CNSTR_PCT_TIME_USED="86.11" CNSTR_PCT_COMPLETE="88.75" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="121219.02" CE_SPENT_AMT="1977.45" TOT_SPENT_AMT="123196.47" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="177887.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013515004" PT_PHASE="Construction begins in 5 to 10 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013515005" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="JCT US380/ W UNIVERSITY DR" LIMITS_TO_DSCR="HARDIN BLVD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="423341898" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="463001678.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="11141247.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013515006" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="SH 5" LIMITS_TO_DSCR="JCT US380/ E UNIVERSITY DR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="302387070" DIST_LET_DATE="9/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="NNF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 12 - Strategic Priority (12TTC)" FUND_CAT1_AMT="329919680.00" FUND_CAT2_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT2_AMT="8753838.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013515007" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="HARDIN BLVD" LIMITS_TO_DSCR="SH 5" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="408879247" DIST_LET_DATE="9/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="INC" PROJ_DSCR="Interchange Improvement (new Or Update)" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14350.16" TOT_SPENT_AMT="14350.16" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (043C)" FUND_CAT1_AMT="321169457.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013515008" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013516002" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="JCT US 380/ W OF PRINCETON DRIVE" LIMITS_TO_DSCR="JCT US 380/ E OF PRINCETON DRIVE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="856181500" DIST_LET_DATE="4/1/2035" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="6/1/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/1/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/1/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/4/2027" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="7/1/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/4/2027" RTL_ACTL_DT="TBD" PE_SPENT_AMT="3685678.88" TOT_SPENT_AMT="3685678.88" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013517002" PT_PHASE="Planning, 10+ years" HWY_NBR="US 380" CNTY_NM="Collin" LIMITS_FROM_DSCR="JCT US380/AUDIE MURPHY W OF FARMERSVILLE" LIMITS_TO_DSCR="WEST OF CR 698 (COLLIN/HUNT COUNTY LINE)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="613947134" DIST_LET_DATE="10/1/2039" CNSTR_CMPNY_LAST_UPDATE_DT="NLF" PROJ_DSCR="Construct New Roadway Lanes" PSE_30_TRGT_DT="4/2/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="4/2/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/1/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Dallas" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Travis Campbell, P.E." TXDOT_CNTCT_PH_NBR="214-319-3611" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="9/1/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="7/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/1/2026" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4548758.69" TOT_SPENT_AMT="4548758.69" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013517004" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013517005" PT_PHASE="Planning, 10+ years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013601066" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 224" CNTY_NM="Hunt" LIMITS_FROM_DSCR="AT SOUTH SULPHUR RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2620776" DIST_LET_DATE="3/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="11/12/2018" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="11/14/2018" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="11/19/2018" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.214 (mi)" TXDOT_CNTCT_NM="James Atkins P.E." TXDOT_CNTCT_PH_NBR="(903)453-3107" CNSTR_CMPNY_NM="HIGHWAY 19 CONSTRUCTION LLC" CNSTR_NTPD_DT="4/29/2022" CNSTR_WKBG_DT="7/28/2022" CNSTR_PCT_TIME_USED="94.57" CNSTR_PCT_COMPLETE="96.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="11/9/2018" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="11/14/2018" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="11/5/2018" ROW_TRGT_DT="TBD" ROW_ACTL_DT="11/5/2018" RTL_TRGT_DT="TBD" RTL_ACTL_DT="11/18/2021" PE_SPENT_AMT="124755.73" CNSTR_SPENT_AMT="2510214.82" CE_SPENT_AMT="92386.86" TOT_SPENT_AMT="2727357.41" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3404000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013601067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 224" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SH 34" LIMITS_TO_DSCR="FM 2874" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1217100" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="12.260 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="850.67" TOT_SPENT_AMT="850.67" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1244764.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013602039" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 24" CNTY_NM="Hunt" LIMITS_FROM_DSCR="SH 50" LIMITS_TO_DSCR="DELTA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/4/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="335684" DIST_LET_DATE="12/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CLARK CONSTRUCTION OF TEXAS, INC." CNSTR_NTPD_DT="4/4/2023" CNSTR_WKBG_DT="4/10/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.35" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="337817.68" CE_SPENT_AMT="4226.70" TOT_SPENT_AMT="342044.38" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="269658.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013602040" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 224" CNTY_NM="Hunt" LIMITS_FROM_DSCR="FM 2874" LIMITS_TO_DSCR="SH 24" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="9/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="259582" DIST_LET_DATE="12/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="2.640 (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/30/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="7.50" CNSTR_PCT_COMPLETE="0.51" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="178.26" TOT_SPENT_AMT="178.26" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="266201.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013603066" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 24" CNTY_NM="Delta" LIMITS_FROM_DSCR="FM 64" LIMITS_TO_DSCR=".081 MILES EAST OF BS 24-D" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1104463" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="1.090 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RICHARD DRAKE CONSTRUCTION COMPANY, L.P." CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="7/6/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.13" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="18392.62" CNSTR_SPENT_AMT="1310837.40" CE_SPENT_AMT="16210.42" TOT_SPENT_AMT="1345440.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1100000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013603067" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 24" CNTY_NM="Delta" LIMITS_FROM_DSCR="AT BU 24 (SOUTH)" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="118655" DIST_LET_DATE="5/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesse Herrera, P.E." TXDOT_CNTCT_PH_NBR="(903)885-4031" CNSTR_CMPNY_NM="NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION" CNSTR_NTPD_DT="6/14/2023" CNSTR_WKBG_DT="3/19/2024" CNSTR_PCT_TIME_USED="90.71" CNSTR_PCT_COMPLETE="97.77" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="119160.00" CE_SPENT_AMT="5026.89" TOT_SPENT_AMT="124186.89" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2308)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="136090.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013604045" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 24" CNTY_NM="Delta" LIMITS_FROM_DSCR="BS 24 D" LIMITS_TO_DSCR="SH 19" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4699414" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.620 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RICHARD DRAKE CONSTRUCTION COMPANY, L.P." CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="7/6/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.13" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="5436521.75" CE_SPENT_AMT="129282.58" TOT_SPENT_AMT="5565804.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="6385000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013604046" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Delta" LIMITS_FROM_DSCR="SH 24" LIMITS_TO_DSCR="1540 FT. EAST OF FM 198" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="855377" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.990 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RICHARD DRAKE CONSTRUCTION COMPANY, L.P." CNSTR_NTPD_DT="5/10/2023" CNSTR_WKBG_DT="7/6/2023" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="100.13" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1182806.28" CE_SPENT_AMT="24344.49" TOT_SPENT_AMT="1207150.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="350000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013604048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Delta" LIMITS_FROM_DSCR="DELTA COUNTY LINE" LIMITS_TO_DSCR="SH 24" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1182628" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="GARRET SHIELDS INFRASTRUCTURE" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="90.31" CNSTR_PCT_COMPLETE="47.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="45286.12" CNSTR_SPENT_AMT="575208.00" CE_SPENT_AMT="13745.87" TOT_SPENT_AMT="634239.99" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="439788.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013604049" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 24" CNTY_NM="Delta" LIMITS_FROM_DSCR="SH 19" LIMITS_TO_DSCR="FM 2716" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="87295" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="GARRET SHIELDS INFRASTRUCTURE" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="90.31" CNSTR_PCT_COMPLETE="47.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="18390.00" CE_SPENT_AMT="1690.64" TOT_SPENT_AMT="20080.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="685244.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013604053" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013605048" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Lamar" LIMITS_FROM_DSCR="N OF CR 22860 (END OF CONTROL SECTION)" LIMITS_TO_DSCR="DELTA CL (END OF CONTROL SECTION)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2155275" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="GARRET SHIELDS INFRASTRUCTURE" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="90.31" CNSTR_PCT_COMPLETE="47.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="928083.70" CE_SPENT_AMT="43307.24" TOT_SPENT_AMT="971390.94" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="439788.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013605049" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Lamar" LIMITS_FROM_DSCR=".1 MI N OF AUDS CREEK" LIMITS_TO_DSCR="DELTA COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="10500000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="27085.30" TOT_SPENT_AMT="27085.30" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="8374967.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT2_PID="PM" FUND_CAT2_AMT="2965033.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013606055" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 19" CNTY_NM="Lamar" LIMITS_FROM_DSCR="SL 286" LIMITS_TO_DSCR="N OF CR 22860 (END OF CONTROL SECTION)" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/17/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1022755" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="GARRET SHIELDS INFRASTRUCTURE" CNSTR_NTPD_DT="2/2/2024" CNSTR_WKBG_DT="4/17/2024" CNSTR_PCT_TIME_USED="90.31" CNSTR_PCT_COMPLETE="47.46" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="651282.00" CE_SPENT_AMT="21216.91" TOT_SPENT_AMT="672498.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="685244.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013606056" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 271B" CNTY_NM="Lamar" LIMITS_FROM_DSCR="CLEMENT RD" LIMITS_TO_DSCR="W SANTA FE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="356871" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/10/2021" PSE_30_ACTL_DT="6/10/2021" PSE_60_TRGT_DT="11/12/2021" PSE_60_ACTL_DT="11/12/2021" PSE_100_TRGT_DT="2/2/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.602 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="11/15/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.45" DSGN_START_TRGT_DT="1/8/2021" DSGN_START_ACTL_DT="1/8/2021" ENVCLR_TRGT_DT="11/12/2021" ENVCLR_ACTL_DT="11/12/2021" UTIL_TRGT_DT="2/14/2020" UTIL_ACTL_DT="2/14/2020" ROW_TRGT_DT="8/5/2019" ROW_ACTL_DT="8/5/2019" RTL_TRGT_DT="8/9/2022" RTL_ACTL_DT="8/9/2022" CNSTR_SPENT_AMT="294231.00" CE_SPENT_AMT="14903.96" TOT_SPENT_AMT="309134.96" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="423380.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013606057" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 19" CNTY_NM="Lamar" LIMITS_FROM_DSCR="SL 286" LIMITS_TO_DSCR=".1 MI N OF AUDS CREEK" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4500000" DIST_LET_DATE="1/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="5040000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013607051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 271" CNTY_NM="Lamar" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="FM 1499" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4709225" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="3.637 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="5/11/2023" CNSTR_WKBG_DT="9/14/2023" CNSTR_PCT_TIME_USED="79.31" CNSTR_PCT_COMPLETE="98.83" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="50705.35" CNSTR_SPENT_AMT="5371860.11" CE_SPENT_AMT="130329.87" TOT_SPENT_AMT="5552895.33" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="4700000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013607052" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 271" CNTY_NM="Lamar" LIMITS_FROM_DSCR="0.25 MI NORTH OF STONE AVE" LIMITS_TO_DSCR="BU 271 B" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="2/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="695961" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/10/2021" PSE_30_ACTL_DT="6/10/2021" PSE_60_TRGT_DT="11/12/2021" PSE_60_ACTL_DT="11/12/2021" PSE_100_TRGT_DT="2/2/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.671 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="11/15/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.45" DSGN_START_TRGT_DT="1/8/2021" DSGN_START_ACTL_DT="1/8/2021" ENVCLR_TRGT_DT="11/12/2021" ENVCLR_ACTL_DT="11/12/2021" UTIL_TRGT_DT="2/14/2020" UTIL_ACTL_DT="2/14/2020" ROW_TRGT_DT="8/5/2019" ROW_ACTL_DT="8/5/2019" RTL_TRGT_DT="8/9/2022" RTL_ACTL_DT="8/9/2022" CNSTR_SPENT_AMT="473512.22" CE_SPENT_AMT="22307.93" TOT_SPENT_AMT="495820.15" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="658997.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013607053" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 271B" CNTY_NM="Lamar" LIMITS_FROM_DSCR="US 271" LIMITS_TO_DSCR="CLEMENT RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="2/12/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="381210" DIST_LET_DATE="8/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="6/10/2021" PSE_30_ACTL_DT="6/10/2021" PSE_60_TRGT_DT="11/12/2021" PSE_60_ACTL_DT="11/12/2021" PSE_100_TRGT_DT="2/2/2021" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.490 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="(INACTIVE)TI-ZACK CONCRETE, INC." CNSTR_NTPD_DT="9/15/2022" CNSTR_WKBG_DT="11/15/2022" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="98.45" DSGN_START_TRGT_DT="1/8/2021" DSGN_START_ACTL_DT="1/8/2021" ENVCLR_TRGT_DT="11/12/2021" ENVCLR_ACTL_DT="11/12/2021" UTIL_TRGT_DT="2/14/2020" UTIL_ACTL_DT="2/14/2020" ROW_TRGT_DT="8/5/2019" ROW_ACTL_DT="8/5/2019" RTL_TRGT_DT="8/9/2022" RTL_ACTL_DT="8/9/2022" CNSTR_SPENT_AMT="256023.53" CE_SPENT_AMT="15685.60" TOT_SPENT_AMT="271709.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="RTZ" FUND_CAT1_AMT="454951.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013607055" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013608043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 271" CNTY_NM="Lamar" LIMITS_FROM_DSCR="0.365 MI SOUTH OF STATE LINE" LIMITS_TO_DSCR="FM 1499" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="8404749" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="9.448 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="5/11/2023" CNSTR_WKBG_DT="9/14/2023" CNSTR_PCT_TIME_USED="79.31" CNSTR_PCT_COMPLETE="98.83" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="14043.54" CNSTR_SPENT_AMT="8853369.32" CE_SPENT_AMT="309171.78" TOT_SPENT_AMT="9176584.64" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="7500000.00" FUND_CAT2_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT2_AMT="4500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013608044" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 271" CNTY_NM="Lamar" LIMITS_FROM_DSCR=".05 MI N OF FM 3298" LIMITS_TO_DSCR=".05 MILES S OF FM 3298" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="135027" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="5/13/2025" CNSTR_PCT_TIME_USED="23.53" CNSTR_PCT_COMPLETE="13.74" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="47310.00" CE_SPENT_AMT="54.45" TOT_SPENT_AMT="47364.45" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="92108.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013608045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 271" CNTY_NM="Lamar" LIMITS_FROM_DSCR=".05 MI N OF FM 2648" LIMITS_TO_DSCR=".05 MI S OF FM 2648" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="85257" DIST_LET_DATE="9/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="10/23/2024" CNSTR_WKBG_DT="5/13/2025" CNSTR_PCT_TIME_USED="23.53" CNSTR_PCT_COMPLETE="13.74" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="53.34" TOT_SPENT_AMT="53.34" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="94549.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013608050" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013609023" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 271" CNTY_NM="Lamar" LIMITS_FROM_DSCR="STATE LINE" LIMITS_TO_DSCR="0.365 MI SOUTH OF STATE LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="4/8/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="353904" DIST_LET_DATE="4/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="3/9/2017" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="3/13/2017" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="3/16/2017" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.365 (mi)" TXDOT_CNTCT_NM="Daniel Taylor, P.E." TXDOT_CNTCT_PH_NBR="(903)737-4601" CNSTR_CMPNY_NM="RK HALL, LLC" CNSTR_NTPD_DT="5/11/2023" CNSTR_WKBG_DT="9/14/2023" CNSTR_PCT_TIME_USED="79.31" CNSTR_PCT_COMPLETE="98.83" DSGN_START_TRGT_DT="3/8/2017" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="3/13/2017" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="3/1/2017" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/1/2017" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/20/2020" RTL_ACTL_DT="TBD" PE_SPENT_AMT="5584.70" CNSTR_SPENT_AMT="394112.73" CE_SPENT_AMT="13092.50" TOT_SPENT_AMT="412789.93" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="840000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013612027" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013613013" PT_PHASE="Construction begins within 4 years" HWY_NBR="BS 24-D" CNTY_NM="Delta" LIMITS_FROM_DSCR="BONHAM ST" LIMITS_TO_DSCR="SH 154" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="600000" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Paris" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Dan Perry, P.E." TXDOT_CNTCT_PH_NBR="903-737-9375" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="56650.01" TOT_SPENT_AMT="56650.01" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="648000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013703084" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 25" CNTY_NM="Wichita" LIMITS_FROM_DSCR="FM 1811" LIMITS_TO_DSCR="US 287 NB ACCESS RD" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="87849" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.87" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="865.05" CNSTR_SPENT_AMT="152130.21" CE_SPENT_AMT="936.25" TOT_SPENT_AMT="153931.51" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="88771.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013703085" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 25" CNTY_NM="Wichita" LIMITS_FROM_DSCR="FM 1811" LIMITS_TO_DSCR="ARCHER COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="3/9/2027" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20570032" DIST_LET_DATE="6/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="7/24/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/7/2023" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/7/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="A. L. HELMCAMP, INC." CNSTR_NTPD_DT="7/17/2024" CNSTR_WKBG_DT="8/29/2024" CNSTR_PCT_TIME_USED="24.29" CNSTR_PCT_COMPLETE="13.72" DSGN_START_TRGT_DT="4/3/2023" DSGN_START_ACTL_DT="4/3/2023" ENVCLR_TRGT_DT="8/7/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/12/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="4/12/2023" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/8/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1598130.88" CNSTR_SPENT_AMT="2825081.69" CE_SPENT_AMT="113109.44" TOT_SPENT_AMT="4536322.01" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="19237497.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013703086" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 25" CNTY_NM="Wichita" LIMITS_FROM_DSCR="AT WICHITA RIVER" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3234339" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/20/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Callan Coltharp, P.E." TXDOT_CNTCT_PH_NBR="(940)397-2074" CNSTR_CMPNY_NM="ALTUS CONSTRUCTION LLC" CNSTR_NTPD_DT="4/3/2025" CNSTR_WKBG_DT="5/19/2025" CNSTR_PCT_TIME_USED="1.36" CNSTR_PCT_COMPLETE="18.15" DSGN_START_TRGT_DT="4/4/2023" DSGN_START_ACTL_DT="4/4/2023" ENVCLR_TRGT_DT="4/4/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/3/2023" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="2/21/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="389915.41" CNSTR_SPENT_AMT="258311.20" CE_SPENT_AMT="1678.05" TOT_SPENT_AMT="649904.66" FUND_CAT1_DSCR="Category 6 - Bridge Program (2506)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="3185140.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013704018" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="WICHITA COUNTY LINE" LIMITS_TO_DSCR="US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="217500" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2005.16" CE_SPENT_AMT="4.12" TOT_SPENT_AMT="2009.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_AMT="355372.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013704019" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="WICHITA COUNTY LINE" LIMITS_TO_DSCR="NEAR US 82" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3000000" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/24/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/24/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/24/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/24/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="3360000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013705036" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="FM 368" LIMITS_TO_DSCR="SH 79" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="650532" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="NORTHEASTERN PAVERS, LLC" CNSTR_NTPD_DT="12/21/2023" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="95.87" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="788.43" CNSTR_SPENT_AMT="607396.98" CE_SPENT_AMT="5127.15" TOT_SPENT_AMT="613312.56" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="709894.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013705037" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="FM 368" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="464406" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CE_SPENT_AMT="8.81" TOT_SPENT_AMT="8.81" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="512006.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013705038" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="US 82" LIMITS_TO_DSCR="FM 368" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5000000" DIST_LET_DATE="3/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Shoulders" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="11/24/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="4/1/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="11/24/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/24/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/24/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/24/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="5600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013705039" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="FM 368" LIMITS_TO_DSCR="SH 79" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="6500000" DIST_LET_DATE="5/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="7280000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013707026" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 25" CNTY_NM="Archer" LIMITS_FROM_DSCR="SH 79" LIMITS_TO_DSCR="US 281" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="935639" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="6/10/2026" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="5/1/2026" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/1/2026" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/1/2026" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="5/1/2026" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/19/2026" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1047916.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013708013" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 174" CNTY_NM="Clay" LIMITS_FROM_DSCR="ARCHER COUNTY LINE" LIMITS_TO_DSCR="SH 148" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="526300" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="568404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013710028" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 174" CNTY_NM="Clay" LIMITS_FROM_DSCR="SH 148" LIMITS_TO_DSCR="FM 3077" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="180534" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Scot Reaves, P.E." TXDOT_CNTCT_PH_NBR="940-720-7717" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="194977.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013711012" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 174" CNTY_NM="Clay" LIMITS_FROM_DSCR="FM 1288N" LIMITS_TO_DSCR="MONTAGUE COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="190537" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1579.83" CE_SPENT_AMT="3.61" TOT_SPENT_AMT="1583.44" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="202071.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013712018" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 174" CNTY_NM="Montague" LIMITS_FROM_DSCR="CLAY COUNTY LINE" LIMITS_TO_DSCR="US 287 SB FR" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="219135" DIST_LET_DATE="11/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Wichita Falls" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="David Rohmer, P.E." TXDOT_CNTCT_PH_NBR="(940)720-7721" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="12/19/2024" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="18.58" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="441.55" CE_SPENT_AMT="4.15" TOT_SPENT_AMT="445.70" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="232060.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013801101" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 31" CNTY_NM="Gregg" LIMITS_FROM_DSCR="US 259" LIMITS_TO_DSCR="SOUTH STREET" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1084289" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="1214404.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013801102" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 31" CNTY_NM="Gregg" LIMITS_FROM_DSCR="FM 349" LIMITS_TO_DSCR="US 259" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="224567" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="251515.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013801103" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Gregg" LIMITS_FROM_DSCR="SH 31" LIMITS_TO_DSCR="SH 31" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="182947" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="204900.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013802040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Rusk" LIMITS_FROM_DSCR="GREGG C/L" LIMITS_TO_DSCR="FM 850" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="699298" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="801714.88" CE_SPENT_AMT="14093.90" TOT_SPENT_AMT="815808.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="820106.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013802041" PT_PHASE="Construction underway or begins soon" HWY_NBR="BU 259G" CNTY_NM="Rusk" LIMITS_FROM_DSCR="GREGG C/L" LIMITS_TO_DSCR="US 259" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/9/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="96336" DIST_LET_DATE="12/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="9/15/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Lance Pomykal, P.E." TXDOT_CNTCT_PH_NBR="(903)729-2205" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="2/21/2024" CNSTR_WKBG_DT="3/5/2024" CNSTR_PCT_TIME_USED="96.47" CNSTR_PCT_COMPLETE="97.37" DSGN_START_TRGT_DT="2/1/2023" DSGN_START_ACTL_DT="1/2/2023" ENVCLR_TRGT_DT="10/26/2023" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/15/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="110039.31" CE_SPENT_AMT="1934.46" TOT_SPENT_AMT="111973.77" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="117251.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013802042" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Rusk" LIMITS_FROM_DSCR="BU 259" LIMITS_TO_DSCR="FM 850" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2420479" DIST_LET_DATE="8/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/10/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/8/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/29/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/6/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="89685.64" TOT_SPENT_AMT="89685.64" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="2891837.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013802043" PT_PHASE="Construction begins within 4 years" HWY_NBR="BU 259G" CNTY_NM="Rusk" LIMITS_FROM_DSCR=".8 MI N OF US 259" LIMITS_TO_DSCR="US 259" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="383533" DIST_LET_DATE="8/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="5/10/2024" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/8/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/18/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/8/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="1/29/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/6/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="12/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="4033.95" TOT_SPENT_AMT="4033.95" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="458220.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013803144" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 259" CNTY_NM="Rusk" LIMITS_FROM_DSCR="FM 850, S &amp; SE" LIMITS_TO_DSCR="SL 571 IN HENDERSON (SBL)" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25000000" DIST_LET_DATE="2/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Adding Shoulders With No Added Capacity" PSE_30_TRGT_DT="9/28/2018" PSE_30_ACTL_DT="9/28/2018" PSE_60_TRGT_DT="11/15/2018" PSE_60_ACTL_DT="2/22/2019" PSE_100_TRGT_DT="5/31/2019" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.243 (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/23/2018" DSGN_START_ACTL_DT="7/23/2018" ENVCLR_TRGT_DT="7/10/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/15/2019" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/30/2028" RTL_ACTL_DT="TBD" PE_SPENT_AMT="591509.98" TOT_SPENT_AMT="591509.98" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="28000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013804047" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013806046" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="1 MILE NORTH OF US 59" LIMITS_TO_DSCR="BU 59-F" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="20700000" DIST_LET_DATE="3/1/2029" CNSTR_CMPNY_LAST_UPDATE_DT="CNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="5/10/2028" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="8/2/2028" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="1/5/2029" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/12/2019" DSGN_START_ACTL_DT="11/12/2019" ENVCLR_TRGT_DT="12/18/2028" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="1/5/2029" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="8/10/2028" ROW_ACTL_DT="TBD" RTL_TRGT_DT="1/5/2029" RTL_ACTL_DT="TBD" PE_SPENT_AMT="722337.28" TOT_SPENT_AMT="722337.28" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="23183999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013806047" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="RUSK COUNTY LINE" LIMITS_TO_DSCR="SH 204" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="59300000" DIST_LET_DATE="5/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="IOI" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/3/2022" PSE_30_ACTL_DT="8/3/2022" PSE_60_TRGT_DT="3/22/2023" PSE_60_ACTL_DT="3/22/2023" PSE_100_TRGT_DT="12/1/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/3/2019" DSGN_START_ACTL_DT="6/3/2019" ENVCLR_TRGT_DT="5/15/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/3/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="3/31/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="9/5/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2825095.62" TOT_SPENT_AMT="2825095.62" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="61671999.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013806049" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 259" CNTY_NM="Nacogdoches" LIMITS_FROM_DSCR="SH 204" LIMITS_TO_DSCR="US 59" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3100000" DIST_LET_DATE="1/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="3/12/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="6/11/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="10/3/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Lufkin" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Matt Brazil, P.E." TXDOT_CNTCT_PH_NBR="936-633-4349" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="1/20/2025" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="7/30/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/8/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="10/3/2025" ROW_ACTL_DT="TBD" RTL_TRGT_DT="11/7/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="2526.28" TOT_SPENT_AMT="2526.28" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="3348000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013808028" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="SH 31" CNTY_NM="Gregg" LIMITS_FROM_DSCR="SOUTH ST IN LONGVIEW, N" LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="36206000" DIST_LET_DATE="8/1/2031" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.398 (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1260696.05" TOT_SPENT_AMT="1260696.05" FUND_CAT1_DSCR="Category DA - Develop Authority (DDA)" FUND_CAT1_AMT="40550720.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013808029" PT_PHASE="Planning, 10+ years" HWY_NBR="SS 63" CNTY_NM="Gregg" LIMITS_FROM_DSCR="N SPUR 63" LIMITS_TO_DSCR="E FAIRMONT ST" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="255217" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013808030" PT_PHASE="Planning, 10+ years" HWY_NBR="SS 63" CNTY_NM="Gregg" LIMITS_FROM_DSCR="US 80" LIMITS_TO_DSCR="MCCANN RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="269718" DIST_LET_DATE="3/1/2028" CNSTR_CMPNY_LAST_UPDATE_DT="PED" PROJ_DSCR="Construct Pedestrian Infrastructure" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013808032" PT_PHASE="Construction begins within 4 years" HWY_NBR="SH 31" CNTY_NM="Gregg" LIMITS_FROM_DSCR="SOUTH ST." LIMITS_TO_DSCR="US 80" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="83511" DIST_LET_DATE="12/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="93533.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013808033" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013809005" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 3310" CNTY_NM="Rusk" LIMITS_FROM_DSCR="US 79 IN HENDERSON, SE" LIMITS_TO_DSCR="US 259" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="118077" DIST_LET_DATE="12/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="126541.89" CE_SPENT_AMT="1931.43" TOT_SPENT_AMT="128473.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2001)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="126000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013810029" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 248" CNTY_NM="Cass" LIMITS_FROM_DSCR="SH 43" LIMITS_TO_DSCR="MARION C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="151894" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2021" PSE_100_ACTL_DT="2/5/2021" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="11.188 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/6/2021" CNSTR_PCT_TIME_USED="109.13" CNSTR_PCT_COMPLETE="111.08" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="10/7/2019" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="6/8/2020" UTIL_TRGT_DT="5/2/2019" UTIL_ACTL_DT="5/2/2019" ROW_TRGT_DT="5/2/2019" ROW_ACTL_DT="5/2/2019" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="42666.63" CNSTR_SPENT_AMT="342595.35" CE_SPENT_AMT="16107.93" TOT_SPENT_AMT="401369.91" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="190715.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013810030" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 248" CNTY_NM="Cass" LIMITS_FROM_DSCR="SH 43" LIMITS_TO_DSCR="FM 125" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="292346" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="6.241 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="283.66" TOT_SPENT_AMT="283.66" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="302291.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013810031" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 248" CNTY_NM="Cass" LIMITS_FROM_DSCR="FM 125" LIMITS_TO_DSCR="MARION C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="240875" DIST_LET_DATE="10/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/29/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="4.821 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="MISSOURI PETROLEUM PRODUCTS COMPANY LLC" CNSTR_NTPD_DT="1/16/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="25.24" CNSTR_PCT_COMPLETE="61.73" DSGN_START_TRGT_DT="11/1/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="5/2/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="5/3/2022" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="5/3/2022" RTL_TRGT_DT="7/29/2024" RTL_ACTL_DT="TBD" CE_SPENT_AMT="233.60" TOT_SPENT_AMT="233.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2501)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="252720.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013811031" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 248" CNTY_NM="Marion" LIMITS_FROM_DSCR="CASS C/L" LIMITS_TO_DSCR="SH 49" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="258396" DIST_LET_DATE="4/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="2/5/2021" PSE_100_ACTL_DT="2/5/2021" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.342 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="H. V. CAVER, INC." CNSTR_NTPD_DT="5/20/2021" CNSTR_WKBG_DT="7/6/2021" CNSTR_PCT_TIME_USED="109.13" CNSTR_PCT_COMPLETE="111.08" DSGN_START_TRGT_DT="10/7/2019" DSGN_START_ACTL_DT="10/7/2019" ENVCLR_TRGT_DT="6/8/2020" ENVCLR_ACTL_DT="6/8/2020" UTIL_TRGT_DT="5/2/2019" UTIL_ACTL_DT="5/2/2019" ROW_TRGT_DT="5/2/2019" ROW_ACTL_DT="5/2/2019" RTL_TRGT_DT="2/5/2021" RTL_ACTL_DT="2/5/2021" PE_SPENT_AMT="3495.90" CNSTR_SPENT_AMT="344044.61" CE_SPENT_AMT="28891.35" TOT_SPENT_AMT="376431.86" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2108)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="283574.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013811034" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 248" CNTY_NM="Marion" LIMITS_FROM_DSCR="CASS C/L" LIMITS_TO_DSCR="SH 49" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="373824" DIST_LET_DATE="10/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.322 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="418683.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013812026" PT_PHASE="Construction underway or begins soon" HWY_NBR="FM 2208" CNTY_NM="Marion" LIMITS_FROM_DSCR="US 59" LIMITS_TO_DSCR="HARRISON C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="337759" DIST_LET_DATE="10/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/28/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="7.262 (mi)" TXDOT_CNTCT_NM="Thomas Bruce, P.E." TXDOT_CNTCT_PH_NBR="(430)222-6017" CNSTR_CMPNY_NM="CDM HOLDINGS" CNSTR_NTPD_DT="1/11/2024" CNSTR_WKBG_DT="5/1/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="88.68" DSGN_START_TRGT_DT="11/1/2022" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="5/3/2023" ENVCLR_ACTL_DT="2/27/2023" UTIL_TRGT_DT="5/3/2022" UTIL_ACTL_DT="4/10/2023" ROW_TRGT_DT="5/3/2022" ROW_ACTL_DT="4/10/2023" RTL_TRGT_DT="7/28/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="331155.98" CE_SPENT_AMT="3402.61" TOT_SPENT_AMT="334558.59" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="327889.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013814015" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2208" CNTY_NM="Harrison" LIMITS_FROM_DSCR="FM 449" LIMITS_TO_DSCR="GREGG C/L" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="396302" DIST_LET_DATE="10/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="5/14/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Atlanta" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="5.965 (mi)" TXDOT_CNTCT_NM="Katie Martin, P.E." TXDOT_CNTCT_PH_NBR="903-799-1342" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="11/1/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="2/17/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="11/1/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="11/1/2024" ROW_ACTL_DT="TBD" RTL_TRGT_DT="5/14/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="428007.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013815014" PT_PHASE="Construction begins within 4 years" HWY_NBR="FM 2208" CNTY_NM="Gregg" LIMITS_FROM_DSCR="US 259" LIMITS_TO_DSCR="HARRISON CL" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="6/30/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="79783" DIST_LET_DATE="2/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Eric Fisher, P.E." TXDOT_CNTCT_PH_NBR="903-510-9135" CNSTR_CMPNY_NM="STRIPING TECHNOLOGY, L.P." CNSTR_NTPD_DT="3/26/2025" CNSTR_WKBG_DT="5/12/2025" CNSTR_PCT_TIME_USED="15.87" CNSTR_PCT_COMPLETE="75.07" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="30657.70" CE_SPENT_AMT="2.43" TOT_SPENT_AMT="30660.13" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2508)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="98952.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013816005" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 259" CNTY_NM="Gregg" LIMITS_FROM_DSCR="SH 31 IN KILGORE, S" LIMITS_TO_DSCR="RUSK C/L" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="9/23/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="4533083" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Resurface Roadway" PSE_30_TRGT_DT="2/25/2021" PSE_30_ACTL_DT="10/19/2021" PSE_60_TRGT_DT="3/31/2021" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="12/28/2021" PSE_100_ACTL_DT="11/30/2021" DIST_NM="Tyler" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Kyle Dykes, P.E" TXDOT_CNTCT_PH_NBR="(903)234-0532" CNSTR_CMPNY_NM="MADDEN CONTRACTING COMPANY, LLC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="3/27/2023" CNSTR_PCT_TIME_USED="197.22" CNSTR_PCT_COMPLETE="92.50" DSGN_START_TRGT_DT="10/20/2020" DSGN_START_ACTL_DT="10/20/2020" ENVCLR_TRGT_DT="7/27/2022" ENVCLR_ACTL_DT="10/21/2021" UTIL_TRGT_DT="11/8/2021" UTIL_ACTL_DT="5/6/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/16/2022" RTL_ACTL_DT="11/30/2021" PE_SPENT_AMT="76601.90" CNSTR_SPENT_AMT="4318772.19" CE_SPENT_AMT="73101.91" TOT_SPENT_AMT="4468476.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="4076989.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013901021" PT_PHASE="Planning, 10+ years" HWY_NBR="US 285" CNTY_NM="Culberson" LIMITS_FROM_DSCR="0.1 MILES SOUTH OF NEW MEXICO LINE" LIMITS_TO_DSCR="CULBERSON COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7000000" DIST_LET_DATE="1/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/30/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/19/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="El Paso" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Raul Ortega, P.E." TXDOT_CNTCT_PH_NBR="915-790-4411" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/8/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/20/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="9253218.86" TOT_SPENT_AMT="9253218.86" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013902030" PT_PHASE="Planning, 10+ years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="RM 652" LIMITS_TO_DSCR="CULBERSON COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="191000000" DIST_LET_DATE="1/1/2037" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="8/30/2022" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="12/19/2022" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="6/8/2020" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/20/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="10624.30" TOT_SPENT_AMT="10624.30" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013903041" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="RM 652" LIMITS_TO_DSCR="CR 232" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="43106369" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="10.713 (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1221043.90" CNSTR_SPENT_AMT="18114590.04" CE_SPENT_AMT="2403881.78" TOT_SPENT_AMT="21739515.72" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="36960000.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013903046" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="SH 302" LIMITS_TO_DSCR="RM 652" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="290000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="23046.10" TOT_SPENT_AMT="23046.10" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="162400000.00" FUND_CAT2_DSCR="Category DA - Develop Authority (SWDA)" FUND_CAT2_AMT="162400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013903048" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT FOUR MILE DRAW" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="8/5/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2936873" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="3/30/2020" PSE_30_ACTL_DT="3/30/2020" PSE_60_TRGT_DT="7/10/2020" PSE_60_ACTL_DT="7/10/2020" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="7/27/2022" CNSTR_WKBG_DT="3/6/2023" CNSTR_PCT_TIME_USED="111.58" CNSTR_PCT_COMPLETE="44.40" DSGN_START_TRGT_DT="1/28/2020" DSGN_START_ACTL_DT="1/28/2020" ENVCLR_TRGT_DT="8/25/2020" ENVCLR_ACTL_DT="8/25/2020" UTIL_TRGT_DT="3/21/2022" UTIL_ACTL_DT="3/7/2022" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/31/2022" RTL_ACTL_DT="3/7/2022" PE_SPENT_AMT="141236.21" CNSTR_SPENT_AMT="2809568.73" CE_SPENT_AMT="173028.00" TOT_SPENT_AMT="3123832.94" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2500000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013903049" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="RM 652" LIMITS_TO_DSCR="CR 232" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/22/2021" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="743396" DIST_LET_DATE="9/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TBD" PROJ_LENGTH="0.001 (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/14/2020" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="99.76" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="640060.06" TOT_SPENT_AMT="640060.06" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_AMT="743396.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013903053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="CR 232" LIMITS_TO_DSCR="SH 302" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="10/31/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="15384615" DIST_LET_DATE="3/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="FNF CONSTRUCTION, INC." CNSTR_NTPD_DT="4/9/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="12474.63" CE_SPENT_AMT="660.41" TOT_SPENT_AMT="13135.04" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="15384615.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013904051" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="0.2 MI N OF FM 1216" LIMITS_TO_DSCR="BI 20-B" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="11/10/2020" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2055116" DIST_LET_DATE="10/1/2019" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.954 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="11/12/2019" CNSTR_WKBG_DT="2/24/2020" CNSTR_PCT_TIME_USED="92.54" CNSTR_PCT_COMPLETE="99.87" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2093558.77" CE_SPENT_AMT="203937.29" TOT_SPENT_AMT="2297496.06" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="1400000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013904052" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="FM 1216" LIMITS_TO_DSCR="SH 302" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="254000000" DIST_LET_DATE="1/1/2033" CNSTR_CMPNY_LAST_UPDATE_DT="WNF" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" PE_SPENT_AMT="21204.21" TOT_SPENT_AMT="21204.21" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="284480000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013904053" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="AT FM 1216" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="3/26/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="194828" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="11/22/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="12/15/2021" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="3/18/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.272 (mi)" TXDOT_CNTCT_NM="Frew Bogale, P.E." TXDOT_CNTCT_PH_NBR="(432)848-9474" CNSTR_CMPNY_NM="VACA UNDERGROUND UTILITIES INC" CNSTR_NTPD_DT="7/11/2022" CNSTR_WKBG_DT="10/11/2022" CNSTR_PCT_TIME_USED="99.17" CNSTR_PCT_COMPLETE="112.60" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="10/18/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="12/14/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="3/31/2022" CNSTR_SPENT_AMT="269727.64" CE_SPENT_AMT="96875.70" TOT_SPENT_AMT="366603.34" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="590943.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013904055" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="0.165 MI N BI20" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="208728" DIST_LET_DATE="2/1/2024" CNSTR_CMPNY_LAST_UPDATE_DT="RH" PROJ_DSCR="Railroad Crossing Improvements" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="66100.32" TOT_SPENT_AMT="66100.32" FUND_CAT1_DSCR="Category 10 - State Railroad Grade Crossing (2210RX)" FUND_CAT1_PID="RGC" FUND_CAT1_AMT="208728.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013905052" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="9.58 MI S OF IH 20" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1699861" DIST_LET_DATE="9/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="1835850.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013905053" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="IH 20" LIMITS_TO_DSCR="9.6 MI S OF IH 20" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1476495" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Highway Improvement" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1653674.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013905056" PT_PHASE="Construction begins within 4 years" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="0" DIST_LET_DATE="" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" PROJ_LENGTH=" (mi)" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" TXDOT_CNTCT_LAST_UPDATE_DT="" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013906021" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Reeves" LIMITS_FROM_DSCR="2.0 MI SOUTH OF CR 113" LIMITS_TO_DSCR="PECOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="29734404" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/5/2020" PSE_30_ACTL_DT="10/5/2020" PSE_60_TRGT_DT="1/20/2021" PSE_60_ACTL_DT="1/20/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.932 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="KIEWIT INFRASTRUCTURE SOUTH CO." CNSTR_NTPD_DT="8/18/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="92.42" CNSTR_PCT_COMPLETE="96.97" DSGN_START_TRGT_DT="4/30/2020" DSGN_START_ACTL_DT="4/30/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/3/2021" UTIL_ACTL_DT="8/3/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/23/2021" RTL_ACTL_DT="4/23/2021" PE_SPENT_AMT="1413838.47" CNSTR_SPENT_AMT="30243805.60" CE_SPENT_AMT="1719433.29" TOT_SPENT_AMT="33377077.36" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="27800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013907025" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Pecos" LIMITS_FROM_DSCR="REEVES COUNTY LINE" LIMITS_TO_DSCR="0.3 MI SOUTH OF FM 1776" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/15/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="28794097" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes" PSE_30_TRGT_DT="10/5/2020" PSE_30_ACTL_DT="10/5/2020" PSE_60_TRGT_DT="1/20/2021" PSE_60_ACTL_DT="1/20/2021" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="13.998 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="KIEWIT INFRASTRUCTURE SOUTH CO." CNSTR_NTPD_DT="8/18/2021" CNSTR_WKBG_DT="9/20/2021" CNSTR_PCT_TIME_USED="92.42" CNSTR_PCT_COMPLETE="96.97" DSGN_START_TRGT_DT="4/30/2020" DSGN_START_ACTL_DT="4/30/2020" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/3/2021" UTIL_ACTL_DT="8/3/2021" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/23/2021" RTL_ACTL_DT="4/23/2021" PE_SPENT_AMT="1217549.70" CNSTR_SPENT_AMT="24927199.43" CE_SPENT_AMT="2064449.13" TOT_SPENT_AMT="28209198.26" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="28000000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013907027" PT_PHASE="Construction begins within 4 years" HWY_NBR="US 285" CNTY_NM="Pecos" LIMITS_FROM_DSCR="REEVES COUNTY LINE" LIMITS_TO_DSCR="0.3 MI S OF FM 1776" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="913327" DIST_LET_DATE="9/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2801)" FUND_CAT1_AMT="1022927.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013908040" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Pecos" LIMITS_FROM_DSCR="0.7 MI NORTH OF W GOMEZ RD" LIMITS_TO_DSCR="1.8 MI NORTH OF IH 10" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="25100000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="3/11/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/1/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH="9.733 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="5/8/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="12/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/21/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/27/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/27/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="1667226.58" TOT_SPENT_AMT="1667226.58" FUND_CAT1_DSCR="Category 4 - Statewide Connectivity Corridor (04CN)" FUND_CAT1_AMT="37800000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013908043" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Pecos" LIMITS_FROM_DSCR="0.35 MI S FM 1776" LIMITS_TO_DSCR="BI 10" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="11/17/2022" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="855171" DIST_LET_DATE="9/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/20/2021" CNSTR_WKBG_DT="7/18/2022" CNSTR_PCT_TIME_USED="63.79" CNSTR_PCT_COMPLETE="78.61" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="846993.95" CE_SPENT_AMT="20743.23" TOT_SPENT_AMT="867737.18" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2201)" FUND_CAT1_AMT="906013.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="013908045" PT_PHASE="Construction underway or begins soon" HWY_NBR="US 285" CNTY_NM="Pecos" LIMITS_FROM_DSCR="S OF FM 1776" LIMITS_TO_DSCR="0.7 MI NORTH OF W GOMEZ RD" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="19600000" DIST_LET_DATE="4/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SP2" PROJ_DSCR="Widen Road - Add Lanes And Shoulders" PSE_30_TRGT_DT="3/11/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="7/1/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="JONES BROS. DIRT &amp; PAVING CONTRACTORS, INC." CNSTR_NTPD_DT="5/8/2025" CNSTR_WKBG_DT="TBD" CNSTR_PCT_TIME_USED="0.00" CNSTR_PCT_COMPLETE="0.00" DSGN_START_TRGT_DT="12/4/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/21/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="10/27/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/27/2025" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 11 - Preservation &amp; Energy Sector (11PES)" FUND_CAT1_PID="PES" FUND_CAT1_AMT="19600000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014001081" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="SH 18" LIMITS_TO_DSCR="0.759 MI E OF US 67" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="3354422" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2023" PSE_30_ACTL_DT="2/14/2023" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="3/24/2023" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="11/8/2023" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.29" DSGN_START_TRGT_DT="3/9/2023" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" PE_SPENT_AMT="31376.38" CNSTR_SPENT_AMT="2814951.90" CE_SPENT_AMT="41803.85" TOT_SPENT_AMT="2888132.13" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="3919374.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014001083" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 5.4 MI E OF SH 18" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="536429" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="536429.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002048" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 0.40 MI E OF FM 2023" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1747086" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/9/2025" PSE_30_ACTL_DT="3/7/2023" PSE_60_TRGT_DT="5/7/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/11/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="2/12/2024" CNSTR_PCT_TIME_USED="63.39" CNSTR_PCT_COMPLETE="102.18" DSGN_START_TRGT_DT="3/13/2025" DSGN_START_ACTL_DT="9/19/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/11/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="255659.75" CNSTR_SPENT_AMT="2067837.36" CE_SPENT_AMT="243042.88" TOT_SPENT_AMT="2566539.99" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1344000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002049" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 5.15 MI E OF FM 2023" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1867664" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/9/2025" PSE_30_ACTL_DT="3/7/2023" PSE_60_TRGT_DT="5/7/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/11/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="2/12/2024" CNSTR_PCT_TIME_USED="63.39" CNSTR_PCT_COMPLETE="102.18" DSGN_START_TRGT_DT="3/13/2025" DSGN_START_ACTL_DT="9/19/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/11/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="254922.66" CNSTR_SPENT_AMT="2291421.65" CE_SPENT_AMT="256157.22" TOT_SPENT_AMT="2802501.53" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="1344000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002050" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="REFERENCE MARKER 285" LIMITS_TO_DSCR="REFERENCE MARKER 293" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/27/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1938518" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/8/2023" PSE_30_ACTL_DT="9/27/2022" PSE_60_TRGT_DT="1/5/2024" PSE_60_ACTL_DT="12/6/2022" PSE_100_TRGT_DT="3/8/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="HJC FARMS, INC." CNSTR_NTPD_DT="10/12/2023" CNSTR_WKBG_DT="2/26/2024" CNSTR_PCT_TIME_USED="50.81" CNSTR_PCT_COMPLETE="89.29" DSGN_START_TRGT_DT="11/13/2023" DSGN_START_ACTL_DT="8/19/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="1/4/2023" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="1/13/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="3/8/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="417649.60" CNSTR_SPENT_AMT="1848128.50" CE_SPENT_AMT="176304.94" TOT_SPENT_AMT="2442083.04" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2408)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="3288162.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002051" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="1.5 MI EAST OF US 67" LIMITS_TO_DSCR="13.7 MI EAST OF US 67" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1929791" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/3/2022" PSE_30_ACTL_DT="3/3/2022" PSE_60_TRGT_DT="4/5/2022" PSE_60_ACTL_DT="4/5/2022" PSE_100_TRGT_DT="7/20/2022" PSE_100_ACTL_DT="7/20/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="5/30/2023" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="95.97" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="6/21/2022" ENVCLR_ACTL_DT="6/21/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/20/2022" RTL_ACTL_DT="7/20/2022" CNSTR_SPENT_AMT="1919822.27" CE_SPENT_AMT="27234.05" TOT_SPENT_AMT="1947056.32" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1328807.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002052" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT FM 2023." LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="384220" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="10/19/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="4/15/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="1/11/2023" CNSTR_PCT_TIME_USED="143.78" CNSTR_PCT_COMPLETE="100.46" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="9/3/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="4/26/2022" PE_SPENT_AMT="33904.71" CNSTR_SPENT_AMT="560070.00" CE_SPENT_AMT="17554.40" TOT_SPENT_AMT="611529.11" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002053" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT MCKENZIE RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="74150" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="10/19/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="4/15/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="1/11/2023" CNSTR_PCT_TIME_USED="143.78" CNSTR_PCT_COMPLETE="100.46" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="9/3/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="4/26/2022" CNSTR_SPENT_AMT="87300.00" CE_SPENT_AMT="10450.63" TOT_SPENT_AMT="97750.63" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014002054" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 5.6 MI EAST OF FM 2023" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="1/13/2025" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1407595" DIST_LET_DATE="11/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="4/9/2025" PSE_30_ACTL_DT="3/7/2023" PSE_60_TRGT_DT="5/7/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="7/11/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="DAN WILLIAMS COMPANY" CNSTR_NTPD_DT="12/5/2023" CNSTR_WKBG_DT="2/12/2024" CNSTR_PCT_TIME_USED="63.39" CNSTR_PCT_COMPLETE="102.18" DSGN_START_TRGT_DT="3/13/2025" DSGN_START_ACTL_DT="9/19/2022" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="4/4/2023" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/11/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="347612.01" CNSTR_SPENT_AMT="1644962.67" CE_SPENT_AMT="193180.66" TOT_SPENT_AMT="2185755.34" FUND_CAT1_DSCR="Category 6 - Bridge Program (2406)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="2240000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014003048" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="LIGON RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="92850" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="10/19/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="4/15/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="1/11/2023" CNSTR_PCT_TIME_USED="143.78" CNSTR_PCT_COMPLETE="100.46" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="9/3/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="4/26/2022" CNSTR_SPENT_AMT="57000.00" CE_SPENT_AMT="12843.36" TOT_SPENT_AMT="69843.36" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014003049" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="12.4 MI E OF US 67" LIMITS_TO_DSCR="0.41 MI W OF RM 2886" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="2355031" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2023" PSE_30_ACTL_DT="2/14/2023" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="3/24/2023" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="11/8/2023" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.29" DSGN_START_TRGT_DT="3/9/2023" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="2392219.24" CE_SPENT_AMT="35526.19" TOT_SPENT_AMT="2427745.43" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="2094886.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014003051" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="4.191 MI W OF FM 11" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="5200000" DIST_LET_DATE="10/1/2027" CNSTR_CMPNY_LAST_UPDATE_DT="BR" PROJ_DSCR="Bridge Replacement" PSE_30_TRGT_DT="10/12/2023" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="2/1/2024" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="4/22/2024" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="7/25/2023" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="6/18/2024" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="4/26/2024" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="6/18/2024" RTL_ACTL_DT="TBD" PE_SPENT_AMT="614353.82" TOT_SPENT_AMT="614353.82" FUND_CAT1_DSCR="Category 6 - Bridge Program (2806)" FUND_CAT1_PID="BSP" FUND_CAT1_AMT="5200000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014003052" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="1.8 MI W OF FM 11" LIMITS_TO_DSCR="FM 2886" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="18037443" DIST_LET_DATE="12/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="RER" PROJ_DSCR="Rehabilitate Existing Roadway" PSE_30_TRGT_DT="3/13/2025" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="5/23/2025" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="8/13/2025" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="12/31/2024" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="10/2/2025" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="8/19/2025" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="10/2/2025" RTL_ACTL_DT="TBD" PE_SPENT_AMT="114704.78" TOT_SPENT_AMT="114704.78" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehabilitation (2701)" FUND_CAT1_AMT="19480438.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014004047" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT BAKER RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91800" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="10/19/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="4/15/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="1/11/2023" CNSTR_PCT_TIME_USED="143.78" CNSTR_PCT_COMPLETE="100.46" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="9/3/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="4/26/2022" CE_SPENT_AMT="12477.77" TOT_SPENT_AMT="12477.77" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014004048" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="0.41 MI W OF RM 2886" LIMITS_TO_DSCR="2.12 E OF US 190" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/21/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1602351" DIST_LET_DATE="9/1/2023" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2023" PSE_30_ACTL_DT="2/14/2023" PSE_60_TRGT_DT="5/3/2023" PSE_60_ACTL_DT="3/24/2023" PSE_100_TRGT_DT="7/5/2023" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="11/8/2023" CNSTR_WKBG_DT="5/15/2024" CNSTR_PCT_TIME_USED="100.00" CNSTR_PCT_COMPLETE="97.29" DSGN_START_TRGT_DT="3/9/2023" DSGN_START_ACTL_DT="1/23/2023" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/5/2023" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="1627940.89" CE_SPENT_AMT="24176.15" TOT_SPENT_AMT="1652117.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2401)" FUND_CAT1_AMT="1423983.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014004049" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 12.7 MI E OF FM 11" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="539414" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="539414.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014005027" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="2.1 MI EAST OF US 190" LIMITS_TO_DSCR="5.5 MI WEST OF SH 349" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="6/7/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1623412" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="3/3/2022" PSE_30_ACTL_DT="3/3/2022" PSE_60_TRGT_DT="4/5/2022" PSE_60_ACTL_DT="4/5/2022" PSE_100_TRGT_DT="7/20/2022" PSE_100_ACTL_DT="7/20/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="COX PAVING OF TEXAS, INC." CNSTR_NTPD_DT="10/11/2022" CNSTR_WKBG_DT="5/30/2023" CNSTR_PCT_TIME_USED="98.13" CNSTR_PCT_COMPLETE="95.97" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="6/21/2022" ENVCLR_ACTL_DT="6/21/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="7/20/2022" RTL_ACTL_DT="7/20/2022" CNSTR_SPENT_AMT="1614919.74" CE_SPENT_AMT="22908.86" TOT_SPENT_AMT="1637828.60" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="1117906.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014005028" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 5.8 MI W OF SH 349" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="650263" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="650263.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014005029" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="AT 7.6 MI E OF US 190" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="522572" DIST_LET_DATE="11/1/2026" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 6 - Bridge Program (2706)" FUND_CAT1_PID="BMN" FUND_CAT1_AMT="522572.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014006036" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="SERVICE RD" LIMITS_TO_DSCR="." PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="5/30/2024" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="91550" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="BMN" PROJ_DSCR="Bridge Maintenance" PSE_30_TRGT_DT="1/7/2022" PSE_30_ACTL_DT="10/19/2021" PSE_60_TRGT_DT="2/4/2022" PSE_60_ACTL_DT="2/2/2022" PSE_100_TRGT_DT="4/8/2022" PSE_100_ACTL_DT="4/15/2022" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RELMCO, INC." CNSTR_NTPD_DT="7/14/2022" CNSTR_WKBG_DT="1/11/2023" CNSTR_PCT_TIME_USED="143.78" CNSTR_PCT_COMPLETE="100.46" DSGN_START_TRGT_DT="12/13/2021" DSGN_START_ACTL_DT="9/3/2021" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="10/1/2021" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/8/2022" RTL_ACTL_DT="4/26/2022" CE_SPENT_AMT="12440.50" TOT_SPENT_AMT="12440.50" FUND_CAT1_DSCR="Category 6 - Bridge Program (2206)" FUND_CAT1_PID="ON" FUND_CAT1_AMT="300000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014006037" PT_PHASE="Construction begins within 4 years" HWY_NBR="IH 10" CNTY_NM="Pecos" LIMITS_FROM_DSCR="5.6 MI W OF SH 349" LIMITS_TO_DSCR="CROCKETT COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="887538" DIST_LET_DATE="9/1/2025" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="Odessa" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Robert Ornelas, P.E." TXDOT_CNTCT_PH_NBR="432-498-4772" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_AMT="923040.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014007021" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 290" CNTY_NM="Pecos" LIMITS_FROM_DSCR="SH 349" LIMITS_TO_DSCR="CROCKETT COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="8/3/2023" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="413443" DIST_LET_DATE="9/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Seal Coat" PSE_30_TRGT_DT="4/5/2022" PSE_30_ACTL_DT="3/3/2022" PSE_60_TRGT_DT="5/3/2022" PSE_60_ACTL_DT="4/5/2022" PSE_100_TRGT_DT="7/6/2022" PSE_100_ACTL_DT="7/20/2022" DIST_NM="Odessa" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Nestor Mendoza Jr., P.E." TXDOT_CNTCT_PH_NBR="(432)336-7998" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="10/6/2022" CNSTR_WKBG_DT="6/2/2023" CNSTR_PCT_TIME_USED="87.04" CNSTR_PCT_COMPLETE="101.25" DSGN_START_TRGT_DT="3/9/2022" DSGN_START_ACTL_DT="12/13/2021" ENVCLR_TRGT_DT="7/6/2022" ENVCLR_ACTL_DT="6/21/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="8/2/2022" RTL_ACTL_DT="7/20/2022" CNSTR_SPENT_AMT="419576.76" CE_SPENT_AMT="1787.33" TOT_SPENT_AMT="421364.09" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2301)" FUND_CAT1_AMT="329731.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014008024" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 290" CNTY_NM="Crockett" LIMITS_FROM_DSCR="PECOS COUNTY LINE" LIMITS_TO_DSCR="4.04 MI E OF PECOS COUNTY LINE" PRJ_TIER="" ENERGY="N" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="99740" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="50.00" CNSTR_PCT_COMPLETE="99.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="96094.77" CE_SPENT_AMT="743.27" TOT_SPENT_AMT="96838.04" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="136000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014009026" PT_PHASE="Construction underway or begins soon" HWY_NBR="SH 290" CNTY_NM="Crockett" LIMITS_FROM_DSCR="4.04 MI E OF PECOS COUNTY LINE" LIMITS_TO_DSCR="15.693 MI E OF PECOS COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="N" TRUNK_SYS_FLAG="N" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="385477" DIST_LET_DATE="12/1/2020" CNSTR_CMPNY_LAST_UPDATE_DT="SC" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="This project is being developed by non-TxDOT resources.  Estimates have been provided to TxDOT by these resources." PROJ_LENGTH=" (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="RONALD R. WAGNER &amp; CO., LP" CNSTR_NTPD_DT="1/14/2021" CNSTR_WKBG_DT="6/14/2021" CNSTR_PCT_TIME_USED="50.00" CNSTR_PCT_COMPLETE="99.01" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" CNSTR_SPENT_AMT="397252.11" CE_SPENT_AMT="2874.04" TOT_SPENT_AMT="400126.15" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2101)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="410000.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014010032" PT_PHASE="Construction begins in 5 to 10 years" HWY_NBR="IH 10" CNTY_NM="Crockett" LIMITS_FROM_DSCR="15.9 MI EAST OF PECOS COUNTY LINE" LIMITS_TO_DSCR="29.0 MI EAST OF PECOS COUNTY LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="7205000" DIST_LET_DATE="1/1/2032" CNSTR_CMPNY_LAST_UPDATE_DT="OV" PROJ_DSCR="Preventive Maintenance" PSE_30_TRGT_DT="TBD" PSE_30_ACTL_DT="TBD" PSE_60_TRGT_DT="TBD" PSE_60_ACTL_DT="TBD" PSE_100_TRGT_DT="TBD" PSE_100_ACTL_DT="TBD" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="13.101 (mi)" TXDOT_CNTCT_NM="John DeWitt, P.E." TXDOT_CNTCT_PH_NBR="325-947-9265" CNSTR_NTPD_DT="TBD" CNSTR_WKBG_DT="TBD" DSGN_START_TRGT_DT="TBD" DSGN_START_ACTL_DT="TBD" ENVCLR_TRGT_DT="TBD" ENVCLR_ACTL_DT="TBD" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="TBD" RTL_ACTL_DT="TBD" TOT_SPENT_AMT="0.00" FUND_CAT1_DSCR="Category 1 - Preventative Maintenance &amp; Rehab (2601)" FUND_CAT1_PID="PM" FUND_CAT1_AMT="8069600.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="" LAST_FIN_UPDATE_DT="" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014010034" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Crockett" LIMITS_FROM_DSCR="15.9 MI E OF PECOS CL" LIMITS_TO_DSCR="29.0 MI E OF PECOS CL" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1835738" DIST_LET_DATE="6/1/2022" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="11/5/2021" PSE_30_ACTL_DT="11/5/2021" PSE_60_TRGT_DT="2/25/2022" PSE_60_ACTL_DT="3/14/2022" PSE_100_TRGT_DT="4/22/2022" PSE_100_ACTL_DT="4/22/2022" DIST_NM="San Angelo" PROJ_NOTE="TxDOT Design" PROJ_LENGTH="0.000 (mi)" TXDOT_CNTCT_NM="Jesus Garcia, P.E." TXDOT_CNTCT_PH_NBR="(325)446-9603" CNSTR_CMPNY_NM="ATLANTIC SPECIALTY INSURANCE COMPANY" CNSTR_NTPD_DT="8/2/2022" CNSTR_WKBG_DT="10/5/2022" CNSTR_PCT_TIME_USED="98.52" CNSTR_PCT_COMPLETE="77.04" DSGN_START_TRGT_DT="8/10/2021" DSGN_START_ACTL_DT="8/10/2021" ENVCLR_TRGT_DT="3/15/2022" ENVCLR_ACTL_DT="3/15/2022" UTIL_TRGT_DT="TBD" UTIL_ACTL_DT="TBD" ROW_TRGT_DT="TBD" ROW_ACTL_DT="TBD" RTL_TRGT_DT="4/22/2022" RTL_ACTL_DT="4/22/2022" PE_SPENT_AMT="31431.86" CNSTR_SPENT_AMT="1292602.19" CE_SPENT_AMT="50750.46" TOT_SPENT_AMT="1374784.51" FUND_CAT1_DSCR="Category 8 - Highway Safety Improvement Program (2208)" FUND_CAT1_PID="HES" FUND_CAT1_AMT="1912089.00" TXDOT_CNTCT_LAST_UPDATE_DT="6/12/2025" LAST_CNSTR_UPDATE_DT="6/12/2025" LAST_FIN_UPDATE_DT="6/12/2025" LAST_FUND_UPDATE_DT="6/12/2025" LAST_MLSTN_UPDATE_DT="6/12/2025" LAST_PROJ_UPDATE_DT1="6/12/2025" /><Detail CSJ_NBR="014010035" PT_PHASE="Construction underway or begins soon" HWY_NBR="IH 10" CNTY_NM="Crockett" LIMITS_FROM_DSCR="15.865 MI E OF PECOS CO LINE" LIMITS_TO_DSCR="28.966 MI E OF PECOS CO LINE" PRJ_TIER="" ENERGY="Y" FREIGHT="Y" TRUNK_SYS_FLAG="Y" CNST_EST_CMPLT_DT="" LAST_PROJ_UPDATE_DT="6/12/2025" CNSTR_EST_AMT="1447771" DIST_LET_DATE="7/1/2021" CNSTR_CMPNY_LAST_UPDATE_DT="SFT" PROJ_DSCR="Hazard Elimination &amp; Safety" PSE_30_TRGT_DT="12/30/2020" PSE_30_ACTL_DT="12/